1 Contents Rigging Stages, Bosun s Chair, and Rope Ladders 3 Introduction 3 Rigging a stage 4 Rigging a Bosun s chair 5 Portable ladders 7 Gangways 8 Nautical Knowledge Ladders and Stages 1

2 2 Nautical Knowledge Ladders and Stages

3 Rigging Stages, Bosun s Chair, and Rope Ladders Introduction This section is not about lifting weights, but about lifting people. If the rules in lifting weight had to be narrowed to one, it probably would be to keep out of the way of loads. But when the load is people, they can t do that. So stick to the safety rules! Practical and closely supervised training is required for such operations, so be familiar with the basics given here. There are various ways to rig staging for a vessel s maintenance. On board any vessel there is little space to set up proper scaffolding and staging, and also there will always be obstacles on deck to contend with that make it difficult to set up staging. So there will generally be a good chance that you will have to compromise or jury-rig the staging. The easiest way to rig staging on a vessel is to use simple scaffolding, which can only be set up one way because of the arranged lengths and clips etc. The most important thing to remember about setting scaffolding up is that the base must be level and sturdy. After you set up a sturdy base, build the scaffolding to the height you require, going a little bit higher so you can fit guard rails. Then, using rigged lines, pull the planking up and place it atop the scaffolding and tie it down with lashing cord. Ensure you have a good working platform. Also ensure you fit the guard rails, which should be just above waist level. Because most vessels will not have the deck space to allow you to do this, you will have to use other parts of the ship to support the planking. There are two ways to do this: Lash a plank between the port and starboard shrouds by letting it rest on top of a ratline (a rope step lashed between shrouds). Then lash it in place and put safety lines around the entire area. Put a plank onto part of the superstructure of the ship, and then take the other end to a ratline or shroud and lash it in place. Again, fit safety lines and lash the planks down. Nautical Knowledge Ladders and Stages 3

4 Those are the two basic stagings you will use on a ship: there are others like the flying stage and suspended stage which are explained in your text, but the key point is that there is no set way to rig up staging on a vessel, because each vessel is different and each situation will have to be assessed to see which is the best way to support planking. Just remember that safety is the key, and the lashings and support lines must be made fast extremely well and secure. Rigging a stage The practical handiest size line for a stage rope is 20mm. This is known as a gantline. It must be long enough to reach the waterline on the bight when working over the ship s side. One method of securing the end of the stage is shown below. Figure 1 In the above method the rope tail is made fast to the standing part after the hitch is completed, using a bowline. If the stage is extra long, it is advisable to rig a centre line to prevent sagging in the middle. The standing part should be reeved through a lizard, shackle or best of all a tail block to enable it to be lowered and adjusted by those working from the stage. Take two full turns of the hauling part around the end of the stage and one full turn around the horn as a means of lowering. 4 Nautical Knowledge Ladders and Stages

5 Precautions Check stage for defects. Inspect all lines and fittings. Correctly rig the stage. Load test the stage to four times the intended load. Gantlines must trail in the water to be used as lifelines. Stages should only be rigged over water. Do not use while underway. Always set down before raising and lowering. Rig a rope ladder for access. Be positively tended and have a life buoy available. Rigging a Bosun s chair In most work done aloft a bosun s chair and gantline is used, the gantline is always attached to the chair by means of a double sheet bend with the end seized to the standing part (Figure 2). The gantline should be reeved through a tail block or lizard for ease of hauling and lowering oneself. How to make a lowering hitch while on a Bosun s chair A long bight of the hauling part is pulled through the strop of the chair, passed over the head and allowed to drop behind to the feet. It is then passed under the feet and brought to the front. The slack on the hauling part is pulled tight forming the hitch. When ready to lower, render slack on the hauling part through the hitch, which it will easily do. The practice of holding on with one hand and making the lowering hitch with the other hand is dangerous. Nautical Knowledge Ladders and Stages 5

6 Figure 2: Bosun s chair Note: Grip with hand and seize both parts of the gantline together before making the lowering hitch. Precautions Check bosun s chair for defects. Inspect all lines and fittings. Corrrectly rig the gantline. Load test four to five times the intended load. When hauling aloft in a bosun s chair it should be done by hand. 6 Nautical Knowledge Ladders and Stages

7 Figure 3: Riding a stay When riding a stay ensure the bow of the shackle rides the stay not the pin. Always seize (mouse) the shackle pin. Wear a safety harness if more than two metres aloft. The person working aloft should make sure all tools have safety lines attached to the chair. A safety precaution while in the chair is to have a harness attached to the standing rigging of the vessel. This will stop you from swinging around when the ship moves about. You can also use somebody on deck to lower you when need, but it must be made clear that they must take caution and have a turn with the halyard around a pin or something sturdy. Also, it is recommended that you use a purchased bosun s chair rather than a home-made one! Portable ladders Rope ladders/side ladders are used to access stages over the vessels side, over hatch coamings to access parts of a hold etc. They are light and handy ladders easily carried around the decks. The top of the ladder can be left with the rope ends whipped or a thimble can be used. This enables it to be shackled to a boom if necessary. Nautical Knowledge Ladders and Stages 7

8 Figure 4 Gangways Gangways are used for the movement of people from the ship to shore, or vice versa. Things you must consider are tide movement, surge, weight of the users, and the length, height and angle of the gangway. Most importantly, ensure that the gangway is firmly secured to the ship, so that it does not move on the deck and cannot fall away from the ship. The gangway should be on wheels and must be able to withstand a great deal of weight. You must also watch the rise and fall of the tide, because you will have to adjust the height of the gangway accordingly. A gangway must have a hand-rail that is waist-high and rigid. It should also have slats which go across the planking every 400cm or so, and the planking should have a non-skid surface. The lifting cables for the gangway should be inspected regularly and greased. All the different types of gangways must be fitted with a safety net that is attached at four points: two on the ship and two at the bottom of the gangway or dock wall. The net should be tight, made from a rope with a minimum thickness of 18 mm, and it should be a little lower in the middle section of the net than the outer edges. 8 Nautical Knowledge Ladders and Stages

9 Check your progress 1 List the precautions for rigging a stage. 2 Briefly list safety precautions for working in a bosuns chair. Check your answers with those given at the end of this learning resource. Nautical Knowledge Ladders and Stages 9

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck Page 1 of 7 Compiled by Approved by Chief Examiner Syllabus Committee:22 November 2011 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Ratings: Page 2 of 7 1. Contribute

More information

You will be shown how to put on your safety harness, and told what to do and what not to do based on the following.

You will be shown how to put on your safety harness, and told what to do and what not to do based on the following. WORKING ALOFT Working at height is potentially dangerous but risks can be reduced. The Ship s Executive insists that work aloft be carried out safely. There is an obligation on crew to look out for themselves

More information

DOYLE Cradle Cover MANUAL

DOYLE Cradle Cover MANUAL DOYLE Cradle Cover MANUAL The Doyle Cradle Cover Upon receiving your new Doyle Cradle Cover and before starting actual installation, we recommend laying out your Cradle Cover on a hard surface in a secure

More information

"FALL PREVENTION IN THE WORKPLACE"

FALL PREVENTION IN THE WORKPLACE MAJOR PROGRAM POINTS "FALL PREVENTION IN THE WORKPLACE" Part of the "GENERAL SAFETY SERIES" Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Fall Protection"

More information

HOW TO RIG A CORMORANT

HOW TO RIG A CORMORANT HOW TO RIG A CORMORANT Page 1 of 6 Instructions adapted from Cormorant Owner s Handbook 1 Ensure that peak halyard, throat halyard and topping lift are attached to the mast as shown in Fig. 1. 2 Set-up

More information

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 50th session Agenda item 5 DE 50/WP.8 7 March 2007 Original: ENGLISH INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION

More information

OSHA s new walking working surfaces standards

OSHA s new walking working surfaces standards OSHA s new walking working surfaces standards changes and new requirements Inspection of walking working surfaces 1910.22(d) Regularly and as needed and correct, repair, or guard against hazardous conditions;

More information

Knots, Hitches and Bends

Knots, Hitches and Bends Knots, Hitches and Bends It is hard to define clearly the terms knot, hitch and bend because their functions overlap. However, the terms may be generally defined as follows: Knots Hitches Bends Knots are

More information

FALL PROTECTION. Leader s Guide. Marcom Group Ltd.

FALL PROTECTION. Leader s Guide. Marcom Group Ltd. 1818 FALL PROTECTION Leader s Guide Marcom Group Ltd. Structure and Organization Information in this program is presented in a definite order, so that employees will see the relationships between the various

More information

OPERATIONAL CHECK LIST

OPERATIONAL CHECK LIST www.spinnakersailing.com (650) 363-1390 OPERATIONAL CHECK LIST https://twitter.com/#!/spinnakersailin http://www.facebook.com/spinnakersailingrwc http://www.spinnakersailing.com/newsletter.html Dear Sailor,

More information

Thanks To Our Sponsors Platinum Sponsor NS Department of Labour and Workforce Development

Thanks To Our Sponsors Platinum Sponsor NS Department of Labour and Workforce Development March 25, 26, 27, 2009 Thanks To Our Sponsors Platinum Sponsor NS Department of Labour and Workforce Development Special Event Sponsor Workers Compensation Board of Nova Scotia Gold Sponsors Maxwell Promotions

More information

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an

Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet an By User Manual Index 1. Trampoline 2. Main Foils 3. Spinnaker Pole 4. Mast Setup 5. Mast Rigging 6. Rig Tension 7. Trapeze Lines 8. Rudders 9. Boom 10. Main Sheet and Traveler 11. Main Sail 12. Downhaul

More information

Essential Rig Tuning Guide The Ins and Outs of tuning your mast.

Essential Rig Tuning Guide The Ins and Outs of tuning your mast. Essential Rig Tuning Guide The Ins and Outs of tuning your mast. Tuning Your Rig The main goal in tuning your mast is to achieve a spar that s straight. By doing this it will help you gain control of sail

More information

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1

Fall Protection Refresher Orientation. Fall Protection Refresher Orientation 1 Fall Protection Refresher Orientation Fall Protection Refresher Orientation 1 Course Objectives! Understand the definitions of fall prevention, fall restraint, and fall arrest.! Understand the requirements

More information

Deckhand Crew. Deckhand Crew Responsibilities

Deckhand Crew. Deckhand Crew Responsibilities Deckhand Crew Responsibilities Deckhand Crew Deckhands must be thorough seamen, for they are responsible for many types of tasks. Deckhands, along with the Bosuns, are in charge of most tasks done "on

More information

DISCUSSION OF QUALIFICATION REQUIREMENTS FOR ABLE SEAFARER-DECK

DISCUSSION OF QUALIFICATION REQUIREMENTS FOR ABLE SEAFARER-DECK Enclosure (1) to NVIC 14-14 DISCUSSION OF QUALIFICATION REQUIREMENTS FOR ABLE SEAFARER-DECK 1. GENERAL. This enclosure provides guidance to qualify for an International Convention on Standards of Training,

More information

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field. Purpose The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field. Fall Protection and Prevention JELD-WEN Field Employees

More information

"FALL PROTECTION IN CONSTRUCTION ENVIRONMENTS"

FALL PROTECTION IN CONSTRUCTION ENVIRONMENTS MAJOR PROGRAM POINTS "FALL PROTECTION IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS

More information

Assembly Instructions

Assembly Instructions SAFETY AT THE HIGHEST LEVEL 6.6ft (2m) Window - Dec Platform System Assembly Instructions Temporary access device conforming to the test requirements of CSA Z271-10, CSA B354.5-07, CSA Z797-09, OH&S Act

More information

Unit 18 LEAVING THE DOCK

Unit 18 LEAVING THE DOCK Unit 18 LEAVING THE DOCK Basic terms - Dock Pilot - River Pilot - tug-boat - transverse thrust - effect of the screw - singling up - mooring ropes - skipper - handling of ships - buoys - dolphins - slack

More information

F-27 RIGGING GUIDE EXTRACTED FROM ORIGINAL F-27 SAILING MANUAL

F-27 RIGGING GUIDE EXTRACTED FROM ORIGINAL F-27 SAILING MANUAL F-27 RIGGING GUIDE EXTRACTED FROM ORIGINAL F-27 SAILING MANUAL By Ian Farrier not be possible if the towing vehicle is a van. When trailering, allow extra distance for stopping. Watch also for low bridges,

More information

Function: Navigation at the support level

Function: Navigation at the support level STCW Code Table A-II/5 Specification of Minimum Standards of Competence of Ratings as Able Seafarer Deck Ref: https://www.edumaritime.net/stcw-code Source: IMO Function: Navigation at the support level

More information

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener Unit 2 SHIPS AND SHIPS TERMS STRUCTURAL MEMBERS OF A SHIP Basic terms shell plating strake keel deck tank top floor stringer buoyancy strength stability bulkhead compartment stem frame beam bracket girder

More information

Fall Protection Checklist. Guardrail System

Fall Protection Checklist. Guardrail System Fall Protection Checklist Location/Department: Date of Inspection: Inspectors: Corrective Actions: Work order/memos were issued: Yes No Date issued: In accordance with the MIOSHA and OSHA standards the

More information

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used

Overview. Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used FALL PROTECTION Overview Identify fall hazardous areas Describing potential fall hazards How appropriate portable and extension ladders are used Fall Protection All situations that expose personnel to

More information

Roles: Presentation Questions:

Roles: Presentation Questions: DECKHAND CREW Instructions: (mates read aloud) This crew packet contains important information for you to know aboard the Balclutha, and it will help you complete your project. First, read the part about

More information

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada)

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada) FALL PROTECTION WORK PLAN (Alstom Power Installation Canada) Location: Unit: Foreman: Task: Supervisors Ensure: Workers must review and sign this fall protection work plan prior to starting work in an

More information

Weta Basic Rigging Guide

Weta Basic Rigging Guide Weta Basic Rigging Guide A quick reference guide of how to rig your Weta, with some tips to make rigging quick and easy! For a more indepth guide see our Weta Manual under Weta Owners on the website. 1.

More information

Scout It Out would like to extend its gratitude to all the sites where the following information had been gathered.

Scout It Out would like to extend its gratitude to all the sites where the following information had been gathered. Rope Work introduces the basic knots that all Scouts and Guides should know. Most of the knots featured here are very useful in Pioneering and should be learnt. This Section does not fully teach the exact

More information

Competency Framework for Advanced Deckhand-Fishing. Competency Framework for Advanced Deckhand-Fishing

Competency Framework for Advanced Deckhand-Fishing. Competency Framework for Advanced Deckhand-Fishing Table of Contents (ADH-F)... 1 Function: Nautical knowledge... 1 Function Fishing Vessel Construction, Deck Equipment and Gear.... 2 Function: Fibre Ropes, Wire Ropes and Chains.... 4 Function: Knots and

More information

JURY SAILS IN THE NORTH ATLANTIC BY J T VARNEY - CHIEF OFFICER R.N.R.

JURY SAILS IN THE NORTH ATLANTIC BY J T VARNEY - CHIEF OFFICER R.N.R. JURY SAILS IN THE NORTH ATLANTIC BY J T VARNEY - CHIEF OFFICER R.N.R. A water colour painted by one of the cadets on this voyage and presented to the author The practical usefulness of jury sails to steady

More information

REPORT INTO THE INCIDENT ON BOARD THE "ARKLOW BROOK" ON 15TH JANUARY 2002 WHERE A CREWMEMBER SUSTAINED SERIOUS INJURIES.

REPORT INTO THE INCIDENT ON BOARD THE ARKLOW BROOK ON 15TH JANUARY 2002 WHERE A CREWMEMBER SUSTAINED SERIOUS INJURIES. REPORT INTO THE INCIDENT ON BOARD THE "ARKLOW BROOK" ON 15TH JANUARY 2002 WHERE A CREWMEMBER SUSTAINED SERIOUS INJURIES. The Marine Casualty Investigation Board was established on the 25 th March, 2003

More information

Course Outline Cover Page

Course Outline Cover Page College of Micronesia FSM P.O. Box 159 Kolonia, Pohnpei Course Outline Cover Page Basic Seamanship MWD 102 Course Title Department and Number Course Description: To provide the learner with the knowledge

More information

Wysiwig - Wayfarer Rigging Guide

Wysiwig - Wayfarer Rigging Guide Wysiwig - Wayfarer 8767 - Rigging Guide GENERAL NOTES Before you go afloat, make sure that the self-bailer is closed. It is operated through the cut-out in the starboard floorboard. If you do not close

More information

MAST RAISING AND LOWERING

MAST RAISING AND LOWERING MAST RAISING AND LOWERING If you are the owner of a sailing boat, there will come a time when the mast has to be lowered and raised whether for maintenance or to adhere to hard standing rules. There is

More information

Rigging. Student Booklet

Rigging. Student Booklet Student Booklet Ministry of Education. December 2009. The material was developed for Continuing Education Committee for the building / construction industry and in cooperation with lecturer Ole Østergaard

More information

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment. Page 1 of 7 REFERENCES Personal Protective Equipment Standards 1.31 PURPOSE This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall

More information

Fall Protection Guidelines. Individual Unit Function: Safety Procedure No.: SOP-0111 Page: 1 of 13. Preparer: Owner: Approver: Safety Safety Safety

Fall Protection Guidelines. Individual Unit Function: Safety Procedure No.: SOP-0111 Page: 1 of 13. Preparer: Owner: Approver: Safety Safety Safety Procedure No.: SOP-0111 Page: 1 of 13 MIDGA Reviewed: 09/187/1 Effective: 09/17/17 Supersedes: Ver. 1.0 7 1. PURPOSE These guidelines are to provide minimum standards for work on corrugated roofing, structural

More information

J/22 Dave Perry. Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat

J/22 Dave Perry. Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat J/22 Dave Perry Based on sailing the POW in the Ft Worth Boat Club (TX) boats in 2006 We sailed with three in the boat GENERAL Boats spin fast! Boats go fast sideways when downspeed Use weight to help

More information

M32 CATAMARAN ASSEMBLY MANUAL

M32 CATAMARAN ASSEMBLY MANUAL M32 CATAMARAN ASSEMBLY MANUAL 1 M32 CATAMARAN ASSEMBLY MANUAL MANUAL SUMMARY M32 ASSEMBLY Parts and tools Instructions MAST PLATFORM Parts and tools Instructions MAST STEPPING Instructions MAIN HALYARD

More information

CPWR - The Center for Construction Research and Training. Fall Hazard Identification and Control Audit of the Aria Building. City Center Project

CPWR - The Center for Construction Research and Training. Fall Hazard Identification and Control Audit of the Aria Building. City Center Project CPWR - The Center for Construction Research and Training Fall Hazard Identification and Control Audit of the Aria Building City Center Project Las Vegas, Nevada September, 2008 Submitted by Mark Fullen

More information

QuikVang. The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL D-30 MODEL D-40

QuikVang. The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL D-30 MODEL D-40 QuikVang The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL D-30 MODEL D-40 33 Broadcommon Road, Bristol, RI 02809 USA T: 401.253.4858 F: 401.253.2552 www.hallspars.com 1

More information

NOTICE OF PROPOSED REVISIONS TO SEAWAY PRACTICES AND PROCEDURES TO BE EFFECTIVE MARCH 31, Part III SEAWAY NAVIGATION.

NOTICE OF PROPOSED REVISIONS TO SEAWAY PRACTICES AND PROCEDURES TO BE EFFECTIVE MARCH 31, Part III SEAWAY NAVIGATION. NOTICE OF PROPOSED REVISIONS TO SEAWAY PRACTICES AND PROCEDURES TO BE EFFECTIVE MARCH 31, 2015 Part III SEAWAY NAVIGATION Maximum Draught 29. (1) Notwithstanding any provision herein, the loading of cargo,

More information

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS

RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS RESOLUTION A.1045(27) RECOMMENDATION ON PILOT TRANSFER ARRANGEMENTS 1 GENERAL Ship designers are encouraged to consider all aspects of pilot transfer arrangements at an early stage in design. Equipment

More information

Fall Protection and Elevated Work

Fall Protection and Elevated Work Program No: SP-010 Page 1 1.0 PURPOSE AND INTRODUCTION Fall Protection and Elevated Work To establish fall protection safety procedures for Pitt County Schools employees engaged in any of the following

More information

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M121.01 TIE KNOTS, BENDS AND HITCHES Total Time: 120 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this

More information

J/70 Building Specification

J/70 Building Specification DECK, HARDWARE AND FITTINGS 1 FRP Composite deck 2 Indeck furler unit 3 Bow "U" bolt mooring eye (stainless) Option for one 6" (152mm) mooring cleat in lieu of eye. 4 Shroud chainplates (stainless) (BSI

More information

GREAT LAKES REGION BOARDING ARRANGEMENTS FOR PILOTS

GREAT LAKES REGION BOARDING ARRANGEMENTS FOR PILOTS GREAT LAKES REGION BOARDING ARRANGEMENTS FOR PILOTS All ships must have pilot transfer equipment and arrangements that are compliant with section 74 of the Transport Canada, Marine Safety, Navigation Safety

More information

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS 1. Purpose The purpose of this procedure is to set forth the standards for small boat operations and the qualifications for a small boat operator. These guidelines shall be used while operating the small

More information

requirement 9 Polyester Nylon

requirement 9 Polyester Nylon Page 4, requirement 9: By yourself, build an A-trestle OR X-trestle OR H- trestle using square and diagonal lashings. Explain the application of the trestle you build. Demonstrate how to tie two spars

More information

Standard Operating Procedure

Standard Operating Procedure Standard Operating Procedure BOOMS Offshore RO-BOOM / Lamor HD boom Equipment description SOP intended for the use and deployment of Lamor HD 1300 and Desmi Ro-clean 1500 offshore boom. The boom reel holds

More information

Dolly wheels in slot #8 for Boat #10.

Dolly wheels in slot #8 for Boat #10. Rigging: Laser SAIL SELECTION: The International Laser Class has three different official rigs. Each sail is designed for sailors of different weights. The Standard Rig was designed for sailors weighing

More information

LOW ANGLE ROPE RESCUE OPERATIONAL

LOW ANGLE ROPE RESCUE OPERATIONAL Scope: This chapter serves as an introduction to system attachments and fall restraint. Terminal Learning Objective (TLO): At the end of this chapter, the student will be aware of several methods of system

More information

Progressive Safety Services LLC

Progressive Safety Services LLC 1910.23 Guarding Floor and Wall Openings and Holes 1910.66 Powered Platforms, Manlifts and Vehicle Mounted Work Platforms. 1926.500 Fall Protection 1926.501 Duty to Have Fall Protection 1926.502 Fall Protection

More information

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline? BANKSMAN / SLINGER 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline? A. 16mm B. 10mm C. 12mm 2. What is the maximum temperature that a webbing sling can be

More information

Stevenson Projects Building the Hull Top Deck and Bulkheads

Stevenson Projects Building the Hull Top Deck and Bulkheads Stevenson Projects Building the Hull 1. Print out both piece sheets. 2. Cut out one keel piece and glue it to a piece of balsa wood or dense cardboard. Cut out the second keel piece and glue it to the

More information

UNIT Seamanship: Efficient Deck Hand (SCQF level 6)

UNIT Seamanship: Efficient Deck Hand (SCQF level 6) National Unit Specification: general information CODE F7HE 12 SUMMARY This Unit is suitable for candidates who aspire to a career in the Merchant Navy, either as a seaman or deck officer. It develops practical

More information

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000 The Hansa C Crane CRANE ID#: Installation & Operation Manual Ideal for the safe and dignified transference of sailors with disabilities from a wharf to the boat. The crane is also suited to many other

More information

Bowsprit Hinge on "Bumble Chugger" By Robin Whittle, Shrimper 124 (Bumble Chugger) (Winter 2003)

Bowsprit Hinge on Bumble Chugger By Robin Whittle, Shrimper 124 (Bumble Chugger) (Winter 2003) Bowsprit Hinge on "Bumble Chugger" By Robin Whittle, Shrimper 124 (Bumble Chugger) (Winter 2003) In April 2003 Practical Boat Owner (PBO) published an article which I had written on the use of the bowsprit

More information

Cable Grip Fitting Procedure General

Cable Grip Fitting Procedure General Cable Grip Fitting Procedure General 1 Ensure the grip is labelled for the correct diameter range and working load limit. (unless otherwise labelled, WLL is one third of the UTS). 2 Always inspect the

More information

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container

LESSONS LEARNED FROM MARINE CASUALTIES. Very serious marine casualty: tug master struck by a falling stores container LESSONS LEARNED FROM MARINE CASUALTIES 1 FATALITY Very serious marine casualty: tug master struck by a falling stores container While discharging a routine parcel of crude oil alongside an oil terminal,

More information

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M TIE KNOTS, BENDS AND HITCHES PREPARATION ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1 EO M121.01 TIE KNOTS, BENDS AND HITCHES Total Time: 120 min PREPARATION PRE-LESSON INSTRUCTIONS Resources needed for the delivery of this

More information

RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS July

RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS July RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS 2016 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory where applicable.

More information

Place a rope coil here

Place a rope coil here 1 2 3 4 The anchor buoys were made from Sculpey. You could however, carve them from wood but I wanted to continue my experimentation with this material. A buoy from this time period would have ranged from

More information

Tacking (sailing on port, tacking to starboard)

Tacking (sailing on port, tacking to starboard) 1. 2. Tactics 3. Main. Pit. 4. Genoa Port Tack. Guy. 5. Genoa Stbd Tack. Sewer. 6. Spinnaker Sheet. 7. Mast. 8. Bow. RS EB CC CM MK SA JS SK Tacking (sailing on port, tacking to starboard) Goto low-side

More information

A Basic Guide to Europe Dinghy Rigging

A Basic Guide to Europe Dinghy Rigging The Basics: A Basic Guide to Europe Dinghy Rigging Use the smallest blocks available for the line size. Most of the blocks on your boat will be micro blocks. Examine all of your rigging and ensure that

More information

Basic Keelboat Sailing Standard (ASA 101)

Basic Keelboat Sailing Standard (ASA 101) Basic Keelboat Sailing Standard (ASA 101) Prerequisites: None General Description: Description: Demonstrated ability to skipper a sloop-rigged keelboat of approximately 20 to 27 feet in length by day in

More information

OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content

OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content OSHA 29CFR 1910 Subpart D Walking-Working Surfaces Content 1910.28 Duty to have Fall Protection and Falling Object Protection 1910.29 Fall Protection Systems and Falling Object Protection Criteria and

More information

Parts of a Rope 1. Carrick Bend 2 Fisherman s Bend 4 Hunter s/rigger s Bend 5 Sheet Bend 7

Parts of a Rope 1. Carrick Bend 2 Fisherman s Bend 4 Hunter s/rigger s Bend 5 Sheet Bend 7 - 1 - Contents Parts of a Rope 1 Bends Carrick Bend 2 Fisherman s Bend 4 Hunter s/rigger s Bend 5 Sheet Bend 7 Hitches Clove Hitch 8 Highwayman s Hitch 9 Italian Hitch 11 Marline Hitch 12 Round Turn and

More information

FALL PROTECTION / ELEVATED WORK

FALL PROTECTION / ELEVATED WORK SEPTEMBER CORE REFRESHER HSE TOOL BOX FALL PROTECTION / ELEVATED WORK FALL PROTECTION Falls from elevations are one of the most common causes of death in this industry. OSHA requires fall protection when

More information

Risk Control at United Fire Group

Risk Control at United Fire Group In the United States, falls are the leading cause of fatalities on a construction site. Employers and employees need to do the following: Where protection is required, select fall protection systems appropriate

More information

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System Model # s: 6000, 6001, 6010 Warning You must read and fully understand all instructions, or

More information

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts: Managing Mobile Crane Hazards Paul Satti Construction Safety Council Hazards of Working Around Cranes Key Concepts: Electrocution Hazards Caught-In, Compressed or Crushing Hazards Struck-By Hazards Other

More information

Constructing the Masts

Constructing the Masts A: Fore Mast completed B: Main Mast unpainted C: Boom Rest D: Unpainted mast detail (fore and main mast) A D B C Constructing the Masts The main and fore masts are virtually identical. At least as far

More information

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices. Title: Elevated Walking/Working Surfaces (Fall Protection) Site Function: Safety Procedure No.: MC032.122 Page: 1 of 16 McIntosh Site Reviewed: 02/2013 Effective: 03/2013 Supersedes: 08/2012 Preparer:

More information

Far East Boat Optimist Rigging Instructions

Far East Boat Optimist Rigging Instructions Far East Boat Optimist Rigging Instructions These instructions are written specifically for Far East Boats Championship and Racing Optimist. Parts of the Optimist PAGE 1 Sprit Wind Indicator Sail Mast

More information

Section 16B. Fall Protection. Falls are the second leading cause of death in the workplace. Factors contributing to falling incidents:

Section 16B. Fall Protection. Falls are the second leading cause of death in the workplace. Factors contributing to falling incidents: Section 16B. Fall Protection Falls are the second leading cause of death in the workplace. Factors contributing to falling incidents: 1. Personal factors Lack of concentration. Use of medication. Poor

More information

Objectives (1 of 3) List at least two types of materials and designs used in rope manufacture. Define and describe the following: Dynamic rope Static

Objectives (1 of 3) List at least two types of materials and designs used in rope manufacture. Define and describe the following: Dynamic rope Static Chapter 16 Rescue Objectives (1 of 3) List at least two types of materials and designs used in rope manufacture. Define and describe the following: Dynamic rope Static rope Webbing List at least five rules

More information

Basic Cruising Standard

Basic Cruising Standard Basic Cruising Standard OBJECTIVE To be able to cruise safely in familiar waters as both skipper and crew of a sloop rigged keelboat of 6 to 10 meters in moderate wind and sea conditions by day. PREREQUISITES

More information

Bowline. Bowline on a bight

Bowline. Bowline on a bight Bowline The Bowline holds tight during extreme situations, yet unties with minimal effort. Used mostly in rigging situations this quickly tied and untied knot is perhaps our most important tool! Caution!

More information

Health and Safety Code of Practice. SCP38 Working at Height

Health and Safety Code of Practice. SCP38 Working at Height Health and Safety Code of Practice Responsibility for Policy: Relevant to: Approved by: Responsibility for Document Review: SCP38 Working at Height Date introduced: February 2007 Date(s) modified: Finance

More information

Sea Scout Knots Knots Hitches Splices and Whippings

Sea Scout Knots Knots Hitches Splices and Whippings Sea Scout Knots Knots Hitches Splices and Whippings Knots www.artworkbygerry.com Bowline... 2 Bowline on the bight... 3 Clove hitch... 4 Double sheet bend... 5 Figure of eight... 6 Fireman s chair knot...

More information

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide

SAIL WELL, STAY WELL. Sydney Flying Squadron ACN Sydney Flying Squadron. SAILING A SKIFF a guide Historic 18 foot Myra Too Sydney Flying Squadron ACN 000 487 230 76 McDougall Street Milsons Point. 2061 SAIL WELL, STAY WELL SAILING A SKIFF a guide PO Box 577 Milsons Point 2061 T: 9955 8350 Web: sydneyflyingsquadron.com.au

More information

The loom consists of a row of vertical posts spaced evenly apart. This is the width you require.

The loom consists of a row of vertical posts spaced evenly apart. This is the width you require. Chapter 19 Construction Construction Projects Camp loom This is a very useful item for camp if you wish to make table tops, walls, placemats, bedding, and so on. Your need will determine the width and

More information

Peinert ZEPHYR. Assembly. The Zephyr is easily rigged; there are only three removable parts - the seat, the foot stretcher, and the rigger arm.

Peinert ZEPHYR. Assembly. The Zephyr is easily rigged; there are only three removable parts - the seat, the foot stretcher, and the rigger arm. Peinert ZEPHYR Assembly The Zephyr is easily rigged; there are only three removable parts - the seat, the foot stretcher, and the rigger arm. Removal and installation of the seat. If the seat is in the

More information

Sheffield Sea Cadet SEAMANSHIP SM05 CONSOLIDATION SM01 SM04

Sheffield Sea Cadet SEAMANSHIP SM05 CONSOLIDATION SM01 SM04 SEAMANSHIP CONSOLIDATION SM01 SM04 Reference Material SM01 SM02 SM03 SM04 PowerPoint presentation, laptop, projector, screen Model (optional) or pictures Quiz sheets as necessary Rope and spars to tie

More information

QuikVang. The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL A-8 MODEL A-12

QuikVang. The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL A-8 MODEL A-12 QuikVang The Original High-Performance Vang INSTALLATION AND OPERATING INSTRUCTIONS MODEL A-8 MODEL A-12 33 Broadcommon Road, Bristol, RI 02809 USA T: 401.253.4858 F: 401.253.2552 www.hallspars.com 1 INTRODUCTION

More information

TUNE YOUR SAILS SPEED

TUNE YOUR SAILS SPEED TUNE YOUR SAILS FOR OUTRIGHT SPEED Rev R05 Important Notes l We recommend not exceeding 350lbs total crew weight as this puts excess stress on the mast and the boat. l When sailing, the boat performs best

More information

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene Procedure No.: BC032.027 Page: 1 of 15 Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene Manager, Occupational Safety Industrial Hygiene Vice President, Ecology & Safety (Signature

More information

INLAND WATERS SYLLABUS

INLAND WATERS SYLLABUS INLAND WATERS SYLLABUS As at 14 May 2012 Index Page 1. Nautical Terms 2 2. Knots and Ropework 3 3. Charts and Navigational Publications 3 4. Navigation 3 5. GPS 4 6. Other Navigational Instruments 4 7.

More information

The Main Gaff... Main Gaff completed. Bearing block

The Main Gaff... Main Gaff completed. Bearing block Once the boom has been placed on the model, the topping lift needs to be rigged. It will be belayed to the port side cap rail. Use the eye bolt aft of the tackle we set up for the backstay. The topping

More information

Working at Heights Training Checklist (Ontario Version)

Working at Heights Training Checklist (Ontario Version) Working at Heights Training Checklist (Ontario Version) The new working at heights training is different from the fall protection training required by Sec. 26.2(1) of the Ontario Construction Projects

More information

ADVENTURE EDUCATION HIGH ROPES

ADVENTURE EDUCATION HIGH ROPES ADVENTURE EDUCATION HIGH ROPES History and Overview Ropes courses could be found in the United States as early as the 1960s. Outward Bound was a leader in these types of adventure activities with their

More information

#1 Genoa Sheeting Apparent Wind: 0-12

#1 Genoa Sheeting Apparent Wind: 0-12 #1 Genoa Sheeting Apparent Wind: 0-12 Outboard of all shrouds, inside lifelines back to genoa track Full Genoa Track Fairlead 3 holes from rear #2 Genoa (High Clew) Sheeting Apparent Wind: 0-15; 15-18

More information

S31 Opening Statement Working at Height

S31 Opening Statement Working at Height S31 Opening Statement Working at Height Falls from height are by far the most common cause of workplace deaths and one of the main causes of major injury in the workplace. Latest figures reveal that 46

More information

Risk Management Assessment. Bill Haines. York College of Pennsylvania

Risk Management Assessment. Bill Haines. York College of Pennsylvania Risk Management Assessment Bill Haines York College of Pennsylvania R i s k M a n a g e m e n t A s s e s s m e n t P a g e i Table of Contents Introduction... 1 Figure #1 Weight Machine Anchoring... 1...

More information

Serenity Houseboat. Standard Operating Procedures for:

Serenity Houseboat. Standard Operating Procedures for: Serenity Houseboat Standard Operating Procedures for: Docking I. Safety a. Never get between the houseboat and the dock or other larger object. b. Always wear PFDs during docking. c. Always wear snug fitting,

More information

Assembly Instructions Star Kayak Sails kit to a Hobie Mirage drive kayak.

Assembly Instructions Star Kayak Sails kit to a Hobie Mirage drive kayak. Assembly Instructions Star Kayak Sails kit to a Hobie Mirage drive kayak. 1. Remove packaging lay out contents. Separate the plastic tubes from the aluminium tubes. 3 plastic and 4 aluminium. ( Giant Star

More information

Fall and Slip Prevention Test. 1. Fall protection is required in construction at and on scaffolds at.

Fall and Slip Prevention Test. 1. Fall protection is required in construction at and on scaffolds at. Date... Name... WSU ID... Fall and Slip Prevention Test 1. Fall protection is required in construction at and on scaffolds at. a) 6 and 10 feet b) 1 and 2 feet c) Not required d) 4 feet for both 2. Falls

More information

RATLINER Assembly Instructions.

RATLINER Assembly Instructions. Model Shipways Inc. www.modelexpo-online.com RATLINER Assembly Instructions. Patent Pending 1. Remove center stands and braces from the main rigging frame. 2. The Stands and Braces should press release

More information