Mott Manufacturing Limited
|
|
- Melvyn Hamilton
- 5 years ago
- Views:
Transcription
1 Mott Manufacturing Limited 452 Hardy Road, PO Box 1120, Brantford, Ontario, Canada, N3T 5T3. Telephone: Fax: Web Site: Fume Hood Performance Test Test Date: January 11, 2005 Project: 48 Observation Bench Hood Test Results Applicable to the following models: 72CV002 Test Conducted By: A. Sinnamon Report Prepared By: A Sinnamon
2 Fume Hood Test Report Test Date(s) 11 January 2005 Report date: 11 January 2005 Manufacturer: Mott Manufacturing Model: Prototype Serial number: Sash type: Vertical Exterior width: 48 inches Exterior height: inches Exterior depth: 66 inches Tracer gas release rate: 4 l/min Test conditions: 100 lfpm with sash open vertically to 18 inch. Introduction: Test Results: The above fume hood was tested the ASHRAE protocol. Tests included: smoke flow visualization, face velocity measurement and tracer gas. The hood was installed in Mott Manufacturing s factory test lab. This double sided hood was equipped with sashes on both sides. All testing was performed with both sashes in the 18 open position. All instruments are calibrated annually or verified on the day of use. Detailed information on the test equipment is available on request. Results are summarized below for all tests. For detailed results see attached charts and graphs. Large Volume Smoke Flow Visualization: A smoke "bomb" is used to produce a large volume smoke challenge within the hood. Large volume smoke visualization is rated qualitatively and is assigned a pass/fail result. ASHRAE 110 defines a fail as "A release of smoke from the hood that is steady and visible" Sash Position Face Velocity Rating Notes 18 inch 100 Pass Some reverse flow noted at sides did not escape past hood face Local Smoke Visualization: A cotton swab is dipped in Titanium Tetrachloride and is used to produce a local source of smoke for detailed visualization. Local smoke visualization is rated qualitatively and is assigned a pass/fail result. ASHRAE 110 defines a fail as "A release of smoke from the hood that is steady and visible" Sash Position Face Velocity Rating Notes 18 inch 100 Pass Some reverse flow noted at sides did not escape past hood face Face Velocity Profile: A calibrated anemometer is used to measure velocities in one square foot areas across the open face of the fume hood. Results are tabulated by computer and charted. Average face velocity, as well as percentage positive and negative variation are noted here. Sash Position Target Face Velocity Actual Face Velocity Variation 18 inch / -7.5 % Fume Hood Test Report - Vista Hood 11 January 2004 Page 1
3
4 Mott Manufacturing Ltd Face Velocity Test Project: Evergreen State Test No: Test Performed By: A. Sinnamon Date: 11 January 2005 Fume Hood Model No: Fume Hood Description: Fume Hood Serial no: Vista Hood Double Sided Workstation Prototype Target Face Velocity (ft/min): 100 Connection: Phoenix Valve #3 Phoenix setting: 1100 Fan RPM: n/a Damper Setting - % Open: n/a Var Speed Cont: n/a Sash Height (in): Face Width (in): Interior Depth (in): Static 0.5 Sash Cells Horizontal Cells 4 Vertical Cells 2 Sash Cell Area : 0.7 Sash Cell Height (in): Sash Cell Width (in): (sq ft) Sash Cell Centre Line Coordinates referenced from Lower Left Corner Actual Face Velocity Measurements (ft/min) CELL A B C D E F G H I K location N/A N/A N/A N/A N/A N/A N/A 4 N/A 5 N/A 6 N/A 7 N/A 8 N/A Measured Variance from Average CELL A B C D E F G H I K location N/A N/A N/A N/A N/A N/A % -4.4% -2.7% 15.8% % -2.8% -7.5% 4.1% 3 N/A 4 N/A 5 N/A 6 N/A 7 N/A 8 N/A Average Face Velocity (ft/min): 94 Variance Actual Overall Face Velocity to Target Face Velocity: -5.8% Results STP ft/min % Variance Overall Average Face Velocity 94 Maximum Face Velocity % Minimum Face Velocity % Average Exhaust Volume (CFM): 518
5 ASHRAE Gas Tracer Test Mannequin Centre AVERAGE EXCLUDING CHALLANGE PPM 00:00:16 00:01:17 00:01:47 00:02:18 00:03:04 00:03:19 00:03:49 00:04:05 00:04:20 00:05:21 00:05:51 Final final peak due to verification of instruments.. Only peaks before final peaks would Results Adjusted for 0 PPB background ASHRAE Gas Tracer Test Mannequin Left AVERAGE EXCLUDING CHALLANGE PPM 00:00:16 00:01:16 00:01:47 final peak due to verification of instruments. Only peaks before final peak would 00:02:17 00:03:18 00:03:49 00:04:04 00:04:19 00:05:20 00:05:51 00:06:07 Results Adjusted for -1 PPB background
6 ASHRAE Gas Tracer Test Mannequin Right AVERAGE EXCLUDING CHALLANGE: PPM 00:00:15 00:01:17 00:01:47 00:02:18 00:03:19 00:03:49 00:04:05 00:04:20 00:05:21 00:05:51 00:06:06 final peak due to verification of instruments. Only peaks before final peak would Results Adjusted for -1 PPB background ASHRAE Gas Tracer Test Sash Mannequin Movement Left Effect PEAK EXCLUDING CHALLANGE: PPM 00:00:16 00:00:30 00:01:31 00:02:32 00:01:16 00:03:33 00:01:47 00:04:04 final Final peak due due to to verification of of instruments.. Only peaks before final peaks would would indicate a loss of of containment. 00:04:34 00:02:17 00:05:35 00:06:06 00:06:36 00:07:07 00:03:18 00:07:37 00:08:08 00:03:49 00:08:38 00:04:04 00:09:08 00:04:19 00:09:39 00:10:09 00:10:40 00:11:11 00:11:41 00:05:20 00:12:12 00:12:42 00:13:13 00:05:51 00:06:07 Results Adjusted for -1-2 PPB background
7 ASHRAE Gas Tracer Test Perimeter Scan PEAK EXCLUDING CHALLANGE : PPM 00:00:10 00:00:20 00:00:30 00:00:40 00:00:51 00:01:11 00:01:21 00:01:31 00:01:41 00:01:52 00:02:12 00:02:22 00:02:32 00:02:42 00:02:53 final peak due to verification of instruments. Only peaks before final peak would Results Adjusted for 0 PPB background
Mott Manufacturing Limited
Mott Manufacturing Limited 452 Hardy Road, Brantford, Ontario, Canada, N3T 5L8. Telephone: 519-752-7825 Fax: 519-752-2895 Web Site: www.mott.ca Fume Hood Performance Test Test Date: 9-Sep-08 Model Number:
More informationStatesville, NC. Results of AM ASHRAE 110 Laboratory Fume Hood Performance Evaluations Venturi Hood
Statesville, NC Results of AM ASHRAE 11 Laboratory Fume Hood Performance Evaluations Venturi Hood January, 217 Prepared By: Exposure Control Technologies Inc. 231-C East Johnson Street Cary, NC 27513 Phone:
More informationFumehood Performance Test Report
Fumehood Performance Test Report 6' Protector ECHO IPA Modified NIH Test Prepared For Labconco Corporation Prepared By Report Date: 02-12-2015 Project No.: 142327 AccuTec Services, Inc*320 NW Capital Dr*Lee's
More informationUniversity of North Florida Performance Requirements For Laboratory Fume Hoods. As Manufactured Performance Tests. As Installed Performance Tests
University of North Florida Performance Requirements For Laboratory Fume Hoods As Manufactured Performance Tests As Installed Performance Tests As Used Performance Tests October 27, 2010 University of
More informationFUME CUPBOARD PERFORMANCE CHECK
WS2 FUME CUPBOARD PERFORMANCE CHECK This exercise is adapted from Appendices E & F of Australian Standard 2243.8 Safety in laboratories: Fume cupboards. 1. PURPOSE This exercise determines how well a fume
More informationAPPENDIX A SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from
SAMPLE FHT SPECIFICATION (This recommended FHT specification is available from www.nebb.org) NEBB recommends that these FHT Specifications be referenced as related documents in other appropriate sections
More informationASHRAE-110 Type-Test Report for 1.5m Wide Bench-Type fumetop1500 FH-150 Fume Hood of TopAir, USA Ref: ANSI/ASHRAE
ASHRAE-110 Type-Test Report for 1.5m Wide Bench-Type FH-150 Fume Hood of TopAir, USA Ref: ANSI/ASHRAE 110-1995 by Dr A F Bicen Invent UK Ltd 85 Southdown Road Harpenden AL5 1PR Tel: +44 (0) 1582 461666
More informationTesting the Vented, 7-Liter Induction Chamber. Report 6 April 2008
Report 6 April 2008 Page 1 of 11 Report 6 April 2008 The final review and approval of this document before its release to the client is the responsibility of the following person at Technical Safety Services.
More informationSURROGATE POWDER AND ASHRAE-110 TESTING OF A MULTI-PURPOSE ENCLOSURE FOR WEIGHING/SIEVING/FLUID BED DRYER APPLICATIONS
SURROGATE POWDER AND ASHRAE-110 TESTING OF A MULTI-PURPOSE ENCLOSURE FOR WEIGHING/SIEVING/FLUID BED DRYER APPLICATIONS By Chris Mento, Geoff Williams, Bryan Prince, Ray Ryan, Flow Sciences, Inc. Introduction
More informationTesting the Vented, 2-Liter Induction Chamber. Report 14 October 2004
Report 156August 2004 Page 1 of 17 Report 14 October 2004 The final review and approval of this document before its release to the client is the responsibility of the following person at Technical Safety
More informationIH Report: SUFMO 08/09-CC21 1/27/2009 Stanford University Gas Cabinet Installation and Performance Criteria
Stanford University Gas Cabinet Installation and Performance Criteria I. Application Gas cabinets are ventilated enclosures that are used to isolate hazardous gas cylinders from the surrounding work place.
More informationKansas State University Fume Hood Operation
FUME HOODS 2009, PAGE 1 FUME HOODS Kansas State University Fume Hood Operation One of the primary safety devices in a laboratory is a chemical fume hood. A well-designed hood, when properly installed and
More informationOutside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program
1 Outside Air Nonresidential HVAC Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program Jim Meacham, CTG Energetics Agenda 2 In Situ Testing Results Reduced Ventilation after
More informationStandard Operating Procedure #COE-SOP-0001 Chemical Fume Hood Operation
Standard Operating Procedure # Chemical Fume Hood Operation Facility: NMSU College of Engineering Laboratories Written by: Juanita Miller, Safety Specialist, miljgh@nmsu.edu (575)-646-1292 Scope: This
More informationCTG Certification Protocol -- Version 3.0 SUMMARY
Date of Test: Test Report Number: SUMMARY Date of Prior Certification: Certified by: Re-certification Due Date: Unit Description: Make : Model: Serial Number: Location: CERTIFIER INFORMATION Name: Client
More informationLEV Inspection & Test Report
LEV Inspection & Test Report CLIENT: SITE: XXXXXXX LTD XXXXXXX Report Reference: Hinge Room-LEV System Identification: BeCu ESTA Survey Conducted By: Name: Position: Signed: XXXX Environmental Consultant
More information2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A
2005 CERTIFICATE OF ACCEPTANCE (Part 1 of 3) MECH-1-A PROJECT ADDRESS TESTING AUTHORITY TELEPHONE Checked by/date Enforcement Agency Use GENERAL INFORMATION OF BLDG. PERMIT PERMIT # BLDG. CONDITIONED FLOOR
More informationTExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems
ILEVE -Institute of LEV Engineers CPD & Information Day TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems Jane Bastow CMIOSH Chartered Safety and Health Practitioner OSCHR Registered
More informationQuestion : What are some tips and recommendations and choices for roof venting?? Part One
Greenhouse - Q and A TIPS AND ADVICE Agroponic Industries Ltd. Calgary, Alberta, Canada ph 403 241 8234 email: agropon@agroponic.com Ask the Experts Question : What are some tips and recommendations and
More informationLABORATORY SAFETY SERIES: Laboratory Hoods
ERI Safety Videos Videos for Safety Meetings 2956 LABORATORY SAFETY SERIES: Laboratory Hoods Leader s Guide Marcom Group Ltd. 1 INTRODUCTION TO THE PROGRAM Structure and Organization Information in this
More informationLaboratory Guidelines and Standards Application Note LC-125
Laboratory Guidelines and s Application Note LC-125 Introduction This publication provides excerpts from some of the many guidelines and standards that pertain to the construction and operation of laboratory
More informationLaboratory Ventilation. Environmental, Health, and Safety
No.: BCF020.054 Page: 1 of 7 RECORD OF REVISIONS Date Rev # Details of Change 09/13 1 Updated job titles to reflect ICON job descriptions. Added a definition for Approved Ventilation Contractor and included
More informationME 449/549 Lab Assignment 2 Spring 2006 due 25 April Background. 2 Apparatus
ME 9/59 Lab Assignment Spring due 5 April 1 Background The thermal management laborator has three small wind tunnels used for heat transfer experiments. The wind tunnels provide air velocities from to
More informationMANAGEMENT PROCEDURE FOR LABORATORY VENTILATION
UNIVERSITY OF ALASKA FAIRBANKS SAFETY SYSTEM POLICY AND PROCEDURE DOCUMENT NUMBER: 508 ISSUE DATE: SEPTEMBER 1996 SUBJECT: Management Procedure for Laboratory Ventilation MANAGEMENT PROCEDURE FOR LABORATORY
More informationH V A C C o n t r o l s L a b o r a t o r y. Application Note
H V A C C o n t r o l s L a b o r a t o r y Application Note Introduction This publication provides excerpts from some of the many guidelines and standards that pertain to the construction and operation
More informationNavy Guidance and Tips for Using DOEHRS-IH Ventilation NAVY & MARINE CORPS PUBLIC HEALTH CENTER
Navy Guidance and Tips for Using DOEHRS-IH Ventilation NAVY & MARINE CORPS PUBLIC HEALTH CENTER October 2010 Purpose This document is a supplemental Navy guide to the DOEHRS Student Guide/User Manual Version
More information"LABORATORY SAFETY SERIES"
PRESENTER'S GUIDE "LABORATORY HOODS" Part of the "LABORATORY SAFETY SERIES" Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS OUTLINE OF MAJOR PROGRAM POINTS
More informationThe primary purpose of laboratory fume hoods is to keep toxic or irritating vapors out of the general laboratory working area.
Introduction Welcome to the Biosafety Cabinets and Fume Hoods Training Course (OHS_BIO304). This training is required for anyone that will be conducting work and/or research that requires the use of a
More informationFall Protection. ANSI-What is it, Why is it important? Craig Firl. March 5 th, Company Private
Fall Protection ANSI-What is it, Why is it important? New ANSI Standards Craig Firl March 5 th, 2013 ANSI Fall Protection Standards What is ANSI? American National Standards Institute Voluntary Consensus
More informationAirtightness Testing in Large Buildings: NESEA 2016
Airtightness Testing in Large Buildings: NESEA 2016 Dr John Straube, P.Eng. Associate Professor, University of Waterloo Principal, RDH Building Science This session: why would one invest in airtightness
More informationQuick Reference Technical Data
Bulletin 127C 2 Quick Reference Technical Data For over 100 years, The Spencer Turbine Company has specialized in innovative solutions to air and gas handling problems. Spencer's product line includes
More informationWind Flow Validation Summary
IBHS Research Center Validation of Wind Capabilities The Insurance Institute for Business & Home Safety (IBHS) Research Center full-scale test facility provides opportunities to simulate natural wind conditions
More informationCYCLIC PERFORMANCE PER ASTM E 330 TEST REPORT. Rendered to: TRUSEAL TECHNOLOGIES, LTD. PRODUCT TYPE: Fixed Window
CYCLIC PERFORMANCE PER ASTM E 330 TEST REPORT Rendered to: TRUSEAL TECHNOLOGIES, LTD. PRODUCT TYPE: Fixed Window Report No.: Test Dates: 07/30/07 Through: 08/03/07 Report Date: 08/20/07 Expiration Date:
More informationSECTION 12.0a CONSTRUCTION SYSTEMS AND ASSEMBLIES STANDARDS AND GUIDELINES ADDENDUM A: LABORATORY BUILDINGS
SECTION 12.0a CONSTRUCTION SYSTEMS AND ASSEMBLIES STANDARDS AND GUIDELINES ADDENDUM A: LABORATORY BUILDINGS INTRODUCTION Laboratory buildings call for special guidelines and standards in addition to those
More informationBuilding Official's Guide to Duct Testing based on 2009 IECC
Why test ducts? Leaky ducts pose health, safety and comfort problems and account for about 25% of the total energy lost in a typical house. Because it s by far the most cost effective way to save energy
More informationLab # 03: Visualization of Shock Waves by using Schlieren Technique
AerE545 Lab # 03: Visualization of Shock Waves by using Schlieren Technique Objectives: 1. To get hands-on experiences about Schlieren technique for flow visualization. 2. To learn how to do the optics
More informationExhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)
1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures
More informationThorough Examination and Test of Local Exhaust Ventilation Systems to Regulation 9 of the COSHH Regulations 2002 (as amended)
Thorough Examination and Test of Local Exhaust Ventilation Systems to Regulation 9 of the COSHH Regulations 2002 (as amended) Test of LEV Systems 6 Monthly Test Report Ref: LEV16012014 Date: 16 th January
More informationRiver Bridge - Test Shaft-1 Clarke County, MS, 4/2/2012
Page 1 of 9 The enclosed report contains the data and analysis summary for the SoniCaliper shaft caliper, performed at River Bridge (Test Shaft-1), Clarke County, MS on Monday, April 02, 2012 by Dave Jakstis.
More informationASTM E1886 and ASTM E1996 TEST REPORT. Report No.: E Rendered to: 3M COMPANY St. Paul, Minnesota 55144
ASTM E1886 and ASTM E1996 TEST REPORT Report No.: E6587.01 201 44 Rendered to: 3M COMPANY St. Paul, Minnesota 55144 PRODUCT TYPE: Safety and Security Window Film SERIES/MODEL: 3M Safety and Security Film
More informationNitrous Oxide as a Tracer Gas in the ASHRAE Standard
Nitrous Oxide as a Tracer Gas in the ASHRAE 110-1995 Standard Martin Burke 1, Larry Wong 2, Ben A. Gonzales 1, and Gerhard Knutson 3 1 TSS Inc., Berkeley, CA 2 University of California Office of the President
More informationCONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7
Page 2 of 22 CONTENTS 1. INTRODUCTION...3 2. DESCRIPTION OF TEST SAMPLE...4 3. TEST RIG GENERAL ARRANGEMENT...6 4. TEST SEQUENCE...7 5. SUMMARY AND CLASSIFICATION OF TEST RESULTS...8 6. WATERTIGHTNESS
More information4 Testing Agency Guide. 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage
10 4 Testing Agency Guide 4.1 U.S. Army Corps of Engineers (USACE) Standard for Air Leakage The USACE requires all new buildings and major renovation projects to pass an air leakage test where the results
More informationCETA Compounding Isolator Testing Guide CAG Revised December 8, 2008
CETA Compounding Isolator Testing Guide CAG-002-2006 Revised December 8, 2008 1.0 Overview: The purpose of this document is to establish an industry-based minimum set of testing criteria appropriate for
More informationDefining Terms. Types Of Ventilation Systems: Types Of Ventilation Systems: Natural Ventilation - Winter
Improving Ventilation in Calf and Heifer Housing Brian Holmes Extension Agricultural Engineer UW Madison Biological Systems Engineering Young Stock Facilities College & Tour Calumet County December, 2010
More informationPERFORMANCE QUALIFICATION AND OCCUPATIONAL EXPOSURE LIMIT (OEL) FOR ISOLATOR
wjpmr, 2017,3(7), 157-162 SJIF Impact Factor: 4.103 WORLD JOURNAL OF PHARMACEUTICAL Ratnesh and Vivek et al. AND MEDICAL RESEARCH www.wjpmr.com Research Article ISSN 2455-3301 WJPMR PERFORMANCE QUALIFICATION
More informationSizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios
Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Yunlong (Jason) Liu, PhD, PE HNTB Corporation Sean Cassady, FPE HNTB Corporation Abstract Extraction
More informationDouble L Group, Ltd. TJP Inlets Number & Placement of Inlets Using Summer Fans with Minimum Ventilation on Endwalls
Double L Group, Ltd. TJP Inlets Number & Placement of Inlets Using Summer Fans with Minimum Ventilation on Endwalls Poultry customers worldwide use TJP wall inlets to ventilate poultry houses with minimal
More informationWASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.)
Page 1 of 18 Water Monitoring Program WASHINGTON CONSERVATION DISTRICT STANDARD OPERATING PROCEDURE (S.O.P.) No. 1 FLOW MONITORING Page 2 of 18 Water Monitoring Program Standard Operating Procedure No.
More informationREPORT NUMBER: G COQ-004 rev 1 ORIGINAL ISSUE DATE: May 18, 2010 REVISION DATE: June 7, 2010
TEST REPORT REPORT NUMBER: G100017878COQ-004 rev 1 ORIGINAL ISSUE DATE: May 18, 2010 REVISION DATE: June 7, 2010 EVALUATION CENTER Intertek Testing Services NA Ltd. 1500 Brigantine Drive Coquitlam, B.C.
More informationOptimized Local Exhaust Solution for Working Place
Optimized Local Exhaust Solution for Working Place Case Study Dr. Daniel Gubler, AFC Air Flow Consulting AG Ventilation 2006 Conference Chicago, May 2006 AFC Air Flow Consulting AG Weinbergstrasse 72 CH-8006
More informationMEASURING AIR FLOW. Ventilation (Outside Air) Calculations. Derive % of OA as part of total air flow using air temperatures:
MEASURING AIR FLOW 1 Ventilation (Outside Air) Calculations Derive % of OA as part of total air flow using air temperatures: % Outside Air (OSA) = [(Return Air T Mixed Air T) / (Return Air T Outside Air
More informationPaper Session II-C - Verification of International Space Station Component Leak Rates by Helium Accumulation Method
The Space Congress Proceedings 2003 (40th) Linking the Past to the Future - A Celebration of Space May 1st, 1:30 PM - 4:30 PM Paper Session II-C - Verification of International Space Station Component
More informationDetermination of Zn using Atomic Absorption with Multiple Standard Additions
1. Purpose Determination of Zn using Atomic Absorption with Multiple Standard Additions This procedure will determine the concentration of zinc at the parts-per-million level using flame atomic absorption
More informationTable of contents. I Drawings 33. A1 Design criteria 1 A1.1 Local thermal discomfort indices... 1
Table of contents A1 Design criteria 1 A1.1 Local thermal discomfort indices........................... 1 A2 Experiment set-up 3 A2.1 Equipment....................................... 3 A2.2 Test cases.......................................
More informationUnit # ± 5,514 SF Width ± 85' Depth ± 68' Plans produced by: ID Plans 10/12/2016 (813)
±50' Lease Line ±20' ±15' Lease Outline Drawing ±65' Lease Line ±68' Lease Line Sunnymead Plaza 24949 Sunnymead Blvd., Moreno Valley, CA 92553 Unit # 24949 ± 5,514 SF Width ± 85' Depth ± 68' Plans produced
More informationNew ANSI Fall Protection Standards
ANSI Z359.7 and ANSI Z359.14 Rick Maurice Craig Firl June 17, 2016 ANSI Z359.14 Self Retracting Devices Effective August 20, 2012 SUMMARY New terms SRD, SRL-R, SRL-LE New classifications Class A, Class
More informationExperimental Characterization and Modeling of Helium Dispersion in a ¼-Scale Two-Car Residential Garage
Experimental Characterization and Modeling of Helium Dispersion in a ¼-Scale Two-Car Residential Garage William M. Pitts, Jiann C. Yang, Kuldeep Prasad, and Marco Fernandez National Institute of Standards
More informationQualification Test Specifications for Dissolution Test Systems
35 for Vantage Dissolution Point Drive, Rochester NY Test 14624 Systems Phone: 800-828- 1470 Fax: 800-395- 0543 Transcat.com Test Set Points/Range Acceptance Criteria Rotational Speed Runout (Wobble) Shaft
More informationOCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE
OCCUPATIONAL SAFETY AND ENVIRONMENTAL HEALTH GUIDELINE Date: 04-22-2009 Revision: 02 Page: 1 of 6 SUMMARY: SCOPE: REFERENCE REGULATIONS: Employees using laboratory fume hoods shall observe all applicable
More informationLABORATORY FUME HOOD SPECIFICATION AND MAINTENANCE PROGRAM
LABORATORY FUME HOOD SPECIFICATION AND MAINTENANCE PROGRAM Last Updated: Tuesday, January 31, 2006 1. INTRODUCTION AND SCOPE 2. RESPONSIBILITIES 3. USER GUIDELINES 4. SYSTEM DESIGN SPECIFICATIONS o The
More informationTransfeu WP2 Subtask Development of small-scale test method for fire effluents
Pagina 83 di 89 Transfeu WP2 Subtask 2.1.2 Development of small-scale test method for fire effluents Step 2: Influence of 2 nd filter on FTIR sampling line to prevent HCl and other halogen gases trapping
More informationHAP e-help. Obtaining Consistent Results Using HAP and the ASHRAE 62MZ Ventilation Rate Procedure Spreadsheet. Introduction
Introduction A key task in commercial building HVAC design is determining outdoor ventilation airflow rates. In most jurisdictions in the United States, ventilation airflow rates must comply with local
More informationby Rob Chopowick General Manager, Con- Test
by Rob Chopowick General Manager, Con- Test ASHRAE & G.W. Knutson and K.J. Caplan, University of Minnesota RP- 70 The Effect of Room Air Challenge on the Efficiency of Laboratory Fume Hoods 1. Smoke test
More informationTECHNICAL DATA Q= C. Table 1 - Specifications
September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,
More informationEvaluation of Consumer Personal Protective Equipment: EMERGENCY ESCAPE MASKS
Evaluation of Consumer Personal Protective Equipment: EMERGENCY ESCAPE MASKS October 2007 Rohit Khanna Division of Combustion and Fire Sciences Directorate for Engineering Sciences U.S. Consumer Product
More informationATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN
ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN (This page intentionally blank) ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN TABLE OF CONTENTS O- Definitions... O- Objective... O- Design
More informationSubject: FW: 2018 First Quarter Probe/Perimeter Monitoring Report Lena Road Landfill WACS # 44795
Borderieux, Scott From: Thompson, Madison Sent: Wednesday, May 16, 2018 3:48 PM To: Borderieux, Scott Subject: RE: 2018 First Quarter Probe/Perimeter Monitoring Report - Lena
More informationCSC-2000 SERIES. Reset Volume Controllers MADE IN U.S.A. DESCRIPTION MODELS SPECIFICATIONS ORDERING
CSC-2000 SERIES Reset Volume Controllers MADE IN U.S.A. DESCRIPTION The CSC-2000 series are designed for use on VAV terminal units in HVAC systems. These are submaster air velocity controllers whose velocity
More informationCERTIFICATION TEST REPORT
CERTIFICATION TEST REPORT 515 Gus Hipp Blvd. Rockledge, Florida 32955 Telephone (321) 632-2008 http://www.imanna.com Post Office Box 560933 Rockledge, Florida 32956-0933 FAX (321) 690-3360 CERTIFICATION
More informationApplication Note AN-107
SPEC Sensor TM Characterization & Calibration Considerations Scope This document is provided to describe the considerations needed to characterize, calibrate, verify and validate the measurement performance
More informationHigh-Rise Fireground Field Experiments Results
High-Rise Fireground Field Experiments Results These graphs show average times for each critical task by crew size. Percentage calculations for all the charts were based on the overall time from detection
More informationVENTILATION EFFICIENCIES OF A DESK-EDGE-MOUNTED TASK VENTILATION SYSTEM
VENTILATION EFFICIENCIES OF A DESK-EDGE-MOUNTED TASK VENTILATION SYSTEM D Faulkner *, WJ Fisk, DP Sullivan and SM Lee Indoor Environment Dept., Lawrence Berkeley National Lab, Berkeley, CA, USA ABSTRACT
More informationDF-310E PROCESS ANALYSERS APPLICATIONS FEATURES
PROCESS ANALYSERS DF-310E The DF-310E is a Coulometric sensor based oxygen analyzer designed to measure trace and percent level oxygen in pure and multi-gas backgrounds for process and quality control
More informationWhen buying one of our prototypes you agree with this!
This ppo2 display unit is just a prototype, using it is not allowed and not our intension. It is for demonstration only. Be always aware that a device like this can and will show wrong data and that can
More informationTEST REPORT. Report No.: G Rendered to: VELUX America LLC Greenwood, South Carolina
TEST REPORT Report No.: G4124.02-109-44 Rendered to: VELUX America LLC Greenwood, South Carolina PRODUCT TYPE: Sun Tunnel Skylight SERIES/MODEL: TCC 022 SPECIFICATION(S): Occupational Safety and Health
More informationEXTRUDED ALUMINUM SQUARE AND RECTANGULAR DIFFUSERS
INDUSTRIAL REGISTRATION NO.353 EXTRUDED ALUMINUM SQUARE AND RECTANGULAR DIFFUSERS SQUARE AND RECTANGULAR FLUSH CEILING DIFFUSERS OUTSTANDING FEATURES: Extruded aluminum construction 1-2-3-4 way throw patterns.
More informationPreinstallation Checklist and Instructions for the TriStar These Preinstallation Checklist and Instructions were reviewed and approved by:
Title: Preinstallation Checklist and Instructions for TriStar 3000 Date: 08/04 300/42870/01 Revision ( A ) MICROMERITICS Preinstallation Checklist and Instructions for the TriStar 3000 These Preinstallation
More informationCustomer Responsibilities. Important Customer Information. Agilent 6400 Series Triple Quad LC/MS Site Preparation Checklist
Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation
More informationFXT. FXT Cooling Tower RIGGING & ASSEMBLY INSTRUCTIONS
FXT FXT Cooling Tower RIGGING & ASSEMBLY INSTRUCTIONS FXT Cooling Towers should be rigged and assembled as outlined in this bulletin. These procedures should be thoroughly reviewed prior to the actual
More informationCover Page for Lab Report Group Portion. Head Losses in Pipes
Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section
More informationManual for continuous distillation
Manual for continuous distillation 1. Week 1: Objectives: Run the column at total reflux. When steady state is reached, take the sample from the top and bottom of the column in order to determine the overall
More informationFAN ENGINEERING. Field Testing of Fans FE-900. Introduction. Testing Equipment. Testing Standards. Prior to Testing
FAN ENGINEERING Information and Recommendations for the Engineer Introduction There are many reasons why a fan test may be performed. AMCA publications cover three categories of tests. 1. General Fan System
More informationModels EXN and OLG. General Description. Features and Benefits. Pressurizer for Vertical Air Conditioners Increased Safety for Hazardous Locations
Models EXN and OLG Certified. Not Modified. Pressurizer for Vertical Air Conditioners Increased Safety for Hazardous Locations General Description Industrial Climate Engineering s (ICE) EXN and OLG pressurization
More informationAAMA/WDMA/CSA 101/I.S.2/A AAMA/WDMA/CSA 101/I.S.2/A STRUCTURAL PERFORMANCE TEST REPORT SUMMARY RENDERED TO:
AAMA/WDMA/CSA 101/I.S.2/A440-05 AAMA/WDMA/CSA 101/I.S.2/A440-08 STRUCTURAL PERFORMANCE TEST REPORT SUMMARY RENDERED TO: ALL SEASONS DOOR & WINDOW, INC. 28 EDGE ROAD EAST BRUNSWICK, NJ 08816 MODEL/ A-200
More informationBreathing Air Purifiers Comply with OSHA Grade D, NFPA-99, European Pharmacopoeia and other International Breathing Air Standards
Breathing Air Purifiers Comply with OSHA Grade D, NFPA-99, European Pharmacopoeia and other International Breathing Air Standards www.domnickhunter.com domnick hunter Breathing Air Purifiers provide air
More informationPQI Model 301 & 300Test Block Procedure
PQI Model 301 & 300Test Block Procedure Overview The purpose of the PQI Test Block is to provide a means to identify changes in PQI characteristics that may affect accuracy during normal operations. The
More informationBS EN :2003 Containment Factor deciphered
BS EN 14175-3:2003 Containment Factor deciphered Waldner Knowledge Base January 2011 Please let us have your feedback on this publication: steffen.springer@waldner.co.uk +44 7795010353 Content 1. Definition
More informationCOMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS
COMPARISON OF DIFFERENTIAL PRESSURE SENSING TECHNOLOGIES IN HOSPITAL ISOLATION ROOMS AND OTHER CRITICAL ENVIRONMENT APPLICATIONS APPLICATION NOTE LC-136 Introduction Specialized spaces often times must
More informationP-5215 Differential Pressure Transmitter
P-5215 Differential Pressure Transmitter Pneumatic Control Manual 717.1 Pressure Section Product Bulletin P-5215 Issue Date 0891 Features and Benefits Ultra Sensitive Feedback Circuit - Enhances System
More informationRuskinn Hypoxia and Anoxia Workstations. innovation in incubation
Ruskinn Hypoxia and Anoxia Workstations The Ruskinn range of hypoxia workstations has been designed to replicate low oxygen in vivo physiology providing the ideal research platform for cell biologists
More informationNuAire Model NU NTE797 Negative Pressure Total Exhaust Compounding Aseptic Containment Isolator Performance Evaluation Compliance to USP797
TECHNICAL BULLETIN : GENERAL INFORMATION NuAire Model NU NTE797 Negative Pressure Total Exhaust Compounding Aseptic Containment Isolator Performance Evaluation Compliance to USP797 Background The United
More informationCustomer Responsibilities
Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation
More informationProposed Uniform Standards for Equipment Leaks
12 th LDAR Symposium May 15-16, 2012 New Orleans, LA Proposed Uniform Standards for Equipment Leaks Standards Certification Education & Training Publishing Conferences & Exhibits 1 Proposed LDAR Uniform
More informationSECTION TESTING ADJUSTING AND BALANCING FOR HVAC
SECTION 23 05 93 - TESTING ADJUSTING AND [Note to PSC: Existing System Coordination When connecting to an existing system, it is the PSC s Responsibility to examine existing documents, field verify existing
More informationOwner's Letter of Assurance
Owner's Letter of Assurance Instructions Educational Facilities WELL Certification is determined by onsite Performance Verification and documentation, including Letters of Assurance from the appropriate
More informationScientific Equipment & Furniture Association SEFA Recommended Practices For Laboratory Fume Hoods
Scientific Equipment & Furniture Association SEFA 1-2010 Recommended Practices For Laboratory Fume Hoods SEFA World Headquarters 1205 Franklin Avenue Ste 320 Garden City, NY 11530 Tel: 516-294-5424 Fax:
More informationModels EXN and OLG. General Description. Features and Benefits. Pressurizer for Vertical Air Conditioners Increased Safety for Hazardous Locations
Models EXN and OLG Certified. Not Modified. Pressurizer for Vertical Air Conditioners Increased Safety for Hazardous Locations General Description Industrial Climate Engineering s (ICE) EXN and OLG pressurization
More informationCFD and Physical Modeling of DSI/ACI Distribution
CFD and Physical Modeling of DSI/ACI Distribution APC Round Table & Exposition July 09, 2013 Matt Gentry mgentry@airflowsciences.com 734-525-0300 1 Outline Introduction Flow Analysis Techniques Application
More informationATION TITLE. Survey QC, Decision Making, and a Modest Proposal for Error Models. Marc Willerth, MagVAR
1 a Modest Proposal for Error Models ATION TITLE Marc Willerth, MagVAR Speaker Information Marc Willerth VP of Survey Technologies April 11, 2018 MagVAR 2 Speaker Bio Marc Willerth Magnetic Variation Services,
More information