COPYRIGHT. Gas Lift Fundamentals. This section will cover the following learning objectives:

Size: px
Start display at page:

Download "COPYRIGHT. Gas Lift Fundamentals. This section will cover the following learning objectives:"

Transcription

1 Learning Objectives Gas Lift Fundamentals This section will cover the following learning objectives: Explain the role of gas lift in a real performance analysis process Explain the principles of multi-phase flow and the principle of gas lift Identify the advantages and disadvantages of gas lift as an artificial lift method Identify gas lift equipment Estimate the production rate achievable by the gas lift Identify gas lift design methods Establish well unloading procedures Outline gas lift surveillance and optimization processes 1

2 Module Contents Introduction Inflow and Outflow Performance Review Gas Lift Theory Gas Lift Applications Gas Lift Equipment Valve Mechanics Well Performance Calculations with Gas Lift Gas Lift Well Unloading Process Gas Lift Design Outline Gas Lift Surveillance and Optimization Gas Lift Case Study Conclusions Module Schedule S. No. Topic of Discussion Activity Time (min) 1 Pre-Assessment Assessment 30 2 Skill Module Introduction Narrated Slideshow 4 3 Gas Lift Video 2 4 Gas Lift Design Introduction Video 3 5 Principles of Gas Lift, Gradient Calculations and Nodal Analysis Virtual Session Well Inflow Performance Narrated Slideshow 9 7 Flowing Gradient Exercise 10 8 Well Outflow Performance Narrated Slideshow 13 9 Gas Lift Requirement Exercise Kickover Tool Gas Lift Valve Setting Procedure Video 1 11 Retrieval of Dummy Valve Video 2 12 Gas Lift Equipment Narrated Slideshow IPO Gas Lift Valve Pressure Setting Exercise Orifice Gas Valve Gas Passage Exercise Gas Lift Design, Troubleshooting and Valve Mechanics Virtual Session Gas Lift Surveillance and Optimization Narrated Slideshow 8 17 Gas Lift Case Study Exercise Skill Module Summary Narrated Slideshow 4 19 Post-Assessment Assessment Gas Lift Fundamentals Survey Survey 15 Total Duration 7 hours 1 min 2

3 Gas Lift Fundamentals Virtual Session 1 Gas Lift Principles Definition, Advantages, Completions 3

4 Natural Flow Well vs. Gas Lifted Well NATURAL FLOW WELL GAS LIFTED WELL Higher magnitude of production Tubing Production; Annular Gas Lift Injection Fluid column weight reduced by formation gas in a natural flow well INJECTION GAS PRODUCED FLUID DEPTH (FT TVD) (305 m) 2000 (610 m) 3000 (914 m) 4000 (1219 m) Fluid column weight reduced by formation and injected gas: a gas lift well Lower back pressure of formation Lower flowing bottom hole pressure CONTINUOUS FLOW GAS LIFT WELL PRESSURE (PSI) 1000 (6895 kpa) 2000( kpa) CASING PRESSURE WHEN WELL IS BEING GAS LIFTED 5000 (1524 m) OPERATING GAS LIFT VALVE 6000 (1829 m) 7000 (2133 m) SIBHP FBHP 4

5 Gas Lift Definition Gas lift is a means of artificial lift involving the injection of high pressure gas downhole into the produced fluid column. The injected gas increases the gas-liquid ratio, reduces the fluid density and column weight of the produced fluids, creating a pressure differential between the wellbore and reservoir Aeration or lightening of fluid column (density reduction) Gas expansion, assisting the fluid to move to surface Types of Gas Lift Continuous flow gas lift Intermittent gas lift CONDITION CONTINUOUS FLOW INTERMITTENT FLOW Production Rate (bbl/day) ,000 Up to 500 Static BHP (psi) > 0.3 psi/ft (6.79 kpa/m) < 0.3 psi/ft (6.79 kpa/m) Flowing BHP (psi) > 0.08 psi/ft (1.81 kpa/m) 150 psi ( kpa) and higher Injection Gas (scf/bbl) (m 3 /m 3 ) ( ) per 1000 ft (304.8 m) of lift ( ) per 1000 ft (304.8 m) of lift Injection Pressure (psi) > 100 psi ( kpa) per 1000 ft (304.8 m) of lift < 100 psi ( kpa) per 1000 ft (304.8 m) of lift Gas Injection Rate Larger volumes Smaller volumes 5

6 Continuous Flow Gas Lift A steady flow of high pressure gas is injected into the production tubing to aerate and lighten the fluid column. A series of gas lift valves are run to allow the deepest possible lift point Production rates can range from 200 BLPD (31.8 m 3 ) through 2" (0.05 m) tubing up to 50,000 BLPD ( m 3 ) in 7" (0.18 m) tubing Gas Lift Advantages Proven method Cost of downhole equipment low Can be installed and serviced without workover Flexible to changes in operating conditions Unaffected by sand, scale and asphaltenes Good for deviated wells Allows downhole chemical injection Good in hot wells Can use compressors designed for other use Tolerates high GOR Open tubing for PLT 6

7 Gas Lift Disadvantages Gas supply needed More gas to handle May be slow to start up after shutdown Gas supply flowline needed to each well Tubing, casing and wellhead design should withstand high pressure gas Safety hazard Hydrates Drawdown less than ESPs Valve interference; heading Gas Lift Costs Provision of gas supply Gas compression Power provision Gas piping to the wellhead Gas lift completion (sometimes dual) Gas lift string installation High capex, low opex 7

8 Gas Lift Completions: Conventional Valves Conventional valves require the tubing to be pulled to service the valves Wireline Retrievable Valves Wireline retrievable require kickover tools to be run down the tubing to service the valves Tubing does not have to be pulled Tubing open to full flow Used extensively offshore Gas Lift Conventional Injection Pressure Operated Valves Time-Cycle Controller and Motor Valve Conventional Mandrel With Gas Lift Valve Conventional Mandrel With Gas Lift Valve Conventional Mandrel With Gas Lift Valve Conventional Mandrel With Gas Lift Valve Packer Landing Nipple Gas Lift Wireline Retrievable Valves Adjustable Choke Subsurface Safety Valve Side Pocket Mandrel With Gas Lift Valve Side Pocket Mandrel With Gas Lift Valve Side Pocket Mandrel With Gas Lift Valve Sliding Sleeve Packer Landing Nipple 8

9 Side String for Injection No pressure on casing Easily controlled More expensive to set up Stable and not subject to surging and heading High Rate Annular Completions Annular flow can be 30,000-60,000 bpd ( m 3 ) if annulus is big enough Well integrity/safety issues Gas Lift Retrievable Valves Side Pipe Injection Adjustable Choke Gas Injection Conduit Side Pocket Mandrel With Gas Lift Valve Side Pocket Mandrel With Gas Lift Valve Side Pocket Mandrel With Gas Lift Valve Packer Landing Nipple Gas Lift Wireline Retrievable Valves Annular Flow Adjustable Choke Side Pocket Mandrel With Gas Lift Valve Side Pocket Mandrel With Gas Lift Valve Side Pocket Mandrel With Gas Lift Valve Bull Plug 9

10 Dual Zone Completion If two zones isolated and gas lift used, it can be hard to split injection gas as desired on a design basis Gas Lift Wireline Retrievable Valves Dual Zone Adjustable Choke Subsurface Safety Valves Intermittent Gas Lift Side Pocket Mandrel With Gas Lift Valve Dual Packer Landing Nipple Blast Joint Packer Landing Nipple 10

11 Pressure Gradient (1) Gradient Calculations Single Phase, Multi-phase Flow The pressure change per unit length is called the pressure gradient and is expressed as psi/ft For incompressible single phase flow, for a constant flow rate, the pressure drop can be expressed as a constant pressure change per unit length However, within the flowing well, two phase vertical flow is encountered and hence a constant pressure gradient cannot be used as the pressure gradient changes with depth Many equations are required to determine the two-phase pressure gradient and so a graphical representation in the form of a pressure-depth traverse is the simplest 11

12 Pressure Gradient (2) Pressure (psi) = Fluid gradient (psi/ft) x Vertical fluid column length (ft.) Fluid gradient (psi/ft) = Specific gravity x psi/ft (2.99 kpa/m) Fluid gradient (psi/ft) = x Density (lbs/gal) Oil gradient (psi/ft) x psi / ft API Static Pressure Gradient Exercise Static pressure measurements are available from a vertical well shut-in for the last six months Calculate: The static BHP of the well The water, oil and gas gradient The water-oil interface and oilgas interface depths Suggest a single point gas lift depth if lift gas is available at 1400 psia ( kpa) (gas gradient 45 psi/1000 ft) (1.02 kpa/m) Depth, Ft Measured pressure in psia Xmas tree ( kpa) 1000 (304.8 m) 251 ( kpa) 2000 (609.6 m) 602 ( kpa) 3000 (914.4 m) 976 ( kpa) 4000 ( m) 1349 ( kpa) 5000 (1524 m) 1725 ( kpa) 6000 ( m) 2148 ( kpa) 7000 ( m) 2600 ( kpa) 8000 ( m) 3048 ( kpa) Tail pipe (EOT) 8800 ( m) 3407 ( kpa) Mid-perf 9100 ( m) 12

13 Static Pressure Gradient Exercise Solution BHP at mid-perf depth = 3540 psi ( kpa) (extrapolated from 8800 ft ( m) to 9100 ft ( m)) Static gradients: Water = ( )/2000 = 0.45 psi/ft. (10.18 kpa/m) Oil = ( )/2000 = psi/ft. (8.48 kpa/m) Gas = ( )/1000 = psi/ft. (0.59 kpa/m) (should be much less; data suspect) Interface depths: Water-oil: ~5500 ft. ( m) (refer to graph) Oil-gas: ~1000 ft. (304.8 m) (refer to graph) Single point gas lift depth: 4000 ft. ( m) (refer to graph) Static Pressure Gradient Exercise GL KO Pressure, Measured pressure in Wireline psia psia depth, Ft ( kpa) ( kpa) ( kpa) 251 ( kpa) 1000 (304.8 m) 1490 ( kpa) 602 ( kpa) 2000 (609.6 m) 1535 ( kpa) 976 ( kpa) 3000 (914.4 m) ( ( kpa) kpa) ( m) ( ( kpa) kpa) 1670 ( kpa) 1715 ( kpa) 1760 ( kpa) 1796 ( kpa) 2148 ( kpa) 2600 ( kpa) 3048 ( kpa) 3407 ( kpa) 5000 (1524 m) 6000 ( m) 7000 ( m) 8000 ( m) Pressure, psia (kpa) Gas Oil Interface ΔP Solution 8800 ( m) Annulus Gas gradient Oil Water Interface 13

14 Nodal Analysis Nodal Analysis Finding the Possible Production Rates Estimate the inflow performance Perform pressure drop calculation for a number of different flow rates = generate family of pressure traverse curves Calculate VLP = wellbore flowing pressures for different flow rates against a constant WHP Solve simultaneous equations defined by VLP and IPR, giving unique solution at selected solution node The intersection of the VLP and IPR curves denotes the operating point of the system 14

15 Operating Point ( kpa) For a given flowrate, drawdown yields BHFP much less than required by tubing to lift against WHP: not enough energy ( kpa) ( kpa) ( kpa) ( kpa) For a given flowrate, drawdown yields BHFP much greater than required by tubing to lift against WHP: too much energy Operating point = stable equilibrium (11.92 m 3 /Day) (23.85 m 3 /Day) (35.77 m 3 /Day) (47.70 m 3 /Day) Reservoir fluid PVT Summary Curves Reservoir fluid PVT property curves vs. pressure 15

16 Nodal Analysis Modeling of GL Well Session Summary Gas Lift: How does it work Costs and challenges associated with setting up gas lift operations Static vs. flowing gradient Multi-phase flow and stability Flowing Gradient plots Gas Lift well modeling Gas Lift initiation & operating point Gas Lift sensitivities: Tubing size GL Injection depth (Lift gas pressure) GL Injection rate Flowing wellhead pressure Water-cut Requirements for gas lift well Multiphase flowing gradient Gas Lift modeling & Sensitivities 16

17 The Production System OUTFLOW Well Inflow Performance Prediction Methods INFLOW 17

18 Inflow Performance The Inflow Performance Relationship (IPR) describes the ability of the reservoir to deliver fluid (i.e. rate) for a prescribed pressure drop between reservoir and wellbore (drawdown) The IPR is independent of the tubulars. The IPR can be evaluated using: Analytical Methods Empirical Methods Inflow: Steady-state Radial Flow Darcy Law C k h Pres pwf Qo Bo In re / rw S IPR=Inflow Performance Relationship Oilfield: C = & Q o in BOPD Metric: C = & Q o in m 3 /d Applicable for non-compressible single phase flow S = classic mechanical skin (dimensionless) 18

19 Inflow: Semi-steady-state Radial Flow Darcy Law (corrected for non-darcy skin) kh Pres pwf Qo Bo In re / rw 0.75 S Dq Productivity Index (PI) where Q o J * P res P wf and J PI or Productivity Index, Oilfield Units Simplest and most widely used relationship Straight line Units stbpd/psi For oil/water wells above bubble point Not applicable to gas wells (kpa) Straight Line PI 1600 (11 032) 1400 (9653) 1200 (8274) 1000 (6895) 800 (5516) 600 (4137) 400 (2758) 200 (1379) (31.8) (63.6) (95.4) (127.2) (159) (190.8) Rate (STBLPD)(SCM/Day) Test Point PI Test Point Pressure (psi) Q PI = P r P wf PI= Productivity Index 19

20 Vogel IPR Originally developed for saturated oil reservoirs / solution gas drive by Alfred Vogel Applicable below bubble point Need Q and P wf from well test Calculate Q max Use Q max to calculate complete IPR Q P P wfs wfs Q P P max r r (kpa) Pressure (psi) Vogel IPR 1800 (12 410) 1600 (11 032) 1400 (9653) 1200 (8274) 1000 (6895) 800 (5516) 600 (4137) 400 (2758) 200 (1379) (15.9) (31.8) (47.7) (63.6) (79.5) (95.4) (111.3) Rate (STBLPD) (SCM/Day) Combined IPR for Under-saturated Reservoir Above P bp, use straight line IPR Below P bp, use a combination of both Total Oil Prod = Q oil at P bp + Q oil Vogel (a) (b) Pwf Test Point Pb Pwf Pwf Q PI Pr Pb PI Pb Pb 2 2 Pressure P res P wf (a) (b) P bp Rate Q max 20

21 Back to Work Suggestions <Course Well Inflow Title> Performance Leverage the skills you ve learned Leverage by the discussing skills you ve the skill learned module by discussing objectives the with skill module your supervisor objectives to develop with your a supervisor personalized to plan develop to implement a personalized the job. plan Some to implement suggestions the are job. provided. Some suggestions are provided. Do you have reliable production data? Do Identify you have a few good wells reservoir in your pressure asset where data? the production decline appears to be Do mainly you have due average to change reservoir in inflow pressure data as performance. a function of time Suggest which possible can be ways used as for a proxy improving to determine production. the hydrocarbons in Review place? the variation of PI observed with Do time you have good fluid properties measurements? Do you have good correlations which we can use to predict the fluid properties? 21

22 The Production System OUTFLOW Well Outflow Performance Prediction Methods INFLOW 22

23 System Pressure Drop P P Pressure (psi) P res P wf P ftp Pflowline Psep inlet Produced Fluids Moving Through The System Multiphase Flow Reservoir Skin?? Perfs Tubing Wellhead Choke Pst tank Flowline Manifold Separator Stock tank The three components of the total pressure loss are given by the following equation ( m represents the properties of the mixture): dp dz total g = m sin g c hyd mvmdv gcdz hydrostatic: gravitational component friction: irreversible heat loss due to work acceleration: expansion/kinetic component Vertical: sinθ = 1 horizontal: sinθ = 0 Whilst hydrostatic and acceleration can be determined analytically, friction has to be determined from correlations m acc f m 2 mv m 2gcD fr 23

24 VLP Multi-phase Flow Regimes (609.6 m) ( m) (A) BUBBLE FLOW (B) SLUG FLOW (C) SLUG-ANNULAR TRANSITION (D) ANNULAR-MIST FLOW Ideal Flow regimes or categories for multiple flow as illustrated by Orkiszewski. First published in the JPT, June 1967 Tubing Performance: Pressure Traverse Affected by wellhead pressure flow rate tubular properties (diameter, roughness) fluid properties/pvt (holdup, slip) well inclination GOR water cut viscosity ( m) calculated ( m) Measured (FGS)? (3048 m) ( kpa) ( kpa) ( kpa) ( kpa) ( kpa) ( kpa) ( kpa)( kpa) 24

25 Vertical Lift Performance Measured Depth (ft) (609.6 m) ( m) ( m) ( m) (3048 m) Pressure traverse curves for curves Q = 0, for 50, Q 100, 300 = 0, 50, stb/d 100, 300 stb/d (47.7 m 3 /Day) ( kpa) Pressure Pressure at Selected Node Depth ( kpa) ( kpa) ( kpa) ( kpa) Vertical Lift Performance VLP Tubing Performance relationship TPR (11.93 m 3 /Day) selected node depth ( kpa) ( kpa) ( kpa) Commonly Used Flow Correlations Poettman and Carpenter (1952) Gilbert (1954) Griffith and Wallis (1961) Duns and Ros (1961) Fancher and Brown (1965) Hagedorn and Brown (1965) Orkiszewski (1967) Govier and Azis (1972) Beggs and Brill (1973) Gray Mechanistic (BAX, EPS) (23.85 m 3 /Day) (35.77 m 3 /Day) (47.70 m 3 /Day) Total Production Rate (STB/day) 25

26 General Multi-phase Flow Correlations Different correlations give reasonable match for different wells: There is no universal correlation that will fit for all conditions Correlation selection is mostly by field experience Data required for curves includes: Conduit Size Producing Rate Flowing wellhead pressure Water Cut API Gravity Water Specific gravity Gas Specific gravity and Average flowing temperature Applications of Gradient Curves Flowing pressure gradient curves were extensively used before nodal analysis programs became available Framed for different production rates, water cuts, gas oil ratios Typical use of gradient curves: Estimate Flowing Bottom Hole Pressure (FBHP) Calculate Productivity Index (PI) Predict maximum flow rates from well Evaluate optimum gas lift rates Determine maximum depth of injection Evaluate the effect of Flowing Well Head Pressure (FWHP), Tubing Size, Gas Lift Injection pressure and water cut on FBHP and flow rates 26

27 (2758) (5516) (8274) (11 032) (13 790) (16 547) (19 305) Pressure in 100 PSIG (kpa) (304.8) (610) (914) (1219) (1524) (1829) (2134) (2438) (2743) (3048) (304.8) (610) (914) (1219) (1524) (1829) Length in 1000 feet (meters) Length in 1000 feet (2758) (5516) (8274) (11 032) (13 790) (16 547) (19 305) Pressure in 100 PSIG (meters) (kpa) (102 mm) (636 m 3 /Day) (2134) (60 C) (2438) (2743) (3048) (3048) 27

28 (2758) (5516) (8274) (11 032) (13 790) (16 547) (19 305) Pressure in 100 PSIG (kpa) (304.8) (610) (914) (304.8) (610) (914) (1219) (1524) (1829) (2134) (2438) Length in 1000 feet (1219) (1524) (1829) (2134) (2438) (2743) (3048) Length in 1000 feet (meters) (2758) (5516) (8274) (11 032) (13 790) (16 547) (19 305) Pressure in 100 PSIG (kpa) For a formation producing from a well under the conditions in the box, these curves provide the P wf to produce 4000 BOPD (636 m 3 /Day) at different producing GOR s (102 mm) (636 m 3 /Day) (60 C) (2743) (3048) 28

29 (2758) (5516) (8274) (11 032) (13 790) (16 547) (19 305) Pressure in 100 PSIG (kpa) (304.8) (610) (914) (1219) (1524) (1829) (2134) (2438) (2743) (3048) Length in 1000 feet (meters) (304.8) (610) (914) (1219) (1524) 180 Generating similar curves For with a formation nodal producing analysis program from a allows well under you to the prepare an exact conditions pressure traverse in the box, using: these curves provide Actual the fluid P wf to produce properties 4000 BOPD Wellhead at different pressure producing GOR s Expected production rate Water cut Other conditions (2758) (5516) (8274) (11 032) (13 790) (16 547) (19 305) (1829) (2134) (2438) (2743) Note: For more examples, refer to the Tubing Gradient and Appendix PDFs under Resources. (3048) 29

30 Back to Work Suggestions Well Outflow Performance Leverage the skills you ve learned by discussing the skill module objectives with your supervisor to develop a personalized plan to implement on the job. Some suggestions are provided. Do you have reliable production data? Do Matching you have with good the reservoir measured pressure BHP data? or FGS data for a well, identify the preferred Do correlation you have average that gives reservoir a reasonable pressure match data as Review a function the of FTP time of wells which in can your be used area as and a proxy identify to determine wells with the excessive hydrocarbons back in pressures. place? Suggest action plan to reduce Do back you pressure have good in fluid an economically properties measurements? attractive way. Do you have good correlations which we can use to predict the fluid properties? 30

31 Gas Lift Equipment Gas Lift Mandrels, Valve Types, Valve Mechanics Gas Lift Mandrels The depth at which the mandrel is included in the completion is Orienting determined by: Sleeve Casing pressure Body Dome Tubing pressure POC Flowing gradient expected in tubular Tubing Bellows Tubing size Ab Other parameters Casing Pressure Tool Discriminator Latch Lug Seat Two types Tubing of mandrels commonly used are: Pressure Conventional mandrel Side pocket mandrel Polished Bore Pocket Conventional Mandrel Side Pocket Mandrel 31

32 Gas Lift Mandrels Orienting Sleeve Dome Body Tubing Tubing Pressure POC Ab Conventional Mandrel Side Pocket Mandrel (140 mm) (38 mm) 5 1/2 MMRG-4, 1 1/2 POCKET ROUND MANDREL DESIGN Orienting Sleeve ENGINEERING DATA Bellows Casing Pressure PART NUMBER SIZE 5 1/2 (140 mm) MAX O.D (216 mm) MIN I.D (134 mm) DRIFT I.D (134 mm) THREAD 17 LB/FT MANN BDS B x P (25 kg/m) TEST PRESSURE INTERNAL 7740 PSI ( kpa) TEST PRESSURE EXTERNAL 6280 PSI ( kpa) LATCH TYPE RK, RK-1, RKP, RK-SP KICKOVER TOOL OM-1, OM-1M, OM-1S RUNNING TOOL RK PULLING TOOL 1 5/8 JDS (41 mm) MATERIAL 410 S.S., 13 CR 22 HRC MAX TENSILE STRENGTH (EOEC) 490,000 LBS( kg) CAMCO 1996 Seat Tool Discriminator G Latch Lug Tool Discriminator Latch Lug Polished Bore Pocket Side Pocket Mandrel Polished Seal Bore CAMCO 32

33 GLV in SPM Side Pocket Mandrel Latch Upper Packing SPM Gas inlet port GLV Gas inlet port Lower Packing Nose (Gas Exit) 33

34 Kickover Tool The kickover tool is run on wireline and used to pull and set gas Orienting lift valves Sleeve Body The ability to wireline change-out Dome gas lift valves gives great flexibility in the gas lift design Tubing Tubing Pressure POC Ab Conventional Mandrel Bellows Casing Pressure Seat Kickover Tool GLV Pulling Procedure Tool Discriminator Latch Lug Polished Bore Pocket Side Pocket Mandrel 34

35 Gas Lift Straddles Tubing Pressure Kickover Tool GLV Setting Procedure Note: Please view the kickover setting procedure video and the retrieving the dummy valve video. Used for gas lifting wells that are not equipped with gas lift Orienting mandrels in the original completion or do not have a mandrel at Sleeve the required depth Body Dome Gas lift straddle installed using wireline (e-line or Slickline) POC Tool Utilizes Tubing a conventional Bellows or wireline retrievable valve or concentric Discriminator Ab gas lift valve (selected based on application) Can have more than one Casing gas lift straddles installed Pressure Retrievable pack-offs available Seat Latch Lug Polished Bore Pocket Conventional Mandrel Side Pocket Mandrel 35

36 Gas Lift Pack-off Straddle Assembly Typical gas lift pack off consists of: Upper tubing stop Upper pack off assembly Gas lift mandrel with GLV/Check valve (with spacer pipe) Lower pack off assembly Lower collar stop Tubing is perforated at a pre-determined depth (without damaging casing) before setting the straddle Will restrict the tubing ID Gas Lift Valve Types Gas Lift Unloading valves Injection Pressure Operated: IPO (Pressure Valves) Production Pressure Operated: PPO (Fluid Valves) Operating Valves Orifice Valves Venturi valves Production Casing Production Tubing Upper Pack off Gas Lift valve Tubing Perforations Lower Pack off Dummy Valves Special Application Valves Constant Flow Valves Proportional Response Valves Pilot Valves Surface Controlled Valves 36

37 Gas Lift Valve Types Gas Lift Unloading valves Injection Aid the Pressure removal Operated: of the heavy IPO weight (Pressure completion Valves) fluid inside Production the tubing Pressure and the Operated: annulus PPO (Fluid Valves) Work in a sequence to help unload the valve and allow the Operating lit gas Valves to reach the operating point Orifice Valves Venturi valves Dummy Valves Special Application Valves Constant Flow Valves Proportional Response Valves Gas Lift Valve Types Gas Lift Unloading valves Pilot Valves Surface Controlled Valves Injection Pressure Operated: IPO (Pressure Valves) Production Pressure Operated: PPO (Fluid Valves) Operating Valves Orifice Stay Valves open all the time injecting the required volume of gas Venturi from valves the annulus into the tubing Dummy Valves Special Application Valves Constant Flow Valves Proportional Response Valves Pilot Valves Surface Controlled Valves 37

38 Injection Pressure Operated Valve Production Pressure Check Valve Seat Ball Stem Injection Pressure Unattached Bellows and Stems/Balls Bellows Mechanical Stop Nitrogen The closing force in an unloading valve is offered by a compressed spring or a bellows charged with nitrogen gas Bellows is a sensitive element of the gas lift valve It should not be exposed to significant differential pressure during the life of the gas lift valve Valve Bellows Two stems with balls 38

39 Unloading Gas Lift Valve Normally required during unloading phase only Valve closes after transfer to next station Valve opens only when annulus and tubing pressures are high enough to overcome valve set pressure May be spring or nitrogen charged Operating Gas Lift Valve Upper Packing Lower Packing Typically an orifice type gas lift valve Always open - allows gas passage whenever correct differential exists Gas injection controlled by size and differential across replaceable choke Back-check prevents reverse flow of well fluids from the production conduit Upper Packing Lower Packing 39

40 Dummy Valves Used to blank off mandrels Typical applications: Sealing off the pocket of side-pocket mandrel, preventing communication between casing and tubing Blanking off the tubing for production until gas-lift valves are required Pressurizing the tubing Isolating tubing and casing flow during single-alternative production and for test purposes during multi-point water- or gas-injection floods IPO Valve Schematic Dome Chevron Packing Stack Bellows Stem Tip (Ball) Square Edged Seat Chevron Packing Stack Po Check Valve 40

41 PPO Valve Schematic Dome Chevron Packing Stack Opening Forces Bellows Stem Tip (Ball) Square Edged Seat Chevron Packing Stack Check Valve Force Balance at Opening P d A B P t A p P c ( A B -A p ) Dome (Loading Element) Po Bellows (Responsive Element) Area of Bellows P c, Casing Pressure P t, Tubing Pressure A p, Area of Port 41

42 Closing Forces Force Balance at Closing P d A B P C A B Valve Opening And Closing Pressures (1) 1. Calculate the bellows pressure at downhole temperature, P bt 2. Correct this P bt to a bellows pressure at 60 F (16 C), Pb@60F 3. Calculate a test-rack opening pressure, PTRO CLOSING FORCE (IPO VALVE) F C = P B A B OPENING FORCES (IPO VALVE) Fo 1 = P C (A b A P ) Fo 2 = P t A P TOTAL OPENING FORCE A b P 1 Fo = P C (A b A P ) + P t A P JUST BEFORE THE VALVE OPENS THE FORCES ARE EQUAL P d A p P c (A b -A p ) + P t A p = P b A b SOLVING FOR P C P b -P t (A p /A b ) P c = (A p /A b ) WHERE: P b = Pressure in bellows P t = Tubing pressure P c = Casing pressure A b = Area of bellows = Area of port A p P C 42

43 Test Rack Opening Pressure 60F 0 TROP b P t A p /A b P c R 1 A p /A b 60F TRO 1 R Note: P 60F = (T c ) Depth) Note: P b is same as P d Tester Bleed Valve Atmospheric Pressure High pressure air or gas Gas Lift valves for high pressure applications Based on the demand for sub-sea wells and deep water applications, Schlumberger developed new Series High pressure gas lift valves 1.75 (60 mm) OD XLift Barrier Series High pressure gas lift valves XLO-B Orifice valve XLO-R-B Rupture disk orifice valve XLI-B Injection pressure operated valve Orifice valves rated for injection pressure of 7500 psi ( kpa) at depth IPO valve rated for injection pressure of 5000 psi ( kpa) at depth Barrier-qualified positive sealing check system Check valve test pressure: max differential 10,000 psi ( kpa) 1.5 OD (54 mm) Barrier Series High Pressure valves Allows deeper-set valves and higher drawdown Enhanced wellbore integrity Similar products now available from other companies as well 43

44 Gas Lift Surface Equipment Gas lift injection (typical) Gas lift header valve Gas injection metering GL choke Check valve Wing valve Pressure, temperature sensors Liquid removal (if needed) Heat tracing, antifreeze (if needed) Oil and gas production Wing valve(s), Header valve(s) Production choke (generally not used) Casing Pressure at Depth Casing pressure or gas lift injection pressure at depth pressure will be required Crawford Equation: P d = P s [ g/(tz) ] h P d = Pressure at Depth, psi P s = Pressure at Surface, psi g = Gas gravity (Air = 1.0) T = Average temperature of the gas column, (Ts+Td)/2; R =( F + 460) z = Average compressibility factor h = Depth in feet Gas Gradient Note: This spreadsheet is available for your use in the resources section. 44

45 Gas Pressure at Depth Chart 1 (304.8 m) (609.6 m) (914.4 m) ( m) (1524 m) ( m) ( m) ( m) ( m) (3048 m) Gas Passage Calculation ( ( ( ( ( ( ( ( ( kpa) kpa) kpa) kpa) kpa) kpa) kpa) kpa) kpa) Thornhill-Craver Equation can be used to calculate the gas passage through a square-edged orifice: Q (2/ ) (( 1)/ ) ( / 1) [ k k xc k d xaxp g k k x r r ] GxT Q = Gas Flow in Mscf/Day at 60 DegF and 14.7 psia (101.3 kpa) C d = Discharge coefficient A = Area of opening, Sq inches P 1 = Upstream pressure, psia P 2 = Downstream pressure, psia g = Acceleration of gravity = 32.2 ft/sec 2 (10 m/s 2 ) k = Ratio, Cp/Cv, Sp heat at const press / Sp heat at const volume r = Ratio P 2 / P 1 r o r o = Critical Flow pressure ratio, [2/(k+1)] k/(k-1) G = Specific gravity (Air = 1.0) T = Inlet temperature, Deg R 45

46 Unloading Valve vs. Orifice: Gas Passage Comparison Orifice Maximum Flow Throttling Range Unloading Valve P tbg Differential Range Orifice vs. Nova Valve: Gas Passage Comparison Nova Valve Orifice Valve P up / P down ratio = 0.53 Critical Flow P up / P down ratio = 0.90 Critical Flow Sub-critical Flow Q gi P csg Q gi P csg P tbg 46

47 Valve Geometry Data Available from Supplier (15.6 C) 47

48 Back to Work Suggestions <Course Gas Lift Equipment Title> Leverage the skills you ve learned by discussing the skill module objectives with your supervisor to develop a personalized plan to implement on the job. Some suggestions are provided. Do you have reliable production data? Do Review you have the good gas lift reservoir valve data pressure that data? is maintained in your asset. Is GLV failure a Do common you have observation? average reservoir Any specific pressure data as pointers a function contributing of time which to valve can be failures? used as a proxy Review to determine the the percentage the hydrocarbons of success of in gas place? lift valve change out jobs. What sort Do of you impact have this good has fluid on properties oil production? measurements? Do you have good correlations which we can use to predict the fluid properties? 48

49 Gas Lift Fundamentals Virtual Session 2 Gas Lift Unloading Using Multiple Unloading Valves 49

50 Continuous Flow Unloading To Separator/Stock Tank Gas in INJECTION GAS CHOKE CLOSED (609.6 m) Tubing Pressure Casing Pressure 4000 ( m) TOP VALVE OPEN SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN Continuous Flow Unloading Gas in INJECTION GAS CHOKE OPEN To Separator/Stock Tank TOP VALVE OPEN SECOND VALVE OPEN 6000 ( m) Depth 8000 ( m) 10,000 (3048 m) 12,000 ( m) 14,000 ( m) (609.6 m) 4000 ( m) 6000 ( m) Depth 8000 ( m) ( ( ( kpa) SIBHP kpa) 8 kpa) kpa Pressure kpa kpa Tubing Pressure Casing Pressure THIRD VALVE OPEN FOURTH VALVE OPEN 10,000 (3048 m) 12,000 ( m) 14,000 ( m) ( ( ( ( kpa) ( ( kpa) SIBHP kpa) kpa) Pressure kpa) kpa) 50

51 Continuous Flow Unloading To Separator/Stock Tank Gas in INJECTION GAS CHOKE OPEN (609.6 m) Tubing Pressure Casing Pressure 4000 ( m) TOP VALVE OPEN SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN Continuous Flow Unloading Gas in INJECTION GAS CHOKE OPEN To Separator/Stock Tank TOP VALVE OPEN SECOND VALVE OPEN 6000 ( m) Depth 8000 ( m) 10,000 (3048 m) 12,000 ( m) 14,000 ( m) (609.6 m) 4000 ( m) 6000 ( m) Depth 8000 ( m) ( ( ( ( ( ( SIBHP kpa) 8 kpa) Pressure kpa) kpa) 7 kpa) kpa) Tubing Pressure Casing Pressure THIRD VALVE OPEN FOURTH VALVE OPEN 10,000 (3048 m) 12,000 ( m) 14,000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) 51

52 Continuous Flow Unloading To Separator/Stock Tank Gas in INJECTION GAS CHOKE OPEN (609.6 m) Tubing Pressure Casing Pressure 4000 ( m) TOP VALVE OPEN SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN Continuous Flow Unloading Gas in INJECTION GAS CHOKE OPEN To Separator/Stock Tank TOP VALVE CLOSED SECOND VALVE OPEN 6000 ( m) Depth 8000 ( m) 10,000 (3048 m) 12,000 ( m) 14,000 ( m) (609.6 m) 4000 ( m) 6000 ( m) Depth 8000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) Tubing Pressure Casing Pressure THIRD VALVE OPEN FOURTH VALVE OPEN 10,000 (3048 m) 12,000 ( m) 14,000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) 52

53 Continuous Flow Unloading To Separator/Stock Tank Gas in INJECTION GAS CHOKE OPEN (609.6 m) Tubing Pressure Casing Pressure 4000 ( m) TOP VALVE CLOSED SECOND VALVE OPEN THIRD VALVE OPEN FOURTH VALVE OPEN Continuous Flow Unloading Gas in INJECTION GAS CHOKE OPEN To Separator/Stock Tank TOP VALVE CLOSED SECOND VALVE CLOSED 6000 ( m) Depth 8000 ( m) 10,000 (3048 m) 12,000 ( m) 14,000 ( m) (609.6 m) 4000 ( m) 6000 ( m) Depth 8000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) Tubing Pressure Casing Pressure THIRD VALVE OPEN FOURTH VALVE OPEN 10,000 (3048 m) 12,000 ( m) 14,000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) 53

54 Continuous Flow Unloading To Separator/Stock Tank Gas in INJECTION GAS CHOKE OPEN (609.6 m) Tubing Pressure Casing Pressure 4000 ( m) TOP VALVE CLOSED SECOND VALVE CLOSED THIRD VALVE OPEN FOURTH VALVE OPEN Continuous Flow Unloading Gas in INJECTION GAS CHOKE OPEN To Separator/Stock Tank TOP VALVE CLOSED SECOND VALVE CLOSED 6000 ( m) Depth 8000 ( m) 10,000 (3048 m) 12,000 ( m) 14,000 ( m) (609.6 m) 4000 ( m) 6000 ( m) Depth 8000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) Tubing Pressure Casing Pressure THIRD VALVE CLOSED FOURTH VALVE OPEN 10,000 (3048 m) 12,000 ( m) 14,000 ( m) DRAWDOWN FBHP ( ( ( ( kpa) ( ( SIBHP kpa) kpa) 8 kpa) Pressure 7 kpa) kpa) 54

55 Casing Pressure and Tubing Pressure Trends during Unloading Process ( ) ( ) ( ) (kpa) (9652.6) (8273.7) (6894.7) (5515.8) (4136.8) (2757.9) (1378.9) Gas Lift Design Gas Lift Design Techniques, Safety Margins, Computer Assisted Gas Lift Designs 55

56 Gas Lift Design Objectives Allow lift gas to be injected as deeply as possible Conserve as much injection pressure as possible Ensure all upper unloading valves are closed after the final point of injection has been reached Be able to unload the well with available injection pressure regardless of the liquid level in the tubing Ensure that the operating valve passes the correct amount of gas to achieve the required gas lift gradient Ensure that the above objectives can be met under present as well as near-future conditions Gas Lift Design Steps 1. Collect data 2. Identify tubing sizing and mandrel spec (valve OD) 3. Design mandrel spacing 4. Position the operating valve 5. Position the unloading valves 6. Specify the unloading valve specs (port size and pressure setting) 7. Select the orifice valve port size 8. Validate the design 56

57 Gas Lift Well with No Unloading Mandrel Pressure GL Kick off Pressure TVD Single GLM Perforations Unloading Gradient Operating Injection Pressure Gas Lift Design with Unloading Valves (IPO) 1. Gather all data 2. Plot gas lift injection gradient 3. Plot well fluid gradient (starting from P wf ), choosing the proper flowing gradient curve 4. Plot operating valve P using operating casing pressure 5. Plot design gradient or trigger line with safety factor (P1, P2) for valve transfer 6. Use casing pressure safety factor for valve closing 7. Space out mandrels using the available gas lift pressure at depth, the trigger line and kill fluid gradient. Locate the first (kick off) valve and other unloading valves down to operating valve 8. Include dummy valves in the spare mandrels below the operating point 9. Determine unloading valve port size and Ptro 10. Finalize the orifice valve specs and the expected operating casing pressure 57

58 Graphical Gas Lift Design (IPO) Expected gradient Design gradient w/ transfer bias TVD Pressure GL kick off pressure Operating Casing pressure Unloading kill fluid gradient Operating Depth Minimum mandrel spacing (Future) FBHP (P wf ) Drawdown Gas Lift Design with Unloading Valves (PPO) SBHP (P res ) 1. Gather all data 2. Plot gas lift injection gradient 3. Plot well fluid gradient (starting from Pwf), choosing proper flowing gradient curve 4. Plot operating valve P using operating casing pressure 5. Plot objective design gradient or trigger line with safety factor (P1, P2). Note that there is some 20-25% safety factor at surface for the trigger line as the valves will close sensing the reduction in tubing pressure. The casing pressure will not be reduced for every mandrel station in case of PPO design. 6. Space out mandrels using the available gas lift pressure at depth, the trigger line and kill fluid gradient. Locate the first (kick off) valve and other unloading valves down to operating valve 7. Include dummy valves in the spare mandrels below the operating point 8. Determine unloading valve port size and Ptro 9. Finalize the orifice valve specs and the expected operating casing pressure 58

59 Graphical Gas Lift Design (PPO) Pressure Expected gradient Design gradient GL kick off pressure Operating Csg pressure Unloading gradient TVD Design Exercise 1: Single Mandrel Gas Lift Operating Depth Minimum mandrel spacing (Future) FBHP (P wf ) Drawdown SBHP (P res ) Following well parameters are available: Well depth 9000 ft. ( m) (Vertical) FWHP: 250 psi ( kpa) Average flowing gradient above point of injection: 0.2 psi/ft (4.52 kpa/m) Gas lift available at well location: 1500 psi ( kpa), 120ºF (48.9 ºF) Gas weight is 45 psi/1000 ft (1.02 kpa/m) P required through the operating valve: 100 psi (689.4 kpa) Locate the gas lift mandrel station depth if The gradient can be reduced to 0.3 psi/ft (6.79 kpa/m) by pumping Nitrogen through coiled tubing for well kick off, prior to placing on gas lift The available gas lift system has to be used for unloading the well. When shut-in, the fluid gradient in tubing may rise to 0.43 psi/ft (9.61 kpa/m) 59

60 Design Exercise 2A: Gas Lift IPO Unloading Tubing size 4-1/2 (0.11 m) Casing Size 9-5/8 (0.24 m), 47 lb/ft (70 kg/m) Deviation Vertical well Desired production 5000 BLPD (794.9 m 3 /day) Watercut 50% Desired TGLR 1000 scf/stb (178.1 m 3 /m 3 ) Oil gravity 35 API Water gravity 1.07 Gas gravity 0.65 Flowing wellhead pressure, temp 200 psig ( kpa), 140 F (60 C) Gas lift kick off pressure 1400 psi ( kpa) at wellhead Average reservoir pressure 3000 psi ( kpa) Reservoir temperature 225 F (107 C) Liquid PI 4 Bpd/psi drawdown (0.09 m 3 /kpa) Formation GOR 400 SCF/STB (71.2 m 3 /m 3 ) Mid perforation depth 8000 ft ( m) Bottom mandrel depth (max depth) 7800 ft ( m) Design Exercise 2B: Gas Lift IPO Unloading Tubing size 3-1/2 (0.09 m) Casing size 9-5/8 (0.24 m), 47 lb/ft (70 kg/m) Deviation Vertical well Desired production 2000 BLPD ( m 3 ) Watercut 50% Desired TGLR 1000 scf/stb (178.1 m 3 /m 3 ) Oil gravity 35 API Water gravity 1.07 Gas gravity 0.65 Flowing wellhead pressure 200 psig ( kpa) Surface temperature static / flowing 80 / 150 F (27 / 66 C) Gas lift kick off pressure 1200 psi ( kpa) at wellhead Avg reservoir pressure, temperature 3000 psi ( kpa), 216 F (102 C) Liquid PI 2 Bpd/psi (0.05 m 3 /kpa) drawdown Formation GOR 400 SCF/STB (71.2 m 3 /m 3 ) Mid perf depth 7500 ft (2286 m) Bottom mandrel depth 7200 ft ( m) Completion fluid weight 8.6 ppg ( kg/m 3 ) 60

61 Recall - Gas Lift Design Steps 1. Collect data Gas Lift Unloading Design Using IPO Valves: Worked Example Example 2A 2. Identify tubing sizing and mandrel spec (valve OD) 3. Design mandrel spacing 4. Position the operating valve 5. Position the unloading valves 6. Specify the unloading valve specs (port size and pressure setting) 7. Select the orifice valve port size 8. Validate the design 61

62 Design Exercise 2A: Gas Lift IPO Unloading Depth (TVD), Ft. (m) 2000 (610) Tubing size 4-1/2 (0.11 m) GLM with 1.5 pocket will be used Casing Size 9-5/8 (0.24 m), 47 lb/ft Deviation Vertical well Desired production 5000 BLPD (794.9 m 3 /day) Watercut 50% Desired TGLR 1000 scf/stb (178.1 m 3 /m 3 ) Oil gravity 35 API Water gravity 1.07 Gas gravity 0.65 Flowing wellhead pressure, temp 200 psig ( kpa), 140 F (60 C) Gas lift kick off pressure 1400 psi ( kpa) at wellhead Average reservoir pressure 3000 psi ( kpa) Reservoir temperature 225 F (107 C) Liquid PI 4 Bpd/psi drawdown (0.09 m 3 /kpa) Formation GOR 400 SCF/STB (71.2 m 3 /m 3 ) Mid perforation depth 8000 ft ( m) Bottom mandrel depth (max depth) 7800 ft ( m) 4000 (1219) 6000 (1829) Pressure, psi (1379) (kpa) (8274) (9653) (11 032) (2758) (4137) (5516) (6895) Prepare a mm Graph sheet, taking Pressure along the horizontal axis and Depth along the vertical axis Mark the mid perf and bottom mandrel (max injection) depths Bottom Mandrel Depth (7800 Ft) [2377 m] 8000 (2438) Mid Perforation Depth (8000 Ft) [2438 m] 62

63 Defining the two gradients Depth (TVD), Ft. (m) 2000 (610) Expected Flowing Gradient Generate the expected flowing gradient for the gas lifted well (after gas lift unloading): By modeling the GL well using a Nodal Analysis program Using estimated flowing gradient (from similar wells), OR Using published gradient curves Plot the tubing pressure traverse vs. True vertical depth (TVD) Expected GL gas gradient Calculate the casing pressure profile starting with GL Kick off pressure (using equation or Chart) Plot downhole casing pressure vs. True vertical depth (TVD) 4000 (1219) Pressure, psi (1379) (kpa) (8274) (9653) (11 032) (2758) (4137) (5516) (6895) Expected flowing gradient Expected GL Gas gradient (Kick off) 6000 (1829) 8000 (2438) Bottom Mandrel Depth (7800 Ft) [2377 m] 1372 Mid Perforation Depth (8000 Ft) [2438 m] 1445 (P wf )

64 Location of Top Mandrel Depth (TVD), Ft. (m) Unloading will begin by U-tubing, where the top of standing fluid level is found in the well (a function of reservoir pressure, THP and fluid gravity) Fluid column in the well: 3000 psi / 0.45 psi/ft = 6667 ft. (2032 m) Fluid level from surface = = 1333 ft (if THP = 0 psig). The worst case scenario is the well standing full up to surface The mandrel spacing will be performed for the worst case scenario. The well will unload even if the reservoir pressure is higher 2000 (610) 4000 (1219) Pressure, psi (1379) (kpa) (8274) (9653) (11 032) (2758) (4137) (5516) (6895) 2600 Ft. GLM-1 [792.5 m] Unloading kill fluid gradient, 0.45 psi/ft (10.2 kpa/m) ΔP:60 psi 6000 (1829) Locate the top GLM by U tubing : draw the kill fluid gradient from the FWHP and determine the location of first GLM by allowing about 60 psi ΔP across the unloading valve (Pc >Pt) 8000 (2438) Bottom Mandrel Depth (7800 Ft) [2377 m] 1372 Mid Perforation Depth (8000 Ft) [2438 m] 1445 (P wf )

65 Depth (TVD), Ft. (m) 2000 (610) Pressure, psi (1379) 320 (kpa) (8274) 1370 (9653) (11 032) (2758) (4137) (5516) (6895) Tubing Design Line 2600 Ft. GLM-1 [792.5 m] 4000 (1219) 6000 (1829) 8000 (2438) Depth (TVD), Ft. (m) 2000 (610) 4000 (1219) 4250 Ft. GLM-2 [ m] Casing safety factor (1.5 OD IPO): Drop Pc by 30 psi for every mandrel (to close the upper valve) Tubing Safety factor: Draw tubing design line by taking 10% safety factor at P1 (Ptbg design = FWHP * (Pcsg Ptbg) Bottom Mandrel Depth (7800 Ft) [2377 m] 1372 Mid Perforation Depth (8000 Ft) [2438 m] Pressure, psi Pcsg available for second mandrel 1445 (P wf) 1660 (1379) 320 (kpa) (8274) 1370 (9653) (11 032) (2758) (4137) (5516) (6895) 2600 Ft. GLM-1 [792.5 m] 4250 Ft. GLM-2 [ m] Starting from the tubing design line at GLM 1, draw the kill fluid gradient to determine the location of GLM 2. Use the reduced casing pressure ΔP 6000 (1829) 8000 (2438) Bottom Mandrel Depth (7800 Ft) [2377 m] 1372 Mid Perforation Depth (8000 Ft) [2438 m] 1445 (P wf )

66 Depth (TVD), Ft. (m) Pressure, psi (1379) (kpa) (8274) (9653) (11 032) (2758) (4137) (5516) (6895) 2000 (610) 2600 Ft. GLM-1 [792.5 m] 4000 (1219) 6000 (1829) 4250 Ft. GLM-2 [ m] 5450 Ft. GLM-3 [ m] Using the same approach locate other deeper mandrels. Continue till the ΔP becomes less than 100 psi (689.5 kpa). Bottom Mandrel Depth (7800 Ft) [2377 m] (2438) Mid Perforation Depth (8000 Ft) [2438 m] Depth (TVD), Ft. (m) 2000 (610) 4000 (1219) Pressure, psi Starting from the tubing design line at GLM 2, draw the kill fluid gradient to determine the location of GLM 3. For every mandrel drop Pc by 30 psi (206.8) 1445 (P wf ) 1660 (1379) (kpa) (8274) (9653) (11 032) (2758) (4137) (5516) (6895) 2600 Ft. GLM-1 (792.5 m) 4250 Ft. GLM-2 ( m) 5450 Ft. GLM-3 ( m) 6000 (1829) 8000 (2438) 6250 Ft. GLM-4 (1905 m) 6850 Ft. GLM-5 ( m) 7200 Ft. GLM-6 ( m) 7500 Ft. GLM-7 (Inactive) (2286 m) 7800 Ft. GLM-8 (Inactive) ( m) Mid Perforation Depth (8000 Ft) [2438 m] Allow mandrels at bracket spacing ( ft) [ m] at bottom as required Mandrel Spacing Complete (P wf )

67 Mandrel Spacing Design Results Depth (TVD), Ft. (m) 2000 (610) 4000 (1219) Eight gas lift mandrels required: 5 Unloading valves (GLM-1 thru 5) 1 Orifice valve (GLM-6) 2 Dummy Valves (GLM 7-8) Next Steps Determine Valve port size for the IPO valve selected (based on gas passage requirements during unloading) Perform valve pressure setting calculations for each of the unloading valve Determine the Orifice port size Pressure, psi (1379) (kpa) (8274) (9653) (11 032) (2758) (4137) (5516) (6895) 2600 Ft. GLM-1 (792 m) 4250 Ft. GLM-2 (1295 m) Read tubing design pressures and casing pressures at each mandrel station depth 5450 Ft. GLM-3 (1661 m) 6000 (1829) 8000 (2438) 6250 Ft. GLM-4 (1905 m) 6850 Ft. GLM-5 (2088 m) 7200 Ft. GLM-6 (2195 m) 7500 Ft. GLM-7 (Inactive) (2286 m) 7800 Ft. GLM-8 (Inactive) (2377 m) Mid Perforation Depth (8000 Ft) [2438 m] (P wf )

68 Depth (TVD), Ft. (m) 2000 (610) Pressure, psi (kpa) (1379) (5516) (6895) (8274) (9653) (11 032) (2758) (4137) Temperature, F C 37.8 C 82.2 C C Draw the static and flowing Gas Lift kick off temperature gradients from pressure mid perf to surface 2600 Ft. GLM-1 (792 m) Static Flowing Operating casing pressure 4000 (1219) 6000 (1829) 8000 (2438) Depth (TVD), Ft. (m) 2000 (610) 4000 (1219) 4250 Ft. GLM-2 (1295 m) 5450 Ft. GLM-3 (1661 m) 6250 Ft. GLM-4 (1905 m) 6850 Ft. GLM-5 (2088 m) 7200 Ft. GLM-6 (2195 m) 7500 Ft. GLM-7 (Inactive) (2286 m) 7800 Ft. GLM-8 (Inactive) (2377 m) Mid Perforation Depth (8000 Ft) [2438 m] 1445 (P wf ) Pressure, psi (kpa) (1379) (5516) (6895) (8274) (9653) (11 032) (2758) (4137) Temperature, F C 37.8 C 82.2 C C 2600 Ft. GLM-1 (792 m) 4250 Ft. GLM-2 (1295 m) Read the temperatures at mandrel depths (static for GLM 1 2 and flowing for deeper mandrels) Ft. GLM-3 (1661 m) 6000 (1829) 8000 (2438) 6250 Ft. GLM-4 (1905 m) 6850 Ft. GLM-5 (2088 m) 7200 Ft. GLM-6 (2195 m) 7500 Ft. GLM-7 (Inactive) (2286 m) 7800 Ft. GLM-8 (Inactive) (2377 m) Mid Perforation Depth (8000 Ft) [2438 m] 1445 (P wf )

69 Unloading valve Calculations For GLM-1, select R-20, port size 0.25 (6.35 mm) Valve Type Port Size (in.) R 1 R R (6.35 mm) R (7.9 mm) Calculate Pb Pb = Pc (1-R) + Pt (R) = 1485 (0.934) (0.066) = 1432 psi (9873 kpa) Calculate Pb@60 F (15.6 C) Pb@60 F = Pb * Ct (Temperature Correction Factor) Ct is (from Temperature Correction Chart for a temperature of 140 F (60 C) using static gradient at GLM-1 depth) Pb@60 F = 1214 psi (8370 kpa) Calculate Test rack opening pressure (TRO) Ptro = Pb@60 F / (1-R) = 1214/0.934 = 1300 psi (8963 kpa) Repeat calculations for Mandrels 2-5 Notes: Used static temperature gradient for the top two unloading valves Orifice valve Calculations Perform orifice sizing calculations using tubing pressure and casing pressure at operating depth (GLM-6) Using gas passage program (or spreadsheet / chart), determine by trial and error the size of the orifice valve that Will be able to inject set point lift gas rate (4.0 MMscf/Day ( m 3 /day)), and Give a noticeable reduction in casing pressure when the well transfers to operating point Results: Orifice size: 0.5" (12.7 mm) Estimated casing pressure at surface after unloading: 1250 psi (8618 kpa) Validate the design (QC) to ensure well will unload Prepare the gas lift valve table to be sent to Gas Lift Shop 69

70 Orifice Valve Sizing ( ) ( ) ( ) ( ) ( ) ( ) (SCM/Day) (84 951) (56 634) (28 317) (1379) Gas Lift Design Results (Example 2A) GLM No Mandrel Depth, Ft. (m) 2600 (792) 4250 (1295) 5450 (1661) 6250 (1905) 6850 (2088) 7200 (2195) 7500 (2286) 7800 (2377) Gas Lift Gas Lift Valve Valve Type Port Size (1.5 OD) (mm) R 20 R 20 R 20 R 20 R 20 Orifice Dummy 1/4" (6.4) 1/4" (6.4) 1/4" (6.4) 1/4" (6.4) 5/16 (7.9) 1/2 (7.9) Casing pressure at depth, psig (kpa) 1485 (10 239) 1510 (10 411) 1515 (10 446) 1510 (10 411) 1505 (10 377) 1480 (10 204) Tubing design pressure at depth, psig (kpa) 675 (4654) 900 (6205) 1060 (7308) 1175 (8101) 1250 (8618) 1310 (9032) (2758) (4137) (5516) (6895) (8274) (9653) (11 032) (kpa) Temperature used for design, F (Ct) Pb@T Psig Pb@T= [Pc*(1 R) +Pt*(R)] Pb@60 Psig Pb@60= (Pb@T)*Ct PTRO Psig Ptro = (Pb@60F)/ (1 R) 140 (0.853) (0.814) (0.771) (0.761) (0.752) NA Dummy Gas Lift Design Complete 70

71 Unloading Guidelines Gas Lift Operations and Diagnostics Unloading Procedures, Gas Lift Efficiency, Surveillance and Troubleshooting 1. Hook up the tubing pressure, casing pressure and gas lift injection rates to chart recorders / trend display devices 2. Bleed tubing down into the oil manifold 3. Start injecting +/- 300 MCFPD (8, scm/day). Slowly increase injection so it takes 10 minutes for a 50 psig (344.7 kpa) increase in casing pressure. Continue until top valve passes gas 4. Slowly increase injection to allow casing pressure to build-up in 100 psig (689.4 kpa) increments every 10 minutes 5. Maintain injection rate about half of set point until the orifice is reached. 6. Once the well is cleaned up and there is a notable drop in surface casing pressure indicating that the well has unloaded to the orifice, increase injection rate to set point 71

72 IPO Design: Valves Close With Drop In Casing Pressure ( kpa) (3447 kpa) (6895 kpa) ( kpa)( kpa)( kpa) ( kpa) 1000 (304.8 m) 2000 (609.6 m) DEPTH FTTVD 3000 (914.4 m) 4000 ( m) 5000 (1524 m) 6000 ( m) 7000 ( m) Gas Lift Response Curve Total Liquid Rate (stb/lpd) (SCM/Day) (190.8) (159) (127.2) (95.4) (63.6) (31.8) TUBING PRESSURE CASING PRESSURE FBHP DRAWDOWN SIBHP (5663) (11 327) (16 990) (22 653) (28 317) (33 980) (39 643) (45 307) (50 970) (56 634) (62 297) (67 960) Gas Lift Rate: QG (Mscf/Day) (SCM/Day) Economic limit of gas injected is often ½ of that needed for max oil rate IPR Base 72

73 Improving Lift Efficiency 3500 (556.5) Production Rate (bbls/d (SCM/Day) 3000 (477) 2500 (397.5) 2000 (318) 1500 (238.5) 1000 (159) 500 (79.5) 0 Shallow injection depth Deep injection depth (14 158) (28 317) (42 475) (56 634) (70 792) Gas Lift Efficiency Checklist Gas Injection Rate (MMSCFD) (SCM/Day) Single point lifting Deeper lift (high gas lift pressure, OR using the available lift gas pressure) Low tubing head pressure (reduced back pressure) Optimum gas lift injection rate Optimum sized tubing and surface flowline Clean tubing and surface piping Corrosion / Scale monitoring Surveillance / Optimization systems in place 73

74 Troubleshooting: Surface Tools When Strip gas-lifted charts producers (electronic) are losing continuous fluid production, display identify if the problem Flowing is: Tubing pressure Inflow related Casing (Gas Lift injection) pressure Outflow related Gas lift injection rate Other data (e.g., flowline temperature) Other data (manifold pressure, flowline temperature, etc.) Production Well Tests CO 2 Tracer Echometer Troubleshooting: Downhole Tools Flowing bottom-hole pressure and temperature surveys To optimize gas lift To gather periodic data Flowing pressure / temperature gradient surveys Identify lift problems in the string Optimize gas lift in the well Update / Calibrate well flow model Production Logging / Temperature logging Identify plugged up / non-contributing perfs Water production profile of the producing zone Pressure build up surveys Evaluate skin data Estimate average reservoir pressure FGS Survey: Extremely valuable! 74

75 Flowing gradient surveys performed with Wireline Example Well-08A Surface Equipment 1. Wireline Stuffing Box 2. Upper Section 3. Quick Union 4. Rope Blocks 5. Telescopic Gin Pole 6. Middle Section 7. Lower Section 8. Bleed-off Valve 9. Wireline Valve 10. Wireline Pulley 11. Wellhead Connection 12. Weight Indicator 13. Load Binder and Chains 14. Wellhead Adapter Reservoir Details Formation Black Gold Layer pressure 2850 psia ( kpa) Productivity Index- ( PI) STB/psi dd (0.08 m 3 /kpa) P- GOR 450 SCF/STB (80.1 m 3 /m 3 ) Production Total fluid 4935 STBLPD (784.6 m 3 /day) Oil 296 STBOPD (47.06 m 3 /day) BS&W 94%. Pressures Kick off pressure psia ( kpa) Operating casing pressure psia ( kpa) Tubing pressure 195 psia ( kpa) Completion 5 1/2 (0.14 m) Tubing 9 5/8 (0.24 m) Production casing Vertical Producer Gas Lift Design Total Mandrel 11 Unloading valves R-25 P1 PPO valves Lifting Point GLM -11, RCC- 5/8 (0.02 m) Flowing Gradient Survey carried out to ascertain the gas lift performance 75

76 Three Pen Chart at Surface Well 08A Blue Casing pressure Green Lift gas injection rate Red tubing pressure FGS Showing Healthy Gas Lift Performance Tubing Gradient (685.8 m) ( m) Gas Lift Design for Well 08A Corr: B &B (S); Lf=0.74; P bar=2850 psia; Pwf=1162 psia; PI=3.48: (4 C) (27 C) Casing Gradient (49 C) (71 C) (93 C) (116 C) Temperature Gradient ( m) Opening pressures of PPO unloading valves [8274] ( m) [2758] [5516] [kpa] [11 032] [13 790] [16 547] 76

77 FGS Helps Identify Gas Lift Inefficiency in Wells [38 C] [60 C] [82 C] [104 C] [127 C] [149 C] Gas Injection Pressure (762 m) (1524 m) (2286 m) (3048 m) CO 2 Tracer Survey Expected pressure gradient Measured pressure gradient Measured temperature gradient Expected temperature gradient (4137 kpa) (8274 kpa) ( kpa) ( kpa) ( kpa) WellTracer allows to quickly determine lift gas entry points in the well without running downhole tools Detect operating lift depth Detect multiple points of injection / tubing leaks WellTracer creates a snapshot of the well performance by introducing a small volume of CO 2 into the injection line then measuring CO 2 concentration flowing back at the well head The method has some limitations 77

78 CO 2 Tracer Survey Set-up schematic CO 2 Tracer Survey Results Survey showing single lift point Survey showing multiple lift points SPE

79 Session Summary Gas Lift Well Unloading Gas Lift Design using single gas lift mandrel Gas Lift Design using multiple mandrels Design with IPO Unloading valves Design with PPO Unloading valves GL Design Example well Mandrel spacing Valve selection Pressure setting design Orifice sizing Surveillance and Trouble shooting Maintaining Efficiency Surface tools Sub-surface tools GL Well Unloading GL Design with IPO valve string Trouble shooting with Flowing Gradient Surveys 79

80 Gas Lift Optimization Gas Lift Surveillance, Optimization and Three Levels of Optimization Real Time Optimization (RTO) Level I: Individual well performance optimisation More a question of maximising productivity, and not strictly speaking an exercise in resource distribution Completion, stimulation, artificial lift designs, troubleshooting Level II: Allocation of resources to maximise production from a group of wells Can take into consideration costs as well as revenue in deciding where to allocate resources Lift gas allocation, electrical submersible pump (ESP) power distribution Level III: Optimising overall performance of a production system True optimisation problem taking into account various possibilities for revenue generation and different constraints present in the production system System automation through dynamic modelling linked to SCADA 80

81 Lift Gas Allocation (Level II) Available lift gas will be allocated to maximize oil production, considering gas lift efficiency of the wells Excess gas available: Increase lift gas to wells with high GL Efficiency Gas Lift shortage (e.g., compressor issues): Decrease lift gas to wells with low GL efficiency (wells with very low efficiency may be shut-in during the period) GL Efficiency: Volume of oil produced for unit volume of lift gas injected (e.g., BOPD/MMscfd) A Well Efficiency ranking list maintained for this purpose Used to manage short term variations of lift gas supply. Pressure drop in flowlines not taken into account A Typical Gas Lift System Prod Manifold Prod Manifold Lift Gas Manifold Prod Manifold Water Lift Gas Oil Export Gas Fuel Gas External Fuel Supply 81

82 Total System Optimization A total system optimization should consider: Updated well performance with reservoir management considerations Effect of pressure drop in production system Effect of pressure drop in gas lift supply system Compression horsepower, performance, availability and costs An iterative optimal solution with all input constraints considered, to determine: Optimum gas lift rate Optimum gas lift pressure Optimum production separator pressure Include any constraints from reservoir management Production Optimization Cycle Implement new set points; Stabilize wells Gather field data (production/injection); Quality check the data Feed data to asset models and calibrate models Perform optimization calculations and generate new set points SPE

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL

PRODUCTION I (PP 414) ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL PRODUCTION I (PP 414) SUBJECT: ANALYSIS OF MAXIMUM STABLE RATE AND CHOKES RESOLVE OF OIL WELLS BY: JOSE RODRIGUEZ CRUZADO JOHAN CHAVEZ BERNAL PROFESSOR MSc. LUIS ANTONIO DEL CASTILLO DE RODRIGUEZ LIMA,

More information

Continuous Flow Gas Lift Design By Jack R. Blann 2/9/2008 1

Continuous Flow Gas Lift Design By Jack R. Blann 2/9/2008 1 Continuous Flow Gas Lift Design By Jack R. Blann 1 2 Petroleum Engineering Handbook Gas Lift appears as Chapter 12 in: Volume IV Production Operations Engineering Edited by Joe Dunn Clegg Chapter 12 was

More information

SPE Copyright 2012, Society of Petroleum Engineers

SPE Copyright 2012, Society of Petroleum Engineers SPE 159645 Successful Application of Venturi Orifice Gas Lift Valve in Kaji-Semoga Field, South Sumatra: A Case Study Nova Arthur Rilian, SPE, Adam Fatchur Rohman, SPE, Kamal Hamzah, SPE, Yoseph Itok Arseto,

More information

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD

COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD COMPARATIVE EVALUATION OF ARTIFICIAL LIFT METHODS ON A NIGER DELTA FIELD Okologume Chinedu Wilfred 1, Ofesi Samuel F. 2 1, 2 Department of Petroleum and Natural Gas Engineering, Federal University of Petroleum

More information

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon

Gas Lift Workshop Doha Qatar 4-88 February Gas Lift Optimisation of Long Horizontal Wells. by Juan Carlos Mantecon Gas Lift Workshop Doha Qatar 4-88 February 2007 Gas Lift Optimisation of Long Horizontal Wells by Juan Carlos Mantecon 1 Long Horizontal Wells The flow behavior of long horizontal wells is similar to pipelines

More information

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS

A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS A LIFE OF THE WELL ARTIFICIAL LIFT STRATEGY FOR UNCONVENTIONAL WELLS Jay Miller Sales Manager Production Lift Companies Inc. Artificial Lift & Production Congress January 29, 2019 Unconventional Wells

More information

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015

International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages , 2015 International Journal of Petroleum and Geoscience Engineering Volume 03, Issue 02, Pages 116- ISSN: 2289-4713 Improving Reservoir Recovery Factor Using Enhanced Electrical Submersible Pump Design; a Case

More information

Section 2 Multiphase Flow, Flowing Well Performance

Section 2 Multiphase Flow, Flowing Well Performance Section 2 Multiphase Flow, Flowing Well Performance Multiphase Vertical Flow When producing an oil or gas well, the flow of the fluids up the tubing will be in most cases be 2 phase, liquid and gas. The

More information

Well Performance and Nodal TM Analysis Fundamentals COPYRIGHT. Skill Module Overview

Well Performance and Nodal TM Analysis Fundamentals COPYRIGHT. Skill Module Overview Introduction Well Performance and Nodal TM Analysis Fundamentals Skill Module Overview This fundamental level PetroAcademy module addresses well performance and how an oil or gas or even an injection well

More information

New 1.5 Differential Gas Lift Valve

New 1.5 Differential Gas Lift Valve New 1.5 Differential Gas Lift Valve Steve Long Date: March 30, 2016 1 Introduction Background Information First differential valves used widely in 1930 s & 40 s 1944 King Injection Pressure Operated Valve

More information

Demystifying ESPs: A technique to make your ESP talk to you.

Demystifying ESPs: A technique to make your ESP talk to you. 6 th European Electric Submersible Pump Round Table Aberdeen Section Demystifying ESPs: A technique to make your ESP talk to you. A.J. (Sandy) Williams (Phoenix Petroleum Services) Abstract Using a diagnostic

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Gas Lift Challenges. Gas-Lift Workshop. Qatar February 4-8, Mike Johnson ExxonMobil Production Company

Gas Lift Challenges. Gas-Lift Workshop. Qatar February 4-8, Mike Johnson ExxonMobil Production Company Gas-Lift Workshop Qatar February 4-8, 2007 Gas Lift Challenges Mike Johnson ExxonMobil Production Company This presentation is the property of the author(s) and his/her/their company(ies). It may not be

More information

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS

W I L D W E L L C O N T R O L PRESSURE BASICS AND CONCEPTS PRESSURE BASICS AND CONCEPTS Pressure Basics and Concepts Learning Objectives You will be familiarized with the following basic pressure concepts: Defining pressure Hydrostatic pressure Pressure gradient

More information

Subsea Safety Systems

Subsea Safety Systems Subsea Safety Systems The ELSA-HP has been developed to service the high pressure horizontal tree completion and intervention market. With systems designed and qualified up to 15,000 psi, 250 degf and

More information

COPYRIGHT PETROSKILLS

COPYRIGHT PETROSKILLS Production Electrical Submersible Pumps Fundamentals Virtual Session 2 ESP Design Example Manual Design 1 Production ESP Design and Equipment Selection: Nine Steps** 1. Basic data 2. Production capacity

More information

Introduction to Artificial Lift Methods COPYRIGHT. Gas Lift and ESP Pump Core. This section will cover the following learning objectives:

Introduction to Artificial Lift Methods COPYRIGHT. Gas Lift and ESP Pump Core. This section will cover the following learning objectives: Learning Objectives Introduction to Artificial Lift Methods Gas Lift and ESP Pump Core This section will cover the following learning objectives: Identify the most common artificial lift technologies employed

More information

Challenging Subsea Gas Lift Application, Offshore Norway.

Challenging Subsea Gas Lift Application, Offshore Norway. Challenging Subsea Gas Lift Application, Offshore Norway. Authors: Magnus Paulsen - Schlumberger Artificial Lift, Norway Rina Stabell StatoilHydro, Norway Eric Lovie - Schlumberger Artificial Lift, Europe

More information

The Inflow Performance Relationship, or IPR, defines a well s flowing production potential:

The Inflow Performance Relationship, or IPR, defines a well s flowing production potential: Artificial Lift Methods Artificial Lift Overview INTRODUCTION TO ARTIFICIAL LIFT The Inflow Performance Relationship, or IPR, defines a well s flowing production potential: (1) q = PI (Pavg - Pwf) where

More information

Dynamic Simulation Content. be dynamic

Dynamic Simulation Content. be dynamic Dynamic Simulation Content 1. Dynamic Simulation 2. Dynamic Simulation in Gas Lift Systems ALRDC 2005 Spring GAS LIFT WORSHOP Rio de Janeiro Brazil 21-25 February be dynamic www.scandpowerpt.com by Juan

More information

Intermittent Gas Lift Utilizing a Pilot Valve

Intermittent Gas Lift Utilizing a Pilot Valve 39 th Gas-Lift Workshop Houston, Texas, USA May 16 20, 2016 Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager May 16 20, 2016 2015 Gas-Lift Workshop 1 Intermittent Gas Lift

More information

Troubleshooting Unloading Gas Lift Design using DynaLift TM

Troubleshooting Unloading Gas Lift Design using DynaLift TM 34 th Gas-Lift Workshop Singapore February 7-11, 2011 Troubleshooting Unloading Gas Lift Design using DynaLift TM Ron Schmidt - Weatherford International William Rucker Weatherford International This presentation

More information

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA

A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA A COMPARATIVE ANALYSIS OF CONTINUOUS GAS LIFT VALVE POSITIONING METHODS AND ITS APPLICATION WITH MS EXCEL & VBA Darsana Dutta, Palash Lochan Bordoloi, Pranjit Mahanta, Rajnib Borah, Sarmistha Roy Choudhury,

More information

Artificial Lift Basics Pre Reading

Artificial Lift Basics Pre Reading Artificial Lift Basics Pre Reading (Last Updated 7 January 2016) NOTICE AND DISCLAIMER The information contained herein and/or these workshop/seminar proceedings (WORK) was prepared by or contributed to

More information

EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION MASTER OF SCIENCE

EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION MASTER OF SCIENCE EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION A THESIS Presented to the Faculty of the African University of Science and Technology in Partial Fulfilment of the Requirements for the Degree of MASTER OF SCIENCE

More information

Artificial Lift: Making Your Electrical Submersible Pumps Talk To You

Artificial Lift: Making Your Electrical Submersible Pumps Talk To You Report by: Distributed by: Artificial Lift: Making Your Electrical Submersible Pumps Talk To You Author Sandy Williams, Director, Artificial Lift Performance Ltd Disclaimer: Whilst every effort has been

More information

Self-Stabilizing Gas Lift Valve (Patent Pending)

Self-Stabilizing Gas Lift Valve (Patent Pending) Tulsa University Artificial Lift Projects Self-Stabilizing Gas Lift Valve (Patent Pending) Holden Zhang www.tualp.utulsa.edu Jose Luis Arellano Chevron Outline Gas lift instabilities Current stabilizing

More information

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution!

Innovating Gas-Lift for Life of Well Artificial Lift Solution. The Unconventional Solution! Innovating Gas-Lift for Life of Well Artificial Lift Solution The Unconventional Solution! Glenn Wilde Optimum Production Technologies Inc. Revive Energy Corp. Unconventional Oil & Gas Resources Unconventional

More information

Advanced Intermittent Gas Lift Utilizing a Pilot Valve

Advanced Intermittent Gas Lift Utilizing a Pilot Valve Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 29 March 2, 2016 Advanced Intermittent Gas Lift Utilizing a Pilot Valve Matt Young Technical Sales Manager Intermittent Gas Lift

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

On-Off Connector Skirt

On-Off Connector Skirt On-Off Connector Skirt Retrievable Packers & Accessories The On-Off Connector Skirt is compact, reliable, fully sealing, J-type tubing disconnect device that automatically engages and releases with a small

More information

Acoustic Liquid Level Testing of Gas Wells

Acoustic Liquid Level Testing of Gas Wells European Conference Gas Well Deliquification 28-30 September 2009, Hampshire Hotel, The Netherlands Acoustic Liquid Level Testing of Gas Wells Originally Presented OKC POS 2009 - SPE 120643 Lynn Rowlan

More information

32 nd Gas-Lift Workshop. Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2

32 nd Gas-Lift Workshop. Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2 32 nd Gas-Lift Workshop The Hague, The Netherlands February 2-6, 2009 Optimizing Subsea Well Kick-off Operations Case Study Using FlowLift2 Denise Lima Artificial Lift Engineer Galileu de Oliveira Artificial

More information

VortexFlow DX (Downhole) Tool Installation Instructions

VortexFlow DX (Downhole) Tool Installation Instructions VortexFlow DX (Downhole) Tool Installation Instructions www.vortextools.com Page 1 of 10 The VortexFLOW tools are based upon Technology that is a result of U.S.A. patents 6,151,751; 6,659,118; 6,749,374;

More information

A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field

A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field Iranian Journal of Chemical Engineering Vol. 6, No. 2 (Spring), 2009, IAChE A Successful Experience in Optimization of a Production Well in a Southern Iranian Oil Field S. R. Shadizadeh, M. Zoveidavianpoor

More information

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP

Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells. Kerry Daly, Global BD Manager- DST TCP MENAPS 2013 Perforating Options Currently Available in Horizontal Shale Oil and Gas Wells Kerry Daly, Global BD Manager- DST TCP MENAPS 13-17 WELL FLOW MANAGEMENT TM Scope/ Contents: MENAPS 13-17 Study

More information

Critical Velocity/ Nodal Stability Gas Well Predictions

Critical Velocity/ Nodal Stability Gas Well Predictions Originally Presented at: Gas Well De-Liquification Workshop Adams Mark Hotel, Denver, Colorado March 5-7, 2007 European Conference Gas Well Deliquification 25-2626 September 2007 Critical Velocity/ Nodal

More information

Caltec. The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement

Caltec.   The world leader in Surface Jet Pump (SJP) and compact separation systems for upstream oil and gas production enhancement Caltec brings simple passive technology that enables oil and gas operators to harness the kinetic energy of the production process to enhance their production, extending economic field life and reducing

More information

Multi-Stage Plunger Lift: Case Histories

Multi-Stage Plunger Lift: Case Histories Gas Well De-Liquification Workshop February 28 - March 2, 2005 Multi-Stage Plunger Lift: Case Histories Rick Hughes, Production Superintendent S. OK District Ted Davis, Production Foreman S. OK District

More information

WellTracer. East Texas Gas Producers Association. Carthage, Texas September 21 st, 2010

WellTracer. East Texas Gas Producers Association. Carthage, Texas September 21 st, 2010 WellTracer East Texas Gas Producers Association Carthage, Texas September 21 st, 2010 Welltracer Gas Lift Diagnostics What methods are available for diagnosing leak points and or gas lift efficiency? Diagnostic

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

De-Liquification and Revival of Oil & Gas Wells using Surface Jet Pump (SJP) Technology

De-Liquification and Revival of Oil & Gas Wells using Surface Jet Pump (SJP) Technology Gas Well Deliquification Workshop Sheraton Hotel, February 19 22, 2012 De-Liquification and Revival of Oil & Gas Wells using Surface Jet Pump (SJP) Technology Colin Morrison & Sacha Sarshar, Caltec, UK

More information

Beam Pumping to Dewater Horizontal Gas Wells

Beam Pumping to Dewater Horizontal Gas Wells 2 nd Annual Appalachian Basin Gas Well Deliquification Seminar Hilton Garden Inn, Pittsburg, PA June 13-14, 2011 Beam Pumping to Dewater Horizontal Gas Wells Lynn Rowlan, Echometer Co. J F Lea, Production

More information

Digital Intelligent Artificial Lift. Technology Application Justification Operation

Digital Intelligent Artificial Lift. Technology Application Justification Operation Digital Intelligent Artificial Lift Technology Application Justification Operation 1 Gas Lift Production Optimization is Difficult Is my well completely unloaded? Is the well multi-point injecting? What

More information

2007 Gas-Lift Workshop

2007 Gas-Lift Workshop 2007 Gas-Lift Workshop Field Application of Automation and Control Equipment by Cleon Dunham Oilfield Automation Consulting 2/11/2007 2007 Gas-Lift Workshop 1 Gas-Lift Automation & Control Equipment Outline

More information

Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation

Using the Artificial Gas Lift to Increase the Productivity of Noor Oil Field / Mishrif Formation Iraqi Journal of Chemical and Petroleum Engineering Iraqi Journal of Chemical and Petroleum Engineering Vol.16 No.2 (June 2015) 39-44 ISSN: 1997-4884 University of Baghdad College of Engineering Using

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

Intermittent Gas Lift and Gas Assist Plunger Lift

Intermittent Gas Lift and Gas Assist Plunger Lift 40 th Gas-Lift Workshop Houston, Texas, USA Oct. 23 27, 2017 Intermittent Gas Lift and Gas Assist Plunger Lift Claire Cherrey, Production Engineer Eagleford Anthony Williams, Production Engineer Bill Hearn,

More information

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide

COPYRIGHT. Production Logging Flowmeter Survey Solution Guide Production Logging Flowmeter Survey Solution Guide Applying Slippage & Liquid Holdup equations, solve for Q oil and Q water at 6130 ft and 6216 ft @ 6130 ft, the % ratio of flow is about 100 %, or 9190

More information

Drilling Efficiency Utilizing Coriolis Flow Technology

Drilling Efficiency Utilizing Coriolis Flow Technology Session 12: Drilling Efficiency Utilizing Coriolis Flow Technology Clement Cabanayan Emerson Process Management Abstract Continuous, accurate and reliable measurement of drilling fluid volumes and densities

More information

Deliquification Short Stories

Deliquification Short Stories Gas Well De-Liquification Workshop February 28 - March 2, 2005 Deliquification Short Stories Gordon Gates Deliquification Specialist Bp Houston Assisted By: Danny Patterson, Jess Babbitt, Tony Lott Does

More information

THE TRANSIENT GAS LIFT SIMULATOR IN PROSPER (IPM10.0)

THE TRANSIENT GAS LIFT SIMULATOR IN PROSPER (IPM10.0) Page 1 INTRODUCTION In IPM 10.0 one of the new features is the ability to perform Transient Gas Lift Designs, and this article is designed to provide the context behind the development whilst also showing

More information

Downhole Gas Separator Selection

Downhole Gas Separator Selection 4th Annual Appalachian Basin Gas Well Deliquification Workshop Marietta College, Marietta, Ohio June 3 5, 2013 Downhole Gas Separator Selection Lynn Rowlan Proper Downhole Gas Separator Selection Critical

More information

TAM Single SeT inflatable

TAM Single SeT inflatable TAM Single SeT inflatable ReTRievAble PAckeRS Sets with pressure only Releases with straight pull or rotate Ideal for horizontal applications Sets in casing or open hole Runs on tubing, coiled tubing,

More information

Gas Lift Valve Testing

Gas Lift Valve Testing 36 th Gas-Lift Workshop Stavanger, Norway February 4 8, 2013 Gas Lift Valve Testing Angel Wileman, Research Engineer Southwest Research Institute, Fluid Dynamics Feb. 4 8, 2013 2013 Gas-Lift Workshop 1

More information

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013

Pump Fillage Problem Overview. Jim McCoy. 9 th Annual Sucker Rod Pumping Workshop. Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 9 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 17-20, 2013 Pump Fillage Problem Overview Jim McCoy Lynn Rowlan Tony Podio Ken Skinner Echometer Company Jim@echometer.com

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger

Advanced Applications of Wireline Cased-Hole Formation Testers. Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Advanced Applications of Wireline Cased-Hole Formation Testers Adriaan Gisolf, Vladislav Achourov, Mario Ardila, Schlumberger Agenda Introduction to Cased Hole Formation tester Tool specifications Applications

More information

Gas Lift Optimization Using Smart Gas Lift Valve

Gas Lift Optimization Using Smart Gas Lift Valve Gas Lift Optimization Using Smart Gas Lift Valve Mohamed A. G. H. Abdalsadig, Amir Nourian, G. G. Nasr, M. Babaie 1 Abstract Gas lift is one of the most common forms of artificial lift, particularly for

More information

Optimizing Production Throughout the Well s Lifespan. Gas Lift

Optimizing Production Throughout the Well s Lifespan. Gas Lift Optimizing Production Throughout the Well s Lifespan Gas Lift Apergy Leading Brands. Leading Solutions. Apergy s artificial lift division is a team of industry-leading companies that utilize their collective

More information

OLGA. The Dynamic Three Phase Flow Simulator. Input. Output. Mass transfer Momentum transfer Energy transfer. 9 Conservation equations

OLGA. The Dynamic Three Phase Flow Simulator. Input. Output. Mass transfer Momentum transfer Energy transfer. 9 Conservation equations 서유택 Flow Assurance The Dynamic Three Phase Flow Simulator 9 Conservation equations Mass (5) Momentum (3) Energy (1) Mass transfer Momentum transfer Energy transfer Input Boundary and initial conditions

More information

Electrical Submersible Pump Analysis and Design

Electrical Submersible Pump Analysis and Design Electrical Submersible Pump Analysis and Design May 30, 2001 Abstract Case Services software provides production optimization for a variety of different methods of artificial lift. This paper discusses

More information

Acoustic Techniques to Monitor and Troubleshoot Gas-lift Wells

Acoustic Techniques to Monitor and Troubleshoot Gas-lift Wells 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Acoustic Techniques to Monitor and Troubleshoot Gas-lift Wells Carrie-Anne Taylor, Engineer Lynn Rowlan, Engineer Echometer Company Feb. 3-7,

More information

Retrievable Bridge Plugs

Retrievable Bridge Plugs Retrievable Bridge Plugs & Associated Equipment Well Intervention omega-completion.com Our Philosophy High performance and integrity The Omega range of Retrievable Bridge Plugs and our accompanying suite

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study

Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Coiled Tubing string Fatigue Management in High Pressure Milling Operation- Case Study Abstract: Paper Presenter: Ebrahim Rabbani 1 e.rabbani@mehranservices.com Ebrahim Rabbani, Danial Davoodi 2, Fatemeh

More information

HPHT Annular Casing Packer. Obex Annular Casing Packer

HPHT Annular Casing Packer. Obex Annular Casing Packer HPHT Annular Casing Packer Obex Annular Casing Packer Industry Challenge Casing packer to support second stage cement Reduce hydrostatic pressure on formation Get cement to surface Annular gas migration

More information

Cased-Hole Logging Environment

Cased-Hole Logging Environment Cased-Hole Logging Environment 2 Planning a Production Logging Job Planning is an important part of a production logging job. Frequently these jobs can only be done in safety during daylight. Thus, the

More information

GAS LIFT IN NEW FIELDS

GAS LIFT IN NEW FIELDS GAS LIFT IN NEW FIELDS GAS LIFT in NEW FIELDS NEW DESIGN FOR WELLS AND COMPRESSORS RESERVOIR AND PRODUCTION SIMULATION MATCHING REQUIRED PRODUCTION NODAL ANALYSIS SIMULATION USED TO SELECT INJECTION DEPTH

More information

DB Bridge Plug. Features. Benefits. Applications

DB Bridge Plug. Features. Benefits. Applications DB Bridge Plug The WELLFIRST Premium Cast Iron Bridge Plug designed to run on electric line. Rated between 2000-10000-psi differential, and 300 F from above and below. Features Field Proven Design Constructed

More information

44 (0) E:

44 (0) E: FluidFlow Relief Valve Sizing Handbook Flite Software 2016 Flite Software N.I. Ltd, Block E, Balliniska Business Park, Springtown Rd, Derry, BT48 0LY, N. Ireland. T: 44 (0) 2871 279227 E: sales@fluidflowinfo.com

More information

Tutorial. BOSfluids. Relief valve

Tutorial. BOSfluids. Relief valve Tutorial Relief valve The Relief valve tutorial describes the theory and modeling process of a pressure relief valve or safety valve. It covers the algorithm BOSfluids uses to model the valve and a worked

More information

APPENDIX A1 - Drilling and completion work programme

APPENDIX A1 - Drilling and completion work programme APPENDIX A1 - Drilling and completion work programme Information about the well and drilling To the extent possible, the international system of units (SI) should be adhered to, and the drilling programme

More information

Presented By Dr. Youness El Fadili. February 21 th 2017

Presented By Dr. Youness El Fadili. February 21 th 2017 Presented By Dr. Youness El Fadili February 21 th 2017 Outline Introduction Objective Critical rate definition Theory and development of New model Application and comparison of the New model Experimental

More information

Cavitation in Valves

Cavitation in Valves VM CAV/WP White Paper Cavitation in Valves Table of Contents Introduction............................... 2 Cavitation Analysis.......................... 2 Cavitation Data............................. 3

More information

A Longer Lasting Flowing Gas Well

A Longer Lasting Flowing Gas Well 2018 Artificial Lift Strategies for Unconventional Wells Workshop Cox Convention Center, February 4 7, 2018 A Longer Lasting Flowing Gas Well New Dual-Tubing Flowing Design Paul Edwards, Production Engineer,

More information

Fully coupled modelling of complex sand controlled completions. Michael Byrne

Fully coupled modelling of complex sand controlled completions. Michael Byrne Fully coupled modelling of complex sand controlled completions Michael Byrne Outline Background Objectives Reservoir, Fluid Properties and Pressure Validating Modelling Fluid Flow Through Inflow Control

More information

Flow Scanner. Production logging in multiphase horizontal wells

Flow Scanner. Production logging in multiphase horizontal wells Flow Scanner Production logging in multiphase horizontal wells Applications Multiphase flow profiling in nonvertical wells Identification of fluid and gas entries in multiphase well or liquid in gas wells

More information

Downhole Gas Separator Selection

Downhole Gas Separator Selection Gas Well Deliquification Workshop Sheraton Hotel, February 17 20, 2013 Downhole Gas Separator Selection James N. McCoy & Lynn Rowlan Feb. 17 20, 2013 2 Downhole Gas Separator Selection Many operators with

More information

Oman Central Gas Velocity Strings in deep tight gas wells. September th European Conference on Gas Well Deliquification.

Oman Central Gas Velocity Strings in deep tight gas wells. September th European Conference on Gas Well Deliquification. Oman Central Gas Velocity Strings in deep tight gas wells September 2009-4th European Conference on Gas Well Deliquification. Velocity Strings Oman Central Gas Agenda: - Objectives - Completions - VS design

More information

Production Optimization Using Bean Size Selection for Niger Delta Oil Wells

Production Optimization Using Bean Size Selection for Niger Delta Oil Wells Production Optimization Using Bean Size Selection for Niger Delta Oil Wells Idongesit Effiong Essen 1, Dulu Appah 2, Mfon Godwill Udoaka 3 1,3 Department of Petroleum Engineering, University of Uyo, Uyo,

More information

Downhole Diverter Gas Separator

Downhole Diverter Gas Separator 7 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September 27-30, 2011 Downhole Diverter Gas Separator Jim McCoy Ken Skinner, Lynn Rowlan, Dieter Becker - Echometer Company

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

W I L D W E L L C O N T R O L FLUIDS

W I L D W E L L C O N T R O L FLUIDS FLUIDS Fluids Learning Objectives You will learn about different fluids that can be used in well control. You will become familiar with the characteristics and limitations of fluids. You will learn general

More information

Unit A-2: List of Subjects

Unit A-2: List of Subjects ES312 Energy Transfer Fundamentals Unit A: Fundamental Concepts ROAD MAP... A-1: Introduction to Thermodynamics A-2: Engineering Properties Unit A-2: List of Subjects Basic Properties and Temperature Pressure

More information

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC.

Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IHS INC. SPE 113661 Design Tapered Electric Submersible Pumps For Gassy Wells Desheng Zhou, SPE, Rajesh Sachdeva, SPE, IS INC. Copyright 8, Society of Petroleum Engineers This paper was prepared for presentation

More information

Gas Gathering System Modeling The Pipeline Pressure Loss Match

Gas Gathering System Modeling The Pipeline Pressure Loss Match PETROLEUM SOCIETY CANADIAN INSTITUTE OF MINING, METALLURGY & PETROLEUM PAPER 2005-230 Gas Gathering System Modeling The Pipeline Pressure Loss Match R.G. MCNEIL, P.ENG. Fekete Associates Inc. D.R. LILLICO,

More information

Next Generation Quartz Pressure Gauges

Next Generation Quartz Pressure Gauges Next Generation Quartz Pressure Gauges Rick Puccio, Ph.D. Senior Scientist Quartzdyne Houston, TX March 2, 2016 Outline Quartz Pressure Gauge Introduction Gauge Size Reduction Long Term Pressure Drift

More information

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells

Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells Gas Well De-Liquification Workshop February 28 - March 2, 2005 Acoustic Liquid-Level Determination of Liquid Loading in Gas Wells Robert Lestz, Eddie Bruner Lynn Rowlan ChevronTexaco OBJECTIVE: 1. Observe

More information

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Alan Brodie, PTC

37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, Alan Brodie, PTC 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 Gas Lift Innovations which deliver more production and reduce or simplify well interventions Alan Brodie, PTC Feb. 3-7, 2014 2014 Gas-Lift

More information

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER

FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER FUNDAMENTALS OF PRESSURE REGULATORS ROBERT BENNETT MANAGER OF TRAINING ELSTER AMERICAN METER SUPPLY = DEMAND FUNCTION OF A REGULATOR A regulator may be defined as a "mechanism for controlling or governing

More information

CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam

CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University Final Exam 8 pages, front & back, not including reference sheets; 21 questions An excerpt from the NCEES Fundamentals

More information

3 1 PRESSURE. This is illustrated in Fig. 3 3.

3 1 PRESSURE. This is illustrated in Fig. 3 3. P = 3 psi 66 FLUID MECHANICS 150 pounds A feet = 50 in P = 6 psi P = s W 150 lbf n = = 50 in = 3 psi A feet FIGURE 3 1 The normal stress (or pressure ) on the feet of a chubby person is much greater than

More information

Using Gas Lift to Unload Horizontal Gas Wells

Using Gas Lift to Unload Horizontal Gas Wells Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 27 March 2, 211 Using Gas Lift to Unload Horizontal Gas Wells Rob Sutton Marathon Oil Company Conventional Gas Lift Application

More information

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy

FORMATION TESTER MOBILITY. Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy FORMATION TESTER MOBILITY Lachlan Finlayson, Chief Petrophysicist Petrofac Engineering & Production Services Engineering Services Consultancy 1 Introduction Petrofac Formation Testers Pretest Procedure

More information

Restoring Fluid Flow in Tubing Strings

Restoring Fluid Flow in Tubing Strings Restoring Fluid Flow in Tubing Strings Andrew Roth, Product Manager Fike Corporation Fike Hydraulic Tubing Drains (HTD) for use with deep hole drilling tools, downhole devices and other oil and off shore

More information

Downhole Gas Separators

Downhole Gas Separators Gas Well De-Liquification Workshop Denver, Colorado February 27 March1, 2006 Downhole Gas Separators A Laboratory and Field Study Jim McCoy, Echometer Company Tony Podio, University of Texas at Austin

More information

A Combined Experimental & Numerical Research Program to Develop a Computer Simulator for Intermittent Gas-lift

A Combined Experimental & Numerical Research Program to Develop a Computer Simulator for Intermittent Gas-lift 37 th Gas-Lift Workshop Houston, Texas, USA February 3 7, 2014 A Combined Experimental & Numerical Research Program to Develop a Computer Simulator for Intermittent Gas-lift Bordalo, S. (1), Barreto, M.

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Orifice Plates EXERCISE OBJECTIVE In this exercise, you will study how differential pressure flowmeters operate. You will describe the relationship between the flow rate and the pressure drop

More information

GEOTHERMAL WELL COMPLETION TESTS

GEOTHERMAL WELL COMPLETION TESTS GEOTHERMAL WELL COMPLETION TESTS Hagen Hole Geothermal Consultants NZ Ltd., Birkenhead, Auckland, New Zealand. ABSTRACT This paper reviews the measurements that are typically made in a well immediately