DART VALLEY RAILWAY PLC RULE BOOK SECTION S. For SIGNALLING and HANDSIGNALS

Size: px
Start display at page:

Download "DART VALLEY RAILWAY PLC RULE BOOK SECTION S. For SIGNALLING and HANDSIGNALS"

Transcription

1 DART VALLEY RAILWAY PLC RULE BOOK SECTION S For SIGNALLING and HANDSIGNALS It is not possible to write a rule for every situation. The greater the volume of regulations, the less likely it is that they will be read, understood and used. At all times, whether in these rules and instructions or not, think SAFETY FIRST. Published by order of Managing Director Dart Valley Railway PLC Queen s Park Station Paignton, Devon TQ4 6AF Page 1 Version 3 Thursday, 15 March 2018

2 Issue No 1.0 Initial Issue 2.0 Review after use Version Control Details of Amendment 3.0 Updated due to changes in signalling Date June 2010 Feb 2014 Mar 2018 Any changes from the previous issue are highlighted in RED. Contents 1 - Signalling And Handsignals General Signals In Use On DVR Handsignals Handsignalling Duties Passing Signals At Danger Signalling Equipment Failure Wrong Direction Movements Authority For Movements Single Line Working Trains Stopped Out Of Course Pilotman Working Britannia Signalbox Closed Page 2 Version 3 Thursday, 15 March 2018

3 1 - SIGNALLING AND HANDSIGNALS General S1.1.1 The line between Paignton and Kingswear is controlled by the Signaller from Britannia signalbox by track circuit block. It is a single track with passing loops at Churston and Goodrington and additional tracks at Paignton and Kingswear. Britannia signalbox MUST be open at all times when passenger or commercial freight trains are to run. It must also be open for the operation of engineer s trains over the level crossing at Kingswear and when shunting at the north end of Goodrington. S1.1.2 The types of signal in use are shown. All signals are of the colour light type. Not all signals shown may be in current use. Colour light signals controlling movements of trains are known as main or running signals. Signals which can show a red aspect are also known as stop signals. Signals capable of showing only yellow or green aspects are known as repeater signals. Position light signals are used primarily for shunting. Main aspects other than red are known as proceed aspects. Special position light signals are used at Greenway which are explained in Rule S Signals in use on DVR S1.2.1 The meanings of the main aspect colour light indications are: Page 3 Version 3 Thursday, 15 March 2018

4 Red Danger, stop on the approach side of the signal Single yellow Caution, proceed but be prepared to stop at the next signal, Stop Board or buffer stop Green proceed, next signal showing a proceed aspect. Banner main signal is displaying a red signal Banner main signal is displaying a yellow aspect Banner Main signal displaying a green aspect Page 4 Version 3 Thursday, 15 March 2018

5 S1.2.2 The meaning of the standard position light signal aspects are as follows. One yellow and one white light displayed horizontally next shunt signal is at red, proceed as far as the line is clear for the Straight move One red and one white light or two red lights shown horizontally - Danger, stop on the approach side of the signal or Two white lights shown diagonally upwards towards the left Proceed, as far as the line is clear S1.2.3 At Greenway special signals have been provided for the station. The signal consists of a position light style signal and displays the following aspects: Single steady white light Proceed without stopping at Greenway Halt Flashing white light stop to pick up passengers at Greenway Halt Flashing alternative red lights stop short of platform and ensure the track in the platform is clear before proceeding Page 5 Version 3 Thursday, 15 March 2018

6 S1.2.4 S1.2.5 S1.2.6 All colour light signals are of the controlled type set to a proceed aspect by the Signaller. The signals are however, restored to danger (or in the case of repeater signals to the caution aspect) automatically by the passage of the train. Drivers, Guards and Travelling Ticket Inspectors observing signals as part of their duties must be aware that in some cases once the front part of the train has passed the signal it will be showing a danger or caution aspect. If a position light signal is used in conjunction with a main aspect signal, it will not be illuminated unless it is in use authorising the driver to pass the main aspect which will be showing red. Unless a train is proceeding under the authority of a main running signal and a position light signal has been cleared as part of that route, the position light signal showing a proceed aspect indicates only that a movement may be made past it on sight and that the line might be obstructed before reaching the next signal, the end of the line at terminus stations or dead end siding tracks. Page 6 Version 3 Thursday, 15 March 2018

7 S1.2.7 There are two types of route indicator in use. They will be displayed to tell the driver the destination where there are multiple destinations available from a signal. They are displayed in two forms: A feather type junction indicator. A row of five white lights indication the direction of the lower speed divergence A stencil type route indicator dis letters or numbers indicating the destination Page 7 Version 3 Thursday, 15 March 2018

8 S1.2.8 S1.2.9 At Churston, hydro-pneumatic points are in use that are designed to be traversed in the wrong position by a train in a trailing direction and will reset automatically to the normal position after the passage of such a train. When a route has been set by the Signaller for a facing move onto the loop track, provided that the facing points are detected in the normal position, the protecting position light signals B131 or B134 will show two diagonal white lights as a proceed indication. If for any reason the points are not detected in the normal position, signals B131 or B134 will show one red and one white light displayed horizontally as a stop indication. In this situation the preceding main colour light signal will be automatically set at danger. If platform starting signals cannot be seen for the full length of the platform, a repeater signal might be provided to assist train and station staff in train despatch. This takes the form of an illuminated display showing the word OFF or the signal number when the signal to which it applies is showing a proceed aspect. Page 8 Version 3 Thursday, 15 March 2018

9 S A special white light indicator known as a set-back signal is situated approximately 80 yards south of Sands Road level crossing on the down side of the DVR running line mounted on a short post. Its purpose is to assist the Driver during shunting, This indicator is controlled by levers 4 and 5 of Paignton South groundframe. The light will be illuminated when lever 5 is operated for movements out of Paignton station, extinguishing to indicate that the movement is clear of the points required for the shunting move and that the driver should stop by replacing the lever. Once the route has been set and lever 4 is pulled to clear the signal for the returning move the set back signal will be illuminated. Page 9 Version 3 Thursday, 15 March 2018

10 S At certain locations STOP boards are used and have the same meaning as a colour light or position light signal at danger. The Driver must stop the train on the approach side of the board and then carry out the instructions printed on the board before proceeding. On some boards the proceed aspect will be given by a flashing white light on the board after the instructions have been proved to have been carried out. At others, the Driver can proceed after carrying out the instructions on the board. S Where new signals are not in use, they will have a cover placed over the head or a X shape fixed to the front of the head. Page 10 Version 3 Thursday, 15 March 2018

11 S All signals are identified with a plate showing a letter and a number. The letter denotes where the signal is controlled from and the number is unique to that signal. This identification must be used when contacting the signalbox or to specify your location B Britannia Crossing CN Churston PN Paignton Main line signal box PS Paignton South Ground Frame QP Queens Park Ground Frame HANDSIGNALS S1.3.1 A handsignal given by the Guard by a GREEN flag waved above the head, or at night, a green lamp held steadily above the head indicates to the Driver that the train is ready to start. This handsignal must also be used to restart a train which has been stopped out of course anywhere on the line to confirm that the Guard has rejoined the train and the train is ready to start. At Kingswear, Greenway and Paignton where it is difficult for the Driver to see the Guard s train ready to start handsignal, Right Away indicators are provided displaying an illuminated RA to show that the train is ready to start, the use of the Right Away indicator is the preferred method of indicating that the train is ready to start from Kingswear and Greenway. If because of operating needs the Right Away indicator is not to be used to start a particular train, the Guard must advise the Driver beforehand which method will be used, i.e. by flag, lamp, or two-way radio. Page 11 Version 3 Thursday, 15 March 2018

12 S1.3.2 S1.3.3 Handsignals can be given by flag, lamp or by arm movements. They must be given clearly and distinctly and aimed at the person for whom they are intended. Other movements of the hands and arms, e.g. a wave in greeting to a person near the shunting operations but unconnected with them, are forbidden as they might be mistaken for a handsignal and could cause an unauthorised train movement to be made. Handsignals must be acknowledged to ensure that the person giving the handsignal knows that it has been seen by the person for whom it is intended. Handsignals by arm movements during daylight are shown. Handsignal Meaning Both arms raised above the head, or, from a Shunter riding on a vehicle, one arm held horizontally and steady Stop Page 12 Version 3 Thursday, 15 March 2018

13 Handsignal Meaning Either arm held horizontally and the whole arm waved slowly up and down caution or slow down Page 13 Version 3 Thursday, 15 March 2018

14 Handsignal Meaning Either arm held upright above the head: i during train despatch, proceed; ii acknowledgement of approaching train; iii during shunting, ready to move. iv acknowledgement of handsignal v when riding on a vehicle - Stop Either arm moved in a circular motion away from the body move away from handsignal Page 14 Version 3 Thursday, 15 March 2018

15 Handsignal Meaning Either arm moved to and fro above the shoulder move towards handsignal Both arms raised above the head with hands moved towards each other several times ease up Either arm moved vertically up and down from the elbow, above shoulder level create vacuum or compressed air for brake test Page 15 Version 3 Thursday, 15 March 2018

16 S1.3.4 S1.3.5 S1.3.6 S1.3.7 A handsignal given by red flag or lamp showing a red light means STOP. It must be used only when necessary to stop a train. If displayed at a signal the Driver must stop the train at the signal regardless of the aspect shown by the signal. In an emergency, if it is necessary to stop a train after it has passed the last controlled signal and no flag or lamp is available, the stop handsignal of both hands raised above the head must be used by day or when sufficient illumination is available, but if no other means are available, by night, ANY light waved violently indicates danger, STOP. If possible, knowledge of the direction of the likely next train movement should be used to give the Driver as much warning as possible. Exceptionally, at night for a standing train, a red light moved vertically up and down at shoulder level indicates to the Driver create vacuum or compressed air for brake test. A handsignal given by a WHITE light indicates: a. waved slowly up and down Move away from handsignal. b. waved slowly from side to side across the body - Move towards handsignal c. held steadily above the head Indication to Guard by station staff or Travelling Ticket Inspector - train ready to start. d. side to side twisting movement above the head by Shunter - Indication to groundframe Operator that a train is clear of points to be moved. Page 16 Version 3 Thursday, 15 March 2018

17 S1.3.8 S1.3.9 S A handsignal given by a YELLOW flag or lamp indicates: a. held steadily at a colour light signal by a Handsignaller - Driver s authority to pass signal at caution. b. held steadily by Signaller after being stopped at signalbox - Driver s authority to proceed after receiving instructions. c. at night in shunting, waved slowly up and down - Move very slowly away from handsignal. d. at night in shunting, waved slowly from side to side across body - Move very slowly towards handsignal. A red banner or stop board on the track indicates that the line is closed and is under engineer s possession. All trains must stop on the approach side and not proceed until instructed. If the Signaller has to stop the train at Britannia signalbox to instruct the Driver, he must first stop the train by maintaining the signal at the approach to Britannia signalbox at danger. Once the train has come to a stand the signaller must then display a yellow handsignal.. This is the Driver s authority to pass the signal at danger and proceed to the Signalbox for further instructions. After passing the necessary instructions to the Driver the Signaller must display a yellow handsignal as the Driver s authority to proceed. This rule only applies signal B4 and B5. At all other signals the Driver must be verbally instructed to pass a signal at danger by telephone or by a Handsignaller. Page 17 Version 3 Thursday, 15 March 2018

18 S S S If a Handsignaller is appointed at a signal which has to be passed at danger, the Handsignaller must display a hand danger signal to each approaching train. After receiving the Signaller s permission for the train to proceed the Handsignaller must instruct the Driver to pass the signal. After ensuring that the instruction has been understood (by repeating the instructions back), the Handsignaller must display a yellow handsignal as the Driver s authority to proceed. If the situation which requires the placing of a Handsignaller at a signal has already been identified to Drivers the Signaller may instruct the Handsignaller to display a yellow handsignal to a train without stopping it. This authority to the Handsignaller must given by the Signaller for each train. If the Signaller has already informed a Driver that a Handsignaller is positioned at a signal and that the Driver must obey the handsignals at that signal, the Driver need not stop if a yellow handsignal is displayed to the train by the Handsignaller when the signal first comes into view. Page 18 Version 3 Thursday, 15 March 2018

19 2 - HANDSIGNALLING DUTIES S2.1 A Handsignaller may be appointed for a variety of purposes and on each occasion the duties will be explained to the person carrying out this work. S2.2 A person appointed as Handsignaller must be trained and passed as competent. When on duty he must be in possession of the correct equipment: A red and yellow flag; A handlamp, capable of showing a red and yellow light; Point clips, scotches and padlock if required; A track circuit operating clip. A mobile phone A Padlock key S2.3 Flags or lamps used in the course of handsignalling MUST be held steadily in the hand and properly displayed to a Driver until the train has passed. They must not be left on the ground or left hanging. S2.4 The Handsignaller must carry out the instructions in a correct manner, standing where told, displaying the correct handsignal, reaching a clear understanding with the person giving the instructions and giving each Driver clear and precise instructions. Page 19 Version 3 Thursday, 15 March 2018

20 3 - PASSING SIGNALS AT DANGER S3.1 The SIGNALLER (or ground frame operator where appropriate) can only authorise the Driver of a train to pass a signal at danger when: a. an engineer s train has to enter a line under possession; b. the signal is disconnected. c. the signal cannot be cleared because of a failure of signalling or level crossing equipment. d. the train is to enter an obstructed line to assist a disabled train, and / or to evacuate passengers. e. it is necessary, in the vicinity of Britannia signalbox, to stop the train at Britannia signalbox to give instructions to the Driver. f. A train is to move from a running line into a siding at a ground frame where there are no fixed signals for the movement (i.e. at Churston and Young s Park) Page 20 Version 3 Thursday, 15 March 2018

21 S3.2 Before giving instructions for a train to pass a signal at danger, the SIGNALLER must ensure that the portion of line concerned is safe for the movement to be made and that wherever possible: the barriers at any level crossing are closed to road traffic; all points have been operated to the required position which MUST be done using the individual point switches; any groundframe releases giving access to the route are normal; all normal or reverse point indications are showing; the necessary reminder appliances have been used; the route setting buttons have been used to call the route where possible to secure the interlocking. Page 21 Version 3 Thursday, 15 March 2018

22 4 - SIGNALLING EQUIPMENT FAILURE S4.1 If a train has to be authorised to pass a section signal at danger into a single line section because of signalling equipment failure that prevents the route being set by the normal route setting buttons in Britannia signalbox, pilotman working must be established if two trains are in service. S4.2 Exceptionally if a train is already standing at a section signal waiting to enter the single line ahead when it is discovered that the section signal cannot be cleared, the Signaller, after ensuring that it is safe to do so, may authorise the train to proceed for one move only. If more than one train is in operation, including engineering trains, pilotman working must be introduced until either the failure is repaired or one train working can be established. S4.3 If two-train working (including an engineering train) is in operation at the time of a widespread power failure, a PERSON IN CHARGE (PIC) and two handsignalmen must be appointed to act at all passing points affected to ensure safety during passing movements in accordance with the signalling regulations. The PIC and the handsignalmen must be equipped with two-way radios to communicate with each other to ensure that only one train enters the passing loop at one time. Page 22 Version 3 Thursday, 15 March 2018

23 S4.4 A failure of point equipment may prevent the Signaller from setting routes in the normal way. Where the Signaller is unable to set the points by the individual point switches, the route setting buttons or detection has been lost, the SIGNALLER must instruct the Train Crew or other competent person to work the points by hand. S4.5 The SIGNALLER must specially watch the operation of the signalling equipment during the passage of the first train signalled to pass over the section of line affected by the work. Page 23 Version 3 Thursday, 15 March 2018

24 5 - WRONG DIRECTION MOVEMENTS S5.1 Before the Signaller can authorise a train to make a wrong direction movement for which a signal is not provided, the SIGNALLER must ensure that the portion of line concerned is safe for the movement to be made, including where: a. the train has to set back after over-running a platform. At Churston the train must NOT set back until the LOCOMOTIVE CREW have ascertained whether any wheels have passed through the hydro-pneumatic points at the ends of the loop tracks. If no wheels have reached the toes of the points the train may set back, provided that the move has been authorised by the Signaller. If any portion of the train has passed over the toes of the points, the train concerned must draw forward completely clear of the hydro-pneumatic points, and if necessary set back into the other platform. b. the train has to set back from or towards a line blocked by a failure, obstruction, or other incident. c. the front portion of a divided train has to set back to the rear portion. d. the shunting move has to set back in a position remote from signals provided that any points which have to be set are controlled by Britannia signalbox. Page 24 Version 3 Thursday, 15 March 2018

25 S5.2 If a train over-runs the platform, before restarting in the normal direction the SIGNALLER must give the Driver authority to proceed by resetting the route to clear the signal. Page 25 Version 3 Thursday, 15 March 2018

26 6 - AUTHORITY FOR MOVEMENTS S6.1 In the event of a signal failure or other operating disruption, it is preferable for the SIGNALLER to instruct Drivers directly either face to face or by telephone or two-way radio. If it is decided to use a Handsignaller positioned at a signal which has to be passed at danger by a train, the HANDSIGNALLER must display a hand danger signal to stop any approaching train. The SIGNALLER will give the Handsignaller the message to be passed to the Driver which must be fully understood by the Handsignaller before being passed to the Driver. S6.2 Instructions to pass a signal at danger or to make a wrong direction move must only be given to a Driver by the SIGNALLER talking directly to the Driver, or his representative, of the train for whom the instruction is intended; or by a Handsignaller or other authorised person acting on the Signaller s instructions at the location concerned. When the signalbox is open NO person can authorise a driver to pass any signal at danger that is prefixed B without the consent of the signaller. S6.3 The SIGNALLER must make absolutely sure that he is talking to the Driver or his representative for whom the instruction is intended. The Signaller and Driver or his representative must come to a clear understanding on what is required. In all cases, the Signaller s instruction must be repeated back by the Driver or his representative before permission is given to proceed. Radios MUST NOT be used for the communication of safety critical messages. Page 26 Version 3 Thursday, 15 March 2018

27 S6.4 The SIGNALLER must tell the Driver how far the movement can be made and the reason why the signal must be passed at danger. He must also state whether the movement must be made at caution, whether the line is obstructed with a disabled train or whether the line is to be examined. The SIGNALLER must state whether any points in the route have to be examined to ensure that they are correctly set for the route on which the train is travelling, before the train passes over them. In the case of a points failure, the Signaller must identify any points that have to be altered by hand and secured with clips and scotches. The Signaller must make an appropriate record in the train register book of events occurring. Page 27 Version 3 Thursday, 15 March 2018

28 7 - SINGLE LINE WORKING S7.1 The clearance of the section signal is the only authority to the Driver to enter a single line section unless: the line is under engineer s possession; pilotman working is in operation; the Driver is instructed by the Signaller to pass the section signal at danger S7.2 If any part of a train is left on the single line for any reason, the Driver of the front portion must, on arrival at the passing loop or end of the single line section, contact the Signaller and ensure that the Signaller understands what has been done and that the standing portion of the train remaining on the single line is under the protection of the fixed signals, with reminder appliances on the signalling control panel and that an appropriate entry has been made in the train register book. Page 28 Version 3 Thursday, 15 March 2018

29 S7.3 The SIGNALLER must watch the operation of track circuits particularly when the line has not been used for a few days. If track circuits are not operating correctly signals must be restored to danger promptly to protect trains. A track circuit which operates intermittently must not be relied upon until such time that it operates correctly. Conflicting routes must not be set until the Signaller can satisfy himself that the train has passed clear of points that require to be changed for a subsequent move. In these circumstances and where more than one train is in operation (including engineering trains), pilotman working must be introduced for trains running over the single line sections until the service can be reduced to a single train. The Signaller must use reminder appliances where necessary and make an appropriate entry in the train register book. Page 29 Version 3 Thursday, 15 March 2018

30 S7.4 When signalling a vehicle or train that cannot be relied on to, operate track circuits (e.g. a trolley or self propelled engineering vehicle) the Signaller must watch its passage closely and use reminder devices as appropriate. Before authorising the movement the signaller shall set and lock individual point switches to the appropriate positions and place reminder devices over the individual point switches and over signal switches for any conflicting movements. Once the vehicle or train has entered a single line section the Signaller must NOT cancel the route. Until the Signaller has received telephone advice or seen for himself that the vehicle or train has passed clear of the single line section beyond the next signal ahead the Signaller must regard the section as being occupied. Only then may the Signaller remove the reminder appliances and resume normal working. The Signaller must make an appropriate entry in the train register book recording the working. S7.5 The SIGNALLER must treat the trolley as a train for signalling purposes. The signaller must not give permission for the trolley to be placed on the line or to pass signals at danger unless the line is clear for the movement. Until the Signaller has been advised by the PERSON IN CHARGE of the trolley that it has been removed from the line, has passed clear of a single line section or personally seen the trolley, the signaller must regard the section concerned as being occupied. The Signaller may then remove the reminder appliances and resume normal working. Page 30 Version 3 Thursday, 15 March 2018

31 S7.6 At Churston, if such a vehicle needs to shunt at the northern end of the station, the move should be made into Churston yard with signals B33 or B35, as required, passed at danger. S7.7 If a section of single line has not been used for two days, the SIGNALLER must place reminder devices over the protecting signals for at least one movement in each direction. The Signaller must watch the operation of the track circuits on the track diagram and should any track circuits fail to operate correctly the reminder appliances must be retained until the Signaller is satisfied that the track circuits are again working correctly. The section signals will operate normally unless an equipment failure has occurred in which case the procedures for failure conditions must be followed. Page 31 Version 3 Thursday, 15 March 2018

32 8 - TRAINS STOPPED OUT OF COURSE S8.1 On becoming aware of an incident or accident the SIGNALLER must immediately take action to stop any trains entering the section concerned by placing or maintaining the protecting signals at danger, putting reminder appliances over the signal controls concerned and making an appropriate entry in the train register book. Where possible he must also use two-way radio or telephone the Train Crew mobile phone to try and stop a train heading into danger. S8.2 The SIGNALLER must, when receiving advice of an accident or obstruction, immediately place or maintain the signals protecting the affected lines at danger and confirm to the person reporting the accident/obstruction that he has done so. The Signaller must also use reminder appliances placed over the operating buttons of the signals concerned and make an appropriate entry in the train register book. Once protection has been provided the SIGNALLER must advise the DUTY MANAGER of the situation. S8.3. The Signaller must instruct the Driver of any assisting locomotive to enter the section occupied by the failed train passing the protecting signal at danger. The Signaller must advise the Driver of the assisting locomotive the location of the failed train and that he must proceed, keeping a sharp lookout for the member of the Train Crew providing protection, at a low speed to stop short of any obstruction. Page 32 Version 3 Thursday, 15 March 2018

33 9 - PILOTMAN WORKING S9.1 In the event of a track circuit, signal or power failure, it may not be possible for the section signals controlling entry to the single line to be cleared. If more than one train is in operation, including engineering trains, then pilotman working must be introduced over the single line affected until one train working is established. S9.2 The PILOTMAN must wear a high visibility vest labelled Pilotman, or if this is not immediately available, a red flag until high visibility vest is provided. S9.3 The SIGNALLER and the PILOTMAN must jointly agree the limits of the section and both complete a Pilotman record of arrangements form which will detail the equipment operating normally and equipment that is defective. S9.4 The PILOTMAN must obtain the Signaller s permission before authorising a movement into a single line section. An appropriate entry must be made in the train register book, and on both the signallers and Pilotman record of arrangements form. S9.5 If the train is worked by more than one locomotive the Pilotman must make himself known to each Driver but travel with the Driver on the leading locomotive. If a locomotive is authorised to operate at the rear of the train, the Driver of the front locomotive must advise the Driver of the rear locomotive that pilot working is in operation. Page 33 Version 3 Thursday, 15 March 2018

34 S9.6 The PILOTMAN must confirm to the SIGNALLER that the train is complete with tail lamp once it has passed through the single line section. The times should be recorded on the Pilotman record of arrangements form by both the Signaller and the Pilotman S9.7 When leaving a train, the Pilotman must not transfer directly from one train to another without speaking to the Signaller. S9.8 If the PILOTMAN is on a train which becomes disabled or divided the Pilotman MUST remain with the portion left on the single line. S9.9 Once the reason for the Pilotman working has passed then the Signaller must advise the Pilotman and resume normal working. An appropriate entry must be made in the train register book and the Pilotman forms cancelled. S9.10 Full details are given in Rule Book section D Page 34 Version 3 Thursday, 15 March 2018

35 10 - BRITANNIA SIGNALBOX CLOSED S10.1 When Britannia signalbox is about to be closed, the Signaller must ensure that any routes set have been cancelled after the movement has been completed and that all route setting buttons are normal before switching out. Failure to cancel routes set will prevent groundframes at Paignton and Churston from being operated. S10.2 On days when scheduled trains are not running and Britannia signalbox is closed, engineering trains, light locomotives and rolling stock transfers may operate without normal signalling protection between Britannia signalbox and Paignton. A Driver may then pass at danger any type of signal, except at: Goodrington signals B40, B41, B42, B49, B51, B52, B141 and B152 Churston position light signals B131 and B134 These signals must not be passed at danger unless the points which they protect have been confirmed as correctly set, scotched and clipped. S10.3 The person in charge at Paignton is responsible for the operations of trains between Paignton station and B52 signal. Should a train from Paignton require to pass B52 signal, the driver MUST obtain permission from the person in charge at Churston. Page 35 Version 3 Thursday, 15 March 2018

36 S10.4 The person in charge at Churston is responsible for the operation of trains between B52 signal at Goodrington and B2 signal at Hoo Down. Should a train from Churston require to pass the limit of shunt at B52 signal, the driver MUST obtain permission from the person in charge at Paignton. Should a train require to pass B2 signal, Britannia Signal Box should be opened, unless the movement is only to access the platform at Kingswear. Under these circumstances, the Driver is responsible for ensuring that the points at Kingswear are in the correct position and are scotched and clipped for the movement to take place. S10.5 Trains must not pass over the level crossings at Britannia or Kingswear without the barriers being lowered across the road. Page 36 Version 3 Thursday, 15 March 2018

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book GERT8000-S5 Rule Book Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) Issue 8 Module S5 September 2018 Comes into force 01 December 2018 Conventions used in the

More information

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D PASSING SIGNALS AT DANGER AND MAKING MOVEMENTS IN THE WRONG DIRECTION Page Date Index Page No. Latest Issue D.1/D.2 June 2003 D.3/D.4

More information

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 I, the undersigned, acknowledge receipt of this publication. I undertake to familiarise myself with any alterations which apply to me. FULL NAME (CAPITALS) STAFF

More information

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book Uncontrolled when printed GERT8000-TS11 Rule Book Failure of, or work on, signalling equipment signallers s Module TS11 Issue 3 September 2017 Comes into force 02 December 2017 Conventions used in the

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Indicators Rule Number: 6009 Version 1.0, 31 March 2016 Indicators Rule Number: 6009 Document Control Identification Document title Number Version Date 6009 Indicators

More information

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018 Handbook RS521 Signals, Handsignals, Indicators and Signs Issue 5 RS521 December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book GERT8000-TS1 Rule Book Uncontrolled when printed General signalling regulations Issue 12.1 Module TS1 March 2018 Comes into force 03 March 2018 Conventions used in the Rule Book A black line in the margin

More information

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018.

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 5.1 16 September 2018 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Signals, Handsignals, Indicators and Signs Handbook

Signals, Handsignals, Indicators and Signs Handbook Handbook RS521 Signals, Handsignals, Indicators and Signs Handbook Issue 4 RS521 December 2016 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved

More information

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book GERT8000-TS10 Rule Book ERTMS level 2 train signalling s Issue 4 Module TS10 September 2018 Comes into force 01 December 2018 Conventions used in the Rule Book A black line in the margin indicates a change

More information

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014 GE/RT8000/TS8 Rule Book Module TS8 One-train working s Issue 4 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved by Traffic

More information

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book T7 (issue 1).qxd 16/4/03 4:27 pm Page 1 GE/RT8000 - T7 Rule Book Module T7 Safe systems of work when walking or working on or near the line Issue 1 June 2003 Comes into force 6 December 2003 T7 (issue

More information

Defective Fixed Signals - Rules 1 to 6

Defective Fixed Signals - Rules 1 to 6 Defective Fixed Signals - Rules 1 to 6 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation

More information

Withdrawn Document. Title of Rule Book. SECTION P (Part ii) WORKING OF SINGLE AND BI- DIRECTIONAL LINES BY PILOTMAN.

Withdrawn Document. Title of Rule Book. SECTION P (Part ii) WORKING OF SINGLE AND BI- DIRECTIONAL LINES BY PILOTMAN. Uncontrolled Railway When Group Printed Standard Title of Rule Book : GO/RT3000 : Master SECTION P (Part ii) WORKING OF SINGLE AND BI- DIRECTIONAL LINES BY PILOTMAN Page Date Index Page No. Latest Issue

More information

GERM8000. Rule Book. Possession Workers Manual. Published by Rail Safety and Standards Board Limited

GERM8000. Rule Book. Possession Workers Manual. Published by Rail Safety and Standards Board Limited GERM8000 Rule Book Possession Workers Manual Published by Rail Safety and Standards Board Limited POSSESSION WORKERS MANUAL GERM8000/possessionworkers RSSB has produced this manual to provide end-users

More information

Infrastructure Works - Rules 1 to 26

Infrastructure Works - Rules 1 to 26 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 4.0 27 January 2013 5.0 04 October 2015 5.1 01 July 2018 Australian Rail Track Corporation Limited

More information

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings

CIRCULAR NO. O-13. Recommended Practices for Manual Protection of Highway/Railway Grade Crossings CIRCULAR NO. O-13 Recommended Practices for Manual Protection of Highway/Railway Grade Crossings Effective: October 1, 2004 CONTENTS 1. SCOPE 2. GENERAL PRINCIPLES 3. DEFINITIONS 4. PROTECTION REQUIRED

More information

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book GERT8000-HB12 Rule Book Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession Issue 6 September 2017 Comes into force 02 December 2017 Handbook 12 Uncontrolled when printed

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 7... 7... 7... 7... 8... 8... 9... 11...

More information

2017 NORAC RAILROAD OPERATING RULES STUDY GUIDE SYSTEM OPERATING PRACTICES

2017 NORAC RAILROAD OPERATING RULES STUDY GUIDE SYSTEM OPERATING PRACTICES SYSTEM OPERATING PRACTICES 2017 NORAC RAILROAD OPERATING RULES STUDY GUIDE This study guide is not the test. It is a guide to help you prepare for the test and should be used in conjunction with the operating

More information

Revision Date issued Description of Changes 1 24/11/2011 Review 2 09/04/2018 Change in format, (current 2017) hand signals

Revision Date issued Description of Changes 1 24/11/2011 Review 2 09/04/2018 Change in format, (current 2017) hand signals Version Author Reviewed Reference PO Box 299 Oberon NSW 2787 ABN 98 107 506 208 A-Rev 2 SMS Work party Committee 23/04/2018 Hand Signals Document Status Version Date Revision Prepared Reviewed Approved

More information

Japanese Traffic Rules

Japanese Traffic Rules Japanese Traffic Rules Pedestrian & Cyclist s Edition Edited by the Gifu Prefectural Police Headquarters Compiled and Published by Gifu Prefecture Basic Traffic Rules Obey all traffic lights and road signs.

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Rail Traffic Whistles Rule Number: 4007 Version 1.0, 31 March 2016 Rail Traffic Whistles Rule Number: 4007 Document Control Identification Document title Number

More information

2018 CAMS MANUAL OF MOTOR SPORT

2018 CAMS MANUAL OF MOTOR SPORT 2018 CAMS MANUAL OF MOTOR SPORT Appendix H Track Control and Flag Signalling CONFEDERATION OF AUSTRALIAN MOTOR SPORT WWW.CAMS.COM.AU ARTICLES 1 AND 2 BELOW ARE A GUIDE TO CAMS REQUIREMENTS FOR TRACK CONTROL

More information

Rule Book for Train & Engine Employees

Rule Book for Train & Engine Employees Rule Book for Train & Engine Employees Effective October 14 th, 2015 Page 2 October 2015 TABLE OF CONTENTS SECTION 1 - DEFINITIONS... 8 SECTION 2 GENERAL... 11 2.1 REPORTING FOR DUTY... 11 2.2 WHILE ON

More information

UNABRIDGED SUMMARY OF NORAC 8 TH EDITION CHANGES

UNABRIDGED SUMMARY OF NORAC 8 TH EDITION CHANGES The following is a description of the changes approved for the NORAC Operating Rules, Eighth Edition, effective January, 2003. A much shorter Summary of Changes will be handed out to employees with the

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

DRIVER S LICENCE HANDBOOK

DRIVER S LICENCE HANDBOOK DRIVER S LICENCE HANDBOOK When you have learnt this book, ask at the bank for the test don t forget to pay R30.00! THE CONTROLS OF THE VEHICLE Let s begin now with the controls of the motor vehicle. The

More information

C Grade Licence Examination Written and Oral questions Study Master List

C Grade Licence Examination Written and Oral questions Study Master List C Grade Licence Examination Written and Oral questions Study Master List Prior to Examination: Candidates should study the current Manual online, and/or download the relevant sections as required from

More information

Flag Marshal s Briefing Notes

Flag Marshal s Briefing Notes CAMS NSW Supersprint Championships Flag Marshal s Briefing Notes By Ian Williams, CAMS NSW Supersprint Panel 1. Welcome Thanks for volunteering your time today. As well as being a crucial part of running

More information

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with? 1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?

More information

MINNESOTA FLAGGING HANDBOOK

MINNESOTA FLAGGING HANDBOOK MINNESOTA FLAGGING HANDBOOK January, 2018 Flagging Handbook This Flagging Handbook has been developed following the guidelines of the 2011 edition of the Minnesota Manual on Uniform Traffic Control Devices,

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SMP 08 (RIC Standard: SC 00 52 00 08 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Issue 1 Revision

More information

Equipment Operation Procedures

Equipment Operation Procedures Procedures Purpose It is the policy of this company to permit only trained and authorized personnel to operate construction equipment. These procedures are applicable to both daily operators, and those

More information

Train stopped by train failure

Train stopped by train failure GERT8000-M2 Rule Book Train stopped by train failure Issue 5 Module M2 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk

More information

IAM RoadSmart Group Organised Rides

IAM RoadSmart Group Organised Rides IAM RoadSmart Group Organised Rides 13/07/16 Dave Shenton Head of Field Operations Operations/Standards V1.00 Contents 1. Introduction 2. A Standard Approach 3. Safety 4. The Law 5. Associate Guide 7.

More information

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES

TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES TRAFFIC CONTROL DEVICES MANUAL FOR WORK ZONES SUMMARY Flagpersons play an important role in the high level of traffic safety expected through work zones on Saskatchewan highway projects. Flagpersons are

More information

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation.

Gas Check. Short testing time, with automatic start-up if no leakage was detected from previous operation. Quality Products at Competitive Prices Gas Check Automatic testing of the down-stream installation to check that all valves are closed and that pipework and fittings are gas tight before each system start-up.

More information

UNIVERSITY BICYCLE CODE

UNIVERSITY BICYCLE CODE UNIVERSITY BICYCLE CODE UNIVERSITY OF ILLINOIS AT URBANA-CHAMPAIGN EFFECTIVE MAY 1, 1989 This Code applies to all students who are regularly enrolled in the University; to all University staff and faculty;

More information

WESTERN PACIFIC RAILROAD MUSEUM CREW TRAINING

WESTERN PACIFIC RAILROAD MUSEUM CREW TRAINING WESTERN PACIFIC RAILROAD MUSEUM CREW TRAINING Celebrating the legacy of the Feather River Route www.wplives.org Last Revised 6/11/18 Safety Procedures for Train Operations General Yard & Caboose Train

More information

FL AGGER S HANDBOOK January 2012

FL AGGER S HANDBOOK January 2012 FLAGGER S HANDBOOK January 2012 Introduction You have been chosen to be a flagger because your supervisor feels you are physically able, mentally alert and sufficiently commanding in appearance to properly

More information

SCHOOL TRAFFIC MANAGEMENT PLAN

SCHOOL TRAFFIC MANAGEMENT PLAN SCHOOL TRAFFIC MANAGEMENT PLAN Introduction Purpose Westwood Secondary School takes the health and personal safety of all individuals, including students, stakeholders, staff and visitors, seriously. It

More information

IC Chapter 3. Traffic Control Signals

IC Chapter 3. Traffic Control Signals IC 9-21-3 Chapter 3. Traffic Control Signals IC 9-21-3-0.5 "Pedestrian hybrid beacon" Sec. 0.5. As used in this chapter, "pedestrian hybrid beacon" means a traffic control signal used to warn and control

More information

Control of Energy - Isolation Process

Control of Energy - Isolation Process Issue Date: 24/03/17 Last Reviewed: 24/03/17 Next Review Date: 24/03/18 Authorised By: Mike Muir Safe Operating Procedure Control of Energy - Isolation Process Purpose: This SOP is based on a Generic 12-step

More information

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6

ISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX

More information

CALIFORNIA STATE RAILROAD MUSEUM

CALIFORNIA STATE RAILROAD MUSEUM CALIFORNIA STATE RAILROAD MUSEUM SACRAMENTO SOUTHERN RAILROAD CIRCULAR 8 GENERAL REQUIREMENTS FOR ENGINEMEN APRIL 25, 2014 1. AUTHORITY TO OPERATE ENGINES a. Only properly qualified engineers, firemen

More information

o UNDAY, 18t MA CH, 1962

o UNDAY, 18t MA CH, 1962 ignal nstruction ( B ZH ALiAY ) No. 18.E.D. OUTHEN EGON-OUTH EATEN DVON nstructions to all concerned as to TODUCTON OF COLOU LGHT G AL AT TONBDGE (in place of certain existing semaphore running signals)

More information

FINA OPEN WATER SWIMMING RULES

FINA OPEN WATER SWIMMING RULES FINA OPEN WATER SWIMMING RULES OWS 1 DEFINITIONS OWS 1.1 OPEN WATER SWIMMING shall be defined as any competition that takes place in rivers, lakes, oceans or water channels except for 10km events. OWS

More information

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety

More information

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18

MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18 MUNICIPALITY OF ANCHORAGE TRAFFIC CODE UPDATE MASTER RECOMMENDATION REPORT: 9.14, 9.16, 9.18 Report Date: Please send all recommendations for update to Shane Locke (343-8413, lockesr@muni.org) 8-Apr-09

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Manitoba Highway Traffic Act

Manitoba Highway Traffic Act Manitoba Highway Traffic Act As it relates to bicycles Summary These are the sections of the Manitoba Highway Traffic Act that include the word bicycle, plus some other bicycle related sections. This is

More information

NOTE: IF YOU HAVE TRAINED IN 2015, 2016 OR 2017 YOU ARE NOT RE- QUIRED TO RE-TRAIN IN 2018

NOTE: IF YOU HAVE TRAINED IN 2015, 2016 OR 2017 YOU ARE NOT RE- QUIRED TO RE-TRAIN IN 2018 AUSTRALIAN INTERNATIONAL PEDAL PRIX INC. 2018 EVENT MARSHAL INFORMATION & TRAINING NOTE: IF YOU HAVE TRAINED IN 2015, 2016 OR 2017 YOU ARE NOT RE- QUIRED TO RE-TRAIN IN 2018 AIM To assist Australian International

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CORPORATIONS, SECURITIES, AND COMMERCIAL LICENSING BUREAU SKI AREA SAFETY - GENERAL RULES

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CORPORATIONS, SECURITIES, AND COMMERCIAL LICENSING BUREAU SKI AREA SAFETY - GENERAL RULES DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS CORPORATIONS, SECURITIES, AND COMMERCIAL LICENSING BUREAU SKI AREA SAFETY - GENERAL RULES (By authority conferred on the director of the department of licensing

More information

Mid-Ohio Sports Car Course August 10-12, 2017 Rounds and 12

Mid-Ohio Sports Car Course August 10-12, 2017 Rounds and 12 1.00 SERIES MEETINGS Attendance at all driver meetings, driver development or driver education seminars/meetings is required. If you are unable to attend please contact the Race Director. 2.00 THE CIRCUIT

More information

FINA OPEN WATER SWIMMING RULES

FINA OPEN WATER SWIMMING RULES PART IV FINA OPEN WATER SWIMMING RULES 2017 2021 OWS 1 OWS 2 OWS 3 OWS 4 OWS 5 OWS 6 OWS 7 DEFINITIONS OFFICIALS DUTIES OF OFFICIALS THE START THE VENUE THE RACE THE FINISH OF THE RACE Version 12.09.2017

More information

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures.

You must NOT touch any equipment unless you are authorised to work on or with that equipment and you have followed correct safety procedures. SYDNEY TOWN HALL 1 HIRER & CONTRACTOR SAFETY FACT SHEET Issue 2 September 2013 www.sydneytownhall.com.au City of Sydney - Venue Management will provide and maintain a safe working environment for the health,

More information

Canadian Tire Motorsport Park July 6-9, 2017 Rounds 7-8 and 9

Canadian Tire Motorsport Park July 6-9, 2017 Rounds 7-8 and 9 F4 US EVENT SCHEDULE Wednesday, July 5, 2017 1:00 pm 5:00 pm F4US Competitor Load-in 1:00 pm 4:00 pm F4US Registration Main Gate Registration Building 5:15 pm 6:45 PM Track Walk Walk and Bicycles Only

More information

Pre Course Workbook. If you have any questions regarding the content of this workbook, these can be raised during your course with the trainer.

Pre Course Workbook. If you have any questions regarding the content of this workbook, these can be raised during your course with the trainer. ZKL 3000 RC User - Delegate Pre-Course Workbook The purpose of this Workbook is to provide delegates who are due to attend a ZKL 3000 RC User course with a refresher on the fundamental requirements for

More information

Madras College Site Traffic Management Plan (South Street) August 2015 Reviewed / Updated August 2016, August 2017 (Next review due August 2018)

Madras College Site Traffic Management Plan (South Street) August 2015 Reviewed / Updated August 2016, August 2017 (Next review due August 2018) Madras College Site Traffic Management Plan (South Street) August 2015 Reviewed / Updated August 2016, August 2017 (Next review due August 2018) South Street, St. Andrews, KY16 9EJ Kilrymont Road, St.

More information

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018 GERT8000-HB16 Rule Book AC electrified lines Handbook 16 Issue 4 September 2018 Comes into force 01 December 2018 This handbook is for those personnel who need to go on the operational railway in an AC

More information

STATE OF MARYLAND FLAGGER EXAM

STATE OF MARYLAND FLAGGER EXAM GRADE: NAME (PRINT): ADDRESS: CITY, STATE, ZIP HOME PHONE: INSTRUCTOR: DATE: YES, I give ATSSA permission to distribute my phone number through its national flagger database, which will be accessible to

More information

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES

WORKING TIMETABLE OF PASSENGER TRAIN SERVICES Spa Valley Railway 2018 SECTION WE A DESTINATION AT EVERY STATION! WORKING TIMETABLE OF PASSENGER TRAIN SERVICES SOUTHERN REGION (CENTRAL DIVISION) SPA VALLEY LINE Thursday 2 nd, Friday 3 rd, Saturday

More information

SPECIAL NEEDS STUDENTS SCHOOL BUS TRANSPORTATION GUIDELINES FOR PARENTS/GUARDIANS

SPECIAL NEEDS STUDENTS SCHOOL BUS TRANSPORTATION GUIDELINES FOR PARENTS/GUARDIANS 100 Nightmist Irvine, CA 92618 949-936-5370 FAX: 949-936-5379 Carla Dupuis, Administrator SPECIAL NEEDS STUDENTS SCHOOL BUS TRANSPORTATION GUIDELINES FOR PARENTS/GUARDIANS INITIATION, REINSTATEMENT, OR

More information

IC Chapter 3. Traffic Control Signals

IC Chapter 3. Traffic Control Signals IC 9-21-3 Chapter 3. Traffic Control Signals IC 9-21-3-0.5 "Pedestrian hybrid beacon" Sec. 0.5. As used in this chapter, "pedestrian hybrid beacon" means a traffic control signal used to warn and control

More information

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE Name Department Initial Orientation Date Supervisor Review Instructions: Check off each section once you have read and discussed it with your Supervisor. EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Introduction to Signalling Maintenance Procedures Reference Number SMP 01 (RIC Standard: SC 00 52 00 01 SI) Document Control Status Date Prepared

More information

Signs. signs, signals and road markings. in this chapter

Signs. signs, signals and road markings. in this chapter 3 signs, signals and road markings in this chapter Signs regulatory signs school, playground and crosswalk signs lane use signs turn control signs parking signs reserved lane signs warning signs object

More information

allglass Anglia Middlewick Stages 2017 Green Belt Motor Club Wickford AutoClub Middlesex County Auto Club Safety Briefing

allglass Anglia Middlewick Stages 2017 Green Belt Motor Club Wickford AutoClub Middlesex County Auto Club Safety Briefing allglass Anglia Middlewick Stages 2017 Green Belt Motor Club Wickford AutoClub Middlesex County Auto Club Safety Briefing MOD Woodbridge, near Ipswich: Sunday 21st May 2017 The event is a qualifying round

More information

Method Statement: Testing Dry Riser System

Method Statement: Testing Dry Riser System Method Statement: Testing Dry Riser System Page 1 of 6 Scope of work Test dry riser system in accordance with BS 5306. Definitions For the purposes of this document, the following definitions apply Rising

More information

2019 FLAGGING, COMMUNICATION, AND SAFETY / INTERVENTION GUIDELINES

2019 FLAGGING, COMMUNICATION, AND SAFETY / INTERVENTION GUIDELINES 2019 FLAGGING, COMMUNICATION, AND SAFETY / INTERVENTION GUIDELINES IMSA WeatherTech SportsCar Championship / IMSA Michelin Pilot Challenge / IMSA Prototype Challenge / Porsche GT3 Cup Challenge USA by

More information

Ventam 85 Installation & Commissioning Instructions

Ventam 85 Installation & Commissioning Instructions Ventam Systems Ltd Unit D4 Seedbed Business Centre Vanguard Way Shoeburyness Essex SS3 9QY Phone 01702 382 307 Fax 01702 382 340 Ventam 85 Installation & Commissioning Instructions 1 General The Ventam

More information

InKart Championship Rules & Regulations

InKart Championship Rules & Regulations InKart Championship Rules & Regulations Daytona Sandown Park Spring Championship The season will comprise of 11 rounds, with the top 9 scoring rounds to count to the final Championship Standings. Round

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

Canadian Rail Operating Rules Guidelines for British Columbia Provincial Industrial Railways

Canadian Rail Operating Rules Guidelines for British Columbia Provincial Industrial Railways Canadian Rail Operating Rules Guidelines for British Columbia Provincial Industrial Railways October 14, 2015 Canadian Rail Operating Rules GENERAL NOTICE Safety and a willingness to obey the rules are

More information

Minimum Safety Requirements for Contractors Working on Railway Property

Minimum Safety Requirements for Contractors Working on Railway Property Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway

More information

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757)

EWC EARLY WARNING CONTROL OPERATIONAL PRESENTATION. Charles Dickens (757) EARLY WARNING CONTROL OPERATIONAL PRESENTATION Charles Dickens (757) 831-2626 Controls still continue to use the foundations of technologies that were developed in the 1970 s. Because of the perceived

More information

Chapter #4 Traffic Control Devices and Laws

Chapter #4 Traffic Control Devices and Laws Chapter #4 Traffic Control Devices and Laws Chapter #4 Overview Unit 4 will introduce the student to traffic control devices, including signs, signals and pavement markings, as well as traffic laws specific

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS NPTC Registered Charity No. 1096429 NATIONAL AGRICULTURAL CENTRE STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7669 6553 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE

More information

TRANSMITTAL LETTER. Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal Supports) - March 2009 Edition

TRANSMITTAL LETTER. Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal Supports) - March 2009 Edition OS-299 (7-08) TRANSMITTAL LETTER PUBLICATION: Publication 149 - Traffic Signal Design Handbook DATE: 10/14/10 SUBJECT: Revision to Publication 149, Chapter 20 (Criteria for the Design of Traffic Signal

More information

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

How to plan an event. Step 1: First things first. Step 2: How to make it all happen? As an event organiser, you have a legal responsibility to ensure the health, safety and welfare of all those involved in your event - all employees, volunteer helpers and contractors as well as members

More information

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.

More information

SECTION 5 SURF BOAT EVENTS

SECTION 5 SURF BOAT EVENTS SECTION 5 SURF BOAT EVENTS 5.1 GENERAL CONDITIONS Boat Crew Definition - a boat crew shall consist of five competitors, four of whom shall be rowers and the fifth shall control the boat by a sweep oar

More information

Chapter 8 (2009) - Summary of key changes

Chapter 8 (2009) - Summary of key changes Chapter 8 (2009) - Summary of key changes (Some sections and paragraphs in the revised edition have been renumbered to take account of new sections and paragraphs; section numbers below refer to the revised

More information

Madras College Site Traffic Management Plan (Kilrymont Road)

Madras College Site Traffic Management Plan (Kilrymont Road) Madras College Site Traffic Management Plan (Kilrymont Road) December 2012 Reviewed / Updated December 2013, 2014, 2015, & 2016 (Next review due December 2017) South Street, St. Andrews, KY16 9EJ Kilrymont

More information

SETTING THE HANDLE HEIGHT ON THE ROLLATOR

SETTING THE HANDLE HEIGHT ON THE ROLLATOR Model No: Maximum User Weight: 10910C (Lightweight) 10928C (Heavy duty) 125kg (20st) (Lightweight) 170kg (27st) (Heavy duty) Height of handles: 780-915mm (30.5-36 ) (Lightweight) 790-930mm (31-36.5 ) (Heavy

More information

Whittlebury Park Golf Club. Ride on Buggy Safe Working Practice Policy

Whittlebury Park Golf Club. Ride on Buggy Safe Working Practice Policy Whittlebury Park Golf Club Ride on Buggy Safe Working Practice Policy 1. Introduction Whittlebury Park Golf Club has a duty of care to all users of the golf course. The topography of certain areas of the

More information

Isolation Lockout and Tagging

Isolation Lockout and Tagging PURPOSE To define the minimum system requirements for isolation of plant and equipment from hazardous substances, mechanical, electrical or other energy sources to protect all workers from personal injury

More information

Traffic Signs and Signals

Traffic Signs and Signals CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department

More information

TRAFFIC ACCOMMODATION IN WORK AREAS

TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS TRAFFIC ACCOMMODATION IN WORK AREAS Copyright 2005 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized

More information

MEN S HOME INTERNATIONALS HARD CARD STANDARD LOCAL RULES & REGULATIONS

MEN S HOME INTERNATIONALS HARD CARD STANDARD LOCAL RULES & REGULATIONS MEN S HOME INTERNATIONALS HARD CARD STANDARD LOCAL RULES & REGULATIONS A: LOCAL RULES The following Local Rules, together with any additions or amendments, as published by Wales Golf at the golf course,

More information

RULES & REGULATIONS 2014 CHAMPIONSHIP SEASON

RULES & REGULATIONS 2014 CHAMPIONSHIP SEASON RULES & REGULATIONS 2014 CHAMPIONSHIP SEASON Competitor eligibility The minimum age of any competitor is 16. Any drivers found or suspected of having taken alcohol or any drug on the I.O.C. list of prohibited

More information

Parental Responsibilities

Parental Responsibilities Bicycle riding is a fun way to exercise and enjoy the outdoors. To remain safe on Illinois roads, bicyclists must obey the same traffic safety laws that govern vehicle drivers. No amount of bicycle safety

More information

SNOOKER SCORE BOARD. Snooker Scorer. Digital snooker score board. Operator & Reference Handbook

SNOOKER SCORE BOARD. Snooker Scorer. Digital snooker score board. Operator & Reference Handbook Snooker Scorer. Digital snooker score board. Operator & Reference Handbook Rev 1 By Geoff Hackett Copyright 2002 Book reference Part number 'DOC SSN1' Contents 1 Welcome Copyright information. 2 Panel

More information

School Traffic Management Plan

School Traffic Management Plan School Traffic Management Plan School Name: Cauldwell School Manager with responsibility for Traffic Management Plan: Contact Number: 01234 301400 Contact Email: schooloffice@cauldwell.org.uk Issue Date:

More information

On-Road Skills Demonstration

On-Road Skills Demonstration TRAINING TOOL On-Road Skills Demonstration DRIVING THE FUTURE 2 ON-ROAD SKILLS DEMONSTRATION TRAINING TOOL On-Road Skills Demonstration This document is a resource for consistent and objective evaluation

More information

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition NORTHERN POWERGRID Distribution Safety Rules 2015 Edition These rules shall be read in conjunction with the Operational Practice Manual and/or indicated Operational Guidance. Refer to the index for supplementary

More information

SWA OPEN WATER SWIMMING RULES

SWA OPEN WATER SWIMMING RULES SWA OPEN WATER SWIMMING RULES All Swimming WA (SWA) Open Water Swimming competitions shall be governed by SAL s Rules and By- Laws, as determined from time to time, with the following exceptions and additions.

More information

Volume 2: OFFICIATING MECHANICS

Volume 2: OFFICIATING MECHANICS Volume 2: OFFICIATING MECHANICS TABLE OF CONTENTS FORWARD... 3 1. INTRODUCTION... 4 2. PREPARATION BEFORE THE GAME... 4 Physical Preparation... 4 Pre-game Duties... 4 3. BEGINNING OF A PERIOD... 4 Administration

More information