Sixth Street Viaduct December 5, 2013 HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
|
|
- Karin Higgins
- 5 years ago
- Views:
Transcription
1 Sixth Street Viaduct December 5, 2013 HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
2 Meeting Agenda 2 1. Project Background and Update 2. Summer Internship Program 3. Viaduct Design Update 4. Intersection Improvement Update 5. Construction 6. Public Art Program 7. Question & Answer SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
3 Project Background 3 In 1932, the Sixth Street Viaduct was constructed of concrete containing an alkali silica mix. It was later discovered the mix was breaking down the viaduct structure. The viaduct was retrofitted in A seismic vulnerability study, completed in 2004, concluded that the viaduct deterioration had reduced its capacity to withstand earthquakes and needed to be replaced. From 2006 to 2011 the City held community meetings to discuss the proposed viaduct replacement project. Approximately 56 public meetings were held between 2006 to 2011 regarding the proposed project: business one-on-one meetings, community advisory committee meetings, public hearings and community information sessions. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
4 Project Background 4 During this period, the City of Los Angeles, Caltrans, and federal agencies held planning meetings and discussions with the community hearing recommendations for the proposed project. This project will demolish and replace the existing 3,500 feet long Sixth Street Viaduct, which spans over the Los Angeles River, railroad corridors, adjacent industrial properties and the 101 Freeway. The community will continue to provide input via community briefings, through the Design Aesthetics Advisory Committee (DAAC), and the Public Arts Advisory Committee (PAAC). SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
5 5
6 Project Background 6 An International Design Competition and release of the project RFP was announced by former Mayor Antonio R. Villaraigosa, Councilmember Jose Huizar, and the Bureau of Engineering on April 12, There were four public presentations by each design team HNTB was selected as the designer on October 19, 2012 HNTB began to work on the project on March 26, 2013 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
7 Project Update 7 The award of CMGC (Construction Manager/General Contractor) Contract to Skanska/Stacy Witbeck, JV (SSW) was adopted by the Board of Public Works on November 15, Funding is primarily from the Federal Highway Bridge Program with matching funds from the State Proposition 1B Seismic Safety Retrofit Program. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
8 Summer Internship Program 8 Two graduates from Bishop Mora Salesian High School were selected. Interns participated in a 6-week Summer Internship Program. They interacted with elected city officials, city engineer, Bureau of Engineering staff, community outreach team, Cultural Affairs Commission, public utility executives, client partners and other stakeholders. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
9 Summer Internship Program 9 A luncheon was held in honor of the interns where they both shared highlights, including meeting Los Angeles Mayor Eric Garcetti. SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
10 Viaduct Design Update 10 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
11 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
12 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
13 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
14 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
15 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
16 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
17 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
18 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
19 Intersection Improvement Update 19 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
20 Intersection Improvement Update 20 50% Design completed August % Design Scheduled January 2014 Construction Begin Summer 2014 Construction Complete Spring 2015 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
21 Construction Skanska & Stacy/Witbeck Joint Venture Skanska USA Civil West (California District) Began working in Southern California in 1919 Recent projects include: Expo 2 Light Rail, Los Angeles & Santa Monica Gold Line Bridge, Arcadia Northridge earthquake I-5 Gavin Canyon bridge reconstruction Stacy & Witbeck Founded in 1981 and based in Alameda, CA Successful CMGC contractor on over 20 projects throughout western US SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
22 Construction 22 Skanska USA- Gold Line Bridge, Arcadia, CA SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
23 Future Construction Activities Building Demolition Approximately 15 buildings which conflict with new viaduct alignment Projected to begin summer, 2014 Utility Relocation Numerous electrical lines to be relocated underground Projected to begin summer, 2014 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
24 Future Construction Activities Off Site Intersections 11 intersections in Boyle Heights 9 intersections west of LA River Night & weekend work to limit disruptions Projected to begin Summer, 2014 Viaduct Demolition Closure of 6 th Street/Whittier Blvd Some night work 6 to 9 months of work beginning no earlier than December, 2014 SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
25 Future Construction Activities New River Gateway Crossing under 9 active rail lines Pile driving during daytime Projected to begin spring, 2015 New Viaduct Foundation work to begin spring 2015 Some work to be performed at night to accommodate railroads, businesses, traffic Other site improvements under consideration to be presented in February/March SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
26 SIXTH STREET VIADUCT REPLACEMENT PUBLIC ART PROGRAM Department of Cultural Affairs PUBLIC ART DIVISION
27 CD14 Motion [Oct 2012]; DCA Report [Mar 2013]; Council Approval [Apr 2013]; PAAC Established [Jul 2013] PAAC Members: Melissa Richardson Banks Principal of CauseConnect Anne Bray artist, teacher, Founding Director of Freewaves Abe Flores Advocacy Field Manager for Arts for LA Timothy Keating Board President & Treasurer of LADADSpace, Vice President of Los Angeles River and Business Association (LARABA), Arts District representative for the LA Historic Cultural Neighborhood Council Edward Padilla artist, teacher, Board President of CASA 0101 Theater PAAC Activities: Orientation [Aug 2013] Working Meeting [Sep 2013] Drafting of a Vision Statement [Nov 2013] BACKGROUND Department of Cultural Affairs PUBLIC ART DIVISION [27]
28 ART PROGRAM FRAMEWORK PRIMARY CONSIDERATIONS: Architectural Vision Iconic Artwork Muralism Local Opportunities Curatorial Approach Department of Cultural Affairs PUBLIC ART DIVISION [28]
29 VIADUCT ART PROGRAM FUNDED by the VIADUCT REPLACEMENT PROJECT: Integrated Public Art ICONIC ARTWORK INSTALLED DURING CONSTRUCTION OTHER POTENTIAL ART PROGRAM CONSIDERATIONS: MURALS PROGRAM CONSERVATION + NEW MURALS TEMPORARY ARTS PROGRAMMING FUTURE PROGRAMMING AT VIADUCT Department of Cultural Affairs PUBLIC ART DIVISION [29]
30 INTEGRATED PUBLIC ART PROJECT Public Works Improvements Arts Program [LAAC 19.85] 1% of Viaduct Construction Budget Iconic Public Artwork Department of Cultural Affairs PUBLIC ART DIVISION [30]
31 THE VIADUCT DESIGN ARCHITECTURAL DESIGN CONCEPTS: Expanding CONNECTIVITY A CINEMATIC Experience A MULTIMODAL Future ART, CULTURE + HISTORY Department of Cultural Affairs PUBLIC ART DIVISION [31]
32 ARCHITECT S PUBLIC ART EXAMPLES Crown Fountain, permanent installation ARTIST Jaume Piensa [Spain] LOCATION Millennium Park, Chicago BUDGET $13.5M Bay Lights, temporary installation ARTIST Leo Villareal [NY] LOCATION Bay Bridge, San Francisco BUDGET $8M Department of Cultural Affairs PUBLIC ART DIVISION [32]
33 ARCHITECT S PUBLIC ART EXAMPLES Song 1, temporary installation ARTIST Doug Aitken [LA] LOCATION Hirshhorn Museum, Washington, D.C. BUDGET $500K Her Patience Is Secret, permanent sculpture ARTIST Janet Echelman [MA] LOCATION Downtown Civic Park, Phoenix BUDGET $2.5M Department of Cultural Affairs PUBLIC ART DIVISION [33]
34 To create an engaging artwork that is interactive, open-ended, and reflective of LA, with an emphasis on bridging communities and activities flowing around and through the site. THE PUBLIC ARTWORK SHOULD: Address equitable onsite opportunities for participatory cultural expression; SIXTH STREET VIADUCT PUBLIC ART VISION STATEMENT Amplify the Viaduct as a central place for creative activity; Enhance the Viaduct as a destination and focal point to unify the city; and Consider the naming of the Viaduct as a way to emphasize the potential use of public art as a process for cultural exchange. Department of Cultural Affairs PUBLIC ART DIVISION [34]
35 For more information, visit 6 th Street Viaduct Replacement Project SIXTH STREET VIADUCT HNTB MICHAEL MALTZAN ARCHITECTURE HARGREAVES ASSOCIATES AC MARTIN
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: December 12,2011 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Bill Rosendahl, Chair, Transportation Committee
More informationTOWN OF WINDSOR AGENDA REPORT
ITEM NO. : 9.7 Town Council Meeting Date: June 17, 2015 TOWN OF WINDSOR AGENDA REPORT To: From: Subject: Mayor and Town Council Jim O Brien, Project Manager Approve a Professional Services Agreement for
More informationAMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities
I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;
More informationWelcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study
Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question
More informationBus Rapid Transit ALTERNATIVES ANALYSIS. Open House
Bus Rapid Transit ALTERNATIVES ANALYSIS Open House June 23, 2015 Open House Meeting Agenda Agenda Introductions What is BRT? Project Goals Study Tasks Next steps Discussion PVTA Bus Rapid Transit Study
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE
CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 9, 2017 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More information1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?
1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? The Los Angeles County Metropolitan Transportation Authority (Metro) is evaluating the development of a grade separation
More informationDiamond Springs Parkway Project
Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of
More informationBUDGET FOR RESEDA BOULEVARD, STREET RECONSTRUCTION / VISION ZERO PROGRAM, REPORT BACK, COUNCIL FILE
FORM GEN. 160 (Rev. 11-02) CITY OF LOS ANGELES INTERDEPARTMENTAL CORRESPONDENCE Date: To: Honorable City Council From: Gary Lee Moore, City Engineer Bureau of Engineering 7%mt /Electronically signed by
More informationEnvironmental Assessment Findings & Recommendations. Public Hearing November 13, 2014
Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of
More information7th Street Bridge Project. Public Presentation February 24, :30pm-8pm
7th Street Bridge Project Public Presentation February 24, 2014 6:30pm-8pm Public Meeting Agenda Welcome and introductions Judith Buethe Opening remarks - David Leamon, PE/Hans Strandgaard, PE Project
More informationJOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica
JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica ITY OF ANTA MONICA RAIL-VOLUTION / OCTOBER 17, 2012 SARAH LEJEUNE, PRINCIPAL PLANNER, STRATEGIC + TRANSPORTATION PLANNING DIVISION
More informationWilshire Boulevard Bus Rapid Transit Project
Los Angeles County Metropolitan Transportation Authority Wilshire Boulevard Bus Rapid Transit Project COMMUNITY MEETINGS November 2008 Agenda Introduction Proposed Project Overview Participating Agencies
More informationACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT
6.h DATE: APRIL 2, 2009 TO: FROM: BOARD OF DIRECTORS RICHARD D. THORPE CHIEF EXECUTIVE OFFICER ACTION: SELECT PREFERRED LIGHT RAIL ALIGNMENT FOR PHASE 2 OF THE EXPOSITION CORRIDOR TRANSIT PROJECT RECOMMENDATION
More informationProject Budget and Schedule Status
Item 8 Program Management Project Budget and Schedule Status Transit Project Delivery Finance, Budget & Audit Committee February 20, 2013 Project Schedules Project 2012 2013 2014 2015 2016 2017 2018 2019
More informationCity of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee Thursday, April 21, :00 PM
1. CALL TO ORDER 2. ROLL CALL 3. ADOPTION OF AGENDA 4. PUBLIC COMMENTS 5. OLD BUSINESS 6. NEW BUSINESS City of Lafayette Public Meeting Agenda Downtown Street Improvement Master Plan Implementation Committee
More informationEL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT
Agenda Item #4.2 EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT VTA BOARD WORKSHOP MAY 1, 2015 ABOUT THIS PRESENTATION CONTEXT Existing conditions and planning for growth WHAT IS THE PROJECT? Project alternatives
More informationCitizens Advisory Committee March 26, 2014
Memorandum 0..1 Citizens Advisory Committee March, 1 Citizens Advisory Committee Maria Lombardo Chief Deputy for Policy and Programming Elizabeth Sall Interim Deputy Director for Planning Vision Zero Committee
More informationSANTA MONICA BOULEVARD CORRIDOR
CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly
More informationTRANSBAY JOINT POWERS AUTHORITY
THIS STAFF REPORT COVERS CALENDAR ITEM NO.: 8 FOR THE MEETING OF: April 19, 2007 TRANSBAY JOINT POWERS AUTHORITY BRIEF DESCRIPTION: This staff report provides the status of a planning feasibility study
More informationWeymouth - Abington Route 18 Widening and Reconstruction Project File No
Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013
More informationExpansion of Bike Share within San Jose supports the City's ambitious mode shift goals to have 15% of commute trips completed by bicycles by 2040.
COUNCIL AGENDA: 12/01/15 ITEM: 4 CITY OF SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL SUBJECT: BAY AREA BIKE SHARE EXPANSION Memorandum FROM: Jim Ortbal DATE: Approved Date irftt/ls'
More informationGeneral Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701
General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study
More informationDraft MOBILITY ELEMENET. Community Meeting May 22, 2013
Draft MOBILITY ELEMENET Community Meeting May 22, 2013 Agenda Presentation Ira Brown New Mobility Paradigm Movement of People Implementation Q&A Ira Brown and Dave Roseman Small Group Discussion at Each
More informationCITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW. Petitioner defines the project area limits and gathers petition signatures.
CITY OF ANN ARBOR TRAFFIC CALMING PROGRAM PROCESS OVERVIEW Step 1: Petition Petitioner defines the project area limits and gathers petition signatures. 50% of addresses within the project area must sign
More informationUPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS
UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego
More informationMEMORANDUM - CITY OF PASADENA Department Of Transportation DATE: OCTOBER 21, 2008 TO: ENVIRONMENTAL ADVISORY COMMISSION FROM: ~ FRED C. DOCK, DIRECTOR OF TRANSPORTATION SUBJECT: UPDATE ON DEPT. OF TRANSPORTATION
More informationCOMMUNITY MEETING August 23, 2018
COMMUNITY MEETING August 23, 2018.. 1 Agenda Welcome & Introduction Project Background & Purpose Project Overview Q & A Stations Charleston / Meadow Palo Alto City-Wide Tunnel Ideas No Longer Considered
More informationA Downtown Transformed Through Partnerships: the Portland Mall Story
A Downtown Transformed Through Partnerships: the Portland Mall Story Portland 2010 Chris Kopca, Downtown Development Group Steve Iwata, City of Portland Bureau of Planning and Sustainability Brian McCarter,
More informationBeach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan
Beach Cities Living Streets Design Manual and Aviation Boulevard Multimodal Corridor Plan AGENDA 1 Introductions & Project Scope 2 Public Outreach Recap 3 Living Streets Design Manual 4 Aviation Boulevard
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationI-105 ExpressLanes Project
I-105 ExpressLanes Project Public Scoping Meetings March 2018 Introduction to Scoping This process is your opportunity to give us your thoughts on: The purpose and need for the proposed improvements The
More informationI-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016
I-395 Express Lanes Northern Extension Project Crystal City Civic Association September 21, 2016 Mike Snare, PE, Project Manager Virginia Department of Transportation GEC Michelle Holland, Megaprojects
More informationRichardson Center Corporation By Gary Phillips University at Buffalo Law Student
FACT SHEET November 7, 2008 Richardson Center Corporation By Gary Phillips University at Buffalo Law Student What is the agency s website and contact information? Website: http://www.richardson-olmsted.com/
More informationParticipation is open to all Stakeholders of the Coastal San Pedro Neighborhood Council.
CSPNC Land-Use & Transportation Committee Meeting Agenda Saturday, July 29 th at 9:00am at Wilder Annex at the West End of Point Fermin Park At the 1100 block of Paseo del Mar, San Pedro, CA 90731 Participation
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed
More information101 Corridor Managed Lanes
101 Corridor Managed Lanes TA BOD Meeting May 5, 2016 Agenda Item 11a Presentation Outline 101 Corridor Profile System Deficiencies Background Managed Lanes Proposed Purpose and Need Alternatives Under
More informationStaff Report City of Manhattan Beach
Agenda Item #: Staff Report City of Manhattan Beach TO: Honorable Mayor Montgomery and Members of the City Council THROUGH: Richard Thompson, Interim City Manager FROM: Sona Kalapura, Environmental Programs
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More informationI-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016
I-395 Express Lanes Northern Extension Project Fairlington Citizens Association September 12, 2016 Susan Shaw, PE, Megaprojects Director, Virginia Department of Transportation Amanda Baxter, Special Projects
More informationTransit Choices December 8, 2016
Transit Choices December 8, 2016 Agenda 1. Network Redesign Status 2. Public Hearings & Bus Stops 3. Public Education Plan 4. Capital Projects Update 1 st Draft Winter Outreach October 2015 February 2016
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationSUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing
REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION
More informationPart of Growing Rail Network
May 3, 2017 Part of Growing Rail Network Montclair Construction Authority s Responsibility Metro s 2009 Long Range Transportation Plan, projects partially funded by Measure R Gold Line s 3 Phases = $3
More informationMay 12, 2016 Metro Potential Ballot Measure Issue Brief: Local Return
Summary: Local return is an important revenue source for cities to maintain their local transportation infrastructure. Most cities use their local return to operate small bus systems and repave streets,
More informationBicycle Friendly Niagara Falls
Bicycle Friendly Niagara Falls STAKEHOLDER COMMITTEE MEETING 2 SUPPORTED BY THE OATH COMMUNITY FUND AT THE COMMUNITY FOUNDATION FOR GREATER BUFFALO Develop a Bicycle Master Plan to document the city s
More informationBD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1
BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner
More informationTransportation Technology and Infrastructure Committee February 13, 2017
Transportation Technology and Infrastructure Committee February 13, 2017 1 A transformative opportunity 2 Our Partners Council Member David Robinson 3 1 Project Kickoff May 2015 Schedule 2 Public Engagement:
More informationService Business Plan
Service Business Plan Service Name Transportation Planning Service Type Public Service Owner Name Kaylan Edgcumbe Budget Year 2019 Service Owner Title Service Description Manager of Transportation Planning
More informationPOLICY ADVISORY COMMITTEE
September 27, 2018 POLICY ADVISORY COMMITTEE ENVIRONMENTAL ANALYSIS PHASE Agenda 1. Welcome and introductions. 2. Overview of project activities and process. 3. Public engagement update. 4. Community Advisory
More informationSummer has come to an end and cooler weather is in sight. This is the perfect time of year to start walking and enjoying our downtown area.
The Phoenix Biomedical Campus Physical Activity Initiative University of Arizona Life & Work Connections and The Mel & Enid Zuckerman College of Public Health Summer has come to an end and cooler weather
More informationCity of Los Angeles. Presentation on Sidewalk Vending
City of Los Angeles Presentation on Sidewalk Vending Current Sidewalk Vending Governance and Enforcement Los Angeles Municipal Code Current Law Definitions City of Los Angeles Enforcement Department of
More informationI-20 East Transit Initiative. Stakeholder Advisory Committee Meeting September 9, :00-6:00 PM
I-20 East Transit Initiative Stakeholder Advisory Committee Meeting September 9, 2010 4:00-6:00 PM Meeting Agenda Introductions Project Background Study Overview Role of the SAC Initial Study Findings
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationSR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street
Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More informationCitizen Advocacy. VISION ZERO IN HILLSBOROUGH COUNTY TODAY
Citizen Advocacy http://www.tampabay.com/news/publicsafety/accidents/car-bus-crash-kills-one/441282 VISION ZERO IN HILLSBOROUGH COUNTY TODAY Does Vision Zero Make Sense Here? Traffic Deaths per 100,000
More informationLiving Streets Policy
Living Streets Policy Introduction Living streets balance the needs of motorists, bicyclists, pedestrians and transit riders in ways that promote safety and convenience, enhance community identity, create
More informationPalou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015
Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015 Agenda Welcome and introductions Project overview, history and goals Concept
More informationMARTIN LUTHER KING JR. WAY
OCTOBER 2011 40 Vision and Goals The Martin Luther King, Jr. Way Illustrative Master Plan that follows has been developed through a process of community involvement. It expresses a long term vision for
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationI-95/Temple Avenue Improvements Project Colonial Heights, VA
I-95/Temple Avenue Improvements Project Colonial Heights, VA Pardon Our Dust Informational Meeting February 3, 2016 Harold Dyson, P.E. Construction Manager, Richmond District Tom Heil, P.E. Allan Myers
More informationCity of Ann Arbor Pedestrian Safety & Access Task Force
City of Ann Arbor Pedestrian Safety & Access Task Force (PSATF) Community Wide Meeting Wednesday, July 8th 6:30 to 8:30 PM Multi purpose Room, Downtown Library www.a2gov.org/pedsafety The Greenway Collaborative,
More informationBlue Ribbon Commission Report Recommendations on Pedestrian and Bicycle Infrastructure Improvements
Recommendations on Pedestrian and Bicycle Infrastructure Improvements July 2017 Plan Development: Our committee consisted of seven individuals appointed by the Mayor and Village Board. Those members included:
More informationVision Zero San Jose. Moving toward zero traffic deaths and providing safe streets for all
Vision Zero San Jose Moving toward zero traffic deaths and providing safe streets for all SPUR San Jose April 4, 2017 Source: Vision Zero Network Vision Zero Core Principles 1. Traffic deaths are preventable
More informationHighway 17 Transportation Improvement Study
Final Report Highway 17 Transportation Improvement Study prepared for Santa Cruz County Regional Transportation Commission (SCCRTC) prepared by Planning and Engineering, Inc. 1155 North First Street, Suite
More informationTAMPA BAY EXPRESS (TBX)
TAMPA BAY EXPRESS (TBX) Hank Schneider, P.E. FDOT- District 7 Consultant Project Manager Florida Department of TRANSPORTATION TAMPA BAY EXPRESS AGENDA What is TBX? What does TBX do? Why is TBX Important?
More informationCharlottesville Regional Chamber of Commerce. October 28, 2014
Charlottesville Regional Chamber of Commerce October 28, 2014 1 A. Rt. 29 Project Delivery Advisory Panel B. Contract Procurement Schedule Status C. Panel Recommendations D. Right of Way and Easements
More informationUpdate of the Master Transportation Plan s (MTP) Bicycle Element
Update of the Master Transportation Plan s (MTP) Bicycle Element April 23, 2019 Background & Context Arlington has an established reputation for advanced bicycle infrastructure and planning Bicycling addresses
More informationAndi Lovano, Project Development Administrato~
CITY COUNCIL CONSENT CALENDAR JUNE 6, 2016 SUBJECT: INITIATED BY: PREPARED BY: RESOLUTION IN SUPPORT OF 2024 SUMMER OLYMPICS IN LOS ANGELES MAYOR PRO TEMPORE JOHN HEILMAN COUNCILMEMBER LINDSEY HORVATH
More informationPROJECT FACT SHEET March 21, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationCHAPTER 1 INTRODUCTION
CHAPTER 1 INTRODUCTION Chapter Table of Contents THE 2017 HOUSTON BIKE PLAN 1-1 HOUSTON BIKEWAYS PROGRAM 1-2 HISTORY OF BICYCLE PLANNING IN HOUSTON 1-3 BICYCLE LEVEL OF COMFORT 1-3 EXISTING PLANS, PROGRAMS
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationChapter VISION, MISSION, AND GOALS AND OBJECTIVES. Vision. Mission. Goals and Objectives CONNECTING COMMUNITIES ACROSS THE ST.
VISION, MISSION, AND GOALS AND OBJECTIVES Chapter 3 The Plan s vision, mission, and goals and objectives were developed through a series of interactive exercises with the Citizens Advisory Committee (CAC)
More informationHOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING
4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown
More informationAGENDA ITEM G-2 Public Works
AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize
More informationTechnical Working Group November 15, 2017
Technical Working Group November 15, 2017 Welcome and Introductions Project Partners Regional Transportation District (RTD) Colorado Department of Transportation (CDOT) Denver Regional Council of Governments
More information5:30 1 Introductions, appointment of note taker (5 minutes) Ad
CITY OF OAKLAND DALZIEL BUILDING. 250 FRANK H. OGAWA PLAZA. SUITE 4344. OAKLAND. CALIFORNIA. 94612 Public Works Agency TEL: (510) 238-3466 Transportation Planning & Funding Division FAX: (510) 238-7415
More informationPEDESTRIAN ACTION PLAN
CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN DRAFT OCTOBER 2015 City Council, February 23, 2016 Beth Rolandson, AICP Principal Transportation Planner Mobility Division, Planning and Community Development
More informationCONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach
CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District
More informationPROJECT FACT SHEET May 25, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationSTONY PLAIN ROAD STREETSCAPE
Jasper Place Revitalization Strategy: Vision The people involved in the Jasper Place Revitalization Strategy envision: Goal 1: Feeling safe in our community Create a community where feeling safe is common--where
More informationFishers Community Art Project Request for Proposals May 1, 2014
Fishers Community Art Project Request for Proposals May 1, 2014 Project The Town of Fishers, Indiana and the Fishers Arts Council are seeking proposals from Indiana artists who are interested in creating
More informationHARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN
HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationCity of Santa Monica City Manager s Update at Council February 23, 2016
NOTE: This document summarizes the staff report provided on 2/23/2016 with an update to the Open Streets Event date inserted on 4/9/2016. For questions, contact communications@smgov.net Metro will announce
More informationHistory Recent Problems Alternative Routes
History Recent Problems Alternative Routes Built in 1936 Length: 8.4 miles Made up of two suspension bridges Meet in the middle of the San Francisco Bay at Yerba Buena Island Double-deck bridge Average
More informationWalterdale Bridge Replacement
Walterdale Bridge Replacement Public Open House Meeting Purpose To provide background and context information To share information on potential roadway modifications and bridge style options To gather
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More informationSoutheast-1 Stations: ALIGNMENT OVERVIEW
Southeast-1 Stations: ALIGNMENT OVERVIEW Street Reconstruction Schedule Proposed Schedule Street Name Traffic Flow During Construction Estimated Completion Date Good Latimer See Maps Sept. 2008 Gaston
More informationDetailed Description of Work
Trail Items I-580 Eastbound Shoulder Running Lane and Bi-Directional Bike Lane Project Bay Area Toll Authority Task Order Contract with HNTB Corporation Effective May 12, 2014 Description of Work: Implement
More informationCounty of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.
County of Orange Resources and Development Management Department Harbors, Beaches and Parks Strategic Plan HBP Strategic Plan Workshop 1 v18 PRESENTATION OUTLINE Harbors, Beaches & Parks (HBP) History
More informationWorking Group Meeting
Working Group Meeting February 6, 2018 Parks and Natural Resources Operations Building Transportation Analysis Draft Policy Framework Agenda 7:05 pm Welcome 7:10 pm Follow-up from Previous Meetings Schedule
More informationCall for Artists/Request for Qualifications Public Art at the Vail Skatepark, Vail, Colorado
Call for Artists/Request for Qualifications Public Art at the Vail Skatepark, Vail, Colorado Call summary: The Town of Vail s Art in Public Places invites professional artists to submit their qualifications
More informationProject Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments
Project Team Project Background Project Improvements Proposed Construction Approach Traffic Impact and Mitigation Next Steps Questions/Comments 1 City of Beverly Hills Samer Elayyan, Project Manager Mark
More information