1 Traffic Reassignment, Traffic Calming and Pedestrian and Cyclist Improvements Part 8 August 2014

2 i

3 Rhebogue Neighbourhood Greenway Table of Contents 1 Application Documentation Part 8 Application Form Copy of Newspaper Notice Copy of Site Notice Site Location Plans Site Notice Locations Project Introduction Background: Ireland's Smarter Travel Demonstration City ( ) Project Vision Project Purpose Project Description Project Scope Planning Context Introduction National Policy Regional Policy Local Policy Environmental Impact Appropriate Assessment Screening Synopsis of Findings Proposed Development Design Approach and Methodology Proposed 30 km/h Speed Limit Zone Proposed Traffic Reassignment Proposed Traffic Calming Proposed Pedestrian and Cyclist Access Proposed Public Lighting Utility Ducting Proposed Signage Visibility Mirror Demountable Bollards List of Figures Figure 1 Overall Site Location Map... 8 Figure 2 Proposed Works Extents... 8 Figure 3 Site Notice Locations... 9 Figure 4 Limerick Smarter Travel Future Targets Figure 5 Limerick Smarter Travel Hubs Figure 6 Proposed LST Cycle and Walking Network Appendices Appendix A Appropriate Assessment Screening Report Appendix B Drawings August 2014 ii

4 Rhebogue Neighbourhood Greenway Appendix C Correspondence August 2014 iii

5 1 APPLICATION DOCUMENTATION F8 1.1 Part 8 Application Form Limerick City & County Council Economic Development & Planning Department DEVELOPMENT PROPOSED BY, ON BEHALF OF OR IN PARTNERSHIP WITH PLANNING AUTHORITY APPLICATION FORM Part XI Planning & Development Acts, Part 8 Planning & Development Regulations, ADMINISTRATIVE USE DATE RECEIVED: REFERENCE NO: ONLY: Administrative Officer Date All APPLICATIONS SHALL BE SENT TO: Economic Development & Planning Department, Limerick City & County Council, 7/8 Patrick Street, Limerick. Telephone: Fax: planning@limerick.ie PLEASE COMPLETE THIS FORM IN FULL. INCOMPLETE SECTIONS MAY LEAD TO A DELAY IN PROCESSING YOUR APPLICATION. 1. LOCATION OF PROPOSAL: (Parallel to Park Canal) August

6 2. NATURE & EXTENT OF DEVELOPMENT PROPOSAL: Implementation of a one-way traffic system northbound on Park Bridge and one way traffic system eastbound on a section of Park Road (parallel to Park Canal); Retention of the existing two-way traffic system on Lower Park Road (Canal section) and Hymees Boreen (Northern end) to serve local access only; Reduction in speed from a 50 km/h to a 30 km/h speed limit zone along a section of Park Road (parallel to Park Canal); Provision of a shared surface (in contrast surfacing) on Park Bridge and along a section of Park Road (parallel to Park Canal); Provision of contra flow cycle lanes on a section of Park Road (parallel to Park Canal) and the Park Bridge. Provision of three raised table tops on this section of Park Road as a traffic calming measure; Re-grading of exiting turning head North of Park Canal on Lower Park Road; Installation of utility ducting along Park road (Park Canal); and Provision of all associated signage, bollards, road markings, coloured surfacing, public lighting, sections of new footpaths and ancillary works. 3. IN THE CASE OF APPLICATIONS FOR A MATERIAL CHANGE OF USE OR FOR RETENTION OF SUCH MATERIAL CHANGE OF USE PLEASE STATE: (A) EXISTING USE: (B) PROPOSED USE: n/a n/a (C) NATURE & EXTENT OF ANY SUCH PROPOSED USE: n/a 4. NUMBER OF RESIDENTIAL UNITS PROPOSED (IF APPLICABLE): n/a 5. NUMBER OF HOUSES: n/a AND/OR APARTMENTS): n/a 6. AREA OF THE SITE: HECTARES): n/a ACRES): n/a (1 Hectare = Acres) LEGAL INTEREST 7. LEGAL INTEREST OF APPLICANT IN THE SITE OF THE PROPOSED DEVELOPMENT: OWNER: Limerick City and County Council OR OTHER (PLEASE SPECIFY): PUBLIC NOTICES 8. NAME OF NEWSPAPER IN WHICH PUBLIC NOTICE WAS PUBLISHED: Limerick Leader (City August

7 and County Edition) 9. DATE OF PUBLICATION: 30 th of August 2014 (Thursdays Leader 28 th of August 2014) 10. DATE SITE NOTICE WAS ERECTED ON SITE: Wednesday 29 th of August 2014 FLOOR AREA: RESIDENTIAL 11. (A) NEW BUILDING(S) RESIDENTIAL FLOOR AREA PER UNIT n/a m² GROSS FLOOR AREA n/a m² PTO (B) EXTENSION TO DWELLING GROSS FLOOR AREA n/a m² (C) OTHER DOMESTIC FLOOR AREA PER UNIT n/a m² (SHEDS, GARDEN SHEDS, GARAGES ETC) GROSS FLOOR AREA n/a m² FLOOR AREA: OTHER 12. (A) Other Development (i.e. car-park etc) Floor Area per Unit n/a m² Gross Floor Area n/a m² (B) Change of Use Floor Area per Unit n/a m² Gross Floor Area n/a m² ENVIRONMENTAL IMPACT STATEMENT 13. IS AN EIS SUBMITTED WITH THIS APPLICATION: YES/NO: No APPROPRIATE ASSESSMENT 14. HAS AN AA BEEN SUBMITTED WITH THIS APPLICATION: YES ( ) NO (x ) SIGNED ON BEHALF OF LIMERICK CITY & COUNTY COUNCIL: DIRECTOR OF SERVICE DATED: August

8 NOTES: REQUIREMENTS FOR A VALID APPLICATION 1. The relevant Department shall engage with the Planning Department in respect of the proposal to ensure: (a) The proposal is in accordance with the City/County/Local Area Development Plans and relevant Government Guidelines (b) The design of the development is acceptable and (c) The drawings are in accordance with the relevant Regulations. 2. Part 8 application to be available in the Planning Department from the date stated in the newspaper notice. 3. Part 8 application form to be signed by the relevant Director of Service. 4. Newspaper and Site Notices shall comply with the requirements of the Planning Regulations. PTO 5. All Part 8 applications to be accompanied by a report from the Roads/Water Services and Environment Departments that they have no objection to the proposal as submitted. Any required amendments must be incorporated into the submitted design. 6. Any submissions or objections received in the Planning Department during the period for submissions will be forwarded to the Department responsible for preparing the Part 8 application for comment. The Department shall submit a report on the submissions received and proposed alterations to the proposal. This report must be presented 14 days prior to the Council meeting. 7. Requests for Further Information or Clarification will be directed to the Department responsible for preparing the Part 8 application for reply 8. Where the period for making submissions ends less than 14 days prior to a Council Meeting, the Manager s Report will not be on the Agenda for that Council meeting. 9. Where responses to submissions or further information requests are not received by the Planning Department at least 14 days prior to a Council meeting the Manager s report will not be on the Agenda for that Council Meeting Copies of Drawings shall be submitted. It is advised that a proposal will require approximately 12 weeks to be processed prior to presentation to the Council. Your attention is also drawn to the fact that proposals where the inspection/submission period takes in the Christmas holiday period, an extra nine days should be added to the above time frame in accordance with the Regulations You should also bear in mind when preparing a Part 8 submission that Council Meetings are not held during the month of August. August

9 1.2 Copy of Newspaper Notice August

10 1.3 Copy of Site Notice August

11 August

12 1.4 Site Location Plans The proposed works site location and extents are shown in Figure 1 and Figure 2, respectively. Figure 1 Overall Site Location Map Park Bridge Park Road Figure 2 Proposed Works Extents August

13 1.5 Site Notice Locations Site notices will be provided at three locations as shown in Figure 3 below, and Drawing No provided in the Appendix B. Key: Site Notice Location Figure 3 Site Notice Locations August

14 2 PROJECT INTRODUCTION 2.1 Background: Ireland's Smarter Travel Demonstration City ( ) Limerick City has been designated as one of three centres in Ireland that are to become Ireland s First Smarter Travel Demonstration Areas. The Limerick submission was ranked first of all submissions received by the Department of Transport from all Local Authorities in Ireland. As a Demonstration City, Limerick will receive funding of 9 million over five years to roll out a wide range of measures and interventions targeted at encouraging people to use more sustainable modes of transport and to engage in transport planning in four Smarter Travel Hubs. The four hubs comprise of: The City and its core; Castletroy (including the University and the National Technology Park); Regeneration area of Southill (including a large inner city community and an extensive employment centre, including light industry); and Corbally (made up of a largely suburban community, separated from the city by two river crossings and restricted road capacity). The LST hubs and targets are provided in Figure 4 and Figure 5, respectively. Figure 4 Limerick Smarter Travel Future Targets The Limerick Smarter Travel (LST) project is being delivered by the newly amalgamated Limerick City and County Council, in partnership with the University of Limerick (UL). The main objective of the LST Project is to connect the four key hubs of Limerick City and suburbs by the development and promotion of sustainable modes of transport for those living, working and studying in these areas. The project provides the opportunity to assess LST measures across a range of communities in an urban context. August

15 Figure 5 Limerick Smarter Travel Hubs The aim of the scheme is to transform people s travel behaviour, with support from local businesses and communities and should result in reduced congestion and pollution, improved road safety, create local employment opportunities, and improve people s health and fitness, as well as enhancing town and streetscapes locally. In doing so, LST aims to reduce single occupancy car use, by facilitating, promoting and encouraging walking, cycling, public transport use, and car sharing by connecting the four hubs via a number of routes and links. 2.2 Project Vision This proposed scheme incorporates Park Bridge and a section of Park Road (parallel to Park Canal), as shown previously in Figure 2. This section of Park Road forms part of LST s Route 2 which provides a walking and cycling route between the City Centre and UL (detailed further in Section 2.3), and the only on road section of the route. This section of Park Road is also used as a link into Rhebogue for vehicular traffic. Park Bridge links Lower Park Road to Park Road. It is a short, narrow-back bridge, only capable of accommodating flows of traffic in one direction at any one time. It is currently subjected to a 3 tonne vehicle weight limit. Despite this restriction, the bridge is used as a rat-run by traffic travelling between the Corbally Road and the Dublin Road and also by the large residential area north of the canal. The original LST submission identifies Route 2 as a major flagship walking and cycling link for Limerick City (detailed further in Section 3). August

16 The completion of Route 2 identifies a walking and cycling vision for Limerick City and UL and provides a strategic approach to further the realisation of Irelands transport policy Smarter Travel A Sustainable Transport Future. The redesign of this only on road section of this route is vital to ensure a continuous and safe walking and cycling link between Limerick City Centre, UL and the residential areas (i.e. Corbally and Rhebogue) that also access the Canal and riverbank. At a time when the benefits of walking and cycling are being increasingly recognised, there is also a growing recognition that further action is likely to be required for these benefits to be fully realised. This design provides a strategic direction to encourage and direct such future action. 2.3 Project Purpose LST Route 2 Link 1 LST Infrastructural works commenced in 2013 on an existing pathway, which extends from Athlunkard Bridge along the riverbank as far as the Guinness Bridge at Park Canal, known as LST Route 2, Link 1 (Limerick City Council Planning Reference No. C12/5), as shown in Figure 6. When the path is completed it will provide 1.62 km of good quality shared surface, running parallel to the River Shannon. The proposed works have been broken into two phases. The first phase has been completed and runs from the Athlunkard Bridge to the end of the public lands on the Shannon Fields. The second phase will be carried out in the later stages of the project, as shown in Figure 6. Figure 6 Proposed LST Cycle and Walking Network August

17 2.3.2 LST Route 3 LST is currently finalising infrastructural works on the Old Dublin Road and Dublin Road that form part of a link between Limerick City and the UL via the R445 Dublin Road, known as Route 3 (Limerick County Council Planning Reference No. 12/6005). This Route has been broken into two phases. Phase 1 includes improvement works from the Parkway Roundabout to the entrance to the UL, which are almost complete, as shown in Figure Proposed Rhebogue Neighbourhood Greenway LST have submitted a Part 8 planning application for a proposed Rhebogue Neighbourhood Greenway, as shown in Figure 6. This Neighbourhood Greenway incorporates Rhebogue Road and Hymee s Boreen. Hymee s Boreen terminates just south of the Canal where the section of Park Road runs adjacent to the Canal. The completion of the proposed Rhebogue Neighbourhood Greenway would provide a safer alternative route to the City Centre avoiding the busy R445 Dublin Road LST Route 2 and Connectivity The design and Appropriate Assessment of Route 2, the flagship walking/cycleway from the City Centre to the University of Limerick via the Canal and the banks of the River Shannon, is now complete and has been submitted to An Bord Pleanala (Planning Reference No. 30.JP0027). This is the statutory planning procedure as the proposed walking and cycle way traverses a Special Area of Conservation. Further works planned under LST include the upgrade of the existing canal walk which is a vital link between the city and the University of Limerick. This proposed development on Park Bridge and a section of Park Road (parallel to Park Canal) includes the introduction of a one-way traffic system northbound on Park Bridge, and eastbound on a section of Park Road (adjacent to the canal only). This again is the road network that connects Corbally to UL and into the City centre. The proposals include improved pedestrian and cyclist access along the canal which would form part of the complete proposed Route 2. The completion of Route 2 Link 1, Route 2 (including this proposed scheme comprising Park Bridge and Park Road adjacent to the Canal), Route 3, and the Rhebogue Neighbourhood Greenway would provide a safe and continuous network for pedestrian and cyclists which would ultimately connect Corbally, UL (and Castletroy) and the City Centre, as shown in Figure 6. The proposed scheme would further improve safety and ease of linkage and connectivity into the City Centre. The proposals are detailed further in Section 2.4. This road network improvement will directly link in with the Rhebogue Neighbourhood Greenway and is the central and significant connection between Route 3, Route 2 and further linking into Route 2 Link 1 (Shannon Fields) and the City Centre via the Park Canal. August

18 Following completion of all smarter travel routes, LST will be promoting the Canal Bank to University off and on road link as a safe cycling and walking route for commuters and leisure users alike. It is important therefore that the traffic management at Park Bridge is revised and modified owing to its significance within the smarter travel commuter and leisure corridor. 2.4 Project Description This proposed design identifies existing and potential walking and cycling along the Canal and the surrounding community. The design seeks to address issues including increasing safety and improving the experience for those who already walk and cycle in the area. The following infrastructural improvements are proposed: Implementation of a one-way traffic system northbound on Park Bridge and one way traffic system eastbound on a section of Park Road (parallel to Park Canal); Retention of the existing two-way traffic system on Lower Park Road (Canal section) and Hymees Boreen (Northern end) to serve local access only; Reduction in speed from a 50 km/h to a 30 km/h speed limit zone along a section of Park Road (parallel to Park Canal); Provision of a shared surface (in contrast surfacing) on Park Bridge and along a section of Park Road (parallel to Park Canal); Provision of contra flow cycle lanes on a section of Park Road (parallel to Park Canal) and the Park Bridge. Provision of three raised table tops on this section of Park Road as a traffic calming measure; Re-grading of exiting turning head North of Park Canal on Lower Park Road; Installation of utility ducting along Park road (Park Canal); and Provision of all associated signage, bollards, road markings, coloured surfacing, public lighting, sections of new footpaths and ancillary works. 2.5 Project Scope This design considers walking and cycling improvement opportunities along the Canal and ultimately the completion of LST s Route 2. The design includes associated 30 km/h speed limit zone, traffic restrictions, and traffic calming measures. While it is not the specific purpose of this design to address broader transport issues, the design does incorporate opportunities to support the former Limerick City Councils (now the amalgamated Limerick City and County Council) alternative transport initiatives, as identified in the Limerick City Councils Limerick City Development Plan (detailed in Section 3). August

19 3 PLANNING CONTEXT 3.1 Introduction The design of the LST Park Bridge and a section of Park Road (parallel to Park Canal) has been closely informed by national, regional and local planning and policy objectives. The following section details the relevant documents at national, regional and local levels. 3.2 National Policy The Irish Government s Smarter Travel, A Sustainable Transport Future, A New Transport Policy for Ireland key goals, targets and actions, by 2020, include the following: Work-related commuting by car will be reduced from a current modal share of 65% to 45% ; Car drivers will be accommodated on other modes such as walking, cycling, public transport and car sharing (to the extent that car commuting by these modes will rise to 55% by 2020) ; Our vision is to create a strong cycling culture in Ireland and ensure that all cities, towns, villages, and rural areas will be cycling-friendly. Cycling will be a normal way to get about, especially for short trips. Next to walking, cycling will be the most popular means of getting to school, both for primary and secondary school ; A culture of cycling will be developed to the extent that, by 2020, we envisage around 160,000 people cycling for their daily commute, up from 35,000 in Cycling will be encouraged as a mode for other purposes so that by % of all our trips will be by bike ; and We will ensure that urban walking networks are strengthened by increasing opportunities for walking and removing constraints, including providing sate pedestrian routes. (Smarter Travel, 2009) Smarter Travel policy aims to:...retrofit areas towards creating sustainable neighbourhoods so that walking and cycling can be the best options for local trips, for example to reach local facilities such as shops and schools. (Smarter Travel, 2009) 3.3 Regional Policy The Midwest Area Strategic Plan (MWASP) , the planning, land use and transportation strategy for the Midwest region supports National Smarter Travel objectives describing Local Authorities investment into Smarter Travel as forming the basis of achieving behavioural change in targeted areas (MWASP pg. 35). August

20 Policy T-PHH-04 describes the MWASP Strategy as one that should promote healthy lifestyle choices in respect of transport mode selection targeting an increase in healthy transport options utilised, such as cycling and walking. The proposed development is in accordance with the transport policies and objectives in the Limerick City Development Plan Local Policy Limerick City Development Plan The City Development Plan for Limerick sets out an overall vision for the county and Corbally/Rhebogue area (to include Park Bridge and Park Canal) in a range of goals supported by specific aims and objectives. With regard Limerick Smarter Travel and the objective of this project, the policies included are of key relevance. It is Limerick City Councils policy to: to promote and deliver a sustainable and integrated transportation and landuse management system for Limerick City. (Policy TR.2 Integrating Land Use & Transportation Policies) It is Limerick City Councils policy to: Maintain and enhance the planning, design and maintenance of the transportation and roads infrastructure in the City to ensure improved safety, promote economic growth, social inclusion and amenity for all road users. (Policy TR.5 Enhancement of Road Infrastructure) It is Limerick City Councils policy to: to implement traffic calming measures in appropriate areas throughout the City. (Policy TR.8 Traffic Calming) It is Limerick City Councils policy to: Prioritize the provision of safe facilities for Pedestrians and Cyclists throughout the City. (Policy TR.9 Cycling & Walking) It is Limerick City Councils policy to enhance the traffic management provision by: That all traffic management and traffic calming schemes be designed and constructed as per Department of Transport guidelines embracing the philosophy of catering for all road users by managing the road network so that fair access is afforded to all. (Policy TR.11 Traffic Management Control) The Limerick City Development Plan also outlines key policies and objectives for suburban areas within the city including Rhebogue/Corbally. August

21 Rhebogue/Corbally (which included Park Road, Park Canal and Park Bridge) was extensively surveyed in respect of character and land uses allowing the City Council to be guided by specific objectives for individual suburban areas. The Limerick City Development Plan highlights the lack of community facilities in the Park and Rhebogue area naming the Canal Bank as an important recreational facility. The City Council will be guided by the following specific objectives in relation to the Corbally/ Rhebogue Area: To seek the development of the Park Canal as a sustainable transportation link between the University of Limerick and the city centre To protect and enhance the open spaces adjacent to the Special Area of Conservation in particular to enhance their recreational value. To provide and improve where necessary, the footpaths in the Park and Rhebogue area in particular in the vicinity of the railway bridges; To promote a high standard of urban design with a clear sense of place and architectural quality that respects the existing character; To ensure the provision of infrastructure appropriate to the needs of the area and the emerging intensification of use. (Chapter 14 Area Profiles pg 143) Limerick Smarter Travel Section Cycling Safety, of the LST bid document outlines LST s commitment to providing safe cycling conditions and reducing traffic speed: We will ensure that the right conditions for safe cycling are provided in Limerick through reducing speed limits, driver feedback signage and tabletop treatments at junctions, and...there will also be the introduction of 30 kph speed limit at a number of locations (Limerick Smarter Travel Stage 2 Bid Document) The LST Design Report identifies the benefits of introducing a significant number of measures to contribute to an overall enhanced public realm, in particular along the Canal, as follows: Public Realm Benefits A significant number of measures we are proposing as part of the Limerick Smarter Travel project contribute to an overall enhanced public realm across the entire study area. Open, pedestrian friendly spaces with adequate lighting and signage will make walking a more attractive option. Fewer cars will bring less congestion, reduced noise levels and better air quality. The cycle and walking route along the riverbank and canal connecting the university with the city centre is a measure which will make a significant contribution to the public realm. (Limerick Smarter Travel Stage 2 Bid Document) August

22 4 ENVIRONMENTAL IMPACT 4.1 Appropriate Assessment Screening An Appropriate Assessment Screening on the Canal Bank including Park Bridge, Rhebogue Road and Hymee s Boreen was undertaken by Ecofact Environmental Consultants on behalf Limerick Smarter Travel to fulfil the requirements of EU Habitats Directive (92/34/EEC). The full report is included in Appendix A of this document. The screening document provides the information required in order to establish whether or not the proposed development is likely to have a significant impact on Natura 2000 sites in the context of their conservation objectives and specifically on the habitats and species for which Natura 2000 sites have been designated. 4.2 Synopsis of Findings The screening took into account the Canal Bank refurbishments, the re-assigning of Park Bridge and Rhebogue Neighbourhood development which are all located within and adjacent to the Lower River Shannon csac site designation. The screening established the proposed works would not have the potential to result in significant impacts to the Natura 2000 site network, specifically in relation to impacts affecting the conservation interests of the Lower River Shannon csac. August

23 5 PROPOSED DEVELOPMENT 5.1 Design Approach and Methodology A scheme design has been produced by Mouchel design consultants for Park Bridge and a section of Park Road (parallel to Park Canal) to improve safety, comfort and security for pedestrians and cyclists. The scheme has been prepared in the context of the following: Limerick Smarter Travel Stage 2 Bid Document (2010); Limerick City Councils Limerick City Development Plan ( ); The Department of Transport s Smarter Travel A Sustainable Transport Future ( ); and The Department of Transport s National Cycle Policy Framework ( ). The designs have been prepared with reference to relevant guidance documents, including the following: Design Manual for Urban Roads and Streets (DMURS) issued by the DTTAS and the Department for Environment, Community and Local Government (2013); Traffic Signs Manual, issued by the Department of Transport (2010); Traffic Management Guidelines, issued by the Department of Transport, the Dublin Transportation Office, and the Department of the Environment and Local Government (2003); and National Cycle Manual, published by the National Transport Authority (2011). The aim of this design for Park Bridge and a section of Park Road (parallel to Park Canal) is to create an area that controls vehicle speeds and provides continuous and safe access for pedestrians, and cyclists. This has been achieved in the proposed design via the following measures: A 30 km/h speed limit zone; Traffic reassignment (reductions and restrictions); Traffic calming; and Two-way access for pedestrians and cyclists. These proposed measures are detailed further in the following sections. 5.2 Proposed 30 km/h Speed Limit Zone At present are located within the 50 km/h urban speed limit of Limerick City. The fatality risk at 50 km/h is more than twice as high as the risk at 40 km/h and more than five times higher than the risk at 30 km/h. The first 30 km/h zone started as a pilot project in Buxtehude, Germany in After that, several other 30 km/h zones were implemented all over Europe. Since then, these zones have become very popular globally. At 30 km/h, the probability of a cyclist surviving a collision with a motor vehicle is 95%; at 50 km/h, the chance is 50% (Copenhagenize Consulting, 2012). August

24 According to DMURS (2013) where vehicle movement priorities are low, such as on local streets, lower speed limits should be applied (i.e. 30 km/h). Table 4.1 of DMURS provides a design speed selection matrix, which indicates the links between place, movement, and speed that need to be considered in order to achieve an effective and balanced design speed solution. are local suburban streets and therefore a 30 km/h speed limit is deemed appropriate at this location. 5.3 Proposed Traffic Reassignment Background Park Bridge is located along the City Canal in Limerick City, linking Lower Park Road to Park Road. It is a short, narrow-back bridge, only capable of accommodating flows of traffic in one direction at any one time. It is currently subjected to a 3 tonne vehicle weight limit. Despite this restriction, the bridge is used as a rat-run by traffic travelling between the Corbally Road and the Dublin Road and also by the large residential area north of the canal. The existing bridge has poor alignment, structural and visibility issues as a result of vertical and horizontal constraints. The construction of Pa Healy Road in 2007 enabled improved access to Limerick City from the suburb of Corbally and also from the great southeast Clare area relieving traffic congestion for commuters and local residents alike Traffic Impact Assessment Study LST commissioned Arup Consulting Engineers to carry out a Transport Assessment on a number of junctions in Limerick City as part of the LST Programme. An original assessment involved the full closure of Park Bridge to vehicular traffic. This was presented in a Traffic Impact Assessment report issued in February Following the preparation of the Traffic Impact Assessment, LST requested Arup to appraise an additional scenario to include the closure of Park Bridge to southbound vehicular traffic reserving its use for southbound pedestrians and cyclists only. Northbound traffic would continue to use the bridge as per current conditions. This additional scenario supplements previous scenarios carried out in the aforementioned Traffic Impact Assessment. The impact the proposed scheme would have on the prevailing traffic network was assessed and localised analyses were carried out at a number of junctions in the vicinity of Park Bridge on Corbally Road, Clare Street, Park Road and Dublin Road. Traffic models were created for the proposed opening year (2014) and 15 years after opening (2029) during morning and evening peak times, using VISSIM micro-simulation traffic modelling software Conclusion and Design Implications The assessment concluded that the impact of the proposed one-way traffic system on the prevailing road network would be to an acceptable level, based on comparisons with queue lengths and journey schemes with and without the proposed restrictions in place. The proposed one-way traffic system is shown in Drawing No provided in the Appendix B. August

25 The proposed design includes the re-grading of an existing turning head on Lower Park Road and appropriate signage on the approaching road network to facilitate turning movements and warn motorists of the traffic restrictions ahead, respectively. The proposed re-grading of the existing turning head is shown in Drawing No and the proposed signage locations are shown in Drawing No provided in the Appendix B. 5.4 Proposed Traffic Calming Traffic calming is one important application when designing for pedestrians and cyclists in a mixed traffic environment. In the first instance, traffic would be calmed by the proposed introduction of a 30 km/h speed limit zone. Park Bridge at present acts as a natural traffic calming measure, given its existing width restrictions. However, there is a need to ensure this 30 km/h speeds are maintained along Park Road. DMURS recommends that raised tables should be provided to promote lower design speeds, slow turning vehicles at junctions, and to enable pedestrians to cross safely. Opportunities have been identified to use these horizontal alignment constraints to keep low speeds down. With reference to the Traffic Management Guidelines, it is recommended that features should be located as regularly and frequently as practicable ( metres). Therefore, the Park Road section of the design includes a number of proposed raised tables to slow vehicles throughout this section of Park Road. These deflections require drivers to slow down and to navigate obstacles, at less than 70 metre intervals along Park Road (parallel to Park Canal). These horizontal constraints, or raised tables, would have the following effects: Reduction in speed; Improve safety; Highlight 30 km/h zone; Removal of long straights that encourage speeds; and Provide opportunities for scheme enhancement including hard and soft landscaping, where possible. The proposed design includes three raised tables. The proposed raised table locations are shown in Drawing No provided in the Appendix B. 5.5 Proposed Pedestrian and Cyclist Access Shared surface Shared surface streets and junctions are integrated spaces where pedestrians, cyclists and vehicles share the main carriageway. With reference to DMURS, shared surfaces are an effective way of providing pedestrians and cyclists with a more enjoyable experience, Shared surface streets and junctions are particularly effective at calming traffic. August

26 Research has found that shared carriageways perform well in terms of safety and there is also evidence to suggest that well designed schemes in appropriate settings can bring benefits in terms of visual amenity, economic performance and perceptions of personal safety (DMURS, 2013). It is proposed to provide a shared surface along Park Bridge and a section of Park Road (parallel to Park Canal) in a contrast coloured surface as shown in Drawing No provided in the Appendix B. The proposed shared surface would allow for the continuous movement of pedestrians and cyclists through the area Contra-flow Cycle Lanes The proposed redesign includes a one way traffic system. However, the proposed design does not include any restrictions for cyclists or pedestrians. The main aim of this design is to ensure safe and continuous access for pedestrians and cyclists and ultimately the continuation and completion of Route 2 which links Limerick City Centre with UL via the Canal and river banks. The proposed shared surface will facilitate two way movements for pedestrians. In addition, the proposed design includes contra flow cycle lanes to facilitate two way cycling along Park Bridge and along the extent of Park Road, parallel to the Canal as shown in Drawing No provided in the Appendix B. The introduction of contra-flow cycle facilities within an urban one way system can significantly improve in directness and the attraction of cycling. The National Cycle Manual (2011) recommends that contra-flow cycle should be provided on access roads or quiet streets in town centres, where speed of 30km/h or less exists. 5.6 Proposed Public Lighting The National Cycle Manual recommends that public lighting (70w Son-t lanterns, 6 to 8 metres in height) should be provided at 34-metre intervals in residential areas to enable road users, including cyclists, to see each other, as well as objects on or next to the road, at a reasonable distance. The design provides proposed lighting to meet the recommended standards, and in appropriate locations, as required. 5.7 Utility Ducting Utility duct will be provided along the Park Road (Canal Section) for future provision of services. August

27 5.8 Proposed Signage The design includes appropriate signage and road markings as required, and with reference to the Traffic Signs Manual. The proposed signage is shown in Drawing No provided in the Appendix B. 5.9 Convex Mirror A convex mirror will be provided to enhance visibility for motorists existing an existing access in one location on Park Road (Canal Section). Convex mirror location is shown in Drawing no Demountable Bollards Demountable bollards will be provided at the Park Road and Hymee s Boreen junction at the entry to the canal walk/cycleway. Demountable bollards will be provided for maintenance access similar to what is existing on Limerick Smarter Travel Route 2 Link 1 at Shannon Fields as shown in Figure 7. Location of bollards is shown in Drawing no Figure 7 Demountable Bollards on LST Route 2 Link 1 Shannon Fields. August

28 Appendix A Appropriate Assessment Screening Report August

29 Appendix B Drawings August

30 Appendix C Correspondence August

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013

Douglas Land Use and Transportation Strategy (DLUTS) Summary. August 2013 Douglas Land Use and Transportation Strategy (DLUTS) Summary August 2013 Background Douglas is a large and popular residential suburb of approximately 30,000 persons on the periphery of Cork City along

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016

March Maidstone Integrated Transport Strategy Boxley Parish Council Briefing Note. Context. Author: Parish Clerk 2 March 2016 Context. Author: Parish Clerk 2 The Draft Integrated Transport Policy (DITS) sets out a vision and objectives, and identifies a detailed programme of interventions to support the Maidstone Borough Local

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities Active Travel Towns Funding Scheme 2014-2016 Project Proposal for Sligo by Sligo Local Authorities Introduction Over the last two years, Sligo Local Authorities have implemented years 1 & 2 of their 5

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

Launceston's Transport Futures. Greater travel options for the people of Launceston

Launceston's Transport Futures. Greater travel options for the people of Launceston Launceston's Transport Futures Greater travel options for the people of Launceston Final Draft 13 Jan 2014 1 Page Number Executive summary 3 What is Transport Futures? 4 Vision 6 Economy, access and liveability

More information

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria,

1.5 On this basis it is fundamental that the Transport Strategy for the site focuses on the following key criteria, 1.0 Introduction 1.1 The Transport Assessment has been prepared on behalf of Eon and Roger Bullivant Ltd in respect of the proposed mixed use sustainable urban extension of Drakelow Park. 1.2 The methodology

More information

Determining bicycle infrastructure preferences A case study of Dublin

Determining bicycle infrastructure preferences A case study of Dublin *Manuscript Click here to view linked References 1 Determining bicycle infrastructure preferences A case study of Dublin Brian Caulfield 1, Elaine Brick 2, Orla Thérèse McCarthy 1 1 Department of Civil,

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland

Walking and Cycling Action Plan Summary. A Catalyst for Change The Regional Transport Strategy for the west of Scotland Walking and Cycling Action Plan Summary A Catalyst for Change The Regional Transport Strategy for the west of Scotland 2007-2021 Strathclyde Partnership for Transport Contents Purpose...2 Issues, Constraints

More information

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION

CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION CAIRNGORMS NATIONAL PARK AUTHORITY FOR DECISION Title: Prepared by: A9 Dualling Project: Dalraddy to Slochd Murray Ferguson, Director of Planning and Rural Development and Gavin Miles, Head of Planning

More information

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY

HAMILTON BIKING PLAN OUR VISION: A BIKE FRIENDLY CITY HAMILTON BIKING PLAN 2015-2045 OUR VISION: A BIKE FRIENDLY CITY INTRODUCTION Biking as a travel option is experiencing a resurgence internationally and in New Zealand, growing as a familyfriendly and healthy

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis.

This objective implies that all population groups should find walking appealing, and that it is made easier for them to walk more on a daily basis. Walking for life The Norwegian Walking Strategy Guro Berge Norwegian public Roads Administration "Walking for life" is the slogan for the National Walking Strategy that is now being formulated in Norway.

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation

More information

Final Plan 20 December 2016

Final Plan 20 December 2016 Final Plan 20 December 2016 Introduction Aims of the Travel Plan How do we travel? Understanding travel behaviours? The University Master Plan and its implications Galway City sustainable transport policies

More information

The Rower Traffic Management Scheme

The Rower Traffic Management Scheme KILKENNY COUNTY COUNCIL Comhairle Chontae Chill Chainnigh Section 38 of the Road Traffic Act, 1994 as amended by the Public Transport Regulation Act, 2009 (Section 46) The Rower Traffic Management Scheme

More information

DRAFT for a State Policy for Healthy Spaces and Places

DRAFT for a State Policy for Healthy Spaces and Places DRAFT for a State Policy for Healthy Spaces and Places 1 DRAFT State Policy for Healthy spaces and Places 1. Purpose To encourage the use and development of land that builds healthy communities through

More information

M6 Junction 10 Public Consultation

M6 Junction 10 Public Consultation M6 Junction 10 Public Consultation December 2015 Introduction Walsall Council and Highways England are developing plans to provide a long term improvement to M6 junction 10. We are holding this non-statutory

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

FAQ s Walsh Road / Ferguson Road Pilot Scheme

FAQ s Walsh Road / Ferguson Road Pilot Scheme FAQ s Walsh Road / Ferguson Road Pilot Scheme What is happening? Traffic calming measures are being installed as a pilot. Temporary Bollards will be installed to the east of 1 Ferguson Road and a Temporary

More information

Public Information Centre

Public Information Centre WELCOME Public Information Centre Father Tobin Road Lougheed Middle School - Library Wednesday November 7, 2012 7:00 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background The City

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

Devonport City Cycling Network Strategy

Devonport City Cycling Network Strategy Devonport City Cycling Network Strategy 2010-2013 Devonport City Cycling Network Strategy Introduction In February 2010 a draft master plan for cycleways was presented to the community. The feedback received

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Active Transportation Infrastructure Investment A Business Case

Active Transportation Infrastructure Investment A Business Case Active Transportation Infrastructure Investment A Business Case In 2016, the Real Estate Foundation awarded the Capital Regional District a $50,000 grant for Shifting Gears: Land Use Change through Active

More information

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference

Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Canada s Capital Region Delegation to the Velo-City Global 2010 Conference Report of Findings from Visits, Meetings & Presentations In Amsterdam-Den Haag, Utrecht, Berlin & Copenhagen The Itinerary Copenhagen

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Living Streets response to the Draft London Plan

Living Streets response to the Draft London Plan Living Streets response to the Draft London Plan Contents Living Streets response to the Draft London Plan... 1 About Living Streets... 2 Summary... 2 Consultation response... 3 Chapter 1: Planning London

More information

Douglas Land Use and Transportation Study

Douglas Land Use and Transportation Study Douglas Land Use and Transportation Study Summary: Key: Yellow Box = key project information Green Box = project recommendations Grey Box = anticipated project outcomes Background: It is an objective of

More information

4.1 Introduction. 4.2 Aspects of walkable communities

4.1 Introduction. 4.2 Aspects of walkable communities 4 Community walkability Community walkability Making communities walkable Urban form Feeling secure 4.1 Introduction Walkability describes the extent to which the built environment is walking-friendly.

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL

NOTES FROM JUNIOR COUNCIL ORIENTATION SESSION HELD ON MONDAY, JANUARY 22, 2018, AT 3:30 PM IN COUNCIL CHAMBERS, CITY HALL CITY OF KAMLOOPS Junior Council Meeting Agenda March 12, 2018, at 3:30 pm in Council Chambers, 7 Victoria Street West, Kamloops, BC Page 1. APPROVAL OF THE AGENDA 2. MINUTES Attachment Recommendation:

More information

Bulwell Cycling Consultation

Bulwell Cycling Consultation Bulwell Cycling Consultation Image 1 Bulwell Bogs (Sutton, 2015) As part of a final year research project, I am seeking feedback on proposals for cycling improvements in Bulwell. This consultation is not

More information

Edenbrook Hill Drive Traffic Calming Study

Edenbrook Hill Drive Traffic Calming Study WELCOME Public Information Centre Edenbrook Hill Drive Traffic Calming Study Fletchers Meadow Secondary School Wednesday January 20, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming

More information

Dodder Greenway Emerging Preferred Route Consultation - October 2018

Dodder Greenway Emerging Preferred Route Consultation - October 2018 Dodder Greenway Emerging Preferred Route Consultation - October 2018 1.0 Introduction Dublin Cycling Campaign is the advocacy group for cycling in Dublin. Dublin Cycling Campaign is the leading member

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Strategy for Walking & Cycling Action Plan

Strategy for Walking & Cycling Action Plan Strategy for Walking & Cycling Action Plan To achieve higher levels of walking and cycling activity, the destinations which people access have to be available within suitable distances and designed to

More information

Frome Street Bicycle Route

Frome Street Bicycle Route The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

Nottingham, the great cycle city

Nottingham, the great cycle city Nottingham, the great cycle city Our vision for the city s cycling future Foreword Councillor Jon Collins Leader of the Council Nottingham has a world class public transport system which is essential to

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Re: N71 Muckross Road Traffic Calming Scheme Part 8 and Section 38

Re: N71 Muckross Road Traffic Calming Scheme Part 8 and Section 38 Administrative Officer, Kerry County Council, Roads, Transportation & Safety Department, Room 115, Áras an Chontae, Rathass, Tralee, Co. Kerry. The Tailor's Hall, Back Lane, Dublin 8. The Tailor's Hall,

More information

City of Perth Cycle Plan 2029

City of Perth Cycle Plan 2029 Bicycling Western Australia s response City of Perth Cycle Plan 2029 2012-2021 More People Cycling More Often ABOUT BICYCLING WESTERN AUSTRALIA Bicycling Western Australia is a community based, not-for-profit

More information

GD 0043/18 ACTIVE TRAVEL STRATEGY

GD 0043/18 ACTIVE TRAVEL STRATEGY GD 0043/18 ACTIVE TRAVEL STRATEGY 2018-2021 May 2018 Minister s Introduction There is strong evidence that regular physical activity reduces the risk of a range of health conditions. The best way to increase

More information

Section 2 Strategic Alignment. Contents

Section 2 Strategic Alignment. Contents Section 2 Strategic Alignment Contents 2 Strategic Alignment... 2 2.1 General... 2 2.2 SmartGrowth Strategy and Implementation Plan... 2 2.3 Walking and Cycling Strategy... 3 2.4 Built Environment Strategy...

More information

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND

COUNCIL POLICY NAME: COUNCIL REFERENCE: 06/119 06/377 09/1C 10llC 12/1C INDEX REFERENCE: POLICY BACKGROUND COUNCIL POLICY NAME: COUNCIL ADVISORY COMMITTEES - TERMS OF REFERENCE ISSUED: APRIL 3, 2006 AMENDED: NOVEMBER 27, 2006 NOVEMBER 23, 2009 JANUARY 11, 2010 DECEMBER 17, 2012 POLICY COUNCIL REFERENCE: 06/119

More information

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network

A future cycle route network for North Staffordshire mb/08/16 Need for a strategy. Existing cycle route network Need for a strategy 1. The government s aim is to double cycling levels nationally by 2025 [note 1]. This would bring significant health, environmental, economic and traffic benefits [note 2]. It is widely

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

TRANSPORT AND MOVEMENT

TRANSPORT AND MOVEMENT TRANSPORT AND MOVEMENT Movement Strategy Public Transport Cycling and Walking Road Network Parking Standards Transport Impact Assessments Traffic Management Policies DRAFT POOLBEG PLANNING SCHEME Movement

More information

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey: Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson

More information

Technical note. 1. Introduction

Technical note. 1. Introduction Project: A428 study - Phase 2 To: Adrian Shepherd Subject: Park & Ride site locations From: Atkins Date: Jun 3, 2016 cc: Ashley Heller 1. Introduction 1.1. Purpose of Technical Note The purpose of this

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT

AIRPORT ROAD ENVIRONMENTAL ASSESSMENT WELCOME TO PUBLIC INFORMATION CENTRE #1 AIRPORT ROAD ENVIRONMENTAL ASSESSMENT From Braydon Boulevard/Stonecrest Drive to Countryside Drive November 23, 2017 6:30 PM 8:30 PM Please sign in and fill out

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

ENFIELD TOWN THE REVISED DESIGN

ENFIELD TOWN THE REVISED DESIGN TOWN THE REVISED DESIGN We re turning Enfield into a borough that encourages walking and cycling, a place that s easy for all of us to get around however we choose to travel. A greener place, with safer

More information

KEY FINDINGS OF THE INTERIM EVALUATION OF THE SMARTER TRAVEL AREAS PROGRAMME

KEY FINDINGS OF THE INTERIM EVALUATION OF THE SMARTER TRAVEL AREAS PROGRAMME Proceedings 1st - 2nd September 2016 BRICK, CANTWELL, SWIFT: Smarter Travel Areas KEY FINDINGS OF THE INTERIM EVALUATION OF THE SMARTER TRAVEL AREAS PROGRAMME Elaine Brick Associate Director AECOM Mairead

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

102 Avenue Corridor Review

102 Avenue Corridor Review February 26, 2015 102 Avenue Corridor Review Transportation Association of Canada Road Safety Engineering Award Submission for the City of Edmonton Introduction Transportation Association of Canada Road

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne

Additional Policies & Objectives for Local Area Plans Ashbourne LAP. Ashbourne Ashbourne Strategic Policies SP 1 To operate an Order of Priority for the release of residential lands in compliance with the requirements of CS OBJ 6 of the County Development Plan as follows: i) The

More information

Urban Street Design with DMURS. Sean McGrath Senior Executive Engineer Fingal County Council

Urban Street Design with DMURS. Sean McGrath Senior Executive Engineer Fingal County Council Urban Street Design with DMURS Sean McGrath Senior Executive Engineer Fingal County Council Urban versus Rural Design Rural Road Design Prefer higher speed Release constraints Work within fence line Urban

More information

Cork to Limerick Route Pre-Feasibility Study Update

Cork to Limerick Route Pre-Feasibility Study Update Cork to Limerick Route Pre-Feasibility Study Update November 2008 Document Title: Cork to Limerick Route Pre-Feasibility Study Update Document Ref(s). : Date Rev Status Originator Checked Approved 01/12/08

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

Part B Design Guidance / Principles _

Part B Design Guidance / Principles _ Part B Design Guidance / Principles www. landlab.co.nz Queenstown Town Centre Public Realm Design Guidelines Version 7 14 June 2018 Page 006 B1 Design Guidance & Best Practice The Queenstown Town Centre

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design

Cycle traffic and the Strategic Road Network. Sandra Brown, Team Leader, Safer Roads- Design Cycle traffic and the Strategic Road Network Sandra Brown, Team Leader, Safer Roads- Design Highways England A Government owned Strategic Highways Company Department for Transport Road Investment Strategy

More information

Limerick City & County Council Traffic Calming Policy for Urban Areas DRAFT

Limerick City & County Council Traffic Calming Policy for Urban Areas DRAFT Limerick City & County Council Traffic Calming Policy for Urban Areas DRAFT Physical Development Directorate February 2018 Traffic Calming in Limerick City Minister Donohue launches 30kph Slow Zone Sign

More information

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route

Dún Laoghaire Rathdown County Council. Luas to Dart via UCD Cycle and Pedestrian Route Dún Laoghaire Rathdown County Council Luas to Dart via UCD Cycle and Pedestrian Route October 2012 Luas to Dart via UCD Cycle and Pedestrian Route DOCUMENT CONTROL SHEET Client: Project Title: Document

More information

BICYCLE INFRASTRUCTURE PREFERENCES A CASE STUDY OF DUBLIN

BICYCLE INFRASTRUCTURE PREFERENCES A CASE STUDY OF DUBLIN Proceedings 31st August 1st ITRN2011 University College Cork Brick, McCarty and Caulfield: Bicycle infrastructure preferences A case study of Dublin BICYCLE INFRASTRUCTURE PREFERENCES A CASE STUDY OF DUBLIN

More information

Classification Criteria

Classification Criteria SCHEDULE D TO RECOMMENDED OFFICIAL PLAN AMENDMENT NO. 40 SCHEDULE C-4 Road Criteria Criteria Traffic Service Objective Land Service/Access Typical Daily Traffic Volume Flow characteristics Travel Speed

More information

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities

THE PLANNING AND. Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities The planning and policy context Transport and the law Integrated transport planning Strategies Responsibilities of local government and road controlling authorities THE PLANNING AND POLICY CONTEXT Providing

More information

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3)

Yorkhill & Kelvingrove Community Council Cycling Village Proposal. Yorkhill Kelvingrove Cycling Village (1.3) Yorkhill Kelvingrove Cycling Village (1.3) 1) Introduction In recent years our community has been transformed. We have seen additional student and residential accommodation constructed. The redevelopment

More information

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL

CITY OF WEST KELOWNA COUNCIL POLICY MANUAL CITY OF WEST KELOWNA COUNCIL POLICY MANUAL Page 1 of 7 DEPARTMENT: Engineering Services SUBJECT: Traffic Calming Policy (Revised June 6, 2017) Policy Statement: The provision of traffic calming measures

More information

Drawing 5269/GA01: A2/A28 Coast bound off-slip - Wincheap Scheme

Drawing 5269/GA01: A2/A28 Coast bound off-slip - Wincheap Scheme Drawing 5269/GA01: A2/A28 Coast bound off-slip - Wincheap Scheme Notes and queries by the Wincheap Society, May 2017 Comments 1 Off the A2: Approaching the A28 junction from the north, new slip road marked

More information

20mph. We want to make Edinburgh a better and safer place to live, work and play.

20mph. We want to make Edinburgh a better and safer place to live, work and play. 20mph CREATING A BETTER SAFER EDINBURGH We want to make Edinburgh a better and safer place to live, work and play. That s why on 13 January 2015 Councillors approved a new speed limit network for Edinburgh

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information