TM-FTTM-ITB Sem DAFTAR PUSTAKA

Size: px
Start display at page:

Download "TM-FTTM-ITB Sem DAFTAR PUSTAKA"

Transcription

1 VIII. DAFTAR PUSTAKA 1. Ikoku, C. U., : Natural Gas Production Engineering, John Wiley & Sons Inc., Tulsa, Oklahoma, Brown, K. E. dan Lea, James. F, Nodal Systems Ahalysis of Oil and Gas Well, PennWell Books, Tulsa, Oklahoma, Oktober Petroleum Expert, Production and System Performance Analysis Software, Edinburgh, Scotland 4. Beggs, D, Production Otimization Using NODAL Analysis, OGCI Publications, Tulsa, Oklahoma. 5. BP Indonesia, Plan of Development, Jakarta. 6. Surya, and CK, Rudy., Prosper Software, BP Indonesia, Jakarta. 7. Svedeman, S. J., Criteria for Sizing Multiphase Flowlines for Erosive/Corrosive Service, SPE Paper, Turner, R.G, Hubbard, M.G., and Dukler, A.E: "Analysis and Prediction of Minimum Flow Rate for the Continuous Removal of Liquids from Gas Wells," J. Pet. Tech (Nov. 1969), Mc. Cain, W.D, : The Properties of Petroleum Fluid, PennWell Publishing Company, Tulsa Oklahoma, API Recommended Practice 14 A, Specification for Subsurface Safety Valve, API, API Recommended Practice 14 B, Design,Installation, Repair, and Operation of Subsurface Safety Valve, API, API Recommended Practice 14 A, Recommended Practice for Installation, Maintaenanceand Repair of Subsurface Safety Valve, API, Craft, B. C., and Hawkins, M. F. : Applied Petroleum Reservoir Engineering, Prentice- Hall Inc., Englewood Cliffs, NJ. 10 TM-FTTM-ITB Sem

2 Lampiran A Tabel A.1 Deviasi sumur Lapangan X XDA-1 XDA-2 XDA-3 XDA-4 XDA-5 MD (ft) TVD (ft) MD (ft) TVD (ft) MD (ft) TVD (ft) MD (ft) TVD (ft) MD (ft) TVD (ft) XDA-6 XDA-7 XDA-8 XDA-9 MD (ft) TVD (ft) MD (ft) TVD (ft) MD (ft) TVD (ft) MD (ft) TVD (ft) Gambar A.1 Trjektori Sumur Lapangan X R Denny Prayogo, , Sem1 2007/

3 Lampiran B Tabel B.1 Sensitivity sumur XDA-4 Label Depth (ft) ID (in) Label Depth (ft) ID (in) Xmas Tree 0 1 Xmas Tree 0 1 XT Base XT Base Tbg Hanger Tbg Hanger F/Coupling F/Coupling P/joint P/joint HP nipple 0 6 HP nipple 0 6 P/joint P/joint Spacer Sub Spacer Sub BA nipple BA nipple P/joint P/joint P/joint P/joint P/J & F/C P/J & F/C Packer Packer Liner Hanger Liner Hanger Mid Perf 8939 Mid Perf 8939 Tabel B.2 Sensitivity WRSV sumur XDA-4 Label Depth (ft) ID (in) Label Depth (ft) ID (in) Xmas Tree 0 1 Xmas Tree 0 1 XT Base XT Base Tbg Hanger Tbg Hanger F/Coupling F/Coupling P/joint P/joint WRSV 0 4 WRSV P/joint P/joint Spacer Sub Spacer Sub P/J old P/J old P/J P/J Packer Packer Liner Hanger Liner Hanger Mid Perf 8939 Mid Perf TM-FTTM-ITB Sem

4 Lampiran C Tabel C.1 Hasil Sensitivity PvD sumur R Denny Prayogo, , Sem1 2007/

5 Lampiran D Gambar D.1 Konfigurasi Tubing Retriveable Safety Valve 14 TM-FTTM-ITB Sem

6 Lampiran E CALCULATION RESULT XDA-1 XDA-2 XDA-3 XDA-4 XDA-5 ID = in depth E E E E ID = in depth E E E E ID = in depth E E E E ID = in depth E E E E ID = in depth E E E E R Denny Prayogo, , Sem1 2007/

7 XDA-6 XDA-7 XDA-8 ID = in depth E E E E ID = in depth E E E E ID = in depth E E E E XDA-9 ID = in depth E E E E WRSV CALCULATION RESULT XDA TM-FTTM-ITB Sem

8 E E E E E E E E E E E E E E E E E E E E XDA , E E E E E E E E E E E E E E E E E E E E+07 XDA R Denny Prayogo, , Sem1 2007/

9 E E E E E E E E E E E E E E E E E E E E XDA E E E E E E E E E E E E E E E E E E E E TM-FTTM-ITB Sem

10 XDA E E E E E E E E E E E E E E E E E E E E+07 XDA E E E E E E E E E E E E E E E E E E E E R Denny Prayogo, , Sem1 2007/

11 XDA E E E E E E E E E E E E E E E E E E E E+07 XDA-8 depth (ft) E E E E E E E E E E E E E E E E E E E E TM-FTTM-ITB Sem

12 XDA E E E E E E E E E E E E E E E E E E E E R Denny Prayogo, , Sem1 2007/

Critical Velocity/ Nodal Stability Gas Well Predictions

Critical Velocity/ Nodal Stability Gas Well Predictions Originally Presented at: Gas Well De-Liquification Workshop Adams Mark Hotel, Denver, Colorado March 5-7, 2007 European Conference Gas Well Deliquification 25-2626 September 2007 Critical Velocity/ Nodal

More information

SPE Copyright 2012, Society of Petroleum Engineers

SPE Copyright 2012, Society of Petroleum Engineers SPE 159645 Successful Application of Venturi Orifice Gas Lift Valve in Kaji-Semoga Field, South Sumatra: A Case Study Nova Arthur Rilian, SPE, Adam Fatchur Rohman, SPE, Kamal Hamzah, SPE, Yoseph Itok Arseto,

More information

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL PRODUCTION I (PP 414) SUBJECT: ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS BY: JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL PROFESSOR MSc. LUIS ANTONIO DEL CASTILLO DE RODRIGUEZ LIMA,

More information

Gas-Well De-Watering Method Field Study

Gas-Well De-Watering Method Field Study 2011 Appalachian Gas Well Deliquification Workshop Pittsburgh, PA June 13-14, 2011 Gas-Well De-Watering Method Field Study Rick D. Haydel, Donald J. Brink, William K. Acker, Gary J. Gassiott, SPE, Altec,

More information

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution! Innovating Gas-Lift for Life of Well Artificial Lift Solution The Unconventional Solution! Glenn Wilde Optimum Production Technologies Inc. Revive Energy Corp. Unconventional Oil & Gas Resources Unconventional

More information

Live well deployment of long perforating gun system using combined CT technologies

Live well deployment of long perforating gun system using combined CT technologies Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker

More information

Dynamic Underbalance (DUB)

Dynamic Underbalance (DUB) Dynamic Underbalance (DUB) Perforating Cam Le Perforating Product Champion Agenda Overview DUB Software Tools Case histories 2011 HALLIBURTON. ALL RIGHTS RESERVED. 2 Dynamic Underbalance Software Dynamic

More information

Production Optimization Using Bean Size Selection for Niger Delta Oil Wells

Production Optimization Using Bean Size Selection for Niger Delta Oil Wells Production Optimization Using Bean Size Selection for Niger Delta Oil Wells Idongesit Effiong Essen 1, Dulu Appah 2, Mfon Godwill Udoaka 3 1,3 Department of Petroleum Engineering, University of Uyo, Uyo,

More information

Deliquification Short Stories

Deliquification Short Stories Gas Well De-Liquification Workshop February 28 - March 2, 2005 Deliquification Short Stories Gordon Gates Deliquification Specialist Bp Houston Assisted By: Danny Patterson, Jess Babbitt, Tony Lott Does

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case

More information

CO2 and Methane Separation Using Finger-Type Slug Catcher at Seabed

CO2 and Methane Separation Using Finger-Type Slug Catcher at Seabed Modern Applied Science; Vol. 12, No. 1; 2018 ISSN 1913-1844 E-ISSN 1913-1852 Published by Canadian Center of Science and Education CO2 and Methane Separation Using Finger-Type Slug Catcher at Seabed Leksono

More information

Reservoir Performance of Fluid Systems with Widely Varying Composition (GOR)

Reservoir Performance of Fluid Systems with Widely Varying Composition (GOR) Reservoir Performance of Fluid Systems with Widely Varying Composition (GOR) A Simulation Approach M. Sc. Thesis Singh Kameshwar December 1997 Declaration I hereby declare that this Master of Science thesis

More information

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation

Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation Iraqi Journal of Chemical and Petroleum Engineering Iraqi Journal of Chemical and Petroleum Engineering Vol.16 No.2 (June 2015) 39-44 ISSN: 1997-4884 University of Baghdad College of Engineering Using

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015

More information

A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field

A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field Iranian Journal of Chemical Engineering Vol. 6, No. 2 (Spring), 2009, IAChE A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field S. R. Shadizadeh, M. Zoveidavianpoor

More information

VortexFlow DX (Downhole) Tool Installation Instructions

VortexFlow DX (Downhole) Tool Installation Instructions VortexFlow DX (Downhole) Tool Installation Instructions www.vortextools.com Page 1 of 10 The VortexFLOW tools are based upon Technology that is a result of U.S.A. patents 6,151,751; 6,659,118; 6,749,374;

More information

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells Gas Well De-Liquification Workshop February 28 - March 2, 2005 Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells Robert Lestz, Eddie Bruner Lynn Rowlan ChevronTexaco OBJECTIVE: 1. Observe

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information

32 nd Gas-Lift Workshop. Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2

32 nd Gas-Lift Workshop. Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2 Denise Lima Artificial Lift Engineer Galileu de Oliveira Artificial

More information

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD Okologume Chinedu Wilfred 1, Ofesi Samuel F. 2 1, 2 Department of Petroleum and Natural Gas Engineering, Federal University of Petroleum

More information

Beam Pumping to Dewater Horizontal Gas Wells

Beam Pumping to Dewater Horizontal Gas Wells 2 nd Annual Appalachian Basin Gas Well Deliquification Seminar Hilton Garden Inn, Pittsburg, PA June 13-14, 2011 Beam Pumping to Dewater Horizontal Gas Wells Lynn Rowlan, Echometer Co. J F Lea, Production

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

Intermittent Gas Lift Utilizing a Pilot Valve

Intermittent Gas Lift Utilizing a Pilot Valve 39 th Gas-Lift Workshop Houston, Texas, USA May 16 20, 2016 Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager May 16 20, 2016 2015 Gas-Lift Workshop 1 Intermittent Gas Lift

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

Determination of Bubble-Point and Dew-Point Pressure Without a Visual Cell

Determination of Bubble-Point and Dew-Point Pressure Without a Visual Cell SPE-169947-MS Determination of Bubble-Point and Dew-Point Pressure Without a Visual Cell R. Hosein, and R. Mayrhoo, The University of The West Indies; W. D. McCain Jr., Texas A&M University Copyright 2014,

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils

Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils 86 Pet.Sci.(29)6:86-9 DOI 1.17/s12182-9-16-x Novel empirical correlations for estimation of bubble point pressure, saturated viscosity and gas solubility of crude oils Ehsan Khamehchi 1, Fariborz Rashidi

More information

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

Advanced Intermittent Gas Lift Utilizing a Pilot Valve Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 29 March 2, 2016 Advanced Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager Intermittent Gas Lift

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

Gas Lift Challenges. Gas-Lift Workshop. Qatar February 4-8, Mike Johnson ExxonMobil Production Company

Gas Lift Challenges. Gas-Lift Workshop. Qatar February 4-8, Mike Johnson ExxonMobil Production Company Gas-Lift Workshop Qatar February 4-8, 2007 Gas Lift Challenges Mike Johnson ExxonMobil Production Company This presentation is the property of the author(s) and his/her/their company(ies). It may not be

More information

Gas Lift Optimization Using Smart Gas Lift Valve

Gas Lift Optimization Using Smart Gas Lift Valve Gas Lift Optimization Using Smart Gas Lift Valve Mohamed A. G. H. Abdalsadig, Amir Nourian, G. G. Nasr, M. Babaie 1 Abstract Gas lift is one of the most common forms of artificial lift, particularly for

More information

Dual Gas Lift Well Analysis Using WellTracer

Dual Gas Lift Well Analysis Using WellTracer 33 rd Gas-Lift Workshop Houston, Texas, USA February 1-5, 2010 Dual Gas Lift Well Analysis Using WellTracer Tony Hord ExxonMobil Production Company This presentation is the property of the author(s) and

More information

A Longer Lasting Flowing Gas Well

A Longer Lasting Flowing Gas Well 2018 Artificial Lift Strategies for Unconventional Wells Workshop Cox Convention Center, February 4 7, 2018 A Longer Lasting Flowing Gas Well New Dual-Tubing Flowing Design Paul Edwards, Production Engineer,

More information

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS

WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS WELLHEADS, FLOWLINES & GAS LIFT INJECTION SYSTEMS The Wellheads, Flowlines and Gas Lift Injection Systems are designed to facilitate production from the reservoir to the platform s process systems. New

More information

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC.

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC. SPE 113661 Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IS INC. Copyright 8, Society of Petroleum Engineers This paper was prepared for presentation

More information

SPE (1) Copyright 1999, Society of Petroleum Engineers Inc.

SPE (1) Copyright 1999, Society of Petroleum Engineers Inc. SPE 5565 Enhancing Liquid Lift From Low Pressure Gas Reservoirs Hiro Yamamoto, SPE, Mobil Exploration and Production, and Richard L. Christiansen, SPE, Colorado School of Mines Copyright 999, Society of

More information

New Viscosity Correlation for Different Iraqi Oil Fields

New Viscosity Correlation for Different Iraqi Oil Fields Iraqi Journal of Chemical and Petroleum Engineering Iraqi Journal of Chemical and Petroleum Engineering Vol.15 No.3 (September 2014) 71-76 ISSN: 1997-4884 University of Baghdad College of Engineering New

More information

Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells

Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 17 20, 2013 Intrinsically Safe Acoustic Instrument Used in Troubleshooting Gas Lift Wells Lynn Rowlan, Echometer Company Carrie-Anne

More information

COPYRIGHT. Gas Lift Fundamentals. This section will cover the following learning objectives:

COPYRIGHT. Gas Lift Fundamentals. This section will cover the following learning objectives: Learning Objectives Gas Lift Fundamentals This section will cover the following learning objectives: Explain the role of gas lift in a real performance analysis process Explain the principles of multi-phase

More information

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 1 Presentation JB AG JCN JR 2 RIG TYPES Land rigs in 2012... total (approx) 3200 Jack Up,... in 2012... total (approx) 485 units 300 * in drilling mode 130 for WD > 350 ft Floaters,...

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Development / installation of. permanent downhole capillary. injection facilities in gas wells with. sub-surface safety valves

Development / installation of. permanent downhole capillary. injection facilities in gas wells with. sub-surface safety valves Development / installation of permanent downhole capillary Gas Well De-Liquification Workshop Denver, Colorado February 28 - March 2, 2005 injection facilities in gas wells with 07/03/2005 File Title Copyright:

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

An approach to account ESP head degradation in gassy well for ESP frequency optimization

An approach to account ESP head degradation in gassy well for ESP frequency optimization SPE-171338-MS An approach to account ESP head degradation in gassy well for ESP frequency optimization V.A. Krasnov, Rosneft; K.V. Litvinenko, BashNIPIneft; R.A. Khabibullin, RSU of oil and gas Copyright

More information

WellTracer. East Texas Gas Producers Association. Carthage, Texas September 21 st, 2010

WellTracer. East Texas Gas Producers Association. Carthage, Texas September 21 st, 2010 WellTracer East Texas Gas Producers Association Carthage, Texas September 21 st, 2010 Welltracer Gas Lift Diagnostics What methods are available for diagnosing leak points and or gas lift efficiency? Diagnostic

More information

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 9 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 Pump Fillage Problem Overview Jim McCoy Lynn Rowlan Tony Podio Ken Skinner Echometer Company Jim@echometer.com

More information

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Review in Oklahoma Identified areas for improvement Design criteria is outdated for play types Vertical separation, cannot

More information

Downhole Gas Separation Performance

Downhole Gas Separation Performance Gas Well Deliquification Workshop Sheraton Hotel, February 20 22, 2017 Downhole Gas Separation Performance Lynn Rowlan Overview Free gas interfering with liquid filling the pump is a major operational

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted

More information

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY

117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY 117 NORWEGIAN OIL AND GAS RECOMMENDED GUIDELINES FOR WELL INTEGRITY No.: 117 Established: 01.10.08 Revision no: 6 Date revised: 08.11.2017 Page: 2 PREFACE This guideline is supported by Norwegian Oil and

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 15871 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon Gas Lift Workshop Doha Qatar 4-88 February 2007 Gas Lift Optimisation of Long Horizontal Wells by Juan Carlos Mantecon 1 Long Horizontal Wells The flow behavior of long horizontal wells is similar to pipelines

More information

31 st Gas-Lift Workshop

31 st Gas-Lift Workshop 31 st Gas-Lift Workshop Houston, Texas February 4-8, 2008 NEW REQUIREMENTS TO GAS LIFT VALVES Øyvind Stokka & Erling Kleppa Petroleum Technology Company This presentation is the property of the author(s)

More information

The Use of Subsea Gas-Lift in Deepwater Applications. Subash Jayawardena, George Zabaras, and Leonid Dykhno Shell Global Solutions (US) Inc.

The Use of Subsea Gas-Lift in Deepwater Applications. Subash Jayawardena, George Zabaras, and Leonid Dykhno Shell Global Solutions (US) Inc. The Use of Subsea Gas-Lift in Deepwater Applications Subash Jayawardena, George Zabaras, and Leonid Dykhno Shell Global Solutions (US) Inc. Contents Why Gas-Lift is Needed Gas Lift Delivery System Design

More information

COPYRIGHT PETROSKILLS

COPYRIGHT PETROSKILLS Production Electrical Submersible Pumps Fundamentals Virtual Session 2 ESP Design Example Manual Design 1 Production ESP Design and Equipment Selection: Nine Steps** 1. Basic data 2. Production capacity

More information

SPE/IADC Abstract

SPE/IADC Abstract SPE/IADC 125311 Pressurized Mud Cap Drilling Drastically Reduces Non-Productive Time in Soka Field, South Sumatera Michael Runtuwene, Sanny Suprihono, and Dany Rizka, SPE, Medco E&P Indonesia, Andi Eka

More information

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs

FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs FRAC FLUIDS AND WATER USAGE Evaluating The Commercial Viability and Success In Using Water-Free Fracs Overview of Presentation BlackBrush Oil & Gas Natural Gas Liquids (NGLs) as frac fluid. Advantages

More information

GAS LIFT IN NEW FIELDS

GAS LIFT IN NEW FIELDS GAS LIFT IN NEW FIELDS GAS LIFT in NEW FIELDS NEW DESIGN FOR WELLS AND COMPRESSORS RESERVOIR AND PRODUCTION SIMULATION MATCHING REQUIRED PRODUCTION NODAL ANALYSIS SIMULATION USED TO SELECT INJECTION DEPTH

More information

SLAP-41 - SPE Perforating Gunshock Loads Prediction and Mitigation

SLAP-41 - SPE Perforating Gunshock Loads Prediction and Mitigation SLAP-41 - SPE-163549 Perforating Gunshock Loads Prediction and Mitigation Carlos Baumann, Angel Lazaro, and Harvey Williams Schlumberger Paulo Stecchini OGX Outline Slide 2 Wellbore hydrodynamics - Pressure

More information

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability

Talk 2 Tree & Wellhead Valve Testing Leak Rate Acceptance. Talk 3 DHSV Control Line hydrocarbon Ingress measurement & acceptability Talisman energy COIN Virtual Meeting # 17 26 th January 2011 Darren Bewick Graeme Douglas Martin Forbes David McGuckien Matt Morrison Martin Mosley Talisman Energy UK Ltd (TLMUK), Aberdeen 1 Presentations

More information

Natural Gas Properties Analysis of Bangladesh: A Case Study of Titas Gas Field

Natural Gas Properties Analysis of Bangladesh: A Case Study of Titas Gas Field SUST Journal of Science and Technology, Vol. 16, No.2, 2012; P:26-31 Natural Gas Properties Analysis of Bangladesh: A Case Study of Titas Gas Field (Submitted: April 13, 2011; Accepted for Publication:

More information

Downhole Gas Separator Selection

Downhole Gas Separator Selection Gas Well Deliquification Workshop Sheraton Hotel, February 17 20, 2013 Downhole Gas Separator Selection James N. McCoy & Lynn Rowlan Feb. 17 20, 2013 2 Downhole Gas Separator Selection Many operators with

More information

Retrofit Gaslift System for TLP wells

Retrofit Gaslift System for TLP wells 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 MLTH CIM Retrofit Gaslift System for TLP wells SCSSV Presenter: Abi Babajide Contributors: Johnnie Garrett, Jim Hall DHPG This presentation

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 01, Pages 56-60, 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 01, Pages 56-60, 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 01, Pages ISSN: 2289-4713 Investigation of Under-Saturated Oil Viscosity Correlations under Reservoir Condition; A Case Study

More information

GAS CONDENSATE RESERVOIRS. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

GAS CONDENSATE RESERVOIRS. Dr. Helmy Sayyouh Petroleum Engineering Cairo University GAS CONDENSATE RESERVOIRS Dr. Helmy Sayyouh Petroleum Engineering Cairo University Introduction and Definitions Gas condensate production may be thought of as a type intermediate between oil and gas. The

More information

Modelling Gas Well Liquid (Un)Loading

Modelling Gas Well Liquid (Un)Loading Gas Well Deliquification Workshop Adams Mark Hotel, February 25-27, 28 Modelling Gas Well Liquid (Un)Loading Kees Veeken (NAM, Assen) Murat Kerem (Shell, Rijswijk) Objectives of Modelling Liquid loading

More information

Gas Well De-Liquification Workshop. Denver, Colorado February 27 - March 1, Multi-Staging Wells. Chandler Frost Production Control Services

Gas Well De-Liquification Workshop. Denver, Colorado February 27 - March 1, Multi-Staging Wells. Chandler Frost Production Control Services Gas Well De-Liquification Workshop February 27 - March 1, 2006 Multi-Staging Wells Chandler Frost Production Control Services How it works Multistage Tool is set in well Normal bottom hole assembly and

More information

Dynamic Underbalance Perforating

Dynamic Underbalance Perforating Dynamic Underbalance Perforating Subset of underbalance perforating. Uses volume of gun and sometimes added surge chambers to create downhole flow surge without flow to surface. Last for a few seconds,

More information

Troubleshooting Unloading Gas Lift Design using DynaLift TM

Troubleshooting Unloading Gas Lift Design using DynaLift TM 34 th Gas-Lift Workshop Singapore February 7-11, 2011 Troubleshooting Unloading Gas Lift Design using DynaLift TM Ron Schmidt - Weatherford International William Rucker Weatherford International This presentation

More information

Using Valve Performance in Gas Lift Design Software

Using Valve Performance in Gas Lift Design Software 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 Using Valve Performance in Gas Lift Design Software Tom Nations This presentation is the property of the author(s) and his/her/their

More information

SIMULATION OF A RE-ENTRY WITH CASING DRILLING UNDER HPHT CONDITIONS Gabriella Federer-Kovacs 1. Introduction

SIMULATION OF A RE-ENTRY WITH CASING DRILLING UNDER HPHT CONDITIONS Gabriella Federer-Kovacs 1. Introduction Simulation of a re-entry with casing drilling under HPHT conditions SIMULATION OF A RE-ENTRY WITH CASING DRILLING UNDER HPHT CONDITIONS Gabriella Federer-Kovacs 1. Introduction Due to the ongoing depletion

More information

Presented By Dr. Youness El Fadili. February 21 th 2017

Presented By Dr. Youness El Fadili. February 21 th 2017 Presented By Dr. Youness El Fadili February 21 th 2017 Outline Introduction Objective Critical rate definition Theory and development of New model Application and comparison of the New model Experimental

More information

Downhole Gas Separator Selection

Downhole Gas Separator Selection 4th Annual Appalachian Basin Gas Well Deliquification Workshop Marietta College, Marietta, Ohio June 3 5, 2013 Downhole Gas Separator Selection Lynn Rowlan Proper Downhole Gas Separator Selection Critical

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

Flow transients in multiphase pipelines

Flow transients in multiphase pipelines Flow transients in multiphase pipelines David Wiszniewski School of Mechanical Engineering, University of Western Australia Prof. Ole Jørgen Nydal Multiphase Flow Laboratory, Norwegian University of Science

More information

HOW TO MAKE MORE PRODUCTION WITH PLUNGER LIFT

HOW TO MAKE MORE PRODUCTION WITH PLUNGER LIFT HOW TO MAKE MORE PRODUCTION WITH PLUNGER LIFT D E V E L O P I N G UNCONVENTIONAL G A S T E C H N I C A L W O R K S H O P M AR C H 2 9, 2 0 1 0 CONTENTS PLUNGER LIFT BENEFITS WITH TELEMETRY HOW TO OPTIMIZE

More information

Intermittent Gas Lift and Gas Assist Plunger Lift

Intermittent Gas Lift and Gas Assist Plunger Lift 40 th Gas-Lift Workshop Houston, Texas, USA Oct. 23 27, 2017 Intermittent Gas Lift and Gas Assist Plunger Lift Claire Cherrey, Production Engineer Eagleford Anthony Williams, Production Engineer Bill Hearn,

More information

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA Darsana Dutta, Palash Lochan Bordoloi, Pranjit Mahanta, Rajnib Borah, Sarmistha Roy Choudhury,

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 03/11/2015

More information

Multi-Stage Plunger Lift: Case Histories

Multi-Stage Plunger Lift: Case Histories Gas Well De-Liquification Workshop February 28 - March 2, 2005 Multi-Stage Plunger Lift: Case Histories Rick Hughes, Production Superintendent S. OK District Ted Davis, Production Foreman S. OK District

More information

Well Performance and Nodal TM Analysis Fundamentals COPYRIGHT. Skill Module Overview

Well Performance and Nodal TM Analysis Fundamentals COPYRIGHT. Skill Module Overview Introduction Well Performance and Nodal TM Analysis Fundamentals Skill Module Overview This fundamental level PetroAcademy module addresses well performance and how an oil or gas or even an injection well

More information

STUDY OF SLUG CONTROL TECHNIQUES IN PIPELINE SYSTEMS

STUDY OF SLUG CONTROL TECHNIQUES IN PIPELINE SYSTEMS STUDY OF SLUG CONTROL TECHNIQUES IN PIPELINE SYSTEMS JOSÉ L. A,VIDAL Petrobrás Research Center - CENPES/PDEP/TOOL Av.Horácio de Macedo 95- Cidade Universitária 191-915 -Rio de Janeiro-RJ E-mail:josearias@petrobras.com.br

More information

Reservoir Engineering 3 (Flow through Porous Media and Applied Reservoir Engineering)

Reservoir Engineering 3 (Flow through Porous Media and Applied Reservoir Engineering) Sudan University of Science and Technology College of Petroleum Engineering and Technology Reservoir Engineering 3 (Flow through Porous Media and Applied Reservoir Engineering) Dr. Tagwa Ahmed Musa Last

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

CB 350. Spare parts list. Hydraulic concrete buster. CB 350 s/n DEQ Construction Tools GmbH No

CB 350. Spare parts list. Hydraulic concrete buster. CB 350 s/n DEQ Construction Tools GmbH No CB 350 Spare parts list Hydraulic concrete buster CB 350 s/n DEQ179000-2018 Construction Tools GmbH No. 3390803501 2018-01-01 General information This spare parts list applies to the following: Part number

More information

SPE Copyright 2012, Society of Petroleum Engineers

SPE Copyright 2012, Society of Petroleum Engineers SPE 15483 Vertical Lift Models Substantiated by Statfjord Field Data Øivind Fevang*, Marthe Gilje Fossmark, Kari Nordaas Kulkarni, Håvard Thomassen Lauritsen, Statoil, Svein M. Skjaeveland*, UIS *SPE member

More information

Pasquale Imbò e Marco Pelucchi ENI S.pA;

Pasquale Imbò e Marco Pelucchi ENI S.pA; 7th European Gas Well Deliquification Conference Innovative Failsafe Capillary Injection System Resolves Liquid Loading in Gas Well with a Cost- Effective Solution that Maintaining Production and Well-Safety

More information

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company Appalachian Basin Gas Well Marietta College, Marietta, Ohio June 7-8, 2010 Casing Plunger Applications & Development Robert McKee, P.E. Design Engineer Multi Products Company Casing Plunger A.L. Lift Without

More information

Downhole Gas Separators

Downhole Gas Separators Gas Well De-Liquification Workshop Denver, Colorado February 27 March1, 2006 Downhole Gas Separators A Laboratory and Field Study Jim McCoy, Echometer Company Tony Podio, University of Texas at Austin

More information

Downhole Diverter Gas Separator

Downhole Diverter Gas Separator 7 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 27-30, 2011 Downhole Diverter Gas Separator Jim McCoy Ken Skinner, Lynn Rowlan, Dieter Becker - Echometer Company

More information

SPE Copyright 2001, Society of Petroleum Engineers Inc.

SPE Copyright 2001, Society of Petroleum Engineers Inc. SPE 67232 Sampling Volatile Oil Wells Ahmed H. El-Banbi, SPE, Cairo University/Schlumberger Holditch-Reservoir Technologies, and William D. McCain, Jr., SPE, Texas A&M University Copyright 2001, Society

More information

FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING

FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING FLOW COMPONENT TESTING FACILITIES API SAFETY VALVE VALIDATION TESTING ID-08-FCTF 1 of 7 Revision 1 API SAFETY VALVE VALIDATION TESTING SOUTHWEST RESEARCH INSTITUTE (SwRI ) FLOW COMPONENT TESTING FACILITIES

More information

Sucker Rod Lift Downhole Gas Separators Proposed Industry Testing

Sucker Rod Lift Downhole Gas Separators Proposed Industry Testing 11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 15-18, 2015 Sucker Rod Lift Downhole Gas Separators Proposed Industry Testing Norman W. Hein, Jr. Oil & Gas

More information

SPE Copyright 2004, Society of Petroleum Engineers Inc.

SPE Copyright 2004, Society of Petroleum Engineers Inc. SPE 91399 Microannulus Leaks Repaired with Pressure-Activated Sealant David W. Rusch, SPE / Seal-Tite International; Fred Sabins, SPE / Cementing Solutions, Inc.; and John Aslakson, SPE / W&T Offshore,

More information

Oman Central Gas Velocity Strings in deep tight gas wells. September th European Conference on Gas Well Deliquification.

Oman Central Gas Velocity Strings in deep tight gas wells. September th European Conference on Gas Well Deliquification. Oman Central Gas Velocity Strings in deep tight gas wells September 2009-4th European Conference on Gas Well Deliquification. Velocity Strings Oman Central Gas Agenda: - Objectives - Completions - VS design

More information