TWIST FAULTS. Produced by Civil Engineering Conference For use by all Railway Civil Engineering Staff

Size: px
Start display at page:

Download "TWIST FAULTS. Produced by Civil Engineering Conference For use by all Railway Civil Engineering Staff"

Transcription

1 TWIST FAULTS Produced by Civil Engineering Conference For use by all Railway Civil Engineering Staff CEC/DG/010 Issue 1 February 2002

2 Note These guidelines have been produced for the benefit of the rail industry and it is the author s intention to permit free copy and distribution. No action under copyright law will be pursued. Printed copies are available from Heron Press. Disclaimer The information contained is believed to be correct at the time of publication but standards and specifications do change. The reader must ensure that they refer to their latest instructions which this document does not supersede. Civil Engineering Conference, its members and Railtrack Plc (in Railway Administration) have used their best endeavours to ensure that the content, layout and text of this document are accurate, complete and suitable for its stated purpose. Conference and Railtrack Plc (in Railway Administration) make no warranties, express or implied, that compliance with the contents of this document is sufficient on its own to ensure safe systems of work or operation. Each user is reminded of their own responsibilities to ensure health and safety at work and their individual duties under health and safety legislation. Neither Conference nor Railtrack Plc (in Railway Administration) will be held responsible for any loss or damage arising from the adoption or use of anything referred to or contained in this publication. The inclusion of a process or product in this document should not be construed as an endorsement of that process or product by the Conference and Railtrack Plc (in Railway Administration). Produced for Civil Engineering Conference by: AMEC Rail AMEY Rail Balfour Beatty Rail Carillion First Engineering Grant Rail Ltd GT Railway Maintenance Ltd Jarvis Rail Serco Rail Maintenance Ltd Mowlem Rail In conjunction with Railtrack Plc (in Railway Administration) Printed by Heron Press, Kings Norton, Birmingham. Telephone: February 2002

3 Contents SUBJECT PAGE Scope 2 Introduction 2 What is Twist? 3 Where are Twist Faults Likely to Occur? 4 Design Twist in Transition Curves 6 What does a Twist Fault Look Like? 7 How a Twist Gradient is calculated 8 Checking the Accuracy of the Cross Level Gauge Before Use 9 Measuring Cross Level on the Same Rail 10 Measuring Cross Level on Different Rails 11 Use of the Void Meter 12 Why is twist measurement important? 13 Twist on Track Renewals Sites 14 Twist and the Track Recording Vehicle (TRV) 15 The Future of the TRV 18 Removing Twist Faults 18 References 19 Appendix One 20 Appendix Two 22 1

4 Scope This booklet has been produced for the guidance of track staff at all levels. It is intended to give general information on the causes, associated risks, identification, avoidance of twist faults; how twist is measured; and what preventative and remedial actions are required. Introduction The presence of twist faults on railway infrastructure may create a risk to safety of the line and has the potential to cause serious incidents. Derailments caused by twist have resulted in prosecution of renewals and maintenance companies by the HMRI. It is essential that all staff play their part in eliminating the occurrence of twist faults. Photograph - derailment risk twist fault in S&C 2

5 What is Twist? Twist is the term used to describe the variation in cross-level measured across the four foot over a given distance along the track. Cross-level for a twist on Railtrack Infrastructure is measured over a 3 metre distance, this equates to approximately 5 sleepers. The dimension relates to the 10-foot wheelbase of older four-wheeled single axle wagons with rigid suspensions. On London Underground twist is measured over a 2 metre distance. (See Appendix 2). Twist in both cases is reported as a gradient e.g. 1 in 200. (See page 8). Twist typically occurs at;- Cant change in the transition of a curve. This is an example of a design twist and will have a maximum gradient of 1 in 400. Correctly maintained cant gradient is an acceptable form of twist that forms an essential part of the design of a railway curve. At a track fault. These may be detected by visual inspection, measurement of the cross level or by a Track Recording vehicle (TRV) and this type of fault is referred to as a twist fault. During track renewal construction work for example at run-ins and run-outs of new work, or where bottom ballast has been poorly compacted, or at particularly wide joints which suffer high wheel impact. Twist faults present a derailment risk to all traffic irrespective of speed. Short wheel based four wheel wagons are most susceptible. The measurement of twist should be considered in two ways, static twist and dynamic twist. Static twist can be measured with a cross-level gauge. It gives the twist measurement of the track whilst unloaded and so does not allow for sleepers voiding. Dynamic twist is the twist that will occur under the passage of a train when the track is loaded. A Track Recording Vehicle,TRV, measures dynamic twist. It is important to allow for the effects of voiding when calculating twist. The use of void meters and a cross level gauge allows the dynamic twist to be calculated. 3

6 Twists are measured across the four-foot and can be calculated by taking the difference between two readings taken 3 metres apart. (5 sleepers).these readings in millimetres are then used to calculate the twist gradient. This is a simple calculation and will be explained later. Within wetbeds and slurry spots Photograph - derailment caused by twist Where are Twist Faults Likely to Occur? Photograph - wetbeds causing twist 4

7 At broken rails or broken fishplates At dipped IBJ's or where two different types of IBJ are used parallel to each other (e.g. 4 hole & 6 holes) or where track type changes. Where a joint is dipped or staggered Photograph - dipping joint Where broken or damaged sleepers are present At breather/adjustment switches Where embankment movement occurs As a result of settlement and mining subsidence. At sites of weak formation, e.g. ash ballast or fen soils. Run-in and run-outs to structures, waybeams and level crossings Near hard-spots, eg tunnel mouths, viaducts, shallow ballast under bridges. Voiding sleepers and sites where poorly consolidated ballast exists. Voids caused by decay on way-beam and longitudinal timbers. On renewals sites during construction activities. Where trackside drainage trenches have recently been exposed. Due to wear at crossing noses. An area where mechanical tamping is restricted. Where drainage is defective. As a result of tunnelling activities under the track e.g. pipeline thrustbore. Twist induced during maintenance activities Due to settlement on Slab track. (Remedy with thicker pads). Where tamping starts and ends. 5

8 Design Twist in Transition Curves In a transition curve the cant is increased/decreased by a calculated amount over a given distance. This is where the high rail gradually rises relative to the low rail by a designed amount. For example the design twist or cant change starts at C=0mm and rises to the value of cant in the regular curve, e.g. C=150mm on high-speed track. The cant in transitions should be shown by markings in steps of 5mm. In some locations cant plates are fixed to the high side of the sleeper at regular intervals. In other locations cant may be marked with black paint on a yellow background. Track staff should use these markings for reference when completing tamping and maintenance activities. All markings should be of such a size so as to be clearly legible from the cab of an on track machine in normal operating mode. Design twist or cant change can be checked using a suitable track gauge. This should be done by appropriately trained track staff and always completed following tamping and maintenance activities. Any variations in the design twist are needed to calculate the twist error in the crosslevel. This is demonstrated in the examples shown later. Photograph- transition curve with cant marking 6

9 What does a Twist Fault Look Like? Visually it may be difficult to see the presence of a twist fault in the track. By careful observation you may notice that one rail is dipping lower than the other. This variation in levels may be static (unloaded) or dynamic (during the passage of a train). Twist Gradients Twist may occur at any of the locations noted previously. The following section of this guide will advise you how to determine whether or not the twist fault presents a risk to traffic. Twists are reported as a gradient. Twist gradients above 1in 301 are low risk. Twist gradient between 1 in 200 and 1 in 300 do present a risk and remedial work should be planned to mandated timescales. Twist gradients between 1 in 91 and 1 in 199 require immediate action to mandated timescales Twist gradients worse than 1 in 90 require traffic to be stopped. If a twist fault is suspected it should be measured by using an appropriate cross level gauge, (calibrated in accordance with the manufacturers instructions) to measure variations in the relative rail levels across the four foot. Examples of how to calculate twist for both straight and curved track follow. If voiding under sleepers occurs, this must also be measured and included in the twist calculation. Photograph - twist fault measured at a Level Crossing 7

10 How a Twist Gradient is calculated A gradient can be expressed as a ratio, eg. 1 in 100 means a rise of 1 unit over a distance of 100 units. Gradient Change in Level Gradient is calculated using a simple equation. Gradient = Change in Level eg. Gradient = 1 Gradient = 1 in 100 Distance Travelled 100 On Railtrack infrastructure a distance of 3000mm (3 metres) is normally used as distance travelled (approximately 5 sleepers). The cant is measured and noted at the two points 3000mm apart. The change in level (difference between the two readings in mm) is then divided into 3000mm to give the twist value. Reading 1 0mm Distance Travelled Reading 2 15mm Change in level Across the four foot Between readings 1 & 2 is 15mm Distance 3000mm Gradient = Change Gradient = 15mm Gradient = 1 Distance 3000mm 200 So Twist Reported as 1 in 200 8

11 Checking the Accuracy of the Cross Level Gauge Before Use The cross level gauge should be routinely checked for damage and accuracy. This is done by taking the reading at a location on a section of straight track and then repeat the measurement with the cross level gauge rotated through 180 degrees. If two different values of cross-level are obtained then the gauge is out of adjustment, it should be returned for correction. IT IS IMPORTANT TO CHECK YOUR CROSS-LEVEL BEFORE USING IT Photograph - measuring cross-level A variety of track geometry trolleys and machines are available which will also measure twist faults. These machines can be used to measure cross levels continuously through the site. 9

12 EXAMPLE 1 - Measuring Cross Level on the Same Rail At sleeper number 1 = 30mm (6 ft rail high) At sleeper number 5 = 10mm (6 ft rail high) Difference between two readings = 30mm-10mm = 20mm Therefore TWIST=20mm in 3,000mm 20 = 1 or Gradient = 1 in When the high rail is the same at both sleepers, the difference between the two readings is found by subtracting one from the other. The gradient is found by dividing the interval by the difference between readings i.e. 3000mm 20mm = 150 (hence 1 in 150 gradient) 10

13 EXAMPLE 2 - Measuring Cross Level on Different Rails At sleeper number 1 = 10mm (6 ft rail high) At sleeper number 5 = 5mm (cess rail high) Difference between two readings = 10mm+5mm = 15mm Note that the two cant/cross level readings have been added together to establish the change of cant/difference because the high rail at sleeper number 1 has become the low rail at sleeper number 5. Therefore TWIST=15mm in 3,000mm 15 = 1 or Gradient = 1 in For a gradient 1 in X, the lower the numerical value of X, the more severe the twist. 11

14 The table below gives sample values of twist over a 3000mm base. A more comprehensive table can be seen in appendix 1. Twist 1 in x Measured changes in cross level in 3m (3000mm) Twist 1 in x Measured changes in cross level in 3m (3000mm) 90 33mm mm mm mm mm 430 7mm mm 600 5mm mm mm Use of the Void Meter Only static twist can be measured with a cross-level, dynamic twist must also be considered. Voids can be detected by watching the vertical movement of sleepers under traffic, sounding on timber sleepers and by observation of worn powdery ballast (or grey slurry when wet) on the ends of concrete sleepers. The presence of voids can result in a dynamic twist. Accurate measurement of voiding should be undertaken using void meters. Since voids cannot be assumed to be constant, void meters should be placed to check all sleepers near a suspected twist fault to find the worst case of voiding. 12 Photograph of Void Meter

15 EXAMPLE 3 - With void meters Void meters are installed under both rails at sleeper 1 and 5 as shown. Measurements were then taken: At sleeper number 1 = 30mm (6 ft rail high) with cross level gauge, 15mm deflection with void meter under the cess rail. No voiding under the six foot rail. At sleeper number 5 = 10mm (6 ft rail high) with cross level gauge, 0 mm deflection with void meter under either rail. Difference between two readings = (30mm+15mm)-10mm = 35mm Therefore TWIST = 35mm in 3,000mm. This equates to 1 in 85. This gradient is severe and would require the line to be blocked. (See table on page 17) Why is twist measurement important? A twist fault can cause a flange climbing derailment at all speeds. A twist fault is a condition where there is a difference in cross-levels between rails over a short distance. Twist faults may cause unloading of one or more of the wheels causing them to lose contact with the rail. Once contact with the running surface is lost the wheel can flange climb and derail the vehicle. Modern vehicles with softer suspension are less prone to twist than older type four wheel freight wagons. However there is still a serious risk of a derailment occurring as a result of twist and it is essential that twist faults are corrected. Dipped joint under wheel 1 with a stiff vehicle chassis causes wheel 2 to lift. This may lead to flange climb and de-railment 1 Twist Occurs 2 Direction of Travel Wheel Dipping at Joint Diagram showing how flange climb derailment may occur. 13

16 Twist on Track Renewals Sites It is common to inadvertently apply twist faults during track renewal activities. These twist faults must be removed prior to the hand back of the line to traffic. A competent person must carry out detailed cross level measurements and ensure that the track meets design and construction requirements after tamping and repair activities. Twist faults that exceed the maximum tolerances (referred to in RT/CE/S/102) must be removed prior to handback of the line to traffic. Twist on renewal sites during the works can cause derailment of on-track plant and ballast trains. This will almost certainly delay relaying activities and causes possession over-runs. A competent person must assess the track to confirm its adequacy prior to engineering equipment being allowed to pass over the site. Good consolidation of ballast during relaying activities is essential. Failure to consolidate may result in twist faults occurring after the line has been opened to traffic. Sites should be monitored following relaying activities, any twist faults occurring should be corrected with appropriate urgency according to the severity of the twist. Methods to avoid twist faults during renewals activity: - When blanketing and traxcavating, ensure bottom ballast is applied evenly, well compacted in layers and with gentle gradient changes. When machine ballast cleaning aim for an even distribution of returned ballast and ensure that blockages in the machine do not lead to uneven return. Ensure that run-in and run-outs to new work are adequately packed before running plant and ballast trains into the site. Do not undermine the track when excavating trenches particularly for drainage. Cross drains and start / finish of digs should be at right angles to the track Ensure that when steel sleepers are installed, sufficient tamping is completed to allow the troughs (on the underside of the sleepers) to fill with ballast. Photograph - Twist fault on renewals site caused by settlement of unconsolidated ballast which subsequently caused a derailment. 14

17 The condition illustrated in the photograph is not specific to renewal sites. Settlement may also occur on maintenance sites where formation is disturbed. For example, removal of wet beds and replacement of sleepers if ballast consolidation is poor. Twist and the Track Recording Vehicle (TRV) Use of the Track Recording Vehicle (TRV) is an effective method of measuring dynamic twist. The data provided by the TRV is useful to P-way Engineers for identifying existing twist faults and predicting potential twist sites. The TRV must be considered as an audit tool to identify twist faults missed by other inspection methods. Twist is one of many characteristics recorded by the TRV and plotted on the chart. The chart is used to assess line safety and track quality. Level 2 twist faults are shown on the top of the chart. The 3m twist is plotted at half of full scale. The lines at each side of the twist trace show the limit above which constitutes a level 2 fault. Use of the chart enables P.way Engineers to visualise the general condition of all lines recorded by the TRV. Twist Line Level 2 Twist Fault Exceedence Lines EXAMPLE: NOT TO SCALE The computers on-board the TRV monitor and process all the data collected by the measuring systems. In addition to twist these systems record data for top, alignment, cant deficiency, dynamic gauge, cross-level and curvature and others listed in the left hand column of the chart. 15

18 When the measurements reach a pre-determined threshold they are also recorded in a report format. (Bench marks for these thresholds are laid out in Industry Specifications) Measurements above these thresholds are called exceedences and are categorised as "level 1" and "level 2" dependant on the severity. Level 1 Exceedence (L1) The threshold for a L1 is set at a level, that indicates an isolated undesirable feature in the track to which attention needs to be given. The level 1 is an increased risk but not at a level that requires immediate action. A twist fault in the L1 category has a twist gradient of between 1 in 300 to 1in 201. Proactive treatment to L1 faults should prevent a L2 twist exceedence developing. Level 2 Exceedence (L2) If the twist value exceeds the threshold for a L1, then it is recorded as a level 2 fault, this must be considered as a serious exceedence. The responsible staff must rectify L2 faults to minimum action timescales. The report below is a typical example of an immediate action report form. The twist faults are represented by TW3M shown in the channel column. Level 2 exceedence reports are available to engineers immediately after the TRV run. Repair must be instigated in accordance with mandated timescales. TRACK RECORDING for RAILTRACK plc by SERCO RAILTEST Ltd TRACK RECORDING VEHICLE [TRU] [SL_DTGS V3.06] AREA [ ECML SOUTH - 2B ] ACTION REPORT page 001 Date WUNL: Networker ZONE [ North Eastern Zone ] JOURNEY: DONCASTER <MARSHGATE JN> TO HOLBECK JN 0054/1 PWME [ A M E DONCASTER ] PWSS: RSM DONCASTER ELRX: DOL FILE [ TRUD B ] Location Level Dist Channel Peak Line Action Sign-off Miles yds ch AWSm Value Speed ELRX: DOL m 811y(36) L2 ( 20) 791 GAUGE = 27.1mm [ 70] > : : / / 156m 861y(39) L2 (-20) 836 LTOP = -22.3mm [ 70] 10 Days > : : / / 156m 848y(38) L2 (-15) 825 ALIG35 = -16.3mm [ 70] 10 Days > : : / / 156m 863y(39) L2 ( 15) 838 TW3M = 17.3mm (1:173) [ 70] 10 Days > : : / / 156/3-156/4 SD1(3.6) 0 ALIG35 = 5.7mm [ 70] > : : / / 156m 880y(40) L2 ( 15) 854 ALIG35 = 21.9mm [ 70] 10 Days > : : / / 156m 876y(39) L2 ( 15) 850 TW3M = 17.5mm (1:171) [ 70] 10 Days > : : / / Signature PWSM Date returned to PWME / / Signature PWME Date received from PWSM / / 16

19 Information shown on the Level 2 report includes Engineers Line Reference (ELR) and track I.D. The mileage and yardage of the fault is shown on the left-hand side. A twist fault is describes as TW3M indicating it is recorded over a 3 metre distance, the value of the twist may be shown either as a gradient or in mm (e.g. 1 in 150 or 20mm for 3m twist). The time-scale for the action required be shown depending on the severity of the twist (e.g. 36 hours or 10 days). When remedial work is completed the report should be signed off and dated by the person responsible for the repair. Notes should also be included which detail the nature of the repair. All repairs signed off should be reviewed and countersigned by the P-way Section Manager and P-way Engineer. The table below suggests the minimum action in place at date of this publication. (Current minimum action needs to be checked against latest Standards.) To assist track staff in locating Level 2 twist faults, the TRV drops a marker trace of red paint in the four foot approximately 22 metres after the fault is detected. Exceedence Level 2 Irregularity Time-scale Action 1 Action 2 Action 3 Dynamic twist of 1 in 90 or worse Stop all traffic and correct immediately TRV Train captain contacts signalman to block line Signalman blocks line and informs infrastructure control Team attends immediately to instigate repair 2 Dynamic twist of between 1 in 91 and 1 in 125 Correct within 36 hours Level 2 exceedence report to area staff Team repairs within timescales - 2 Dynamic twist of between 1 in 126 and 1 in 199 Correct within 10 working days Level 2 exceedence report to area staff Team repairs within timescales - 1 Dynamic twist of between 1 in 200 and 1 in 300 No immediate action. Section Manager to observe P-way Engineer review cause & considers L2 preventative work Team completes preventative work L2 avoided in next run - 17

20 The Future of the TRV The UK rail industry is presently reviewing TRV requirements. New technology computers, video and remote data technology will improve the accuracy of data recorded and the speed in which it is processed. This will impact on the way that twist faults are reported in the future. Removing Twist Faults It is essential that remedial measures taken give a permanent fix ensuring the fault does not reoccur. If the twist fault is in a slurry spot for example, merely lifting and packing is unlikely to be sufficiently durable. It will be necessary to dig out the slurry spots, replace with fresh compacted ballast and ensure drainage is working adequately. It is the root cause of a track fault that must be treated. Site circumstances will dictate the nature of remedial work to be completed. This may include: Manual lifting and packing Measured shovel packing Dig out and make good wet beds Hand held stone blowing Machine Tamping or Stone blowing Rail end straightening Manual lifting and packing may adequately repair a twist fault caused by localised settlement of the track bed. Following the repair a twist gradient worse than 1 in 400 should not be present in the track. (A difference in rail level of 7mm over 5 sleepers) The use of hand held stone blowing or on-track machine stone blowing may produce a more durable correction to twist fault than tamping and both methods have the advantage over measured shovel packing of not requiring the cribs or area between sleepers, to be opened out for the work to be undertaken. Most twist faults will be repaired under traffic within a safe system of work. Whilst carrying out these repairs great care should be taken to ensure that temporary variations in cant or cross level are not worse than 1 in 200 or 15mm in 3000mm. Repairs should be carried out in such a way that the twist fault is reduced and removed. Care should also be taken when lifts greater than 25mm are required to correct twist faults, a TSR may need to be imposed. Where lifting is carried out it may be necessary to return to the site after a short time under traffic to remove the effects of any settlement. Repair to twist faults during hot weather may affect the stability of the track and the critical rail temperature. More information can be found in the Railtrack Company Specification RT/CE/S/011 18

21 Your P-way Engineer or responsible manager should be informed if: A lift of more than 25mm is required When remedial work is necessary during hot weather. When remedial work is carried out it is essential to ensure that fastenings are correctly tensioned, rails are seated, defective fastening and sleepers are replaced. Adequate ballast must be provided prior to lifting and correct ballast profiles should be left on completion. More detailed information on maintenance methods can be obtained from the Civil Engineering Conference Track Maintenance Handbook Parts one and two CEC/C/0005 or equivalent P W I Textbooks. References Additional information relating to twist and twist faults can be found in your area track technical library: Track Maintenance Handbook - Part 1 - Plain Line CEC/C/0005 Track Maintenance Handbook - Part 2 - Switch and Crossing CEC/C/0005 Track Construction Standards RT/CE/S/102 Track Inspection Requirements RT/CE/S/103 Track Maintenance Requirements RT/CE/S/104 Continuous Welded Rail (CWR) Track RT/CE/S/011 London Underground E8404 A3 PWI British Railway Track,Volume 4 19

22 References Appendix One The table below relates to unloaded measurements taken over 3000mm, allowance must be made for voids and design twist (see page 3 and 6). Difference (mm) Gradient Action 5 >1 in 600 No Action 6 1 in 508 Monitor & Repair 7 1 in 435 Monitor & Repair 8 1 in 381 Monitor & Repair 9 1 in 339 Monitor & Repair 10 1 in 300 Monitor & Repair 11 1 in 277 Monitor & Repair 12 1 in 254 Monitor & Repair 13 1 in 230 Monitor & Repair 14 1 in 218 Monitor & Repair 15 1 in days 16 1 in days 17 1 in days 18 1 in days 19 1 in days 20 1 in days 21 1 in days 22 1 in days 23 1 in days 24 1 in days 25 1 in hours 26 1 in hours 27 1 in hours 28 1 in hours 29 1 in hours 30 1 in hours 31 1 in hours 32 1 in hours 33 1 in hours 34 1 in 90 Close Line 35 1 in 87 Close Line 36 1 in 85 Close Line 37 1 in 82 Close Line 38 1 in 80 Close Line 39 1 in 78 Close Line 40 1 in 76 Close Line 41 1 in 74 Close Line 42 1 in 73 Close Line 43 <1 in 71 Close Line 20

23 Appendix Two Twist on London Underground Dynamic twist on London Underground is also measured by a Track Recording Vehicle TRV over a 2 metre base (2000mm). As with other railway track exceedences can be located manually by use of a cross level gauge. In this case measurements being taken over a 2 metre base. Allowance must be made for dynamic movement. Tolerances for track category Exceedence A B C D All Lines except defined lines Minimum Action Notes Level 3 25mm 25mm 25mm 25mm Inspect within 24 hour repair within 48 hours 1 Level 2 20mm 20mm 20mm 20mm Inspect and rectify within 8 weeks Level 1 12mm 13mm 15mm 18mm Plan maintenance if required The Defined Lines are: All of the District Line The Piccadilly Line - Baron Court to Northfields and Hanger Lane Junction All of the Jubilee Line The Metropolitan Line - Finchley Rd to Wembley Park Level 3 Level 2 Level 1 20mm 18mm 12mm 20mm 18mm 13mm 20mm 18mm 15mm 20mm 19mm 18mm Inspect within 24 hour repair within 48 hours Inspect and rectify within 8 weeks Plan maintenance if required Note 1: If the 2 metre twist is over 25mm impose 10mph speed restriction and correct within 24 hours. 25mm over 2000 mm equates to a 1 in 80 twist gradient. 1 The latest version of London Underground E8404 A3 Track Geometry and Condition Standards Manual should be consulted. 21

24 22 Notes

25 Notes 23

26 24 Notes

The Journal April 2018 Volume 136 Part 2

The Journal April 2018 Volume 136 Part 2 ARTICLE AS PUBLISHED IN The Journal April 2018 Volume 136 Part 2 If you would like to reproduce this article, please contact: Alison Stansfield MARKETING DIRECTOR Permanent Way Institution alison.stansfield@thepwi.org

More information

Controlling the risk of derailments in S&C

Controlling the risk of derailments in S&C Controlling the risk of derailments in S&C Brian Whitney Principal Engineer [Track & Civils] Network Rail brian.whitney@networkrail.co.uk 27 th November 2014 / 1 1-Dec-14 / 2 Introduction NR/L2/TRK/0053

More information

Track & Civil Code of Practice Response Booklet

Track & Civil Code of Practice Response Booklet Division / Business Unit: Function: Document Type: Enterprise Services Track & Civil Work Instruction Track & Civil Code of Practice Response Booklet Applicability ARTC Network Wide SMS Publication Requirement

More information

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along

More information

M&EE Networking Group

M&EE Networking Group Superseded by COP0024 Iss 5 on 05/12/2015 COP0024 Issue 4 March 2014 Code of Practice for Use and Loading of MEWPs M&EE Networking Group No COP0024 Superseded M&EE by Networking COP0024 Iss Group 5 on

More information

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book

Module T7. Safe systems of work when walking or working on or near the line. Withdrawn Document Uncontrolled When Printed. GE/RT T7 Rule Book T7 (issue 1).qxd 16/4/03 4:27 pm Page 1 GE/RT8000 - T7 Rule Book Module T7 Safe systems of work when walking or working on or near the line Issue 1 June 2003 Comes into force 6 December 2003 T7 (issue

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Rerailing Precautions to be Taken Reference Number SMP 26 (RIC Standard: SC 00 52 00 26 SI) Document Control Status Date Prepared Reviewed

More information

LEVEL CROSSING SIGHTING DISTANCES

LEVEL CROSSING SIGHTING DISTANCES Ref No: HGR-A0458 Issue No: 01 Issue Date: September 2012 HERITAGE RAILWAY ASSOCIATION GUIDANCE NOTE LEVEL CROSSING SIGHTING DISTANCES for Footpath and Vehicular User-Worked Crossings Purpose This document

More information

When Wheels and Rails don t. Interact in a Good Way

When Wheels and Rails don t. Interact in a Good Way When Wheels and Rails don t Interact in a Good Way 1 : KHHO 5DLO,QWHUDFWLRQ ' HUDLOP HQW * HRUJH )RZ OHU 7UDFN,QIUDVWUXFWXUH (QJLQHHU 0 D\ The TSB Our Mission To advance transportation safety in the air,

More information

Cross Industry collaboration to control the risk of freight wagon derailment

Cross Industry collaboration to control the risk of freight wagon derailment Dallas, 2015 Cross Industry collaboration to control the risk of freight wagon derailment Dr Gareth Tucker 9/11/17 Institute of Railway Research Have a strategic partnership with RSSB (currently in contract

More information

Managing Track Stability

Managing Track Stability Division / Business Unit: Function: Document Type: Enterprise Services Track & Civil Procedure Applicability ARTC Network Wide SMS Publication Requirement Internal / External Primary Source Consolidates

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Introduction to Signalling Maintenance Procedures Reference Number SMP 01 (RIC Standard: SC 00 52 00 01 SI) Document Control Status Date Prepared

More information

INSTRUCTIONS. for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties. For 4-Axle and 6-Axle Locomotives and all Freight Cars

INSTRUCTIONS. for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties. For 4-Axle and 6-Axle Locomotives and all Freight Cars INSTRUCTIONS for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties For 4-Axle and 6-Axle Locomotives and all Freight Cars Manual Lift Sign Holder 4014-18-5-D size 5 4014-18-6-D size 6 4014-18-7-D

More information

RAILWAY INVESTIGATION REPORT R10Q0037 MAIN-TRACK DERAILMENT

RAILWAY INVESTIGATION REPORT R10Q0037 MAIN-TRACK DERAILMENT RAILWAY INVESTIGATION REPORT R10Q0037 MAIN-TRACK DERAILMENT CANADIAN NATIONAL FREIGHT TRAIN M-365-21-23 MILE 165.80, SAINT-MAURICE SUBDIVISION CLOVA, QUEBEC 23 AUGUST 2010 The Transportation Safety Board

More information

Calculation of Enhanced Permissible Speeds for Tilting Trains

Calculation of Enhanced Permissible Speeds for Tilting Trains Railway Safety Approved Code of Practice Calculation of Enhanced Permissible Speeds for Tilting Trains Synopsis This Railway Safety Approved Code of Practice sets out an approved method of calculating

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

Vibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual

Vibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual Vibrating Wire Load Cell (3, 4, 5 And 6 Gauge Cells) User Manual Man 188 1.1.0 06/08/2014 Chris Rasmussen Philip Day Chris Rasmussen Manual No. Revision Date Originator Checked Authorised for Issue User

More information

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018

Handbook 16. Issue 4. AC electrified lines. GERT8000-HB16 Rule Book. September 2018 Comes into force 01 December 2018 GERT8000-HB16 Rule Book AC electrified lines Handbook 16 Issue 4 September 2018 Comes into force 01 December 2018 This handbook is for those personnel who need to go on the operational railway in an AC

More information

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 I, the undersigned, acknowledge receipt of this publication. I undertake to familiarise myself with any alterations which apply to me. FULL NAME (CAPITALS) STAFF

More information

OCTOBER 2017 ISSUE Page 1 of 7

OCTOBER 2017 ISSUE Page 1 of 7 Field testing is performed on fully assembled pipelines for the purpose of determining pipeline acceptability. Following visual acceptance of joints and pipeline components, pressure pipelines in their

More information

Uncontrolled When Printed Document comes into force 05/12/2015 Supersedes GERT8000-HB6 Iss 4 on 05/12/2015

Uncontrolled When Printed Document comes into force 05/12/2015 Supersedes GERT8000-HB6 Iss 4 on 05/12/2015 GE/RT8000/HB6 Rule Book Uncontrolled When Printed Handbook 6 Handbook 6 General duties of an individual working alone (IWA) Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

Withdrawn Document Uncontrolled When Printed

Withdrawn Document Uncontrolled When Printed Part A Purpose These instructions set out the actions to be taken to avoid danger from the presence of DC electrified lines or the process to be followed to determine the actions to be taken to avoid such

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers.

SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS. This specification shall apply to the installation of raised pavement markers. SPECIFICATION FOR INSTALLATION OF RAISED PAVEMENT MARKERS 1 SCOPE This specification shall apply to the installation of raised pavement markers. 2 DEFINITIONS Type A Marker - Retroreflective raised pavement

More information

CPCS renewal test factsheet

CPCS renewal test factsheet CPCS renewal test factsheet Introduction to the CPCS renewal test The industry-led CPCS Management Committee has determined that key safety-related knowledge must be checked on each category prior to the

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS NPTC Registered Charity No. 1096429 NATIONAL AGRICULTURAL CENTRE STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7669 6553 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE

More information

Geotechnics, Face & Stockpile Operations

Geotechnics, Face & Stockpile Operations Quarries National Joint Advisory Committee (QNJAC) Geotechnics, Face & Stockpile Operations Information Sheet 1 June 2009 Guidance on Safe Face Management Operations in Quarries Approved by the Quarries

More information

Relationship Between Missing Ballast and Development of Track Geometry Defects

Relationship Between Missing Ballast and Development of Track Geometry Defects Transp. Infrastruct. Geotech. (2015) 2:167 176 DOI 10.1007/s40515-015-0025-8 TECHNICAL PAPER Relationship Between Missing Ballast and Development of Track Geometry Defects Allan M. Zarembski 1 & Gregory

More information

Pedestrian Level Crossings Design and Installation

Pedestrian Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Pedestrian Level Crossings Design and Installation ETD-16-03 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS

More information

The influence of structural response on ballast performance on a high speed railway

The influence of structural response on ballast performance on a high speed railway The influence of structural response on ballast performance on a high speed railway David Milne 1, Louis Le Pen 1, William Powrie 1, David Thompson 1, Geoff Watson 1, Simon Morley 2, Mick Hayward 2 1 University

More information

Rail Profiling - Turnouts

Rail Profiling - Turnouts Discipline: Engineering (Track & Civil) Category: Standard Rail Profiling - Turnouts ETM-03-02 Applicability ARTC Network Wide Primary Source ARTC NSW Standard LMP 03 Document Status Version Date Reviewed

More information

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more)

TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) TLILIC2005A Licence to operate a boomtype elevating work platform (boom length 11 meters or more) Release: 1 TLILIC2005A Licence to operate a boom-type elevating work platform (boom length 11 meters or

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SMP 08 (RIC Standard: SC 00 52 00 08 SI) Document Control Status Date Prepared Reviewed Endorsed Approved Issue 1 Revision

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information

Controlling the Speed of Tilting Trains through Curves

Controlling the Speed of Tilting Trains through Curves Rail Industry Standard RIS-8012-CCS Date September 2017 Controlling the Speed of Tilting Trains through Curves Synopsis This document sets out the means by which tilting trains may be operated at higher

More information

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG PUNE TECHTROL PVT LTD Instruction and Maintenance Manual for and Tape Gauge FTG INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR FLOAT AND TAPE GAUGE FTG 1 Introduction : It is used to measure and indicate

More information

Temporary Vehicle Restraint System Policy

Temporary Vehicle Restraint System Policy Temporary Vehicle Restraint System Policy Prepared By; J Wilkinson H&S Manager, Civils Prepared for: Installation of TVRS on all triio highways projects including JV s. Page 1 of 8 Contents 1.0 Introduction

More information

Operational fault states in railways

Operational fault states in railways Eur. Transp. Res. Rev. (2012) 4:107 113 DOI 10.1007/s12544-011-0068-z ORIGINAL PAPER Operational fault states in railways Andreas Schöbel & Thomas Maly Received: 21 June 2010 / Accepted: 12 December 2011

More information

Technical Test Theory Crawler - Tractor/Dozer A34

Technical Test Theory Crawler - Tractor/Dozer A34 1 What THREE things should be checked out before carrying out embankment work? 2 How can a qualification or card benefit a plant operator? 3 What is a possible effect on the undercarriage when reversing

More information

GM/GN2497. Guidance on Railway Wheelset Tread, Gauging and Damage. Identification. Railway Group Guidance Note. Published by

GM/GN2497. Guidance on Railway Wheelset Tread, Gauging and Damage. Identification. Railway Group Guidance Note. Published by GN Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2007 Rail Safety and Standards Board Limited GM/GN2497 Issue One: December 2007 Railway Group Guidance

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 7... 7... 7... 7... 8... 8... 9... 11...

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GM/GN2646 Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue

More information

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES LNX-9Q7DAS Received:4 October 04 Completed:4 October 04 YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES. The position of Yorkshire Water Services Ltd (YWS) apparatus shown on the existing mains record

More information

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if 1 Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) 477-5050, even if there is no apparent damage. Call 911 if gas is blowing

More information

FINAL REPORT. Investigation of the train accident on 22 July 2004 near Pamukova, Turkey

FINAL REPORT. Investigation of the train accident on 22 July 2004 near Pamukova, Turkey Esveld Consulting Services BV FINAL REPORT Investigation of the train accident on 22 July 2004 near Pamukova, Turkey 3 September 2004 Prof.dr.ir. Coenraad Esveld Delft University of Technology Subfaculty

More information

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310

IN-PLACE DENSITY AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 AND MOISTURE CONTENT OF SOIL AND SOIL- AGGREGATE BY NUCLEAR METHODS (SHALLOW DEPTH) FOP FOR AASHTO T 310 Scope This procedure covers the determination of density, moisture content, and relative compaction

More information

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser

Designing and Benchmarking Mine Roads for Safe and Efficient Haulage. Roger Thompson Alex Visser Designing and Benchmarking Mine Roads for Safe and Efficient Haulage Roger Thompson Alex Visser Departments of Mining and Civil & Bio-systems Engineering University of Pretoria, South Africa Aim of Presentation

More information

Student Manual. Lesson 4- Nuclear Density Testing. Version 1.0-3/09 4-1

Student Manual. Lesson 4- Nuclear Density Testing. Version 1.0-3/09 4-1 Version 1.0-3/09 4-1 Version 1.0-3/09 4-2 Version 1.0-3/09 4-3 What is the Density we are measuring? Can the Density be more than 100% of Maximum Dry Density reported in the Proctor test? Version 1.0-3/09

More information

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD

ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 Scope ATT-66/96, DENSITY TEST, ASBC CONTROL STRIP METHOD 1.0 SCOPE This test procedure describes the method of determining the required minimum number of "passes" with approved compaction equipment,

More information

HumeCeptor system Installation guide. Issue 2

HumeCeptor system Installation guide. Issue 2 HumeCeptor system Installation guide Issue 2 Purpose of this guide This guide outlines the construction procedures and requirements for the installation of the HumeCeptor system. This document should be

More information

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book Uncontrolled when printed GERT8000-TS11 Rule Book Failure of, or work on, signalling equipment signallers s Module TS11 Issue 3 September 2017 Comes into force 02 December 2017 Conventions used in the

More information

Manual Handling Policy

Manual Handling Policy Manual Handling Policy Version No V1.0 DRAFT Author Date Comments Approved by Bridget Meats 2-10-15 Recommended for Approval by H&S Group V1.0 29-10-15 APPROVED For approval by QRC V2.0 13-10-16 Recommended

More information

Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet. Grader Note: It is recommended that you read the Supporting Information page before you read this factsheet. Preparation for work (Preparation) Graders are part of a group of specialist machines that are

More information

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner PUBLISHED PROJECT REPORT PPR850 Optimisation of water flow depth for SCRIM S Brittain, P Sanders and H Viner Report details Report prepared for: Project/customer reference: Copyright: Highways England,

More information

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different

Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different Risk Assessment for Stone Quarry Mining is among the most hazardous activities all around the world, being always accompanied with different incidents, injuries, loss of lives, and property damages. Dimension

More information

Excavations and Trenches

Excavations and Trenches Purpose Excavation and trenching are among the most hazardous work activities undertaken by the TNRD. This document outlines general requirements and specific safe work procedures to ensure the health

More information

3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals.

3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals. GO.. TITLE: OPERATIONS MANUALS 2. DATE ISSUED: July 996 ISSUE: 2 3. PURPOSE: To establish the minimum safety content of swimming pool Operations Manuals. 4. (a) An Operations Manual should be prepared

More information

Non-Linear Seismic Analysis of Multi-Storey Building

Non-Linear Seismic Analysis of Multi-Storey Building Non-Linear Seismic Analysis of Multi-Storey Building Uzair Khan 1 1 M.Tech (Structural & Construction Engineering) Department of Civil Engineering, National Institute of Technology, Jalandhar. Hina Gupta

More information

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book

Handbook 12. Issue 6. Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession. GERT8000-HB12 Rule Book GERT8000-HB12 Rule Book Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession Issue 6 September 2017 Comes into force 02 December 2017 Handbook 12 Uncontrolled when printed

More information

Appendix C Field Testing of Pipelines

Appendix C Field Testing of Pipelines 1 (Normative) C1 Scope Appendix C is based on some of the test methods in AS/NZS 2566.2, section 6, and associated appendices. This appendix specifies suggested methods of test and their application to

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 CONTENTS 1. Introduction 2. Definitions and Statements 3. LOLER Considerations

More information

Method Statement: Testing Dry Riser System

Method Statement: Testing Dry Riser System Method Statement: Testing Dry Riser System Page 1 of 6 Scope of work Test dry riser system in accordance with BS 5306. Definitions For the purposes of this document, the following definitions apply Rising

More information

GOLDEN SAFETY RULES AFT DR

GOLDEN SAFETY RULES AFT DR GOLDEN SAFETY RULES The Golden Safety Rules exist to keep you safe Your safety and the safety of your workmates is paramount. The Golden Safety Rules exist, above all else, to keep you safe. Since we adopted

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

MEWP - Scissor Note: It is recommended that you read the Supporting Information page before you read this factsheet.

MEWP - Scissor Note: It is recommended that you read the Supporting Information page before you read this factsheet. MEWP - Scissor Note: It is recommended that you read the Supporting Information page before you read this factsheet. Preparation for work (Preparation) Scissor-type mobile elevated work platforms, commonly

More information

The Use of BS 5400: Part 10: Code of Practice for Fatigue

The Use of BS 5400: Part 10: Code of Practice for Fatigue THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT Amendment No. 1, dated November 1983 THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND The Use of

More information

BUTTERFLY VALVES Series 800

BUTTERFLY VALVES Series 800 BUTTERFLY VALVES Series 800 WARNING Before proceeding read ALL instructions and become familiar with the equipment and associated drawings. Follow ALL applicable safety regulations and codes for pressurized

More information

c) Loss of product or replacement when units are being serviced All of these are factors that need to be considered by the user.

c) Loss of product or replacement when units are being serviced All of these are factors that need to be considered by the user. GAS DETECTION Cost of Ownership In today's competitive marketplace the initial cost of any capital equipment is important to the end user but of equal importance is the ongoing cost of ownership. In many

More information

TCML operate and control the 146 Km Railway line from Lake Magadi to Konza.

TCML operate and control the 146 Km Railway line from Lake Magadi to Konza. REQUEST OF A QUOTATION TO CARRY OUT STRUCTURAL ASSESSMENT OF BRIDGES, VIADUCT, BOX CULVERTS AND DRAINAGE STRUCTURES ON THE LAKE MAGADI AND KONZA RAILWAY LINE. Tata chemicals Magadi Limited, transport a

More information

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction

EUSMUNC06 (SQA Unit Code - FG2W 04) Locate and avoid supply apparatus for Utilities Network Construction Locate and avoid supply apparatus for Utilities Network Construction Overview This national occupational standard defines the competence involved in locating and avoiding supply apparatus by using appropriate

More information

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for:

Annual CCR Landfill Inspection. Lansing Landfill. Interstate Power and Light Company. Prepared for: Annual CCR Landfill Inspection Lansing Landfill Prepared for: Interstate Power and Light Company Lansing Generating Station 2320 Power Plant Drive Lansing, Iowa 52151 Prepared by: SCS ENGINEERS 2830 Dairy

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES

ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES ASSESSMENT AND ANALYSIS OF PIPELINE BUCKLES GE Oil & Gas PII Pipeline Solutions Inessa Yablonskikh Principal Consultant Aberdeen, November, 14 th 2007 Assessment And Analysis Of Pipeline Buckles Introduction

More information

Guidance on piling, heavy loads, excavations, tunnelling and dewatering

Guidance on piling, heavy loads, excavations, tunnelling and dewatering Guidance on piling, heavy loads, excavations, tunnelling and dewatering thameswater.co.uk/developerservices Contents 1 Introduction... 3 2 Works That Can Impact Our Assets And Cause Damage... 3 3 What

More information

Quarries National Joint Advisory Committee (QNJAC) Occupational Health. Information Sheet 7. October Whole Body Vibration

Quarries National Joint Advisory Committee (QNJAC) Occupational Health. Information Sheet 7. October Whole Body Vibration Quarries National Joint Advisory Committee (QNJAC) Occupational Health Information Sheet 7 October 2012 Whole Body Vibration This information sheet has been developed by the Quarries National Joint Advisory

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

Site Improvements

Site Improvements Sections Included In This Standard: 1.1 Bicycle Facilities 1.2 Guardrails 1.3 Parking Bumpers 1.4 Traffic Signage 1.5 Traffic Signals 1.6 Traffic Impact Studies 1.7 Vision Triangle 1.8 Bus Stop Shelters

More information

92831 TEL: (714) FAX:

92831 TEL: (714) FAX: Document N0. 1800-03 Copyright 2010 Terra Universal Inc. All rights reserved. Revised Sept. 2010 Terra Universal, Inc. TerraUniversal.com 800 S. Raymond Ave. Fullerton, CA 92831 TEL: (714) 578-6000 FAX:

More information

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.

To position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles. Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised

More information

TECHNICAL INFORMATION SHEET 17. Revision 1 : 2016 MODEL RISK ASSESSMENT FOR THE MANUAL HANDLING OF GAS CYLINDERS

TECHNICAL INFORMATION SHEET 17. Revision 1 : 2016 MODEL RISK ASSESSMENT FOR THE MANUAL HANDLING OF GAS CYLINDERS TECHNICAL INFORMATION SHEET 17 Revision 1 : 2016 MODEL RISK ASSESSMENT FOR THE MANUAL HANDLING OF GAS CYLINDERS Copyright 2016 by British Compressed Gases Association. First printed 2009. All rights reserved.

More information

SMART STEEL CRASH CUSHION

SMART STEEL CRASH CUSHION APRIL 2015 DETAIL SHEET SMART STEEL CRASH CUSHION VicRoads Requirements Refer to Austroads - Safety Barrier System Acceptance Conditions for the SMART Steel Crash Cushion. All requirements listed by Austroads

More information

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES

YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES LNX-A4JHSS Received:3 November 05 Completed:5 April 06 YORKSHIRE WATER PROTECTION OF MAINS AND SERVICES. The position of Yorkshire Water Services Ltd (YWS) apparatus shown on the existing mains record

More information

: 70 YEARS OF DESIGN & INNOVATION BELL & AVECTOR BOLLARDS

: 70 YEARS OF DESIGN & INNOVATION BELL & AVECTOR BOLLARDS 1946-2016: 70 YEARS OF DESIGN & INNOVATION e-brochure REF:E-007-03-16 BELL & AVECTOR BOLLARDS BELL & AVECTOR BOLLARD RANGE Ref: S-079-02-16 INTRODUCTION The original robust traffic calming solution Large

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED

Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED Installation Guide Fiji Step 1. PLANNING FOR THE INSTALLATION TOOLS REQUIRED In planning for the installation of a new Viking pool, there are many important considerations that must be evaluated in order

More information

FATAL AND SEVERE RISK PROGRAM

FATAL AND SEVERE RISK PROGRAM FATAL AND SEVERE RISK PROGRAM LEADER SESSION FALL FROM HEIGHTS Only do the task if it can be done safely FALL FROM HEIGHTS OUR COMMITMENT LIFE SAVING BEHAVIOUR: I WILL ALWAYS USE ADEQUATE PROTECTION WHERE

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018.

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 5.1 16 September 2018 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

PF30 Inspection & Maintenance Manual

PF30 Inspection & Maintenance Manual PF30 Inspection & Maintenance Manual Version 1.4 (September 2011) 1 Contents 1. Warning!!!!!!!!!! 3 2. Terminology! Figure 1: POWERFAN PF30 and Drope!!!! 4! Figure 2: POWERFAN PF30 with belt guard retracted!!

More information

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b)

ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS CCR Rule Section (b) ANNUAL INSPECTION BY A QUALIFIED PROFESSIONAL ENGINEER ALL CCR IMPOUNDMENTS ASBURY POWER PLANT 21133 Uphill Lane Asbury, Missouri 64832 January 18, 2017 EMPIRE DISTRICT ELECTRIC COMPANY Prepared by: Rachel

More information

Best Practice for Calibrating LTH Conductivity Instruments

Best Practice for Calibrating LTH Conductivity Instruments Application Note Best Practice for Calibrating LTH Conductivity Instruments As accurate process measurement becomes an everyday requirement it is vital to be able to calibrate conductivity instruments

More information

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches.

This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Appendix H Specific Excavation Requirements This section applies to all open excavations made in the earth's surface. Excavations are defined to include trenches. Surface encumbrances All surface encumbrances

More information