1 Change Crossarm Insulator with Hotsticks S T U D E N T M A N U A L March 31, 2005

2 2 STUDENT TRAINING MANUAL Prerequisites: Introduction to Hotsticks module Use and Care of Hotsticks module Weights & Forces module Universal Tool Accessories I module Universal Tool Accessories II module Wire Tong and Accessories module Objectives: Given a hotstick trailer, a tangent three-phase pole, you will be able to change insulators on a three-phase crossarm using the hotstick method. Rationale: Customer demand to maintain uninterrupted power may require that the work be performed in an energized state. Learning Objectives Demonstrate the procedure to hold a tailboard discussion. Calculate the weight of the conductor. Identify the hotsticks and tools required to change out an insulator on a three-phase crossarm. Inspect and clean the hotsticks and tools required to change out an insulator on a three-phase crossarm. Install protective cover where required. Demonstrate the procedure to move conductors using wire tongs and rope blocks. Install the hotsticks in the configuration required to change out an insulator on a three-phase crossarm. Demonstrate the procedure to untie and tie the line conductors using the hotstick method. Learning Methods Self-learning + On-the-job Self-learning + On-the-job Self-learning + On-the-job Self-learning + On-the-job Self-learning + On-the-job Self-learning + On-the-job

3 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 3 Self-learning + On-the-job Self-learning + On-the-job EVALUATION METHODS Written test Written test Written test Written test Written test Written test Written test Written test STUDENT RESOURCES Learning Steps None 1. Read the Learning Guide. 2. Follow the steps outlined in the Learning Guide. 3. Clarify any questions or concerns you may have. 4. Complete the Practice and Feedback. 5. Complete the Evaluation. Introduction In the procedure of changing an insulator on a typical three-phase tangent structure, the conductors are moved and anchored to a safe working position using wire tongs, lever lifts, saddles and rope blocks. This configuration allows adequate working clearance to change out the insulator safely. No matter what tool you are using, remember that your safety, and that of your co-workers, are prime considerations in all work activities. Recommended working clearances must be maintained at all times for

4 4 STUDENT TRAINING MANUAL the voltage being worked.

5 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 5 Lesson 1: Tail Board Discussion Learning Objective:Demonstrate the procedure to hold a tailboard discussion. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction Upon arriving at the job site, A tailboard discussion must be held with all personnel prior to commencing work. The power line technician must obtain a standoff permit on the appropriate circuit, and the crew must be made aware of the circuit status. A proper tail board includes a discussion covering the following details: The procedure to be executed, a job drawing may be used to clarify any questions Potential hazards and the possible safeguards to take Work assignments defined and designated Specialty tools or equipment to be utilized Ensure all personnel involved clearly understand their roles and responsibilities, and conduct additional briefings as required to ensure that all personnel involved understand each step of the work when changes have been made.

6 6 STUDENT TRAINING MANUAL

7 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 7 Lesson 2: Weight of the Conductor Learning Objective:Calculate the weight of the conductor. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction The weight of the conductor for hotstick work is calculated by using a predetermined safety factor and a formula. Spans 75 metres or longer use a safety factor of 1.5 and spans shorter than 75 metres use a safety factor of 2 in the calculation.

8 8 STUDENT TRAINING MANUAL Lesson 3: Select the Hotsticks and Tools Learning Objective:Identify the hotsticks and tools required to change out an insulator on a three-phase crossarm. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction Once the weight of the conductor is known, the appropriate hotsticks and accessories can then be selected to safely remove the conductor from the insulator on the crossarm. You must determine the condition of the structure including the pole, crossarm, insulators and hardware. In some cases, wire tongs may be required to secure the conductors in position before starting to untie them. You must then determine the working side of the structure; this is the side of the structure that the wire holding sticks will be on, usually opposite the crossarm. The selection of the lifting tong is determined by its ability to raise the weight of the conductor from the crossarm and support that weight in a cantilever position. We are using a 2-1/2 inch wire tong as a lifting tong and a 1-1/2 inch wire tong as a holding tong for this procedure. The conductor weight will also help you determine the wire tong accessories required to move and hold the lifting tongs in position. Our procedure requires one lever lift along with one pole saddle for the outside phase.! CAUTION Never use a 1-1/2 inch wire tong as a lifting tong. Always use a wire tong of 2 inches or greater in diameter. The selection of the rope blocks will also be determined by the weight of the conductor and the force required on the fall line to allow one person to move the conductor easily. In some instances, rope blocks will not be required; however, we will be using two sets of double sheave live line rope blocks. The selection of the tie sticks is determined by the type of conductor tie

9 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 9 which is in place, and the type of tie being used to attach the conductor upon completing the work. Our procedure includes untying a steel distribution top tie with a rotary blade and lever cutters, and tying the conductor back in with a supper-top tie using a hold stick and a hot rodder accessory, attached to a universal pole. It has been determined that two conductor covers, an insulator cover, a pole guard and a crossarm guard are required as protective cover.

10 10 STUDENT TRAINING MANUAL Lesson 4: Inspect and Clean the Hotsticks and Tools Learning Objective:Inspect and clean the hotsticks and tools required to change out an insulator on a three-phase crossarm. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction All of the hotsticks and accessories should be set out on a tarp and thoroughly inspected. The hotsticks must be cleaned and wiped down with a silicone wiping cloth and all of the saddles, lever lifts, protective covers and rope blocks must be in perfect working condition. The sticks should be set on hotstick tool holders after they have been cleaned.

11 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 11 Lesson 5: Install Protective Cover Learning Objective:Install protective cover where required. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction Protective cover should be installed by hanging the handline in a position that will allow the tools to be easily raised to the workers. Begin by installing two line guards and an insulator cover with a grip all hotstick on the centre phase. A short pole guard may be used to cover the snipe of the pole. A crossarm guard is also used when untying and tying the conductor. If working clearances require the outside phases to be covered, it should also be done at this time as well.

12 12 STUDENT TRAINING MANUAL Installing the Hotsticks From the working side of the structure untie and cut the tie wire away from the conductor to be moved. This allows the wire tongs to be attached closer to the insulator. (If the tie wire or the insulator is in poor condition, the wire tongs must be attached before attempting to untie the conductor). Installing the Lifting Tong Attach a wire tong band to the lifting tong not more than 30 inches from the head of the lifting tong. Clamp the lifting tong to the conductor, a short distance from the insulator, by rotating the pole. Attach a lever lift to the pole at the butt ring of the lifting tong and secure it with the wheel tightener. Attach the lifting tong by inserting the clevis pin into the butt ring. Installing the Holding Tong Mount the holding tong saddle with the corresponding wire tong clamp to the pole approximately 3 feet down from the crossarm, at an angle of 30 degrees between the centre of the pole, on the opposite side of the pole from the phase to be moved. Attach the holding tong to the conductor beside the lifting tong; engage the holding tong in the saddle clamp and tighten the clamp.

13 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 13 Installing the Rope Blocks Install a rope snubbing bracket at the base of the pole and secure it with the wheel tightener. Choke a sling to the pole approximately halfway between the holding tong saddle and the lever lift. Install a set of rope blocks in the standing position between the sling and the clevis on the lever lift. Take up the slack in the fall line and secure it to the snubbing bracket. Install a second set of rope blocks in the standing position to the holding tong saddle clevis and, using a hotstick and the hotstick handling rings, attach the other end of the rope blocks to the wire tong band on the lifting tong. Remove the slack and secure the fall line to the snubbing bracket. Finish untying the conductor. Now the conductor is ready to move.

14 14 STUDENT TRAINING MANUAL Lesson 6: Moving the Conductor Learning Objective:Demonstrate the procedure to move conductors using wire tongs and rope blocks. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction Have the ground personnel untie and hold the fall lines of the rope blocks attached to both of the wire tongs. One of the workers on the pole can now loosen the clamp on the holding tong saddle. With the rope blocks attached to the lever lift, the ground personnel can raise the conductor upward approximately 1 foot as directed by the pole personnel. While guiding the holding tong with outward pressure, the rope blocks which are attached to the wire tong band are gradually released until the conductor rests at a safe working distance from the pole. Tighten the saddle clamp on the holding tong, securing the conductor in position.

15 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 15

16 16 STUDENT TRAINING MANUAL Lesson 7: Changing the Insulator Learning Objective:Install the hotsticks in the configuration required to change out an insulator on a three-phase crossarm. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction Position yourself on the pole to remove the insulator, at all times, working clearances must be maintained or additional protection must be installed. Remove the damaged insulator and send it down on the handline. Check the insulator pin to ensure that it is in good condition. Replace the insulator with a new one.

17 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 17 Lesson 8: Attaching the Conductor Learning Objective:Demonstrate the procedure to untie and tie the line conductors using the hotstick method. Learning Method:Self-learning + On-the-job Evaluation Method:Written test Introduction The conductor should be moved into position by the ground personnel manipulating the rope blocks under supervision of the powerline technician from the pole. Once the conductor is in the insulator grove, pull downward on the wire tongs to keep the conductor in place while it is being tied in. Tie the conductor into the insulator with a super-top tie using a hold stick and a universal stick along with a hot rodder accessory installed on one end of it. Inspect the tie. Remove the rope blocks and wire tongs and send them to the ground on the handline. Finish removing the saddles, lever lifts and protective cover from the structure. Remove the handline and send it to the ground. Descend the pole. Clean up the work site and store all of the hotsticks and accessories back on the trailer. Verbally attain clearance from all personnel involved that the work has been completed and formally surrender the standoff on the circuit. The job is now complete.

18 18 STUDENT TRAINING MANUAL Summary To summarize this module, you have learned: The procedure to hold a tail board discussion The procedure to determine the weight of the conductor The identity of the hotsticks and tools required to change out an insulator on a three-phase crossarm The procedure to inspect and clean the hotsticks and tools required to change out an insulator on a three-phase crossarm The procedure to install protective cover where required The procedure to move conductors using wire tongs and rope blocks The procedure to install the hotsticks in the configuration required to change out an insulator on a three-phase crossarm The procedure to untie and tie the line conductors using the hotstick method Practice Feedback Review the lesson, ask any questions and complete the self-test. Evaluation When you are ready, complete the final test. You are expected to achieve 100%.

19 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 19 Review Questions 1. Your prime considerations when performing live line work are your personal safety and the safety of your coworkers. 2. Recommended working clearances do not have to be maintained at all times when performing live line work. 3. A proper tailboard will include: (a) Work assignments defined and designated. (b) Specialty tools or equipment to be utilized. (c) Potential hazards. (d) All of these 4. The recommended working clearance on a 25kV line is: (a) 1.22m. (b).60m. (c).90m (d) None of these 5. Span length is not a factor in the weight at the suspension point. 6. When calculating the weight of a conductor, a span of 75 metres requires a safety factor of You must determine the condition of the structure you are working on. 8. You may use a 1-1/2 inch wire tong for a lifting tong. 9. The working side of the structure is the side opposite the crossarm. 10. All hotsticks must be cleaned before use with a silicone wiping cloth. 11. It is not necessary to inspect saddles before use. 12. The lifting tong is attached to the lever lift.

20 20 STUDENT TRAINING MANUAL 13. A wire tong band is attached to the lifting tong more than 30 inches from the head. 14. The wire tong saddle is installed 3 feet down from the crossarm. 15. The holding tong is attached to the conductor beside the lifting tong. 16. Rope blocks are used to assist with the moving of the conductor. 17. Ground personnel assist the workers with the movement of the conductors. 18. The rope blocks attached to the lever lift will raise the conductor giving the lineman more vertical clearance from the crossarm. 19. The power line technician must maintain proper working clearances when changing the insulator. 20. The power line technician should inspect the insulator pin to make sure that it is in good condition. 21. The conductor is moved into position by the ground personnel using the rope block. 22. A super top tie is installed using a hold stick and a universal pole with a hot rodder attachment. 23. The standoff is to be surrendered after the work is complete.

21 CHANGE CROSSARM INSULATOR WITH HOTSTICKS 21 Review Question Solutions 1. T 2. F 3. All of these 4..60m. 5. F 6. T 7. T 8. F 9. T 10. T 11. F 12. T 13. F 14. T 15. T 16. T 17. T 18. T 19. T 20. T 21. T 22. T

22 22 STUDENT TRAINING MANUAL 23. T

Live Line Tool Techniques

Live Line Tool Techniques Live Line Tool Techniques Safe Practice Guide ihsa.ca Infrastructure Health & Safety Association Safe Practice Guide Live Line Tool Techniques Foreword This Guide designates the practices that should be

More information

Journeyman Team Events

Journeyman Team Events Journeyman Team Events Journeyman Team Rules Journeymen Teams Journeymen teams for the Florida Lineman Competition are comprised of three participants: 1. At least one of the climbers must be a Lineman

More information

Whiskey City Lineman Rodeo Competitive Events

Whiskey City Lineman Rodeo Competitive Events Whiskey City Lineman Rodeo Competitive Events Team Events Hurt-man Rescue... 2 10 KVA Transformer Change-Out (Energized) 3 Crossarm Change-Out 4kv (Energized)... 4 3 Phase Conductor Tie- In (Dead & Grounded)..

More information

Apprentice Event Written Test Chief Judge: David Benenhaley

Apprentice Event Written Test Chief Judge: David Benenhaley Apprentice Event Written Test Chief Judge: David Benenhaley Event Time: N/A Drop-Dead Time: 15 Minutes Summary: This event is a written test compiled of 24 true/false and multiple-choice safety knowledge

More information

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013

COOPER POWER SERIES. D-73P3 bypass switches installation instructions. Switches MN008005EN. Effective April 2016 Supersedes S June 2013 Switches MN008005EN Effective April 2016 Supersedes S328-120-1 June 2013 D-73P3 bypass switches installation instructions COOPER POWER SERIES DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY The information,

More information

ENMAX LINEMAN RODEO & SAFETY EXPO. July 14, 2018 CALGARY, ALBERTA

ENMAX LINEMAN RODEO & SAFETY EXPO. July 14, 2018 CALGARY, ALBERTA ENMAX LINEMAN RODEO & SAFETY EXPO July 14, 2018 CALGARY, ALBERTA Competition Events There will be four Journeyman Power Line Technician events and four Apprentice events. Journeyman Powerline Technician

More information

VERIFICATION OF EMPLOYEE TRAINING

VERIFICATION OF EMPLOYEE TRAINING VERIFICATION OF EMPLOYEE TRAINING I, (Full Name) official representative of (Utility Name), certify that the employees listed below, have received proper training and are qualified to participate in the

More information

Hands-On Pole Top and Bucket Truck Rescue

Hands-On Pole Top and Bucket Truck Rescue Hands-On Course Description The reaction to emergencies can be life or death situations. Pole top and bucket truck rescue training teaches the skills necessary to save another persons life. The course

More information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors 5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors

More information

ELECTRIC OPERATING PROCEDURES Date: 11/01/06

ELECTRIC OPERATING PROCEDURES Date: 11/01/06 Doc No.: NG-USA EOP D001 Page: 1 of 5 ELECTRIC OPERATING PROCEDURES SUBJECT: Cutouts Open/Enclosed Type SECTION: Distribution/Overhead REFERENCE: National Grid Retail Company Safety Manuals National Grid

More information

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION

CLIMBING STEEL POLES INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION INSTRUCTOR GENERAL LESSON OUTLINE ONLINE/CLASSROOM SESSION This lesson describes different steel pole steps and discusses strategies for climbing, descending, and positioning steel poles to reach work

More information

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning

Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System. Warning OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions Ladder Climber s Safety System Model # s: 6000, 6001, 6010 Warning You must read and fully understand all instructions, or

More information

Lawrenceburg. whiskey city rodeo. Event Summary and Rodeo Rules

Lawrenceburg. whiskey city rodeo. Event Summary and Rodeo Rules Lawrenceburg whiskey city rodeo Event Summary and Rodeo Rules Events CROSS ARM CHANGE OUT ENERGIZED 12-minute mean time 18-minute drop-dead time Event Summary: Teams will be replacing an eight-foot fiberglass

More information

S Surge Arresters

S Surge Arresters Surge Arresters UltraSIL Polymer-Housed VariSTAR Type US, UH, and UX Station-Class Surge Arresters Installation and Maintenance Instructions Service Information S235-88-1 Contents Product Information...........................1

More information

LADWP Lineman s Rodeo April 30, 2016

LADWP Lineman s Rodeo April 30, 2016 LADWP Lineman s Rodeo April 30, 2016 LINEMAN S RODEO SCHEDULE 7:00AM 8:00AM REGISTRATION JUDGE S MEETING 8:30 AM NATIONAL ANTHEM START OF COMPETITION 8:30 9:00am APPRENTICE QUIZ 10:00AM 2:00PM BALLOONS

More information

DM# High Voltage Live Work Procedures Distribution Insulated Stick

DM# High Voltage Live Work Procedures Distribution Insulated Stick DM# High Voltage Live Work Procedures Distribution Insulated Stick 2014, Electricity Networks Corporation t/a Western Power. Permission is granted to view, copy, print and use documents providing the information

More information

TVPPA Lineman Apprenticeship Program

TVPPA Lineman Apprenticeship Program Self-Study Modules Unit 1 Unit 2 Unit 3 Unit 4 Lineman Apprenticeship Program Skills Labs Pre-Apprentice Assessment Digger Derrick Training Fundamentals Lab 1 Construction Lab 2 Operations Lab 3 Underground

More information

LADWP Lineman s Rodeo April 29, 2017

LADWP Lineman s Rodeo April 29, 2017 LADWP Lineman s Rodeo April 29, 2017 LINEMAN S RODEO SCHEDULE 7:00AM 8:00AM REGISTRATION JUDGE S MEETING 8:30 AM NATIONAL ANTHEM START OF COMPETITION 8:30 9:00am APPRENTICE QUIZ 10:00AM 2:00PM BALLOONS

More information

Methods of installation of ADSS fiber optic cables

Methods of installation of ADSS fiber optic cables Methods of installation of ADSS fiber optic cables Two main methods recommended by the cable manufacturers: A. Mobile Cable Reel method generally recommended for span < 50 m B. Static Cable Reel method

More information

2018 Public Power Lineworkers Rodeo General Rules for All Rodeo Competitors

2018 Public Power Lineworkers Rodeo General Rules for All Rodeo Competitors 2018 Public Power Lineworkers Rodeo General Rules for All Rodeo Competitors 1. All safety rules are to be observed during events. 2. A competitor may not compete if bleeding. 3. Rubber gloves are required

More information

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions

Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions Transfer Chain (SA-1002) & Adjustable I-Beam Clamp (SA-1039 or SA-1040) Operating Instructions SPIDER Page 1 of 8 702127 Rev A Using Transfer Chain with Adjustable I-Beam Clamp Safety Notes Do not use

More information

SAMPLE PAGE. Section 2... Wire Rope

SAMPLE PAGE. Section 2... Wire Rope Section 2...................................................... Wire Rope Never use any kind of clip to directly connect two straight lengths of wire rope to form a continuous piece. Do not make up slings

More information

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , , ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

Tripod Setup Guide (M-TPx)

Tripod Setup Guide (M-TPx) Items needed: 1/2 inch wrench, mast level (M-MLA), medium size wire cutters, crescent wrench, all-purpose grease, tape measure, tie wraps, redi-mix cement (optional), shovel (optional), sledge hammer (for

More information

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers

DEH Instructions. Three-Phase, Platform-Mounted Distribution Transformers g DEH 40050 Instructions Three-Phase, Platform-Mounted Distribution Transformers Introduction The equipment covered by these instructions should be operated and serviced only by competent technicians familiar

More information

LADWP/ IBEW LOCAL 1 8 LINEMAN S RODEO. LADWP Lineman s Rodeo May 19, 2018

LADWP/ IBEW LOCAL 1 8 LINEMAN S RODEO. LADWP Lineman s Rodeo May 19, 2018 LADWP Lineman s Rodeo May 19, 2018 LINEMAN S RODEO SCHEDULE 7:00AM 8:00AM REGISTRATION JUDGE S MEETING 8:30 AM NATIONAL ANTHEM START OF COMPETITION 8:30 9:00am APPRENTICE QUIZ 10:00AM 2:00PM BALLOONS AND

More information

Original Date of Issue: 04/09

Original Date of Issue: 04/09 POLICIES AND PROCEDURES DEPARTMENT: Environmental Health and Safety SUBJECT: Electrical Safety Program Original Date of Issue: 04/09 Reviewed 12/2011 Revised 12/2011 BACKGROUND ELECTRIC SHOCK It is well

More information

Team A6 OCR Change-out Event

Team A6 OCR Change-out Event Team A6 OCR Change-out Event Mean Time: 20 Minutes, Drop Dead Time: 25 Minutes EVENT SUMMARY: Replace a pole mounted oil circuit reclosure (OCR) on a single phase distribution line for scheduled maintenance.

More information

Installation and Operation

Installation and Operation S&C TripSaver Dropout Recloser Outdoor Distribution (15 kv and 25 kv) Installation and Operation Table of Contents Section Page Section Page Introduction Qualified Persons.... 2 Read this Instruction Sheet....

More information

RehabPro Standard Pulley (M30, M50, M70, M30F, M50F, M70F)

RehabPro Standard Pulley (M30, M50, M70, M30F, M50F, M70F) RehabPro Standard Pulley (M30, M50, M70, M30F, M50F, M70F) User Manual RehabPro, Inc. 28215 North 25th Dale Phoenix, AZ 85085 602-317-7207 (phone) E-mail: sales@rehabpropulleys.com E-mail: kris@rehabpropulleys.com

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning

OWNER'S MANUAL. Turnbuckle. Stanchions. Warning GEMTOR, INC....when your life is on the line One Johnson Avenue Matawan, NJ 07747 732-583-6200 800-405-9048 Fax 732-290-9391 OWNER'S MANUAL Installation, Operating, Inspection and Maintenance Instructions

More information

Block & Tackle. Block & Tackle. Klein s line of block and tackle is engineered for high-strength requirements.

Block & Tackle. Block & Tackle. Klein s line of block and tackle is engineered for high-strength requirements. Block & Tackle Klein s line of block and tackle is engineered for high-strength requirements. 254 Block and Tackle These are NOT occupational protective devices. NOT for human support. Sheaves are strong,

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production

More information

Sub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171

Sub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171 Transformer Business Department Regulator & Inductive Products Sub-Base Assembly For Type-ML 32 & VR-1 Step Voltage Regulator Single-Phase Liquid-Filled Part # GEK 35171 Last Update 11-19-2013 Tom Dauzat,

More information

Page 1 of 1 04/19/13 SBR

Page 1 of 1 04/19/13 SBR Office of Roadway Engineering - Plan Insert Sheets Number Title Date Number Title Date Number Title Date 201015 Extension of Anchor Bolts 07/20/12 207000 Bikeway Pavement Marking Details 01/18/13 202010

More information

SAVE THESE INSTRUCTIONS. NOTE: Check all parts for shipping damage. In case of damage, DO NOT use. Contact Carrier/Invacare for further instructions.

SAVE THESE INSTRUCTIONS. NOTE: Check all parts for shipping damage. In case of damage, DO NOT use. Contact Carrier/Invacare for further instructions. Walking Tutor, Installation and Operating Instructions Model No. WT 200 SAVE THESE INSTRUCTIONS NOTE: Check all parts for shipping damage. In case of damage, DO NOT use. Contact Carrier/Invacare for further

More information

S Vacuum Switches. Contents. Type VCS-1 Single-Phase Vacuum Capacitor Switch Installation and Operation Instructions

S Vacuum Switches. Contents. Type VCS-1 Single-Phase Vacuum Capacitor Switch Installation and Operation Instructions Vacuum Switches Type VCS-1 Single-Phase Vacuum Capacitor Switch Installation and Operation Instructions Service Information S260-15-1 Figure 1 Type VCS-1 Vacuum Capacitor Switch 010065KM Contents Safety

More information

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline

Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline Rigging Safety 16 Hour (API RP 2D 7 th Edition) Course Outline Prerequisites: This course shall have no formal pre-requisite. The individual should have no history of a disabling medical condition, which

More information

IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact DBI/SALA.

IMPORTANT: If you have questions on the use, care, or suitability of this equipment for your application, contact DBI/SALA. User Instruction Manual Precast Concrete Beam Horizontal Lifeline System This manual is provided as the Manufacturer s Instructions, and should be used as part of an employee training program as required

More information

MANITOWOC MODEL TON CAPACITY

MANITOWOC MODEL TON CAPACITY LIFTING CHARTS - Crawler Cranes ANITOWOC ODEL - 0 TON CAPACITY BOO RIGGING GUIDE ODEL AND # EL BOO Table of Contents General... Assist Crane Requirements... Accessing Parts... Installation and Removal

More information

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG

PUNE TECHTROL PVT LTD. Instruction and Maintenance Manual for Float and Tape Gauge FTG PUNE TECHTROL PVT LTD Instruction and Maintenance Manual for and Tape Gauge FTG INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR FLOAT AND TAPE GAUGE FTG 1 Introduction : It is used to measure and indicate

More information

ORRA SPINNING REEL INSTRUCTION MANUAL (DRAFT)

ORRA SPINNING REEL INSTRUCTION MANUAL (DRAFT) ORRA SPINNING REEL INSTRUCTION MANUAL (DRAFT) a. Congratulations b. Pictures of Components c. Family Info d. How to Fill the Spool with Line e. Handle Assembly f. Anti-Reverse g. Drag Adjustment h. Reel

More information

Load Charts Annotated Instructor s Guide. Module MODULE OVERVIEW PREREQUISITES OBJECTIVES PERFORMANCE TASKS MATERIALS AND EQUIPMENT LIST

Load Charts Annotated Instructor s Guide. Module MODULE OVERVIEW PREREQUISITES OBJECTIVES PERFORMANCE TASKS MATERIALS AND EQUIPMENT LIST Load Charts Annotated Instructor s Guide Module 21301-05 MODULE OVERVIEW This module discusses the importance of load charts and charts that apply to different configurations. It includes on-rubber, on-outrigger,

More information

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS

Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS 1 Stand-N-Fish FULL DETAIL INSTALLATION INSTRUCTIONS Thank you for purchasing the incredible new Stand-N-Fish Kayak Fishing System. Once installed on your kayak the Stand-N-Fish will take your kayak fishing

More information

In This Document. OBJECTIVES Upon completion of this module, you should be able to:

In This Document. OBJECTIVES Upon completion of this module, you should be able to: Struck By Fact Sheet MODULE DESCRIPTION This module provides information that will enable you to recognize common struck-by hazards at construction worksites. OBJECTIVES Upon completion of this module,

More information

An introduction to Rigging for Trail Work

An introduction to Rigging for Trail Work An introduction to Rigging for Trail Work Give me a lever long enough and a prop strong enough, I can single handed move the world. Archimedes The purpose of this seminar is to provide a hands-on introduction

More information

Puller. Operation Service Parts SHERMAN & REILLY, INC.

Puller. Operation Service Parts SHERMAN & REILLY, INC. Puller Operation Service Parts SHERMAN & REILLY, INC. P.O. Box 11267 400 West 33rd Street Chattanooga, TN 37401 USA Phone 423 756 5300 Fax No. 423 756 2948 Toll-Free 800 251 7780 Web Site www.sherman-reilly.com

More information

CARDINAL SPINNING REEL INSTRUCTION MANUAL

CARDINAL SPINNING REEL INSTRUCTION MANUAL CARDINAL SPINNING REEL INSTRUCTION MANUAL a. Congratulations b. Pictures of Components c. Family Info d. How to Fill the Spool with Line e. Handle Assembly f. Anti-Reverse g. Drag Adjustment h. Reel Function

More information

COOPER POWER SERIES. DS250 deadbreak straight connector installation instructions interface A. Connectors MN650027EN

COOPER POWER SERIES. DS250 deadbreak straight connector installation instructions interface A. Connectors MN650027EN Connectors MN650027EN Effective November 2016 Supersedes January 2014 (IS550-11-1) DS250 deadbreak straight connector installation instructions interface A COOPER POWER SERIES DISCLAIMER OF WARRANTIES

More information

RehabPro Speed Pulley (M100S & M100FS) User Manual

RehabPro Speed Pulley (M100S & M100FS) User Manual RehabPro Speed Pulley (M100S & M100FS) User Manual 1. Inspection of Delivery Before unpacking the Pulley please inspect the packaging for shipping damage. Observable damage should be noted prior to signing

More information

TECHNICAL DATA BROCHURE - ZTR 428 & 429

TECHNICAL DATA BROCHURE - ZTR 428 & 429 TECHNICAL DATA BROCHURE - ZTR 428 & 429 DATE 8/89 (Rev.) MPORTANT -- READ OPERATOR S MANUAL BEFORE OPERATING OR MAKING ADJUSTMENTS. Deluxe Seat Adjustment Easy hand lever action allows forward and backward

More information

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this

More information

COOPER POWER SERIES. 600 A, 15, 25, and 35 kv Class Cleer Grounding Elbow Installation Instructions. Loadbreak Apparatus Connectors MN650056EN

COOPER POWER SERIES. 600 A, 15, 25, and 35 kv Class Cleer Grounding Elbow Installation Instructions. Loadbreak Apparatus Connectors MN650056EN Loadbreak Apparatus Connectors MN650056EN Effective July 2018 Supersedes May 2017 COOPER POWER SERIES 600 A, 15, 25, and 35 kv Class Cleer Grounding Elbow Installation Instructions DISCLAIMER OF WARRANTIES

More information

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES

INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES Page 1 of 15 INSTALLATION PROCEDURE FOR OPGW FIBER OPTIC CABLES Page 2 of 15 1. PURPOSE 2. SCOPE 3. REFERENCES 4. GENERAL INDEX 5. PROCEDURES 5.1 Line survey 5.2 Transport, loading, unloading and storage

More information

I.H.S INSTALLATION INSTRUCTIONS

I.H.S INSTALLATION INSTRUCTIONS I.H.S INSTALLATION INSTRUCTIONS TOOLS REQUIRED The following tools will be required for installation of your I.H.S. system. Item Qty Needed 9/16 Open End Wrench 2 3/4 Open End Wrench 1 1/2 Open End Wrench

More information

COOPER POWER SERIES. DE250 deadbreak elbow connector installation instructions interface A. Screened Separable Connectors MN650025EN

COOPER POWER SERIES. DE250 deadbreak elbow connector installation instructions interface A. Screened Separable Connectors MN650025EN Screened Separable Connectors MN650025EN Effective November 2016 Supersedes September 2013 (IS550-10-1) DE250 deadbreak elbow connector installation instructions interface A COOPER POWER SERIES DISCLAIMER

More information

INSTRUCTION MANUAL. January 23, 2003, Revision 0

INSTRUCTION MANUAL. January 23, 2003, Revision 0 INSTRUCTION MANUAL Model 810A In-Vitro Test Apparatus for 310B Muscle Lever January 23, 2003, Revision 0 Copyright 2003 Aurora Scientific Inc. Aurora Scientific Inc. 360 Industrial Parkway S., Unit 4 Aurora,

More information

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY

Installation Guide RHT-380. This Manual Must Be Read Before Operating The Equipment CUSTOMER COPY Installation Guide This Manual Must Be Read Before Operating The Equipment RHT-380 Madison Heights, Michigan 48071 800-725-8377 www.snowexproducts.com CUSTOMER COPY Trynex International 2013 (REV B) F50767

More information

Appendix 4 Don t Get Hurt Pulling Cable

Appendix 4 Don t Get Hurt Pulling Cable Appendix 4 Don t Get Hurt Pulling Cable Appendix 4 Don t Get Hurt Pulling Cable Don t Get Hurt Pulling Cable Here are some tips on pulling cable safely (Reprinted from CEE News dated June, 1990) There

More information

Chapter 5 Site Considerations and Set-ups Table of Contents

Chapter 5 Site Considerations and Set-ups Table of Contents WI-750-074 Rev C Page 1 of 9 Chapter 5 Site Considerations and Set-ups Table of Contents 1. PURPOSE... 1 2. SCOPE... 2 3. DEFINITIONS... 2 4. ASSOCIATED DOCUMENTS... 2 5. SITE CONSIDERATIONS... 2 5.1.

More information

HOLLISTER-WHITNEY ROPE GRIPPER

HOLLISTER-WHITNEY ROPE GRIPPER HOLLISTER-WHITNEY ROPE GRIPPER Instructions for Model #620GA1, 620GA2 (Patented worldwide, other patents pending) WARNING: KEEP HANDS CLEAR OF ROPE GRIPPER. FORCES CREATED CAN CRUSH FINGERS. Figure 1 ROPE

More information

ZIGZAG Experience. Important / remember. Failure to heed any of these warnings may result in severe injury or death.

ZIGZAG Experience. Important / remember. Failure to heed any of these warnings may result in severe injury or death. A. Childeric / Copalme ZIGZAG Experience This "Product Experience" document is a supplement to the Instructions For Use, which provides feedback from field experience and tips for using your product It

More information

DT400/436 Tee Connector Installation Instructions

DT400/436 Tee Connector Installation Instructions Connectors Lorem ipsum and dolor Splices sit Amat Effective September 2014 Supersedes IS550-30-1 March 2011 MN650001EN DT400/436 Tee Connector Installation Instructions DISCLAIMER OF WARRANTIES AND LIMITATION

More information

Zip-Line Kit Instructions

Zip-Line Kit Instructions 1 Zip-Lines Ireland - Zip-Line Kit Instructions DC001A Zip-Line Kit Instructions Thank you for your purchase of the ZLI Zip-line kit! This product was engineered to provide safe fun for all ages when the

More information

E Lightband Compression Tool Operating Procedure

E Lightband Compression Tool Operating Procedure 2002159E Lightband Compression Tool Operating Procedure Organization Name MLB Diameter MLB Assembly Number MLB Assembly Revision MLB Serial Number Instructions: IF LCTS ARE NOT YET INSTALLED ON LIGHTBAND:

More information

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline? BANKSMAN / SLINGER 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline? A. 16mm B. 10mm C. 12mm 2. What is the maximum temperature that a webbing sling can be

More information

Santa Fe Cycles Assembly Guide Introduction

Santa Fe Cycles Assembly Guide Introduction Santa Fe Cycles Assembly Guide Introduction Congratulations on your purchase of your new Santa Fe bicycle. You have purchased a bicycle that has many features and qualities. Please take a few minutes and

More information

Troyer s Gourd Rack 8 unit F R H O P

Troyer s Gourd Rack 8 unit F R H O P B E A D I M-N L Vertical Parts F R H O P Horizontal Parts C G J Updated 11/16 Parts List A: Top of Pole B: Bottom of Pole C: 48 Ground Stake D: Top Perch rods 48 long E: Hub F: Rope Winder w/ attached

More information

Underwater Wet Welding Products Operating Instructions

Underwater Wet Welding Products Operating Instructions BROCO Inc. 400 S. Rockefeller Ave. Ontario, CA 91761 USA (909) 483-3222 (909) 483-3233 Fax (800) 845-7259 Underwater Wet Welding Products Operating Instructions Product Warnings WARNING Please read and

More information

Beginners/Basic Fly Tying Course

Beginners/Basic Fly Tying Course ` Beginners/Basic Fly Tying Course Basic Tools Vise Scissors Hackle Pliers Bobbins Bodkin/Dubbing Pick Hair Stacker Dubbing Wax Head Cement Dispenser Whip Finish Tool Wing Burning Tools Tweezers Half Hitch

More information

MANITOWOC MODEL TON CAPACITY

MANITOWOC MODEL TON CAPACITY LIFTING CHARTS - Crawler Cranes ANITOWOC ODEL - TON CAPACITY BOO RIGGING GUIDE ODEL # HEAVY LIFT BOO Table of Contents General... Assist Crane Requirements... Accessing Parts... Installation and Removal

More information

Manual: GPK1 - Gin Pole Kit Accessory for the ARRS1-AMKUS Rope Rescue System

Manual: GPK1 - Gin Pole Kit Accessory for the ARRS1-AMKUS Rope Rescue System Copyright Amkus Rescue Systems, Inc. 2016 LAA-001 April 15, 2016 Rev00 Manual: GPK1 - Gin Pole Kit Accessory for the ARRS1-AMKUS Rope Rescue System DANGER Understand manual before use. Operating AMKUS

More information

MSA Confined Space Entry Equipment

MSA Confined Space Entry Equipment MSA Confined Space Entry Equipment Because every life has a purpose... MSA Confined Space Entry Equipment MSA XTIRPA Manhole Guard System Use for confined space vertical entry and fall protection when

More information

Instruction Manual AC350 GUIDED-TYPE FALL ARRESTER ON RIGID ANCHORAGE LINE EN 353-1:2002

Instruction Manual AC350 GUIDED-TYPE FALL ARRESTER ON RIGID ANCHORAGE LINE EN 353-1:2002 GENERAL CONDITIONS OF UTILIZATION 5 6 7 8 9 - should be filled in by competent person and kept during whole period of the system usage. COMISSION AND FIRST USE - after installation of the working rope

More information

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN

COOPER POWER SERIES. 200 A 15, 25, and 35 kv class portable feedthru installation instructions. Loadbreak Apparatus Connectors MN650037EN Loadbreak Apparatus Connectors MN650037EN Effective November 2016 Supersedes October 2013 (S500-14-1) 200 A 15, 25, and 35 kv class portable feedthru installation instructions COOPER POWER SERIES DISCLAIMER

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

HOLLISTER-WHITNEY ROPE GRIPPER

HOLLISTER-WHITNEY ROPE GRIPPER HOLLISTER-WHITNEY ROPE GRIPPER Instructions for Model #620GA1, 620GA2 (US PATENT 8,511,437) WARNING: KEEP HANDS CLEAR OF ROPE GRIPPER. FORCES CREATED CAN CRUSH FINGERS. Figure 1 ROPE GRIPPER TM MOUNTING

More information

RCW-3001 & RCWINCH Please read this document carefully, it gives instructions for the correct use of this product

RCW-3001 & RCWINCH Please read this document carefully, it gives instructions for the correct use of this product Part Number: SS-RCP9009 RCW-3001 & RCWINCH Please read this document carefully, it gives instructions for the correct use of this product Language: English Please read this document carefully, it gives

More information

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS! ! WARNING DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS! A zip line can be very dangerous. Do not use this kit if you do not understand

More information

632 AccuPro Set-up & Operation

632 AccuPro Set-up & Operation 632 AccuPro Set-up & Operation Always check: Reel & Roller bearings Bent or broken blades Make sure the reel spins freely in the frame Place the Reel Into the Machine There are three lifting options for

More information

Shifting Lever. RAPIDFIRE Plus 11-speed

Shifting Lever. RAPIDFIRE Plus 11-speed (English) DM-SL0005-04 Shifting Lever Dealer's Manual RAPIDFIRE Plus 11-speed MTB XTR SL-M9000 DEORE XT SL-M8000 CONTENTS IMPORTANT NOTICE... 3 TO ENSURE SAFETY... 4 LIST OF TOOLS TO BE USED... 7 INSTALLATION...

More information

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions

200 A, 15 and 25 kv class loadbreak bushing insert installation instructions Loadbreak Apparatus Connectors Effective October 2013 Supersedes March 2011 200 A, 15 and 25 kv class loadbreak bushing insert installation instructions S500-12-1 DISCLAIMER OF WARRANTIES AND LIMITATION

More information

Technical Data. Luffing Capacities. Luffing Attachment (supersedes 5784)-1217-U2Luffer

Technical Data. Luffing Capacities. Luffing Attachment (supersedes 5784)-1217-U2Luffer 1 5802 (supersedes 5784)-1217-U2Luffer Technical Data Luffing Capacities Luffing Attachment CAUTION: This material is supplied for reference use only. Operator must refer to in-cab Crane Rating Manual

More information

CHAPTER 5 REWIND STARTERS

CHAPTER 5 REWIND STARTERS GENERAL INFORMATION CHAPTER 5 REWIND S Rewind starters used on vertical shaft Tecumseh engines are top mount horizontal pull style or side mount vertical pull style. Horizontal shaft engines use side mounted

More information

Families are encouraged to attend and support their favorite lineworkers. This year family friendly activities will be scheduled throughout the day.

Families are encouraged to attend and support their favorite lineworkers. This year family friendly activities will be scheduled throughout the day. The 2017 Lineworkers Rodeo will be held on March 31 st and April 1 st at Horry-Georgetown Technical College. The Apprentice Written Test will take place at 1:00PM on Friday afternoon following the vendor

More information

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS

KTM OM-2 SPLIT BODY FLOATING BALL VALVES INSTALLATION AND MAINTENANCE INSTRUCTIONS Before installation these instructions must be fully read and understood SECTION 1 - STORAGE 1.1 Preparation and preservation for storage All valves should be properly packed in order to protect the parts

More information

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift

QUALITY ALUMINUM BOAT LIFTS, INC. INSTRUCTIONS. Dominator Lake Lift INSTRUCTIONS Dominator Lake Lift PHONE:251-986-3882 * FAX:251-986-3136 QABLDOMINATORINST.2014 P a g e 1 Quality Aluminum Boat Lifts, INC. Installation Instructions: Dominator Lake Lift Thank you for your

More information

Final Assembly Instructions Bikes with Quill Stems

Final Assembly Instructions Bikes with Quill Stems Final Assembly Instructions Bikes with Quill Stems Thank you for buying your new bicycle from L.L.Bean. Read these instructions carefully before beginning the final assembly. Prior to shipping, our expert

More information

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 2 EO M CARRY OUT SAFETY PRECAUTIONS ON THE CADET AIR RIFLE PREPARATION

COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 2 EO M CARRY OUT SAFETY PRECAUTIONS ON THE CADET AIR RIFLE PREPARATION COMMON TRAINING PHASE ONE INSTRUCTIONAL GUIDE SECTION 2 EO M106.02 CARRY OUT SAFETY PRECAUTIONS ON THE CADET AIR RIFLE Total Time: 30 min PREPARATION PRE-LESSON INSTRUCTIONS A complete list of resources

More information

Installation and Training Manual

Installation and Training Manual AirForce1 Tower Kit Installation and Training Manual FuturEnergy Limited Ettington Park Business Centre Stratford upon Avon CV37 8BT +44 (0)1789 451070 Table of Contents Safety Notes... 3 Parts Supplied

More information

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L

General Information. NTA607HD Lift Assist Adjustments. Tools Required. Work Location. Notations and Conventions U B F D R B F L Great Plains Manufacturing, Inc. 1 NTA607HD Lift Assist Adjustments Null4: When you see this symbol, the subsequent instructions and warnings are serious - follow without exception. Your life and the lives

More information

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH.

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH. W. W. Patterson Company 3 Riversea Road Pittsburgh, PA 15233 Phone: 800-322-2018 FAX: 412-322-2785 OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP75H-10 HYDRAULIC WINCH. Please fill in the following blanks

More information

CHAPTER 4 ADVANCED GROUND-FIGHTING TECHNIQUES

CHAPTER 4 ADVANCED GROUND-FIGHTING TECHNIQUES (FM 21-150) CHAPTER 4 ADVANCED GROUND-FIGHTING TECHNIQUES After achieving an understanding of the basics of ground fighting, other elements of fighting on the ground are added. These techniques, however,

More information

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 13 Ropes Equipment Aloft Revised

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 13 Ropes Equipment Aloft Revised Truck Module Page 1 of 13 ROPES EQUIPMENT ALOFT The Escondido Fire Department has options for tying equipment to go aloft. One may use: Utility rope Utility rope after tying a figure eight Rope bag with

More information

GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE

GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE GM-120: Container Top Lock Anchor Wand Page 1 WINSAFE CORP. GM 120 CONTAINER TOP LOCK ANCHOR WAND OPERATING INSTRUCTIONS AND MAINTENANCE US Patent No. 6834745 This equipment conforms to 0321 EN795:1996

More information

Product Name: Hold Me Rope Anchor

Product Name: Hold Me Rope Anchor Product Name: Hold Me Rope Anchor Part #: 01300 Instruction Manual Do not throw away these instructions! Read and understand these instructions before using equipment! Introduction 1 Applicable Safety

More information

LOW ANGLE ROPE RESCUE OPERATIONAL

LOW ANGLE ROPE RESCUE OPERATIONAL Scope: This chapter serves as an introduction to anchor systems. Terminal Learning Objective (TLO): At the end of this chapter, the student will be aware of anchor selection and anchor system construction.

More information

Heavy Equipment Technician Rigging

Heavy Equipment Technician Rigging 1. What is SWL? a. Single weight of load b. Second weakest location c. Working load limit Heavy Equipment Technician IP Red Seal Practice Exam d. Abbreviation for swivel Heavy Equipment Technician Rigging

More information