REDUCING AVALANCHE HAZARD TO US ROUTE 89/91 IN JACKSON WYOMING USING SNOW SAILS
|
|
- Angela Richard
- 5 years ago
- Views:
Transcription
1 REDUCING AVALANCHE HAZARD TO US ROUTE 89/91 IN JACKSON WYOMING USING SNOW SAILS Jamie Yount* Avalanche Technician, Wyoming Department of Transportation (WYDOT) Jackson Maintenance Facility Rand Decker Professor and Chair, Department of Civil and Environmental Engineering, Northern Arizona University Robert Rice Research Associate, Engineering Division, University of California at Merced Leroy (Ted) Wells District Three Maintenance Engineer, WYDOT ABSTRACT: Snow sails are a form of passive avalanche starting zone defense. A deployment of snow sails work to disrupt the formation of continuous, coherent wind-slabs in avalanche starting zones. Snow sails are only effective on avalanche paths were the dominant avalanche mechanism is through the formation wind-slabs. The objectives of using snow sail defense structures at the 151-avalanche path in Jackson Wyoming are to cost effectively reduce the avalanche hazard to motorists and highway maintainers on US 89/91 and minimize the visual and terrain impacts. The 151-avalanche path is managed as critical big game habitat and is located adjacent to the residential areas of Jackson Hole. Heavy snows and consistent S-SW winds with a ~1 mile fetch recurrently produce high hazard conditions, with snow slides frequently reaching the highway (~1.0/year). US 89/91 is the primary route for commuter traffic in the Jackson area and has recently been classified as the busiest primary highway in the state of Wyoming. In the autumn of 2002 a deployment of ~50 snow sails were fabricated, transported, and installed on the 151 avalanche path. The snow sails are removed annually in the spring and re-installed in the fall. This was required as a consequence of the National Environmental Policy Act (NEPA) Environmental Assessment (EA) to minimize year-round visual impact. After two seasons of operational use and continued evaluation, the project has proven effective in disrupting the formation of a coherent wind-slab in the 151 staring zone. However, widespread avalanche activity on January 1, 2004 produced an event at 151 depositing 10 of debris across five lanes of highway. Continued evaluation will be required to determine the success of the snow sail deployment in reducing the avalanche hazard, and those conditions and configuration where the deployment is most effective. Keywords: passive avalanche mitigation, avalanche engineering, transportation 1. INTRODUCTION Snow sails are a form of passive avalanche starting zone defense, designed to use the inherent energy of the wind to disrupt and modify snow deposition patterns, resulting in a reduced occurrence of wind-slab avalanching. A deployment of snow sails will disrupt the snowpack in an avalanche starting zone and inhibit the formation of coherent, continuous avalanche wind-slabs. * James M. Yount, Wyoming Department of Transportation, PO Box 14700, Jackson, WY 83002; tel: ; jamie.yount@dot.state.wy.us To be effective in scouring and disrupting the snow depositional pattern, a given snow sail is deployed so that the wind must flow perpendicular, against, and under the broad face of the sail. A single snow sail is installed on a 14 foot mast. It has a broad trapezoidal fabric sail panel, 10 feet tall, mounted on two booms 10 feet at the top, 8 feet at the bottom with a 4 foot gap between the ground surface the lower edge of the sail. A given unit has an appearance similar to the sail of a Viking ship hence the name: snow sails. The resulting complex, highly turbulent airflow erodes and disturbs the snow depositional pattern on the ground. The zone of disrupted snowpack is typically an ellipse 30 to 40 feet in diameter, with the shallowest snowpack being near or immediately under the snow sail itself. 705
2 2. BACKGROUND Snow sails where first constructed from on-hand materials and deployed in the European Alps in the late 1940 s through the 1950 s when military garrisons (and hence labor) were plentiful in the international passes. They were known in German as kolktalfen which translates literally as (airflow) eddy (generating) tables. Figure 1 shows suggested configurations for these original kolktalfen [1]. Figure Objectives of the 151 snow sail project Figure 1 Based on European guidelines, for snow sails to be effective in reducing wind-slab avalanches, the sails must be deployed so that the distance between any two adjacent sails is 1.0 to 1.5 the sail top width (10 feet). Snow sails are only applicable to certain specific avalanche environments, including; sites where the dominant avalanche mechanism is through the formation of wind slabs and the total snowpack depth does not become large (> 6 feet). For these reasons, snow sail use in Europe was superseded by the use of more effective (and more costly) snow supporting structures in the avalanche starting zone and/or avalanche sheds (tunnels) at the roadway. However, for reasons of cost effectiveness European avalanche hazard specialist are once again experimenting with kolktalfen. Figure 2 shows a modern trial deployment of omni (wind) directional kolktalfen in the Austrian Alps. The objective the milepost 151 avalanche project was to assess, test, and install an operational deployment of ~50 snow sail in the avalanche starting zone as a means of cost effectively reducing the avalanche hazard, due primarily to wind-slab avalanching, for motorists and WYDOT maintainers on USR 89/191. This site is ~3 mile south of the community of Jackson, Wyoming. USR 89/191 is the primary route in and out of this valley from the south. The location of this site is shown in Figure 3. Figure 3 The 151 avalanche is pre-dominantly a wind-slab avalanche. During periods of heavy snow, coupled with strong southwesterly winds, snow is transported into the 151 avalanche starting zone. When the resulting wind-slabs become unstable, they may avalanche onto the 706
3 USR 89/191 roadway, which is located at the valley floor, approximately 1000 vertical feet below. Potential alternative techniques for avalanche hazard reduction in at the 151 avalanche site include the use of avalanche hazard forecasting and explosive control or other forms of constructed, passive defense measures; such as snow supporting structures in the starting zone or a snow shed at the road. The 151 avalanche is located adjacent a populated residential area and is also critical, managed big game winter habitat. This precludes the regular use of explosives for avalanche control. Additionally, cost estimates for snow supporting structures in the 151 avalanche starting zone indicates that this form of passive avalanche defense at this site would cost ~$1.4 million, installed. A snow shed at the roadway has been previously estimated at ~$12.7 million for this site for a two lane roadway. USR 89/191 is now an upgraded four lanes highway. 3. SPECIFICATIONS THE 151 SNOW SAIL DEPLOYMENT The net cost to fabricate, transport and install the operational deployment of 50 snow sails on the 151 avalanche and leave 10 preassembled sails in reserve at the WYDOT Maintenance facility in Jackson was $~90K. This cost was originally estimated at $96.6K. In addition, there was one-time proto-type development and testing costs of $82K during the pilot phase testing during three winter season prior to 2002/03. The final snow sail design is fabricated from aircraft grade aluminum and uses a vinylized commercial truck tarpaulin material for the sail. It is cable stayed with earth anchoring pins, each driven ~3 feet deep. The static design wind load is 1200 lbf. lateral, which would be produced by a design wind of 90 mph. There is an on-going, automated wind study being conducted on-site. Figure 4: Full 151 Snow Sail Deployment During the summer and autumn of 2002 a compliment of 60 snow sails were fabricated and transported from Salt Lake City to the Jackson, Wyoming area. The final sail design was similar to the initial trial design with little or no modification and the simplest (stitched) connection for the cloth sail panel to the aluminum frame. The original proto-type of this sail is still in service on the 151 site. It has now been in continuous service since the summer of Helicopter supported logistic were used to transport the pre-assembled snow sails, earth pin anchors and cabling from the Jackson valley floor to the 151 avalanche site. 3.1 National Environmental Policy Act (NEPA) Requirements The 151 avalanche starting zone is managed by the USDA Forest Service as a Critical Big Game habitat. It also has high quality visual attributes. Hence, during the autumn and winter of 1999/00, Carter & Burgess, a Denver based contractor, and WYDOT headquarters personnel pursued and developed the requisite National Environmental Policy Act (NEPA) Environmental Assessment (EA) for the 151 Snow Sail project. The findings of the draft EA supported continued progress towards the full, operational deployment of ~50 snow sails on the 151 as a preferred method of avalanche 707
4 hazard reduction at this site. The visual impact of the ~50 sails remained the most pressing public and USDA Forest Service concern. The primary mitigation technique for visual impact includes the provision to annually remove the sails in the spring and reinstall them in the autumn. In addition, the winter 1999/2000 pilot project addressed the issue of sail cloth color and the visual impact of the sails when they are installed in the 151 avalanche starting zone. The prairie brown color blended well visually. The white sails blended well with the snow and sky, but stood out starkly when seen against the mountainside. The 151 avalanche snow sail deployment National Environmental Policy Act (NEPA) Environmental Assessment resulted in a Finding of No Significant Impact (FONSI) [2]. This was due, in large part to the fact that, unlike other forms of constructed, passive avalanche starting zone defense, snow sails may be removed annually in the spring and reinstalled in the autumn. This minimizes their year-round visual impact. Annual removal/redeployment and maintenance costs for the 151 avalanche snow sail system has been estimated at $21K. Figure 5 shows personnel re-installing one of the final compliment of 50 snow sails in the full deployment at the beginning of the 2003/04 winter season. An additional element of the EA included a recommendation that forest species planting (or re-planting) be assessed and, if found feasible, conducted on the 151 avalanche starting zone. The premise is that mature conifer stands on the 151 avalanche starting zone, if in sufficient numbers and size, could serve the same purpose as the snow sails in disrupting snow depositional patterns and, hence, reducing avalanche hazard. There is some evidence (a few large, old downed timber trunks) in the upper reaches of the 151 avalanche starting zone to suggest that there was once a stand of timber on this site during pre-history. Perhaps it was burned. Subsequently, it s possible that the barren nature of the site, with its attendant high winds, avalanching, and snow creep and glide, would not allow the site to re-seed naturally. 4. EVALUATION The operational snow sail deployment at the 151 avalanche path has undergone 2 seasons of evaluation. Winter operational deployment Spring removal and damage assessment Winter operational deployment Spring removal and damage assessment Evaluation of the complete operational deployment for two winter seasons has yielded several conclusions of the feasibility, reliability, and, effectiveness of the snow sails deployment. 4.1 Reliability The current snow sail design uses cable stays to secure the assembled sail to the slope. Experience of the winter show that during periods of heavy snow deposition in the starting zone, snow creep mechanisms increase the forces on these cable stays. The combination of increased loads on the stays and strong winds has led to sail damage in some cases. A majority of the observed failure has occurred in the connection between the boom and mast. This connection is accomplished with.5in high grade steel all-thread that is susceptible to the extreme stresses of wind and snow creep. The estimated failure rate for the current design is ~10% of the full deployment requiring minor repairs and ~2% needing major repair or replacement. Figure Effectiveness 708
5 During the winter of there was no avalanche activity observed at the 151. Snowpack accumulations were near normal at the upper elevations and slightly below normal at the lower elevations. Observations of the snow distribution at the 151 showed a highly disrupt snowpack with variations depth exceeding 80cm. Minor avalanche activity was observed in some lower elevation starting zones, but no low elevation avalanches paths in the Jackson area impacted the highway during the winter. While the snow sail deployment has proven effective in the disruption of the formation of a continuous/coherent wind slab, there has been one avalanche event at the 151. On January 1, 2004 strong winds and heavy snows produced high avalanche conditions throughout the Jackson Hole area. At approximately 2100hrs a large natural avalanche released and impacted US 89/191 with ~10 deposition across five lanes of highway. There was no property damage or vehicle interaction with the slide. Numerous other avalanches also slide to the valley floor and the backcountry avalanche hazard was high. Conditions leading up to the event consisted of heavy snow at both upper and lower elevations with several low pressure systems moving through western Wyoming within a 7day period. This was the first true test of the deployment during a period of extended heavy snowfall and high winds. Two strong cold fronts associated with the low pressure systems worked to produced strong S-SW winds with maximum gust velocities of 75mph and average wind velocities of 30-45mph. The avalanche coincided with the passage of a very strong cold front seen in the peak wind velocities in figure 6. Cold frontal passages in Western Wyoming typically drive strong S-SW winds ahead and heavy snows of the front. Snowfall rates were estimated at ~2-3in/hr two hours prior to the avalanche event on January 1. Figure 6: 24hr Wind Data; 12/31/2003 to 1/1/2004 Observations taken at the 151 starting zone several days after the event revealed a crown face traversing the slope and another crown fracturing down the southern flank and through the areas of disrupted snowpack created by the snow sails, see figure 7. The crown extended into the slope beyond the area of influence formed by the sails (~50ft). A profile of the crown face identified a layer of large facets/depth hoar near the ground produced the sliding surface. Figure 7: Crown traversing slope and southern flank Multiple days of heavy snows and strong S- SW winds decreased the effectiveness of the snow sail deployment s ability to disrupt the snowpack in the 151 starting zone. Effectively, the deployment was unable to decrease the avalanche hazard at the 151. While the depth hoar was a significant contribution to problem, a semi-continuous slab was able to form in the starting zone and eventually release to the highway. 5. CONCLUSIONS The 151 snow sail deployment has proven effective in disrupting the formation of a continuous coherent wind slab. However, the deployment does not mitigate 100% of the avalanche hazard. While this is a cost effective alternative to snow supporting 709
6 structures, the effectiveness is limited to periods of snowfall and wind with moderate duration and intensity. Performance of operational effectiveness of the 151 deployment is ongoing. Continued evaluation will be required to identify conditions and configuration where the deployment is most effective. 6. ACKNOWLEDGEMENTS The 151 avalanche snow sail project; WYDOT Project #RS03(199), has been supported by the Wyoming Department of Transportation, through on-going reviews and funding by the WYDOT Research Advisory Committee (RAC). 7. REFERENCES 1. Okologische Untersuchungen in der subalpine Stufe zum Zwecke der Hochlagenaufforstung; Windbeeinflussende Bauten in der Lawinen-verbauung and -vorbeaugung (the Austrian mountain engineering handbook, section on wind influences in avalanche formation and defense), Der Forstlichen Bundes - Versuchsanstalt (Forest Ministry), Snow Sail (Draft) Environmental Assessment Jackson South Avalanche Mitigation, Carter & Burgess for the Federal Highway Administration (FHWA), WYDOT, and the USDA Forest Service 710
2016/04/03 Alaska Hoodoo Mountains, Eastern Alaska Range Published by Conrad Chapman Eastern Alaska Range Avalanche Center
2016/04/03 Alaska Hoodoo Mountains, Eastern Alaska Range Published by Conrad Chapman Eastern Alaska Range Avalanche Center Avalanche Details Date: 03 April 2016 Time: 3:00 pm AST Location: Hoodoo Mountains,
More informationAvalanche Problem Essentials Wind Slabs. Development
1 Avalanche Problem Essentials Wind Slabs This document is part of Decision Making in Avalanche Terrain: a fieldbook for winter backcountry users by Pascal Haegeli, Roger Atkins and Karl Klassen and provides
More informationMt Hood Meadows Avalanche Accident
Mt Hood Meadows Avalanche Accident February 28, 2011 Date: Noon on Monday, 2/28/2011 Submitted by: Joe Sillman, Mt Hood Meadows Pro Patrol and Mark Moore, NWAC Place: Heather Canyon Drainage, Backyards,
More informationRoundabouts in Edmonton - A Comparison to the State-of-the-Art
Roundabouts in Edmonton - A Comparison to the State-of-the-Art Authors: Carl Clayton, P.Eng. P.E. PTOE Stantec Consulting Ltd. Chuan Kua, P.Eng. City of Edmonton, Transportation and Streets Brice Stephenson,
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationEvaluating the Design Safety of Highway Structural Supports
Evaluating the Design Safety of Highway Structural Supports by Fouad H. Fouad and Elizabeth A. Calvert Department of Civil and Environmental Engineering The University of Alabama at Birmingham Birmingham,
More informationField Design, Construction and inspection of ADA compliant Curb ramps. Mike Anderson City of Lee s Summit Construction Manager (816)
Field Design, Construction and inspection of ADA compliant Curb ramps Mike Anderson City of Lee s Summit Construction Manager (816)969-1800 Today s Agenda Definitions & Acronyms Access Board vs. PROWAAC
More informationGeneral Design Factors
Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding
More information2001 AASHTO Training Manual
2001 AASHTO Training Manual December 2004 MSC4014 12/04 Table of Contents I. 2001 AASHTO General Overview 1 General Overview 2 II. Wind and Allowable Stress Design 3 Three Second Gust vs. Fastest Mile
More informationONTARIO REGULATION 239/02 MUNICIPAL ACT MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS
ONTARIO REGULATION 239/02 made under the MUNICIPAL ACT Made: July 23, 2002 Filed: August 8, 2002 MINIMUM MAINTENANCE STANDARDS FOR MUNICIPAL HIGHWAYS Definitions 1. (1) In this Regulation, cm means centimetres;
More informationGrouse in the Bavarian Alps: Status, threats and conservation Example: Black grouse in the Bavarian Alps
Grouse in the Bavarian Alps: Status, threats and conservation Example: Black grouse in the Bavarian Alps Albin Zeitler (Consultant for the Bavarian State Ministry of the Environment) The Bavarian Alps
More informationSNOW FENCE DO'S AND DON/TS R. L. JAIRELL AND R. A. SCHMIDT' ABSTRACT
SNOW FENCE DO'S AND DON/TS R. L. JAIRELL AND R. A. SCHMIDT' ABSTRACT Common mistakes in locating and constructing snow fences limit their usefulness in controlling snow drifts. Choosing the proper fence
More information3/8/2016 Oregon Wallowa Mountains Published by Michael Hatch (Wallowa Avalanche Center) and Scott Savage (on behalf of USFS National Avalanche Center)
Location: Place Chief Joseph Peak, Wallowa Mountains State Oregon Date 3/8/2016 Time 1630 hrs Summary 1 skier partially buried and killed Number: Caught 1 Fully Buried 0 Injured 0 Killed 1 Avalanche Details:
More informationCity of Vallejo Traffic Calming Toolbox
City of Vallejo Traffic Calming Toolbox June 1, 2013 Final Table of Contents Introduction... 1 Non-Physical Devices... 3 High-Visibility Crosswalk... 3 In Pavement Lighted Crosswalk... 4 Rapid Flashing
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationPHASE 1 WIND STUDIES REPORT
PHASE 1 WIND STUDIES REPORT ENVIRONMENTAL STUDIES AND PRELIMINARY DESIGN FOR A SUICIDE DETERRENT SYSTEM Contract 2006-B-17 24 MAY 2007 Golden Gate Bridge Highway and Transportation District Introduction
More informationHatch Peak Avalanche Fatality
Hatch Peak Avalanche Fatality Date: 19 March 2011 Place: Hatch Peak (Hatcher Pass area, Talkeetna Mountains) State: Alaska Fatalities: 1 Summary: 2 skiers caught, 1 partially buried and 1fully buried and
More information12/14/2015 Idaho Bald Mountain Sidecountry Published by Scott Savage, SAC
Location: Place Christmas Eve, Bald Mountain Sidecountry State Idaho Date 12/14/2015 Time 1135 Summary 1 skier partially buried and injured due to striking trees Number: Caught 1 Fully Buried 0 Injured
More informationNOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG
NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT
More informationTraffic Signal Design
Traffic Signal Design Instructor: S. M. Mahdi Amiripour m.amiripour@gmail.com 2 Introduction Intersection is an area shared by two or more roads Designated for the vehicles to turn to different directions
More informationTraffic Impact Analysis Chatham County Grocery Chatham County, NC
Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...
More informationSnow load on structures: case studies on cableway masts and measures against snow gliding
Hasliberg March 1999 Swiss Federal Institute for Snow and Avalanche Research Snow load on structures: case studies on cableway masts and measures against snow gliding Stefan Margreth/Mark Schaer Aosta,
More informationWIND AND SNOW FENCES
Fencing Order No. 307.230-1 Revised December 2015 WIND AND SNOW FENCES Whereas many fence designs are constructed for livestock and wildlife control or crop protection, these designs are to modify either
More informationLANE ELIMINATION PROJECTS
PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:
More informationItem 404 Driving Piling
Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.
More informationExperience with Traffic Actuated Signals
Experience with Traffic Actuated Signals E ric G. T h orson District Traffic Signal Engineer Illinois Division of Highways Elgin, Illinois The State of Illinois installed its first set of traffic actuated
More informationLoose Dry Avalanches
Loose Dry Avalanches Introduction Loose dry avalanches are usually confined to surface layers, and therefore are often small. They contain loose cohesion less dry powdery snow. They start from a point
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationManual: GPK1 - Gin Pole Kit Accessory for the ARRS1-AMKUS Rope Rescue System
Copyright Amkus Rescue Systems, Inc. 2016 LAA-001 April 15, 2016 Rev00 Manual: GPK1 - Gin Pole Kit Accessory for the ARRS1-AMKUS Rope Rescue System DANGER Understand manual before use. Operating AMKUS
More informationIntroduction. Geomembrane lining systems are used in a variety of different applications. Landfill Lining Landfill Capping Salt Piles Lagoons / Ponds
Contents 1. Introduction/Overview 2. Traditional Methods of Anchoring Geomembrane Liners 3. What can go wrong? 4. Net Down 5. Theory and how Net Down works 6. Installation Details 7. Technical Information
More information021 Deer Management Unit
021 Deer Management Unit Geographic Location: Deer Management Unit (DMU) 021 is 1,464 square miles in size and is located in the central Upper Peninsula (UP). This DMU is dominated by publicly owned land
More informationCulvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest
Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low
More informationIllini Union Champaign, IL. February 24, Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering
Illini Union Champaign, IL February 24, 2015 Paul Lorton, P.E. Safety Programs Unit Chief IDOT, Division of Highways, Bureau of Safety Engineering Temporary Concrete Barrier Pinning and Drop-off Policy
More informationWork Zone Traffic Safety
Work Zone Traffic Safety Summary The Hazard: death or serious injury from being struck by vehicles or equipment in work zones. Who is at risk: streets/highways, utilities and other public works department
More informationRoute 29 Corridor Assessment Update. Development of Possible Solutions
Route 29 Corridor Assessment Update Development of Possible Solutions Public Workshop #3 October 27, 2016 Purpose of Developing Possible Solutions Recap of where we ve been and timeline for moving forward
More informationSimulation Analysis of Intersection Treatments for Cycle Tracks
Abstract Simulation Analysis of Intersection Treatments for Cycle Tracks The increased use of cycle tracks also known as protected bike lanes has led to investigations of how to accommodate them at intersections.
More informationTHE EFFECTIVENESS OF BOOT PACKING FOR SNOWPACK STABILIZATION
THE EFFECTIVENESS OF BOOT PACKING FOR SNOWPACK STABILIZATION Matt Wieland 1, 2 Jordy Hendrikx 2 Karl W. Birkeland 3, 2 1 Moonlight Basin Ski Resort, Big Sky, MT, USA; 2 Snow and Avalanche Laboratory, Montana
More informationHighway Capacity and LOS. Reading Assignment: pgs
Highway Capacity and LOS Reading Assignment: pgs. 170-200 We know from the previous section that traffic flows fairly well when Demand < Capacity. However, when demand approaches capacity, we begin to
More informationPLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION
Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.
More information2010 International Snow Science Workshop
HOW TO TURN A KIDS BIKE INTO A BOMB TRAM FOR AVALANCHE CONTROL WORK David Immeker* Heavenly Mountain Resort Professional Ski Patrol, South Lake Tahoe, California ABSTRACT: Bomb trams have been used for
More informationTools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL
Tools for safety management Effectiveness of risk mitigation measures Bernhard KOHL Contents Background Tools for risk-based decision making Safety measures Illustration of methodical approach Case studies
More informationNUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT
- 277 - NUMERICAL INVESTIGATION OF THE FLOW BEHAVIOUR IN A MODERN TRAFFIC TUNNEL IN CASE OF FIRE INCIDENT Iseler J., Heiser W. EAS GmbH, Karlsruhe, Germany ABSTRACT A numerical study of the flow behaviour
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More informationProceedings, International Snow Science Workshop, Breckenridge, Colorado, 2016 POLAR CIRCUS AVALANCHE RESPONSE, FEBRUARY 5-11, 2015
POLAR CIRCUS AVALANCHE RESPONSE, FEBRUARY 5-11, 2015 Stephen Holeczi * and Grant Statham Parks Canada Visitor Safety, Lake Louise, Alberta, Canada ABSTRACT: On the evening of February 5, 2015, two Canadian
More informationLewelling Boulevard Improvements Response to Questions/Comments From October 9, 2001 Community Meeting
Lewelling Boulevard Improvements Response to Questions/Comments From October 9, 2001 Community Meeting Group 1 Questions/Comments (Topic: Impact to Properties) How many residential/business properties
More informationSnow Avalanches. Basic Principles for Avoiding and Surviving Snow Avalanches. By Lance Young
Snow Avalanches Basic Principles for Avoiding and Surviving Snow Avalanches By Lance Young Introduction Snow avalanches are complex natural phenomena, experts do not fully understand all their causes.
More informationROUNDABOUTS/TRAFFIC CIRCLES
GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal
More informationE. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences
EACWE 5 Florence, Italy 19 th 23 rd July 29 Flying Sphere image Museo Ideale L. Da Vinci Chasing gust fronts - wind measurements at the airport Munich, Germany E. Agu, M. Kasperski Ruhr-University Bochum
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationPERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4
PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,
More informationA plan for improved motor vehicle access on Railroad Avenue in Provincetown
A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationANSI A Work Zone Safety for Highway Construction. Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America
ANSI A10.47-2009 Work Zone Safety for Highway Construction Scott Schneider, CIH and Travis Parsons Laborers Health and Safety Fund of North America Agenda Introductions History Overview of the Standard
More informationLincoln Avenue Road Diet Trial
Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume
More informationSTATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL
August 23 STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting
More informationChapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL
Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE
More informationCyclists at road narrowings
Traffic Advisory Leaflet 1/97 February 1997 Cyclists at road narrowings Introduction Traffic calmed streets can offer a more attractive environment for cycling, by reducing motor vehicles speeds to a level
More informationNear Miss Avalanche Incident Jan 3 rd, 2014
Near Miss Avalanche Incident Jan 3 rd, 2014 Location: Turnagain Pass Tincan mountain - Lower CFR, West aspect Summary Tincan avalanche, dog fully buried, presumed dead January 3rd, 2014 2:50pm HS-AO-D2.5-R2.5-O/G
More informationAPPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011
APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE
More informationDECISION-MAKING AND AVALANCHE MITIGATION DURING A RAPID ONSET WET SLAB AVALANCHE CYCLE
DECISION-MAKING AND AVALANCHE MITIGATION DURING A RAPID ONSET WET SLAB AVALANCHE CYCLE Paul Baugher 1* and Karl W. Birkeland 2 1 Crystal Mountain Ski Patrol/Northwest Avalanche Institute, Crystal Mt.,
More informationSpeed Control & Limits
Speed Control & Limits Exceeding the speed limit is a common contributing factor of fatal and other types of accidents. *25 mph* School zones, business or residential districts *55 mph* Certain state highways
More informationTruck Climbing Lane Traffic Justification Report
ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:
More informationUSER GUIDE FOR R1-6 GATEWAY TREATMENT
USER GUIDE FOR R1-6 GATEWAY TREATMENT FOR PEDESTRIAN CROSSINGS Prepared by: Western Michigan University T.Y. Lin International December 2016 Acknowledgements Michigan Department of Transportation MDOT
More informationINNOVATIVE INTERSECTION DESIGN
INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and
More informationMorse Creek Drainage Avalanche Accident March 7, 2004
Morse Creek Drainage Avalanche Accident March 7, 2004 Date: Avalanche occurred around 1:30pm, Sunday March 7, 2004. Location: In the Morse Creek drainage, just south of Three Way Peak, just beyond the
More informationSign Installation Guide
United States Department of Agriculture Forest Service Technology & Development Program Sign Installation Guide 7100 Engineering July 2003 0371-2812-MTDC Thanks to: Ted J. Cote MTDC James Kautz MTDC Cathy
More informationFINAL REPORT. Wind Assessment for: NEW OFFICE BUILDING AT ESSENDON FIELDS Essendon, Victoria, Australia
FINAL REPORT Wind Assessment for: NEW OFFICE BUILDING AT ESSENDON FIELDS Essendon, Victoria, Australia Prepared for: Essendon Fields Pty Ltd Essendon Fields House Level 2, 7 English Street Essendon Fields
More informationH8 Signs, Supports and Poles
Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,
More informationNEAR-SURFACE FACETED CRYSTALS ON A SLOPE COVERED WITH STONE PINE TREES. Peter Höller*
NEAR-SURFACE FACETED CRYSTALS ON A SLOPE COVERED WITH STONE PINE TREES Peter Höller* ABSTRACT: This paper presents snow surface temperature measurements as well as snow temperature investigations in the
More informationUSER GUIDE FOR R1-6 GATEWAY TREATMENT
USER GUIDE FOR R1-6 GATEWAY TREATMENT FOR PEDESTRIAN CROSSINGS Prepared by: Western Michigan University T.Y. Lin International December 2016 Updated May 2018 Acknowledgements Michigan Department of Transportation
More informationCROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT
CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT Many factors contribute to the need for a Crossing Guard. General federal guidance, provided by the FHWA MUTCD, states that adult crossing guards
More informationWind Directional Effect on a Single Storey House Using Educational Wind Tunnel
Wind Directional Effect on a Single Storey House Using Educational Wind Tunnel S S Zaini 1, N Rossli 1, T A Majid 1, S N C Deraman 1 and N A Razak 2 1 Disaster Research Nexus, School of Civil Engineering,
More informationCITY OF COCONUT CREEK IMPLEMENTATION GUIDELINES FOR TRAFFIC CALMING
CITY OF COCONUT CREEK IMPLEMENTATION GUIDELINES FOR TRAFFIC CALMING I. Introduction: The City of Coconut Creek recognizes that the conditions of residential streets can greatly affect neighborhood livability;
More informationSCHOOL CROSSING PROTECTION CRITERIA
CITY OF MADISON TRAFFIC ENGINEERING SCHOOL CROSSING PROTECTION CRITERIA AUGUST 1990 Adopted as Policy on August 31, 1976, by Common Council by Amended Resolution #29,540 Amended on September 14, 1976,
More informationWelcome to the Open House
Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports
More informationProceedings, International Snow Science Workshop, Breckenridge, Colorado, 2016 THE FIVE DECISIVE AVALANCHE PROBLEMS
THE FIVE DECISIVE AVALANCHE PROBLEMS Rudi Mair Avalanche Warning Service of Tirol (LWD Tirol) Innsbruck, Tirol, Austria ABSTRACT: Making forecasts and compiling studies of hundreds of avalanches for 25
More informationLESLIE BARNS & CONNECTION TRACK. Construction Liaison Group Meeting #2
LESLIE BARNS & CONNECTION TRACK Construction Liaison Group Meeting #2 July 23, 2013 1 UPDATE (SINCE LAST CLG) Cyclist safety walk (June 26) to review current construction configurations and discuss how
More informationSubject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones.
6 - G2 Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13 MdMUTCD REF. NO. None Date Issued: 09/09 Effective Date: 09/09 Brief Description: Guidance for the use and placement of pull-off area in
More informationOngoing research in Hong Kong has led to improved wind shear and turbulence alerts
Ongoing research in Hong Kong has led to improved wind shear and turbulence alerts (published in the International Civil Aviation Organization (ICAO) Journal, Volume 58, Number 2, March 2003) Located in
More informationWind Flow Validation Summary
IBHS Research Center Validation of Wind Capabilities The Insurance Institute for Business & Home Safety (IBHS) Research Center full-scale test facility provides opportunities to simulate natural wind conditions
More informationStudy of the Effects of Buried Pipe Integrity on Roadway Subsidence
Pipe-RU6558 Study of the Effects of Buried Pipe Integrity on Roadway Subsidence FINAL REPORT October 2005 Submitted by Dr. Husam Najm * Professor Dr. Ali Maher * Professor/Director Dr. Nenad Gucunski *
More informationAPPENDIX A TWO-LANE RURAL ROADS ELEMENTS OF DESIGN CREST VERTICAL CURVES
APPENDIX A TWO-LANE RURAL ROADS ELEMENTS OF DESIGN CREST VERTICAL CURVES 1. Two-lane Rural Roads 1.1 Introduction The definition of rural area can be derived from the definition of urban areas. Officially,
More informationCOUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca
OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT
More informationDeer Management Unit 252
Deer Management Unit 252 Geographic Location: Deer Management Unit (DMU) 252 is 297 miles 2 in size and is primarily in southeastern Marquette, southwestern Alger and northwestern Delta County. This DMU
More informationSafety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections
Safety Assessment of Installing Traffic Signals at High-Speed Expressway Intersections Todd Knox Center for Transportation Research and Education Iowa State University 2901 South Loop Drive, Suite 3100
More informationGuidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects
Guidelines for Integrating Safety and Cost-Effectiveness into Resurfacing, Restoration, and Rehabilitation Projects NCHRP Project 15-50 July 2017 1 Research Objective Develop guidelines for safe and cost-effective
More informationWildlife Crossings: A Solution for Moose Vehicle Collisions in Alaska
Wildlife Crossings: A Solution for Moose Vehicle Collisions in Alaska M elchisedek Jean & Katy Wright April 8, 2017 Prepared for: Dr. Protasel PADM A628: Public Financial M anagement Statement of Need
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationESAIL D3.1.1 Requirement specifications of the tether test reels
D3.1.1 Requirement specifications of the tether test reels Work Package: WP 3.1 Version: Version 1.0 Prepared by: DLR German Aerospace Center, Olaf Krömer, Roland Rosta Time: Bremen, May 30 th, 2011 Coordinating
More information3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN
maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower
More informationIntroduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a
HIGH-CAPACITY ROUNDABOUT INTERSECTION ANALYSIS: GOING AROUND IN CIRCLES David Stanek, PE and Ronald T. Milam, AICP Abstract. Roundabouts have become increasingly popular in recent years as an innovative
More informationGRANITE MOUNTAIN (5629 ) AVALANCHE INCIDENT March 10, Narrative provided by John Stimberis WSDOT Avalanche Technician, Snoqualmie Pass
Page 1 of 9 GRANITE MOUNTAIN (5629 ) AVALANCHE INCIDENT March 10, 2002 Narrative provided by John Stimberis WSDOT Avalanche Technician, Snoqualmie Pass Accident Narrative On March 10, 2002, two Seattle
More informationHow Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017
How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles
More informationMEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD
MEMORANDUM TO: FROM: BY: TRAFFIC COMMISSION TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MATT HORN, CITY ENGINEER SUBJECT: CONSIDERATION OF RESTRICTING PARKING ADJACENT TO 170 AND 171 BRISCO ROAD DATE:
More informationCrown Point Avalanche Incident January 4 th, 2017
Crown Point Avalanche Incident January 4 th, 2017 Report by Dennis D Amico and Ian Nicholson Incident snapshot Occurrence Time and Date: 1100 am on January 4th, 2017 Location: Crown Point, Pickhandle Basin,
More information2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook?
2014 FHWA Aging Road User Handbook Recommendations to Accommodate Aging Pedestrians Lifesaver National Conference March 17, 2015 Revised June 2014 1 What is the Handbook? 1998 1st Edition 2001 2nd Edition
More informationAPPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS
APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study
More informationDesign Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope
Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian
More informationPROJECT FACT SHEET May 25, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationRoute 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection
TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC
More information