studio 646 ARCHITECTURE, LLC
|
|
- Peter Chapman
- 5 years ago
- Views:
Transcription
1 ZONING DATA AND EXPLANATION FOR THE SPECIAL PERMIT APPLICATION: The present zoning for this project is R-2. The proposal includes eight residential townhome units accommodated within two buildings, with attached garages containing sixteen total spaces. The total amount of residential floor area is approximately 14,3 S.F. and the overall density of this project is 0.53 FAR or 12.8 units/acre. SHEET INDEX OF 09 COVER SHEET AND GENERAL INFORMATION OF 09 SITE PLAN OF 09 SITE UTILITY PLAN OF 09 SITE GRADING PLAN OF 09 LANDSCAPE PLAN OF 09 ELEVATIONS OF 09 ELEVATIONS 08 OF 09 PERSPECTIVES 09 OF 09 SITE PHOTOMETRIC PLAN CITY OF GOLDEN PLANNING COMMISSION APPROVED BY THE CITY OF GOLDEN PLANNING COMMISSION THIS DAY OF, 28 CHAIRMAN SECRETARY SITE DATA: Total area of the property: 27,149 S.F. Building coverage: 6,734 S.F. 25% (including the garages and porches) (40% open required) Total landscape area coverage: 20,415 S.F. 75% (includes sidewalks) Total parking lot coverage: N/A RESIDENTIAL UNITS: Unit Type 1: 3 bedrooms, 3 1/2 baths 1,899 s.f. total floor area Unit Type 2: 3 bedrooms, 3 1/2 baths 1,872 s.f. total floor area Unit Type 3: 2 bedrooms, 2 1/2 baths 1,664 s.f. total floor area Unit Type 4: 2 bedrooms, 2 1/2 baths 1,718 s.f. total floor area OWNERSHIP CERTIFICATE APPROVED BY THE CITY OF GOLDEN PLANNING COMMISSION THIS DAY OF, 28 BY NOTARIAL APPROVED BY THE CITY OF GOLDEN PLANNING COMMISSION STATE OF COUNTY OF THE FORGOING SIGNATURE WAS ACKNOWLEDGED BEFORE ME THIS DAY OF, 28 FLOOR AREA SUMMARY: PROPERTY LOOKING SOUTH FROM WASHINGTON AVE. PROPERTY LOOKING WEST FROM WASHINGTON AVE. Unit 1: 1,899 S.F. Unit 2: 1,872 S.F. Unit 3: 1,872 S.F. Unit 4: 1,899 S.F. Unit 5: 1,664 S.F. Unit 6: 1,718 S.F. Unit 7: 1,718 S.F. Unit 8: 1,664 S.F. Total: 14,3 S.F. VICINITY MAP REQUIRED PARKING: Unit 1: 2 spaces Unit 2: 2 spaces Unit 3: 2 spaces Unit 4: 2 spaces Unit 5: 1 1/2 spaces Unit 6: 1 1/2 spaces Unit 7: 1 1/2 spaces Unit 8: 1 1/2 spaces Total: 14 spaces SITE PROVIDED PARKING: Two-car garages: 16 spaces Surface parking: 0 spaces Total: 16 spaces (NOT TO SCALE) STREET ELEVATION COVER SHEET AND GENERAL INFORMATION SHEET OF 09
2 7.00' 20.67' LEGEND SITE PROPERTY LINE 1.34' SIDE SETBACK DIRECTION OF VEHICULAR ACCESS PEDESTRIAN ENTRY PROPOSED CONCRETE PROPOSED BUILDING 5,615 SQ. FT. 6,734 SQ. FT. ELECTRIC PLUG-IN STATION 28" 10" 24" ELEV. (A) 3.00' 18.00' FLOOR ABOVE EXISTING TREE TO BE REMOVED EXISTING TREE TO REMAIN 3.86' 20.00' 12" FRONT SETBACK CALCULATION BUILDING 1 A B C D 58.40' 58.63' 58.17' 58.00' 58.55' CALCULATION BUILDING 2 E F G H 58.' 58.27' ' ' 58.35' SANITARY LINE REAR ACCESSORY SETBACK 10.00' REAR SETBACK SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 2.52' 20.00' REAR PRIMARY SETBACK 24" DETENTION POND 26" ELEV. (D) ELEV. (H) 10" EL. = 8.00' UNIT 4 EL. = 8.86' UNIT 5 EL. = ' EL. = 799.3' EL. = 8.99' EL. = 8.88' EL. = 8.00' 4.00' BLDG 1 UNIT 3 UNIT 2 EL. = 8.86' EL. = 8.86' UNIT 1 EL. = 8.86' CONC. PATIO (TYP) ELEV. (C) COMPOSITE DECK (TYP) UNIT 6 UNIT 7 UNIT 8 EL. = ' EL. = ' EL. = ' BLDG 2 ELEV. (E) EL. = ' EL. = ' EL. = ' 35.' ELEV. (B) ELEV. (F) 30" 98.78' 12" 26" 28" 12" 6.00' SIDEWALK BICYCLE LANE WASHINGTON AVE. BICYCLE LANE SIDEWALK 30" 20" 24" ELECTRIC PLUG-IN STATION 24" 14" 20.00' FRONT SETBACK 4.00' 53.43' 7.00' SIDE SETBACK ' 10" 8" ELEV. (G) 8" 3.00' 18.00' FLOOR ABOVE 16.00' 23.00' 3.00' 1 SITE PLAN 1" = 10'-0" N 0' 5' 10' 20' SITE PLAN SHEET OF 09
3
4
5 OPEN SPACE CALCULATION: Total area of the property: 27,149 S.F. Building coverage: 6,734 S.F. 25% (including porches) (40% open required) Total landscape area coverage: 20,415 S.F. 75% (including sidewalks) LANDSCAPE PLAN SHEET OF 09
6 BLDG 1 - T/O PLATE 124' - 0 1/8" BLDG 1 - T/O PLATE 124' - 0 1/8" BLDG 1 - LEVEL 3 115' - 11" BLDG 1 - LEVEL 2 1' - 9 7/8" 34.97' BLDG 1 - LEVEL 3 115' - 11" BLDG 1 - LEVEL 2 1' - 9 7/8" 34.97' BLDG 1 - LEVEL 1 96' - 8 3/4" BLDG 1 - LEVEL 1 96' - 8 3/4" BLDG 1 - E ELEVATION 1/8" = 1'-0" 2 1/8" = 1'-0" BLDG 1 - N ELEVATION BLDG 1 - T/O PLATE 124' - 0 1/8" BLDG 1 - T/O PLATE 124' - 0 1/8" BLDG 1 - LEVEL 3 115' - 11" BLDG 1 - LEVEL 3 115' - 11" BLDG 1 - LEVEL 2 1' - 9 7/8" 34.97' BLDG 1 - LEVEL 2 1' - 9 7/8" 34.97' BLDG 1 - LEVEL 1 96' - 8 3/4" BLDG 1 - LEVEL 1 96' - 8 3/4" BLDG 1 - S ELEVATION 1/8" = 1'-0" 4 1/8" = 1'-0" BLDG 1 - W ELEVATION Siding - BM Waynesboro Taupe Board and Batten - BM London Fog Standing Seam Metal Roof - Charcoal Gray Siding - BM London Fog CALCULATION ( )/4=58.55' BM 16 - Graphite Vinyl Window - Bronze Brick - Misty Hollow ELEVATIONS SHEET OF 09
7 BLDG 2 T/O PLATE 118' - 2 1/4" BLDG 2 T/O PLATE 118' - 2 1/4" ' BLDG 2 - LEVEL 2 110' - 1 1/8" 32.73' 08 BLDG 2 - LEVEL 2 110' - 1 1/8" BLDG 2 - LEVEL 1 100' - 0" BLDG 2 - LEVEL 1 100' - 0" BLDG 2-91' - 0" BLDG 2-91' - 0" 1 BLDG 2 - E ELEVATION 1/8" = 1'-0" 2 1/8" = 1'-0" BLDG 2 - N ELEVATION BLDG 2 T/O PLATE 118' - 2 1/4" BLDG 2 T/O PLATE 118' - 2 1/4" 32.73' 08 BLDG 2 - LEVEL 2 110' - 1 1/8" 32.73' BLDG 2 - LEVEL 2 110' - 1 1/8" 08 BLDG 2 - LEVEL 1 100' - 0" BLDG 2 - LEVEL 1 100' - 0" BLDG 2-91' - 0" BLDG 2-91' - 0" 3 BLDG 2 - S ELEVATION 1/8" = 1'-0" 4 1/8" = 1'-0" BLDG 2 - W ELEVATION Siding - BM 11 - Long Valley Birch Board and Batten - BM 10 - Woodacres Metal Roof and Accent Panels - Charcoal Gray Brick - Springcreek Tudor CALCULATION ( )/4=58.35' BM 16 - Graphite Vinyl Window - Bronze Composite Decking - Clam Shell Siding - BM 10 - Woodacres ELEVATIONS SHEET OF 09
8 PERSPECTIVES SHEET 08 OF 09
64' - 4" +- 12' - 6" 124 RETAINING WALLS SEE CIVIL DWGS. LEVEL REAR YARD PROPOSED MAIN FLOOR F.F. 113' 18 3" +- (E) HOUSE TO BE REMOVED COV' PORCH
6 6.79 8. 6.0 7.0 8.0 0.07 6.8 ""7" TREE TOE.9.0.78 7. " TREE 0.67.7 " TREE.6.89.8.0 9" TREE.6.66.8.97.6 9" TREE.96.89.68 8" TREE " TREE.9.7 " TREE 9" TREE 9" TREE.7.9 9.86.8.6 8" TREE 7.89 6.7.. 7....9
More informationArea of existing house. Gross Flr. area excluding parking. (+1,657 basement) Gross Flr. area inc. covered parking & accessory bldg.
ABBREVIATIONS MATERIALS Area of existing house AREA CALCULATIONS Gross Flr. area excluding parking Gross Flr. area inc. covered parking & accessory bldg.,773 sf. 6,086sf. (+,657 basement) 6,776sf. (+,657
More informationNEW PORCH 162 SQ. FT ENCROACHMENT INTO YARD SET BACKS C L WALL 8'-0"
PROPERTY LINE WHEELCHAIR LIFT 0' FRONT YARD ST FL. RADIATOR 2ND FL. 2'-7 /2"x4'-8" 2'-7 /2"x4'-8" 9'-3 2 " '-5 4 " 2'-7 /2"x4'-8" 2'-7 /2"x4'-8" '-6" 2'-0 2 " 6'-0" 5'-5" 3'-3 2 " 2'-" 3'-9" 5'-2" PLUMBING
More informationNORTH RAVENSWOOD
4540-42 NORTH RAVENSWOOD PROPOSAL FOR ZONING CHANGE 10/22/16 SITE INFORMATION SITE SURVEY SITE SITE LOOKING SOUTH FROM WILSON LOOKING SOUTHEAST FROM UNDER EL TRACKS SITE LOOKING SOUTH ON RAVENSWOOD LOOKING
More information2200 FIFTH STREET CONTINUED PRELIMINARY DESIGN REVIEW
D E S I G N R E V I E W C O M M I T T E E S t a f f R e p o r t CONTINUED PRELIMINARY DESIGN REVIEW For Committee Discussion/ Majority Recommendation MARCH 16, 2017 Design Review #DRCP2016-0006 of the
More informationThe following is submitted together with the plans and application for the staff and plan commission consideration of approval.
October 7, 2015 Revised November 10, 2015 Revised January 13, 2016 Ms. Katherine Cornwell Department of Planning & Development City of Madison 215 Martin Luther King Jr. Blvd PO Box 2985 Madison, Wisconsin
More informationREAR YARDS - There shall be a rear yard no less than forty (40) feet.
ARTICLE VII - RESIDENCE R-2 DISTRICT 700-PURPOSE - The purpose of the R-2 District is to permit the establishment of medium density one and two family dwellings. 701-PERMITTED USES - After obtaining a
More informationCITY OF SPRING HILL BOARD OF MAYOR AND ALDERMEN SEWANEE RETREAT APPEALS HEARING PACKET JUNE 18, :30 PM
CITY OF SPRING HILL BOARD OF MAYOR AND ALDERMEN SEWANEE RETREAT APPEALS HEARING PACKET JUNE 18, 2018 06:30 PM Board of Mayor and Aldermen: Rick Graham, Mayor Bruce Hull, Jr., Vice-Mayor Kevin Gavigan Jeff
More informationFOR SALE SOMI LAND DOWNTOWN SOUTH MIAMI MIXED-USE DEVELOPMENT SITE EXCLUSIVELY PRESENTED BY:
FOR SALE DOWNTOWN SOUTH MIAMI MIXED-USE DEVELOPMENT SITE EXECUTIVE SUMMARY SUMMARY Address: 7435 SW 61 Avenue Lot Size: 30,820 SF Asking Price: $2,495,000 Price PSF Land: $80.95 Zoning: RM-24 Development
More informationParking. Parking 11/27/2012. On street parking. Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way.
Parking On street parking Off-street parking is space provided for vehicular parking outside the dedicated street right-of-way. At-grade parking lot Parking garages SITE Parking 90 degree (20 x 9 stalls)
More informationNEIGHBORHOOD PLAN RENDERING A1.0: NEIGHBORHOOD PLAN
2 RENDERING A.0: NEIGHBORHOOD AN 9/2/6 2 BERNARD ST 3 RENDERING NEIGHBORHOOD AN 30 Bocana Street, San Francisco California 940 45 867 5357 A3.0 A4.0 BERNARD STREET 30 Bocana Street, San Francisco California
More informationArapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016
Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016 Agenda 3:00 Opening/Welcome 3:15 Touch Base on Schedule and Milestones Moving Forward 3:20 Review the Overall
More informationLAND FOR SALE RAVINIA PARK DEVELOPMENT SHERIDAN BLVD, ARVADA, CO Presented By:
Jamis Companies, Inc. 2140 Arapahoe St Denver, CO 80205 www.jamisco.com EXECUTIVE SUMMARY OFFERING SUMMARY Sale Price: $275,000 - $1,000,000 Lot Size: 1.0 Acres Zoning: B2 Market: Arvada Submarket: Ravinia
More informationGENERAL INSTRUCTIONS FOR A FENCE PERMIT
Need To Submit: GENERAL INSTRUCTIONS FOR A FENCE PERMIT 1. Building permit application for accessory structures filled out completely. 2. Plot plan or survey showing the location of the proposed fence
More informationTHE EAGLE CREEK PLAN BN-1B W/BASEMENT
THE EAGLE CREEK PLAN BN-1B W/BASEMENT Homesite 1 Presale Price $829,900 2-Story w/basement, 4 bedroom, 3.5 bath, lower level rec-room, detached 2-car garage with a total of 3,137 square feet of finished
More informationSWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS
SWIMMING POOL BUILDING PERMIT REQUIREMENTS FOR THE UNINCORPORATED TERRITORY OF DOUGLAS COUNTY, KANSAS ALL CONSTRUCTION SHALL BE BUILT IN ACCORDANCE WITH STANDARDS SET FORTH IN THE 2012 International Code
More informationDerby Street. Project Updates. Salem, Massachusetts
Derby Street Project Updates Salem, Massachusetts September 13, 2017 Project Limits Derby Street Project Objectives 1. Improve complete streets elements on Derby Street 2. Improve sidewalks on finger streets
More information$ Plan Review Fee when Permit Application is submitted HOT TUBS AND SPAS BUILDING PERMIT APPLICATION. COST: $80.
Community Development 1050 W Romeo Rd, Romeoville, IL 60446-1530 (815) 886-7200 Fax #: (815) 886-2724 Email: buildinginspections@romeoville.org HOT TUBS AND SPAS BUILDING PERMIT APPLICATION Application
More informationSingle Family Detached District Summary of Allowable Uses
Single Family Detached District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory community center private (SUP) Accessory
More informationFOR LEASE PASEO STUDIOS N Walker Ave., Oklahoma City, OK Jeremy Foraker President Office
PASEO STUDIOS 2807 N Walker Ave., Oklahoma City, OK 73103 FOR LEASE PRESENTED BY: Jeremy Foraker President 405.229.7917 Office jeremy@forakercompany.com ForakerCompany.com PASEO STUDIOS 2807 N Walker Ave.,
More informationCOTTAGES AT OVERBROOK THE 'ROWLEY'
THE 'ROWLEY' GREENVILLE, SC DESCRIPTION / INFORMATION LIST OF ABBREVIATIONS INDEX OF DRAWINGS TEAM TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX
More informationConstruction Staging Area Vaughan Road
REPORT FOR ACTION Construction Staging Area - 109 Vaughan Road Date: May 25, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More informationR o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a. S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5
1 4 0 1 W i l s o n B o u l e v a r d & 1 4 0 0 K e y B o u l e v a r d R o s s l y n, A r l i n g t o n C o u n t y, V i r g i n i a S i t e P l a n R e v i e w C o m m i t t e e M e e t i n g # 5 1 2.
More informationTOWN of CHEEKTOWAGA Permit Application for Swimming Pools, Hot Tubs, or Personal Spas
Permit Application for Swimming Pools, Hot Tubs, or Personal Spas / 20 - Date of Application Received By Permit No. APPLICANT to COMPLETE the PINK PORTION! ( ) ( ). Applicant s Name Daytime Phone No. Cell
More informationWELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015
WELCOME! OPEN HOUSE SHAW ROAD IMPROVEMENT PROJECT JUNE 30, 2015 Traffic Improvements Project Goals Widen roadway to construction two-way left turn lanes-greatly decreases congestion Ease access to & from
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationTOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES
TOWN OF CHAPEL HILL POLICY AND PROCEDURES FOR TRAFFIC CALMING MEASURES (Adopted by the Town Council on June 30, 2004) (Revised December 6, 2010) (Revised February 8, 2016) POLICY AND PROCEDURES FOR TRAFFIC
More informationRESIDENTIAL SWIMMING POOL
MAIL PICK-UP A. SWIMMING POOL PERMIT TYPE ABOVE-GROUND POOL B. IDENTIFICATION PROJECT LOCATION (ADDRESS): NORTH WHITEHALL TOWNSHIP 3256 LEVANS ROAD, COPLAY, PA 18037 610-799-3411 610-799-9629 FAX www.northwhitehall.org
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationCommunity Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm
Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, 2017 6:30-8:30pm Attendance: 17 community members Welcome and Introductions- Christina Howell Christina introduced herself as the
More informationDream House Design SHEET INDEX. Location Photo/Map PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT
Design Render " = '-0" Location Poto/ap SHEET INDEX A0 TITLE SHEET ELEVATIONS A0 FLOOR PLANS A0 FLOOR PLANS A05 CROSS SECTIONS A06 SCHEDULES Cecked By Cristoper Cover A0 0950888 06/0 Autor Cecker " = '-0"
More informationSWIMMING POOL / SPA PLAN REVIEW CHECKLIST
SWIMMING POOL / SPA PLAN REVIEW CHECKLIST This checklist must be submitted with a Building Permit Application for any SWIMMING POOL or SPA. Job Information Property Address: Suite # Contractor: Residential
More informationA Portion of DIAMOND A FARM. Steele Road, Versailles, Woodford County, Kentucky /- Acres. Offered Exclusively By
A Portion of DIAMOND A FARM Steele Road, Versailles, Woodford County, Kentucky 522.75 +/- Acres Offered Exclusively By www.kyhorsefarms.com 518 East Main Street Lexington, Kentucky 40508 (859) 255-3657
More informationYour story begins here. SINGLE-FAMILY HOMES (FS)
AT Your story begins here. SINGLE-FAMILY HOMES (FS) WWW.DRHORTON.COM/HAWAII WELCOME TO HA AKEA AT HO OPILI Ho opili, West O ahu s newest master-planned community, is planned to provide the room growing
More informationCountry Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: Phone
Country Residential Lots from 1 Acre PLUS! TEXAS Country Living at it s VERY BEST! Builder: david@majorleaguecustomhomes.com Phone 940-206-6603 Realtor: cathy@majorleaguecustomhomes.com Phone 817-228-9936
More informationDriveway Design Criteria
Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved
More informationLOT OFFERINGS in COPPERHEAD GOLF COMMUNITY
LOT OFFERINGS in COPPERHEAD GOLF COMMUNITY Location: 20910 Copperhead Drive Lehigh Acres, FL 33936 Lee County --- PRICING AVAILABLE UPON REQUEST --- 665 Residential Units* on 73 Acres in Copperhead Golf
More informationADA Training Standard Plans
ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb
More informationDecisions of the Area Planning Panel (Keighley and Shipley) on Wednesday, 21 March 2018
Decisions of the Area Planning Panel (Keighley and Shipley) on Wednesday, 21 March 2018 These decisions are published for information in advance of the publication of the Minutes Decisions 6. APPLICATIONS
More informationCitizen Advisory Committee (CAC) Meeting #5 West Anaheim Youth January 27, 2016
Citizen Advisory Committee (CAC) Meeting #5 West Anaheim Youth January 27, 2016 1 Project Team City: Jonathan Borrego, AICP Planning Manager Susan Kim, AICP Principal Planner Gustavo Gonzalez, AICP Associate
More informationDEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee
DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More information11TH & VERMONT SPRC MEETING 4 1/25/ th & North Vermont. Ballston, VA R2L:ARCHITECTS 1 PROJECT TEAM
PROJECT TEAM DEVELOPER/OWNER NVR Inc. 11700 Plaza America Drive Suite 500 Reston, VA. 20190 T: 703-956-4775 Contact: John Halak Jay Johnson ATTORNEY Mcguire Woods, LLP 1750 Tysons Boulevard 18th Floor
More informationSWIMMING POOL PERMIT GUIDELINES AND APPLICATION FOR PERMIT
SWIMMING POOL PERMIT GUIDELINES AND APPLICATION FOR PERMIT GUIDELINES FOR SWIMMING POOL PERMIT 1. READ THESE GUIDELINES All pools holding 24 inches of water depth or more are considered swimming pools.
More informationMAJOR THOROUGHFARE PLAN
MAJOR THOROUGHFARE PLAN Adopted by City Commission On November 21, 2005 Per Resolution No. 4420 Amendment to the Comprehensive Community Development Plan City of Hobbs City of Hobbs MAJOR THOROUGHFARE
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 7, 2016 SUBJECT: Adoption of amendments to the Master Transportation Plan (MTP) to create a new Pedestrian
More informationENTITLEMENT MODIFICATION
33033 CAMINO CAPISTRANO SAN JUAN CAPISTRANO, CA 92675 ENTITLEMENT MODIFICATION OWNER: AMERCO REAL ESTATE COMPANY 2727 N. CENTRAL AVE 5-N PHOENIX, AZ 85004 MUNICIPALITY: CITY OF SAN JUAN CAPISTRANO 32400
More informationNottingham Township 909 Sugar Run Road Eighty Four PA (724) Fax (724)
Nottingham Township 909 Sugar Run Road Eighty Four PA 15330 (724) 348-5622 Fax (724) 348-8822 Swimming Pool Application Requirements SWIMMING POOL Any structure intended for swimming or recreational bathing
More informationOrdinance No Exhibit A. Application
PLANNING AND ZONING FEES: Application Fee Site plan/design review $100.00 Sign permit $ 50.00, plus $.50 per sq. ft. Conditional Use Permit $125.00 Zoning Amendment $250.00 Zoning Board of Appeals Variance
More informationNon-required Fences Update
Non-required Fences Update Quality of Life & Environment Committee January 11, 2016 Presented by the Department of Sustainable Development and Construction Purpose Follow up on the May 26, 2015, August
More informationAND GUIDING PRINCIPLES. Boise, Idaho 1997
USTICK CONCEPT MASTER PLAN AN AND GUIDING PRINCIPLES Boise City Comprehensiv ehensive e Plan Boise, Idaho 1997 GOALS, OBJECTIVES AND POLICIES BOISE CITY ~ NEIGHBORHOOD MASTER PLANS USTICK CONCEPT MASTER
More informationCity of Margate, Florida. Neighborhood Traffic Management Manual
City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT
More informationTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER
More informationTECHNICAL MEMORANDUM. Introduction
TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment
More informationsection 4 Existing Conditions, Issues, and Options
section 4 Existing Conditions, Issues, and Options 4.0 Existing Conditions, Issues, and Options This section analyzes each segment of the corridor on a street to street basis. Each segment is discussed
More informationNARRATIVE FOR SERENITY HILL OF HALSTED BAY SERENITY HILL OF LAKE MINNETONKA, LLC
NARRATIVE FOR SERENITY HILL OF HALSTED BAY SERENITY HILL OF LAKE MINNETONKA, LLC January 31, 2016 Written statements providing information regarding your proposal. Please provide a separate answer for
More informationSent via Addition of fence standards. If I can be of assistance, please contact me at
December 5, 2017 Sent via email: ronaldhood.clcfd@yahoo.com Ronald Hood Crescent Lakes Common Facilities District Board of Supervisors DEPARTMENT OF COMMUNITY DEVELOPMENT Dave Tomek Administrator Joe Johnston
More information22'-9 1/2" 6.94 m. 48'-10" m TEACH TOT POOL. POOL AREA = ±3845 ft². 35'-1 1/2" m BEACH ENTRY MINI SPLASH PAD = ± 475 SF. 16'-0 1/2" 4.
OPTIONAL WATERSLIDE LANDSCAPE AREA: ±7507 SF 22'-9 1/2" 6.94 m TOT TEACH 35'-1 1/2" 10.71 m 48'-10" 14.88 m AREA = ±3845 ft² APPROXIMATE CAPACITY ASSUMPTIONS: 1. 1.5sq.m/person (16.146 sq. ft) 2. 300 ft²
More information12/13/2018 VIA
12/13/2018 VIA EMAIL Daniel Abbes, Assistant Planner City of Sacramento community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: Bruceville Apartments (P18-073) Dear Mr.
More informationSWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST
SWIMMING POOL & SPA DOCUMENT SUBMITTAL LIST Completed Application for Construction or Use (Permit application). Application must include authorized signature from the property owner if it is not owner
More informationGENTILE GLAS HOLLOWAY O 'MAHONEY&Associates, tnc.
Landscape Architects Planners Environmental Consultants GENTILE GLAS HOLLOWAY O 'MAHONEY&Associates, tnc. LCOOOOI, Cf'Org~ G. Ctontilf' f -\SlA M. 1 f O ) Hollo\uy o\sla Emily M. O ' M.) ASlA
More informationRegional Commercial District Summary of Allowable Uses
Regional Commercial District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory outside display of merchandise Accessory outside
More informationDRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.
TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: 17356 To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse,
More informationMARTIN COUNTY BOARD OF COUNTY COMMISSIONERS
MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS 2401 S.E. MONTEREY ROAD STUART, FL 34996 DOUG SMITH Commissioner, District 1 Telephone: 772-288-5495 Fax: 772-288-5764 Email: nikkiv@martin.fl.us ED FIELDING
More informationAquatic Concepts. July 23, 2018
Aquatic Concepts July 23, 2018 DESIGN DIRECTION Lazy River Zero Depth Entry Water slides at least one for 48 + and one for little kids Spray features Indoor lap lanes Outdoor lap lanes that can accommodate
More informationSITE DEVELOPMENT PLAN FOR PLANTATION LANDING TOWNHOMES WILMINGTON, NORTH CAROLINA
yard Sagewood Dr. 25' Setback 20' Future Greenway Esmt. SITE DEVELOPMENT PLAN FOR WILMINGTON, NORTH CAROLINA JUNE 2018 SITE DATA TABLE VICINITY MAP INDEX OF SHEETS LEGEND DEVELOPER/OWNER MUNGO HOMES OF
More informationTOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division
TOWN OF AURORA Pool Enclosure Permit Guide PLANNING AND BUILDING SERVICES Building Division Phone: 905-727-3123 ext. 4388 Fax: 905-726-4731 Email: building@aurora.ca Town of Aurora 100 John West Way, Box
More information8/21/2013 THE UNIVERSITY OF TEXAS AT AUSTIN CAMPUS MASTER PLAN. Board of Regents Meeting Academic Affairs Committee May 2013 ACCOMMODATING GROWTH
THE UNIVERSITY OF TEXAS AT AUSTIN CAMUS MASTER LAN Board of Regents Meeting Academic Affairs Committee May 2013 1 ACCOMMODATING GROWTH 2 1 CAMUS ZONES Core 196 acres Central 182 acres East 52 acres 3 FAR
More informationRef. No February 19, Ms. Ashley Blissett, P. Eng., Senior Development Engineer City of Halifax PO Box 1749 HALIFAX NS B3J 3A5
Ref. No. 151-00564-01 February 19, 2015 Ms. Ashley Blissett, P. Eng., Senior Development Engineer City of Halifax PO Box 1749 HALIFAX NS B3J 3A5 RE: Traffic Impact Statement, Proposed Multi-Tenant Residential
More informationMerrick and Memorial Neighborhood Study 5/14/2014 Public Meeting
Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need
More informationPrimary Streets. Delaware Street. Bay Meadows Specific Plan Amendment - Framework Plan. November 7, 2005 IV - 45
Primary Streets Primary Arterial and Collector streets are specifically located framework streets that serve and connect Bay Meadows to the existing street network of the larger San Mateo area. These streets
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationGENERAL LEGEND 12"CMP
PLANS FOR X-REFS: west branch_ci FILE PATH: Z:\WEST BRANCH 36863 SIDEWALK IMPROVEMENTS 212 - SRTS - OLIPHANT\DRAWINGS\_PRODUCTION DRAWINGS\A.1 COVER PLOTTED: Monday, July 23, 212 2:44:13 PM OLIPHANT STREET
More information/ ARLINGTON COUNTY, VIRGINIA
/ ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 24, 2016 DATE: August 11, 2016 SUBJECT: Amendment of the Master Transportation Plan (MTP) Streets Element to include new local
More informationNovember 13, Planning and Land Development Regulation Commission (PLDRC)
1 of 29 GROWTH AND RESOURCE MANAGEMENT DEPARTMENT PLANNING AND DEVELOPMENT SERVICES DIVISION CURRENT PLANNING ACTIVITY 123 W. Indiana Avenue, DeLand, FL 32720 (386) 943-7059 PUBLIC HEARING: CASE NO: SUBJECT:
More informationTownship of North Huntingdon Application for Permit
Township of North Huntingdon Application for Permit 11279 Center Highway, North Huntingdon, PA 15642 724-863-3806 ext. 126 / www.nhtpa.us 1. Swimming Pool Permit Request TYPE OF STRUCTURE: SWIMMING POOL
More informationCommunity Retail District Summary of Allowable Uses
Community Retail District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory outside display of merchandise Accessory outside
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationArchitectural Survey Data for Oregon Main Street Survey - Mosier
(printout date: /5/009) Page of 5 s 803 nd Ave c.980 Synthetic Wood Siding 80 nd Ave c.900 Vertical Board Commercial (Type) -Part Block Department Store Comments: False front store - service garage 940
More informationSwimming Pool Requirements
Swimming Pool Requirements 1. Definitions: Approved Safety Pool Cover. Means a manually or power-operated safety pool cover that meets all of the performance standards of the American Society for Testing
More informationGIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011
The Purpose of GIS Based Network Planning GIS Based Data Collection / Network Planning Healthy Communities Active Transportation Conference Tuesday, May 10, 2011 10:00 AM Norman Cox, LLA, ASLA. Ann Arbor,
More informationUDC Street Cross Sections
UDC Street Cross Sections Local Street - Downtown Local Street Mountable Curb Local Street Vertical Curb Alley Major Arterial Minor Arterial Residential Lane Residential Collector Residential Collector
More informationARTICLE V - AGRICULTURAL SUBURBAN ESTATE RESIDENTIAL - A- SER
Adopted August 23, 2010 ARTICLE V - AGRICULTURAL SUBURBAN ESTATE RESIDENTIAL - A- SER 500-PURPOSE - The purpose of the A-SER District is: 1) to preserve and protect the decreasing supply of prime agricultural
More informationTraffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014
Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control
More informationACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP / PP-07-16/ RZ-12-16/ CPA-01-16/ A-07-16
Development Services Department DATE: December 14, 2016 TO: FROM: SUBJECT: ACHD Board of Commissioners Stacey Yarrington, Planner III Tandem Ridge/ EPP16-0012/ PP-07-16/ Executive Summary: This is an annexation,
More informationUDB. Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013
UDB Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013 Prepared by: Prepared for: FOTENN Consultants Urban Design Review Panel NEUF Architects HEIGHT LIMIT
More informationOcean Park Boulevard Green Street Project Community Workshop
Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,
More informationVicinity Map. Proposed Roosevelt Street Sidewalk Project OVERLAND ROAD TO CASSIA STREET W ROSE HILL ST W ALBION ST S OWYHEE ST W CASSIA ST
Vicinity Map W ROSE HILL ST Cassia Park W CAMAS ST LEGEND W ALBION ST S ROOSEVELT ST W CASSIA ST Sacred Heart W KOOTENAI ST Monroe Elementary S OWYHEE ST South Junior High S SHOSHONE ST Project area Bus
More informationWest Seattle Junction CITY COUNCIL PRESENTATION Seattle, Washington. March 8, 2011
West Seattle Junction CITY COUNCIL PRESENTATION Seattle, Washington March 8, 2011 Contents Project Description... 2 Site Analysis / Project Timeline... 3 Context Photos... 4 Extent Of Subterranean Vacation...
More informationNeighborhood Design. City Council Update June 4, 2018
Neighborhood Design City Council Update June 4, 2018 Stakeholder Committee Stakeholder Meetings (7 meetings) Planning Commission Update City Council Update Stakeholder Committee Review / Revisions Council
More informationP r o j e c t T e a m
P r o j e c t T e a m Owner: Designer: Contractor: Mechanical: Electrical: GR Residential Design Gustavo Rojas 3024 Huff Av. #32 San Jose, Ca. 9528 T.B.D. N/A N/A PROJECT DATA VICINITY MAP SCOPE OF WORK
More informationCity of Walnut Creek TELEGRAPH AVENUE BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION
TELEGRAPH AVENUE City of Walnut Creek BART LINE SELF-GUIDED TOD TOUR 19TH STREET BART STATION Self-Guided TOD Tour With the Walnut Creek BART Station located squarely within its boundaries, the West Downtown
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationPUBLIC REALM MASTER PLAN
WESTSHORE BUSINESS DISTRICT PUBLIC REALM MASTER PLAN MASTER PLAN COMMITTEE MEETING MARCH 20, 2013 WESTSHORE BUSINESS DISTRCT PUBLIC REALM MASTER PLAN MACRO-SCALE CONCEPT: A PUBLIC REALM FRAMEWORK DEFINED
More informationIncentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction
Incentive Zoning Zoning Ordinance Advisory Committee June 21, 2018 Pam Thompson, Senior Planner, Sustainable Development and Construction Presentation Overview Stakeholder questions Updated charts Design
More informationThis chapter describes the proposed circulation system and transportation alternatives associated with
5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationALPHARETTA CONFERENCE CENTER & THE HOTEL AT AVALON
BLDG. 3000 BLDG. 5000 11/30/15 BLDG. 2000 RESIDENTIAL OVER RETAIL FIRST ST. BUILDING #7000 5 STORY (UNDER CONSTRUCTION) CENTRAL PARKING DECK PARKING DECK & SURFACE LOT BLDG. 6000 DATE: BUILDING #8000 OFFICE
More information