1 CHELMSFOD CITY LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 34) This Potential List identifies all of the requests which have been received for the consideration of the City Local Highways Panel. The Panel are asked to review the on the attached Potential List, finalise their funding recommendations for the they wish to see delivered in and remove any the Panel would not wish to consider for future funding. There are currently potential with an estimated of 1,206,640 as shown in the summary below - Potential s List (ersion 34) ef. Type Total Costs Prioritised s 1 TBC (Seven ) 2 Walking Cycling 792, ,640 4 School Crossing Patrol TBC TBC (One ) 5 Passenger Transport 66, Public ights of Way 107,000 36,000 Total 1,206, ,640 Page 1 of 16

2 CHELMSFOD CITY LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 34) On the Potential s List the A column acknowledges the status of the request as shown below: A Status A Description of A status The has been validated as being feasible and is available for Panel consideration The has been commissioned for a feasibility study which needs completing before any Panel consideration A which is against policy or where there is no appropriate engineering solution A request has been received and is in the initial validation process Page 2 of 16

3 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 1 Main oad (at northern Broomfield boundary), Broomfield illage ateway Treatment Lack of illage ateway feature to define entry to Broomfield Broomfield Total LCHE ,000 has agreed for to be considered once any changes at adjacent roundabout have been finalised 2 Court oad j/w Main oad, Broomfield Problems at peak times with egress of traffic from Court oad onto Main oad esidents Broomfield Total LCHE ,000 alidation - ecommendation to install KEEP CLEA road marking on Main oad to allow vehicles to turn out of Court oad onto Main oad 3 Church reen, Broomfield Kerbing Wooden sleepers need replacing Broomfield Total LCHE TBC In validation 4 Essex ecords Office, Signage to (1) vehicular access to EO on Navigation oad and (2) outside pedestrian entrance to EO Lack of signage lor ed Total LCHE alidation - Site (2) agreed and Site (1) not necessary as building visible from location. to be considered if available 5 Park Avenue, Cars mounting pavement causing conflict with pedestrians Cars park on one side of road and when two vehicles try to pass, they routinely mount the pavement lor ed Total LCHE TBC In validation North Avenue, Improved parking Lack of residents parking esidents ed Feasibility LCHE ,000 alidation - Option to encourage residents to apply for dropped kerbs and park on their frontage for Feasibility Study/Design into creating parking within adjacent green area 7 Old Moulsham, 7.5 tonne environmental weight limit Delivery vehicles for Moulsham Street routinely driving through Old Moulsham esidents ed Feasibility LCHE ,000 alidation - ecommends Feasibility Study into 7.5t environmental weight limit, to include H traffic surveys and details of any delivery vehicles using Old Moulsham to access Moulsham Street shops 8 Admirals Park Estate, North-West (Boarded Barns) 20mph zone Speed of vehicles lor ed Total LCHE TBC In validation - Will require approx. 30 automatic traffic counts ing 7,500 to complete validation. Four ATC carried out - Corporation oad - 30mph speed limit - East bound 26.7mph & West bound 27.4mph, Swiss Avenue - 30mph speed limit - East bound 25.5mph & West bound 27.4mph, Langton Avenue - 30mph speed limit - South bound 25.4mph & West bound 24.6mph, Kings oad - 30mph speed limit - Southwest bound 25.4mph & Northeast bound 26.1 mph. ood compliance with existing 30mph speed limit. emaining 26 ATC will 6,500 Page 3 of 16

4 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 9 O/s 78 to 88 oxwell oad, measures to enforce 30mph speed limit lor ed Total LCHE NA alidation - Speed survey had to be removed after 2 days following esidents noise complaints - data obtained oxwell oad - 30mph limit - East bound mph & West bound mph. Need speed data to assess issues. 10 Magistrates Court, New Street, Directional signs to Magistrates Court Lack of directional signs to Magistrates Court lor ed Total LCHE ,000 alidation - Feasible to install directional signage on existing street furniture from Bus/Train station to Magistrates Court. Possible Wayfinder also being implemented CCC may cover this signage request 11 Copperfield oad j/w Dickens Place, lor ed Survey LCHE alidation - esults of speed survey at two locations - Eastbound 30.0mph & 29.7mph Westbound 30.9mph & 27.6mph. ood compliance with posted 30mph speed limit. Copperfield oad is a Priority oute 2 and Dickens Place is a Local oad, traffic flow would be on the P2. Would be against policy ( Strategy) to hold up traffic on a P2. September Joint site visit carried out and new automatic traffic count carried out - 35m E of Nickle oad - 30mph limit - East bound mph & West bound mph. ood compliance to speed limit, some evidence of speeding during hours of darkness. oad is a Priority oute 2 and a miniroundabout would be against policy. Suggestion is to carry out oad Safety Assessment 12 Savernake oad near ossendale oad, eview of No Entry Point lor ed Feasibility Study LCHE ,000 alidation - ecommendation is to carry out Feasibility Study to look at physical measures to enforce No Entry Point 13 College, icarage oad, Pedestrian/vehicular to College Access Cars parking too close to College access and no defined pedestrian dropped kerbs lor ed Total LCHE ,500 alidation - Formalise crossing point, remove KEEP CLEA road marking and implement double yellow lines across junction 14 loucester Avenue nr j/w Brian Close Pedestrian Crossing Improvements Unable to recruit a School Crossing Patrol officer for site lor ed Total LCHE NA alidation - Degree of pedestrian conflict survey carried out and result of 0.102x10^8, does not meet criteria for pedestrain crossing 15 King Edward I rammar School and County High School for irls, Broomfield oad, From Feasibility Study - Improvements to kerbing/pedestrian guard rail and signage at pedestrian crossings lor ed Total LCHE ,000 From Feasibility Study Panel prefers combination of - Option 1 (ecommended) Enhanced oad Safety education for school children and Monitoring of crossing at school times. And Option 2 10,000 - kerbing/guard rail/signage 16 Leeford j/w Partridge Avenue, Parking Cars parking on verges lor ed Total LCHE NA alidation - parking restrictions would need to be considered Parking Partnership Page 4 of 16

5 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 17 Writtle oad j/w A1016 Westway, Pedestrian guard railing ehicles routinely driving over footway to access forecourt of Brandon Tool Hire lor ed Total LCHE ,500 In validation - Formalised vehicle crossing not approved, validation being progressed with pedestrian guard railing to stop vehicle movements 18 High Street, Improvements to Prohibition of Cycling Signage Cyclists using High Street esidents ed Total LCHE TBC Initial validation indicates that TO is enforceable but some could be made to TO signage. Awaiting results of Feasibility Study A 2017/18 Priority 19 North Avenue, Pedestrian crossing Difficult for pedestrians to cross road. lor ed Total LCHE TBC Awaiting results of Feasibility Study A 20 The Meades, Measures to prevent verge damage erge routinely being driven over at S/o 1 lor ed Total LCHE TBC Awaiting results of Feasibility Study A 21 Waterhouse Lane j/w Beeches oad and Forest Drive, Measures to improve traffic flows Difficulty for vehicles turning right onto Waterhouse Lane from Beeches oad/forest Drive esidents ed Total LCHE TBC Awaiting results of Feasibility Study A 2017/18 Priority 22 Church oad j/w Mashbury oad, Chignal St James No through road signage ehicles turning into road then unable to turn around Chignal Total LCHE TBC In validation 23 Chignal Hall Lane jw Mashbury oad, Chignal Smealy emove bennet junction Existing verge being overrun dragging mud onto road Chignal Smealy Feasibility LCHE ,000 alidation - Feasibility/design recommended into junction improvement options 24 Sporhams Lane, Danbury Width restriction on road, to prevent goods vehicles damaging verges ehicles damaging verges Danbury Total LCHE TBC In validation - need to await results of request for Quite Lane status 25 Bicknacre oad, Danbury Improvements to traffic warning signs esidents Danbury Feasibility LCHE ,000 alidation - Possible to traffic warning signs, requires Feasibility Study/Design 26 Well Lane to The Heights - Service oad, Danbury One-way road ehicles routinely parking/blocking service road Danbury Total LCHE TBC Awaiting results of feasibility study A 2017/18 Priority 27 S/o ita Bella, The Tye, East Hanningfield Footway widening works - kerbing/resurfacing to open up full width Narrow footway for pedestrians East Hanningfield Feasibility LCHE ,000 alidation - Feasibility Study into footway widening to consider extent of highway, statutory undertakers apparatus and fully any proposal Page 5 of 16

6 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 28 The Tye (nr j/w Old Church oad/main oad), East Hanningfield Kerbing and verge reinstatement ehicles over running verge and causing damage East Hanningfield Design LCHE ,000 alidation - Kerbing introduced previously on western side of road. ecommendation is for detailed design, obtaining statutory undertakers apparatus drawings and road safety audit. This will provide a feasible design and an accurate target 29 Old Church oad, Near Back Lane, East Hanningfield Concealed entrances to properties East Hanningfield Total LCHE NA alidation - 40mph speed limit Northeast bound 31.3mph and South bound 29.6mph, good speed compliance. No reported accidents, No concealed entrance sign within TSD. 30 Pryors oad, alleywood Measures to stop vehicles driving along independent footway Car routinely driving along footway lor alleywood Total LCHE ,000 alidation - lockable bollards could be feasible CHE/10/ , School oad, ood Easter 7.5T environmental weight limit oods vehicle using route as an alternative route damaging road ood Easter Surveys LCHE ,000 alidation - eintroduced to Panel - Speed/volume data shows H's usage very low. Unsuitable for H signage considered as unsuitable as this road is similar to others in the vicinity and could lead to excessive blue signs. have asked for to be considered the Panel. Next would be for H Origin and Destination Survey using Automatic Number Plate ecognition cameras 32 Chelwater, reat Baddow Speed of vehicles on access road and existing street lighting lor reat Baddow Survey LCHE ,500 alidation - This is an access road to a small group of properties. In first instance any speeding issues should be raised through Police. A street lighting survey could be carried out to determine lux levels of existing lights to see if they are emitting enough light, if not it could be a maintenance issue to upgrade the lighting heads 33 alleywood oad nr jw Pertwee Drive reat Baddow Pedestrian crossing Issues with pedestrians trying to cross alleywood oad, especially when trying to access bus stop reat Baddow Total LCHE TBC In validation - needs P² survey when funding permits 34 Bell Street, reat Baddow Footway Lack of footway reat Baddow Total LCHE TBC In validation 35 Church Street/High Street/icarage Dropped kerb Lane, reat Baddow Lack of crossing points reat Baddow Total LCHE TBC In validation 36 Maldon oad, reat Baddow Dropped kerb Improvements to existing crossing point reat Baddow Total LCHE TBC In validation Page 6 of 16

7 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 37 The Bringey, reat Baddow Pedestrian guard railing at Baddow Hall Junior School Pedestrians exiting school in possible conflict with vehicles lor reat Baddow Total LCHE TBC In validation - School pedestrian entrance is off a Public ight of Way (Footpath 20) with agreement of land owner staggered barriers could be put in front of school entrance. Need to establish who owns land between footpath and school 38 Cole Hill, reat Leighs lor reat Leighs Total LCHE TBC In validation - Speed data 60mph limit, South bound 35.3mph & North bound 35.1mph 39 Hatchfields, reat Waltham Parking lay- Lack of parking within illage reat Waltham Total LCHE ,000 alidation - Suggested area for parking is owned, who could create parking on this land subject to any necessary planning/highway agreements needed. Limited parking restrictions within illage. Could carry out Feasibility Study at 3,000 but s could be very high and would need any land dedicated as highway 40 B1008 Ford End 40mph buffer on approaches to illage reat Waltham Total LCHE TBC In validation - Speed data - South of illage, oad 60mph Southeast bound 41.5 mph & Northwest bound 44.2 mph and North of illage Main oad 60mph East bound 39.9mph & West bound 37.5 mph 41 Ford End - Outside Ford End C of E Primary School Pedestrian refuge island reat Waltham Total LCHE NA alidation - 10m of carriageway width required for pedestrian. refuge island. At this location 6.2m carriageway and 3.3m of footway. Would require private land over significant length to realign road to accommodate suggested works. Could undertake a feasibility study at 5k but s including land acquisition could be very high. 42 Ford End C of E Primary School, B1008, Ford End Advisory 20mph speed limit with Wig-Wag flashing lights reat Waltham Total LCHE ,000 Cabinet Member has agreed can be implemented CHE/10/722-3, Highwood oad Edney Common to Loves reen, including St Pauls Church Pedestrian footway - 1.2m walkable verge, crossing point at Highwood oad and removal of informal lay at St Paul's Church, estimated 105,000 next detailed design Lack of footway/walkable verge Highwood Design LCHE ,500 Technical Note (ing 4,000) previously shared with Panel March 2015 Page 7 of 16

8 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 44 The idge jw unsell Lane and Fir Tree Lane and Holybread Lane, Little Baddow Speed Indictor Poles (x3) and Speed Indicator Device on rotation To remind traffic of 30 mph speed limit Little Baddow Total LCHE ,000 alidation - Three speed surveys North Hill (N) Lt Baddow (60m N of The odney PH) South mph & North mph The idge (mid) Lt Baddow South mph & North mph The idge (s) Lt Baddow South mph & North mph. Speeds do not meet criteria for a SID. ecommendation is to review of size/number of speed limit repeater signs 45 Brook Hill/The Street, Little Waltham Little Waltham Total LCHE TBC In validation - The Street - Speed data 30mph North site - South bound 20.7mph & North bound 20.2mph, South site - South bound 27.6mph & North bound 27.3mph. Brook Hill - Speed data 30mph - Southeast bound mph & Northwest bound 27.4mph 46 Chatham reen, Little Waltham 30mph speed limit through Hamlet Little Waltham Total LCHE ,000 alidation - Speed data Chatham reen 60 mph South bound 21.1mph & North bound 19.8 ph - Feasible to implement a 30mph speed limit but there would need to be 30mph signs at either end of the new limit and repeater signs along the new limit, Change in speed limit would also require a formal consultation where objections may be made. 47 Bridge over iver Crouch, Hawk Hill, Battlesbridge Signalisation of working over bridge Frequently two cars try to cross bridge at same time causing a "face to face" stand off in middle of bridge ettendon Feasibility LCHE ,000 alidation - Signalisation of bridge could 160k, it is first advised to carry out oad Safety Assessment of proposal to address any safety concerns/risks of signalisation. ecommendation to monitor to signage on bridge 48 Woodham oad (service road nr ettendon AB) ettendon Carriageway ehicles routinely "bottoming out" when turning into service road lor ettendon Total LCHE NA alidation - any improvement would involve extending entrance into carriageway, requiring major junction realignment which could exceed LHP budget 49 A132 Burnham oad, ettendon, O/s Hayes Country Park Lack of bus service to esidential Park and pedestrian crossing facilities esidents ettendon Total LCHE TBC In validation - Awaiting results of A131 oute Based Strategy 50 icarage oad, Skreens Park oad and Stonehill oad, oxwell illage ateway treatments oxwell Total LCHE TBC In validation - needs three automatic traffic counts when funding permits Page 8 of 16

9 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 51 Brock Hill nr jw Wavereley Crescent, Widford near junction unwell Total LCHE ,000 alidation - ecommendation to install junction warning signs and SLOW road markings 52 Woodhill oad (S/O Sandon School), Sandon Bollards to prevent verge parking ehicles parking on footway Sandon Total LCHE ,500 alidation - Against Officer recommendation Bollards/footway could relocate parking problem further down the road towards a bend 10/00002/FU L Sporhams Lane, Sandon Suggestion to be classified as a Quiet Lane Narrow lane, often used as a "rat run" or short cut Sandon Total LCHE TBC In validation - awaiting impact of five Quiet Lanes currently being implemented in County 54 School oad (Crowsheath Lane to illage Hall), Downham within 30mph speed limit South Hanningfield Total LCHE ,000 alidation - 30mph speed limit, Southeast bound 33.5mph and Northwest bound 33.5mph. ecommendation was to carry out Feasibility Study into traffic calming options. Further validation work now recommends three illage gateway treatments and size/frequency to existing 30mph speed limit repeater signage 55 Marsh Farm oad, South Woodham Ferrers H's using car park at the end of Marsh Farm oad Town South Woodham Ferrers Total LCHE ,500 alidation - Unsuitable for H signage could be considered 56 Lawn Lane near junction with Orford Crescent, Springfield Improved pedestrian crossing facilities Pedestrians having difficulties crossing lor Springfield Total LCHE TBC In validation - Degree of pedestrian conflict survey carried out results 0.482x10^8 feeding into validation process. Existing tree currently obscure sight line. Need to carry out new P² at adjacent crossing point 60m north of this location when funding permits 57 O/s 322 Springfield oad, Springfield Improvements to esidents On Street Parking area Parked vehicles routinely being damaged lor Springfield Total LCHE ,000 alidation - eview of road markings and implement more suitable. Could be possible to remove centre hatching near parking bay and introduce single centre line to show road narrows 58 Beaulieu Park, Springfield Enhancements to existing 20mph zone - epeater signs/roundels within 20mph zone Springfield Total LCHE TBC In validation - Speed data Beaulieu Boulevard 20mph S bound 21.2mph & N bound 20.8mph, Shardelow Avenue 20mph E bound 15.5mph & W bound 17.7mph 59 Pump Lane nr j/w ushleydale, Springfield Measures to stop cars loosing control eports of vehicle damage to walls lor Springfield Total LCHE NA alidation - Does not meet accident cluster criteria for intervention, as only one slight injury collision in last 3 year period. 60 O/s Shelley oad, Extension of parking bays Insufficient parking for residents cars lor Springfield Total LCHE TBC In validation 61 Canvey Walk j/w FP 46, Improvements Conflict between pedestrians/cyclist on footpath and vehicles lor Springfield Total LCHE TBC In validation Page 9 of 16

10 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 62 Tyrells School, Springfield - Tavistock d/bodmin d/taunton d, Springfield 20mph zone lor Springfield Total LCHE TBC Awaiting results of Feasibility Study A 2017/18 Priority 63 Chancellor Avenue j/w Chelmer illage Way, Springfield Measures to prevent vehicles loosing control on roundabout and hitting adjacent wall ehicles loosing control on roundabout Springfield Total LCHE TBC Awaiting results of Feasibility Study A 2017/18 Priority 64 High Street, Stock oute enhancement study Stock Feasibility LCHE ,000 alidation - Feasibility Study suggested following request for 20mph speed limit/average speed camera 65 Brookmans oad jw Back Lane, Stock Bollards on verge to prevent verge damage ehicles damaging verge Stock Total LCHE ,000 alidation - Option 1 approach Parking partnership for junction protection parking restrictions, Option 2 reduce width of verge, install H overrun to allow easier turning for larger vehicles 66 Smallgains Lane nr j/w Longacre, Stock Speed reduction measures Stock Total LCHE TBC In validation - Speed data in 60mph limit, South bound 27.6mph & North bound 27.1mph 67 The Square j/w High Street, Stock Parking Lack of parking Stock Total LCHE TBC In validation - looking to fund design CHL/07/320-2, Hall Lane, West Hanningfield Suggestion to be classified as a Quiet Lane West Hanningfield Total LCHE TBC In validation - Speed data in 40mph limit NE mph/Average 82 vehicles a day and SW 25.7mph/Average 60 vehicles a day 69 Main oad nr jw Workhouse Lane, Woodham Ferrers - bend signage Speed of vehicles at bend/hill/cross roads lor Woodham Ferrers Total LCHE TBC In validation - Temporary 40mph speed limit in place. oad part of Capital Surfacing 10/00016/FU L - 1, Lordship oad j/w Fox Burrows Lane, Writtle Feasibility Study into junction/carriageway improvement ecommendation from oute Enhancement Study Writtle Feasibility LCHE ,000 ecommendation from oute Enhancement Study, suggestion is to await results of any future development on Fox Burrows Lane 71 Writtle College Main Access, Lordship oad, Writtle Feasibility Study into carriageway/footway /signing/lining/street lighting/verge Speed/volume of traffic Writtle Feasibility LCHE ,000 ecommendation from oute Enhancement Study Page 10 of 16

11 City Local Highway Panel - Potential list (ersion 34) ef Location Description Problem equested Comments A 72 Highwood oad, Edney Common to Loves reen 50mph speed limit Writtle Total LCHE ,000 alidation - Speed data - 60mph speed limit - 150m SW of A414 - Northeast bound mph & Southwest bound mph, 930m SW of A414 - South bound mph & 49.9mph, 560m Northeast of Nathans Lane - Northeast bound mph & Southwest bound mph. Based on speed data - 30mph limit near A414 not feasible as recorded speeds are too high, also environment of road would not assist a 30mph limit as properties not apparent to drivers. It could though be possible to consider a 50mph limit, which may reduce some of the higher speeds along the road 73 Lodge oad/bridge Street/The reen/st Johns reen, Writtle Concerns around junction Writtle Total LCHE TBC In validation - needs three P² surveys when funding permits 74 Hylands School, oad, Writtle Pedestrian crossing Pedestrian difficulty in crossing road Writtle Total LCHE NA alidation - Degree of pedestrian/vehicle conflict survey 0.247x10^8 but would not meet National guidelines for installation of a signalised crossing CHE/10/ , Lordship oad/ongar oad/the Feasibility Study into junction reen/mayfield improvement oad/orchard Close, Writtle ecommendation from oute Enhancement Study Writtle Total LCHE TBC Awaiting results of Feasibility Study A 11/00081/FU L - 3,020 10/01635/FU L - 11, /18 Priority 76 Ongar oad j/w Eastview, Writtle Feasibility Study into junction carriageway improvement ecommendation from oute Enhancement Study Writtle Feasibility LCHE TBC Awaiting results of Feasibility Study A 2017/18 Priority Page 11 of 16

12 City Local Highway Panel - Potential list (ersion 34) Walking 0 ef Location Description Problem equested Comments A 1 Bicknacre oad, Overhsot Bridge to Poplar Farm, Danbury Walkable verge/footway Lack of footway/walkable verge Danbury Feasibility LCHE NA alidation - ecommendation was for 3,000 Feasibility Study to include video survey top establish pedestrian usage of verge/road. Update - no longer consider this a. Consideration should be given to footway on Penny oyal oad/mayes Lane. Page 12 of 16

13 City Local Highway Panel - Potential list (ersion 34) Cycling 792,640 ef Location Description Problem equested Comments A 19/10/17 Sub-roup Decision 1 Winsford Way, Boreham Creation of shared cycleway/footway eports of collisions between cyclists and vehicles Boreham Total NA alidation - No recorded personal injury accidents involving cyclists in last five years. Suggestion to cut back vegetation to open up full width of footway, possible highway rangers and enforcement of waiting restrictions. 2 Longstomps Cycleway, Create shared footway/cycleway Improvements to National Cycle oute 13, along busy section of Longstomps Cycling team ed Total 100,000 Not a within Cycling Action Plan 3 West Park, Install a 3.5m replacement bridge on existing alignment Design of replacement footbridge currently not part of Highways Network, which would need to be addressed Cycling team ed Design 65,000 alidated Cycling team 4 Springfield reen/timsons Lane Options to improve connection of existing routes Lack of connectivity Cycling team non ed Total 298,000 Priority for LHP in terms of Cycling Action Plan 5 Chelmer Park Cycle oute, Beehive Lane, alleywood Shared footway/cycleway on Beehive Lane between Skinners Lane and Chelmer Car Park Lack of cycle network connectivity to alleywood Cycling team alleywood Design 227,000 Priority for LHP in terms of Cycling Action Plan 6 Church Lane j/w Lawn Lane, Springfield Phase 1 - Cycle link/junction - Warning signs & advisory cycle lane across junction Need for cycling Safer roads team Springfield Total 8,500 Draft Design presented at June 2017 Panel meeting Priority 7 Church Lane j/w Lawn Lane, Springfield Phase 2 - Cycle link/junction - 3m shared cycleway across Park Need for cycling Safer roads team Springfield Total 86,000 Draft Design presented at June 2017 Panel meeting Priority 8 Writtle Cycle oute, Writtle Solar lights/studs at 10m intervals Mainly rural unlit route Cycling team Writtle Total 8,140 Priority for LHP in terms of Cycling Action Plan Priority Page 13 of 16

14 City Local Highway Panel - Potential list (ersion 34) School Crossing Patrols 0 ef Location Description Problem equested Comments A Section Kings oad Primary School on Corporation oad, Bollards on service road to be relocated to prevent parking Crossing Patrol improvement School Crossing Patrol team ed Total LCHE TBC Awaiting results of Feasibility Study A Priority Page 14 of 16

15 City Local Highway Panel - Potential list (ersion 34) Passenger Transport 66,000 ef Location Description equested Category Comments A 19/10/17 Sub-roup Decision 1 Stop Name Prison, Springfield oad, eal time passenger information Passenger Transport team ed Passenger Transport LCHE ,000 alidated Passenger Transport team - This is a top up request to existing 8k funding of this emove from PSL 2 Bus Station, Duke Street, Measures to improve bus/pedestrian safety Bus Provider ed Passenger Transport LCHE ,000 alidation - Feasible to install approx.30m of pedestrian guard rail. As Duke Street is in a conservation area guard railing would need to reflect this (ornate/painted black) 3 The Street, nr Winkford Close, Little Waltham eplacement bus shelter reat Waltham Passenger Transport LCHE ,000 alidated Passenger Transport team 4 Metsons Lane, Highwood Upgrade bus stops - aised kerbs and dropped crossing point Passenger Transport team Highwood Passenger Transport LCHE ,000 alidated Passenger Transport team 5 Nr Allotments Blasford Hill, Little Waltham KEEP CLEA road marking in existing bus stop Little Waltham Passenger Transport LCHE ,000 validated Passenger Transport team 6 Heath oad, amsden Heath eplacement bus shelter amsden Heath Passenger Transport LCHE ,500 alidated Passenger Transport team - includes removal of existing shelter, new base and then new shelter 7 Stop Name Woodham Hall, Main oad, Woodham Ferrers New wooden bus shelter Woodham Ferrers Passenger Transport LCHE ,000 alidated By Passenger Transport Team 8 Lordship oad, Writtle Pair of bus stops, raised kerbs flags/poles Passenger Transport team Writtle Passenger Transport LCHE ,500 alidated Passenger Transport team Page 15 of 16

16 City Local Highway Panel - Potential list (ersion 34) Public ights of Way 107,000 ef Location Description Problem equested Comments A Section /10/17 Sub-roup Decision 1 reat Baddow Footpaths 11, 12 & 67 Clear blocked ditches/culverts, removed vegetation, level/edge and lay all weather surfacing Unsurfaced paths now well used urban footpaths within housing estates, provides access to schools/shops/bus routes. PoW team reat Baddow Total LCHE ,000 alidated Public ights of Way team Priority 2 PoW network, reat & Little Leighs Improvement measures to PoW signage and bridge More signs to keep walkers on PoW network and bridge improvement to British Accessibility Standards PoW team reat Leighs Total LCHE ,000 alidated Public ights of Way team Priority 3 reat Leighs Footpath 41 (Part of The Essex Way) Surfacing and Drainage Water meadow/natural springs affecting a well used PoW PoW team reat Leighs Total LCHE ,000 alidated Public ights of Way team 4 Little Waltham Footpath 28 Surfacing and Drainage - 365m length and average 2m width Path is routinely very muddy throughout the year PoW team Little Waltham Total LCHE ,000 alidated Public ights of Way team 5 Bridleway 10, Mill Lane amsden Heath Bridleway 10 South Hanningfield Surface Improvements Boggy and uneven surface in sections makes bridleway a difficult route to follow for some users PoW team South Hanningfield Total LCHE ,000 alidated Public ights of Way team 6 Footpath 63, South Hanningfield Footpath surface with planings Footpath surface in need of improvement PoW team South Hanningfield Total LCHE ,000 alidated Public ights of Way team Page 16 of 16

CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 36)

CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 36) CHELMSFORD CITY LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 36) This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the City Local Highways

More information

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme /18

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme /18 CHELMSFORD CITY LOCAL HIHWAY PANEL Approved Works Programme - 2017/18 At the September 2017 meeting of the Chelmsford City Local Highways Panel (LHP) the Panel decided to from a Sub-roup to consider scheme

More information

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update The following report provides an update on the current position of all of the schemes which the Chelmsford City Local Highway

More information

There will be a buffet lunch available for Panel Members and officers from 12.30

There will be a buffet lunch available for Panel Members and officers from 12.30 MEETIN OF THE CHELMSFORD LOCAL HIHWAYS PANEL 26 TH JANUARY 2016 COUNCIL CHAMBER, CHELMSFORD CITY COUNCIL COMMENCIN AT 13.00 There will be a buffet lunch available for Panel Members and officers from 12.30

More information

Chelmsford City Local Highways Panel - Approved Works Programme (December 2016) Type. 2013/14 Approved. 2014/15 Approved.

Chelmsford City Local Highways Panel - Approved Works Programme (December 2016) Type. 2013/14 Approved. 2014/15 Approved. Approved s - Designs & Feasibility Studies City Local Highways anel - Approved Works rogramme (December 2016) Key Completed Cancelled Update Ref. No. Task Name arish Finish CMA Approved Cost Code Type

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Local Highway Panels Members Guide. 5 Crossing Facilities

Local Highway Panels Members Guide. 5 Crossing Facilities Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross

More information

CHELMSFORD CITY LOCAL HIGHWAY PANEL. Approved Works Programme June Design & Feasibility Studies

CHELMSFORD CITY LOCAL HIGHWAY PANEL. Approved Works Programme June Design & Feasibility Studies CHELMSFORD CITY LOCAL HIHWAY PANEL Approved Works Programme June 2016 Design & Feasibility Studies Since the 2016/17 capital recommendations at the March Panel meeting, Officers have been working to set

More information

Bramshaw traffic calming proposal

Bramshaw traffic calming proposal - 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 5 South and East Chelmsford July - August 27 Chelmsford City Growth Package Contents Introduction 5 Army and Navy Roundabout Improvements:

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management 90,000 Ref Location Description Requested by Scheme Category Scheme stage Cost Code Estimated cost Comments RA London Road, Wickford close to no 63 2 Twinstead, Wickford 3 4 5 6 7 B48 Westmayne / Ford

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 1 North Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 1 - North Chelmsford Contents

More information

COLCHESTER BOROUGH COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 14 TH December /18 POTENTIAL SCHEMES LIST

COLCHESTER BOROUGH COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 14 TH December /18 POTENTIAL SCHEMES LIST COLCHESTER BOROUH COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIHWAY PANEL 14 TH December 2017 2017/18 POTENTIAL SCHEMES LIST Summary of schemes on current Potential s List: Potential s Budget Summary 18,500

More information

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Local Highway Panels Members Guide. 2 Speed and Traffic Management Local Highway Panels Members Guide 2 Speed and Traffic Management 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Following the publication of the DfT guidance on setting local speed

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Appendix A Type of Traffic Calming Measures Engineering Solutions

Appendix A Type of Traffic Calming Measures Engineering Solutions Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

TIP Scheme List Huntingdonshire

TIP Scheme List Huntingdonshire Scheme List 2018 - Huntingdonshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 265 T A1096 junction capacity enhancements Highway Capacity Improvements LTTS around

More information

Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RAG. Waltham Abbey/Nazeing

Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RAG. Waltham Abbey/Nazeing Speed Surveys do not indicate a speeding issue. Two surveys were completed in January 2018 1 Woodside, Thornwood - Traffic calming equest for traffic calming along Woodside Concerns that vehicles are travelling

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

Improving Thetford Cycling Provision. In and Around Thetford

Improving Thetford Cycling Provision. In and Around Thetford Improving Cycling Provision In and Around Thetford Presentation to Thetford Town Council July 2015 About Me Lecturer in Mathematics at the University of East Anglia Keen recreational cyclist Volunteer

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Easton Safer Streets - Final Project Report BRISTOL

Easton Safer Streets - Final Project Report BRISTOL - Final Project Report BRISTOL A Sustrans Community Street Design Project in partnership with Bristol City Council February 07 About Sustrans Sustrans makes smarter travel choices possible, desirable and

More information

Process for managing parking on verges, footways and footpaths

Process for managing parking on verges, footways and footpaths Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS. CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from

More information

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations

Entry Treatments. Traffic Advisory Leaflet 2/94 August Introduction. Design. Vertical Deflections. Locations Traffic Advisory Leaflet 2/94 August 1994 Entry Treatments Introduction Entry treatments have been developed for use at side roads so that drivers leaving a major road are in no doubt that they are entering

More information

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP SUMMARY OF FINDINGS AND PRIORITIES PARKING There was a high level of response to this topic which included many aspirations to provide car parking near to

More information

Audit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection

Audit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection Audit No. RSA 2199 Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection 1 1.0 INTRODUCTION 1.1 This report results from a Stage 1 Road Safety Audit for a highways

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

Appendix 12 Parking on footways and verges

Appendix 12 Parking on footways and verges Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires

More information

Appendix 11 Barton Greenway Review

Appendix 11 Barton Greenway Review Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE 165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager

More information

A guide to how local communities can change local speed limits

A guide to how local communities can change local speed limits A guide to how local communities can change local speed limits The Council s approach to speed management Speeding continues to be one of the key road safety concerns being raised by local communities.

More information

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /

More information

Sevenways Roundabout, and the need for a Road Safety Scheme:

Sevenways Roundabout, and the need for a Road Safety Scheme: Sevenways Roundabout, and the need for a Road Safety Scheme: The way the current roundabout has evolved has obviously created an environment that is dangerous for all road users, motorists, cyclists and

More information

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments

More information

Local Highway Panels Members Guide 11 Quiet Lanes

Local Highway Panels Members Guide 11 Quiet Lanes Local Highway Panels Members Guide 11 Image courtesy of Ian Dunster 2 Local Highway Panels (LHP) Members Guide 2018./19 1. Introduction Local authorities are able to designate country lanes as in rural

More information

Glebe Neighbourhood Cycling Plan

Glebe Neighbourhood Cycling Plan Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling

More information

Local Highway Panels Members Guide. 4 Signs & Road Markings

Local Highway Panels Members Guide. 4 Signs & Road Markings Local Highway Panels Members Guide 4 Signs & Road Markings 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Road Signs and Road Markings on the public highway are governed by legislation.

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

Walk Description. Directions

Walk Description. Directions Title: Saffron Trail: Battlesbridge to Chelmsford Distance: 14¾ miles Time taken: 6 hours Start Point: Outside the Barge Inn, Battlesbridge OS Explorer Map: 175 & 183 Grid Ref.: TQ 780 947 Transport: Rail:-

More information

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Have your say on the transformation of Oxford Street West

Have your say on the transformation of Oxford Street West Have your say on the transformation of Oxford Street West About Living Streets We are Living Streets, the UK charity for everyday walking. We want to create a walking nation, free from congested roads

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48 Street Lighting Section Unique Reference: o. 48 Traffic Assets Section Report o 48 Reviewer: Ellie Briggs, BEng (Hons) CEng MICE Highway Classification / umber Road / Street ame: District / Settlement:

More information

Collision Site Investigation - Bodenham By-Pass Background

Collision Site Investigation - Bodenham By-Pass Background Collision Site Investigation - Bodenham By-Pass Background The junction of the C12 and A338 was the subject of a Local Safety Scheme (LSS) in 2011. Analysation of the collisions at the time revealed the

More information

Cuddington Traffic Calming

Cuddington Traffic Calming Buckinghamshire County Council Cuddington Traffic Calming PRIV18003 / FEA / DOC / 01 June 2018 Ringway Jacobs Ltd Harling House 47-51 Great Suffolk Street London SE1 0BS Tel: 02079604040 Fax: 02079604051

More information

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication

More information

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street

1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street 1. TRANSFORM CITY ROAD WEST INTO A GREAT CENTRAL city street Understanding City Road West City Road West (between Clarendon Street and ower Street) is a local street, and can be significantly enhanced

More information

road safety issues 2001 road toll for Gisborne district July 2002 Road user casualties Estimated social cost of crashes*

road safety issues 2001 road toll for Gisborne district July 2002 Road user casualties Estimated social cost of crashes* GISBORNE DISTRICT road safety issues July 22 The Land Transport Safety Authority (LTSA) has prepared this Road Safety Issues Report. It is based on reported crash data and trends for the 1997 21 period.

More information

Swamp Road Residents Study

Swamp Road Residents Study Swamp Road Residents Study SRRG Meeting with PennDot and Elected Officials Newtown and Wrightstown, PA April 25, 2008 Newtown Township Section of Swamp Road Limited Public Funds No reconstruction of a

More information

Perne Rd / Radegund Rd Roundabout Cambridge

Perne Rd / Radegund Rd Roundabout Cambridge Perne Rd / Radegund Rd Roundabout Cambridge The conversion of an conventional urban roundabout to continental geometry A little bit of history The first traffic roundabout was built in Sollershott, Letchworth

More information

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Traffic signs Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Although The Highway Code shows many of the signs commonly in use,

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements

Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements Road Safety in Radyr and Morganstown: the Community Council's response to Cardiff Council's draft scheme layout for highway improvements Introduction Radyr and Morganstown Community Council has been invited

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave.

Rideau Canal Corridor Pedestrian Crossing Study. Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Rideau Canal Corridor Pedestrian Crossing Study Queen Elizabeth Dr.: Preston St. to Laurier Ave. & Colonel By Drive: Hog s Back to Daly Ave. Background: Canal parkways evolved over past 100 years Today

More information

Traffic Calming Regulations

Traffic Calming Regulations Traffic Advisory Leaflet 7/93 August 1993 Traffic Calming Regulations Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures which are self-enforcing.

More information

TRAFFIC ADVISORY LEAFLET

TRAFFIC ADVISORY LEAFLET TRAFFIC ADVISORY LEAFLET 2/04 Rural traffic calming: Bird Lane, Essex INTRODUCTION Many rural communities are concerned about traffic growth and high vehicle speeds. Local authorities have to balance the

More information

TIP Scheme List East Cambridgeshire

TIP Scheme List East Cambridgeshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 454 P Soham Railway Station Rail Improvement LTTS + 455 P Ely area rail infrastructure improvements Rail Improvement

More information

BYRES ROAD: PUBLIC REALM Public Consultation

BYRES ROAD: PUBLIC REALM Public Consultation Public Consultation Introduction As a vibrant commercial, shopping and residential location within the heart of the West End Byres Road is an important destination. Its proximity to the University of Glasgow

More information

Traffic calming regulations (Scotland)

Traffic calming regulations (Scotland) Traffic Advisory Leaflet 11/94 December 1994 Traffic calming regulations (Scotland) Introduction Traffic calming can help drivers to make their speeds appropriate to local conditions, through measures

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

National Cycle Network Route 81 Wolverhampton Cross City Route August 2005

National Cycle Network Route 81 Wolverhampton Cross City Route August 2005 Page 12 Buses often stop in Lichfield Street and there is no space to pass. Should an NCN route be following a road which is heavily congested with buses and diesel fumes? 14. Railway Drive The dropped

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Residential Traffic Calming Program Guide. Town of Ashland, Virginia

Residential Traffic Calming Program Guide. Town of Ashland, Virginia Residential Traffic Calming Program Guide Town of Ashland, Virginia August 1, 2006 TABLE OF CONTENTS A. INTRODUCTION... 1 B. GOALS... 1 C. CRITERIA... 1 D. IDENTIFYING NEIGHBORHOOD TRAFFIC CONCERNS...

More information

AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d BRIEFING NOTE B4219 COWLEIGH ROAD, STORRIDGE (ADL REF: 3409/09 NOVEMBER 2017)

AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d BRIEFING NOTE B4219 COWLEIGH ROAD, STORRIDGE (ADL REF: 3409/09 NOVEMBER 2017) AD L T r a f f i c a n d H i g h w a y s E n g i n e e r i n g L t d ADL House, Oaklands Business Park, Armstrong Way, Yate, Bristol, BS37 5NA Tel: 01454 332 100 Fax: 01454 327 983 Email: cad@adltraffic.co.uk

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

Cycling Safety Review. (April 2017)

Cycling Safety Review. (April 2017) Cycling Safety Review (April 2017) Background Analysis of STATS19 database: - Only includes incidents where police were in attendance, or where the crash was subsequently reported to the police - Significantly

More information

to the Public Information Centre for the Downtown Traffic Study

to the Public Information Centre for the Downtown Traffic Study to the Public Information Centre for the Downtown Traffic Study City of Sault Ste. Marie July 25, 2018 Purpose of Study Determine if changes to one-way corridors can enhance downtown s character and spaces

More information

Part B Design Guidance / Principles _

Part B Design Guidance / Principles _ Part B Design Guidance / Principles www. landlab.co.nz Queenstown Town Centre Public Realm Design Guidelines Version 7 14 June 2018 Page 006 B1 Design Guidance & Best Practice The Queenstown Town Centre

More information

Agenda Item 34. N11 - Brewery Road Improvement Scheme

Agenda Item 34. N11 - Brewery Road Improvement Scheme Agenda Item 34 N11 - Brewery Road Improvement Scheme Public Consultation Report on Submissions Client: Dún Laoghaire-Rathdown County Council Date: November 2017 Job Number: 13_066A Document Pack Page 11

More information

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Introduction. Prince Street Cycling Ambition Fund Public Realm Project Introduction The (CAF) project will create a high quality, 8-80 s cycle route up the west side of Prince Street from Cumberland Road, over Prince Street bridge to the Centre. This is part of the City Centre

More information

MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ

MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ Dear Councillors, Please find enclosed additional papers

More information

How do we design for pedestrians? Case study: transforming the Walworth Road

How do we design for pedestrians? Case study: transforming the Walworth Road How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design

More information

Lea Bridge Road A street for everyone Tell us

Lea Bridge Road A street for everyone Tell us Lea Bridge Road A street for everyone Tell us Public consultation document Section H your views 1 Lea Bridge Road: a street for everyone Introduction Mni-Holland is an exciting programme to improve walking

More information

Forest Hills Improvement Initiative

Forest Hills Improvement Initiative Forest Hills Improvement Initiative Transportation Action Plan Short Term Recommendations ONLY Final Draft as of April 30, 2008 For Community Review and Feedback Prepared for: The City of Boston Boston

More information