Clear Creek Fish Passage and Instream Flow Enhancement Phase II

Size: px
Start display at page:

Download "Clear Creek Fish Passage and Instream Flow Enhancement Phase II"

Transcription

1 Upper Columbia Regional Application 2017 Clear Creek Fish Passage and Instream Flow Enhancement Phase II Trout Unlimited 103 Palouse Street # PRISM # HWS # 04-CHW Anticipated Request - SRFB: $ 28, Anticipated Request - Tributary Committee: $ 0 Anticipated Request for Proposal: $ 28, Anticipated Other Funding/Contributions/Matches: $ 19, (Name Source, if applicable) Anticipated TOTAL Project Budget: $ 47,173.90

2 Questions Answers Information Resource REGIONAL INFORMATION 1 What Upper Columbia subbasin is the project in? 2 What project category is your project? 3 What Assessment Unit is the project in? 4 What rank restoration and/or protection priority is the assessment unit the project is located in? 5 What is the primary species the project will target? 6 What secondary species will the project will target? 7 What regional PCSRF Metrics will be implemented with this project? 8 What Primary Ecological Concern does the Project Address? (not required for protection projects) 9 What other Ecological Concerns does the Project Address (not required for protection projects? 10 What is the rank priority of the primary ecological concern this project addresses in the assessment unit it occurs (not required for protection projects) Wenatchee Restoration Wenatchee River 04: Chiwawa (CHW) Wenatchee Entiat Methow Okanogan Restoration Design Only Restoration/Protection Protection Assessment Monitoring Click Here for Assessment Unit names 0 Click Here for table of Assessment Unit ranks Steelhead Cutthroat, Spring Chinook, Bull Trout, Rainbow Trout 1 large barrier and 1 small impediment removed; over 5 miles potential upstream habitat made accessible Habitat Quantity Anthropogenic Barriers N/A 11 Where is the project? , Steelhead Spring Chinook Bull trout Steelhead Spring Chinook Bull trout Other (please name) Click Here for regional PCSRF Metric definitions Click here for Ecological Concern definitions See above 2 Click here for table of Ecological Concern ranks by assessment unit

3 Regional Technical Team - Summary Information Click here for complete RTT scoring criteria QUESTION 1 In one sentence, what is the purpose of your project? 2 Location of the Restoration Project SUMMARY INFORMATION The purpose of the project is to increase accessible habitat for steelhead and other salmonids. Project will occur in Clear Creek at approximate RM Project is located in Chiwawa River Assessment Unit (MaSA for steelhead and spring Chinook; SR and FMO for bull trout). Project will provide access to several miles of high quality habitat on undeveloped forest lands. 3 In one sentence, identify what you are going to do Project will remove one significant passage barrier and one small passage impediment. 4 How long will it take for the benefits of the project to be realized and how long are they estimated to persist? Channel development through reservoir above diversion dam location will occur during high flow season within several months following removal of the barrier. Benefits are permanent. 5 Benefits to Freshwater Survival or Capacity Habitat increases as a result of this barrier removal project provide an opportunity for increased salmonid production in Clear Creek.

4 Citizens Advisory Committee Ranking Criteria and Summary Information For complete CAC ranking criteria click here CRITERIA SUMMARY INFORMATION Criterion 1: Benefits to Fish and Certainty of Success (60 pts. as a weighted percentage based upon RTT score) Is the project consistent with Yes the Recovery Plan Implementation Strategy? Is the project/assessment based Yes on proven scientific methods that will meet objectives? Are there any obstacles that could delay the implementation of this project or study (e.g. permitting, design)? Criterion 2: Project Longevity (30 points) Permitting is the only possible delay. Trout Unlimited has already facilitated site consultations with permitting representatives from WDFW, Ecology, and US Army Corps of Engineers and an appropriate permitting pathway is being fleshed out. Who has the responsibility to manage and maintain the project? What is the responsibility of current or future landowners? Has the sponsor successfully implemented projects in the past? Are the benefits associated with the project in perpetuity? *Will the project last only a few years? Is there a high risk of failure associated with this project? Trout Unlimited will observe physical changes following barrier removal. This water diversion site will be decommissioned and the project requires no long term maintenance. Yes in particular, this project aims to follow the model of a diversion dam removal completed by Trout Unlimited on Beaver Creek just a few miles south of the subject project location. Yes, this is a permanent barrier removal. No Criterion 3: Project Scope (15 points) How much habitat is being protected or gained? Over 5 miles of potential habitat will be made accessible, at least 3 miles of which has perennial flow. Are threats imminent? Is the scale of the proposed action appropriate? Criterion 4: Community Support (25 points) Threats are present and ongoing fish rarely pass the barrier moving upstream. Yes *Has there been public outreach about this project to assess the level of community support? *Does the project build community support for salmon recovery efforts? *Is there any community outreach planned during and/or after implementation? Trout Unlimited engages in ongoing outreach with the project landowner and neighboring property owners to discuss project activities. Outreach activities to date include: regular meetings with project landowner, site walks with facilities manager, project meeting with neighbors, well monitoring study with neighbors, periodic phone calls and updates with neighbors. The project landowner is a stakeholder in decision-making related to engineering, contractor selection, site plans, permitting, and regulatory communications.

5 Has the project sponsor secured landowner participation or acceptance? Will there be public access? Yes, a formal agreement is in place and the landowner is an active partner in project planning and decision-making. No, the barrier is on private land. However, most land upstream of the barrier is managed by the US Forest Service and is open to the public. Will the project create benefits or raise concerns for particular groups or the community at large? What is the breadth and strength of the partnership supporting the project (technical support, financial, and in-kind contributions, labor)? Criterion 5: Economics (20 points) Yes. The subject project will enhance fisheries and restore natural geomorphology to a stream reach. Furthermore, the subject project is a component of a larger flow enhancement effort that increases late season flows in Clear Creek by up to 20% and facilitates water supply system upgrades for a large campground resort. USFWS is providing technical support. The landowner is a cooperative, engaged project partner and is contributing approximately 30% of project costs. Neighboring landowners have provided feedback and been cooperative and engaged through project planning and groundwater analysis. WDFW facilitated screening of a small irrigation diversion on site and supports TU s efforts to remove the barrier and decommission the larger potable diversion. Does the project represent an opportunity for economic benefit? Will this project help the region move closer to delisting or reduce regulatory intervention? Is the project budget clearly defined and reasonable? How much benefit does the project create for the dollars invested? Yes. Local contractors will be hired for the diversion removal and eventually for whole project construction (new water system implementation not part of this funding request). Most likely. The project will provide access to several miles of high quality habitat and expand fish population/production capacity in Clear Creek. Yes. The budget is based on prior permitting efforts and a contractor consultation. Removal of the barrier should be straightforward. Miles of habitat access achieved is high for the cost.

6

7 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal Appendix C-3: Restoration, Acquisition, and Combination Project Proposal Project Number Project Name Clear Creek Fish Passage and Instream Flow Enhancement Phase II Sponsor Trout Unlimited List all related projects previously funded or reviewed by RCO: Project # or Name Status Choose a status Choose a status Choose a status Status of Prior Phase Deliverables and Relationship to Current Proposal? If previous project was not funded, describe how the current proposal differs from the original. N/A Submit this proposal as a PRISM attachment titled Project Proposal Project brief. The purpose of the project is to restore local reach geomorphology and access to quality habitat by removing passage barriers on Clear Creek. Project location. The project site is located at approximate RM 0.65 on Clear Creek, Chelan County, WA. Problem statement. Clear Creek is the first perennial tributary of the Chiwawa River upstream of the confluence of the Chiwawa River with the Wenatchee River and located in a major spawning area for steelhead and spring Chinook. The area offers spawning/rearing and foraging/overwintering habitat for bull trout. Resident rainbow and cutthroat trout also inhabit the assessment unit. Access to a majority of habitat in Clear Creek is impeded by a 10-ft tall rock-concrete- Page 1 Manual 18, Salmon Recovery Grants March 2017

8 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal sandbag potable water diversion dam located at approximate RM Trout Unlimited (TU) has been working with the landowner to replace the surface diversion with a groundwater well (Clear Creek Fish Passage and Instream Flow Enhancement Phase I), which will enable removal of the diversion dam (Phase I is scheduled for construction in summer 2017). Washington Department of Fish and Wildlife redd surveys conducted from suggest the dam prevents a majority of adult upstream steelhead migration as 48 of 50 surveyed redds were located downstream of the impoundment despite several miles of quality habitat on undeveloped forest lands upstream of the dam. Since the barrier blocks upstream passage of most adult steelhead, other adult and juvenile salmonids are also unlikely to move upstream of the diversion. The dam was installed circa 1970 and no consideration was given to fish passage. Today, the passage barrier is well documented and efforts to remedy the problem are supported by regional fisheries restoration strategies and guidance documents. 4. List the fish resources present at the site and targeted by this project. Species Life History Present (egg, juvenile, adult) Current Population Trend (decline, stable, rising) Endangered Species Act Coverage (Y/N) Steelhead E, J, A stable Y Bull Trout E, J, A stable Y Spring unknown stable Y Chinook Summer Chinook unknown stable N Describe the limiting factors, and limiting life stages (by fish species) that your project expects to address. The limiting factor (ecological concern) addressed by this project is reduced habitat quantity resulting from anthropogenic barriers. The barriers primarily impact adult upstream migration, which reduces the capacity for fish production within the Clear Creek watershed. Project goals and objectives. When answering the questions below please refer to Chapter 4 of the Washington Department of Fish and Wildlife s Stream Habitat Restoration Guidelines for more information on goals and objectives. A. What are the project s goals? The project goal is to enhance salmonid production capacity in the Clear Creek watershed by removing anthropogenic barriers that severely limit upstream passage to over 5 miles of habitat located primarily on US Forest Service lands. Target species include ESA-listed Steelhead and Bull Trout along with resident cutthroat and rainbow trout, with potential benefits for Spring and Summer Chinook. Biological benefits for these species will be realized year round and for all life stages for both anadromous and resident salmonids. Page 2 Manual 18, Salmon Recovery Grants March 2017

9 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal B. What are the project s objectives? i. Remove a diversion dam that is a significant barrier to fish passage and an unused weir that is a minor impediment to fish passage. ii. Restore access to over 5 miles of high quality potential habitat located primarily on US Forest Service lands. iii. Complete barrier removals during the 2018 in-water work window. C. What are the assumptions and constraints that could impact whether you achieve your objectives? The project will proceed provided funding and permitting are secured. Landowner agreement is already secured. 7. Project details. A. Provide a narrative description of the proposed project. Describe the specific project elements and explain how they will lead to the project s objectives. Include relevant existing project documentation (if any) as attachments in PRISM. B. Provide a scope of work and detailed list of project deliverables. Provide a detailed description of the proposed project tasks, who will be responsible for each, what the project deliverables will be, and a schedule for accomplishing them. C. Explain how the sponsor determined cost estimates. Costs were determined based on prior permitting for and completion of similar projects by Trout Unlimited as well as a contractor consultation in March D. Describe the design or acquisition alternatives considered to achieve the project s objectives. Three alternatives were considered: i. Do nothing: Leave the passage barrier in place. This alternative does not solve the problem and is the least preferred alternative. ii. Engineer and construct a step-pool passage corridor: Although passage could be achieved through an engineered approach, this alternative is expensive. Trout Unlimited was concerned the price would reduce the project value. Furthermore, Trout Unlimited prefers approaches that restore natural process and conditions prior to human impact. iii. Remove the physical barrier and allow the stream to return to its natural geomorphology: This is the least expensive of the two dosomething alternatives considered. WDFW and USFWS Page 3 Manual 18, Salmon Recovery Grants March 2017

10 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal representatives who visited the site suggested this natural approach as the most cost-effective. They also indicated this natural approach may require less maintenance over the long term should problems arise from an engineered approach. Both representatives cited the nearby Beaver Creek diversion dam and grade control removal effort as a model for removing barriers and allowing the stream to do the work. E. How have lessons learned from completed projects or monitoring studies informed this project? WDFW redd surveys demonstrated the diversion dam is a passage barrier. A previous barrier removal project in the vicninity informed the preferred restoration alternative. F. Describe the long-term stewardship and maintenance obligations for the project or acquired land. There are no long-term maintenance or stewardship obligations. Trout Unlimited will photo-document stream geomorphological changes following removal Explain why it is important to do this project now instead of later. Trout Unlimited has secured an agreement with the landowner that will allow the diversion dam to be removed following completion of Phase I (new water system implementation). The diversion dam is the most significant barrier remaining in Clear Creek as several culvert barrier issues were addressed in a previous project completed by Chelan County Natural Resources and an undersized culvert at the Chiwawa Loop Road crossing will be replaced by Chelan County Public Works in June If the project is a part of a larger overall project or strategy, describe the goal of the overall strategy, explain individual sequencing steps, and which of these steps is included in this application for funding. Removal of the diversion constitutes Phase II of Trout Unlimited s Clear Creek Fish Passage and Instream Flow Enhancement Project. 10. Describe the sponsors experience managing this type of project. Trout Unlimited has managed dozens of successful instream flow enhancement and passage barrier projects in Washington State, including a very similar project completed in 2014 on Beaver Creek just 3 miles south of the subject project location. 11. List all landowner names. MHC TT, Inc. (Thousand Trails Leavenworth campground resort) is the only landowner. List project partners and their role and contribution to the project. US Fish 12. and Wildlife Service (technical assistance), HCP Tributary Committees (funding), Page 4 Manual 18, Salmon Recovery Grants March 2017

11 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal MHC TT, Inc. (funding and implementation assistance), WDFW (advising and permitting) 13. Stakeholder outreach. Removal of the diversion dam is contingent on a replaced water supply and TU and the landowner successfully found a reliable groundwater supply. In June 2017Chelan County Public Works is replacing an undersized (but passable) culvert downstream of the diversion dam so proposed project activities were scheduled to not conflict with the culvert replacement. Outreach has been conducted with neighboring residential property owners. Supplemental Questions Restoration Project Supplemental Questions Answer the following supplemental questions: A. Will the sponsor complete, or already completed, a preliminary design, final design, and design report (per Appendix D) before construction? No i. Trout Unlimited is working with USFWS restoration biologist Robes Parrish on the diversion removal plan. No formal design is anticipated. The removal may occur as a single effort or in stages. B. Will a licensed professional engineer design the project? No i. N/A C. If this project includes measures to stabilize an eroding stream bank, explain why bank stabilization there is necessary to accomplish habitat recovery. N/A D. Describe the steps the sponsor will take to minimize the introduction and spread of invasive species during construction and restoration. The contractor will thoroughly clean equipment prior to mobilization and demobilization. Site disturbance will most likely be limited to an exisiting access road. Fish Passage Project Supplemental Questions Answer the supplemental questions below. NOTE: For fish passage design and evaluation guidance, applicants should refer to the Washington Department of Fish and Wildlife s Fish Passage Barrier and Surface Water Page 5 Manual 18, Salmon Recovery Grants March 2017

12 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal Diversion Screening Assessment and Prioritization Manual and the Water Crossing Design Guidelines (2013) For engineering design questions or technical assistance, contact Don Ponder, Department of Fish and Wildlife, (360) To schedule fish passage and diversion inventory and assessment training, contact Justin Zweifel, Department of Fish and Wildlife, (360) A. Describe the passage problem (outfall, velocity, slope, etc.) Height/slope of diversion dam B. Describe the current barrier (age, material, shape, and condition). Installed circa 1970, concrete-rock-sandbag construction, fair condition C. Is the current barrier a complete or partial barrier? Near complete barrier D. If a culvert or arch is proposed, does it employ a stream simulation, no slope, hydraulic, or other design? N/A E. Describe the amount and quality of habitat made accessible if the barrier is corrected. Has the project received a Priority Index (PI) number? Over 5 miles of high-quality habitat located almost entirely on US Forest Service lands will be made accessible through barrier removal. It is not known if the barrier has a PI number but it is registered in the WDFW barrier inventory database with Site ID # F. Identify if there are additional fish passage barriers downstream or upstream of this project. No. Chelan County Natural Resources corrected culvert barrier issues on US Forest Service property several years ago with support from SRFB. An undersized (but passable) culvert will be replaced by Chelan County Public Works in June G. Engineering licensing requirement. Will a licensed professional engineer design the project? No i. Robes Parrish, USFWS, has worked with TU on similar barrier removal projects in the past. A licensed engineer is not needed for this work. Page 6 Manual 18, Salmon Recovery Grants March 2017

13 Appendix C-3: Restoration, Acquisition, and Combination Project Proposal Comments Use this section to respond to the comments received after the initial site visits, and then again after submitting the final application. Response to Site Visit Comments Please describe how the sponsor responded to the review panel s initial site visit comments. RCO recommends that the sponsor list each review panel comment and question and identify the response. The sponsor may use this space to respond directly to the comments. Response to Post-Application Comments Please describe how the sponsor responded to the review panel s post-application comments. RCO recommends that the sponsor list each of the review panel s comments and questions and identify the response. The sponsor may use this space to respond directly to the comments. Page 7 Manual 18, Salmon Recovery Grants March 2017

14 Clear Creek Fish Passage and Instream Flow Enhancement Project Responses to RTT and SRP Comments What is the status of the Chiwawa Loop Road and the Wenatchee-Chiwawa Irrigation District ditch? Chiwawa Loop Road: The section of Chiwawa Loop Road that crosses Clear Creek is currently being improved. In addition to roadway widening and repaving, the existing undersized pipe culvert will be replaced with a large box culvert. Wenatchee-Chiwawa Irrigation District ditch: The WCID ditch is not associated with Clear Creek. A review of Ecology s GWIS and Water Resources Explorer as well as conversations with Ecology personnel yielded no water right relationship between WCID and Clear Creek. WCID passes over the top of Clear Creek in a box flume located on the project landowner s property downstream of the diversion. What does the diversion structure look like below ground? Neither TU nor the landowner know what the dam looks like underground. The water right permit application suggests the dam specifications are 10ft high, 15 across the bottom, 8 feet across the top, and constructed of earth/concrete. No exploratory digging has been completed. Recently, TU had a contractor visit the site and it was recommended TU use a metal detector to identify rebar-fortified concrete, which could provide some indication of dam structure/shape below ground. The actual water diversion intake is a cylindrical concrete infiltration chamber. It will be decommissioned when the new well water system is installed. TU may want to consider the geomorphic response following removal of the diversion dam. USFWS and TU completed a topographic survey to gather data useful in estimating the volume of the sediment wedge that has built up behind the dam. We anticipate a head cut. Some sediment will flush downstream and fall from suspension in the landowner s ponds, while some will continue downstream. Are there issues with fish passage below the ponds? Has anyone evaluated passage at this site. Fish spawn below this area at higher densities, which could mean a passage issue. TU has not specifically evaluated fish passage below the ponds and does not perceive any passage barrier at or just below the ponds there are no impeding structures or natural conditions identified that would block fish movement. Several years ago Yakama Nation conducted snorkel surveys in the ponds and found juvenile O. mykiss. WDFW surveyors identified redds above the ponds. There is not much area for fish to spawn between the ponds and the diversion structure, which may explain higher redd densities in the reach below the ponds. Are there plans to monitor passage past the project area? TU has not proposed any monitoring past the project area. Jeremy Cram suggested WDFW may be able to offer a PIT-tag array. TU is in the area frequently and would be happy to help install and maintain the array. TU suggests an array be installed as soon as possible so some pre-project monitoring could be achieved. TU thanks the RTT and SRP for their comments.

15 Clear Creek Fish Passage and Instream Flow Enhancement Phase II Trout Unlimited Project Cost Estimate TASK UNIT NO. OF UNITS NOTES SUBTOTAL Administration Project Management hour 160 includes 16.12% NICRA $ 6, Travel Mileage mile 1200 Consulting Services Permitting Contractor Services Diversion Removal lump sum daily cost 1 3 based on 2017 federal mileage rate based on previous permitting efforts based on contractor consultation $ $ 5, $ 15, TOTAL ESTIMATED PROJECT COST $ 28,094.27

16 Clear Creek Fish Passage and Instream Flow Enhancement Project Stehekin River Lake Chelan Location of Chelan County in Washington State Little Wenatchee River Chiwawa River Entiat River Clear Creek Project Icicle Creek Leavenworth Wenatchee River C h e l a n C o u n t y Wenatchee Miles This map provided "as is" and without warranty of any kind.

17 Potable water supply diversion dam Unused weir

18 Barrier Evaluation Form - Dam Location Information Project Name: Clear Creek Fish Passage Phase II SRFB Project #: County: Chelan HPA #: unknown Parcel #: GPS Location: Datum NAD83; Decimal Degrees Latitude: Longitude: 47.8 ¼ Section: NENE Section: 31 Township: 27 Range: 18 East West Stream Name: Clear Creek Tributary To: Chiwawa River WRIA #: 45 Driving Directions: North from Plain 3 miles, past Thousand Trails entrance, diversion dam located just east of Chiwawa Loop Rd Landowner Information Landowner: MHC TT, Inc. Mailing Address: City: State: Zip: Telephone: ( ) Cell: ( ) Fax: ( ) Landowner Agent: Cody Gillin Mailing Address: 103 Palouse Street #14 City: Wenatchee State: WA Zip: Telephone: (509) Cell: ( ) Fax: ( ) cgillin@tu.org Evaluator Information Evaluator Name: Cody Gillin Affiliation: Project Manager/Landowner Rep Mailing Address: City: State: Zip: Telephone: Fax: Cell: Barrier Information (measurements in meters) Is There a Road on Top of the Dam? Yes No If No, Stop, the Dam Does Not Qualify for the FFFPP, if Yes Continue. Is the Stream Fish-bearing? Yes No Unknown Species, if Known: Steelhead Date of Visit: Fish-bearing Criteria: Fish Observation Stream Type SalmonScape Physical Criteria Other: Stream flow: Perennial Intermittent Unknown Source of Information: Primary Purpose: Debris Control Flood Control Hydroelectric Irrigation Navigation Stock Pond Water Quality Recreation Water Supply Tailings Other (describe) Type: Concrete Earth Rock Masonry Metal Timber Other Span: Full Partial Outlet Type: Spillway Standpipe Flashboard Riser Culvert Operation Timing: Year-round Seasonal Length: Height: Water Surface Difference: Plunge Pool Depth: Fishway Present? Yes No Description/comments: Is this Dam a Fish Passage Barrier? Yes No Unknown Problem with Dam: WS drop Depth Other Unspecified Percent Passability: 0% 33% 67% 100% Bankfull Width (outside of dam influence): Road Width: Will this Dam be Entered into the WDFW-FPDSI (formerly SSHEAR) Database? Yes No If Yes, Site ID #: Manual 18, Salmon Recovery Grants March 2017

Newaukum Watershed Culvert Assessment

Newaukum Watershed Culvert Assessment Newaukum Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson July 2002 Funded by: Chehalis Fisheries Restoration

More information

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16 2016 SRFB Grant Round Version: 2/19/16 Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region The Project Funding Process Presented by the Snake River Salmon Recovery Lead Entity

More information

Planning and Combination (Planning and Acquisition) Project Proposal

Planning and Combination (Planning and Acquisition) Project Proposal Planning and Combination (Planning and Acquisition) Project Proposal Project Number 16-2095 Project Name Tucannon Mobile PIT Tag Detection Sponsor Washington Dept of Fish and Wildlife List all related

More information

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mission Statement The mission of the Mid-Columbia Fisheries Enhancement Group is to restore self-sustaining

More information

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3

Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Report for Marsh Creek and Albion River Instream Fish Barrier Removal Flynn Creek Road, CR 135, M.P. 8.1 and 8.3 Project Title: Marsh Creek and Albion River Instream Fish Barrier Removal, Flynn

More information

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is

More information

Follow this and additional works at:

Follow this and additional works at: University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

South Fork Chehalis Watershed Culvert Assessment

South Fork Chehalis Watershed Culvert Assessment South Fork Chehalis Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson March 2003 Funded by: The Washington State

More information

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1. Please find attached a response from The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) for Project # 2008-301-00, Habitat Restoration Planning, Design and Implementation within

More information

STEELHEAD SURVEYS IN OMAK CREEK

STEELHEAD SURVEYS IN OMAK CREEK STEELHEAD SURVEYS IN OMAK CREEK 2002 Annual Report Prepared by Chris Fisher John Arterburn Colville Confederated Tribes Fish and Wildlife Department P.O. Box 150 Nespelem, WA 99155 Prepared for Project

More information

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP Mid-Columbia Fisheries Enhancement Group MISSION STATEMENT The Mid-Columbia Fisheries Enhancement Group is a non-profit organization dedicated to restoring selfsustaining salmon and steelhead populations

More information

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Talk overview: Restoration projects

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Sub-watershed Summaries

Sub-watershed Summaries Project Description The Salmon Drift Creek Watershed Council (SDCWC) has focused their efforts in the Salmon River estuary for the past few years. The multifaceted partnership effort is nearing completion

More information

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council Annual Report for Fiscal Year 2012-2013 and Future Plans for the Tillamook Bay Watershed Council A report prepared for the Tillamook County Board of Commissioners August 2013 Table of Contents: Recently

More information

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON To: Branch of Natural Resources P.0. Box C, Warm Springs, Oregon 97761 Phone (541) 553-2002/2003 Fax (541) 553-1994 The Independent Science

More information

Packwood Hydroelectric Project Barrier Analysis December 12, 2006

Packwood Hydroelectric Project Barrier Analysis December 12, 2006 Packwood Hydroelectric Project Barrier Analysis December 12, 2006 Study Area Natural barriers to upstream fish passage on Lake Creek at RM 1.03 and RM 1.95 Snyder Creek culvert under the Project tailrace

More information

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 107 FERC 61,282 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, and Joseph T. Kelliher. Public Utility District No. 1 of

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

PRE- PROPOSAL FORM - Lewis River Aquatic Fund PRE- PROPOSAL FORM - Lewis River Aquatic Fund 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest 2. Organization purpose Resource management agency 3. Project manager (name,

More information

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell: From: To: Cc: Subject: Date: Attachments: Hemstrom, Steven "Lewis, Stephen" Sokolowski, Rosana 2014 Rocky Reach Bull Trout Report Wednesday, June 18, 2014 3:01:07 PM Final 2014 Rocky Reach Bull Trout Observations

More information

MCCAW REACH RESTORATION

MCCAW REACH RESTORATION Final Report MCCAW REACH FISH RESTORATION PHASE B Jack McCaw Inland Empire Action Coalition http://www.wwccd.net/ Phone: 509-956-3777 Hours: 8:00-4:30 Walla Walla County Conservation District Snake River

More information

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase III September 2016

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase III   September 2016 Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase III http://www.wildfishconservancy.org/maps September 2016 Water typing is the state-sanctioned process of mapping

More information

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA + 2 nd Steelhead Summit October 27 & 28, 2016 in San Luis Obispo, CA 1 + Session Overview Sponsors: California Trout City of San Luis Obispo Sustainable Conservation California Conservation Corps Cachuma

More information

WHATCOM COUNTY FISH PASSAGE BARRIER INVENTORY FINAL REPORT

WHATCOM COUNTY FISH PASSAGE BARRIER INVENTORY FINAL REPORT WHATCOM COUNTY FISH PASSAGE BARRIER INVENTORY FINAL REPORT January, 2006 IAC Project Number: 01-1258 N Project Sponsor: Whatcom County Public Works 5280 Northwest Drive, Suite C Bellingham, WA 98226 Grant

More information

COLUMBIA LAKE DAM REMOVAL PROJECT

COLUMBIA LAKE DAM REMOVAL PROJECT COLUMBIA LAKE DAM REMOVAL PROJECT Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass?

Guidance Note. Hydropower Guidance Note: HGN 8 Fish Passage. When do you need to install a fish pass? Guidance Note Hydropower Guidance Note: This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments and EU obligations.

More information

COA-F17-F-1343 YEAR END REPORT

COA-F17-F-1343 YEAR END REPORT DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,

More information

Southern Oregon Coastal Cutthroat Trout

Southern Oregon Coastal Cutthroat Trout Species Management Unit Description Southern Oregon Coastal Cutthroat Trout The Southern Oregon Coastal Cutthroat Trout SMU includes all populations of cutthroat trout inhabiting ocean tributary streams

More information

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013 Program - Aquatic Organisms and Stream Crossings Ecological Connectivity A watershed is a network of channels that drain a common boundary. Channel characteristics formed by interaction of precipitation,

More information

The Blue Heron Slough Conservation Bank

The Blue Heron Slough Conservation Bank 1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River

More information

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # Burns Paiute Tribe Fisheries Department Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # 199701900 Prior to 1990 Technical and/or scientific background Malheur population,

More information

Gold Action #1: Instream and Floodplain Habitat Restoration

Gold Action #1: Instream and Floodplain Habitat Restoration Gold Action #1: Instream and Floodplain Habitat Restoration Action Type: Recovery Threat addressed: Severity: Significant Spawning/egg incubation, Pre/post spawning migrations, Juvenile rearing Action

More information

Yakima/Klickitat Fisheries Project

Yakima/Klickitat Fisheries Project Yakima/Klickitat Fisheries Project Lower Yakima River Supplementation and Research Project Operations and Maintenance Annual Report 2002-2003 March 2004 DOE/BP-00006677-1 This Document should be cited

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

THE WESTERN NATIVE TROUT INITIATIVE PLAN FOR STRATEGIC ACTIONS November GOALS, OBJECTIVES, and KEY STRATEGIC ACTIONS

THE WESTERN NATIVE TROUT INITIATIVE PLAN FOR STRATEGIC ACTIONS November GOALS, OBJECTIVES, and KEY STRATEGIC ACTIONS THE WESTERN NATIVE TROUT INITIATIVE PLAN FOR STRATEGIC ACTIONS November 2016 INTRODUCTION In January 2008, after an intensive scoping and development process, the Western Native Trout Initiative (WNTI)

More information

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 145 FERC 62,070 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Douglas County, Washington Project No. 2149-163 ORDER APPROVING BULL TROUT STRANDING, ENTRAPMENT,

More information

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0 Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL 26/02/2015 Version 2.0 1 Table of Contents List of Tables... 2 Introduction... 3 Methods... 4 Preliminary

More information

Interim Guidance Fish Presence Absence

Interim Guidance Fish Presence Absence Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced

More information

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT:

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT: Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington July 2, 2013

More information

Fish Passage at Road Crossings Assessment Boise National Forest FY 2004

Fish Passage at Road Crossings Assessment Boise National Forest FY 2004 Culvert Inventory Summary 2004 - Boise National Forest Fish Passage at Road Crossings Assessment Boise National Forest FY 2004 Feather River at Road #135 Crossing By Michael S. Kellett, Fishery Biologist

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County has been proposed for

More information

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT

SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT SELBY CREEK SILVERADO TRAIL CULVERT FISH PASSAGE ASSESSMENT NAPA COUNTY, CALIFORNIA PREPARED BY NAPA COUNTY RESOURCE CONSERVATION DISTRICT 1303 JEFFERSON ST. SUITE 500B NAPA, CALIFORNIA 94559 WWW.NAPARCD.ORG

More information

R & E Grant Application 15 Biennium

R & E Grant Application 15 Biennium R & E Grant Application 15 Biennium Project #: 15-026 Project Information R&E Project Request: Total Project: Start Date: End Date: Organization: Cedar Creek Hatchery Raceway and Pump Replacement $500,000.00

More information

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Executive Summary. Map 1. The Santa Clara River watershed with topography. Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa

More information

Status of Prior Phase Deliverables and Relationship to Current Proposal?

Status of Prior Phase Deliverables and Relationship to Current Proposal? Restoration, Acquisition, and Combination Project Proposal Project Number 15-1309 Project Name Steptoe Creek perched culvert replacement Sponsor Palouse Conservation District List all related projects

More information

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II October 2014

Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II  October 2014 Wild Fish Conservancy Watertype Assessment Project Summary West Sound Watersheds Phase II http://www.wildfishconservancy.org/maps October 2014 Water typing is the state-sanctioned process of mapping the

More information

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement Background Why is the NH Fish and Game Department interested in culverts? Block fish migration Reduce opportunities

More information

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Susan Ireland, Kootenai Tribe of Idaho Future of our Salmon Conference Technical Session August 2016 Healthy Floodplains,

More information

Yakima River Basin Coho Reintroduction Feasibility Study

Yakima River Basin Coho Reintroduction Feasibility Study Yakima River Basin Coho Reintroduction Feasibility Study Yakima Klickitat Fisheries Project Goals and Mission The purposes of the YKFP are to: enhance existing stocks of anadromous fish in the Yakima and

More information

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management Primary Outcome Area: Economy & Jobs Secondary Outcome Area: Healthy Environments Program Contact: Ed Bowles, 503-947-6206

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report

Subject: Wells Hydroelectric Project FERC Project No Bull Trout Management Plan and Incidental Take Annual Report Ms. Jessica Gonzales April 15, 2015 Wenatchee Office Lead Central Washington Field Office U. S. Fish and Wildlife Service 215 Melody Lane, Suite 119 Wenatchee, WA 98801-5933 Subject: Wells Hydroelectric

More information

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Prepared by: Phil Edwards, Rhode Island Department of Environmental

More information

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project #

Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # Fish Passage Culvert Assessment for Cahilty Creek Watershed FIA Project # 4602004 Prepared for Weyerhaeuser Company Ltd. Jason Ladyman R.P.F. 1550 Mission Flats Road PO Box 40 Kamloops BC V2C 5K3 Prepared

More information

Summary of the Pilot Assessment of Three Potential Fish Barriers on Battle Creek

Summary of the Pilot Assessment of Three Potential Fish Barriers on Battle Creek Summary of the Pilot Assessment of Three Potential Fish Barriers on Battle Creek Laurie A. Earley March 2014 U.S. Fish and Wildlife Service, Red Bluff Fish and Wildlife Office 10950 Tyler Road, Red Bluff,

More information

Wenatchee Spring Chinook Relative Reproductive Success Study. Andrew Murdoch (WDFW) Michael Ford (NOAA) Michael Hughes (WDFW)

Wenatchee Spring Chinook Relative Reproductive Success Study. Andrew Murdoch (WDFW) Michael Ford (NOAA) Michael Hughes (WDFW) Wenatchee Spring Chinook Relative Reproductive Success Study Andrew Murdoch (WDFW) Michael Ford (NOAA) Michael Hughes (WDFW) Acknowledgements Bonneville Power Administration Chelan PUD Grant PUD Study

More information

Conserving the Forests, Lakes and Streams of Northeast Michigan

Conserving the Forests, Lakes and Streams of Northeast Michigan 4241 Old US 27 South, Suite 2, Gaylord, Michigan 49735 (989) 448-2293 www.huronpines.org info@huronpines.org Prioritized Restoration Projects in the AuSable River Watershed Summer 2015 Update from Huron

More information

Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report

Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report Packwood Lake Hydroelectric Project (FERC No. P-2244) Anadromous Salmonid Habitat and Spawner Survey Report Prepared For Prepared By EES Consulting 1155 N. State Street, Suite 700 Bellingham, WA 98225

More information

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ OKANAGAN RIVER RESTORATION INITIATIVE - FAQ Initiative background: The health of the q awsitk w (Okanagan River) has been severely impacted by the channelization works that occurred in the mid-1950 s.

More information

Chadbourne Dam Repair and Fish Barrier

Chadbourne Dam Repair and Fish Barrier Chadbourne Dam Repair and Fish Barrier Final Report for the Western Native Trout Initiative Prepared by: Carol Endicott Yellowstone Cutthroat Trout Conservation Biologist Montana Fish, Wildlife & Parks

More information

2016 Annual Work Plan

2016 Annual Work Plan Rocky Reach Hydroelectric Project FERC No. 2145 2016 Annual Work Plan 2015 Progress Report d per Rocky Reach Settlement Agreement, Sections 15.1.1 & 15.6.5 Reports provided by Chelan PUD Leads: Ray Heit

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

BULL TROUT OPERATIONAL PLAN

BULL TROUT OPERATIONAL PLAN BULL TROUT OPERATIONAL PLAN ROCKY REACH HYDROELECTRIC PROJECT FERC Project No. 2145 April 10, 2001 Public Utility District No. 1 of Chelan County Wenatchee, Washington BULL TROUT OPERATIONAL PLAN This

More information

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5 PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5 2. Organization purpose USFS-Resource management agency WDFW-Fish and Wildlife management

More information

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed

Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed Fish Passage Culvert Inspection (FPCI) Nicklen Creek Watershed FPCI Sites funded by FIA Prepared for: Tolko Industries Ltd., Okanagan Regional Woodlands & British Columbia Timber Sales, Okanagan-Shuswap

More information

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed

1. Project Title Bull Trout Habitat Restoration Project Identification Assessment. 3. Identification of problem or opportunity to be addressed PROPOSAL FORM - Lewis River Aquatic Fund 1. Project Title Bull Trout Habitat Restoration Project Identification Assessment 2. Project Manager Adam Haspiel USFS Abi Groskopf Mount S. Helens Institute (MSHI)

More information

Lake Chelan Kokanee Spawning Ground Surveys 2012 Final Report

Lake Chelan Kokanee Spawning Ground Surveys 2012 Final Report Lake Chelan Kokanee Spawning Ground Surveys 2012 Final Report Spawning kokanee (Oncorhynchus nerka) in Company Creek Chelan County PUD, 2005. (Photo by Brad Buchsieb) Prepared by: Barry G. Keesee And Lance

More information

P.O. Box 65 Hancock, Michigan USA fax

P.O. Box 65 Hancock, Michigan USA fax This PDF file is a digital version of a chapter in the 2005 GWS Conference Proceedings. Please cite as follows: Harmon, David, ed. 2006. People, Places, and Parks: Proceedings of the 2005 George Wright

More information

Strategies for mitigating ecological effects of hatchery programs

Strategies for mitigating ecological effects of hatchery programs Strategies for mitigating ecological effects of hatchery programs Some case studies from the Pacific Northwest Kathryn Kostow Oregon Department of Fish and Wildlife Ecological risks occur when the presence

More information

August 3, To: Rob Jones NOAA Fisheries 1201 NE Lloyd Blvd, Suite 1100 Portland, Oregon Dear Mr. Jones,

August 3, To: Rob Jones NOAA Fisheries 1201 NE Lloyd Blvd, Suite 1100 Portland, Oregon Dear Mr. Jones, August 3, 2010 To: Rob Jones NOAA Fisheries 1201 NE Lloyd Blvd, Suite 1100 Portland, Oregon 97232 Dear Mr. Jones, Public Utility District No.1 of Chelan County (Chelan) respectfully submits the 2009 Wenatchee

More information

OREGON DEPARTMENT OF FISH AND WILDLIFE

OREGON DEPARTMENT OF FISH AND WILDLIFE OREGON DEPARTMENT OF FISH AND WILDLIFE Ladd Marsh Wildlife Area 1 Benefits for all Oregonians 2 The Mission To protect and enhance Oregon's fish and wildlife and their habitats for use and enjoyment by

More information

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project

Final Bull Trout Redd Monitoring Report for the Wallowa Falls Hydroelectric Project Final for the Wallowa Falls Hydroelectric Project East Fork Wallowa River barrier to upstream fish migration, photo courtesy of Kendrick Moholt (FERC No. P-308) December 18, 2017 Prepared by: Jeremiah

More information

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT

DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT DEADWOOD CREEK FISH PASSAGE IMPROVEMENT PROJECT Coho Salmon in Deadwood Creek Project Area - November 2, 2004 FINAL REPORT National Fish and Wildlife Foundation Project #2002-0368-014 CA Department of

More information

Western native Trout Status report

Western native Trout Status report Bull trout (Salvelinus confluentus) Data: Draft Recovery Plan, USFWS, 2002; FR Final Critical Habitat Rule - 2005 Partners: ID, MT, OR, WA, NV, FWS, FS, BLM, NPS, Tribes, AK, Canada Species Status review:

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Restoration & Management Program Oncorhynchus mykiss irideus California Steelhead Distinct Population Segments

More information

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008

Attachment 6. Public Correspondence. Public correspondence received as of July 2, 2008 Attachment 6 Public Correspondence Public correspondence received as of July 2, 2008 May 8, 2008 Roger Smith Oregon Department of Fish and Wildlife 3406 Cherry Avenue N.E. Salem, OR 97303 Mr. Smith and

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Management, Research and Restoration Program Oncorhynchus mykiss irideus California Steelhead - Hot Topics Implementation

More information

Okanagan Sockeye Reintroduction

Okanagan Sockeye Reintroduction Okanagan Sockeye Reintroduction Backgrounder Elders accounts, and other forms of Traditional Ecological Knowledge (TEK) tell us that many species of salmon once came into the Okanagan Valley and tell us

More information

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT TITLE: Upper Rogue Smolt Trapping Project, 1999 STREAM: Big Butte, Little Butte, South Fork Big Butte, Slate and West Fork Evans Creeks

More information

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension Restoration Ecology: Rivers and Streams WFC 10 29 Nov 2010 Restoration of ecosystems often involves creating new systems with only partial resemblance to the original ecosystems Lisa Thompson Fisheries

More information

REVIEW OF USDA FOREST SERVICE COMMUNITY-BASED WATERSHED RESTORATION PARTNERSHIPS APPENDIX J

REVIEW OF USDA FOREST SERVICE COMMUNITY-BASED WATERSHED RESTORATION PARTNERSHIPS APPENDIX J REVIEW OF USDA FOREST SERVICE COMMUNITY-BASED WATERSHED RESTORATION PARTNERSHIPS APPENDIX J Reviews of Watershed Projects Bob Doppelt and Craig Shinn, Portland State University DeWitt John, Bowdoin College

More information

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat

Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat Past, Present and Future Activities Being Conducted in the Klamath River Basin Related to the Protection and Recovery of Fish and Their Habitat National Marine Fisheries Service March 2003 The Department

More information

Hatchery Scientific Review Group Review and Recommendations

Hatchery Scientific Review Group Review and Recommendations Hatchery Scientific Review Group Review and Recommendations Lochsa River Spring Chinook Population and Related Hatchery Programs January 31, 2009 Lochsa River Spring Chinook Population Report Page - 1

More information

Section II: Project Description

Section II: Project Description Project Funding 319 Funds Requested $89,700.00 Matching Funds State Cash Match $78,200.00 Local Cash Match $1,800.00 In-Kind Match $1,000.00 Total Match $81,000.00 Other Federal Funds $24,800.00 Total

More information

Draft. Upper Columbia Spring Chinook Salmon, Steelhead, and Bull Trout Recovery Plan. December 2005 Prepared for Upper Columbia Salmon Recovery Board

Draft. Upper Columbia Spring Chinook Salmon, Steelhead, and Bull Trout Recovery Plan. December 2005 Prepared for Upper Columbia Salmon Recovery Board Draft Upper Columbia Spring Chinook Salmon, Steelhead, and Bull Trout Recovery Plan December 00 Prepared for Upper Columbia Salmon Recovery Board Mission Statement: To restore viable and sustainable populations

More information

Mountain Columbia Province

Mountain Columbia Province Rolling Provincial Review: Implementation 2001-2003 Province 229 Columbia Basin Fish & Wildlife Authority Province FY 2001-2003 Spending Summaries NPCC Recommendations and BPA Spending by Project Category,

More information

Concurrent Sessions C: Prioritization - Oregon Fish Passage Priority List - A Statewide Barrier Prioritization Effort

Concurrent Sessions C: Prioritization - Oregon Fish Passage Priority List - A Statewide Barrier Prioritization Effort University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

The Dipnetter. December published for tribal fishers by the Columbia River Inter-Tribal Fish Commission

The Dipnetter. December published for tribal fishers by the Columbia River Inter-Tribal Fish Commission The Dipnetter published for tribal fishers by the Columbia River Inter-Tribal Fish Commission December 2009 A Record Spring Chinook Salmon Run for 2010 Forecast Marketing Workshops Give Valuable Advice

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Estimated on-the-ground start and end dates: 1 June October 2018

Estimated on-the-ground start and end dates: 1 June October 2018 A. Applicant Information Name of Organization: U.S. Army Corps of Engineers, Carlyle Lake 801 Lake Road, Carlyle, IL 62231 Contact Information: Robert Wilkins, Operations Manager, (618) 594-2484, Robert.Wilkins@usace.army.mil

More information

Black Sturgeon Regional Plan

Black Sturgeon Regional Plan Black Sturgeon Regional Plan This is one of twenty Regional Plans that support implementation of the Lake Superior Biodiversity Conservation Strategy (Strategy). The Strategy, prepared and overseen by

More information

Oregon Coast Coastal Cutthroat Trout

Oregon Coast Coastal Cutthroat Trout Oregon Coast Coastal Cutthroat Trout Species Management Unit Description The Oregon Coast Coastal Cutthroat Trout Species Management Unit (SMU) includes all populations of cutthroat trout inhabiting ocean

More information

Project Completion Abstract Fish Passage Activity ( Engineering Activities)

Project Completion Abstract Fish Passage Activity ( Engineering Activities) Project Completion Abstract Fish Passage Activity ( Engineering Activities) SUBMIT COMPLETED FORM TO DISTRICT MANAGER AND FIA ADMINISTRATOR AFTER PROJECT COMPLETION SECTION A GENERAL INFORMATION Recipient:

More information

Klamath Lake Bull Trout

Klamath Lake Bull Trout Klamath Lake Bull Trout Existing Populations The Klamath Lake Bull Trout SMU is comprised of seven existing populations and four populations classified as extinct or functionally extinct (Table 189). Populations

More information

Merrimack River Watershed MERRIMACK RIVER WATERSHED

Merrimack River Watershed MERRIMACK RIVER WATERSHED MERRIMACK RIVER WATERSHED 96 Merrimack River Watershed Merrimack River Newburyport, Amesbury, Merrimack, Haverhill, Groveland, Methuen, Lawrence, N. Andover, Andover, Dracut, Tewksbury, Lowell, Chelmsford,

More information

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District

Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December Grand Valley Ranger District Amendment to a Biological Assessment/Evaluation completed for the Coon Creek Land Disposal completed December 2007 Grand Valley Ranger District Grand Mesa, Uncompahgre, Gunnison National Forests Prepared

More information

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary X Y Potlatch River Drainage: Largest lower Clearwater River tributary Area = 1500 km 2 Mouth ~ 13 km upstream of Snake/Clearwater confluence X Y Dominated by private land Salmonid Presence: Steelhead,

More information

Understanding the Impacts of Culvert Performance on Stream Health

Understanding the Impacts of Culvert Performance on Stream Health Understanding the Impacts of Culvert Performance on Stream Health Kristin Thomas Aquatic Ecologist Michigan Trout Unlimited Transportation and the Environment Conference 12/5/2018 Importance of adequately

More information