Estimated Year of Completion

Similar documents
Fall Technical Briefing 2016

Spring/Summer Traffic and Construction Technical Briefing

APPENDIX B.2 TABLE 2 CITY OF TORONTO PRELIMINARY DRAFT DEVELOPMENT-RELATED CAPITAL PROGRAM TRANSIT (BALANCE) Grants/ Subsidies/Other Recoveries

CPC Parking Lot Riverside Drive. Transportation Rationale

Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville

Arlington County 10-Year Transit Development Plan & Premium Transit Network Briefing. May 2016

ANNEX A: Rapid Transit, Transit Priority, and Road Projects

Arterial Transitway Corridors Study. Sept. 26, 2011

Having held a public hearing, that Council approve:

5. WOODROFFE AVENUE BUS-ONLY LANES BASELINE STATION TO FALLOWFIELD PARK & RIDE CONSULTANT APPOINTMENTS CONTRACTS NOS. ETL , 6001 AND 6002

ECONOMY PEOPLE ENVIRONMENT

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

ABC Activities / External Products by Account Types ($ in 000's) FIELD SERVICES FEBRUARY, 2004

Baseline Road Rapid Transit: Bayshore Station to Prince of Wales Drive

Presentation of Staff Draft March 18, 2013 COUNTYWIDE TRANSIT CORRIDORS FUNCTIONAL MASTER PLAN

COST ESTIMATION. Fully Allocated Causal Factor Models Temporal Variation Models Incremental Fixed Variable Cost Models

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

Scope of the Transit Priority Project

Building Great Neighbourhoods STRATHEARN

Bus Rapid Transit Plans

Wellington Public Transport Spine Study

APPENDIX C. Systems Performance Report C-1

David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County

Designing Streets for Transit. Presentation to NACTO Designing Cities Kevin O Malley Managing Deputy Commissioner 10/24/2014

BRT in Scandinavia. Henrik Juul Vestergaard Project manager, Public transport planning

VOLUME 5 Technology and Option Evaluation

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Chapter 8 - Implementation

Decision on North Waterloo Routing

Arterial Transitway Corridors Study. Ave

Transportation. Pages E-3 to E-145 PROPOSED FY CAPITAL IMPROVEMENT PLAN (CIP) CCCRC Presentation Thursday, June 14, 2018

Light Rail Transit in North Central Calgary Open House and Workshop Summary. Summer 2013

Public Consultation Centre For. Transportation Master Plan Update. Information Package

Building a Liveable Ottawa 2031 Preliminary Policy Proposals

Crystal City Citizen Review Council Meeting. July 10, 2013

Prince George s County Council Retreat January 5, 2017

Joseph Iacobucci. James Czarnecky, AICP

ANNUAL REPORT Portland Streetcar 2016

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

Transportation and Equity: A 2017 Agenda for Candidates

Estimated People & Jobs Total Short-Term ~2031. (Density) 12,400. = 45% of long-term People & Jobs estimate, as shown in column F).

Transit Operations in the I-95 Express Lanes

TRANSPORTATION MASTER PLAN

Where are my accommodations? Delegates that have pre-booked will be staying at the University of Ottawa residences, located at:

PUBLIC TRANSPORTATION PLAN FOR THE CITY OF GEORGETOWN

The role of the Authority in promoting sustainable transport. Gerry Murphy South East Regional Assembly 27 th May 2011

WELCOME BUS RAPID TRANSIT PUBLIC MEETING. MEETING TIME: 5 p.m. - 8 p.m.

Customer Service and Operations Committee. Board Action Item III-A. February 12, 2015

Public Consultation Centre

North Vancouver Community Associations Network. November 15, pm to 9 pm

Application of Value Engineering The Crosstown Project

Complete Streets in Constrained Corridors: Chicago s Central Loop BRT

Craig Rempp, Transit Superintendent Mary Karlsson, Kimley-Horn. Mankato City Council Meeting 6/25/2018

Arterial Transitway Corridors Study

Instances of 1 Minute or Less Between Buses 4 5% 55% 3.9% 3.5% 3.5% 3.5% 2.9% 2.8% Sep- Sep 07 Oct-07 Nov-07 Dec-07 Jan- Jan 08 Feb- Feb 08 Mar-08

TRANSIT SIGNAL PRIORITY The Toronto Experience

Spring Lake Park Mounds View North Oaks. Arden Hills. Shoreview. Roseville. Little Canada. Falcon Heights SNELLING. Lilydale. West Saint Paul 35E

Bus Riders of Saskatoon Meeting with City of Saskatoon Utility Services Department October 23, :30pm 2:30pm th Street West, Saskatoon

95 th Street Corridor Transportation Plan. Steering Committee Meeting #2

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

York Region Rapid Transit Corporation

Van Ness Avenue BRT Overview and Scoping Process. Geary BRT CAC January 8, 2009

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

CPC Parking Lot Riverside Drive. Transportation Brief

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

Arterial Transitway Corridors Study

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Regional Transportation Needs Within Southeastern Wisconsin

CONTENTS PREFACE 1.0 INTRODUCTION AND SCOPE 2.0 POLICY AND GOVERNANCE 3.0 SUMMARY OF PROGRESS 4.0 NATURE OF DEMAND 5.0 TRAVEL AND PARKING INITIATIVES

South King County High Capacity Transit Corridor Report. Regional Transit Connections and Active Transportation

28th Nov 2014 Chandramauli Shukla CEO, BCLL, Bhopal

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

Konstantin Glukhenkiy Economic Affairs Officer

The Corporation of the City of Victoria British Columbia Capital Plan

Countywide Transit Corridors Functional Master Plan

Markham Sports, Entertainment and Cultural Centre Transportation Overview

1. Provide a dedicated westbound approach bus lane at the intersection;

CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Transit Division

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

2. Transportation in Ottawa Today and Tomorrow

Transportation Master Plan Advisory Task Force

5 Transit & Traffic. Overview

Brainstormed Solutions - Passenger 1-1a Air / Exand: Expand capacity (runway lengths) at BG airport (LOW)

Metropolitan Council Transportation Committee

19 July 2016 OUR REF:

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

METRO RTA TRANSIT MASTER PLAN. May 25-26, 2011

ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY

Transportation Assessment

Omaha s Complete Streets Policy

BEST PRACTICES FOR ACCESSIBLE TRANSPORT. C G B (Kit) Mitchell

Two Capitals: 1 w/lrt, 1 w/out How Has Transit Fared in Each?

ROUTES 55 / 42 / 676 BUS RAPID TRANSIT LOCALLY PREFERRED ALTERNATIVE

US 19 Pedestrian and Bicycle Safe Access to Transit Corridor Study

Questionnaire for reporting on progress made on the attainment of the Paris Goals

SWBRT Review. best value. specifically. informed

Feasibility Study for Intermodal Facility in Anchorage, Alaska

Public Transport Asset Management

Transcription:

Authority Planning, Infr, & Economic Dev Transit Services 906109 Scoping Pre/Post Trillium Line Structure CW 2018 150,000 150,000 906443 Buildings-Transit CW 2018 4,300,000 3,710,485 35,017 554,498 906497 Scoping Pre/Post - Tway Structures CW 2018 100,000 81,932 18,068 906505 Transit Structures - Drainage CW 2018 470,000 432,324 14,599 23,077 906914 Transitway Structures - Site Specific CW 2016 150,000 150,000 906915 Trillium Line Structures CW 2016 1,000,000 372,990 64,264 562,746 906981 Buildings - Transit CW 2016 4,610,000 4,075,836 43,547 490,617 906983 Scoping Pre/Post Tway Roads - CW 2018 110,000 3,000 107,000 907278 Transitway Structures - Drainage CW 2018 1,150,000 287,982 55,837 806,180 907290 Buildings-Transit CW 2018 3,600,000 3,405,271 194,729 907295 Scoping Pre/Post - Twy Roads CW 2016 110,000 33,530 76,470 907296 Transitway Roads CW 2018 1,775,000 1,699,511 75,489 907297 Transitway Structures CW 2018 3,725,000 2,363,385 9,372 1,352,244 907743 Buildings-Transit Services CW 2018 3,600,000 2,838,401 236,443 525,156 907766 Transitway Roads CW 2018 2,650,000 2,019,202 45,167 585,631 907768 Transitway Structures - Site Specific CW 2018 300,000 9,686 290,314 907769 Transit Structures - Drainage CW 2017 1,280,000 859,198 62,526 358,276 907770 Transitway Structures CW 2017 950,000 583,250 23,997 342,753 907771 Scoping Pre/Post Trillium Line Struc CW 2018 110,000 110,000 907881 2016 Buildings-Transit Services CW 2018 3,600,000 1,894,478 88,158 1,617,364 908186 2016 Scoping Pre/Post Tway Roads CW 2018 100,000 100,000 908187 2016 Transitway Roads CW 2018 2,000,000 550,735 5,648 1,443,617 908188 2016 Scoping Pre/Post Tway Structures CW 2018 100,000 21,737 54,341 23,922 908189 2016 Transitway Structures CW 2018 3,935,000 110,912 57,793 3,766,295 908190 2016 Transitway Struct.-Site Specific CW 2018 300,000 300,000 908191 2016 Transit Structures - Drainage CW 2018 400,000 114,843 248,920 36,237 908473 2017 Buildings-Transit Services CW 2018 3,600,000 21,192 68,361 3,510,447 908502 2017 Transit Structures - Drainage CW 2018 780,000 780,000 1

Authority 908503 2017 Transitway Roads CW 2018 1,000,000 1,000,000 908504 2017 Transitway Structures CW 2018 100,000 4,603 95,397 908505 2017 Transitway Structures-site specific CW 2019 300,000 924 299,076 908506 2017 Twy Roads-Scoping Pre/Post Eng CW 2018 100,000 100,000 908507 2017 Twy Struc-Scoping Pre/Post Eng CW 2018 200,000 200,000 908508 2017 Trillium Line Struc-Scoping Pre/Pos CW 2018 150,000 150,000 908647 PTIF-Pinecrest Garage-sewer line replace 07 2018 1,500,000 461 68,555 1,430,985 908649 PTIF-Advanced Renewal Proj-LRT Stage2-32 CW 2018 3,100,000 17,054 3,082,946 908652 PTIF-Park & Ride Lot Improvements (013) CW 2018 2,500,000 118,080 2,381,920 908654 PTIF-Transitway Resurfacing (022) CW 2018 3,000,000 188,922 23,043 2,788,036 Transit Services 56,905,000 25,684,790 1,340,720 29,879,490 Transportation Services 907767 Scoping Pre/Post Tway Structures CW 2017 100,000 100,000 Transportation Services 100,000 100,000 Planning, Infr, & Economic Dev 57,005,000 25,684,790 1,340,720 29,979,490 Transportation Services Depart Transit Services 900300 IT Smartcard * CW 2018 34,124,000 32,088,576 3,021,004 (985,580) 904610 IT Bus Radio System CW 2018 13,589,461 13,017,102 4,680 567,679 904868 Transitway System Improvements CW 2017 1,465,000 604,127 860,873 905152 Building Capacity Improvement CW 2018 16,161,000 16,099,489 21,692 39,820 905160 Customer Service Platform CW 2018 4,975,000 4,653,583 127,559 193,858 905174 Transit Security Platform CW 2016 3,722,000 2,145,491 1,211,882 364,627 905175 IT Business Intelligence Platform CW 2018 1,100,000 1,044,036 53,413 2,550 905203 IT 2009 Transit Vehicle Info Sys CW 2018 6,855,000 5,707,763 611,325 535,912 905204 IT 2009 Transit computer Systems CW 2017 2,105,000 1,983,842 102 121,057 905503 2010 Train & Rail Lifecycle - O Train CW 2016 3,029,000 2,945,408 74,595 8,997 2

Authority 905508 Bus Equipment Replacement-2011 CW 2018 2,563,000 1,505,613 37,114 1,020,272 905893 IT Corporate Support Platform CW 2018 1,364,000 1,291,740 10,662 61,598 905894 IT Operating & Control Centre Platform CW 2018 2,556,000 1,939,169 527,026 89,804 905972 Bus Refurbishment & Modifications - 2011 CW 2018 19,555,000 17,607,410 2,902 1,944,688 905974 Facility Rationalization CW 2018 3,895,000 3,616,312 12,815 265,874 905978 Para Bus Replacement CW 2018 13,000,000 12,970,252 3,200 26,548 905979 Trillium Line Service Expansion CW 2018 60,300,000 60,168,471 209,505 (77,976) 905980 Transit Brand Renewal CW 2018 1,250,000 1,158,911 91,089 905982 Transit Fac -Renewal of Ops Assets-2011 CW 2018 7,639,228 7,664,125 11,052 (35,950) 905983 Transit Network Capital Projects - 2011 CW 2018 1,350,000 1,055,502 10,244 284,254 906169 OLRT Transition CW 2018 80,729,000 54,846,439 7,347,201 18,535,360 906247 Revenue Bus Replacement (Double Deckers) CW 2018 73,400,000 73,387,982 25,445 (13,427) 906432 Bus Equipment Replacement CW 2018 2,000,000 522,204 49,909 1,427,887 906433 IT Transit Customer Svce Platform CW 2018 1,900,000 642,640 593,385 663,975 906434 IT Security Platform CW 2018 400,000 381,999 18,001 906511 IT Operational & Control Centre Platform CW 2018 1,588,000 1,447,879 198,512 (58,390) 906513 Non-Revenue Vehicle Replacement - 2012 CW 2018 1,365,000 1,023,472 336,682 4,846 906518 IT Corporate Support Platform CW 2018 1,480,000 1,012,229 467,771 906519 IT Business Intelligence Platform CW 2018 380,000 123,265 177,086 79,650 906520 IT Scheduling Platform CW 2018 2,950,000 1,792,973 1,166,073 (9,047) 906521 Building Capacity Improvements CW 2018 11,344,000 11,348,671 254 (4,925) 906522 Transitway Yearly Rehab CW 2018 5,425,000 5,313,253 486 111,261 906525 AVM upgrade to new Artic Fleet CW 2017 1,500,000 1,081,072 667 418,261 906527 IT Maintenance Platform CW 2018 2,516,000 1,544,510 971,490 906944 Environmental Improve - Reg. Compliance CW 2018 1,600,000 305,054 24,096 1,270,850 906945 On-Street Transit Facility Improvements CW 2018 790,000 455,926 11,204 322,871 906950 Transitway System Improvements-2013 CW 2018 1,100,000 526,693 30,655 542,652 906951 IT CAD AVLC CW 2018 2,000,000 909,405 1,112,961 (22,365) 906952 IT DriverMate MDT Solution-Taxi Services CW 2018 225,000 225,932 (932) 906953 IT New octranspo.com hosting CW 2018 110,000 52,800 51,536 5,664 3

Authority 906957 IT Transit Zone - Business Continuity CW 2017 1,200,000 680,674 36,008 483,318 906959 IT Video Wall Controller Life-Cycle CW 2017 120,000 112,221 7,779 906960 New Regulatory Safety Requirements CW 2018 1,825,000 1,080,430 681,873 62,697 906965 Miscellaneous Vehicle Replacement CW 2018 1,285,000 1,255,071 29,929 906966 Para Transpo Engines & Transmissions CW 2018 90,000 27,284 62,716 906967 Technical Training Equipment CW 2018 75,000 69,934 961 4,105 907001 Bus Replacement CW 2018 11,000,000 10,996,151 7,259 (3,410) 907364 Renewal of Operational Assets CW 2019 2,750,000 2,750,146 35,500 (35,646) 907365 Bus Stops & Shelters CW 2018 900,000 841,308 58,692 907367 Rapid Transit Syst Customer Improv CW 2018 1,300,000 486,023 6,465 807,511 907368 Station Accessibility Improvements CW 2018 450,000 458,216 6,041 (14,257) 907369 Transitway Yearly Rehab. CW 2018 500,000 26,419 67,449 406,132 907370 IT Transit Infrastructure Lifecycle CW 2018 1,500,000 618,911 881,089 907372 Rail Radio Integration CW 2018 1,000,000 19,984 980,016 907373 Fare Control Syst Confed Line Stn CW 2018 25,000,000 10,307,010 12,483,403 2,209,588 907375 Bus Refurbishment - 2014 CW 2018 4,650,000 4,658,655 58,227 (66,883) 907819 Bus Stops & Shelters - 2015 CW 2018 815,000 563,955 45,447 205,597 907820 Rapid Transit System Customer Improvemen CW 2018 2,570,000 158,172 1,811,800 600,028 907821 Renewal of Operational Assets - 2015 CW 2019 4,700,000 4,472,243 209,116 18,641 907822 Station Accessibility Improvements -2015 CW 2018 500,000 506,383 16,264 (22,647) 907823 Transit Priority Road & Signal Projects CW 2018 2,828,000 38,734 9,012 2,780,255 907824 Transitway Yearly Rehab - 2015 CW 2018 1,100,000 653,942 274,003 172,055 907825 TSCC Renovation for confederation Line CW 2018 1,700,000 1,009,307 757,268 (66,575) 907826 Unplanned Infrastructure Response - 2015 CW 2018 1,000,000 598,287 58,043 343,670 907827 IT Business Intelligence CW 2018 150,000 192,585 (42,585) 907828 IT Para Transpo Platform CW 2019 990,000 499,895 6,136 483,969 907829 IT Scheduling Platform CW 2018 1,200,000 222,484 777,637 199,879 907830 IT Security Platform CW 2018 3,296,000 1,062,089 197,283 2,036,628 907831 Trillium Line & Rail Lifecycle - 2015 CW 2018 3,250,000 1,376,970 1,201,717 671,313 907832 Bus Refurbishment - 2015 CW 2018 24,552,000 8,420,779 1,656,743 14,474,478 4

Authority 907833 Destination Sign Upgrade CW 2018 900,000 734,017 37,855 128,129 907835 Vehicle Modifications CW 2018 250,000 84,564 28,683 136,753 907836 Vehicle Replacement Non Rev - 2015 CW 2018 210,000 176,773 32,054 1,173 908225 Bus Stops and Shelters - 2016 CW 2018 640,000 215,511 19,166 405,323 908226 Rapid Transit Syst Cust Improvemts -2016 CW 2018 1,250,000 1,250,000 908227 Renewal of Operational Assets - 2016 CW 2018 3,950,000 3,258,959 526,521 164,520 908228 Transit Priority Road & Signal Project CW 2018 3,030,000 292,560 2,737,440 908229 Transitway Yearly Rehab - 2016 CW 2018 1,550,000 244,399 143,346 1,162,256 908230 Unplanned Infrastructure Response - 2016 CW 2018 250,000 2,921 247,079 908231 IT Operations & Control Centre Platform CW 2018 300,000 300,000 908232 IT Scheduling Platform CW 2018 385,000 345,792 55,459 (16,252) 908233 Trillium Line & Rail Lifecycle - 2016 CW 2018 1,800,000 1,360,028 178,283 261,688 908234 Bus Refurbishment - 2016 CW 2018 9,327,000 79,379 9,247,621 908235 Non Revenue Vehicle Replacement - 2016 CW 2018 800,000 243,776 125,692 430,532 908236 Vehicle Modifications - 2016 CW 2018 750,000 750,000 908363 St Laurent Blvd Transit & Intersect Impr 18 2018 6,050,000 1,150,597 3,568,205 1,331,198 908565 PTIF 004 Carleton Siding - Spring switch CW 2018 2,500,000 2,544,000 (44,000) 908648 PTIF 006 Customer waiting area Confed St CW 2019 2,000,000 2,000,000 908651 PTIF 002 Transit Op Crew room Bayview CW 2018 1,500,000 140,752 1,359,248 908653 PTIF 003 Tunney's Pasture Bus Loop CW 2018 3,000,000 2,079,911 58,773 861,316 908661 Rapid Transit Syst Cust Improvemts 2017 CW 2018 3,250,000 3,250,000 908662 Renewal of Operational Assets - 2017 CW 2018 4,000,000 272 3,999,728 908663 Station Accessiblity Improvements CW 2018 500,000 32,397 467,603 908664 Transitway Yearly Rehab - 2017 CW 2018 1,000,000 1,000,000 908665 PTIF-Baseline Trt Corr-Bayshore-Billings 07,09,16,17 2018 12,000,000 23,702 11,976,298 908666 PTIF-Chapman Mills Beatrice-Longfields36 22 2018 3,000,000 244,462 2,755,538 908667 PTIF-Kanata LRT Extension - Env Assess29 04,06,07,08,23 2019 3,000,000 1,772,087 1,227,913 908682 PTIF-008 Elevator Tremblay Station CW 2018 1,000,000 1,000,000 908695 Unplanned Infrastructure Response - 2017 CW 2020 250,000 18,689 231,311 908696 IT Corporate Support Platform - 2017 CW 2020 1,450,000 1,450,000 5

Authority 908698 IT Operations & Control Centre Platform CW 2018 700,000 700,000 908699 IT Scheduling Platform CW 2018 1,000,000 1,971 337,192 660,837 908702 Trillium Line & Rail Lifecycle - 2017 CW 2018 6,400,000 3,129,226 3,270,774 908704 Non Revenue Vehicle Replacement - 2017 CW 2020 1,500,000 1,500,000 908753 PTIF 014 Rural Bus Stop Improvements CW 2018 400,000 102 144,287 255,612 908754 PTIF 015 Bus Shelters CW 2018 750,000 209,189 540,811 908755 PTIF 016 Concrete Bus Pads CW 2018 350,000 178,640 171,360 908756 PTIF 017 Emergency Phone Upgr at Twy Stn CW 2018 2,000,000 2,000,000 908757 PTIF 020 Merivale Driver facil& Elevator CW 2018 1,500,000 40,409 203,271 1,256,321 908758 PTIF 023 Fare Gate Entrances Transitway CW 2018 1,750,000 1,750,000 908759 PTIF 024 Transit Operator room Hawthorne CW 2018 500,000 500,000 908760 PTIF 034 Transit Priority Projects CW 2018 8,700,000 8,700,000 908761 PTIF 018 Passenger Information Display CW 2018 2,000,000 37 1,867,786 132,176 908762 PTIF 019Smartbus Infrastructure on board CW 2018 4,500,000 4,500,000 908763 PTIF 025 Transport Demand Mgmt - detours CW 2018 30,000,000 9,719,666 20,280,334 908764 PTIF 005 Walkley Interlock Refurb & Repl CW 2018 11,000,000 5,712,370 5,287,630 908765 PTIF 007 Modern Signal &Control Trillium CW 2018 2,000,000 2,000,000 908766 PTIF 035 Acquisition of (17) new buses CW 2018 18,400,000 1,967,841 14,927,487 1,504,672 908772 PTIF 030 Aboriginal Consultation CW 2019 200,000 200,000 908700 IT Transit Infrastructure Lifecycle 2017 CW 2020 1,300,000 1,300,000 Transit Services 660,537,689 422,279,354 74,135,860 164,122,475 Transportation Services Depart 660,537,689 422,279,354 74,135,860 164,122,475 Grand 717,542,689 447,964,144 75,476,580 194,101,965 * Account 900300 IT Smartcard is not in deficit as there are recoveries/revenue not shown here. 6