PUBLIC OPEN HOUSE. Preliminary Engineering Study to Upgrade the Pembina Highway Underpass MAY 9, 2012

Technical Briefing Rapid Transit

PUBLIC OPEN HOUSE. Panet Road / Molson Street Reconstruction. April 24, 2013

Federal Way City Center Access Study Comment Log Summary

The timelines for the proposed short-term, medium-term, and long-term improvements to the corridor be accelerated.

Project No.: Notes taken by:

EXECUTIVB SUMMARY Regular Board Action Item 98 Approval of Revised Regional Roadway Network M"p, Revised Criteria and Joint Resolution

Atherton Middlefield Road Bicycle Lane Improvements Public Meeting

Presented by: Presented to:

Lamb Boulevard Safety Management Plan Between E. Desert Inn Rd. to Lake Mead Blvd. Clark County, NV

Stakeholder Working Group (SWG) Meeting #2 Summary

Advisory Group Meeting #7. March 9, Transcribed Breakout Group Discussion Notes.

Phase 1: Station Area Planning. Golden Valley Road Parking Management Strategies Assessment. Purpose. Context. Parking Management Options

2017 Active Allegheny Grant Program Program Guidelines

CHAPTER 4 VISION, GOALS AND OBJECTIVES

3 ways to build a healthy future for NSW

PSOMAS MEMORANDUM. North Santa Monica Boulevard Resonsturction PROJECT: 1BEVO PSOMAS Project No.

Working Group Meeting #2. One Financial Plaza 1350 Main Street 3rd Floor, Community Room A Springfield, Massachusetts

COMPLETE STREETS HANDBOOK CHECKLIST Philadelphia City Planning Commission

Project Advisory Team Existing Conditions Meeting Agenda

CARLSON BOULEVARD CARLSON BOULEVARD CORRIDOR OVERVIEW EXISTING CONDITIONS. Maine Avenue to El Cerrito Plaza BART Station

North Avenue Reconstruction Project Context Sensitive Solutions Advisory Group Meeting #4

Long-Term Transportation Plan

TITLE TEXT. School Start Times Exploration Update. Presented by Scott Nielsen

Cecil Plains State School Executive Summary

Completed Project Justification Package Example

South Portland Public Input Meeting Summary Notes and Public Comments

Appendix C. Travel Demand Forecasting Technical Memorandum

City of Ottawa. Transit Solutions. O c t o b e r

Kingsthorpe State School Executive Summary

Ipswich Central State School Executive Summary

DRAFT - TRANSPORTATION AND PUBLIC HEALTH

Eton State School Executive Summary

Kilkivan State School Executive Summary

Quebec Street Multimodal Improvement Project Open House Summary September 27, 2017

Jinibara State School Executive Summary

Mount Gravatt State School Executive Summary

SANDYFORD BUSINESS DISTRICT SUMMARY OF AREA WIDE MOBILITY MANAGEMENT PLAN.

Hilder Road State School Executive Summary

Birkdale State School Executive Summary

ATHLETICS AUSTRALIA SELECTION POLICY WORLD CROSS COUNTRY CHAMPIONSHIPS AARHUS, DENMARK 30 MARCH 2019

TRANSPORTATION DISCUSSION GROUP Laptop notes (as projected on screen during the meeting) Monday, June 10, 2013

Boronia Heights State School Executive Summary

Technical Memorandum. Introduction. Projected Traffic Volumes

Binghamton Metropolitan Transportation Study Pedestrian & Bicycle Advisory Committee Meeting Minutes April 14, 2008

Byfield State School Executive Summary

Community Meeting September 29, :30 7:30 p.m. Leataata Floyd Elementary School Multi-Purpose Room 401 McClatchy Way, Sacramento.

Nine Elms Lane and Battersea Park Road

Hervey Bay Special School Executive Summary

Pomona State School Executive Summary

!! 1st/ 2nd Grade. 3rd Grade

DRAFT Goals, Principles and Objectives

Parking Committee Report to Commissioners AUGUST 17, 2018

City of London Transport Strategy

Prepared by: TH STREET SUITE 2301 DENVER, CO CITY AND COUNTY OF DENVER. n W

Currimundi Special School Executive Summary

Transportation Vision

Stakeholder Interviews Memo

Minutes of the KENOSHA COUNTY JURISDICTIONAL HIGHWAY PLANNING COMMITTEE. Members Present Gary Sipsma... Director of Highways/Highway Commissioner,

Tewantin State School Executive Summary

Subject: Recommended Updates to Transportation Development Parameters

OFFICE OF THE WATERFRONT July 6, 2015 KING COUNTY METRO

Mudgeeraba State School Executive Summary

Coowonga State School Executive Summary

ELLERSLIE AFC OPERATIONAL PLAN (Game Development and Football Success)

TRANSPORTATION SYSTEM PLAN ADVISORY COMMITTEE (Transportation Advisory Board / Technical Advisory Committee) Minutes April 11, 2012

Wondall Heights State School Executive Summary

Hambledon State School Executive Summary

FY 2018 Transportation Alternatives Instructions

Moura State School Executive Summary

PILKINGTON RESPONSE o Rich Martinko returned call on 8/10/2014 at 2:50pm and spoke with Ms. Pilkington o The information below was given to her.

Paradise Beach State School

Marburg State School Executive Summary

Vincent State School Executive Summary

CITY OF STEVENS POINT AGENDA

2.0 VISIONING DIRECTION

Redland District Special School Executive Summary

Vista Field Redevelopment Project Transportation System Impact Evaluation Volume II Additional Analysis Completed for Mitigation Requirements

Sellwood Bridge AM Traffic Evaluation

Crow s Nest State School Executive Summary

Demonstrate the capability to carry out emergency response functions in an unannounced exercise or drill.

Kenmore South State School Executive Summary

To enforce and defend our rights to Handicap and Course Rating terminology and services as deferred through the agreement with the USGA.

Cycling Strategy Group. Terms of Reference

Forest Lake State School Executive Summary

MEASURE K BICYCLE, PEDESTRIAN, AND SAFE ROUTES TO SCHOOL AND SMART GROWTH INCENTIVE PROGRAM GUIDELINES

TECHNICAL MEMORANDUM

Taabinga State School Executive Summary

Tolga State School Executive Summary

Richmond District Strategy Community Conversation December 10th Meeting Notes. Table #1 Facilitator and Note Taker: Brittany Bendix and Victoria Chong

Bikeway Classification

Burnside State High School Executive Summary

Jobs in Green and Healthy Transport

Additional Investigation Report for a Second Bridge Across the Ashburton River

Guidance on Exception Reporting for Educational and Clinical Supervisors and Leads

Kowanyama State School Executive Summary

Glenmore State School Executive Summary

Mooloolaba State School Executive Summary

Toowong State School Executive Summary

Referee Mentor Handbook

Transcription:

Images f cmmunity cmments n the Study Area maps The first Public Infrmatin Centre was held fr bth the Casablanca Bulevard and GO Access Envirnmental Assessment and the Livingstn Avenue Extensin Envirnmental Assessment n June 20 th, 2018 at the Casablanca Winery Inn and Spa in Grimsby. The tw EA prjects are being cnducted cncurrently, as the transprtatin assessment fr the cmplete Study Area that includes bth EA prjects aims t prvide a hlistic apprach t mdelling future traffic and netwrk peratins and practively identifying issues that will arise int 2041. A ttal f 70 peple signed in t the event, and 13 cmment frms were received. A number f cmments were als received via verbal feedback t members f the prject team, and as part f the Questin & Answer sessin that was held fllwing the presentatin frm the cnsulting team Prject Manager, Paul Macled. The fllwing sectins summarize these cmments based n the particular EA Prject they pertain t. This dcument prvides a summary f the event and the key cncerns and pprtunities discussed with the cmmunity. Cmments Heard Casablanca Bulevard/GO Statin Access EA: Existing speeding cncerns were a key issue alng the crridr particularly nrth f Livingstn Avenue, with a need nted fr traffic calming. Driveway accesses particularly fr the 4-5 prperties directly suth f the CN Rail (east side f Casablanca) a majr cncern at present. Desire t see active transprtatin cnnectins, with sme cncern abut integratin and safety.

Drainage issues n bth sides f the crridr are t be investigated as part f the EA prcess. Supprt fr a widening t three lanes (center turning lane) suth f Livingstn Avenue. Cncern abut the design f the intersectin f Livingstn Ave and Casablanca Bulevard including the size f intersectin, safety and queueing. Agreement with the prblems and pprtunities identified n the PIC bards. Safety an issue fr cyclists and pedestrians, especially crssing the QEW. Traffic prblem (heavy vlumes) at Main Street West / Casablanca Bulevard intersectin during turist seasn and when QEW is cngested. Mst cncerns related t prperty wner adjacent t crridr understanding what, if any, prperty impacts wuld be realized. Nise was a particular cncern given the ptential significant increase in traffic alng Casablanca Bulevard. The ptential implementatin f a Rail Grade separatin at the CN Rail crssing was viewed with cncern fr hmewners living adjacent t the Rail crridr whse backyards and driveways wuld be impacted. Sme residents felt it wuld be needed given the wait times at the crssing. Cncern that a sidewalk r active transprtatin rute culd present a safety hazard given the number f driveways accessing directly nt Casablanca Bulevard. Active mde cnnectins acrss QEW and t future GO Statin psitively received. The cnsideratin f a right-hand turning lane travelling eastbund n Casablanca Bulevard nt Livingstn Avenue was suggested. Many agreed that imprvements t the crridr are needed (t imprve peratins, design, and ptentially widening the crridr). Livingstn Avenue EA/East-West Cnnectin: Cncerns were raised abut cnservatin f the Irish Grve wdlt lcated alng the Livingstn Avenue Right-f-Way. Main Street West and Suth Service Rad were supprted as alternative east-west cnnectins t be cnsidered fr imprvement t supprt the transprtatin netwrk. The status f the Irish Grve wdlt as a Specialty Crp area under the Grwth Plan fr the Greater Glden Hrseshe (2017) prvides prtectins t restrict develpment including infrastructure, except where n reasnable alternative can be fund t supprt a key need. Supprt was expressed fr an east-west cnnectin and fr cmpletin f the Livingstn Avenue crridr, feeling that Main St. West is becming mre cngested and will cntinue t fill up in future. Current speed limits and safety issues related t speeding were a key cncern raised particularly alng Main St. West.

The name f the prject (Livingstn Avenue Extensin) was suggested t be reviewed t better represent the nature f the study, which is lking at east-west cnnectins and nt nly cnsidering the Livingstn Avenue extensin. Psitive feedback fr a future facility nly being tw travel lanes with accmmdatin fr active mdes n ne side (westbund side, adjacent t the Irish Grve Wdlt). Cncern abut prtectin f the Wdlt and hmewners if Livingstn Avenue is extended, with questins abut ptential safety and buffering measures that wuld be implemented. The ptential impacts t the Winstn Neighburhd as a result f a cnnectin t Oakes Rad was raised, with cncern fr ptentially increased traffic in an area that is already facing speeding and traffic management issues. GO Statin Design Sme cncern that there are nt enugh parking spts allcated fr pening day. Request fr imprved clarity n whether parking is needed suth f the Rail track as part f the mdelling fr the study. Cncern abut lcatin f access pints n Suth Service Rad and Casablanca Bulevard and ptential fr queueing/accidents. General Cmments The criteria that will be used t evaluate the design alternatives and select the preferred alternative were discussed, including envirnmental, transprtatin effectiveness, safety, cst, utilities, all branches f engineering, sci-ecnmic, and s n. Suggested additinal criteria/fcus n criteria fr evaluatin f alternatives/decisin-making included: pedestrian/cyclist safety (make mre prminent), nise, scietal impacts including lifestyle disruptins and safety, cultural heritage preservatin. Cncern abut the linking f the tw EA prjects and cncern abut the ability t fully engage the cmmunity in decisin making particularly n the Livingstn Avenue Extensin. Cncern that the space at the intersectin f Casablanca Bulevard and Livingstn Avenue seems t limited t supprt the number f lanes being suggested t meet at this pint, namely 4 lanes transitining t 3 lanes suth f Livingstn Avenue travelling nrth-suth and 2 lanes cntinuus travelling eastwest. The implicatins f the Prvincial Electins and ptential that service f GO Train t Grimsby may be reviewed was raised as a cncern. Cnfirmatin that a nise study is being cmpleted was requested and prvided

Nte frm a cmmunity member that the nging results f cncurrent envirnmental studies being initiated by the Regin related t agriculture and ther natural heritage aspects shuld be included in the EA cnsideratins. Infrmatin n the cst f the prject was requested, with a high level summary prvided indicating that bth EAs are being cmpleted fr apprximately $1 Millin and the Livingstn Avenue cmpnent representing apprximately 25% f this cst. The imprtance f cmmunity input and a transparent prcess was highlighted by cncerns abut prviding an impartial prcess t decisin-making. The cmments and feedback received will be utilized t refine the alternative slutins and develp the criteria fr assessing the alternative designs as the prject mves frward. T submit a cmment, please cntact: Carlyn Ryall Paul MacLed, P.Eng. Directr, Transprtatin Services Prject Manager Niagara Regin Dilln Cnsulting Limited 905-980-6000 ext 3620 416-229-4447 ext 2317 carlyn.ryall@niagararegin.ca pmacled@dilln.ca