VTP 2040 Multimodal Transportation Investment Projects

Similar documents
TABLE 2-3 Constrained Highway and Express Lane Projects in Santa Clara County

Bicycle Expenditure Program (BEP)

US 101 Express Lanes Project Open House WELCOME! Want to learn more?

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

LOCAL OPERATION SYSTEMS. *Some Expressway Projects are captured in the Highway Project List.

Chapter 4 Projects, Funding and Implementation

Final Program Environmental Impact Report for the. Santa Clara Valley Transportation Authority Long Range Transportation Plan

17 Palo Alto Shuttle Project (PA) Acquire (or lease) shuttle vehicles to operate expanded service and improve shuttle stops

Chapter 3 Bikeway Projects Planning Methodology

Expressway Plan 2040 Fact Sheet

Santa Clara I-280 CORRIDOR STUDY

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE MINUTES

FOR INFORMATION ONLY

San Tomas Expressway

TRANSPORTATION TRAINING TOPICS. April 6, 2010

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

4.1 Evaluation Criteria

SECTION CONTENTS. SR 87 CORRIDOR STUDY Evaluation of Alternatives 6-1

STATE ROUTE 85 CORRIDOR POLICY ADVISORY BOARD ADDENDUM TO AGENDA

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE MINUTES

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

El Camino Real Bus Rapid Transit Conceptual Engineering. Los Altos Council Workshop January 24, 2012

San Jose Transportation Policy

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Foothill Expressway Improvements Between El Monte and San Antonio

Development Review Program Annual Report 2016

For Lease. 940 Old County Rd. Belmont, CA DO NOT DISTURB TENANT. New listing ±2,750 SF. Available now. Flexible lease terms. Extensive glass line

Chapter 2 Current Conditions and Settings

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

Applications for Funding

Comprehensive County Expressway Planning Study

Bus Rapid Transit on Silicon Valley s El Camino Real: Working Together to Create a Grand Boulevard Steven Fisher

EL CAMINO REAL BUS RAPID TRANSIT (BRT) PROJECT

PRESS RELEASE San Joaquin Council of Governments

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE MINUTES

NEPA and CEQA Transportation Operation Analysis

Circulation, Access, and Parking

4.12 Transportation and Traffic

A GOALS, POLICIES, IMPLEMENTATION ACTION STEPS. Countywide Bicycle Plan

San José Better Bikeways

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

including shade trees; Recommend minimum 13 ft total sidewalk

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Lincoln Avenue Road Diet Trial

Key objectives of the survey were to gain a better understanding of:

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE MINUTES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

ATTACHMENT A INTERCEPT SURVEY (2013) PLAN AND RESULTS

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE AGENDA

BICYCLE & PEDESTRIAN ADVISORY COMMITTEE AGENDA

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Santa Clara County. Spring 2015 Public Engagement Open House Comments, by County. Goals and Targets Station Feedback

SAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT

A PPENDIX A S UMMARY OF M EETINGS

I will attend tonight's meeting to summarize this proposal during my public comment. Thank you.

Chapter 3: Multi-Modal Circulation and Streetscapes

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

IMAGE SOURCE: JONAS FLAKEN, FLICKR (CREATIVE COMMONS) IMAGE SOURCE: DONJD2, FLICKR (CREATIVE COMMONS) Appendices

Bicycle Count Data. December 2008

Attendees: Members in Attendance: Davide Vieira, Kathy Ericksen, Terry Christensen, Geoff Hatchard, Carlos Diaz, and Bob Van Cleef

Planning Committee STAFF REPORT

2040 RTP. Chapter 6: Investments in our Transportation Future

Basalt Creek Transportation Refinement Plan Recommendations

REQUIREMENTS FOR TRAFFIC CONTROL PLAN SUBMISSION

City of San Bernardino

Bicycle & Pedestrian Advisory Committee

PROJECT SPONSOR: The City of Oakland

M R O. February 25, Mr. David Brandt, City Manager City of Cupertino Torre Avenue Cupertino, California 95014

City of Palo Alto (ID # 7812) City Council Staff Report

The public outreach team included:

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Bicycle Pedestrian Commission

LIST OF TRANSPORTATION PROJECTS FROM MTC'S TRANSPORTATION 2030 PLAN FOR THE SAN FRANCISCO BAY AREA

Bicycle Pedestrian Commission

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

NEED FOR ADDITIONAL FUNDING

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

Santa Clara County Expressways Complete Streets & Design Challenges

Project Fact Sheet. August 1,

MPO Staff Report Technical Advisory Committee: May 10, 2017 MPO Executive Board: May 17, 2017

Get Us Moving Update. June 2018

2040 Long Range Plan Projects Draft October 2011

"Mobility 2045" Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

ATTACHMENT A EXISTING TRAFFIC ENVIRONMENT

Bicycling & Walking in the Twin Cities TPP Bike/Ped Chapter Overview. Land Use Advisory Committee September 21, 2017

DEKALB COUNTY. 22. Priority Projects for DeKalb County

Project Name Project Description Authorized Amount

2016 TRANSPORTATION SYSTEMS MONITORING REPORT (DRAFT)

TRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO

2016 Annual Passenger Counts

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

San Mateo County Bicycle and Pedestrian Advisory Committee

CMAQ DETAILED PROJECT LISTING REPORT ( FY 2002 )

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN

Transcription:

Campbell 240509 B1 Los Gatos Creek Trail Expansion on West Side (Hamilton to Campbell) $2.9 240509 B2 Widen Los Gatos Creek Trail on East Side (Camden to Campbell) $0.3 240509 B3 San Tomas Aquino Creek Trail: Westmont High School to Virginia $1.7 240509 B4 Portals Project: Bike Lanes on Campbell Avenue at SR 17 $4.6 240494 S1 Hamilton Ave. Intelligent Transportation Systems $0.5 240494 S2 Citywide Traffic Signal System Upgrade $0.3 240494 S3 Winchester Blvd. Intelligent Transportation System $0.5 240494 S4 Reactivation of Traffic Count Stations $0.1 Gilroy 240509 B7 Western Ronan Channel SCVWD Service Road Trail $3.1 240509 B8 Gilroy Sports Park Trail $5.6 240509 B9 Lions Creek SCVWD Service Road Trail: West of Kern Ave. between Kern and $2.2 Day 240509 B10 Lions Creek SCVWD Service Road Trail: West of Santa Teresa Blvd. (Between $0.7 Tapestry and ST/ Day Rd east) 240509 B11 Northern Uvas Creek SCVWD Service Road Trail $2.2 240494 S6 City of Gilroy Adaptive Traffic Control System $1.1 240494 S7 City of Gilroy Event Management System $1.1 240494 S8 City of Gilroy Traffic Signal System Upgrade $4.7 240494 S9 City of Gilroy Flood Watch Camera Installations $0.6 240494 S10 ITS Enhancements on Santa Teresa Blvd. $2.4 240494 S11 10thSt St. and Downtown Signals Upgrade $1.8 240494 S12 SR 152 Signal System Upgrade $2.8 240494 S13 Gilroy Community Bus Signal Priority $0.5 240494 S14 Gilroy Other Signal Upgrade $1.2 240494 S15 Gilroy Downtown Parking Management System $0.4 Los Altos 240509 B14 Miramonte Ave. Bikeway Improvement $1.6 240509 B15 Stevens Creek Link Trail $3.5 Los Altos 240509 B17 El Monte Rd. from Stonebrook to Voorhees Segment 4 $0.3 Hills Los Gatos 240509 B19 Los Gatos Creek Trail Connector to SR 9 $1.2 240494 S16 Town of Los Gatos Traffic Signal System Upgrade $0.4 Milpitas 240509 B20 Montague Expwy Bike/Ped Overcrossing $18.6 240403 R11 Dixon Landing Road Pedestrian and Bicycle Improvements $6.6 240494 S17 South Milpitas Blvd. SMART Corridor $0.6 Morgan Hill 240494 S19 Citywide Traffic Signal Operation Center $1.6 240494 S20 Citywide Wireless Vehicle Detection System Installation $1.1 Mountain 240509 B31 Stevens Creek Trail Reach 4 Segment 2: Dale/Heatherstone to Mountain View $13.9 View High School 240509 B32 Stevens Creek Trail/Middlefield Rd. North Side Access $0.8 240509 B33 Stevens Creek Trail/Landels School Trailhead $0.7 240509 S21 Citywide Traffic Signal Upgrade and IP Traffic Signal Access $3.0 240509 S22 Shoreline Blvd. Adaptive Traffic Signals $2.0 7

240509 S23 Rengstorff Ave. Traffic Signal Improvements $1.6 Palo Alto 240509 B41 Bicycle Boulevards Network Project $5.8 240509 B42 California Ave. Caltrain Undercrossing: ADA Retrofit/Reconstruction $15.1 240509 B43 US 101/Adobe Creek Ped/Bicycle Grade separation $10.9 230385 R29 Palo Alto Smart Streets $4.6 240494 S24 Citywide Traffic Signal System Upgrade $2.2 240494 S25 Citywide Traffic Signal CCTV/Emergency Vehicle Preemption Project (not $1.7 mapped) San Jose 240509 B45 Almaden Expwy. Bicycle and Pedestrian Overcrossing along Guadalupe River $9.8 Trail alignment 240509 B47 Los Gatos Creek Trail (Auzerais Ave. to Park Ave.) $5.8 240509 B48 Los Gatos Creek Trail (Park to Santa Clara): Diridon Station Segment $8.5 240509 B49 Coyote Creek Trail (Montague Expwy. to Oakland Rd.) $8.7 240509 B50 Coyote Creek Trail (Oakland Rd. to Watson Park) $8.7 240509 B51 Coyote Creek Trail (Watson Park to Williams St. Park) $5.8 240509 B52 Coyote Creek Trail (Williams St. Park to Kelley Park) $3.3 240509 B53 Branham Lane: Edenvale Bicycle / Pedestrian Overcrossing and Bike Trails (US $27.3 101 & Coyote Creek) 240509 B54 Blossom Hill: Calero Bikeways at Coleman Rd to Palmia Dr at Cottle Rd $0.4 240509 B55 Brokaw Coleman Airport Bikeway $1.2 240509 B56 CapitolAve Ave./Capitol Expwy. Bikeway from Penitencia Creek Rd/Trail to $0.3 Quimby Rd 240509 B57 Charcot Bikeway: from Orchard Pkwy to Hwy 880 $0.5 240509 B58 Five Wounds Trail: Watson Park to Williams St. Park Alum Rock BART Station $21.9 Segment 240509 B60 Hwy 237 Bikeway on & off road from Grt America Parkway to Zanker $0.5 240509 B61 Monroe Bikeway: Newhall St to Hwy 17 POC at Daniel Way / Westfield Ave. $0.2 240509 B63 Park Ave/San Fernando St. San Antonio Bikeway $0.3 240509 B64 Penitencia Creek Trail: Coyote Creek King Rd. $4.3 240509 B65 Thompson Creek Trail: Tully Rd to County Limit $7.4 240509 B66 Three Creeks Trail from Lonus Street to Coyote Creek (formerly Willow Glen $2.9 Spur Trail) 22246 R37 Caltrain Pedestrian Crossing Bridge at Blossom Hill Station $2.9 230641 R40 North San Jose Bike and Ped Improvements $35.0 230643 R44 Neiman Blvd. Pedestrian Overcrossing at Capitol Expwy. $9.3 230642 R48 Bird Ave. Pedestrian Corridor $3.5 240497 R51 Auzerais Ave. Bicycle and Pedestrian Improvements from Sunol St. to Race St. $2.2 230466 R45 CaItrain Grade Separation at Branham Ln. (included in 230446) $0.0 240494 S27 San Jose Proactive Signal Retiming Program $30.0 240494 S28 San Jose Transportation Communications Network Enhancements $0.0 240494 S29 San Jose Traffic Signal System Upgrades $15.0 240494 S30 Downtown San Jose Area Freeway Management System $2.4 8

San Jose 240494 S31 Downtown San Jose Local Street Advanced Traffic Management System $3.6 Continued 240494 S32 Downtown San Jose CMS Upgrades $1.8 240494 S33 King Rd/Story Rd. Area Advanced Traffic Management System $3.6 240494 S34 Silicon Valley ITS Program Upgrades $32.5 240494 S35 Silicon Valley TiMC San Jose Police Department Integration $2.4 240494 S36 City of San Jose Red Light Running Enforcement Program $0.6 240494 S37 San Jose Traffic Signal Interconnect $4.8 240494 S38 SVITS Hybrid Analogy/Digital Video System $0.2 240494 S39 Silicon Valley TiMC Ramp Metering Integration $9.6 240494 S40 Monterey Highway ITS $5.8 240494 S41 San Jose Emergency Vehicle Preemption System $8.2 240494 S42 SVITS Connection to Sunnyvale $4.2 240494 S43 Winchester /Stevens Creek Area Advanced Traffic Mgmt System $2.4 240494 S44 Eastridge/Evergreen Area Advanced Traffic Mgmt System $4.8 240494 S45 Almaden/Blossom Hill Area Advanced Traffic Mgmt System $2.4 Santa Clara 240509 B95 San Tomas Aquino Creek Spur Trail $2.3 240494 S49 Santa Clara Communications Network Upgrade $6.0 240494 S50 Santa Clara Traffic Signals Upgrade $5.0 240494 S51 Santa Clara TMC Upgrade $1.3 Saratoga 240509 B97 Blue Hills School RR Crossing Safety Project $0.4 240427 R74 SR 9 Ped Safety Improvement $2.3 240428 R75 Citywide Signal Upgrade Project Phase II $0.6 240419 R76 Herriman Ave./Saratoga Ave. Traffic Signal $0.3 240419 R78 Verde Vista Ln. Traffic Signal $0.3 240434 R80 Saratoga Ave. Sidewalk Ped Improvement $0.3 240494 S60 City of Saratoga Citywide Signal Upgrade Project Phase II $0.2 240494 S61 Citywide Accessible Pedestrian Signals $0.4 Sunnyvale 240509 B99 Bernardo Ave. Caltrain Undercrossing $9.9 240509 B100 Mary Ave. Bike Lanes Fremont to Evelyn $0.6 240509 B102 Stevens Creek Trail Connector $1.6 240509 B103 Mathilda Ave. Bike Lanes: US 101 to El Camino Real $4.3 240509 B108 Maude Ave. Bike Lanes: Mathilda to Wolfe $0.2 230539 R85 Sunnyvale Downtown Specific Plan Improvements $15.1 240470 R86 Installation of Ped Countdown Signals $0.2 240494 S62 Traffic Adaptive Signal Controller Update $4.0 240494 S63 Citywide CCTV Camera Deployment $1.3 240494 S64 Citywide Traffic Signal Controller Update $0.7 240494 S65 Citywide Count and Speed Monitoring Stations $1.2 240494 S66 Citywide ITS Communications Infrastructure $2.0 240494 S67 Traffic Management Center Integration $0.4 240494 S68 Emergency Preemption Receiver Installation $1.2 County 240509 B113 Oregon Expwy/Page Mill Rd: I 280 Interchange Modification $1.09 9

County 240509 B114 McKean Rd Shoulder Improvements (Harry Rd to Bailey Ave) $6.6 Continued 240509 B120 Los Gatos Creek Trail Lark Ave to Blossom Hill Dr. $1.6 240509 B121 Coyote Creek Trail Silicon Valley Blvd to Metcalf Rd. $1.0 22829 R93 Fitzgerald Ave/Masten Ave Realignment at Monterey $0.7 230266 R94 Santa Teresa Blvd & Tilton Ave Traffic Signal Improvements $0.7 22811 R95 Railroad Crossing Improvements at Church Ave and Monterey Hwy $0.8 230255 R97 Santa Teresa Blvd & San Martin Ave Traffic Signal Improvements $0.7 230286 R98 Doyle Rd Bicycle and Pedestrian Trail Connection $0.5 240509 R88 Foothill Expwy./Loyola Bridge $1.2 240494 S74 Expressway Adaptive Pedestrian Timing Project $2.2 240494 S75 Expressway and Santa Teresa Corridor Bike Detection $2.5 230242 X2 Capitol Expwy TOS infrastructure $5.5 22910 X21 $5.8 Santa Teresa Blvd/Hale Ave Corridor TOS Infrastructure Improvements 22822 X22 SCC Motorist Traffic Information & Advisory Systems $5.8 230292 X23 Signal Coordination/Interconnect with Cross Streets $5.8 230251 X24 TOS Infrastructure Improvements $11.6 Total Constrained MTI Projects $560.3 Pavement and fully funded projects not included. 10

San Antonio Union VTP 2040: MTI Projects (Multimodal Transportation Investment Preliminary Constrained Project List) WREN HALE LLAGAS X21 R94 Burnett S19, S20 S25 B41 University B113 R97 Main R93 B10 Page Mill Dunne 0 2 Miles Tennant Santa Teresa Embarcadero B42 R95 B9 Alma Middlefield!!" B11 B17 El Camino Real B43 Rengstorff B14 Foothill Expressway South County San Martin S10 R93 Leavesley S11 S6, S12 7,9 S8 B8 B7 S13, 14,15!" S23 S24 Miramonte Shoreline Charleston S21 Moffet R88 Source: Valley Transportation Authority Preliminary Unconstrained Project List, TeleAtlas Date: 12.19.11 B33 S22 Fremont B32 }þ 85 B100 B102 B31 B15 McClellan Mary B99 R86, S68 R78 Sunnyvale Saratoga Mathilda R75 B103 R85 B97 Caribbean R76 Homestead Prospect R74 B108 Lawrence }þ 237 280 Tasman Central Expressway B95 R80 R98 S16 Doyle Saratoga B3 Campbell Hacienda B120 B60b S1 Winchester B19 R40 S51 S50 S49 S4 S2 }þ 85 880 680 S30- S36, S32 S60- S61 S62- S67 X22- X24 S74- S75 37,41 B63 B63 B48 B61 S27- B52 S29 S33 S35 S43 R48 R51 B66 S44 B47 Montague Winchester B60a Lafayette S3 Bascom B2 1ST R11 Coleman Stevens Creek B4 B57 Zanker Hamilton B1 B49 B55 Blossom Hill S17 Abel Willow S34, S35, 38,42 S39 Curtner Hillsdale Camden Oakland B20 13th 10th Branham Calaveras B50 B64 S45 B45 B51 Landess S30 Berryessa }þ 87 Mabury B58 X2 Almaden Expressway B56 Alum Rock B54 Piedmont Keyes Snell!! " VTP 2040 project Tully Capitol Expressway B114 VTP 2040 project that spans entire city or county 0 4 Miles R45 S35 R37 Santa Teresa R44 Cottle Coyote Monterey B53 B65 B121 o S40 M