1 SEVERITY Risk matrix Definitions LIKELIHOOD Site description: Neasham Village Green is an open area of grassland in the middle of Neasham Village (see map attached), roughly triangular in shape, bounded to the East by the River Tees, to the south by the Kent Beck (which flows into the Tees), and to the West in part by domestic properties, and in part by an adopted Highway. The Village Green is bisected by a floodbank which forms part of the Flood Protection Works constructed by the statutory predecessors of the Environment Agency, and now managed and maintained by the Environment Agency pursuant to its statutory powers and duties. A public footpath runs along the crest of the floodbank. Another crosses it, as does a public bridleway, which goes on to cross the river at the High Wath (ford). There are stands of mature and semimature trees at the Kent Beck and south of the Millennium Garden, and rows of mature trees bounding the Highway, the Millennium Garden and the Kent Beck. Neasham Village has no commercial facilities save for one public house (The Fox and Hounds) in the middle of the Village. It has no school or religious buildings. Its only community facility is the Reading Room at the east end of the Village. The Village Green is used for unstructured recreational activity by residents and visitors, the only organised event being the annual Duck Derby. People use the river for fishing and occasional informal water activity. No Severity Likelihood 1 Minor injury Very unlikely st Aid required Serious (3 day) Major hospital required Fatal Unlikely Likely Very likely Almost certain Overall risk: 1-5: low 6-10: medium 12-25: high Page 1 of 6
2 Residual risk score Likelihood Severity Existing risk score Likelihood Severity Initial risk score Likelihood Severity Ref Site hazards & description Underlying risk Existing control measures Current risk Measures needed Residual risk 1 Steep drops & slopes: The floodbank adjacent to the Kent Beck runs steeply from the public footpath to the beck. The floodbank alongside the river has various amounts of level ground before a short steep fall (which may be covered in high water or flood conditions) to the river. The floodbanks are unfenced ½ metre pathway verges kept cut to assist definition of pathway/slope boundary New Village Green signage erected includes take care warnings All signage or other structures on the Flood Bank require EA approval. Consideration will be given to whether any additional signage is required when EA have posted the signage they have proposed informally. 2 Uneven ground paths & steps: Whilst a public footpath along part of the river edge is recorded on the definitive map, there is no visible sign of this. The visible footpath is shown on the map attached. Along the crest of the floodbank it is mainly flagged, is in reasonable condition (see EA-PRSA no ) and maintained by the Environment Agency Pathways inspected formally each 6 months and informally by regular use by Councillors. Defect reporting system in place to either report defects to EA or LA, as appropriate, or repair if within PC controlled area Steps have been renovated by the EA (Sept/Oct 2017) and those which now come within the Council s remit will be included within the Council s inspection regime Agree with EA and DBC the respective boundaries of those parts of the footpaths that they maintain; include steps to Teesway, and onto the green, which are our maintenance responsibility following completion of EA works. Page 2 of 6
3 3 4 5 Uneven ground recreation area: This open area is mown at regular intervals during the growing season by Darlington Borough Council. Its surface is as would reasonably be expected of public open space. Uneven ground river bank: The river bank is a band of steep sloping land approximately 2 metres wide on average with dense riveredge vegetation. The river bank is unfenced. Traps & confined spaces: Northumbrian Water Limited own and operate a sewerage pumping station to the south of the Millennium Garden with an outfall to the river. The building is secured, and screened by a dense leylandii hedge. The two large floodwater outfalls which penetrate the floodbank are protected by steel fences and gates erected and maintained by the Environment Agency which also operates the facility at times of severe flooding affecting the land ward side of the floodbank New signage invites responsible use. Public defects reporting system in place Formal and informal inspection system in place System in place for inspection of riverbank after flood to detect unusual dangers In the event that defects are observed to third party property in the course of a PC inspection, an urgent report will be made to the relevant third party. Both the Environment Agency and Northumbrian Water Limited have warning and contact notices displayed. Consider arrangements for maintaining cutting if DBC frequency reduces Page 3 of 6
4 6 Trees: Most trees within publiclyaccessible areas are lowgrowing and unlikely to form a hazard to pedestrians or traffic. The mature trees at the Kent Beck are inaccessible to the public; but there may be some risk of falling branches from the mature trees at the Millennium Garden Tree register prepared and issued, to be updated twice yearly following inspection. Urgent maintenance has been carried out, and maintenance for the next fiscal year identified work to include raising crown of mature trees s. of Millennium Garden & crown cleaning. Crown raising should deter tree-climbing by public Revolving maintenance plan to be prepared over the course of nest growing season Public services: One set of telephone wires crosses a small part of the north side of the Village Green. There is a power supply, mainly in a shallow underground conduit, serving the Spruce Tree which bears the Christmas lights. All other public services are underground. Power supply now checked annually (see inspection schedules) Trees now cut back from overhead wires, & inspected twice yearly Adjacent highway (Teesway): The highway is segregated from the Village Green by an adopted pavement. There are no unusual hazards for those who take due care of their highway safety. Vehicular access to the Village Green & floodbank without consent is enforced by locked bollards. Page 4 of 6
5 9 Storage areas: No such areas exist, save for temporary arrangements made with contractors or others. Authorised users are required to make their own public safety arrangements, suitably insure, and indemnify the Council Kent Beck & River Tees: These waterways have the usual inherent dangers, particularly to those who do not treat watercourses with appropriate care and respect. In times of heavy rain or snow-melt, they are likely to surcharge, and frequently overtop their banks. Severe flooding is not uncommon, which will inundate the recreation area, and on rarer occasions may threaten to overtop the floodbank. Use for organised activities: Under the Council s Health & Safety Policy organised activities need to be approved by the Council New signage erected by PC draws attention to river and flood risks Signage promised by EA is expected to do likewise EA have assessed the floodbank (and by implication the public access via path) and concluded they do not require any further protective measures Draft consent letter prepared, and Council is guided by guidance issued by present and previous insurers and by SLCC/NALC Draft code of practice in preparation to give additional guidance Page 5 of 6
6 Page 6 of 6
COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction
COUNCIL POLICY Road Reserve and Footpath Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction Approved By: Council Review Date: 31 December 2013 Responsible Officer: Version No: 02 General Manager
More informationHow to plan an event. Step 1: First things first. Step 2: How to make it all happen?
As an event organiser, you have a legal responsibility to ensure the health, safety and welfare of all those involved in your event - all employees, volunteer helpers and contractors as well as members
More informationOur Approach to Managing Level Crossing Safety Our Policy
Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable
More information18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE:
18 HOLE RISK ASSESSMENT COMPLETED BY: MARK HAINES POSITION HELD: COURSE MANAGER DATE: 03.02.2017 REVIEW DATE: 03.02.2019 Hole No. Risk Description Grade of Risk Recommendations 1st Course access path on
More informationAPPENDIX A: Risk Assessment for all activities at Farm
APPENDIX A: Risk Assessment for all activities at Farm Sheet No...of...... Drafted by Nick Laister Date of Revision: January 08 Location: Southcombe, Chipping Norton Heading: General Organisation L C R
More informationRisk Assessment Form
Assessment Form This reviewed assessment supersedes the original assessment dated October 2003 and is reviewed on an annual basis Business Area: Ingleton Waterfalls Walk Area/Task: Pathway around the waterfalls
More informationRights of Way Enforcement Procedure for Land Managers
Rights of Way Enforcement Procedure for Land Managers November 2006 Contents 1. Introduction 2. Infringements 2.1 Disturbance to the surface of a right of way 2.2 Obstructions 2.3 Structures 3. Enforcement
More informationDESIGN CODE. Enterprise West Harlow London Road North Design Code 21
DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.
More informationCYCLING TIME TRIALS The national governing body for CYCLING time trials
CYCLING TIME TRIALS The national governing body for CYCLING time trials www.ctt.org.uk SOUTH DISTRICT COUNCIL COURSE DETAILS FOR START SHEETS & RISK ASSESSMENT INDEX Guidance Notes for Event Promoters
More informationRowany Golf Club Limited RISK ASSESSMENT
Copyright Rowany Golf Club 2016 2a Berkeley Street Lane, Douglas, Isle of Man IM2 3RN Introduction This document assesses the risks associated with Rowany Golf Course, in order that that Rowany Golf Club
More informationPublic Rights of Way A guide for landowners and farmers
Public Rights of Way A guide for landowners and farmers Introduction...3 Public Rights of Way...3 Barbed Wire...4 Bulls and Dangerous Animals...4 Cross Compliance...5 Dangerous Land adjoining a Public
More informationWerneth Low Golf Club Health and Safety On The Golf Course
Introduction The following provides an overview assessment of the risks identified for players when playing any of the courses at. It is the responsibility of all players (members, guests and visitors)
More informationProcess for managing parking on verges, footways and footpaths
Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction
More informationKeeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy
Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Health and Safety Policy Our Health and Safety Policy Name of Church: Address: As a church we understand that we owe a duty of care to ensure the safety
More informationPUBLIC RIGHTS OF WAY ISSUES
PUBLIC RIGHTS OF WAY ISSUES ANIMALS Aggressive animals: section 2 of the Animals Act 1971 makes the keeper of an animal liable for damages if it injures another person, provided that the keeper was aware
More informationWANBOROUGH PARISH COUNCIL
1 WANBOROUGH PARISH COUNCIL Minutes of the meeting of Wanborough Parish Council held on 18 th December 2017 in Wanborough Village Hall, High Street, Wanborough at 19.30. PRESENT: Mr C Offer (Chairman),
More informationSafety, Health and Environment Angler Safety
Safety, Health and Environment Angler Safety A Guide to Risk Assessment Supporting a Reduction in the Default 30 metre Angling Exclusion Zone The Guide is NOT intended to be used by individuals as a guide
More informationDevelopment, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain
Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain 1 Level Crossing Facts (Great Britain) Over 7000 in active use
More informationPALMERSTON NORTH CITY PALMERSTON NORTH SIGNS AND USE OF PUBLIC PLACES BYLAW Administration Manual
PALMERSTON NORTH CITY PALMERSTON NORTH SIGNS AND USE OF PUBLIC PLACES BYLAW 2015 Administration Manual Document control Version No. Reason for amendment Date 1 Adopted by Council 1 October 2015 2 Correct
More informationBUGGY POLICY. Introduction
BUGGY POLICY The Birstall Golf Club General use of Ride-on Buggies on the Golf Course (In this document Privately owned refers to any Golf Buggy brought to the course & excludes the Golf Buggies available
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/W 003 H05 PATTENS CROSSING THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION
More informationCabinet Member for Highways & Streetscene. Highway Infrastructure Manager
LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS
More informationASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT
ASSOCIATION OF RUNNING CLUBS EVENT PLANNING AND RISK ASSESSMENT The purpose of this document is to inform and promote best practice for organisers of ARC permitted races. Consideration of the following
More information2017 Temporary traffic control guidelines for pedestrians. v.2
2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered
More informationAuckland Transport Code of Practice 2013
P age 234 9 Roadside Restraint Devices 9.1 Scope This chapter includes the following: Road Safety Barrier Systems Fences Railings Bollards Sight Rails It excludes: Fences and restraints required within
More informationLondon Prepares. series
Prepares series c/o The Organising Committee of the Olympic Games and Paralympic Games Ltd. 23rd Floor, One Churchill Place Canary Wharf,, E14 5LN Reception +44 (0)20 3 2012 0 0 0 Fax +44 (0)20 3 2012
More informationTHE CORPORATION OF THE CITY OF KENORA BY-LAW NUMBER
THE CORPORATION OF THE CITY OF KENORA BY-LAW NUMBER 94-2006 Being a by-law to provide that the Line Fences Act does not apply to all of Kenora and for the regulation, erection and maintenance of fences
More informationCHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form
CHRISTCHURCH AND EAST DORSET Local Plan Review Options Consultation Response Form Name Steve Gerry Organisation (if any) North Dorset Trailway Network (reg charity 1145442) Address Line 1 Address Line
More informationBuggy Policy Document Date: 10 November 2017
Buggy Policy Document Date: 10 November 2017 Cavendish Golf Club recognises that it has a duty of care to the staff, members and guest users of the golf course. The topography and nature of the course
More informationStyal Golf Course Accommodation Works Environmental Statement Non-Technical Summary 1007/6.15.2/169
Styal Golf Course Accommodation Works Non-Technical Summary 1007/6.15.2/169 September 2013 Document Control Sheet Project Title: Styal Golf Course Report Title: Non Technical Summary Document No: 1032775.014.001
More informationTHE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05
OBJ/148/026 Rebuttal THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 REBUTTAL PROOF BY MR PAUL
More informationRisk Assessment for Buggy Users at Corhampton Golf Course
Risk Assessment for Buggy Users at Corhampton Golf Course The following Risk Assessment applies to all persons using ride on buggies on the course, i.e. Members of the Golf Club, Visitors to the Club and
More informationCollision Site Investigation - Bodenham By-Pass Background
Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the
More informationPart 9 Specific Land Uses - Foreshore & Waterway Development
7 FORESHORE AND WATERWAY DEVELOPMENT This section applies to the following development uses proposed within the foreshore area (defined by LM LEP 2014), and contains Council s specific requirements for
More informationRoads and public rights of way
Roads and public rights of way This factsheet outlines how the effects of the Proposed Scheme on roads and public rights of way (PRoW) along the line of route would be managed. Version 1.0 Last updated:
More informationContract for grass and undergrowth cutting in Sheviock Parish 2017/18.
The Bill Warren Room, Sheviock Memorial Hall, Crafthole, Torpoint, Cornwall, PL11 3DG Clerk: Mrs Linda Coles Telephone: 01503 232996 Email: sheviockpc@btinternet.com Contract for grass and undergrowth
More informationPrevention of Falls and Working at Heights
Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,
More informationWorks on Local Government Controlled Roads. & Traffic Control Permit No
Works on Local Government Controlled Roads & Traffic Control Permit No. 171219-000220 Pursuant to Local Government Act 2009 (Section 75) This permit is valid for the following purpose(s) at the locations,
More informationEMERGENCY PLANNING OS MAP No. & TYPE Landranger 64 (1:50k) GRID REFERENCE NS (Dam wall) TYPE OF RISK
RESERVE / SITE RISK ASSESSMENT SITE NAME Loch Ardinning Wildlife Reserve DATE OF RISK ASSESSMENT 28 JANUARY 2016 Due to be updated: 28/01/17 EMERGENCY PLANNING OS MAP No. & TYPE Landranger 64 (1:50k) GRID
More informationTT04-06 issue 01 RISK ASSESSMENT POLICY. THIS DOCUMENT WAS FIRST APPROVED ON 14 th May 2013
TT04-06 issue 01 RISK ASSESSMENT POLICY THIS DOCUMENT WAS FIRST APPROVED ON 14 th May 2013 THIS ISSUE (01/2009) WAS ADOPTED ON 14 th May 2013 CONTENTS 1 INTRODUCTION... 3 2 ACTIVITIES AND ASSOCIATED RISKS...
More informationChapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London
Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which
More informationCommunity Highways Volunteering. Information Pack 2017/18
Community Highways Volunteering Information Pack 2017/18 Chief Executive Gillian Beasley www.cambridgeshire.gov.uk Contents Welcome to the Community Highways Volunteering Scheme... 2 How the scheme works...
More informationPOOL FENCING A Guide to the Fencing of Swimming Pools Act 1987
POOL FENCING A Guide to the Fencing of Swimming Pools Act 1987 Enforcement Team Inspections and Enforcement Unit Christchurch City Council 163-173 Tuam Street PO Box 237, Christchurch Telephone 941-8999
More informationBALCOMBE AND ARDINGLY RESERVOIR, WEST SUSSEX
BALCOMBE AND ARDINGLY RESERVOIR, WEST SUSSEX 7 miles Circular 4 hours 080816 Challenging Terrain Hi, I'm Luke and this is my West Sussex Weekends walk It's a 7 mile loop from Balcombe rail station, taking
More informationInfrastructure Requirements for Personal Safety in Respect of Clearances and Access
Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along
More informationSADBERGE PARISH COUNCIL
SADBERGE PARISH COUNCIL Minutes of the meeting held at 7 p.m. on Tuesday 11 th September 2018 in Sadberge Village Hall Present: Councillors Tate, Best, Heath, Heywood, Schott and Smith In attendance: Councillor
More informationPolicy. Stormwater Fencing. 1. Overview Objective Scope Summary
Policy Stormwater Fencing 1. Overview 1.1. Objective The purpose of the Fencing Policy is to ensure the right information and consistent guidelines are used in fencing Sydney Water s Stormwater Network
More informationSHOTLEY BRIDGE VILLAGE TRUST
SHOTLEY BRIDGE VILLAGE TRUST Traffic & Parking Study - 2009 The Parking Lot, a focus group of the Shotley Bridge Village Trust, has undertaken this study. Evidence was gathered, through surveys during
More informationHigh 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High
Hurworth Parish Plan 2010 Actions In this action plan cost ranges are: Low up to 499 Med - 500 to 4,999 High 5,000+ Very - Over 20,000 Hurworth Parish Council Darlington Borough Council MSG Middleton St
More informationRISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)
RISK ASSESSMENT 2011 WALLINGTON LIFT MAINTENANCE CO LTD Installation of electrically operated service lifts (non passenger type) 1 1 L a k e s i d e, W a l l i n g t o n, S u r r e y, S M 6 7 J Y T e l
More informationRisk Assessment Form. Date of risk assessment: Reviewed 26/04/17 Place/activity: School Visits Assessor s name: Kim Bellis
Risk Assessment Form Date of risk assessment: Reviewed 26/04/17 Place/activity: School Visits Assessor s name: Kim Bellis Please Note: This risk assessment is a guidance sheet providing a general outline
More informationBMC Dragline Move Vegetation Clearing Procedure. 1 December 2016
BMC Dragline Move Vegetation Clearing Procedure 1 December 2016 Table of Contents 1.0 Vegetation Clearing Procedure 1 1.1 Scope 1 1.2 Clearing Guidelines 1 1.3 Induction and Toolbox Notes 2 1.4 Inspections
More information18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure
18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related
More informationCONTRACTOR SAFETY INDUCTION HANDBOOK
CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number
More informationAppendix 12 Parking on footways and verges
Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires
More informationSite risk assessment record
Site risk assessment record Location: Sole Common Pond Date of assessment: 19/02/2015 Nearest postcode: RG20 8PN (Sole Farm) Main entrance OS Grid Ref : SU 414 706 Hazards/hazardous events Uneven ground
More informationMILTON ROAD LLF PROJECT UPDATE
Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable
More informationReport to Cabinet. 18 May 2016
Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment
More informationProcedure: Work health and safety hazard management
Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation
More informationRLRC COMMUNITIES EAST GRAND FORKS AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN
AREA CHARACTER THE RED LAKE RIVER & THE RED RIVER OF THE NORTH CONFLUENCE EAGLE POINT BOAT LAUNCH DESIGN DESIGN DETAILS 135 AREA CHARACTER East Grand Forks a city of 7,501 people is located across the
More informationKettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall
HAZARD IDENTIFICATION AND CONTROL MEASURES: Step 1 Identify significant hazards Step 2 Identify who might be harmed and how Step 3 Identify precautionary measures already in place List of significant hazards
More informationEarthen Embankments. turning into larger, more costly repairs. The following. The State Dam Safety Program has inspection
TOPIC: COMMON PROBLEMS FOR SMALL DAMS WITH CONCRETE CHANNEL SPILLWAYS The State Dam Safety Program has inspection requirements for state regulated dams. A dam, like any man-made structure, will change
More informationGuidance Notes for Parish Footpath Wardens
Ramblers Kent Area Guidance Notes for Parish Footpath Wardens Definitions of Public Right of Way: Footpath (FP) For walkers only. Prams, pushchairs or wheelchairs are allowed along a public footpath but
More informationTo position power poles a safe distance from the road to minimise the likelihood of being accidentally hit by vehicles.
Policy Statement Subject Placement of Rigid Distribution Poles Along Roads With Speed Limits Exceeding 70KM/H Approved by Robert Rogerson Signature & Date Distribution Standards and Policy Manager Authorised
More informationDorridge & District Residents Association A Walk Along The Green Belt From Dorridge to Catherine-de-Barnes
Dorridge & District Residents Association A Walk Along The Green Belt From Dorridge to Carine-de-Barnes The starting section of this walk through open fields would be destroyed by building of motorway
More informationFencing swimming and spa pools
A Guide to... Fencing swimming and spa pools What you should know. Contents Do I need a building consent for my pool? 2 Do all pools need to be fenced? 2 Who is responsible to fence the pool? 3 Why do
More informationGlobal EHS Powered Industrial Truck and Pedestrian Safety
Global EHS Powered Industrial Truck and Pedestrian Safety Control No: Policy Name: Powered Industrial Truck and Pedestrian Safety Policy Responsible Corporate Function/Business Segment: Global Environmental
More informationThe Mendip Way. Route Directions and Maps Wells to Frome
The Mendip Way Route Directions and Maps Wells to Frome Website: www.mendiphillsaonb.org.uk Email: mendip@mendiphillsaonb.org.uk Facebook & Twitter: @MendipHillsAONB Phone: 01761462338 1 Wells to Shepton
More informationPolicy. The Calico Group. Calico Homes. Calico Enterprise. SafeNet. Acorn Recovery Projects. Whitworth Care Trust
Policy Title: Fencing Policy Author: Beth Gallagher Approved by: Board Date of First Issue: May 2011 Last full review date: February 2014 Updated: January 2016 Date of next review: February 2017 This document
More informationEssential Standard No. 16. Streetworks - Short duration static works carried out from a vehicle
Key Messages Short duration static works must not exceed 60 mins, including setting up and dismantling traffic management. A vehicle or vehicles should be used whenever possible to protect the workforce.
More informationQLDC Council 29 October Report for Agenda Item: 3
QLDC Council 29 October 2015 Department: Infrastructure Beach Street Pedestrianisation Purpose Report for Agenda Item: 3 1 The purpose of this report is to obtain Council approval to consult over options
More informationSite risk assessment record
Site risk assessment record Location: Bowdown Woods Date of assessment: 06/03/2017 Nearest postcode: RG19 8DB Main entrance OS Grid Ref : SU 505 652 Hazards/hazardous events Uneven ground due to roots,
More informationField Instruction. Protect Horizon Power employees and contractors from a potential hazard.
2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect
More informationStaff Contractors. Public. Staff Contractors
1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances
More informationMINUTES 2 January 2019
Dethick, Lea & Holloway Parish Council Chair 2018-19 Councillor I Hooker Telephone: 01629 534393 Clerk to the Parish Council T Walker Tel: 01629 706222 Email: parishclerk@dethickleaandholloway.org.uk Website:
More informationLocal Highway Panels Members Guide. 9 Public Rights of Way
Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.
More informationNEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE
The City of Vaughan 2141 Major Mackenzie Drive Vaughan, Ontario Canada L6A 1T1 Tel (905) 832-2281 NEIGHBOURHOOD TRAFFIC COMMITTEE POLICY AND PROCEDURE REVISED JUNE 2010 APPLICABILITY The Neighbourhood
More informationRoute: Skewsby Foulrice Stearsby
Route: Skewsby Foulrice Stearsby Distance: 7 miles Map: Explorer: 300 Howardian Hills & Malton Start (OS ref): SE625710 Park in the village of Skewsby. Walk east out of the village to the T-Junction and
More informationThe Royal Birkdale Golf Club BUGGY POLICY
The Royal Birkdale Golf Club BUGGY POLICY Introduction Due to disability, some members and visitors may not be able to play golf without the help provided by a motorised ride-on buggy. The purpose of this
More informationSIGNS - RULES Signs - Rules Structure of the Rules Section Activities Discretionary Activities
Attachment C.2 Signs - Rules.2.1 Structure of the Rules Section Four Activity Tables Commercial, Residential and Other group the District Plan zones. Each Activity Table contains rules relevant to the
More informationTideswell to Castleton
Tideswell to Castleton 1 Walk summary Length: 14 km, 8.5 miles Maps: OS Explorer OL1 The Peak District - Dark Peak Area, OS Explorer OL24 The Peak District - White Peak Area, OS Landranger 110 Sheffield
More informationCITY CLERK. (City Council on October 2, 3 and 4, 2001, adopted this Clause, without amendment.)
CITY CLERK Clause embodied in Report No. 7 of the, as adopted by the Council of the City of Toronto at its meeting held on October 2, 3 and 4, 2001. 15 Draft By-laws- Installation of Speed Humps - Various
More informationLOUTH LOCAL AUTHORITIES. Policy on non Regulatory Road Signage
1. BACKGROUND LOUTH LOCAL AUTHORITIES Policy on non Regulatory Road Signage 1.1 This policy relates solely to sign/ objects/advertisements placed on Public Roads, footpaths or open spaces and which may
More information1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
TECHNICAL NOTE: TIDAL FLOW BUS LANE OPTION ASSESSMENT Purpose 1 This technical note considers the issues associated with the use of tidal flow bus lanes on key public transport corridors in Cambridge.
More information1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?
1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?
More informationThoreau Path Master Plan Final Draft. prepared for: The Boston Redevelopment Authority West End Community November 2007
Thoreau Path Master Plan Final Draft prepared for: The Boston Redevelopment Authority West End Community November 2007 Introduction Carol R. Johnson Associates ( CRJA ) was retained by the Boston Redevelopment
More informationRISK ASSESSMENT FORM
RISK ASSESSMENT FORM Risk Assessment No.: Description of Assessment Overall site / event risk assessment for North Yorkshire School Games at Queen Margaret s School (Escrick, Selby) on 09/07/07 Responsible
More informationBlocks must always run perpendicular (at 90 degrees) to the fence to ensure adequate stability.
This information paper is to provide minimum guidelines and information of the erection of temporary fencing for the purpose of barricading, delineation of a work area, and for protection of workers from
More informationMeeting between British Transport Police and Kirknewton Residents 3 rd January
Kirknewton Level Crossing EH27 8DE Meeting between British Transport Police and Kirknewton Residents 3 rd January 7 th February2017 1. Objective- To address concerns at the repeated obstruction of the
More information8 Miles Circular 4 hours
VISIT RYEDALE HELMSLEY AND RICCAL DALE 8 Miles Circular 4 hours 090616 Challenging Terrain An 8 mile (13km) circular walk from the market town of Helmsley in Ryedale. The route heads out across sheep pastures
More informationManagement of Memorials
Institute of Cemetery & Crematorium Management Management of Memorials Summary Version Revised April 27 Contents Glossary 2 1. Introduction Responsibility and Liability 2. Design and Construction and Installation
More informationHorses on the National Cycle Network
Horses on the National Cycle Network Technical Information Note No. 28 September 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity
More informationGENERIC ENVIRONMENT RISK ASSESSMENT
No. P01: Out of Classroom Page 1 of 12 Appendix 3: Generic Environment Assessment APPENDIX 3: GENERIC ENVIRONMENT RISK ASSESSMENT This appendix contains the Assessment for Generic Environment Assessment.
More informationH&T. H O L L O W E L L & T E E T O N P A R I S H C O U N C I L
H&T. H O L L O W E L L & T E E T O N P A R I S H C O U N C I L Web site: http://www.hollowellandteeton.org.uk/ Email: pc-clerk@hollowellandteeton.org.uk Re: Hollowell & Teeton Parish Council Mowing Areas
More informationThe Hundred Parishes
The Hundred Parishes Walks from railway stations number 9 6.4 miles (10kms) from Bishop s Stortford to Stansted Mountfitchet Start: Bishop s Stortford station (Grid Reference TL492209) (ample parking and
More informationWalking Audit Supporting Information
Walking Audit Supporting Information Planning to do a walking audit of your streets? Here s some helpful suggestions to help get you started. 1. Preparing for your audit Decide where you want to walk.
More informationGreenwood. Walks. Cossall Canal Walk. Cossall Canal Walk
Cossall Canal Walk C5 Cossall Canal Walk C5 Features: Cossall is a picturesque, relatively unspoiled village on the Nottingham canal, four miles south-east of Eastwood. Architecturally interesting. See
More informationRisk Assessment In accordance with the Management of Health and Safety Regulations 1999
Ref No 6.1 Task of Assessor Job Title Litter Picking on and around Streets and Highways Below 40mph Simon Foley Location Quality Health and Environmental Manager Bath Signature Issue Date 15 th July 2015
More informationStaff Report City of Manhattan Beach
Agenda Item #: Staff Report City of Manhattan Beach TO: Honorable Mayor Ward and Members of the City Council THROUGH: Geoff Dolan, City Manager FROM: Richard Gill, Director of Parks and Recreation Richard
More informationQueen s Park Golf Course Queen s Park West Drive Bournemouth BH8 9BY Tel:
Queen s Park Golf Course Queen s Park West Drive Bournemouth BH8 9BY Tel: 01202 451675 Email: queenspark@bournemouth.gov.uk www.queensparkgolfcourse.com RIDE-ON BUGGY SAFETY POLICY USE OF RIDE-ON BUGGIES
More information