1 Functional Design Report Route 28 Chatham Roadway Improvements Project No Prepared for Massachusetts Department of Transportation Town of Chatham, Massachusetts Prepared by Howard/Stein-Hudson Associates, Inc. February 204 Howard/Stein-Hudson Associates, Inc. CREATIVE SOLUTIONS EFFECTIVE PARTNERING

2 Contents Introduction... Study Area... 2 Existing Conditions... 4 Existing Roadway Conditions... 4 Study Area Roadways... 4 Existing Traffic Conditions... 5 Study Area Intersections... 5 Daily Traffic Estimates... 6 Peak-hour Intersection Turning Movements... 6 Intersection Operations Analysis... 2 Safety Analysis Pedestrians Bicycles Future Conditions No-Build Conditions (2023) Estimation of Future (2023) Traffic Volumes Intersection Operations Analysis Build Conditions (2023) Route 28 Corridor Main Street (Route 28)/George Ryder Road Main Street (Route 28)/Barn Hill Road Proposed Alternative Intersection Operations Analysis Traffic Management Plan Overall Approach Conclusion Howard/Stein-Hudson Associates, Inc. i

3 List of Figures Figure. Locus Map & Study Area Intersections... 3 Figure 2. Route 28 Seasonal Variations (MassDOT )... 8 Figure 3. Traffic Count Locations... 9 Figure 4. Average Daily Traffic Variations, Main Street (Route 28), of George Ryder Road... 0 Figure 5. Average Daily Traffic Variations, Main Street (Route 28), of Barn Hill Road... Figure 6. Average Daily Traffic Variations, George Ryder Road... 2 Figure 7. Average Daily Traffic Variations, George Ryder Road South... 3 Figure 8. Average Daily Traffic Variations, Seaquanset Road... 4 Figure 9. Average Daily Traffic Variations, Barn Hill Road... 5 Figure 0. Average Daily Traffic Variations, Seasonal Comparison, Main Street (Route 28), of George Ryder Road... 7 Figure. Existing (203) Conditions Traffic Volumes, a.m. Peak Hour (8:30-9:30 a.m.)... 8 Figure 2. Existing (203) Conditions Traffic Volumes, p.m. Peak Hour (3:00-4:00 p.m.)... 9 Figure 3. Existing (203) Conditions Traffic Volumes, Saturday Mid-day Peak Hour (:5 a.m.-2:5 p.m.) Figure 4. Existing (203) Conditions Peak-hour Pedestrian Volumes Figure 5. Existing (203) Conditions Peak-hour Bicycle Volumes Figure 6. No-Build (2023) Conditions Traffic Volumes, a.m. Peak Hour Figure 7. No-Build (2023) Conditions Traffic Volumes, p.m. Peak Hour Figure 8. No-Build (2023) Conditions Traffic Volumes, Saturday Mid-day Peak Hour Figure 9. Proposed Alternative Figure 20. Build (2023) Conditions Traffic Volumes, a.m. Peak Hour Figure 2. Build (2023) Conditions Traffic Volumes, p.m. Peak Hour... 5 Figure 22. Build (2023) Conditions Traffic Volumes, Saturday Mid-day Peak Hour List of Tables Table. Average Weekday Traffic Volumes... 7 Table 2. Main Street (Route 28) ADT Comparison... 6 Table 3. Level of Service Criteria, Unsignalized Intersections... 2 Table 4. Synchro Adjustment Factors... 2 Table 5. Existing Conditions (203) Capacity Analysis Summary, a.m. Peak Hour Table 6. Existing Conditions (203) Capacity Analysis Summary, p.m. Peak Hour Table 7. Existing Conditions (203) Capacity Analysis Summary, Saturday Peak Hour Table 8. MassDOT Crash Data Summary ii Project No

4 Table 9. No-Build Conditions (2023) Capacity Analysis Summary, a.m. Peak Hour Table 0. No-Build Conditions (2023) Capacity Analysis Summary, p.m. Peak Hour Table. No-Build Conditions (2023) Capacity Analysis Summary, Saturday Mid-day Peak Hour Table 2. Build (2023) Conditions Capacity Analysis Summary, a.m. Peak Hour Table 3. Build (2023) Conditions Capacity Analysis Summary, p.m. Peak Hour Table 4. Build (2023) Conditions Capacity Analysis Summary, Saturday Peak Hour List of Appendices Appendix A.Traffic Count Data Appendix B.Traffic Analysis Reports Appendix C.Detailed Crash Data and Collision Diagrams Appendix D.Safety Issues Appendix E. Alternatives Matrix Howard/Stein-Hudson Associates, Inc. iii

5 Introduction This report presents the functional design for Route 28 (Main Street) in Chatham, Massachusetts. The project area includes Main Street between George Ryder Road and Barnhill Road including the intersections of these side streets and Route 28. The redesign of the specific project area is being done in accordance with the goals of the Town of Chatham s Comprehensive Long Range Plan and the Route 28 Corridor Visioning Study including providing for calm, but efficiently moving traffic, greening Route 28 to soften its highway-like feel, and improving bicycle and pedestrian accommodations in the area to create more of a walkable village in Chatham. Route 28 in Chatham has been the focus of substantial planning effort within the past decade and has been addressed specifically in the Town s Comprehensive Plan, the 2006 Chatham Grant Study, and in a planning study which began in 2009 and culminated in a project initiation form (PIF) submitted to MassDOT in the summer of 20. This document serves as the foundation for the current design work and details the data collection efforts to supplement the previous work along the corridor. With substantial analysis and input from the community, the design team developed its own plans based on that work. As part of the Chatham Roadway Design Project, the consultant team under the direction of the Town of Chatham has undertaken a thorough and far-reaching public involvement effort to ensure that the proposed improvements to Route 28 are in alignment with the wishes of community residents. This effort, begun in April, 203 has included both digital and face-to-face approaches. The digital aspect has centered on a project website which provides users with an overview of the project, contact information and materials such as PowerPoint presentations and meeting minutes developed to support face-to-face public involvement work. The digital outreach associated with this project has also been unique in that dozens of s running to hundreds of pages have been exchanged between community residents and the project team. To maximize transparency, all of these s have been posted to the project website with personal data such as addresses and telephone numbers redacted to ensure user privacy. On the face-to-face side, the Town s consultant team has conducted a series of one-on-one key informant interviews, held one public information meeting to kick off the project, appeared three times before the Chatham Board of Selectmen and engaged in one-on-one meetings with abutters with owning property on Route 28. In one form or another, the results of all these efforts have been posted to the project website to allow all residents of Chatham to have a full understanding of the project. The following functional design report presents the best design recommendation for the redesign of Main Street between George Ryder Road and Barn Hill Road in a manner which addresses the corridor s documented deficiencies and improves safety and access for all modes in a manner aligned with MassDOT s complete streets guidelines. This design proposes calming traffic through introducing roundabouts at Route 28/George Ryder Road and Route 28/Barnhill Road and reducing Route 28 to a two-lane cross section with design-standard shoulders. New and/or greatly improved bicycle and pedestrian accommodations will be introduced throughout the study area. During the early development of this design in fall 203, the consultant team coordinated its efforts with Town staff, particularly members of the police, fire and public works departments, and MassDOT staff from District 5 and headquarters in Boston. As such, Town staff members are comfortable with this design from the perspective of emergency response and snow removal. We are likewise confident that by obtaining early guidance from MassDOT we are submitting a 25% design which is in alignment with agency practice and goals. The standards used for analysis and signal design conform to the 2009 Manual on Uniform Traffic Control Devices (MUTCD 2009); the 2000 Highway Capacity Manual (HCM 2000); the American Association of State Highway and Transportation Officials (AASHTO) manual A Policy on Geometric Design of Highways and Streets, 5th Edition; and the MassDOT Project Development and Design Guide (2006). Howard/Stein-Hudson Associates, Inc.

6 Study Area The following three unsignalized intersections constitute the study area, as shown in Figure : Main Street (Route 28)/George Ryder Road/George Ryder Road South; Main Street (Route 28)/Seaquanset Road; and Main Street (Route 28)/Barn Hill Road. Additionally, 4 driveways along Route 28 and George Ryder Road corridors are also included in the study area and shown in Figure : Main Street (Route 28)/Market Place; Main Street (Route 28)/Hess Driveway; Main Street (Route 28)/Ocean State Job Lot; Main Street (Route 28)/Post Office/Local Color Drive ; Main Street (Route 28)/Local Color Drive ; Main Street (Route 28)/Cape Cod Healthcare/Residential Driveway; Main Street (Route 28)/D Angelo ; Main Street (Route 28)/D Angelo ; Main Street (Route 28)/Ollie s /Residential Driveway; Main Street (Route 28)/Ollie s ; Main Street (Route 28)/Shop Ahoy ; Main Street (Route 28)/Shop Ahoy ; George Ryder Road/Hess Driveway; and, George Ryder Road/Ocean State Job Lot. 2 Project No

7 Functional Design Report Route 28: Chatham Roadway Improvements Figure. Locus Map & Study Area Intersections U Unsignalized Intersection Project Area Driveways HESS GAS STATION GEORGE RYDER RD. OCEAN STATE JOB LOT U GEORGE RYDER RD. S. U SEAQUANSET RD. MAIN ST. (ROUTE 28) SHOP AHOY U BARN HILL RD. Not to scale. Howard/Stein-Hudson Associates, Inc.

8 Existing Conditions This section describes existing study area roadway geometry, intersection conditions with existing traffic volumes and intersection geometry, average daily traffic levels, and peak-hour vehicular volumes. Existing Roadway Conditions The intersections are the junctions of the following roadways, which are categorized according to MassDOT Office of Transportation Planning functional classifications: Study Area Roadways Main Street (Route 28) MAIN STREET is a principal arterial that is owned and maintained by MassDOT and runs in an eastwest direction from Shore Road in Chatham in the east to the Harwich Town line in the west. Main Street is a two-way roadway with one travel lane in each direction. Within the study area, Main Street varies between 36 feet and 40 feet wide with one travel lane in each direction and a two-way-left-turnlane in the center. Parking is prohibited along Main Street within the project area. A sidewalk is provided along the north side of the roadway within the study area even though a majority of the commercial uses are located on the south side of the roadway where no sidewalk is provided. The posted speed limit on Main Street is 40 mph within the study area, which is consistent with the speed regulations. George Ryder Road GEORGE RYDER ROAD is a local, town-owned road that runs in a north-south direction from Old Queen Anne Road in the north to Main Street in the south. Within the study area, George Ryder Road is a two-way roadway approximately 27-feet wide with one travel lane in each direction. No parking is provided along the roadway and there are no sidewalks provided for pedestrians. The eastern section of the Old Colony Rail Trail intersects George Ryder Road approximately,200 feet north of Main Street, where bicycles are provided shared on-street accommodation via sharrows for approximately,400 feet. The western section of the Old Colony Rail Trail intersects George Ryder Road approximately 2,600 feet north of Main Street. George Ryder Road South GEORGE RYDER ROAD SOUTH is a local, town-owned road that extends in a north-south direction from Main Street in the north to Sulphur Springs Road in the south. Within the study area, George Ryder Road South is a two-way roadway approximately 23-feet wide with one travel lane in each direction. Parking and sidewalks are not provided along the roadway. Seaquanset Road SEAQUANSET ROAD is a local, town-owned road that extends in a north-south direction from Main Street in the north to south of Geranium Drive before stopping at a dead-end. Within the study area, Seaquanset Road is a two-way road approximately 23-feet wide with one travel lane in each direction. No on-street parking or sidewalks are provided along the roadway. 4 Project No

9 Barn Hill Road BARN HILL ROAD is a local, town-owned road that runs in a north-south direction from Main Street in the north, ending at a marina in the south. Within the study area, Barn Hill Road is a two-way roadway approximately 24-feet wide and has one travel lane in each direction. In fall of 202, the Town installed a 6-foot wide multi-use path along the west side of the roadway from the Shop Ahoy Plaza driveway to Hardings Beach via Hardings Beach Road. No on-street parking is provided along the roadway in the vicinity of the study area. Existing Traffic Conditions Study Area Intersections Main Street/George Ryder Road/George Ryder Road South MAIN STREET/GEORGE RYDER ROAD/GEORGE RYDER ROAD SOUTH is a 4-leg, unsignalized intersection with 4 approaches. The Main Street eastbound and westbound approaches have a 7-foot shared left-turn/through/right-turn lane. Field observations indicate that motorists occasionally form two lanes in each direction to perform passing maneuvers due to the wide roadway. The George Ryder Road South northbound approach is unmarked with no center line and operates as a single shared leftturn/through/right-turn lane. The George Ryder Road southbound approach is offset approximately 60 west of George Ryder Road and has a 2-foot shared left-turn/through/right-turn lane. The George Ryder Road northbound and southbound approached operate under stop-control, while the Main Street approaches have free-flowing movements. Parking is not provided along any of the approaches. Crosswalks and wheelchair ramps are not provided across any of the approaches even though a sidewalk runs along the north side of Main Street. Main Street/Seaquanset Road MAIN STREET/SEAQUANSET ROAD is a 3-leg, unsignalized intersection with 3 approaches. The Main Street eastbound approach has one -foot general use lane. The Main Street westbound approach has a 2-foot general use lane. The eastbound and westbound directions of travel are separated by a 2-foot two-way-left-turn lane. The Seaquanset Road northbound approach has a 2-foot shared leftturn/right-turn lane. Seaquanset Road operates under stop-control at this location, while the Main Street eastbound and westbound approaches have free-flowing movements. A crosswalk is provided across Main Street on the west side of the intersection. Wheelchair ramps are not provided across any of the approaches. Main Street/Barn Hill Road MAIN STREET/BARN HILL ROAD is a 3-leg, unsignalized intersection with 3 approaches. The Main Street eastbound approach has an -foot shared through/right-turn lane. The Main Street westbound approach has a 3-foot shared left-turn/through lane. On the west side of the intersection, the Main Street eastbound and westbound directions of travel are separated by a 2-foot two-way-left-turn lane. The Barn Hill Road northbound approach has a 0-foot exclusive left-turn lane and a 2-foot exclusive right-turn lane, with a raised island separating the northbound and southbound movements at the intersection. A flashing beacon is located in the raised island. Barn Hill Road operates under stopcontrol at this location, while the Main Street eastbound and westbound approaches have free-flowing movements. Parking is not provided along any of the approaches. A crosswalk is provided across Main Street approximately 00 feet west of the intersection. Wheelchair ramps are not provided. Howard/Stein-Hudson Associates, Inc. 5

10 Daily Traffic Estimates Through the MassDOT traffic count database, there are 2 locations on Route 28 that have permanent count station information for a 5 year period between 2005 and 2009: Route 28 in Yarmouth, east of Higgins Crowell Road, and Route 28 in Barnstable, east of Putnam Avenue. As shown in Figure 2, Route 28 in the Cape Cod region has a spike in traffic in the months of June, July, and August. Due to the significant seasonal peaking that the Cape Cod communities often see during the summer, the design team discussed preferred data collection times with the Town, MassDOT District 5, and the Cape Cod Commission (CCC). Through these discussions, it was recommended that counts be taken after Memorial Day, with preference to late June prior to the last day of school in order to capture elevated and above average conditions while avoiding the highest peak that occurs during the summer. To estimate daily traffic, Automatic Traffic Recorder (ATR) counts were recorded for 5 days from June 8, 203 to June 23, 203 at the following locations: Main Street (Route 28), of George Ryder Road; Main Street (Route 28), of Barn Hill Road; Barn Hill Road, South of Main Street (Route 28); George Ryder Road, North of Main Street (Route 28); George Ryder Road South, South of Main Street (Route 28); and, Seaquanset Road, South of Main Street (Route 28). Traffic count locations are shown in Figure 3. The data from Wednesday and Thursday were averaged to estimate the weekday daily traffic. Table summarizes existing traffic data including Average Daily Traffic (ADT), peak-hour percentage (K), and percent heavy vehicles (T). Average daily traffic variations for each roadway are shown in Figure 4 to Figure 9. 6 Project No

11 Table. Average Weekday Traffic Volumes Approach ADT K T 85 th Percentile Speed (mph) Main Street ( of George Ryder) bound 6,87 6.9% 5.2% 34 Main Street ( of George Ryder) bound 6, % 5.0% 34 Main Street ( of George Ryder) TOTAL 3, % 5.% Main Street ( of Barn Hill) bound 6, % 4.9% 32 Main Street ( of Barn Hill) bound 6,74 7.9% 6.5% 36 Main Street ( of Barn Hill) TOTAL 3, % 5.7% Barn Hill Road Northbound,55 8.4% 6.3% 3 Barn Hill Road Southbound,564 9.% 8.6% 3 Barn Hill Road TOTAL 3,5 8.7% 7.5% George Ryder Road Northbound,2 9.0% 5.8% 34 George Ryder Road Southbound,22 8.5% 5.5% 33 George Ryder Road TOTAL 2, % 5.6% George Ryder Road South Northbound % 2.% 24 George Ryder Road South Southbound % 3.0% 24 George Ryder Road South TOTAL % 2.5% Seaquanset Road Northbound 98.% 5.6% 22 Seaquanset Road Southbound 206.7% 4.9% 20 Seaquanset Road TOTAL 404.4% 5.2% ADT = Average Daily Traffic; K = Peak-hour Percentage; T = Truck Percentage. Howard/Stein-Hudson Associates, Inc. 7

12 Functional Design Report Route 28: Chatham Roadway Improvements Figure 2. Route 28 Seasonal Variations (MassDOT ) 35,000 30,000 Yearly Averge (Barnstable) Average Daily Traffic (veh/day) 25,000 20,000 5,000 0,000 Yearly Averge (Yarmouth) 5,000 Route 28 - Yarmouth Route 28 - Barnstable 0 Howard/Stein-Hudson Associates, Inc.

13 SEAQUANSET RD. Functional Design Report Route 28: Chatham Roadway Improvements Figure 3. Traffic Count Locations Turning Movement Counts: 7 a.m. - 7 p.m. Weekday & a.m. - 3 p.m. Saturday Turning Movement Counts: 8 - a.m. & 3-6 p.m. Weekday & a.m. - 3 p.m. Saturday GEORGE RYDER RD. ATRs: 5-Days GEORGE RYDER RD. S. MAIN ST. (ROUTE 28) BARN HILL RD. Not to scale. Howard/Stein-Hudson Associates, Inc.

14 Functional Design Report Route 28: Chatham Roadway Improvements Figure 4. Average Daily Traffic Variations, Main Street (Route 28), of George Ryder Road,400,200,000 Weekday bound Weekday bound Weekday TOTAL Saturday bound Saturday bound Saturday Total Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

15 Functional Design Report Route 28: Chatham Roadway Improvements Figure 5. Average Daily Traffic Variations, Main Street (Route 28), of Barn Hill Road,400,200,000 Weekday bound Weekday bound Weekday TOTAL Saturday bound Saturday bound Saturday Total Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

16 Functional Design Report Route 28: Chatham Roadway Improvements Figure 6. Average Daily Traffic Variations, George Ryder Road Weekday Northbound Weekday Southbound Weekday TOTAL Saturday Northbound Saturday Southbound Saturday TOTAL 250 Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

17 Functional Design Report Route 28: Chatham Roadway Improvements Figure 7. Average Daily Traffic Variations, George Ryder Road South Weekday Northbound Weekday Southbound Weekday TOTAL Saturday Northbound Saturday Southbound Saturday TOTAL 250 Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

18 Functional Design Report Route 28: Chatham Roadway Improvements Figure 8. Average Daily Traffic Variations, Seaquanset Road Weekday Northbound Weekday Southbound Weekday TOTAL Saturday Northbound Saturday Southbound Saturday TOTAL 250 Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

19 Functional Design Report Route 28: Chatham Roadway Improvements Figure 9. Average Daily Traffic Variations, Barn Hill Road Weekday Northbound Weekday Southbound Weekday TOTAL Saturday Northbound Saturday Southbound Saturday TOTAL 250 Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

20 Additional ATR counts were recorded on Main Street, east of George Ryder Road, on April 25, 203 and August 22, 203. These counts were taken to capture the volume of traffic during the peak and off-peak season. Table 2 shows a comparison of the counts taken on Main Street during each of the 3 time periods. Figure 0 illustrates the comparable seasonal volumes by hour. Table 2. Main Street (Route 28) ADT Comparison Approach April 203 June 203 August 203 Main Street ( of George Ryder) bound 4,82 6,87 8,077 Main Street ( of George Ryder) bound 4,442 6,805 8,507 Main Street ( of George Ryder) TOTAL 8,624 3,622 6,584 An average weekday traffic volume in the month of June is approximately 37% higher than an average weekday in the month of April; and average weekday in the month of August is approximately 8% increase from an average weekday in the month of June. Peak-hour Intersection Turning Movements Manual Turning Movements Counts (TMCs) were collected for all intersections in the study area during the morning (8:00 - :00 a.m.) and evening (3:00-6:00 p.m.) peak periods on June 9, 203, performed by Accurate Counts. Saturday (:00 a.m. - 3:00 p.m.) peak period counts were performed at all intersections in the study area by Accurate Counts on June 22, 203. From the TMCs, the morning, evening, and Saturday Mid-day peak hours were determined to be 8:30-9:30 a.m., 3:00-4:00 p.m., and :5 a.m. - 2:5 p.m., respectively. The peak-hour volumes are shown in Figure, Figure 2, and Figure 3. All traffic count data can be found in Appendix A. 6 Project No

21 Functional Design Report Route 28: Chatham Roadway Improvements Figure 0. Average Daily Traffic Variations, Seasonal Comparison, Main Street (Route 28), of George Ryder Road,400,200 Weekday April Weekday June Weekday August Saturday June,000 Volume (veh/hour) Howard/Stein-Hudson Associates, Inc.

22 6 9 Functional Design Report Route 28: Chatham Roadway Improvements Figure. Existing (203) Conditions Traffic Volumes, a.m. Peak Hour (8:30-9:30 a.m.) HESS 0 92 George Ryder Road Main Street (Route 28) HESS Ocean State Job Lot Market Place Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive 5 2 George Ryder Road So Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

23 5 Functional Design Report Route 28: Chatham Roadway Improvements Figure 2. Existing (203) Conditions Traffic Volumes, p.m. Peak Hour (3:00-4:00 p.m.) HESS 6 89 George Ryder Road Main Street (Route 28) HESS Ocean State Job Lot Market Place Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive 0 4 George Ryder Road So Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

24 Functional Design Report Route 28: Chatham Roadway Improvements Figure 3. Existing (203) Conditions Traffic Volumes, Saturday Mid-day Peak Hour (:5 a.m.-2:5 p.m.) HESS 8 08 George Ryder Road Main Street (Route 28) HESS Ocean State Job Lot Market Place Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive 3 35 George Ryder Road So Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

25 Intersection Operations Analysis Traffic operations are determined through an analysis of intersection Level of Service (LOS) calculations. LOS at all locations was using Synchro 8.0, which is based on the traffic operational analysis methodology of the Transportation Research Board s 2000 Highway Capacity Manual (HCM). The LOS and delay (in seconds) are based on intersection geometry and traffic volume. Table 3 an excerpt from the HCM, provides LOS criteria for unsignalized intersections. LOS A defines the most favorable condition, with minimum traffic delay. LOS F represents the worst condition, with significant traffic delay. LOS D is generally considered acceptable for urban environments. Table 3. Level of Service Criteria, Unsignalized Intersections Level of Service Average Stopped Delay (sec./veh.) A B C D E F >50.0 Source: Highway Capacity Manual, Transportation Research Board. In accordance with MassDOT guidelines, the peak 5 minutes of data collected during the peak hour were isolated in order to calculate the peak-hour factors (PHFs) for each approach. The percentage of heavy vehicles was noted for each approach as well. Calibrations and factors used in the Synchro analysis are shown in Table 4. All capacity analyses were checked against actual conditions in the field. Table 4. Synchro Adjustment Factors Adjustment Factor Used in Analysis? Notes Lane widths Yes Measured in field Area type No Right turn on red No All unsignalized intersections Conflicting peds/bikes Yes Peak-hour factor Yes From turning movement counts Heavy vehicle % Yes From turning movement counts Bus blockages/hour No From field observations, the two-way-left-turn lane is not utilized by vehicles turning left from the side streets; therefore, the two-way-left-turn lane is analyzed as short left-turn lanes. Table 5, Table 6, and Table 7 summarize the existing LOS, delay, volume to capacity ratio, and queue analysis for all intersections during both the morning and evening peak hours. Synchro reports are provided in Appendix B. Howard/Stein-Hudson Associates, Inc. 2

26 Table 5. Existing Conditions (203) Capacity Analysis Summary, a.m. Peak Hour Intersection/Movement Delay V/C 50 th Percent 95 th Percent LOS (seconds) Ratio Queue (feet) Queue (feet) Study Area Intersections Main Street/George Ryder Road/George Ryder Road South Main EB left/thru/right A Main WB left/thru/right A George Ryder S. NB left/thru/right C George Ryder SB left/thru/right D Main Street/Seaquanset Road Main EB thru/right A Main WB left A Main WB thru A Seaquanset NB left/right C Main Street/Barn Hill Road Main EB thru/right A Main WB left/thru A Barn Hill NB left right C Study Area Driveways Main Street/Market Place Main EB thru/right A Main WB left/thru A Market NB left/right C Main Street/Hess Driveway Main EB left/thru A Main WB thru/right A Hess SB left/right B Main Street/Ocean State Job Lot Main EB left A Main EB thru A Main WB thru/right A Ocean State SB left/right C Main Street/Post Office/Local Color Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Post Office NB left/thru/right C Local Color SB left/thru/right B Main Street/Local Color Main EB left A Main EB thru A Main WB thru/right A Local Color SB left/right A Main Street/Cape Cod Healthcare/ Residential Driveway Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Cape Cod Health NB left/thru/right A Driveway SB left/thru/right B Project No

27 Intersection/Movement Delay V/C 50 th Percent 95 th Percent LOS (seconds) Ratio Queue (feet) Queue (feet) Main Street/D Angelo Main EB thru/right A Main WB left A Main WB thru A D Angelo NB left/right C Main Street/D Angelo Main EB thru/right A Main WB left A Main WB thru A D Angelo NB left/right C Main Street/Ollie s /Residential Driveway Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Ollie s NB left/thru/right C Driveway SB left/thru/right A Main Street/Ollie s Main EB thru/right A Main WB left A Main WB thru A Ollie s NB left/right B Main Street/Shop Ahoy Main EB thru/right A Main WB left A Main WB thru A Shop Ahoy NB left/right C Main Street/Shop Ahoy Main EB thru/right A Main WB left A Main WB thru A Shop Ahoy NB left/right C Howard/Stein-Hudson Associates, Inc. 23

28 Table 6. Existing Conditions (203) Capacity Analysis Summary, p.m. Peak Hour Intersection/Movement Delay V/C 50 th Percent 95 th Percent LOS (seconds) Ratio Queue (feet) Queue (feet) Study Area Intersections Main Street/George Ryder Road/George Ryder Road South Main EB left/thru/right A Main WB left/thru/right A George Ryder S. NB left/thru/right E George Ryder SB left/thru/right F Main Street/Seaquanset Road Main EB thru/right A Main WB left A Main WB thru A Seaquanset NB left/right C Main Street/Barn Hill Road Main EB thru/right A Main WB left/thru A Barn Hill NB left right E Study Area Driveways Main Street/Market Place Main EB thru/right A Main WB left/thru A Market NB left/right B Main Street/Hess Driveway Main EB left/thru A Main WB thru/right A Hess SB left/right C Main Street/Ocean State Job Lot Main EB left A Main EB thru A Main WB thru/right A Ocean State SB left/right D Main Street/Post Office/Local Color Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Post Office NB left/thru/right D Local Color SB left/thru/right B Main Street/Local Color Main EB left A Main EB thru A Main WB thru/right A Local Color SB left/right A Main Street/Cape Cod Healthcare/ Residential Driveway Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Cape Cod Health NB left/thru/right B Driveway SB left/thru/right B Project No

29 Intersection/Movement Delay V/C 50 th Percent 95 th Percent LOS (seconds) Ratio Queue (feet) Queue (feet) Main Street/D Angelo Main EB thru/right A Main WB left A Main WB thru A D Angelo NB left/right C Main Street/D Angelo Main EB thru/right A Main WB left A Main WB thru A D Angelo NB left/right C Main Street/Ollie s /Residential Driveway Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Ollie s NB left/thru/right F Driveway SB left/thru/right A Main Street/Ollie s Main EB thru/right A Main WB left A Main WB thru A Ollie s NB left/right C Main Street/Shop Ahoy Main EB thru/right A Main WB left A Main WB thru A Shop Ahoy NB left/right D Main Street/Shop Ahoy Main EB thru/right A Main WB left A Main WB thru A Shop Ahoy NB left/right C Howard/Stein-Hudson Associates, Inc. 25

30 Table 7. Existing Conditions (203) Capacity Analysis Summary, Saturday Peak Hour Intersection/Movement Delay V/C 50 th Percent 95 th Percent LOS (seconds) Ratio Queue (feet) Queue (feet) Study Area Intersections Main Street/George Ryder Road/George Ryder Road South Main EB left/thru/right A Main WB left/thru/right A George Ryder S. NB left/thru/right F George Ryder SB left/thru/right F Main Street/Seaquanset Road Main EB thru/right A Main WB left A Main WB thru A Seaquanset NB left/right D Main Street/Barn Hill Road Main EB thru/right A Main WB left/thru A Barn Hill NB left right F Study Area Driveways Main Street/Market Place Main EB thru/right A Main WB left/thru A Market NB left/right C Main Street/Hess Driveway Main EB left/thru A Main WB thru/right A Hess SB left/right C Main Street/Ocean State Job Lot Main EB left A Main EB thru A Main WB thru/right A Ocean State SB left/right F Main Street/Post Office/Local Color Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Post Office NB left/thru/right F Local Color SB left/thru/right F Main Street/Local Color Main EB left A Main EB thru A Main WB thru/right A Local Color SB left/right A Main Street/Cape Cod Healthcare/ Residential Driveway Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Cape Cod Health NB left/thru/right F Driveway SB left/thru/right B Project No

31 Intersection/Movement Delay V/C 50 th Percent 95 th Percent LOS (seconds) Ratio Queue (feet) Queue (feet) Main Street/D Angelo Main EB thru/right A Main WB left A Main WB thru A D Angelo NB left/right D Main Street/D Angelo Main EB thru/right A Main WB left A Main WB thru A D Angelo NB left/right D Main Street/Ollie s /Residential Driveway Main EB left A Main EB thru/right A Main WB left A Main WB thru/right A Ollie s NB left/thru/right E Driveway SB left/thru/right A Main Street/Ollie s Main EB thru/right A Main WB left A Main WB thru A Ollie s NB left/right C Main Street/Shop Ahoy Main EB thru/right A Main WB left A Main WB thru A Shop Ahoy NB left/right E Main Street/Shop Ahoy Main EB thru/right A Main WB left A Main WB thru A Shop Ahoy NB left/right D As shown in the tables, all the intersection approaches operate at LOS D or better during the peak hours, except for the approaches at the following intersections; specifically: Main Street (Route 28)/George Ryder Road/George Ryder Road South The George Ryder Road South northbound approach operates at LOS E during the evening peak hour and LOS F during the Saturday mid-day peak hour. The George Ryder Road southbound approach operates at LOS F during both evening and Saturday peak periods. This is typical for a stop-controlled intersection where a minor street intersects a major arterial roadway. The delay is mainly attributed to vehicles on George Ryder Road and George Ryder Road South waiting for a gap to turn onto Main Street (Route 28). Main Street (Route 28)/Barn Hill Road During the evening and Saturday peak hours, the Barn Hill Road northbound approach operates at LOS E and LOS F, respectively. This is typical for a stop-controlled intersection where a minor street intersects a major arterial roadway. The delay is mainly attributed to vehicles on Barn Hill Road waiting for a gap to turn onto Main Street (Route 28). Howard/Stein-Hudson Associates, Inc. 27

32 Main Street (Route 28)/Ocean State Job Lot The Ocean State Job Lot southbound approach operates at LOS F during the Saturday mid-day peak hour. This is typical for the intersection of a driveway with a major arterial road where there is no stop control. The delay is a result of drivers exiting from Ocean State Job Lot waiting for a gap to turn onto Main Street (Route 28). Main Street (Route 28)/Post Office/Local Color The Post Office northbound and Local Color southbound approaches operate at LOS F during the Saturday mid-day peak hour. This is typical for the intersection of a driveway with a major arterial road where there is no stop control. The delay is a result of drivers exiting from the Post Office and Local Color driveways waiting for a gap to turn onto Main Street (Route 28). Main Street (Route 28)/Cape Cod Healthcare/Residential Driveway The Cape Cod Healthcare northbound approach operates at LOS F during the Saturday mid-day peak hour. This is typical for the intersection of a driveway with a major arterial road where there is no stop control. The delay is a result of drivers exiting from Cape Cod Healthcare waiting for a gap to turn onto Main Street (Route 28). Main Street (Route 28)/Ollie s /Residential Driveway The Ollie s northbound approach operates at LOS F during the evening peak hour and at LOS E during the Saturday mid-day peak hour. This is typical for the intersection of a driveway with a major arterial road where there is no stop control. The delay is a result of drivers exiting from Ollie s waiting for a gap to turn onto Main Street (Route 28). Main Street (Route 28)/Shop Ahoy The Shop Ahoy northbound approach operates at LOS E during the evening peak hour. This is typical for the intersection of a driveway with a major arterial road where there is no stop control. The delay is a result of drivers exiting from Shop Ahoy waiting for a gap to turn onto Main Street (Route 28). 28 Project No

33 Safety Analysis HSH compiled motor vehicle crash data from the MassDOT Crash Records System and the Chatham Police Department for the most recent four-year period for which they are available (2009 2). The data describes reported vehicular crashes in the study area and is based on information compiled by MassDOT and the Chatham Police Department. Crash rates are determined based on the number of crashes per million entering vehicles (MEV) in an intersection. The crash rate is based on two factors: traffic volumes and crashes, and it compares the relationship between them. Table 8 summarizes the data for the study area intersections; detailed crash data and crash rate worksheets and collision diagrams are included in Appendix C. As shown in the table, 8 crashes occurred at the study area intersections over the four-year period, with no reported fatalities. No crashes occurred at the intersection of Main Street (Route 28)/Seaquanset Road. All study area intersections have crash rates below the district average. A collision involving a cyclist occurred on August 9, 2009 at approximately 2:50 p.m. on Main Street at George Ryder Road South resulting in injury. Table 8. MassDOT Crash Data Summary Scenario Main St. (Rte 28)/ George Ryder Rd. / George Ryder Rd. South Intersection/# of Crashes Main St. (Rte 28)/ Barn Hill Rd. Year Main St. (Rte 28)/ Ocean State Job Lot Driveway Main Street (Rte 28)/ Ollie's Restaurant Driveway Single vehicle Angle 4 2 Rear-end Head-on Sideswipe Unknown/other Severity Property damage only 5 7 Personal injury Fatality Hit-and-run Unknown Type Total 9 7 Crash Rate District Average Source: MassDOT, Average Crash Rates based on crash information queried on May 7, 202. Howard/Stein-Hudson Associates, Inc. 29

34 The intersection of Main Street (Route 28)/George Ryder Road/George Ryder Road South had the highest incidence of crashes among the study area intersections with 9 crashes during the four year period. Of these crashes, 4 were reported to be angle crashes. Angle crashes at unsignalized intersections are often attributed to poor intersection sight distance, not enough gaps in the mainstream traffic, or high vehicle speeds. The design team will consider these factors in the design. Through field observations there are significant sight distance issues along the entire corridor. These issues are due to the horizontal alignment of the roadway as well as objects and landscaping blocking sight lines. These sight distance issues can be seen specifically at George Ryder Road, George Ryder Road South, and Seaquanset Road. Sight lines are also an issue at Barnhill Road due to the 2 lane approach to Main Street. The right turning vehicles often have difficulty looking for Main Street eastbound traffic when there is an adjacent vehicle attempting to make a left turn out of Barnhill Road. Meanwhile, motorists making right-turns onto Main Street typically encroach into TWLTL due to the limited shoulder width. Field observations also noted that the Main Street eastbound lane is poorly aligned in the vicinity of Barn Hill Road and motorists traveling eastbound typically encroach into the TWLTL, which conflicts with westbound motorists that are attempting to transition into the TWLTL. Photos of these safety issues can be found in the Appendix D. Table shows the 85 th percentile speeds for each of the roadways within the study area during the June 203 count period. While these values show speeds generally within 5 mph of the speed limits, speeds during the offpeak seasons were shown to be higher. During the April 203 count period, the 85 th percentile speed was 40 mph, with max speeds topping around 50 and 55 mph. Due to the horizontal and vertical alignment and the width of the roadway, high speeds can be an issue, particularly during off-peak times when there are lower volumes on the road, and may be unexpected in a commercial area by pedestrians or other motorists. Pedestrians Currently, there are limited accommodations for pedestrians along Main Street. A 4-foot sidewalk is provided on the north side of the roadway. There is also a 4-foot sidewalk provided on the south side of Main Street in front of the Shop Ahoy Plaza to the west of Barn Hill Road. However, there are no pedestrian accommodations on the south side of the street for the remainder of the corridor within the study area. There are only 2 crosswalks across Main Street within the study area, which are located at Seaquanset Road to the west of the intersection and approximately 00 feet to the west of Barn Hill Road. Both of these crossings are approximately 40 feet in length and unsignalized, creating uncomfortable crossing conditions for pedestrians that walk through the two-way left-turn lane and are not provided with any refuge. From field observations, the few pedestrians in the area tend to jaywalk across Main Street to get to and from the businesses along the south side of Main Street and the sidewalk on the north side of Main Street. The Cape Cod Regional Transit Authority (CCRTA) operates the H2O Hyannis-Orleans bus service along Route 28 through the study area. Passengers along the south side of the road do not have a safe location to board or alight. Pedestrian volumes were counted at the same time as vehicles. Peak hour pedestrian volumes can be found in Figure 4. Bicycles There are no on-road accommodations for bicyclists along Main Street. From field observations, cyclists tend to ride on either the sidewalk on the north side of Main Street or along the narrow shoulder (only -2 feet wide) 30 Project No

35 and through the parking lots on the south side of Main Street. Meanwhile, the Old Colony Rail Trail crosses George Ryder Road just,200 feet north of Main Street and the Town recently installed a new multi-use path along the west side of Barn Hill Road between Main Street and Hardings Beach. Bicycle volumes were counted at the same time as vehicles. Peak hour bicycle volumes can be found in Figure 5. Howard/Stein-Hudson Associates, Inc. 3

36 Functional Design Report Route 28: Chatham Roadway Improvements Figure 4. Existing (203) Conditions Peak Hour Pedestrian Volumes Main Street (Route 28) HESS [] George Ryder Road A.M. (P.M.) [SAT] HESS () [] [] Ocean State Job Lot Market Place Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive George Ryder Road So. () [7] [2] 2 Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

37 Functional Design Report Route 28: Chatham Roadway Improvements Figure 5. Existing (203) Conditions Peak Hour Bicycle Volumes Main Street (Route 28) HESS () [3] [] George Ryder Road [2] A.M. (P.M.) [SAT] HESS () Ocean State Job Lot Market Place (5) [] (3) [7] Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive 2 George Ryder Road So. () (4) [] (3) [8] (6) 2 () (5) Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

38 Future Conditions Future traffic volumes were estimated and analyzed to determine the number of travel lanes and lane usage required for the primary study area intersections and the impacts to the extended study area. Two conditions were examined: No-Build Future traffic volumes with the existing geometry; Build Future traffic volumes with proposed geometry. These future conditions are discussed in the sections below. No-Build Conditions (2023) Estimation of Future (2023) Traffic Volumes Future volumes for the 2023 design year were established by increasing the existing volumes by a background growth rate consistent with historical growth trends and then adding traffic that will be generated by known planned developments in the area. General Background Growth A minimal background growth rate of 0.5% per year was applied to the existing volumes along Route 28, George Ryder Road, George Ryder Road South, Seaquanset Road, and Barn Hill Road to be conservative. There are no known developments planned in the area that would generate a significant increase in traffic. Figure 6 through Figure 8 shows the No Build volumes for the project area intersections. Intersection Operations Analysis An analysis was performed to evaluate the effect of the future traffic volumes with the existing Main Street (Route 28) infrastructure, as shown in Table 9 through Table. Detailed Synchro analyses are provided in Appendix C. 34 Project No

39 Functional Design Report Route 28: Chatham Roadway Improvements Figure 6. No-Build (2023) Conditions Traffic Volumes, a.m. Peak Hour HESS 0 0 George Ryder Road Main Street (Route 28) HESS Ocean State Job Lot 8 Market Place Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive 7 24 George Ryder Road So Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

40 5 Functional Design Report Route 28: Chatham Roadway Improvements Figure 7. No-Build (2023) Conditions Traffic Volumes, p.m. Peak Hour HESS 6 98 George Ryder Road Main Street (Route 28) HESS Ocean State Job Lot Market Place Ocean State Job Lot Local Color Local Color Residential Drive Residential Drive 27 George Ryder Road So Post Office Cape Cod Healthcare Ollie s BarnHill Road Not to scale. Seaquanset Rd. D Angelo D Angelo Ollie s Shop Ahoy Shop Ahoy Howard/Stein-Hudson Associates, Inc.

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

The Cape Cod Five Cents Savings Bank

The Cape Cod Five Cents Savings Bank TRAFFIC IMPACT AND ACCESS STUDY The Cape Cod Five Cents Savings Bank Hyannis, Massachusetts PREPARED FOR The Cape Cod Five Cents Savings Bank 19 West Road Orleans, Massachusetts 0263 PREPARED BY 1 Walnut

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TRAFFIC IMPACT STUDY

TRAFFIC IMPACT STUDY TRAFFIC IMPACT STUDY for the GLEN ELLEN COUNTRY CLUB SENIOR RESIDENTIAL REDEVELOPMENT 84 Millis, Massachusetts Prepared by: McMahon Associates, Inc. Prepared for: Toll Brothers, Inc. August 216 DRAFT

More information

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members:

December 4, Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA Attn: Kathy Marshall. Dear Board Members: December 4, 28 Merrimac Zoning Board of Appeals 2-8 School Street Merrimac, MA 86 Attn: Kathy Marshall RE: RAMSHEAD MERRIMAC, MA Dear Board Members: Bayside Engineering, Inc. has received the MDM Transportation

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report

Traffic Study of Fuller Street, Cady Street, West Street and West Avenue. Final Report Traffic Study of Fuller Street, Cady Street, West Street and West Avenue Final Report July 2005 Prepared for: Town of Ludlow Prepared by: Pioneer Valley Planning Commission 26 Central Street West Springfield,

More information

Proposed Lowe s Home Improvement Center

Proposed Lowe s Home Improvement Center Traffic Impact and Access Study Proposed Lowe s Home Improvement Center Dennis, Massachusetts Prepared for Prepared by Lowe s Home Centers, Inc. 1605 Curtis Bridge Road Wilkesboro, North Carolina 28697

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M.

Design Public Hearing MassDOT Project # February 19, 2015 Chatham Town Hall Annex 7:00 P.M. Design Public Hearing MassDOT Project #606596 February 19, 2015 Chatham Town Hall Annex 7:00 P.M. Overview Process to date Project goals Data collection results Existing conditions Alternative analysis

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

A plan for improved motor vehicle access on Railroad Avenue in Provincetown

A plan for improved motor vehicle access on Railroad Avenue in Provincetown A plan for improved motor vehicle access on Railroad Avenue in Provincetown February 2011 A plan for improved motor vehicle access on Railroad Avenue in Provincetown INTRODUCTION AND PROBLEM IDENTIFICATION

More information

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC.

Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES. Foster Street Littleton, Massachusetts. Prepared for: Grimes Road, LLC. Traffic Impact and Access Study PROPOSED DURKEE FARM ESTATES Foster Street Littleton, Massachusetts Prepared for: Grimes Road, LLC. Westford, MA Prepared by: MDM Transportation Consultants, Inc. 28 Lord

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report

CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA (508) Fax (508) Transportation Safety Report CAPE COD COMMISSION 3225 MAIN STREET P.O. BOX 226 BARNSTABLE, MA 02630 (508) 362-3828 Fax (508) 362-3136 2006 Transportation Safety Report Bourne: Otis Rotary Harwich: Route 137/Route 39 Orleans: Route

More information

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: QUICKIE C STORE AND GAS BAR 1780 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Quickie Convenience Stores Larny Holdings Ltd. c/o PBC Group April 15, 2015 115-615 Report_1.doc D. J. Halpenny

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

Community Advisory Committee

Community Advisory Committee Community Advisory Committee Meeting #1 November 19, 2014 Presentation Team Matt Fulda, Greater Bridgeport Regional Council Chris Granatini, P.E., Tighe & Bond Craig Yannes, P.E., PE PTOE, Tighe & Bond

More information

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for:

HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF. Prepared for: HILTON GARDEN INN HOTEL HOTEL EXPANSION 2400 ALERT ROAD, OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 October

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine

STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine Draft Study STILLWATER AVENUE CORRIDOR STUDY Old Town, Maine SUBMITTED TO: BANGOR AREA COMPREHENSIVE TRANSPORTATION SYSTEM SUBMITTED BY: I MAY 23, 2017 DRAFT STILLWATER AVENUE STUDY FINAL REPORT Table

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

Traffic Signal Redesign 50% Design Report

Traffic Signal Redesign 50% Design Report Traffic Signal Redesign 50% Design Report Joseph Davis, Jace Elkins, Jordan Weyrauch and Zach Crimmins CENE 486 Capstone J3Z Engineering March 10 th, 2016 Table of Contents 1.0 Project Description...1

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION

BOSTON REGION METROPOLITAN PLANNING ORGANIZATION PLANNING ORGANIZATIO BOSTON REGION MPO NMETROPOLITAN BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Stephanie Pollack, MassDOT Secretary and CEO and MPO Chair Karl H. Quackenbush, Executive Director,

More information

MEMORANDUM. Layout Of Study Intersections And Traffic Control

MEMORANDUM. Layout Of Study Intersections And Traffic Control BOSTON REGION METROPOLITAN PLANNING ORGANIZATION Richard A. Davey, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff DATE November 15, 2012 TO FROM RE Town of

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP

APPENDIX D. Traffic Impact Study Creighton Manning Engineering, LLP APPENDIX D Traffic Impact Study Creighton Manning Engineering, LLP Traffic Impact Study Catskill Access Evaluation NYS Thruway Exit 21 Town of Catskill, New York CM Project No. 114-232 Prepared For: Greene

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc.

CITY OF OAKLAND. 27th Street Bikeway Feasibility and Design. Final Report (v3) March 23, Kimley-Horn and Associates, Inc. CITY OF OAKLAND 27th Street Bikeway Feasibility and Design Final Report (v3) March 23, 2007 PREPARED BY: Kimley-Horn and Associates, Inc. Table of Contents 1. Introduction 3 2. 27 th Street/Bay Place Corridor

More information

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts

Traffic Impact and Access Study. The Preserve at Abbyville Proposed 40B Residential Development. Norfolk, Massachusetts Traffic Impact and Access Study The Preserve at Abbyville Proposed 40B Residential Development Norfolk, Massachusetts Prepared for DiPlacido Development Corp. April 2017 Prepared by GREEN INTERNATIONAL

More information

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for:

APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY. Prepared for: APARTMENT BUILDING DEVELOPMENT 1161 HERON ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT STUDY Prepared for: 1649362 Ontario Inc. c/o Manor Park Management 231 Brittany Drive, Suite D Ottawa ON K1K 0R8 July

More information

EXISTING (2006) CONDITIONS

EXISTING (2006) CONDITIONS Section 2 EXISTING (2006) CONDITIONS This section provides a description of the existing transportation system in the study area and a comprehensive analysis of existing traffic operations and crash history.

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012

BELCHERTOWN. Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 BELCHERTOWN Intersection of Federal Steet (Route 9) and Bay Road MAY 2012 Prepared Under the Direction of Pioneer Valley MPO By: Pioneer Valley Planning Commission 60 Congress Street Springfield 01104-3419

More information

Pedestrian & Bicycle Safety Innovations & Applications

Pedestrian & Bicycle Safety Innovations & Applications Pedestrian & Bicycle Safety Innovations & Applications County Engineers Association of Maryland Spring, 2017 Conference May 25, 2017 George Branyan Pedestrian Program Coordinator District Department of

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

WAUGH CHAPEL ROAD-EXISTING CONDITIONS REPORT

WAUGH CHAPEL ROAD-EXISTING CONDITIONS REPORT May 2018 TRANSPORTATION FACILITY PLANNING WAUGH CHAPEL ROAD-EXISTING CONDITIONS REPORT TRANSPORTATION FACILITY PLANNING WAUGH CHAPEL ROAD Waugh Chapel Road from Maytime Drive to New Market Lane Project

More information

Total Athletics Cape Cod Proposed Sports Facility

Total Athletics Cape Cod Proposed Sports Facility TRAFFIC IMPACT AND ACCE TUDY Total Athletics Cape Cod Proposed ports Facility Barnstable, Massachusetts PREPARED FOR Mr. Warren Nighan Total Athletics 128 Devon Lane Marston Mills, MA 02648 PREPARED BY

More information

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Water Street Corridor Streetscape TRAFFIC STUDY

Water Street Corridor Streetscape TRAFFIC STUDY TRAFFIC STUDY November 12, 2015 WATER STREET CORRIDOR STREETSCAPE IMPROVEMENTS PROJECT BOROUGH OF MANHATTAN EDC Contract No.: 48480002 Prepared for: Prepared by: TABLE OF CONTENTS I. INTRODUCTION/ EXECUTIVE

More information