Ing. JOZEF BALÁŽ Ph.D. and Ing MILAN CVAN CSc

Size: px
Start display at page:

Download "Ing. JOZEF BALÁŽ Ph.D. and Ing MILAN CVAN CSc"

Transcription

1 PROPOSAL, DESIGN, IMPLEMENTATION AND SAFETY DEMONSTRATION OF SEVERE ACCIDENT MANAGEMENT MEASURES AT VVER440 IN SLOVAKIA Ing. Jozef Baláž, Ph.D. VUJE a.s. Trnava, Slovakia Ing. Milan Cvan, CSc VUJE a.s. Trnava, Slovakia Abstract During the past two decades large effort was dedicated in Slovakia to upgrade the operating VVER440/V213 units to cope with severe accidents. The concept is based on In Vessel Retention (IVR) strategy, but the upgrades - now in finalization phase - were complex and harmonized within all aspects, both safety (prevention, mitigation, releases) and feasibility (availability of equipment, realization costs). The complex of hardware upgrades is composed of eight groups, as e.g. IVR, primary circuit depressurization, long term heat removal, severe emergency sources of coolant and power supply etc. The paper briefly summarizes the long way already passed - initial conditions, approach in design concept, scope and interrelations of individual measures, up to safety demonstration of the efficiency of the severe accident management using adjusted severe accident management guidelines. Selected specific topics are described in more detail to point out the obstacles and list of most important contributions to safety of the units is presented. 1. INTRODUCTION Extension of the safety assessment of the nuclear power units in operation started in Slovakia during the late 90s. Initially the effort was focused to understanding of the overall response of the VVER 440 units to severe accident conditions - development of basic models and simulation of such accident scenarios in frame of PHARE project [4], [5]. Consequently, all necessary steps were undertaken to cover complete scope of the evaluated safety extension to severe accidents - from probabilistic assessment of events, core and plant damage states and creation of large and full scope database of severe accident analyses point of view, up to the quantification of potential impacts of severe accidents on the environment. At the beginning of 2005, the level of knowledge was considered sufficient enough to start - in parallel with continuing analytical effort - with systematic identification of weaknesses of the VVER 440, V213 units regarding and ability to control of severe accidents. This systematic identification was aimed on compilation of objectives, strategies, specific procedures and necessary needed systems, which would allow either, enhance protection of the units or an efficient management of severe accident scenarios. During the first decade of 20th, four units of VVER440 (V213) reactors were in operation in Slovakia. At that time the decision was taken to complete another two units of the same design, but with design extension up to the 4 th level in depth, i.e. to modify the design in such a way, that it would also satisfy as much as reasonably possible the requirements relevant for newly built units. It required activities aimed to proposal and design systems for protection and mitigation ([6], [7]) of severe accident, which resulted in design and realization of the complex of measures on units in operation and also on units in completion phase. Application of such measures enabled development and introduction of efficient Severe Accident Management Guidelines. 1

2 IAEA-CN-86 [Right hand page running head is the paper number in Times New Roman 8 point bold capitals, centred] 2. SELECTION OF APPROACH As required and as specific for severe accidents, the philosophy of the approach to proposal and development of a set of technical measures, dedicated to the severe accident management, shall emphasise protection of the environment and the limitation of consequences on the environment. Thus the main objective of the strategy shall be to protect the containment integrity and to control the atmosphere pressure inside of the containment, especially form the long term point of view. Analyses of diverse scenarios and considerations of potential measures showed that effective limitations of consequences of severe accidents on opened reactor or in the spent fuel pool are difficultly applicable, if ever and the effort in this case should be better focused on practical elimination of such events via implementation of the extraordinary robust and reliable prevention technical and management means. Evaluation of the complex set of severe accident scenarios with simulation of diverse potential systems for their control shown, that the principal requirement is to prevent reactor pressure vessel damage (to made ex-vessel phases of severe accident practically eliminated). If this goal is not reached then the phenomena as high pressure melt ejection, steam explosions, excessive hydrogen production and containment pressurization in long term may cause present insolvable challenges in proposal mitigation measures. Another specific outcome of the evaluation was in conclusion that the set of measures needs to be complex, dealing with all identified challenges, and well balanced to provide optimum set of means to control any hypothetical severe accident scenario, without impact to design basis safety. The design phase of individual systems followed the evaluation. At the beginning it was ascertained, that the qualification of newly designed systems and equipment is a very important and difficult problem. Systems needed to be qualified to environmental conditions, specific for developed severe accident such as very high radiation, high temperature and pressure, exposure from hydrogen burning, flooding etc. Generic approach to qualification use to lead to requirements that are not applicable on corresponding equipment, due to commercial unavailability on the market. Developed methodology of qualification of the equipment, dedicated to severe accident management helped to bridge these obstacles. Compilation of the overall mitigation strategy represented a task which was consisting of design of particular highly reliable technical means and appropriate procedures dedicated to cope with severe accident challenges, to allow the staff an efficient control of the accident, and to provide them properly reliable technical means for, in expected environmental conditions. This effort, concerned the both, the development of the systems and the application of them at units, had resulted in practical application of 4th level of defence in depth, as full scope extension of the original design basis. 3. APPLIED SOLUTION CONCEPT The need of practical elimination of the possibility of the severe accident occurrence on opened reactor or spent fuel pool led to proposal of supplementary independent systems dedicated to coolant delivery in to points of interests (opened reactor and spent fuel pool), supplementary cooling systems, dry risers and organization measures within Severe Accident Management Guidelines framework. All these measures were assessed from reliability and disposability point of view. Taking in to account mainly these criteria they were further developed in detail design level. The matter of severe accidents management and control at the power states of the plant had shown more difficult. Too demanding requirements, which come from expected environmental loading conditions for the equipment located inside of the containment caused, that survivability and reliability of such equipment, without any regard on its possible qualification could not be assured during the all expected period of the accident (at least one year). The solution of the issue led to final formulation of mitigation strategy, development of qualification methodology for equipment

3 dedicated to operate in severe accident conditions and to dividing of accident management in to a few separate stages Mitigation strategy Following are the basics of the severe accident control strategy, developed on the basis of existing and newly added systems. To depressurize the primary circuit via independent, highly reliable and appropriately capable system in order to prevent scenarios characterized by the high pressure inside the primary circuit, typically resulting in the high pressure corium discharge into the reactor pit; To acquire sufficient sources of coolant to flood the reactor pit in order to take over the control of severe accident; To install supplementary external sources of the coolant to prevent transition of any accident to the severe fuel damage; to quench and cool down the core and/or; to decrease pressure inside of the containment and; to increase coolant amount inside of the containment. To flood the reactor pit, to prevent permanent coolant losses and to provide access for the coolant to reactor pressure vessel; To retain degraded core inside of reactor pressure vessel and to set up sufficient heat sing from the core through reactor pressure vessel wall (In Vessel Retention); To manage hydrogen control inside of the containment, via recombination and ignition of the hydrogen and other combustibles and inertisation of the atmosphere to prevent fast flame propagation in case of burning and to prevent detonation; To set up sufficient heat sink from the containment and to assure appropriate tightness of the containment hermetical boundary; To install the system which would prevent possible dangerous underpressure inside of the containment during particular accident regimes; To assure appropriate measurement of necessary parameters required for the proper decision making process Methodology of qualification of the equipment for Severe Accidents Difficulties experienced during a selection of the equipment capable enough to operate inside the containment in severe accident conditions, for generally defined period of the time of the accident lasting, insufficient commercial availability of such equipment and frequent questions of the designers led developing team to release qualification methodology [8]. The methodology addresses and summarizes procedures to quantify requirements for the equipment dedicated to operate in severe accidents conditions. It simultaneously provides designer, how to proceed in selection of particular equipment. This methodology distinguishes between really required active mission time of the particular system (equipment) and its passive part (passive mission time), in which it is necessary to maintain the system operable in the standby mode. The overall required mission time is by this manner significantly reduced, resulting in significant reduction of the total absorbed radiation dose and the heat and pressure exposition. This approach is based on the fact, that once the intended safety function of the particular equipment or system is completed the operability of this system is not required anymore. Therefore, the real mission time requirement can be derived from the time frame in which the execution of required action can be assumed effective and reliable. This approach is furthermore supported by the fact that if the relevant action is executed over such timeframe, it may miss their purpose (e.g. delayed primary depressurization leads to primary break) and may lead to the overall strategy failure. 3

4 IAEA-CN-86 [Right hand page running head is the paper number in Times New Roman 8 point bold capitals, centred] The methodology requires take in to account the particular place of installation of the equipment (from which the environmental loading conditions are derived) and the affiliation of the equipment to the mitigation system (what respond the question of needed mission time). The methodology then instructs designer directly qualify the equipment if possible. If it is not, the methodology comprehensively instructs designer how to relocate the equipment on a less exposed place of installation and what are dependencies of such relocation, accompanied with. If neither this option is applicable, designer is instructed how to protect the equipment and how to handle with high radiation exposure and hydrogen burning effects. The approach and description of the methodology will be included also in the TECDOC ([11]) which is in preparation phase Separation of accident management in to stages In order to allow better understanding of real needs of mission times of systems dedicated to severe accident management and control, the accident management process was divided in to a few stages of the accident management. Mentioned dividing which describes expected use of mitigation systems is demonstrated on following figure (Fig. 1.): Fig. 1. Separation of the Severe Accident in to Stages 4. SAFETY DEMONSTRATION OF PROPOSED MEASURES Following implementation of the technical resources in to the plants, this new abilities have been incorporated into the Severe Accident Mitigation Guidelines (SAMG). The real characteristics of systems, their intended application within the SAMGs including were used for integral assessment of their impact and contribution to the enhancement of safety of enhanced units. It included the comprehensive check of the Severe Accident Mitigation Guidelines (SAMG) [9], simulating evolution of diverse severe accident scenarios, including desired operation of mitigation systems. Also it was checked whether the operating personal is able to identify transition to severe accident, based on available information and whether it is able to mitigate sufficiently the severe accident consequences. The probabilistic safety assessment level 2 was used for selection of scenarios included into the verification scope. The severe accident management and control represents a process of decision making being carried out in very specific conditions, limited scope of information, high psychological stress, limited access

5 to the most systems inside of the plant and limited possibility of the manual check of corresponding equipment e.g. in case of monitoring lost its monitoring. Moreover, for certain crucial manipulations the limited timeframes exist. That is why the validation process of the both SAMGs and dedicated mitigation systems has also to prove, that it is reasonable to assume, that operating personal gets sufficient information and is provided sufficient time to execute desired manipulations. The verification and validation of SAMGs consisted of assessment of simulated response of operating personal using analyses of the scenarios, operating and emergency procedures and considering estimated response times and decision making delays. Consequently, decision making processes was analysed and assessed to judge its feasibility. Deterministic analyses used for this process (integral simulations of variations of diverse scenarios of severe accidents) took in to account estimated, verified and postulated delays in decision making trees gained during previous stage of the assessment. Consequently, the efficiency of the systems was evaluated. 5. CONCLUSION Extension of the design basis of existing Slovak units to severe accidents was long and a complicated way, which has been passed by Slovak nuclear operator and all supporting companies and teams. It was truly iterative process, based on very large analytical basis, putting together views, knowledge and effort of large number of diverse experts, resulting in installation of additional systems and completed by development and introduction of effective SAMGs. The final integral evaluation of the effort and state of the units regarding satisfaction of both legal and functional requirements (completed recently) stated, that all goals of the upgrade of units have been reached and that units satisfy safety requirements, relevant even for newly built reactors. VUJE expert team was participating intensively for the entire duration of the activities and proved its capability to deal with complex and complicated tasks. REFERENCES [1] CVAN, M., PHARE a Task 6 Code and Model Qualification Report, rev. 2, internal report, VUJE, Trnava, [2] ROHAR, M., LOCAs to Qualify MAAP Mass and Energy Release Curves during Blowdown Phase rev.3, internal report, VUJE, Trnava, [3] PRIOR, B., Analysis of BOBA and Severe Accidents without Operator Actions, internal report, Westinghouse Energy Systems Europe SA, [4] CVAN, M., PHARE a Task 8/9 Summary Report, rev. 3, internal report, VUJE, Trnava, [5] PRIOR, B., PHARE Project a /93: VVER-440/213 Beyond Design Basis Analysis and Accident Management Final Report and Project Summary, internal report, Westinghouse Energy Systems Europe SA, [6] CVAN, M. at all, Súhrnná záverečná správa projektu UTR 9075, internal report, VUJE, Trnava, [7] CVAN, M. at all, Návrh patrení a modifikácií projektu pre riadenie ťažkýkch havárií, internal report, VUJE, Trnava, [8] BALÁŽ, J. at all, Určenie parametrov prostredia v miestnostiach a priestoroch pre zariadenia SAM 3. a 4. blok JE EBO, internal report, VUJE, [9] STOJKA, T. at all, 8SG/0004 Validation of Severe accident management guidelines - SAMG, internal report, VUJE, [10] JANČOVIČ J. at all, Hlavná správa projektu Vypracovanie komplexného deterministického zhodnotenia Projektu implementácie SAM - Riadenie ťažkých havárií, internal report, VUJE, [11] DUCHÁČ, A. at all, Assessment of equipment capability to perform reliably under severe accident conditions, TECDOC, IAEA, in preparation. 5

IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP

IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP IEM on Severe Accident Management in the light of the accident at the Fukushima Daïchi NPP Progress, challenges and perspectives in the field of design features, as regards SAMG IAEA, March 2014 Introduction

More information

IAEA SAFETY STANDARDS for protecting people and the environment

IAEA SAFETY STANDARDS for protecting people and the environment IAEA SAFETY STANDARDS for protecting people and the environment DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS DRAFT SAFETY GUIDE DS 482 STATUS: STEP 11 Submission to Review

More information

SAFETY APPROACHES. The practical elimination approach of accident situations for water-cooled nuclear power reactors

SAFETY APPROACHES. The practical elimination approach of accident situations for water-cooled nuclear power reactors SAFETY APPROACHES The practical elimination approach of accident situations for water-cooled nuclear power reactors 2017 SUMMARY The implementation of the defence in depth principle and current regulations

More information

Severe Accident Management Programmes for Nuclear Power Plants

Severe Accident Management Programmes for Nuclear Power Plants DS 483: Mode 2 27 March 2017 IAEA SAFETY STANDARDS for protecting people and the environment STEP 11: Approval by the relevant review Committees Reviewed in NSOC (Asfaw) Severe Accident Management Programmes

More information

Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design

Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design Considerations for the Practical Application of the Safety Requirements for Nuclear Power Plant Design Joint ICTP-IAEA Essential Knowledge Workshop on Deterministic Safety Analysis and Engineering Aspects

More information

RISKAUDIT GRS - IRSN Safety assessment of the BELENE NPP

RISKAUDIT GRS - IRSN Safety assessment of the BELENE NPP RISKAUDIT GRS - IRSN Safety assessment of the BELENE NPP Bulatom Conference 2010 Bulgarian Nuclear Energy National, Regional and World Energy Safety 9th -11th June 2010, Riviera complex, Varna Système

More information

Safety and efficiency go hand in hand at MVM Paks NPP

Safety and efficiency go hand in hand at MVM Paks NPP International Forum Atomexpo 2018 Safety and efficiency go hand in hand at MVM Paks NPP József Elter MVM Paks Nuclear Power Plant Ltd. Hungary Start up Four of the VVER-440/V213 unit Power units up-rate

More information

IAEA SAFETY STANDARDS for protecting people and the environment

IAEA SAFETY STANDARDS for protecting people and the environment Date: 2016-08-31 IAEA SAFETY STANDARDS for protecting people and the environment STATUS: STEP 8a For Submission to Member States DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

More information

Safety Analysis: Event Classification

Safety Analysis: Event Classification IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Safety Analysis: Event Classification Lecturer Lesson IV 1_2 Workshop Information IAEA Workshop City, Country XX - XX Month,

More information

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY STANDARDS SERIES No. NS-G-1.10 DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY GUIDE DS 482 2016-04-20 INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, C-41 (May 13)

More information

How to reinforce the defence-indepth in NPP by taking into account natural hazards?

How to reinforce the defence-indepth in NPP by taking into account natural hazards? How to reinforce the defence-indepth in NPP by taking into account natural hazards? Caroline LAVARENNE Karine HERVIOU Patricia DUPUY Céline PICOT IAEA 21-24 October 2013, Vienna Introduction The DiD has

More information

Review and Assessment of Engineering Factors

Review and Assessment of Engineering Factors Review and Assessment of Engineering Factors 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with: Engineering factors as follows; Defense in

More information

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS

DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY STANDARDS SERIES No. NS-G-1.10 DESIGN OF REACTOR CONTAINMENT STRUCTURE AND SYSTEMS FOR NUCLEAR POWER PLANTS SAFETY GUIDE DS 482 2016-04-20 INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, C-41 (May 13)

More information

MELCOR code application to VVER440/V213 analyses

MELCOR code application to VVER440/V213 analyses 1 st Meeting of European MELCOR Users Group, MELCOR code application to VVER440/V213 analyses Villigen, Switzerland 15-16 December 2008 Juraj Jančovič jancovic@vuje.sk 1 CONTENT - overview of MELCOR models

More information

The «practical elimination» approach for pressurized water reactors

The «practical elimination» approach for pressurized water reactors The «practical elimination» approach for pressurized water reactors V. TIBERI K.HERVIOU International Conference on Topical Issues in Nuclear Installation Safety: Safety Demonstration of Advanced Water

More information

ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP

ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP ACCIDENT MANAGEMENT AND EPR AT DUKOVANY NPP 27-29 September 2017 Vienna IAEA Miroslav Trnka OVERVIEW General EOPs and SAMGs (changes) DAM (FLEX) EDMG Equipment (new + ongoing projects) Staff (drills and

More information

Verification and validation of computer codes Exercise

Verification and validation of computer codes Exercise IAEA Safety Assessment Education and Training (SAET) Programme Joint ICTP- IAEA Essential Knowledge Workshop on Deterministic Safety Assessment and Engineering Aspects Important to Safety Verification

More information

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION

CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION PAGE : 1 / 8 CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION SUB-CHAPTER 1.1 INTRODUCTION SUB-CHAPTER 1.2 GENERAL DESCRIPTION OF THE UNIT SUB-CHAPTER 1.3 COMPARISON WITH REACTORS

More information

DISTRIBUTION LIST. Preliminary Safety Report Chapter 19 Internal Hazards UK HPR1000 GDA. GNS Executive. GNS all staff. GNS and BRB all staff CGN EDF

DISTRIBUTION LIST. Preliminary Safety Report Chapter 19 Internal Hazards UK HPR1000 GDA. GNS Executive. GNS all staff. GNS and BRB all staff CGN EDF Rev: 000 Page: 2 / 20 DISTRIBUTION LIST Recipients GNS Executive GNS all staff Cross Box GNS and BRB all staff CGN EDF Regulators Public Rev: 000 Page: 3 / 20 SENSITIVE INFORMATION RECORD Section Number

More information

Workshop Information IAEA Workshop

Workshop Information IAEA Workshop IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Risk Monitoring tools: Requirements of Risk Monitors, relation with the Living PSA, applications of Risk Monitors Lecturer Lesson

More information

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis

Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis Loss of Normal Feedwater Analysis by RELAP5/MOD3.3 in Support to Human Reliability Analysis ABSTRACT Andrej Prošek, Borut Mavko Jožef Stefan Institute Jamova cesta 39, SI-1 Ljubljana, Slovenia Andrej.Prosek@ijs.si,

More information

REGULATORY OBSERVATION

REGULATORY OBSERVATION RO unique no.: REGULATORY OBSERVATION REGULATOR TO COMPLETE RO-ABWR-0046 Date sent: 20 th April 2015 Acknowledgement required by: 08 th May 2015 Agreement of Resolution Plan required by: 14 th May 2015

More information

Nuclear Safety Regulation: Before and after Fukushima*

Nuclear Safety Regulation: Before and after Fukushima* Nuclear Safety Regulation: Before and after Fukushima* Shridhar Chande, India International Conference on Effective Nuclear Regulatory Systems: Sustaining Improvements Globally, Vienna 11-15 April 2016

More information

Understanding safety life cycles

Understanding safety life cycles Understanding safety life cycles IEC/EN 61508 is the basis for the specification, design, and operation of safety instrumented systems (SIS) Fast Forward: IEC/EN 61508 standards need to be implemented

More information

V.H. Sanchez Espinoza and I. Gómez-García-Toraño

V.H. Sanchez Espinoza and I. Gómez-García-Toraño V.H. Sanchez Espinoza and I. Gómez-García-Toraño ANALYSIS OF PWR SEVERE ACCIDENT SEQUENCES INCLUDING MITIGATIVE MEASURES TO PREVENT OR DELAY THE FAILURE OF SAFETY BARRIERS WITH THE SEVERE ACCIDENT CODE

More information

Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR

Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents in a German PWR OECD International Workshop on Level 2 PSA and Severe Accident Management Koeln, Germany, March 29-31, 2004 Classical Event Tree Analysis and Dynamic Event Tree Analysis for High Pressure Core Melt Accidents

More information

THE NITROGEN INJECTION THREAT IN PWR REACTORS

THE NITROGEN INJECTION THREAT IN PWR REACTORS THE NITROGEN INJECTION THREAT IN PWR REACTORS Weakness of current strategies & ASVAD, the new passive solution. Arnaldo Laborda Rami ASVAD INTL. SL (SPAIN) Tarragona (SPAIN) Email: alaborda@asvad-nuclear.com

More information

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed)

Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed) Safety assessments for Aerodromes (Chapter 3 of the PANS-Aerodromes, 1 st ed) ICAO MID Seminar on Aerodrome Operational Procedures (PANS-Aerodromes) Cairo, November 2017 Avner Shilo, Technical officer

More information

Safety Classification of Structures, Systems and Components in Nuclear Power Plants

Safety Classification of Structures, Systems and Components in Nuclear Power Plants DS367 Draft 5.1 IAEA SAFETY STANDARDS for protecting people and the environment Date: 04/11/2008 Status: for Member States comments Reviewed in NS-SSCS Please submit your comments by 20 March 2009 Safety

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information

AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels

AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels - 204 - ABSTRACT AUSTRIAN RISK ANALYSIS FOR ROAD TUNNELS Development of a new Method for the Risk Assessment of Road Tunnels Kohl B. 1, Botschek K. 1, Hörhan R. 2 1 ILF, 2 BMVIT In Austria, in the past

More information

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS

THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS J.E. HARBER, M.K. KATTAN Atomic Energy of Canada Limited 2251 Speakman Drive, Mississauga, Ont., L5K 1B2 CA9900006 and M.J. MACBETH Institute for

More information

EXPERIMENTAL SUPPORT OF THE BLEED AND FEED ACCIDENT MANAGEMENT MEASURES FOR VVER-440/213 TYPE REACTORS

EXPERIMENTAL SUPPORT OF THE BLEED AND FEED ACCIDENT MANAGEMENT MEASURES FOR VVER-440/213 TYPE REACTORS International Conference Nuclear Energy for New Europe 22 Kranjska Gora, Slovenia, September 9-12, 22 www.drustvo-js.si/gora22 EXPERIMENTAL SUPPORT OF THE BLEED AND FEED ACCIDENT MANAGEMENT MEASURES FOR

More information

Integration of safety studies into a detailed design phase for a navy ship

Integration of safety studies into a detailed design phase for a navy ship Integration of safety studies into a detailed design phase for a navy ship A. Fulfaro & F. Testa Fincantieri-Direzione Navi Militari, 16129 Genova, Italy Abstract The latest generation of Italian Navy

More information

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER

DIGITAL SOLUTIONS TRAINING CATALOGUE. QRA and CFD simulation. Phast, Safeti and KFX SAFER, SMARTER, GREENER DIGITAL SOLUTIONS TRAINING CATALOGUE QRA and CFD simulation Phast, Safeti and KFX SAFER, SMARTER, GREENER 02 PHAST, SAFETI AND KFX Training catalogue Global training Our increased focus on global training,

More information

Recent Research on Hazards PSA

Recent Research on Hazards PSA Recent Research on Hazards PSA Marina Röwekamp, Hartmut Holtschmidt, Michael Türschmann Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) ggmbh IEM8 - International Experts Meeting on Strengthening

More information

RELIABILITY OF ENERGY SYSTEMS

RELIABILITY OF ENERGY SYSTEMS RELIABILITY OF ENERGY SYSTEMS Dubitsky M.A. Introduction. Depending on the goals of studies, the object of studies may be either an energy complex as a whole, or individual energy systems it includes,

More information

TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants

TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants TEPCO s Safety Assurance Philosophy on Nuclear Power Generation Plants January 25, 2013 Tokyo Electric Power Company, Inc. This English translation has been prepared with the intention of creating an accurate

More information

Probabilistic safety assessment of fire hazards

Probabilistic safety assessment of fire hazards Türschmann Michael GRS ggmbh, Berlin, Germany Röwekamp Marina GRS ggmbh, Köln, Germany Journal of Polish Safety and Reliability Association Summer Safety and Reliability Seminars, Volume 7, Number 1, 2016

More information

Extensive Damage Mitigation Guidelines (EDMG)

Extensive Damage Mitigation Guidelines (EDMG) Extensive Damage Mitigation Guidelines (EDMG) Roy Harter RLH Global Services Regional Workshop on Sharing Best Practices in Development and Implementation of Severe Accident Management Guidelines October

More information

Regulatory Review of Safety Assessment for Decommissioning of Facilities Using Radioactive Material

Regulatory Review of Safety Assessment for Decommissioning of Facilities Using Radioactive Material SAFETY ASSESSMENT FOR DECOMMISSIONING Annex III Regulatory Review of Safety Assessment for Decommissioning of Facilities Using Radioactive Material INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA CONTENTS 1.

More information

MDEP Common Position No AP

MDEP Common Position No AP MDEP Validity: until net update or archiving MDEP Common Position No AP1000-01 Related to : AP1000 Working Group activities THE DESIGN AND USE OF EXPLOSIVE - ACTUATED (SQUIB) VALVES IN NUCLEAR POWER PLANTS

More information

The RCM Analyst - Beyond RCM

The RCM Analyst - Beyond RCM The RCM Analyst - Beyond RCM darylm@strategic-advantages.com About the Author: Daryl Mather was originally trained in RCM in 1991, after which he was involved in the application of the method through a

More information

Workshop Information IAEA Workshop

Workshop Information IAEA Workshop IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Safety Assessment of General Design Aspects of NPPs (Part 2) Lecturer Lesson Lesson III III 1_2 1_2 Workshop Information IAEA

More information

The Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it.

The Nitrogen Threat. The simple answer to a serious problem. 1. Why nitrogen is a risky threat to our reactors? 2. Current strategies to deal with it. International Conference on Topical Issues in Nuclear Installation Safety: Safety Demonstration of Advanced Water Cooled Nuclear Power Plants. The simple answer to a serious problem Vienna. 6 9 June 2017

More information

Assessing Combinations of Hazards in a Probabilistic Safety Analysis

Assessing Combinations of Hazards in a Probabilistic Safety Analysis Assessing Combinations of Hazards in a Probabilistic Safety Analysis Halbert Taekema a, and Hans Brinkman a a NRG, Arnhem, The Netherlands Abstract: Guidance on how to systematically address combination

More information

Enhancing NPP Safety through an Effective Dependability Management

Enhancing NPP Safety through an Effective Dependability Management Prepared and presented by Gheorghe VIERU, PhD Senior Scientific Nuclear Security Research Worker AREN/c.o. Institute for Nuclear Research Pitesti, ROMANIA Safety: Defence in Depth, October 2013 1 OUTLINES

More information

NUBIKI Nuclear Safety Research Institute, Budapest, Hungary

NUBIKI Nuclear Safety Research Institute, Budapest, Hungary System Reliability Analysis and Probabilistic Safety Assessment to Support the Design of a New Containment Cooling System for Severe Accident Management at NPP Paks Tamas Siklossy* a, Attila Bareith a,

More information

D-Case Modeling Guide for Target System

D-Case Modeling Guide for Target System D-Case Modeling Guide for Target System 1/32 Table of Contents 1 Scope...4 2 Overview of D-Case and SysML Modeling Guide...4 2.1 Background and Purpose...4 2.2 Target System of Modeling Guide...5 2.3 Constitution

More information

Reliability Analysis Including External Failures for Low Demand Marine Systems

Reliability Analysis Including External Failures for Low Demand Marine Systems Reliability Analysis Including External Failures for Low Demand Marine Systems KIM HyungJu a*, HAUGEN Stein a, and UTNE Ingrid Bouwer b a Department of Production and Quality Engineering NTNU, Trondheim,

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge] PAGE : 1 / 9 5. CONTAINMENT PURGE (EBA [CSVS]) The Reactor Building purge system comprises the following: A high-capacity EBA system [CSVS] [main purge] A low-capacity EBA system [CSVS] [mini-purge] 5.1.

More information

Systems of Accounting for and Control of Nuclear Material

Systems of Accounting for and Control of Nuclear Material Systems of Accounting for and Control of Nuclear Material STATES' OBLIGATIONS TO ESTABLISH AN ACCOUNTING AND CONTROL SYSTEM The implementation of safeguards agreements has always involved governmental

More information

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment

Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Improving Accuracy of Frequency Estimation of Major Vapor Cloud Explosions for Evaluating Control Room Location through Quantitative Risk Assessment Naser Badri 1, Farshad Nourai 2 and Davod Rashtchian

More information

C. Mokkapati 1 A PRACTICAL RISK AND SAFETY ASSESSMENT METHODOLOGY FOR SAFETY- CRITICAL SYSTEMS

C. Mokkapati 1 A PRACTICAL RISK AND SAFETY ASSESSMENT METHODOLOGY FOR SAFETY- CRITICAL SYSTEMS C. Mokkapati 1 A PRACTICAL RISK AND SAFETY ASSESSMENT METHODOLOGY FOR SAFETY- CRITICAL SYSTEMS Chinnarao Mokkapati Ansaldo Signal Union Switch & Signal Inc. 1000 Technology Drive Pittsburgh, PA 15219 Abstract

More information

FLIGHT TEST RISK ASSESSMENT THREE FLAGS METHOD

FLIGHT TEST RISK ASSESSMENT THREE FLAGS METHOD FLIGHT TEST RISK ASSESSMENT THREE FLAGS METHOD Author: Maximilian Kleinubing BS. Field: Aeronautical Engineering, Flight Test Operations Keywords: Flight Test, Safety Assessment, Flight Test Safety Assessment

More information

Human Reliability Analysis of Ultimate Response Guideline in a Compound Disaster. Hyatt Regency Tokyo, Japan April 16, 2013

Human Reliability Analysis of Ultimate Response Guideline in a Compound Disaster. Hyatt Regency Tokyo, Japan April 16, 2013 PSAM 203 Topical Conference in Tokyo OS-VIII : Human Factors and (#08) Human Reliability Analysis of Ultimate Response Guideline in a Compound Disaster Kang-Hung Liu, Sheue-Ling Hwang, Tsu-Mu Kao and Hui-Wen

More information

SMART CITIES & MOBILITY AS A SERVICE

SMART CITIES & MOBILITY AS A SERVICE , SMART CITIES & MOBILITY AS A SERVICE EFFECTIVENESS OF INTELLIGENT SPEED ADAPTATION, COLLISION WARNING AND ALCOLOCK SYSTEMS ON DRIVING BEHAVIOUR AND SAFETY ATHANASIOS THEOFILATOS 1, RICARDO NIEUWKAMP

More information

Integrated Coping Strategies for Beyond-Design-Basis External Events

Integrated Coping Strategies for Beyond-Design-Basis External Events IAEA IEM on SAM in the Light of the Fukushima Daiichi NPP, 17-20 March 2014, Vienna, Austria Integrated Coping Strategies for Beyond-Design-Basis External Events Jaewhan Kim and Kwang-Il Ahn KAERI Contents

More information

IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning)

IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning) IAEA Training in Level 2 PSA MODULE 8: Coupling Source Terms to Probabilistic Event Analysis (CET end-state binning) The Problem A probabilistic treatment of severe accident progression leads to numerous

More information

Comparison of the partner s approaches for physical phenomena assessment in level 2 PSA

Comparison of the partner s approaches for physical phenomena assessment in level 2 PSA 1/11 Comparison of the partner s approaches for physical phenomena assessment in level 2 PSA J. Eyink, Framatome ANP; H. Löffler, GRS Cologne Abstract Aim of the task 5.1 of the SARNET PSA2 work package

More information

Analysis of Pressure Rise During Internal Arc Faults in Switchgear

Analysis of Pressure Rise During Internal Arc Faults in Switchgear Analysis of Pressure Rise During Internal Arc Faults in Switchgear ASANUMA, Gaku ONCHI, Toshiyuki TOYAMA, Kentaro ABSTRACT Switchgear include devices that play an important role in operations such as electric

More information

A Guide to SCRUMstudy Certifications and Courses SDC SMC SPOC AEC ESM.

A Guide to SCRUMstudy Certifications and Courses SDC SMC SPOC AEC ESM. A Guide to SCRUMstudy Certifications and Courses SDC SMC SPOC AEC ESM www.com Table of Contents Introduction 3 About SCRUMstudy 3 Why should I pursue SCRUMstudy Certification? 3 SCRUMstudy Certifications

More information

A Guide to SCRUMstudy Certifications and Courses SDC SMC SPOC AEC ESM.

A Guide to SCRUMstudy Certifications and Courses SDC SMC SPOC AEC ESM. A Guide to SCRUMstudy Certifications and Courses SDC SMC SPOC AEC ESM www.com Table of Contents Introduction 3 About SCRUMstudy 3 Why should I pursue SCRUMstudy Certification? 3 SCRUMstudy Certifications

More information

EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION

EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION EMERGENCY CORE COOLING SYSTEM SIMPLIFICATION XA9846601 R.S. HART Sheridan Park Research Community, Atomic Energy of Canada Ltd, Mississauga, Ontario D.B. RHODES Chalk River Laboratories, Atomic Energy

More information

A systematic hazard analysis and management process for the concept design phase of an autonomous vessel.

A systematic hazard analysis and management process for the concept design phase of an autonomous vessel. A systematic hazard analysis and management process for the concept design phase of an autonomous vessel. Osiris A. Valdez Banda ᵃᵇ, Sirpa Kannos, Floris Goerlandt ᵃ, Piet er van Gelder ᵇ, Mart in Bergst

More information

The Common Project for Completion of Bubbler Condenser Qualification (Bohunice, Mochovce, Dukovany and Paks NPPs)

The Common Project for Completion of Bubbler Condenser Qualification (Bohunice, Mochovce, Dukovany and Paks NPPs) International Conference Nuclear Energy for New Europe 2003 Portorož, Slovenia, September 8-11, 2003 http://www.drustvo-js.si/port2003 The Common Project for Completion of Bubbler Condenser Qualification

More information

Effects of Delayed RCP Trip during SBLOCA in PWR

Effects of Delayed RCP Trip during SBLOCA in PWR Effects of Delayed RCP Trip during SBLOCA in PWR Javier Montero Technical University of Madrid, Alenza 4, 28003, Madrid, Spain fj.montero@alumnos.upm.es Cesar Queral, Juan Gonzalez-Cadelo cesar.queral@upm.es,

More information

Regulatory requirements with respect to Spent Fuel Pool Cooling

Regulatory requirements with respect to Spent Fuel Pool Cooling Regulatory requirements with respect to Spent Fuel Pool Cooling Dr. Christoph Pistner Annual Meeting on Nuclear Technology Hamburg, 12.05.2016 Important Documents Safety Requirements for Nuclear Power

More information

ASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.)

ASVAD THE SIMPLE ANSWER TO A SERIOUS PROBLEM. Automatic Safety Valve for Accumulator Depressurization. (p.p.) ASVAD Automatic Safety Valve for Accumulator Depressurization (p.p.) THE SIMPLE ANSWER TO A SERIOUS PROBLEM International Experts Meeting on Strengthening Research and Development Effectiveness in the

More information

1 SE/P-02. Experimental and Analytical Studies on Thermal-Hydraulic Performance of a Vacuum Vessel Pressure Suppression System in ITER

1 SE/P-02. Experimental and Analytical Studies on Thermal-Hydraulic Performance of a Vacuum Vessel Pressure Suppression System in ITER 1 SE/P-2 Experimental and Analytical Studies on Thermal-Hydraulic Performance of a Vacuum Vessel Pressure Suppression System in ITER K. Takase 1), H. Akimoto 1) 1) Japan Atomic Energy Research Institute,

More information

Evaluation and Demonstration of Safety of Decommissioning of

Evaluation and Demonstration of Safety of Decommissioning of Evaluation and Demonstration of Safety of Decommissioning of Research Reactors Borislava Batandjieva, IAEA Research Reactor Decommissioning Demonstration Project (R2D2P) 26-30 June 2006, Manila, Philippines

More information

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION

SIL explained. Understanding the use of valve actuators in SIL rated safety instrumented systems ACTUATION SIL explained Understanding the use of valve actuators in SIL rated safety instrumented systems The requirement for Safety Integrity Level (SIL) equipment can be complicated and confusing. In this document,

More information

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power

2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power 2013 Special Reliability Assessment: Accommodating an Increased Dependence on Natural Gas for Electric Power Special Reliability Assessments Deeper focus on issues identified in Long-Term Reliability Assessment

More information

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by:

PI MODERN RELIABILITY TECHNIQUES OBJECTIVES. 5.1 Describe each of the following reliability assessment techniques by: PI 21. 05 PI 21. 05 MODERN RELIABILITY TECHNIQUES OBJECTIVES 5.1 Describe each of the following reliability assessment techniques by: ~) Stating its purpose. i1) Giving an e ample of where it is used.

More information

Impact on People. A minor injury with no permanent health damage

Impact on People. A minor injury with no permanent health damage Practical Experience of applying Layer of Protection Analysis For Safety Instrumented Systems (SIS) to comply with IEC 61511. Richard Gowland. Director European Process Safety Centre. (Rtgowland@aol.com,

More information

Safety Analysis Methodology in Marine Salvage System Design

Safety Analysis Methodology in Marine Salvage System Design 3rd International Conference on Mechatronics, Robotics and Automation (ICMRA 2015) Safety Analysis Methodology in Marine Salvage System Design Yan Hong Liu 1,a, Li Yuan Chen 1,b, Xing Ling Huang 1,c and

More information

NEW IGC CODE AND IGF CODE

NEW IGC CODE AND IGF CODE NEW IGC CODE AND IGF CODE SAFETY ASPECTS Raffaele Piciocchi Gas Center - Greece SAFETY4SEAS - Athens 1 October 2014 Content NEW IGC CODE DRAFT IGF CODE 2 The New IGC Code A new IGC Code has been approved

More information

A study on the relation between safety analysis process and system engineering process of train control system

A study on the relation between safety analysis process and system engineering process of train control system A study on the relation between safety analysis process and system engineering process of train control system Abstract - In this paper, the relationship between system engineering lifecycle and safety

More information

Understanding the How, Why, and What of a Safety Integrity Level (SIL)

Understanding the How, Why, and What of a Safety Integrity Level (SIL) Understanding the How, Why, and What of a Safety Integrity Level (SIL) Audio is provided via internet. Please enable your speaker (in all places) and mute your microphone. Understanding the How, Why, and

More information

HYDROGEN RISK ANALYSIS FOR A GENERIC NUCLEAR CONTAINMENT VENTILATION SYSTEM

HYDROGEN RISK ANALYSIS FOR A GENERIC NUCLEAR CONTAINMENT VENTILATION SYSTEM HYDROGEN RISK ANALYSIS FOR A GENERIC NUCLEAR CONTAINMENT VENTILATION SYSTEM u, Z. 1 and Jordan, T. 2 Karlsruhe Institute of Technology, P.O. Box 3640, 76021 Karlsruhe, Germany 1 zhanjie.xu@kit.edu, 2 thomas.jordan@kit.edu

More information

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April

MINE SAFETY TARGETED ASSESSMENT PROGRAM. Ground or strata failure NSW metalliferous mines. April MINE SAFETY TARGETED ASSESSMENT PROGRAM Ground or strata failure NSW metalliferous mines April 2017 www.resourcesandenergy.nsw.gov.au Document control Publication title: Ground or strata failure NSW metalliferous

More information

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT

USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT USE OF THE EXCEEDANCE CURVE APPROACH IN OCCUPIED BUILDING RISK ASSESSMENT Kieran J Glynn, Advisor Major Accident Risk, BP, UK The exceedance curve approach was developed following the issue of the 2003

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Level 2 PSA for the VVER 440/213 Dukovany Nuclear Power Plant

Level 2 PSA for the VVER 440/213 Dukovany Nuclear Power Plant Nuclear Nuclear Research Research Institute Řež plc Institute Řež plc Level 2 PSA for the VVER 440/213 Dukovany Nuclear Power Plant Jiří Dienstbier, Stanislav Husťák OECD International Workshop on Level-2

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC)

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER P: REFERENCE OPERATING CONDITION STUDIES (PCC) PAGE : 1 / 11 1. PASSIVE SINGLE FAILURE ANALYSIS The aim of the accident analysis in Chapter P is to demonstrate that the safety objectives have been fully achieved, despite the most adverse single failure.

More information

IAEA Regional Workshop Legal and Regulatory Aspects of Decommissioning of Research Reactors June Manila, Philippines

IAEA Regional Workshop Legal and Regulatory Aspects of Decommissioning of Research Reactors June Manila, Philippines IAEA Regional Workshop Legal and Regulatory Aspects of Decommissioning of Research Reactors 26 30 June 2006 Manila, Philippines Monday, 26 June 2006 09:00 09:45 Opening (A. Dela Rosa, B. Batandjieva) Welcoming

More information

MITIGATE GAS COMBUSTION IN CASE OF INTERNAL ARC

MITIGATE GAS COMBUSTION IN CASE OF INTERNAL ARC MITIGATE GAS COMBUSTION IN CASE OF INTERNAL ARC Jérôme DOUCHIN Yann CRESSAULT Raphael Danjoux Schneider Electric France Toulouse University France FLIR France Jerome.douchin@ cressault@laplace.univ-tlse.fr

More information

NKS PODRIS project. Importance of inspection reliability assumptions on piping failure probability estimates

NKS PODRIS project. Importance of inspection reliability assumptions on piping failure probability estimates NKS PODRIS project Importance of inspection reliability assumptions on piping failure probability estimates Kaisa Simola, Otso Cronvall & Ilkka Männistö (VTT) Jens Gunnars, Peter Dillström & Lars Averlind

More information

Transient Analyses In Relief Systems

Transient Analyses In Relief Systems Transient Analyses In Relief Systems Dirk Deboer, Brady Haneman and Quoc-Khanh Tran Kaiser Engineers Pty Ltd ABSTRACT Analyses of pressure relief systems are concerned with transient process disturbances

More information

MIL-STD-883G METHOD

MIL-STD-883G METHOD STEADY-STATE LIFE 1. PURPOSE. The steady-state life test is performed for the purpose of demonstrating the quality or reliability of devices subjected to the specified conditions over an extended time

More information

MAHB. INSPECTION Process Hazard Analysis

MAHB. INSPECTION Process Hazard Analysis Number 5 2016 seveso common MAHB INSPECTION s e r i e s criteria Process Hazard Analysis Major Accident Hazards Bureau Security Technology Assessment Unit This publication of the European community on

More information

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508

DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 DETERMINATION OF SAFETY REQUIREMENTS FOR SAFETY- RELATED PROTECTION AND CONTROL SYSTEMS - IEC 61508 Simon J Brown Technology Division, Health & Safety Executive, Bootle, Merseyside L20 3QZ, UK Crown Copyright

More information

DRAFT REGULATORY GUIDE DG-1074

DRAFT REGULATORY GUIDE DG-1074 Draft Guide DG-1074 - December 1998 Page 1 of 55 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REGULATORY RESEARCH DRAFT REGULATORY GUIDE December 1998 Division 1 Draft DG-1074 Contact: E.L. Murphy

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries

Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Proposed Abstract for the 2011 Texas A&M Instrumentation Symposium for the Process Industries Focus Area: Automation HMI Title: Author: Shared Field Instruments in SIS: Incidents Caused by Poor Design

More information

A Method Quantitatively Evaluating on Technical Progress of Students in Ship Handling Simulator Training ABSTRACT

A Method Quantitatively Evaluating on Technical Progress of Students in Ship Handling Simulator Training ABSTRACT A Method Quantitatively Evaluating on Technical Progress of Students in Ship Handling Simulator Training Kinzo INOUE, Hideo USUI, Rong MA and Cemil YURTOREN Kobe University of Mercantile Marine 5-1-1 Fukae-minami

More information

A SEMI-PRESSURE-DRIVEN APPROACH TO RELIABILITY ASSESSMENT OF WATER DISTRIBUTION NETWORKS

A SEMI-PRESSURE-DRIVEN APPROACH TO RELIABILITY ASSESSMENT OF WATER DISTRIBUTION NETWORKS A SEMI-PRESSURE-DRIVEN APPROACH TO RELIABILITY ASSESSMENT OF WATER DISTRIBUTION NETWORKS S. S. OZGER PhD Student, Dept. of Civil and Envir. Engrg., Arizona State Univ., 85287, Tempe, AZ, US Phone: +1-480-965-3589

More information

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR

SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 440/270 REACTOR PROCEEDINGS OF THE YEREVAN STATE UNIVERSITY Physical and Mathematical Sciences 216, 2, p. 57 62 P h y s i c s SENSITIVITY ANALYSIS OF THE FIRST CIRCUIT OF COLD CHANNEL PIPELINE RUPTURE SIZE FOR WWER 44/27

More information

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM

INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM INHERENTLY SAFER DESIGN CASE STUDY OF RAPID BLOW DOWN ON OFFSHORE PLATFORM Volton Edwards bptt Angus Lyon DNV Energy Alastair Bird DNV Energy INTRODUCTION A term now in common usage within the oil & gas

More information

Progress with the Road Investment Strategy

Progress with the Road Investment Strategy Report by the Comptroller and Auditor General Department for Transport and Highways England Progress with the Road Investment Strategy HC 1056 SESSION 2016-17 22 MARCH 2017 4 Key facts Progress with the

More information