Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products

Size: px
Start display at page:

Download "Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products"

Transcription

1 Outline for Safety Performance Supervisory Inspection of Boiler and Pressure Vessel Products Appendix 1 Supervisory Inspection Rule for Safety Performance of Boiler and Pressure Vessel Products Published by KÜPPERS Engineering

2 Contents A. Boiler... 3 B. Pressure Vessel...6 C. Gas Zylinder... 8 D. Non-Metallic Pressure Vessel E. Baric oxygen chamber for medical treatment

3 A. BOILER I. Applicable scope This outline is the general requirements for supervisory inspection of the safety performance of stationary pressure-containing boilers with water medium and organic fluid Heaters and their parts. The supervisory agency may adjust the items and contents based on the actual situation. II. Contents of supervisory inspection 1. Supervisory inspecting the items related to the safety performance of the product during boiler manufacturing. 2. Supervisory examining the implementation of the quality system of the supervised manufacturer III. Items and methods of supervisory inspection 1. Drawing and data review (1) Review the design data of the boiler products, (2) Examine the standards and technology for boiler manufacture and inspection; (3) Review the standards and technology for non-destructive examination (NDE); (4) Review the approval formalities of design change (including material substitution). 2. Manufacture quality of drum (shell), furnace, tube-plate, reverse combustion chamber, vertical flue and lower support ring (1) Check material certificate and material re-test report (2) Check the selection and formalities of substitute materials (3) Check the transplantation of material identification (4) Appearance examination (including base metals and welds) (5) Examine weld position and stagger between the abutting welds (6) Check the identification steel stamp of welders and welding operators (7) Spot-check geometric dimension (including difference between the maximum and the minimum inner diameters of cylinder, angularity, straightness, misalignment and location of opening) (8) Measure wall thickness of cylinders and heads (tube plate) (if necessary) (9) Examine the number and manufacturing method of welding test plate (10) Check property test reports of welding product test plate and verify the test results (11) Check NDE report and spot-check the x-ray films. The number of the x-ray films being checked should not be less than 30 per cent of the total number of films (films at cross joint, T-joint and at doubtful position and welding repair should be included. (12) Check heat treatment records and report (13) Check hydrostatic (pressure) test (including testing pressure, temperatures of test medium and of environment, pressure raising rate, pressure dwelling time and validation of pressure gauge calibration) (14) Check the dimensions and appearance of openings for tube, the rectification of tube joints and machining quality. 3

4 3. Supervisory inspection of manufacturing quality for header (1) Check material certificate and material re-testing report (2) Check the selection of substitute materials and material substitution formalities (3) Examine the transfer of material identification (4) Examine surface quality (including weld) (5) Wall-thickness measurement (if necessary) (6) Check the identification steel stamp of welders (7) Check spectrum analysis report of alloy steel tube, weld and of components and parts (8) Verifying the number and manufacturing method of welding test plate (9) Check the mechanical property test report of the product welding test plate and verify the test result (10) Check NDE report and spot check x-ray films. The number of the x-ray films being checked should not be less than 30 per cent of the total number of films (11) Check heat treatment technology and report (12) Check hydrostatic (pressure) test (including testing pressure, temperatures of testing medium and of environment, pressure raising rate, dwelling time and the validation of calibration for pressure gauges) (13) Examine the opening dimension and surface quality of tube hole, rectification of tube-joints and machining quality 4. Supervisory inspection of manufacturing quality for tubes (1) Check material certificate and material re-testing report (2) Check the selection of substitute materials and material substitution formalities (3) Check the transfer of material identification (4) Appearance examination (including weld) (5) Spot-check geometry (including bending quality of tubes and difference between the maximum and the minimum inner diameters) (6) Review the spectrum analysis report for alloy steel tube, welds, components and parts (7) Verifying the number and manufacturing method tube test samples made by either cutting from tubes or attaching with tubes (8) Check the mechanical property test report of the product welding test plate and verify the test result (9) Check NDE report and spot check x-ray films. The number of the x-ray films being checked should not be less than 30 per cent of the total number of films (10) Conduct sounding of tube by balls (11) Check hydrostatic (pressure) test (including testing pressure, temperatures of test medium and of environment, pressure raising rate, dwelling time and validation of calibration for pressure gauges) 5. Safety appurtenance The number, specifications, types and certificates of compliance of safety appurtenance should meet the relevant requirements. 6. Thermal adjusting test for safety performance of compact oil-fired or gas-fired boilers in manufacturer (1) Check if the types and specifications of safety valves, pressure gauges and water level indicators meet the requirements. (2) Check if the water level control devices are sensitive (3) Check if the over-pressure protection devices are sensitive (4) Check if the ignition program controllers and fire extinguish protection devices are sensitive (5) Check if the burner matches the boiler 4

5 7. Examination of delivery technical document of boilers (1) Check the delivery technical documents (2) Check the contents on nameplate and stamp the supervisory inspection symbol on it 8. Supervisory inspection data Once the product has passed the supervisory inspection, the supervisory inspector should summarize the data and verifying papers in time according to the Supervisory Inspection Items for Safety Performance of Boiler Products and issue the Supervisory Inspection Certificate. 9. The supervisory inspector should check the following documents of the supervised companies (1) Quality manual (2) The list of appointment and dismissal of quality system personnel (3) The list of qualified welders and welding operators engaged in boiler welding (including qualified items, term of validity in their certificates and identification steel stamp) (4) The list of personnel engaged in NDE (including qualified items, level and term of validity in their certificates) (5) The list of inspectors engaged in boiler quality inspection (6) Boiler design data, technological document and inspection and testing report and record and a summarized table of welding procedure qualification (7) Supervised manufacturer production plan for boilers (8) Sub-contracts for boiler production 5

6 B. Pressure Vessel I. Applicable scope This outline is applied to the supervisory inspection on safety performance of pressure vessel except for gas cylinders. II. Contents of supervisory inspection 1. Supervisory inspecting the items related to the safety performance of the product during pressure vessel manufacturing. 2. Supervisory examining the implementation of the quality system of the supervised manufacturer III. Items and methods of supervisory inspection 1. Drawing and data (1) Examine the certification of pressure vessel designer, conform the effectiveness of its qualification (2) Review the effectiveness of standards on manufacture and inspection for pressure vessel (3) Review the approval formalities for design change (including material substitution). 2. Materials (1) Check material certificate and material re-test report (2) Check the transplantation of material identification (3) Check the selection and formalities of substitute materials for main pressure parts 3. Welding (1) Check the welding procedure qualification and their records, verify that the welding technology used in product production is in accordance with the relevant standards and codes. (2) Confirm the number and manufacturing method of the welding test plate. (3) Check the property test report of the product welding test plates and confirm the test results. (4) Check identification steel stamps of welders and welding operators. (5) Check formalities and procedures for welding repair. 4. Visual and dimensional examination (1) Examine the appearance of welded joints. (2) Check the mechanical damage on the surface of base metal (3) Check the difference between maximum and minimum diameters of shell. Check the straightness of the cylinder of vertical vessel with height more than 30 meters, Check the arrangement of welds and the deviation of figure in head and record their actual dimensions. Check the main dimensions of the forming petal for spherical vessels. 5. Non-destructive examination (1) Check x-ray film arrangement map and NDE report. Verify the proportion and position of NDE. For the spot-nde pressure vessel, check the extension RT for the repaired welds. As for the UT or surface flaw detection, the supervisory inspector should conduct random on-site supervisory inspection in addition checking the report. (2) Check the x-ray films. The number of the x-ray films being checked should not be less than 30 per cent of the whole and should not less than 10 films (including the x-ray films at T-joint, doubtful area and at the repaired area). 6

7 6. Heat treatment Check and confirm the correspondence between heat treatment curve and actual heat treatment parameter and procedure. 7. Pressure test Before pressure test, confirm that all required items have passed the supervisory inspection and the supervised manufacturer has kept the testimony of the whole-completed work. During pressure test, the supervisory inspector shall check the test equipment, instruments, preparation work for testing and verify the test results on the site. 8. Safety appurtenance The number, specifications, types and certificates of compliance of safety appurtenances should meet the requirements. 9. Leak test Check the leak test result to assure that it meets to the requirement of concerned code, standards, and design drawing. 10. Delivery technical data (1) Check the technical data to be delivered (2) Check the nameplate if the contents on it are in accordance with the relevant requirements and the supervisory inspection stamp has imposed. 11. Supervisory inspection data Once the product has passed the supervisory inspection, the supervisory inspector should summarize and verify the testifying paper in time according to the Supervisory Inspection Items for Safety Performance of Pressure Vessel Products and issue the Supervisory Inspection Certificate. 7

8 C. Gas cylinder I. Applicable Scope This outline is applicable to the supervisory inspection for safety performance of gas cylinders. II. Supervisory inspection content 1. Supervisory inspecting the items related to the safety performance of the product during gas cylinder manufacturing. 2. Supervisory examining the implementation of the quality system of the supervised manufacturer. III. Items and methods of supervisory inspection 1. Check if the enterprise standard (i.e. the standards formulated by manufacture itself) has established and being approved by safety supervision department of AQSIQ. Confirm that the design documents of gas cylinders have been checked and approved by inspection agency in accordance with the relevant requirements. The general drawings of gas cylinders should bear the symbol of being checked and approved. Check the type approval testing results of the gas cylinders. 2. Check and confirm the material certificates of the proper of gas cylinders. Confirm that all kinds of data meet the requirements of corresponding codes and standards and design documents. 3. Check the materials of the gas cylinder proper; verify the chemical composition per heat and the re-testing results. The supervisory inspection agency may conduct the re-testing if necessary. Confirming the re-test results for macrostructure of material if the gas cylinders are made of billet. Verifying the situation and results of NDE per each tube if the gas cylinders are made of seamless steel tubes. 4. Check the identification of the acceptable material before and the transportation identification of the after cutting. 5. Check the welding procedure qualification and its record, Confirm the welding procedures used in gas cylinder production are conform to the relevant standards and codes. Check the proof test reports for heat treatment parameter and procedure of seamless gas cylinders. 6. On-site witness the hydrostatic pressure tests of each gas cylinder and confirm the test pressure, dwelling time, test results and the cylinder s serial numbers stamped on each gas cylinders whether have been recorded. 7. The supervisory inspector shall select and mark the sampling gas cylinders with small or medium volume and record the serial numbers of them. The inspection results of the appearance and other items, that require to be inspected one by one according to the product standards, should accord with the requirements as specified in the relevant codes and standards. 8. Check if the material of product welding test plate for big gas cylinders (>150 liters) are in conformity with the material of the gas cylinder proper. Before product welding test plate is cut off from longitudinal weld, the supervisory inspector should stamp the Supervisory Inspection Symbol on it for verification and confirm whether the manufacturing number and identification number of the welder is in existence. 9. The supervisory inspector should choose and mark one sample cylinder per batch of acetylene gas cylinders, and records its manufacturing number. When the sample cylinder is sectioned, the inspector should check the gap between packing and wall of the cylinder, packing appearance, surface holes and the preparation of packing sample on the spot. During the test of compressive strength, bulk density and porosity etc. of the sample packing, the supervisory inspector should conduct on-site spot check and verify the test records. 10. On-site check if the process and test results of mechanical property testing conform to the relevant requirements. 11. The supervisory inspector shall sample the gas cylinders for performing flattening test according to the rules, check the preparation work before the test and witness the test on the site. Check the span between plungers, flattened value and whether there is crack in the flattened place under loading. 12. Check the section, preparation of cold bending test specimens for seamless gas cylinders and the cold bending test method and test results of them. 13. Check the metallographic report. Check metallographic photo if necessary. As for gas cylinders under heat re-treatment, check the test specimen and metallographic photo of the sample cylinder. Check the section and preparation of the dissection specimen from the bottom of gas cylinder, examine its macroscopic analysis result and measuring the shape and size of the bottom structure of gas cylinder. 8

9 14. The supervisor should sample one test cylinder from every batch of products, witness the hydraulic burst test on the site. Check test equipment, instruments and safe protection measures before the test. Validate the test records and results. 15. Check the appearance, stamp mark, color and mark of the gas cylinder. The color should be in conformity with standard color card. 16. Check the batch inspection report of delivery gas cylinders. Each gas cylinder should attach with certificate of compliance with the stamp of supervisory inspector. The supervisory inspector should put supervisory inspection stamp on each gas cylinder. 17. The supervisory inspector should review the following documents of the supervised (1) Quality manual (2) The list of appointment and dismissal of quality system personnel (3) The list of personnel engaged in NDE (including items in certificate, level and term of validity, etc.) (4) The list of personnel engaged in gas cylinder quality inspection (5) Manufacturing technological documents and inspection data as well as the list of welding procedure qualification. (6) Enterprise standards, design documents and fatigue test verification report for gas cylinder. IV. Quantity of gas cylinders to be supervisory inspected 1. Each beach gas cylinders must complete all supervisory inspection items listed in Supervisory Inspection Items Form. 2. If the unacceptable items found during supervisory inspection, the items should be re-inspected and re-tested with additional quantity, which should be in accordance with the requirement of relevant standards or decided by supervisory inspection agency when the requiring quantity for re-inspection and re-testing is unavailable in the standards. The supervisory inspection agency can add additional supervisory inspection items to the Supervisory Inspection Item Form when necessary. 9

10 D. Non-metallic pressure vessels I. Applicable scope This outline is applied to the supervisory inspection of the safety performance of glass-fiber-reinforced plastic vessels and graphite vessels. II. Supervisory inspection content 1. Supervisory inspection of the items related to the safety performance of non-metallic vessels during their manufacture. 2. Supervise and examine the implementation of quality system of the supervised manufacturer. III. Items and methods of supervisory inspection 1. Drawing and Data (1) Check the certified stamp of pressure vessel design to confirm the validity of its qualification. (2) Check the validity of applied manufacturing and inspection standards. (3) Check the formalities of design change. 2. Materials (1) Check material certificate of main body. (2) Check the transplantation of material identification. (3) Check the material substitution formalities. 3. Technology qualification (1) Check the technology qualification of glass-fiber reinforced plastic vessel product (2) Check the assessment for graphic vessel products per certified material standard (CMS) and certified cohesive standard (CCS). Assessment: For dipped non-penetrating graphite product, check the infusing procedure qualification and cohesive procedure qualification. (3) Check the property test reports of product test plate and confirm the test result. (4) Check the certification of qualification of workers engaged in on-site manual paste operation of glass reinforced plastic and graphite cohesion 4. Appearance and geometry (1) Check the surface appearance of the joint especially the appearance of fillet joints. (2) Check the products' appearance. (3) Check the data of total weight, Babbit hardness, content of resin, moisture absorptivity of laminate materials etc. (4) Spot-check the grain composition test, bending strength, tensile strength, tensile strength of adhesive. 5. Pressure test Before pressure test, confirm that all related items have passed the supervisory inspection and the supervised manufacturer has kept the evidence of the whole-completed work. During pressure test, the supervisory inspector shall check the test equipment, instruments, preparation work for testing and verify the test results. 10

11 6. Safety appurtenance Check if the specifications and number of safety appurtenance accord with the relevant stipulations 7. Delivery technical data Check if the contents of product s certificate of compliance and product quality certificate are correct and complete and if the final issuing and signing (stamping) formalities are complete and correct. Check if the as-built drawing can reflect the factual manufacture situation of the product. 8. Name-plate Check the nameplate if the contents on it are in accordance with the relevant stipulation 11

12 E. Baric oxygen chamber for medical treatment I. Applicable scope This outline is applied for all kinds of baric oxygen chamber for medical treatment with working pressure equal to or less than 0.3 MPa. II. Supervisory inspection contents 1. Supervisory inspection the items concerning products' safety performance during the process of manufacturing and installing baric oxygen chamber for medical treatment, i.e., including supervisory inspection during manufacturing and supervisory inspection during installation. 2. Supervisory examining the implementation of the quality system of the baric oxygen chamber manufacturer. III. Items of supervision inspection 1. Design drawing and related data (1). Check if the design drawings of the chamber and of the main system of the product have reviewed and approved in accordance with the relevant stipulation and if the drawings has borne a design approval stamp so as to confirm the validity of their qualification. (2). Confirm the effectiveness of the standards for manufacture, installation and for inspection on design drawing. (3). Check the certificates of compliance, quality certificates, as-built drawing and supervisory inspection certificate of the auxiliary pressure vessel for the baric oxygen chamber. (4) Check if the contents of on-site commission report are complete and correct and if all the functions of the baric oxygen chamber meet the requirements of related standards and codes. (5) Check the on-site supervisory inspection record for installation, including system leak test record, purge records of supply and exhaust piping for both oxygen and gas, degrease record of supply and exhaust piping for oxygen, and welding and NDE record. (6) Check the qualification of the personnel engaged in manufacture (installation) and inspection of the baric oxygen chamber, including welders and welding operators, non-destructive examiners and electricians. (7) Verify whether the volume of the chamber per person meets the requirements in relevant standards. 2. Materials (1) Check the material certificate of the chamber proper and main pressure parts (including plate, pipe for supply gas and for supply and exhaust oxygen). (2) Check material certificate of observation windows, illumination window and the organic glass for illumination windows. The material must free of obvious scuffing and mechanical damage or aging silvery vestiges. (3) Check if the decoration materials in the chamber meet the related requirements of GB12130 or related standards for the baric oxygen chamber. (4) Check the certificates of compliance of valves, sealing components and cables. (5) Check the material substitution formalities for main pressure parts and components and for organic glass. 3. Manufacture, inspection and testing (1) Check the applied welding procedure qualification of the baric oxygen chamber. (2) Spot-check the identification steel stamp and the qualification of the welder and welding operator performing the welding of the chamber. (3) Check the surface quality of welded joint, Especially attention to the appearance of fillet joint between observation window and chamber, supply passage and chamber, and the chamber door and head. (4) Check the x-ray film map and the flaw detection report. Verify the NDE detection rate, x-ray position and assessment result of flaw detection. 12

13 4. Equipment in the chamber (1) Check if the supply passage, chamber door in the chamber, which has quick-actuating door structures opening outwards, has installed with safety interlock devices. (2) Check if the manual operational device in quick-actuating door structures opening outwards, which has equipped with the electric or pneumatic gearing device, can open the door within the specified time. (3) Check the connections of electrical cables and if they are easy to examine and repair when the electrical appliances are fitted in the chamber. (4) Check if the oxygen-collecting opening for oxygen gauge is placed in the middle of the chamber and its outlet is out of the ornamental plate. (5) Check the mark, reliability and sensitivity of emergency exhaust device. (6) Check if there is a ground wire for eliminating electricity in the baric chamber. 5. Electric appliances and communications (1) Confirm that the chamber adopts both cold light source and external illumination, and is equipped with emergency illumination system, which can work automatically as soon as the power source of chamber was broken. (2) The intercom device between control desk of oxygen chamber and the chamber room should be sensitive and with clear voices. (3) Check the resistance and connections of grounding device of the chamber proper and the cases of other device. (4) Check if the electric motor and controller for air-conditioning device are fixed outside of the chamber. (5) Check the leakage electric current to the earth. (6) Check the certificates of compliance or quality documents of attached electric appliances 6. Supply and exhaust systems for gas and oxygen (1) Check the function of sound alarm and light warning device of the oxygen gauge. Check if the oxygen electrode is valid when the oxygen gauge is based on the principle of galvano-chemistry. (2) Check the material for the oxygen exhaust piping in the chamber and the link between oxygen exhaust piping and the chamber. (3) Check the leakage rate of the chamber during the leak test. (4) Check the control valves at the high pressure side of the oxygen manifold, check the anti-malfunction device and warning sign at the connection between manifold and oxygen gas cylinder. (5) Check the outfits of gas storage tanks, air purifier and oil and water separators. (6) Check the certificates of compliance or quality documents of flow meters, thermometers pressure gages and other instruments. 7. Heat treatment Check the area or parts of the baric oxygen chamber, which require heat treatment. Confirm the heat treatment parameter and procedure and its actual report. 8. Safety appurtenances (1) Check the quantity, accuracy and scale of the pressure gauges in the oxygen chamber. (2) Check the type, quantities and set pressure of the safety valves on the chamber proper and on the auxiliary pressure vessels. 9. Check if the fire-fighting equipment in the chamber meets the requirements of GB Name-plate Check if the contents and specifications on the nameplates of the baric oxygen chamber and its auxiliary pressure vessels meet the relevant requirements. 13

14 IV. Methods of supervisory inspection 1. Both manufacture and installation supervisory inspection for baric oxygen chamber for medical treatment should use the Supervisory Inspection Item Form. The items should be done during manufacture at the place where the oxygen chamber manufacturer located as far as possible. 2. Except the items listed in this outline to be supervised and inspected during both manufacture and installment, all the other items that have passed the supervisory inspection during manufacture should not undergo repeated supervisory inspection during installation. 3. The agency, which undertakes the manufacture supervisory inspection, should sign on the items that pass the supervisory inspection for confirmation and issue the Manufacture Supervisory Inspection Certificate. The agency, which undertakes the installation supervisory inspection of oxygen chamber, should sign on the items that have passed the supervisory inspection for confirmation and issue the Supervisory Inspection Certificate and stamp the Supervisory Inspection Mark on the nameplate of the oxygen chamber. 4. The supervisory inspector shall put acceptable on the Supervisory Inspection Result column for those items which are conform with relevant codes and standards and put the name and serial number of their testifying paper with his/her signature on the Working Testimony column. The supervisory inspector should put the measuring data or existing problems on the Supervisory Inspection Result column and describing the actual situation of non-conform with the relevant codes and standards in detail in addition to the handled measures of supervised manufacture on the Note column, if the items are not conform to the relevant codes and standards. 14

Supervisory Inspection Rule for Safety Performance of. Boiler and Pressure Vessel Products

Supervisory Inspection Rule for Safety Performance of. Boiler and Pressure Vessel Products Supervisory Inspection Rule for Safety Performance of Boiler and Pressure Vessel Products Chapter 1 General Provisions Article 1 This rule is formulated in accordance with the Supervision Administration

More information

Notice for Pressure Special Equipment Manufacture Licensing

Notice for Pressure Special Equipment Manufacture Licensing AQSIQ Notice No.151 (2012) Notice for Pressure Special Equipment Manufacture Licensing To further enhance the implementation of the manufacture licensing system to imported pressure special equipment,

More information

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS

More information

F-08 HIGH-PRESSURE HOSE USED IN CO2 SYSTEM

F-08 HIGH-PRESSURE HOSE USED IN CO2 SYSTEM Guideline No.: F-08(201510) F-08 HIGH-PRESSURE HOSE USED IN CO2 SYSTEM Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements,

More information

B-05 SEAMLESS STEEL GAS CYLINDERS

B-05 SEAMLESS STEEL GAS CYLINDERS Guideline No.: B-05(201705) B-05 SEAMLESS STEEL GAS CYLINDERS Issued date: May 9, 2017 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

Other Si min/max. Cr min/max. 0.4/ / / / Bal.

Other Si min/max. Cr min/max. 0.4/ / / / Bal. 178.46 Specification 3AL seamless aluminum cylinders. (a) Size and service pressure. A DOT 3AL cylinder is a seamless aluminum cylinder with a imum water capacity of 1000 pounds and minimum service pressure

More information

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material

CONTENTS Article NC-1000 Introduction Figures Article NC-2000 Material CONTENTS Foreword... xv Statements of Policy... xvii Personnel... xix Organization of Section III... xxxi Summary of Changes... xxxiii List of Changes in BC Order... xxxiv Article NC-1000 Introduction...

More information

Liquefied gas cargo tanks and process pressure vessels

Liquefied gas cargo tanks and process pressure vessels .1 -.3 Liquefied gas cargo tanks and process pressure vessels.1 General.1.1 The present texts give the general principles which are applied by Classification Societies for approval and survey of the relevant

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS

ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS ACCREDITATION OF ON-LINE LEAK SEAL ORGANIZATIONS TSSA GUIDE FOR SURVEY TEAMS The Technical Standards and Safety Authority Boilers and Pressure Vessels Safety Division 3300 Bloor Street West 14th Floor,

More information

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp.

ASME and PED Requirements for Drum Level Instrumentation. Presented by: Amir Hedayatnia Clark-Reliance Corp. ASME and PED Requirements for Drum Level Instrumentation 2017 Presented by: Amir Hedayatnia Clark-Reliance Corp. Topics Gage Glasses and Remote Reading Instruments ASME Code Section I Requirements for

More information

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives)

Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on Locomotives) December 5, 1994 TM Rules for the Installation, Inspection and Testing of Air Reservoirs (Other than on

More information

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL)

STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) STANDARD SPECIFICATION FOR SPLIT TEES (HOT TAP MATERIAL) TEE (HOT TAPPING MATERIAL) S-04-02-040 Page 1 of 7 1.0 SCOPE This specification covers the basic requirements for the design, manufacture and supply

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society Guideline No.M-05(201510) M-05 AIR COMPRESSOR Issued date: 20 October 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical requirements

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure F. INTERPRETATION OF THE ESSENTIAL SAFETY REQUIREMENTS ON MANUFACTURING Guideline F-01 Guideline related to: Annex 1 Section 3.1.2 According to section 3.1.2 (permanent joining) of Annex I, the third party

More information

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards. 1. Scope Description of requirements and procedures for compact provers to be used as verification standards. 2. Reference documents Trade Metrology Act SANS1698 3. Policy A. BASIC REQUIREMENTS Compact

More information

High-Pressure Boiler Inspection Procedures: A Complete Checklist

High-Pressure Boiler Inspection Procedures: A Complete Checklist High-Pressure Boiler Inspection Procedures: A Complete Checklist Inspecting high-pressure boilers is a complex process requiring preparation, planning, and a multitude of safety precautions. Regular inspections

More information

CAST IRON SAFETY VALVE TYPE 6301

CAST IRON SAFETY VALVE TYPE 6301 CHARACTERISTICS The 6301 safety valve is dedicated to protect the equipment from potential overpressure. This is an automatic device that closes when the pressure conditions are back to normal. It is a

More information

Regulations Respecting Compressed Gas Pressure Vessels

Regulations Respecting Compressed Gas Pressure Vessels COMPRESSED GAS PRESSURE VESSELS SR 99/70 1 Regulations Respecting Compressed Gas Pressure Vessels Repealed by Chapter B-5.1 Reg 1 (effective January 1, 2007) Formerly Saskatchewan Regulations 99/70 (effective

More information

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - APPLIANCE BALL VALVE PTS - APPLIANCE BALL VALVE 2 30.06.17 Issued for Tender AS ADE GS 1 12.04.17 Issued for Tender AS AD GS 0 06.03.17 Issued for Client s Comments AS AD GS Rev. Date Subject of revision Author Checked Approved

More information

Transferring and Storage

Transferring and Storage Organometallics Transferring and Storage A dip tube is available for Container 2 which can be screwed into the neck to permit safe transfer of product. Small quantities of metal alkyl can be withdrawn

More information

STS 650 PRESSURE EQUIPMENT

STS 650 PRESSURE EQUIPMENT Hunter Water Corporation ABN 46 228 513 446 Standard Technical Specification for: STS 650 PRESSURE EQUIPMENT This Standard Technical Specification (STS) was developed by Hunter Water Corporation to be

More information

Testing Procedures of Watertight Compartments

Testing Procedures of Watertight Compartments (1996) (Rev.1 Feb 2001) (Rev.2 May 2001) (Rev.3 May 2010) (Rev.4 Aug 2012) Testing Procedures of Watertight Compartments.1 Application Revision 4 of this UR is to be complied with in respect of the testing

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk

Periodical surveys of cargo installations on ships carrying liquefied gases in bulk (June 1999) (Rev.1 Mar 2006) (Rev.2 May 2007) (Rev.3 Mar 2010) (Corr.1 Feb 2011) (Rev.4 Oct 2013) Periodical surveys of cargo installations on ships carrying liquefied gases in bulk 1 General 1.1 Scope

More information

Informal document regarding progress of CEN standards for reference in RID/ADR

Informal document regarding progress of CEN standards for reference in RID/ADR Joint Meeting of the RID Safety Committee and the Working Party on the Transport of Dangerous Goods (Berne, 13-24 March 2000) Informal document regarding progress of CEN standards for reference in RID/ADR

More information

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION

CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION CERTIFICATION OF COMPLIANCE OF THE USER S DESIGN SPECIFICATION I, the undersigned, being experienced and competent in the applicable field of design related to pressure vessel requirements relative to

More information

Procedure: Pressure equipment safety

Procedure: Pressure equipment safety Procedure: Pressure equipment safety Purpose The purpose of this procedure is to define the method for safe operation and inspection of pressure equipment and the collection and recording of associated

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

MSC Guidelines for Pressure Vessels

MSC Guidelines for Pressure Vessels References: a. 46 CFR Part 54 Pressure Vessels S. T. Brady, CDR, Chief, Engineering Division b. ASME Boiler and Pressure Vessel Code (BPVC), Section VIII, Division 1, (1998 Edition) c. Navigation and Inspection

More information

2.1 Introduction to pressure vessels

2.1 Introduction to pressure vessels 2.1 Introduction to pressure vessels Pressure vessels in the form of cylinders and tanks are used for storing variety of liquids and gasses at different temperatures and pressures. Some of the substances

More information

INSPECTION OF RECOVERY BOILERS

INSPECTION OF RECOVERY BOILERS INSPECTION OF RECOVERY BOILERS W. B. A. (Sandy) Sharp SharpConsultant, Columbia, Maryland, U.S.A. TAPPI Kraft Recovery Short Course St. Petersburg, Florida, January 7-10, 2008 OUTLINE Purpose of inspections

More information

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 Edition 4 December 2018 Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 / Edition: 4 Page 1 of 8 Contents 1. Introduction 2 2. Scope - Inspection Services

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated

More information

v. Size shall be specified on drawings.

v. Size shall be specified on drawings. SPECIFICATION FOR VACUUM INSULATED PIPING Part 1 General 1. Submittals a. After award of contract and before executing any manufacturing, shop drawings and specifications shall be submitted to the customer

More information

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This

More information

6301 TYPE CAST IRON SAFETY VALVES

6301 TYPE CAST IRON SAFETY VALVES Pressure (bar) 6301 TYPE CAST IRON SAFETY VALVES FEATURES The 6301 type safety valve is a device designed to protect installations against possible overpressure. It operates automatically and closes when

More information

MSC Guidelines for Independent Fuel Tanks

MSC Guidelines for Independent Fuel Tanks References: Contact Information a. 46 CFR 58.50 (Independent Fuel Tanks) b. 46 CFR 119.440 (Independent Fuel Tanks) c. 46 CFR 182.440 (Independent Fuel Tanks) C. J. Robuck, LCDR, Chief, Engineering Division

More information

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS

FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS CHAPTER 35 FLAMMABLE GASES AND FLAMMABLE CRYOGENIC FLUIDS SECTION 3501 GENERAL 3501.1 Scope. The storage and use of flammable gases shall be in accordance with this chapter. Compressed gases shall also

More information

THE PROCESS OF JOINT INTEGRITY

THE PROCESS OF JOINT INTEGRITY BOLTED JOINTS A.333 THE PROCESS OF JOINT INTEGRITY To assist in managing a process, ask yourself the following questions: why, what, who, and how? Why do we need a Flange Joint Integrity program? This

More information

AUTOMATIC HOSE TEST UNIT, TYPE SPU

AUTOMATIC HOSE TEST UNIT, TYPE SPU VALVES AND FITTINGS UP TO 14,000 BAR TEST AND CONTROL EQUIPMENT H IGH PRESSURE TECHNOLOGY AUTOMATIC HOSE TEST UNIT, TYPE SPU Pressure range from 1 up to 10,000 bar User-friendly touch panel operation HIGH-PRESSURE

More information

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

NATURAL GAS MAINTENANCE. Part 192 Subpart M NATURAL GAS MAINTENANCE Part 192 Subpart "M" CONTACT INFORMATION Pamela West Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Main: (405) 686-2310

More information

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Sabine Powell 02/12/2016 Use of Underwater Dry Welding for In Situ Repair to Offshore Structures Sabine Powell engineering@neptunems.com 02/12/2016 In Situ Welding Steel Structures Suitability of Repair Methods Mobile Offshore

More information

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems

Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems Water Mist Systems Inspection, Testing, and Maintenance of Water Mist Systems Name of Property: Address: Phone Number: Inspector: Contract No.: Date: This Report Covers: Monthly Quarterly Annual Other

More information

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

PRESSURIZED EQUIPMENT AND SYSTEMS

PRESSURIZED EQUIPMENT AND SYSTEMS SECTION 20 PRESSURIZED EQUIPMENT AND SYSTEMS 20.A GENERAL 20.A.01 Inspections and tests - general. a. Pressurized equipment and systems shall be inspected and performance tested before being placed in

More information

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures

SAFETY POLICY AND PROCEDURE MANUAL All Euramax Subsidiaries. Number K-3.0 Welding Safety Procedures Number K-3.0 Issued: 1/2009 Revised: 3/2016 Page 1 of 3 1.0 PURPOSE: To standardize procedures associated with production and maintenance welding and to minimize the potential risk of accident or injury

More information

CHAPTER 1 General Part

CHAPTER 1 General Part 1 (Garuda Emblem) Notification of Ministry of Industry Re: Safety measure for gas business operation B.E. 2548 (2005) ---------------------------- By the virtue of clause 18 and clause 19 of the Ministerial

More information

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124

Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 Pressure Equipment Directive (PED) 97/23/EC Page 033 of 124 13.7 Pressure Equipment Directive (PED) 97/23/EC 1 The Pressure Equipment Directive (PED) 97/23/EC applies to the design, manufacturing and conformity

More information

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions. IMPORTANT NOTICE

SAPAG. Safety valves, type 5700 Storage, Use, Operation and Maintenance Instructions.  IMPORTANT NOTICE SAPAG IMPORTANT NOTICE Contents Important notice 1 0 Valve identification 2 1 Storage 2 2 Installation 2 3 Operation 2 4 Maintenance 3 4.1 Dismantling 3 4.2 Inspection 3 4.3 Repair 3 4.4 Assembly 4 4.5

More information

Operating Manual FSV, FSÖV, SSVF

Operating Manual FSV, FSÖV, SSVF Contents 1. General Remarks... 1 1.1. Marking... 2 1.2. Tightness of the Quick-Closing Valve... 2 1.3. Medium... 2 1.4. Ambient and Medium Temperature... 3 1.5. Vibrations... 3 1.6. Pipe Tensions... 3

More information

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module: FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS This work covers part of outcome 2 of the Edexcel standard module: UNIT 21746P APPLIED PNEUMATICS AND HYDRAULICS The material needed for outcome

More information

ENGINEERING TECHNICAL REPORT

ENGINEERING TECHNICAL REPORT SSP DUOLOK FITTINGS ON 1.000 x 0.139 WALL 316SS TUBING ENGINEERING TECHNICAL REPORT SSP 8250 Boyle Parkway Twinsburg, Ohio 44087 U.S.A. mysspusa.com 1.330.425.4250 1 TABLE OF CONTENTS 1.0 Introduction

More information

Flexible hoses - Non-metallic materials

Flexible hoses - Non-metallic materials CLASS PROGRAMME Type approval DNVGL-CP-0183 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

OPENINGS AND REINFORCEMENTS 26

OPENINGS AND REINFORCEMENTS 26 ASME BPVC.VIII.1-2015 UG-35.2 UG-36 (4) It is recognized that it is impractical to write requirements to cover the multiplicity of devices used for quick access, or to prevent negligent operation or the

More information

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES Page 1 of 15 INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES Page 2 of 15 1. PURPOSE 2. SCOPE 3. REFERENCES 4. GENERAL INDEX 5. PROCEDURES 5.1 Line survey 5.2 Transport, loading, unloading and storage

More information

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems

Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems. 20.A General B Compressed Air and Gas Systems Section 20 TABLE OF CONTENTS Pressurized Equipment and Systems Section: Page 20.A General... 20-1 20.B Compressed Air and Gas Systems... 20-4 20.C Boilers and Systems... 20-7 20.D Compressed Gas Cylinders...

More information

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA

EXPIRATION DATE: (FOR RENEWAL, SEE 49 CFR ) 1. GRANTEE: Structural Composites Industries (SCI) Pomona, CA East Building, PHH-30 1200 New Jersey Avenue S.E. U.S. Department of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 13583 (NINTH REVISION) EXPIRATION

More information

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times

The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times Tseries Series AB AB Air Air Boosters Boosters The Compact, Portable, Efficient and Economical Solution to boost Shop Compressed Air Pressure by 2 or 3 times.01/1 MANIFOLD MOUNTED VALVES FOR EASY SERVICING

More information

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard

CITY AND COUNTY OF DENVER CR&CF RISK UNIT Compressed Gas Safety Standard CITY AND COUNTY OF DENVER CR&CF RISK UNIT 65.5.11 Compressed Gas Safety Standard 1.0 Introduction 2.0 Scope This standard has been developed to protect all City and County of Denver employees and contractors

More information

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016

APPENDIX 1. PART 10: Leak Detection Inspector, Level 1, 2 and 3 CERTIFICATION SCHEME FOR PERSONNEL. 3 rd Edition, February 2016 CERTIFICATION SCHEME FOR PERSONNEL Document No. CSWIP-ISO-NDT-11/93-R Requirements for the Certification of Personnel Engaged in Non- Destructive Testing in accordance with the requirements of BS EN ISO

More information

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1

Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Date of Issue: July 2016 Affected Publication: API Specification 16C, Choke and Kill Equipment, Second Edition, March 2015 ADDENDUM 1 Page 16, Section 4.6, delete the entire section and renumber all subsequent

More information

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap

MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap 1250650/6 IM-P125-07 ST Issue 6 MST21 Stainless Steel Balanced Pressure Thermostatic Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation

More information

Vertical and Horizontal Bladder Tanks

Vertical and Horizontal Bladder Tanks DATA SHEET Vertical and Horizontal Tanks Application The ANSUL bladder tank is one component in a balanced pressure proportioning system. Its operation requires no external power other than a pressurized

More information

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions

KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 4059051/3 IM-P405-48 EMM Issue 3 KBV21i and KBV40i Key Operated Boiler Blowdown Valves Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

TECHNICAL DATA OBSOLETE

TECHNICAL DATA OBSOLETE April 9, 2009 Preaction 326a 1. DESCRIPTION Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilizing the Viking G-4000P Deluge Valve. The small profi le, lightweight,

More information

BASIC REQUIREMENTS FOR FIBER REINFORCED PLASTIC (FRP) TYPE 3FC COMPOSITE CYLINDERS

BASIC REQUIREMENTS FOR FIBER REINFORCED PLASTIC (FRP) TYPE 3FC COMPOSITE CYLINDERS 1 DOT FRP - 1 STANDARD DATE: Original; July 1, 1981 Revision 1; March 15, 1982 Revision 2; February 15, 1987 BASIC REQUIREMENTS FOR FIBER REINFORCED PLASTIC (FRP) TYPE 3FC COMPOSITE CYLINDERS 178.AA Fiber

More information

Vehicle- or rack-mounted liquefied gas meters, pump supplied

Vehicle- or rack-mounted liquefied gas meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Rack/fixed metering

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

F-07Air breathing apparatus

F-07Air breathing apparatus Guideline No.F-07 (201510) F-07Air breathing apparatus Issued date: 20 October, 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical

More information

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC

General Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC United States Environmental Protection Agency RCRA Programs Branch Region IV Atlanta, GA CAA/RCRA Air Rules 27 November 2000 General Inspection Guidance for Waste Management Units Requiring Air Emission

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 9 ACCUMULATORS The material needed for outcome 2 is very extensive so there are

More information

COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1)

COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1) COMPETENCIES FOR IN-SERVICE INSPECTORS OF PRESSURE EQUIPMENT (NOTE 1) AICIP-003REV7 31 JULY 2017 No COMPETENCY LIST Time (Mins) Note 7 1. PLANNING AND PREPARING FOR INSPECTION ISI SISI AS/NZ 3788 Reference

More information

Handling and Storage of Gases

Handling and Storage of Gases Handling and Storage of Gases Learning Outcome When you complete this module you will be able to: Describe the procedures for safe storage and handling of cylinders containing gases. Learning Objectives

More information

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service GUIDELINES Pressure Systems Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service Document Reference: PSG 16 Issue 04 Dated 13/09/16 The Safety Assessment Federation

More information

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Spring Loaded Safety Valves

Spring Loaded Safety Valves Translated English of Chinese Standard: GB/T12243-2005 Translated by: www.chinesestandard.net Wayne Zheng et al. Email: Sales@ChineseStandard.net GB ICS 23.060.01 J 16 NATIONAL STANDARD OF THE PEOPLE S

More information

BMW proposal for. Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS. for the use in hydrogen powered road vehicles

BMW proposal for. Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS. for the use in hydrogen powered road vehicles BMW Draft, based on TRANS/WP.29/GRPE/2003/14 page 1 SGS 3-8 BMW proposal for Technical requirements concerning LIQUID HYDROGEN STORAGE SYSTEMS for the use in hydrogen powered road vehicles BMW Draft, based

More information

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C EXPIRATION DATE: June 30, 2015 November 14, 2014 East Building, PHH-30 U.S. Department 1200 New Jersey Avenue S.E. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 16219 EXPIRATION

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE

SUPPLY OF ISOLATION AND APPLIANCE VALVES PTS - ISOLATION BALL VALVE PTS - ISOLATION BALL VALVE 2 30.06.17 Issued for Corrigendum#1 AS ADE GS 1 12.04.17 Issued for Tender AS AD GS 0 06.03.17 Issued for Client s Comments AS AD GS Rev. Date Subject of revision Author Checked

More information

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Q= Cv S Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Subpart E. Pressure Testing

Subpart E. Pressure Testing Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.

More information

PIP PNE00012 Piping Examination and Leak Test Guide

PIP PNE00012 Piping Examination and Leak Test Guide October 2017 Piping PIP PNE00012 Piping Examination and Leak Test Guide PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144

Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering and Thermal Cutting in the Workplace L/505/0144 Unit Title Ofqual unit reference number (code) Organisation Reference QCF 665 Unit Level Unit Sub Level Installing, Repairing or Modifying Construction Resources by Heating, Welding, Brazing, Soldering

More information

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2)

A Rationale for Pressure Relief Device(s) Qualification Requirements (LH2) UN-GTR PART A INSERTION Stand 09.02.2011, 17:20 Uhr A.3.3 HYDROGEN STORAGE SYSTEM The hydrogen storage system consists of all components that form the primary pressure boundary of the stored hydrogen in

More information

Translation of the original Operating Instructions for HKS rubber compensators

Translation of the original Operating Instructions for HKS rubber compensators Because of their flexible elements and mechanisms, HKS rubber compensators are susceptible to damage of all types and adverse loads in operation. For reliable operation of a compensator and, thus, the

More information

Accreditation for In-Service Inspection of Pressure Systems/Equipment

Accreditation for In-Service Inspection of Pressure Systems/Equipment RG 2 Edition 5 November 2018 - Draft for consultation Accreditation for In-Service Inspection of Pressure Systems/Equipment RG 2 / Edition: 5 Page 1 of 10 Contents 1. Introduction 2 2. Scope - Inspection

More information

Atmospheric relief valve type 1100 Installation and maintenance instructions

Atmospheric relief valve type 1100 Installation and maintenance instructions SAPAG 1. Description Sapag atmospheric relief valves type 1100 have been selected for installation because of their performance features, reliability and ease of maintenance. They are designed to protect

More information

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC 157-20067 1 PURPOSE 1.1 The purpose of this standard is to establish an acceptable standard

More information

DOT-CFFC BASIC REQUIREMENTS (FIFTH REVISION) PAGE 1

DOT-CFFC BASIC REQUIREMENTS (FIFTH REVISION) PAGE 1 DOT-CFFC BASIC REQUIREMENTS (FIFTH REVISION) PAGE 1 CFFC-1 SCOPE APPENDIX A BASIC REQUIREMENTS FOR FULLY WRAPPED CARBON-FIBER REINFORCED ALUMINUM LINED CYLINDERS(DOT-CFFC) DATE: MARCH 2007 (FIFTH REVISION)

More information

DVS Technical Codes an Bulletins

DVS Technical Codes an Bulletins DVS Technical Codes an Bulletins DVS 1904-1 (2010-02) Adhesive bonding of plastics in domestic installation Requirements on plants and personnel... 1 DVS 1904-2 (2010-02) Adhesive bonding of plastics in

More information

1 Exam Prep. Tabs and Highlights

1 Exam Prep. Tabs and Highlights 1 Exam Prep NFPA 14: Standard for the Installation of Standpipe and Hose Systems Tabs and s These 1 Exam Prep tabs are based on the NFPA 14: Standard for the Installation of Standpipe and Hose Systems,

More information