APPENDIX 5: STAKEHOLDER MEETING NOTES

Size: px
Start display at page:

Download "APPENDIX 5: STAKEHOLDER MEETING NOTES"

Transcription

1 APPENDIX 5: STAKEHOLDER MEETING NOTES

2

3 Ministry of Transportation and Infrastructure George Massey Tunnel Replacement Project VANCOUVER BOARD OF TRADE STAKEHOLDER MEETING December 18, 2015 Summary of the Vancouver Board of Trade, Metro Vancouver Transportation and Infrastructure Committee Stakeholder Meeting for Phase 3 of the consultation for the George Massey Tunnel Replacement Project held Friday, December 18, 2015 at Stantec, 111 Dunsmuir Street, Vancouver, B.C. ATTENDEES Participants John Collings, Co-Chair Marian Robson, Co-Chair Rob Mackay-Dunn, VBOT Public Policy and Communications Iqbal Ahmed, VBOT Andreas Bakli, DB Schenker Catherine Fritter, Moffat & Nichol Jesse Koehler, TransLink Alvin Epp, Point Nexus Consulting Kleo Landucci, Ascroft Terminal Tony Nardi, Neptune Terminals/GVGC Aaron Robinson, VBOT Bruce Rozenhart, Counterpoint Communications Kip Skabar, Stantec Derek Stanger, CN Solomon Wong, InterVistas Consulting Inc. Project Team Representatives Joost Meyboom Pam Ryan Presentation and Comment The following abbreviations are used throughout this summary: Q/C=Question/Comment, R=Project Team Responses 1. Welcome/Agenda Overview John Collings, Committee Co-Chair, welcomed the Project Team representatives to the regular meeting of the Metro Vancouver Transportation and Infrastructure Committee. Pam Ryan thanked the Vancouver Board of Trade for the opportunity to meet and encouraged participants to complete and submit the George Massey Tunnel Replacement Project Definition Report Consultation Feedback Form Vancouver Board of Trade Stakeholder Committee Meeting Summary held December 18, 2015 Page 1 of 3

4 online prior to the January 28, 2016 closing date. Pam Ryan also requested that participants inform a member of the Project Team if they are aware of other organizations that may be interested in a more in-depth presentation and discussion. 2. Presentation & Review of Project Definition Report Pam Ryan, GMT Director of Planning, presented the George Massey Tunnel Replacement Project Definition Report (PDR) and provided an overview of the consultation process being undertaken to seek input into the Project Definition Report. 3. Discussion Questions and Answers Questions and comments from participants were welcomed, which prompted the following exchange: C: Appreciate the improvements being proposed at the Highway 99/ Westminster Highway interchange, which currently has lots of challenges. Q: Has the Project Team considered the potential effects of increased weaving as drivers enter the highway and merge into the median HOV lane? R: Median HOV lanes are common in other jurisdictions and similar to what is currently in place on Highway 1 in Metro Vancouver. Median HOV lanes provide carpools and transit buses with better travel time savings than shoulder HOV lanes because they don t have to mix with traffic that is entering and exiting the highway. Q: How will this project fit within the context of future regional tolling? R: The Province intends to fund the Project at least in part through user tolls. The Province is also seeking a contribution from the federal government. The toll rate hasn t been set, but at tolls similar to that of the Port Mann Bridge, the Project can be self-financing without federal funding. The PDR consultation seeks feedback on tolling. We expect that there will be lots of discussion about tolling for this crossing and the broader region to support a final decision well in advance of when the new bridge opens in Q: What will happen at the Oak Street Bridge? Will there be more congestion? R: The efficiency of the Oak Street Bridge will continue to be governed by traffic lights at 70 th Avenue, so there will continue to be some congestion there during rush hour. Traffic forecasting indicates that while morning queues will continue as today and traffic patterns may change somewhat there will be no significant change in total traffic. This is in part because approximately 60 per cent of tunnel Vancouver Board of Trade Stakeholder Committee Meeting Summary held December 18, 2015 Page 2 of 3

5 users end their trip in Richmond so they aren t using the Oak Street Bridge, and in part because Oak Street Bridge traffic volumes have been relatively constant or declining over the past decade as a result of Canada Line and Highway 99 transit service. C: Recommend that the tolls charged should be sufficiently high to cover the costs of the next round of Highway 99 improvements as well. 4. Closing Remarks/Next Steps Pam Ryan thanked the participants for their time and reminded everyone to submit an online feedback form prior to the January 28, 2016 deadline. Ms. Ryan also encouraged participants to let other members of their respective organizations to do the same (the form is available online at and noted that written submissions are also welcome for those who wish to provide more comprehensive feedback about the Project. Vancouver Board of Trade Stakeholder Committee Meeting Summary held December 18, 2015 Page 3 of 3

6

7 Ministry of Transportation and Infrastructure George Massey Tunnel Replacement Project RICHMOND CHAMBER OF COMMERCE STAKEHOLDER MEETING January 12, 2016 Summary of the Richmond Chamber of Commerce Executive Committee Stakeholder Meeting for Phase 3 of the consultation for the George Massey Tunnel Replacement Project held Tuesday, January 12, 2016 at the Chamber of Commerce offices at 5811 Cooney Rd, Richmond, B.C. ATTENDEES Participants Rob Akimow, Chair Matt Pitcairn, Executive Director Phebe Chan Gerard Edwards Rob Howard Don Mann Dan Sakaki Project Team Representatives Geoff Freer Enriquez Mitchell Pam Ryan Presentation and Comment The following abbreviations are used throughout this summary: Q/C=Question/Comment, R=Project Team Responses 1. Welcome/Agenda Overview Matt Pitcairn, Richmond Chamber Executive Director welcomed the Project Team representatives to the meeting. Geoff Freer, GMT Project Executive Director thanked the Chamber for the opportunity to meet. Meeting attendees introduced themselves. 2. Presentation & Discussion Guide Pam Ryan, GMT Director of Planning, presented the George Massey Tunnel Replacement Project Definition Report (PDR) and provided an overview of the consultation process being undertaken to seek input into the Project Definition Report. Richmond Chamber of Commerce Stakeholder Meeting Summary held January 12, 2016 Page 1 of 4

8 3. Discussion Questions and Answers Questions and comments from participants were welcomed, which prompted the following exchange with the Project Team: Q: Some have questioned the viability of a bridge, given soil conditions in the area and the potential for soil liquefaction in the event of an earthquake. How will the bridge towers be built to withstand this? R: Through a process called ground strengthening, in which river sand is replaced with gravel, to a depth of about 25 to 30 metres. This stops sand from outside the area from moving sideways. After the ground is strengthened, piles can be driven to a depth of about 65 to 85 metres, and the towers are built on top of the piles. This is a very common practice. A similar approach was used for the (new) Port Mann, Alex Fraser and Pitt River bridges. Q: Are there any conflicts or impacts to Gardens development at Steveston Highway and No. 5 Road? R: Some residents there may have a view of the new bridge, and their view of the Steveston interchange will change because the new interchange will look different. There are no property impacts, and the reference concept maintains access from Highway 99. Q: What about light impacts? R: All interchanges must be lit for safety reasons, but there s a lot that can be done to minimize light distribution. We don t anticipate any significant effects from lighting, since the current interchange is also lit. The bridge will have minimal lighting, but will require aircraft safety lights at the top of the towers. Q: How much of the Project will be funded through user tolls? How much is the federal government is contributing? Is regional tolling being considered? R: Details are yet to be determined because federal funding has not yet been confirmed. The Project can be fully funded through user tolls; so federal funding is not a requirement for the Project to proceed. As to regional tolling, we expect that there will be lots of discussion over the next several years, and changes, if any, can be made well in advance of when the new bridge opens in Q: What are the quantified user benefits? R: Primarily travel time savings and improved safety through reduced vehicle collisions. These have been calculated in the standard way for business cases. The benefits are summarized in the PDR and discussed more extensively in the detailed business case, which is available on the Project website. Richmond Chamber of Commerce Stakeholder Meeting Summary held January 12, 2016 Page 2 of 4

9 Q: Why is the bridge design so large and so tall? R: We wanted to maintain the existing three travel lanes in the peak direction during rush hour as well as to extend the existing transit queue jumper lanes across the bridge, which means four lanes in each direction. The fifth lane will support the high volume of traffic entering and exiting the highway at the two interchanges on either side of the bridge as well as provide a lane for slower moving traffic like trucks. As for the height, it s primarily the result of keeping piers out of the water, which has environmental and navigational benefits. That s a very long distance to span, which affects the height of the towers. Q: What is the projected lifespan of the new bridge? R: 100+ years. Q: When does tolling start to pay for itself? R: At approximately the 40-year mark if the bridge is 100 per cent funded through tolls. Q: In the past, the Ministry has indicated that a challenge for construction of a Blundell interchange was its proximity to Steveston. Is this still an issue? R: It is always a consideration. However, with this Project, the issue is addressed by having a continuous merge lane through to Steveston, to help minimize safety concerns that would otherwise have occurred with the weaving pattern that is created as vehicles enter and exit the highway. Addressing weaving concerns is also a key reason why the Project includes Westminster Highway access improvements. Q: Can a Blundell interchange be built in the future? Could it be added to the Project at a later date? At what cost? R: The new Blundell overpass that will be built as part of this Project will be constructed to allow for a future interchange. A very rough estimate of extra costs to build the interchange is about $25 million. Q: Richmond s Mayor has vocally disapproved of the Project and says the City doesn t have sufficient information about the Project; what are the Province s plans to rebuild this relationship? R: The Project team has met with staff every two weeks for the last two years, and our relationship with staff is good. The Mayor and some councillors have attended past consultation sessions, and we are meeting with several council committees over the next several weeks. Some of the main things we have heard from council members are preference not to remove the tunnel as a means to limit further industrialization and increased port activity, as well as concerns about potential for soil liquefaction concerns. Richmond Chamber of Commerce Stakeholder Meeting Summary held January 12, 2016 Page 3 of 4

10 We also know that the City has concerns about congestion at No. 5 Road and Steveston Highway. We can t address all of this but we are addressing the Highway congestion, which should help. The City of Richmond will be able to adjust traffic signal timing at this interchange once the Project is complete. Construction of the Rice Mill Road accesses as part of the Project will also help. This connection can t be built until after bridge construction is complete because we will need the area for construction staging. We re continuing to work with City of Richmond staff on this. We also know that property acquisition is a concern. We don t require any property from Westminster to Blundell and in fact, can potentially return some for farming. From Blundell to Steveston, highway widening will be done to the west, to minimize impacts to active farmland, and we will require some small strips of land to accommodate the widening. We ve initiated discussions with these property owners. At Steveston, the new interchange will have a reduced footprint, which means we can return some land for farming there too. 4. Closing Remarks/Next Steps Matt Pitcairn thanked the Project Team for the informative discussion and the meeting adjourned. Geoff Freer thanked participants for their feedback and reminded everyone to submit an online feedback form prior to the January 28, 2016 deadline (the form is available online at and noted that written submissions are also welcome for those who wish to provide more comprehensive feedback about the Project. Richmond Chamber of Commerce Stakeholder Meeting Summary held January 12, 2016 Page 4 of 4

11 Ministry of Transportation and Infrastructure George Massey Tunnel Replacement Project CYCLING GROUPS STAKEHOLDER MEETING January 12, 2016 Summary of the Cycling Groups Stakeholder Meeting for Phase 3 of the consultation for the George Massey Tunnel Replacement Project held Tuesday, January 12, 2016 at George Massey Tunnel Replacement Project Office, Steveston Highway, Richmond, B.C. ATTENDEES Participants Lois Armerding, HUB Richmond Allan Buium, Cross Canada Cycle Tour Society Richard Campbell, BC Cycling Coalition Mark Heath, Richmond Active Transportation Committee Matthias Heinzemann, HUB Delta Sandra Jones, HUB Delta Jeff Leigh, HUB Regional Advisory Committee Neil Pope, HUB Delta Roel Schootman, HUB Regional Advisory Committee Debbie Snihur, HUB RATC Arno Schortinghuis, HUB Richmond Patrick Thompson, HUB Delta Committee Carol Vignale, HUB Safe Route Tsawwassen Derek Williams, HUB Richmond Liesl Fox, Corporation of Delta Joan Caravan, Cycling City of Richmond Tim Kooistra, City of Surrey Jordan Magtoto, City of Surrey Project Team Representatives Joost Meyboom Amber Standbridge Enriquez Mitchell Erin Sept Lori Alexander Pam Ryan Presentation and Comment The following abbreviations are used throughout this summary: Q/C=Question/Comment, R=Project Team Responses Cycling Groups Stakeholder Meeting Summary held January 12, 2016 Page 1 of 6

12 1. Welcome/Agenda Overview Pam Ryan, GMT Director of Planning, welcomed participants to the meeting, and all participants introduced themselves. Ms. Ryan encouraged participants to complete and submit the George Massey Tunnel Replacement Project Definition Report Consultation Feedback Form online before January 28, Presentation & Review of Project Definition Report Ms. Ryan provided an overview presentation regarding the George Massey Tunnel Replacement Project Definition Report (PDR) and the consultation process being undertaken to obtain feedback. Ms. Ryan and Joost Meyboom, Project Engineer, then provided a detailed presentation of the Project cycling elements. 3. Discussion Questions and Answers Questions and comments from participants were welcomed, which prompted the following exchange with the Project Team: General Questions and Comments: Q: What is the width of the multi-use pathway (MUP) on the new bridge? R: Three metres. Q: Will the counterflow be maintained? R: No, but the new bridge will be built to allow for counterflow in the future, if needed. Q: How wide will traffic lanes be? R: 3.65 metres, which is standard. Q: Why a 10-lane bridge instead of an 8-lane bridge? R: We wanted to maintain the existing three travel lanes in the peak direction during rush hour as well as to extend the existing transit queue jumper lanes across the bridge, which means four lanes in each direction. The fifth lane will support the high volume of traffic entering and exiting the highway at the two interchanges on either side of the bridge as well as provide a lane for slower moving traffic like trucks. An eight-lane bridge would have congestion on opening day, whereas a 10- lane bridge does not. Also, although it s marginally more expensive, it has a higher benefit-cost ratio. Q: Was a transit-only option considered? R: Yes, during the early stages of the review. However, the traffic analysis found that given this corridor s already-high transit usage, a transit-only solution would not meet forecast demand. Additionally, it would not provide the safety benefits for other vehicles. Cycling Groups Stakeholder Meeting Summary held January 12, 2016 Page 2 of 6

13 C: The Project should include a Park & Ride at the Bridgeport Canada Line station and also should improve the Marine Drive off-ramp at the Oak Street Bridge. C: Municipalities should get involved in all of this, including making improvements to the cycling access on the Richmond side of the Oak Street Bridge as well as better signage, using a numbering system like there is on highways. Q: What is the height and steepness of the new bridge? R: There will be a five per cent grade on the bridge. C: You should try to keep cyclists and vehicles separate get bikes away from the highway. The grade of the bridge is steep but acceptable. Q: There are safety issues with long, steep MUPs that have multi-directional traffic because cyclists can end up going quite fast and it is difficult to stop. There is a potential for head-on collisions and cyclist-pedestrian collisions. R: The current design calls for a path on each side of the bridge. Q: Will there be any poles, which reduce the effective width of the pathway? R: No. The path will have three metres of clear width. Q: Will the Project include additional cost-sharing opportunities for cycling and pedestrian improvements, as was done for the Gateway Program? R: We are working with our colleagues at the Ministry to look at options within the Cycling BC program. C: Will there be a camera system for safety? R: Yes. C: The Project Success Measures should incorporate a goal of a 10 per cent increase in cycling. C: Add zero-fatality as a goal or success measure. Q: How will the Ministry ensure that the contract documents are more prescriptive so that the contractor delivers what we want? Past projects have resulted in delivery of lower standards of infrastructure than had been discussed with the cycling community (e.g. cycling access on the west side of the Pitt River Bridge and the cycling path through the Cape Horn area of Coquitlam). R: Right now, we are focusing on confirming the scope of the improvements. Cycling Groups Stakeholder Meeting Summary held January 12, 2016 Page 3 of 6

14 Q: If surface is exposed, will there be joints? R: Yes. Three to four joints over a distance of about one kilometre. C: Joints need to be safe, and the surface should be smooth, skid-resistant, and reflective. Area-Specific Cycling Questions and Comments: 1) Bridgeport C: There is a conflict with the bus lane at Bridgeport trail. C: Recommend having the MUP follow the existing route along Van Horne and connect to the new greenway that will provide a new route. 2) Odlin/Shell C: There should be a paved connection to Shell and a crossing under Shell to connect along the CN Rail line. 3) Westminster Highway C: Recommend also improving the cycling crossing at the ramp so it is safer. C: Suggestions for how to address cycling at Westminster/No. 5 Road: Take the cycling path on Westminster as far as Shell Road. Allow for a four-metre-wide MUP that ties in with existing trail. Consider an underpass (would require switchbacks). Consider no right-turn on red at the light (from No. 5 to Westminster). Move path to the service road. Think about grades can t be too steep. 4) Steveston Highway C: No issues with the at-grade. C: Regarding the transit station: there should be two elevators as well as stairs, instead of the current TransLink standard of one elevator and stairs. The stairs should have channels (e.g. at Burrard Bridge in Vancouver). The stairs and elevators should connect to the first level. C: Please be sure that the elevator size can accommodate tandems or bikes with trailers. 5) Bridge A general discussion of the accesses to the bridge if the MUPs are designated for one-way use (e.g. access to the bridge from the east side would require either Cycling Groups Stakeholder Meeting Summary held January 12, 2016 Page 4 of 6

15 allowing two-way traffic on both sides or requiring one direction to use an underbridge path to access the other side) generated the following comments: Install a spiral ramp on the west side and a switchback ramp on the east side. As long as it s easy to get across, people will use only one side. A spiral is preferred to switchbacks (ramp is not possible on both sides). Consider a bike path under the bridge to cross, like on Canada Line. C: Bad examples of existing ramp infrastructure include: The north end of the Cambie Bridge (switchback) South side of Canada Line cycling bridge (switchback) North end of Alex Fraser Bridge (partly due to the height of the bridge (seven metres at the abutment) so there are a number of twists) C: Good examples of existing ramp infrastructure include: Roundabout at Golden Ears Bridge works well good line of sight. 6) Other Richmond Areas C: It s good that Blundell will also have a multi-use pathway crossing to Sidaway Road and Shell Road, but a bike lane on Sidaway is also needed or it won t work. Q: Have you considered a crossing to Williams directly? R: There is no room. 7) River Road, Delta C: If River Road becomes a through-road, there needs to be adequate room for safe pedestrian and cycling access along River Road and Vassey/64th. Q: The PDR isn t clear about whether improvements to the Millennium Trail are included. Recommend showing the trail as it exists today, to make the importance more clear. R: The Millennium Trail is incorporated into the Project design. 8) Other Delta C: More information about cycling improvements on the Delta side is needed not as developed as on the Richmond side. C: Some members of the cycling community would like a direct path along Highway 99 to Highway 17A and Burns Road. This would be the big win for the Project. Cycling Groups Stakeholder Meeting Summary held January 12, 2016 Page 5 of 6

16 C: The Project should include an integrated transit crossing at Highway 17A. If we connected it better, more people would use it. R: The current concept assumed that the regional transit connections would remain at Ladner Loop and King George. The Highway 17A transit connection was planned as a local connection only. We are working with TransLink to look at this area in more detail. C: The Project should include better signs to direct cycling traffic to the ferry. C: Provide more information for the south (e.g. where Ladner Trunk Road crosses Highway 99; information about other crossings). 4. Report Out Key Themes Pam Ryan reported on the key themes that were expressed during the meeting: Review plans for two-directional cycling trails consider pedestrian/cyclist conflicts and the potential for requiring one-way travel for bikes, with convenient crossovers for cyclists. Need to think about pedestrians ways to slow cyclists down, especially near viewing platforms. Ensure all crossings have good sightlines, are efficient and connections are grade- and user-appropriate. Incorporate improved signs as part of the Project scope (including to airport/border/ferry) HUB may be willing to cost-share in this regard. Generally prefer the path bridge pathways to be tucked under the bridge (like on Canada Line) to better protect users from vehicle traffic and from the elements. Good cycling and pedestrian connections will increase the number of users this should be a Project goal. Concerns about timing for decisions and funding of all the routes don t want to end up with a partially built network. Safety incorporate measures to keep the pathway surfaces clean and skidresistant. Update the Project maps to make the Delta bike route improvements more clear. Appreciation for the early engagement cautiously optimistic. 5. Closing Remarks/Next Steps Joost Meyboom thanked participants for their detailed and informative feedback. Pam Ryan reminded everyone to submit an online feedback form prior to the January 28, 2016 deadline and encouraged participants to let other members of their respective organizations to do the same (the form is available online at Written submissions are also welcome for those who wish to provide more comprehensive feedback about the Project. Cycling Groups Stakeholder Meeting Summary held January 12, 2016 Page 6 of 6

17 Ministry of Transportation and Infrastructure George Massey Tunnel Replacement Project BCTA LOWER MAINLAND TRANSPORTATION ISSUES COMMITTEE STAKEHOLDER MEETING January 13, 2016 Summary of the BCTA Stakeholder Meeting for Phase 3 of the consultation for the George Massey Tunnel Replacement Project held Wednesday, January 13, 2016 at the BC Trucking Association Office, A Avenue, Langley, B.C. ATTENDEES Participants Louise Yako, BCTA Greg Kolesniak, BCTA Lindsay Samson, BCTA Doug Elliot, Apex Specialized Rigging & Moving Paul Schroeder, Bison Transport Jim White, Commercial Logistics Inc. Brad Cruickshank, HUB International Insurance Darren Racine, Protrux Systems Inc. Steve Szalkai, Ocean/Rempel Bros. Concrete Rob Slarks, Ocean/Rempel Bros. Concrete Murray Scadeng, Triton Transport Ltd. Keith Freeman, Triton Transport Ltd. Project Team Representatives Pam Ryan Geoff Freer Presentation and Comment The following abbreviations are used throughout this summary: Q/C=Question/Comment, R=Project Team Responses 1. Welcome / Agenda Overview Louise Yako, BC Trucking Association CEO, welcomed the Project Team representatives to the regular meeting of the Lower Mainland Transportation Issues Committee. Geoff Freer, GMT Project Executive Director, thanked the BCTA for the opportunity to meet. Meeting attendees introduced themselves. 2. Presentation & Review of Project Definition Report Pam Ryan, GMT Director of Planning, presented the George Massey Tunnel Replacement Project Definition Report and provided an overview of the consultation process being undertaken to seek input into the Project Definition Report. BCTA Stakeholder Meeting Summary held January 13, 2016 Page 1 of 5

18 3. Discussion Questions and Answers Questions and comments from participants were welcomed, which prompted the following exchange: Q: How dense/stable is the soil where the pylons will be? R: The area has soft soils but is similar to the Alex Fraser Bridge and Port Mann Bridge. With current engineering designs and standards, a bridge is the more practical structure for our combined geotechnical/seismic conditions. Q: Is the design set? R: We have a reference concept. During the procurement process to retain a contractor, we will focus on design specifications to deliver the desired outcomes but that also leave room for private sector innovation. In some areas, specific deliverables may be required and these will be prescribed. Q: Will you expect more competition/interest in this project as compared with others? R: The construction community and P3 community is already actively expressing interest, and this is from around the world. Q: What is the plan for a Rice Mill Road connection? R: This connection was developed as a result of significant interest from businesses in the area. It will also help to relieve some of the congestion that currently happens at the Steveston interchange because of back ups from traffic accessing the Ironwood commercial area at Steveston Highway and No. 5 Road. The reference concept calls for a Highway 99 southbound access to Rice Mill Road and a Rice Mill Road to Highway 99 northbound access. The new bridge will free up room for these connections to occur underneath, where currently the tunnel prevents a connection. Q: Will there be work for local contractors as well? Are you anticipating any relaxation on foreign worker requirements? Would you consider WorkSafe relaxations? R: The Ministry would not consider WorkSafe relaxations. Experience with the Port Mann/Highway 1 Project and the South Fraser Perimeter Road indicates that larger contractors subcontract with local firms, which have the expertise and the local area knowledge necessary to do things efficiently. Most of the workers on the job are also local. Q: For these projects, were there fewer foreign workers by regulation or by happenstance? R: Probably more by happenstance. This area is federally controlled. BCTA Stakeholder Meeting Summary held January 13, 2016 Page 2 of 5

19 Q: Construction of the Alex Fraser Bridge led to a housing boom in North Delta. Has this potential effect been considered for this project? R: The Ministry has undertaken extensive traffic modelling. The presence of the Metro Vancouver Regional Growth Strategy and the Agricultural Land Reserve will help to manage any potential changes in land use or unplanned density changes. The reality is that there is not much vacant residential land available, so changes, if any are likely to be in a bit more densification of built out areas. Q: Does the traffic modelling consider full build-out of Deltaport? R: Yes. C: BCTA members are concerned about the diversion effects of having only one non-tolled crossing once the Massey Tunnel replacement bridge and the new Pattullo Bridge are constructed. Q: Is the analysis of tolling effects for this Project based on current traffic? How confident is the Ministry in the estimates based, on the fact that history has shown them to be too optimistic? R: Traffic modelling is much more conservative now than it used to be. For this project, we have the benefit of the Port Mann Bridge and the Golden Ears Bridge to draw from. We also have better traffic data (Bluetooth data capture). What we do now is created a blended forecast based on the traffic model results, current traffic volumes and good judgment. One thing no one can accurately predict is latent demand. Instead, we undertake sensitivity analysis to look at what could happen if traffic volumes are much lower or much higher than anticipated. This provides a range of potential demand. The Project Team will continue to monitor traffic volumes and continue to conduct sensitivity analysis and update traffic forecasts as appropriate. Q: Is the Ministry satisfied with the results of the Highway 1 Brunette to McGill traffic patterns now? R: It s not perfect, but then again, original forecasts for the Gateway Program contemplated a North Fraser Perimeter Road and a significantly different interchange at Brunette Avenue. That didn t happen for a lot of reasons. We are also seeing local traffic using Highway 1 to avoid congestion on other routes, which is the opposite of what was happening before the improvements were done, so arguably, this is the right amount of traffic on the highway. We are also seeing more traffic at east end of SFPR than forecast, but west end is pretty accurate. This is the latent demand phenomenon that is so hard to predict. BCTA Stakeholder Meeting Summary held January 13, 2016 Page 3 of 5

20 Q: Does the traffic analysis go all the way to the U.S. border? R: Yes. Q: How will the Tunnel be decommissioned? R: We are still analyzing this, and it depends on how much of the Tunnel is removed. The Project Team has assumed that the four sections will be removed, through essentially a reversal of how it was installed. The concept is that once the tunnel is decommissioned, the bulkheads will be sealed to separate individual sections. The riprap can then be removed from the top and each section floated to the surface one by one. Ultimately, the contractor will decide on the best process to do this. Q: How long will construction take and what is being planned for traffic management purposes? R: Although the Project will take about five years to construct, the most notable portion from a traffic perspective will be only about two years piling likely will start in 2017 and continue through 2018; this will mostly be off corridor work. From 2019 to 2020 will be the key timeframe for highway widening. The contractor will be required to keep traffic moving, with performance specifications to monitor compliance. Like the Port Mann/Highway 1 Project, we will not permit any girder installations over traffic. The new bridge will be wide, so it will be feasible to work beside (but not over top of) moving traffic and then shift traffic lanes at night to allow work to continue. There may be a need for some short Highway 99 lane closures overnight, in which case traffic would be rerouted to the Alex Fraser Bridge. C: So the piers of the new bridge will be on either side of the tunnel? R: Yes. Q: Did the Ministry s tolling analysis consider the possibility of tolling the Alex Fraser Bridge before construction? R: This is not contemplated in the current provincial tolling guidelines. Q: What considerations will be made for trucks at Nordel Scale if traffic is diverting to Alex Fraser Bridge? R: We will have to monitor that with our Ministry colleagues. The Ministry is separately considering upgrades to Nordel Interchange. C: From the BCTA s perspective, the traffic management for the recent Port Mann/Highway 1 Project was a success. A similar program including the use of a Traffic Management Advisory Committee would be a good approach for the GMT Project. It would also be a good idea to include penalty clauses in the contract, to minimize potential for issues. BCTA Stakeholder Meeting Summary held January 13, 2016 Page 4 of 5

21 R: We appreciate the positive feedback and agree that everything ran quite smoothly. The Ministry agrees that the Traffic Advisory Committee process was good. The PMH1 and SFPR contractors were also very responsive to comments. Q: What elements of consultation will be most influenced by ongoing consultation? R: We re still working on the cycling and pedestrian access details. We re also working with the farm community on a few items of agricultural interest. There will be other areas as well. Q: What is the status of cost sharing discussions with the federal government? R: The Province has submitted a request to PPP Canada and we anticipate feedback in coming months. Discussions have been underway for some time and there are many projects asking for funding. The GMT Project is not contingent on federal funding but it would certainly help. Q: Will the tolls be similar with TReO classifications? BCTA would appreciate greater consistency with standard vehicle classifications. BCTA prefers the Golden Ears Bridge classifications, which correspond to national standards for vehicle weights and dimensions. BCTA will provide additional information. R: Noted. Q: Is there a potential to lower the grade of Highway 99 in the areas where overpasses are not being replaced, to achieve a greater height clearance? BCTA recommends a minimum clearance of 5.5-metres, but would prefer between 6-metres and 7.2-metres. R: Noted for follow up. 4. Closing Remarks / Next Steps Louise Yako thanked the Project Team for the informative discussion and the meeting adjourned. Pam Ryan thanked participants for their feedback and reminded everyone to submit an online feedback form prior to the January 28, 2016 deadline (the form is available online at and noted that written submissions are also welcome for those who wish to provide more comprehensive feedback about the Project. BCTA Stakeholder Meeting Summary held January 13, 2016 Page 5 of 5

22

23 Ministry of Transportation and Infrastructure George Massey Tunnel Replacement Project RICHMOND ACTIVE TRANSPORTATION ADVISORY COMMITTEE STAKEHOLDER MEETING January 13, 2016 Summary of the Richmond Active Transportation Advisory Committee Stakeholder Meeting for Phase 3 of the consultation for the George Massey Tunnel Replacement Project held Wednesday, January 13, 2016 at Richmond City Hall in Richmond, B.C. ATTENDEES Participants Kevin Connery, City of Richmond Joan Caravan, City of Richmond Linda Love, Committee Chair Graeme Bone Mark Heath Barbara Huisman John Reinders Debbie Snihur Derek Williams Project Team Representatives Geoff Freer Pam Ryan Enriquez Mitchell Presentation and Comment The following abbreviations are used throughout this summary: Q/C=Question/Comment, R=Project Team Responses 1. Welcome / Agenda Overview Linda Love, Committee Chair, welcomed the Project Team representatives to the regular meeting of the Richmond Active Transportation Group. A round table of introductions followed and after completing some committee business, the Chair invited the Project Team to present. 2. Presentation & Review of Project Definition Report Pam Ryan, GMT Director of Planning, presented the George Massey Tunnel Replacement Project Definition Report and provided an overview of the consultation process being undertaken to seek input into the Project Definition Report (PDR). Richmond Active Transportation Advisory Committee Stakeholder Meeting Summary held January 13, 2016 Page 1 of 5

24 3. Discussion Questions and Answers Questions and comments from participants were welcomed, which prompted the following exchange: General Questions: Q: How will construction be staged? How will heavy trucks (for construction) navigate the area without affecting regular highway traffic? R: Although the Project will take about five years to construct, the most notable portion from a traffic perspective will be only about two years. The contractor will be required to keep traffic moving, with performance specifications to monitor compliance. The contractor likely will create an on-site concrete batch plant to minimize hauling. We also anticipate that equipment will be barged in. Q: How are the traffic forecasts measuring up in reality? R: Traffic modelling is much more conservative now than it used to be. For this project, we have the benefit of the Port Mann Bridge and the Golden Ears Bridge to draw from. We also have better traffic data (Bluetooth data capture). One thing no one can accurately predict is latent demand. Instead, we undertake sensitivity analysis to look at what could happen if traffic volumes are much lower or much higher than anticipated. This provides a range of potential demand. Q: When and how will rapid transit be extended in this area? R: The timeline for potential future expansion is not known. TransLink s priority for north-south rapid transit right now is King George Boulevard. For now, rapid buses will take passengers to Canada Line. In the future, the transit/hov lanes on the bridge would be converted for rapid transit. Q: What percentage of population is opposed to tolling? R: The Project Definition Report consultation is seeking feedback on plans to toll the bridge. The Port Mann Bridge provides a recent similar comparison though. In the first two years of tolling, traffic dropped by about 13 percent. But since then, traffic volumes are steadily increasing. During the morning rush hour, traffic volumes have increased by more than 25 per cent. Q: Any thought to tolling all the bridges? R: Discussions like this are happening now and we are interested in your input. Q: What will the toll be? R: Similar to Port Mann. Richmond Active Transportation Advisory Committee Stakeholder Meeting Summary held January 13, 2016 Page 2 of 5

25 Q: Is a free alternative required? R: It is in the current Tolling Guidelines. Q: How will the bridge be decommissioned? R: We are still analyzing this, and it depends on how much of the Tunnel is removed. The Project Team has assumed that the four sections will be removed, through essentially a reversal of how it was installed. Q: How will our feedback be captured and considered? R: A consultation summary report will be posted to the Project website after the consultation period is complete and feedback analysed. The Project Team will use this information to revise the reference concept as appropriate. The Environmental Assessment review of the EA application will begin later this spring, which may lead to further design changes. A final reference concept will then be prepared to support the procurement process to select a contractor. Additional consultation may take place if significant changes are made after the reference concept is finalised. Cycling-Specific Recommendations (North to South): 1) Bridgeport Road Area Recommend realigning the proposed connection to go along Van Horne, and Bridgeport, connecting to the existing trail, or make the connection go all the way from Bridgeport Road to Shell Road. The City is working on a significant park initiative at Garden City and Westminster Highway, which should be considered. If the connection remains on Bridgeport, cyclists could connect to the trail to the east to get to Shell Road, but there is a gap in the cycling network for cyclists heading south that should be connected. 2) Odlin Road/Shell Road No comments. 3) Westminster Highway Agreement that the cycling plans as proposed represent a significant improvement as compared with today only one conflict would remain, instead of many. Support pathway on south side only, to avoid the Highway access ramp, and to better connect to service road and No. 6 Road The interchange at No. 6 Road and Westminster Highway is very difficult to cross. It would be the City s responsibility to manage any Westminster Highway cycling improvements beyond No. 5 Road. Richmond Active Transportation Advisory Committee Stakeholder Meeting Summary held January 13, 2016 Page 3 of 5

26 4) Blundell Road The Project Team noted that while the Blundell overpass will be replaced, the significant bend in the road would remain because of existing property boundaries. Some committee members believe this is a safety issue and recommended a wider-than-normal standard lane width on the north side to provide sufficient shy distance for people to cycle across. Agreement with the Project s plans for a multi-used path (MUP) on south side of the road given that a future interchange could be constructed. 5) Steveston Interchange General agreement with the schematics as shown. Noted that there is likely to be major east-west cycling movements, as well as to/from the bridge and to/from the transit platforms. Q: How far will the transit platform be from the Richmond Farm Market? R: Specifics are still to be confirmed, but it is anticipated that the connection will be only slightly farther than the current northbound transit stop near the offramp. Q: Will there be a connection to the MUP on the north side of Steveston Highway to access No. 5 Road/Loblaws? R: Yes. Committee members requested hybrid connections as much as possible to encourage use by cyclists and pedestrians. Richmond s goal is to be more pedestrian friendly. Q: Will the ramp connections to the bridge be ellipsis, spiral or switchback styled? R: Details are yet to be determined. Switchbacks or spirals are easier to accommodate in tighter spaces. Committee members noted that people in wheelchairs have challenges with spiral designs because they put significant pressure on wheel rebalancing. Committee members requested that the Project Team consider turning radius for tandem bikes and for trailers. 6) River Road Q: Will there be a connection to Deas Island Bridge? R: No. The connection will be via the Millennium Trail, similar to today. Q: Will the MUP be on both sides of the bridge or one side? Richmond Active Transportation Advisory Committee Stakeholder Meeting Summary held January 13, 2016 Page 4 of 5

27 R: While not 100 per cent confirmed, we anticipate on both sides. Committee members expressed a preference for one direction on one side and one on the other side for reasons of safety and latent demand as tourism and recreation increase [e.g. Experience the Fraser program]. As long as the connections are close enough and sign with wrong way for cyclists, most people will respect the one-way use. Support for a 3-metre width. Q: Will the MUPs be lit? R: Interchanges are always lit. We anticipate some lighting on the paths, but will try to keep it to a minimum (softer/human scale), to avoid complaints about light pollution. 4. Closing Remarks/Next Steps The Committee Chair thanked the Project team for the informative discussion. Kevin Connery offered to forward to the GMT Project Team a copy of Richmond s trail network and municipal trail system standards. Pam Ryan thanked participants for their feedback and reminded everyone to submit an online feedback form prior to the January 28, 2016 deadline (the form is available online at and noted that written submissions are also welcome for those who wish to provide more comprehensive feedback about the Project. Richmond Active Transportation Advisory Committee Stakeholder Meeting Summary held January 13, 2016 Page 5 of 5

28

29 Ministry of Transportation and Infrastructure George Massey Tunnel Replacement Project STEVESTON 20/20 STAKEHOLDER MEETING January 18, 2016 Summary of the Steveston 20/20 Stakeholder Meeting for Phase 3 of the consultation for the George Massey Tunnel Replacement Project held Monday, January 18, 2016 at the George Massey Tunnel Replacement Project Office, Steveston Highway, Richmond, B.C. ATTENDEES Participants Bruce Rozenhart, Steveston Group Linda Barnes, Steveston Group Judy Lau, Steveston Historic Society Ralph Turner, Gulf of Georgia Cannery Carlton Hibbert, Gulf of Georgia Cannery and Britannia Heritage Yard Loren Slye, Britannia Heritage Yard Lorin Yatiwchuk, Britannia Heritage Yard Robert Hayman, Richmond Marine Rescue Society Project Team Representatives Geoff Freer Enriquez Mitchell Pam Ryan Presentation and Comment The following abbreviations are used throughout this summary: Q/C=Question/Comment, R=Project Team Responses 1. Welcome/Agenda Overview Pam Ryan, Facilitator, welcomed participants to the meeting. Participants were each encouraged to complete and submit the George Massey Tunnel Replacement Project Definition Report Consultation Feedback Form online prior to the January 28, 2016 closing date. Ms. Ryan also requested that participants inform a member of the Project Team if they are aware of other organizations that may be interested in a more in-depth presentation and discussion. 2. Presentation & Review of Project Definition Report Ms. Ryan provided an overview presentation regarding the George Massey Tunnel Replacement Project Definition Report (PDR) and the consultation process being undertaken to obtain feedback. Steveston 20/20 Stakeholder Meeting Summary held January 18, 2016 Page 1 of 5

30 3. Discussion Questions and Answers Questions and comments from participants were welcomed, which prompted the following exchange with the Project Team: Q: Did the traffic analysis consider all crossings? R: The analysis focused on the George Massey Tunnel and the Alex Fraser Bridge; with numerous data capture points along Highway 99 and Highway 91, including entrances and exits to other routes. Q: How does Bluetooth work? R: It captures signals from Bluetooth-enabled devices such as cell phones and in-vehicle GPS units. The Project Team also recorded vehicle counts using the more traditional (manual) method. The advantage of Bluetooth data capture is that it can identify where vehicles enter and exit the highway, to provide origin-destination information rather than just volume counts. C: Google does this as well. Q: What is the volume of vehicles at the Tunnel? R: Average 80,000 vehicles per day. Q: Will the Project make agricultural land more accessible? R: Yes. C: Like that the ramp from Steveston Highway to the bridge has no signal lights. Q: Where do the extra lanes drop/increase from 10 lanes to the current number? R: On the Richmond side, one lane in each direction at Westminster, one in each direction at Highway 91 and one in each direction near Bridgeport where the transit/hov lanes end and transit buses exit/enter the highway at a dedicated ramp. On the Delta side: at Highway 17, just past 80 th Street, and at Highway 91. Q: What effect will this have on ownership of properties? R: The widening can primarily done within the existing right-of-way. Some property acquisition will be needed including a small strip on the west side of Highway 99 between Blundell Road and Steveston Highway. The Ministry pays market value, and has already contacted property owners already to initiate discussions. Q: How long is the payback period for the toll? Steveston 20/20 Stakeholder Meeting Summary held January 18, 2016 Page 2 of 5

31 R: About 40 years. Q: What was the toll in the 1960s? R: We understand it was 50 cents. Q: Any idea how much the federal government will contribute? R: Not at this time. C: I understand the Gateway Transportation Collaboration Forum is also advocating with the federal government for funding participation for this project. Q: Will Richmond contribute? R: The Ministry is not seeking municipal contribution for the Project; however, there may be opportunities for additional municipal infrastructures enhancements that could take place concurrent with the Project, and as with other projects of this nature, the Ministry would expect municipalities to share, or in some cases, fully fund these costs. Q: Will Metro Vancouver water main come out? R: Not as a result of this Project. The Project Team is not aware of any plans by Metro Vancouver to do so. In fact, Metro Vancouver staff has been involved to ensure that the Project has no negative effects on the crossing. Q: What is the cost of the tunnel removal? R: We are still analyzing this, and it depends on how much of the Tunnel is removed. The Project Team has assumed that the four sections will be removed, through essentially a reversal of how it was installed. Analysis to date suggests this would cost approximately $50 million. Q: Could the Tunnel just be sealed and left in place? R: Technically yes. It would cost about $2 million per year to keep the Tunnel safe for continued use by utilities. Flooding it and leaving it in place is possible, but would leave an ongoing risk. It makes most sense from a cost and risk perspective to have the same contractor that builds the new bridge remove the Tunnel. The Project Team commissioned a hydrological model to simulate what will happen in the river when tunnel is removed and found that the hole left behind would fill in with river sand in about 250 days. The marine community has advocated for tunnel removal to provide more flexibility for the future; however there currently are no long-term plans to dredge the river to a deeper depth. Steveston 20/20 Stakeholder Meeting Summary held January 18, 2016 Page 3 of 5

George Massey Tunnel Replacement Project

George Massey Tunnel Replacement Project George Massey Tunnel Replacement Project Richmond General Purposes Committee January 18, 2016 GP - 11 Project Consultation 2 2012: Phase 1 consultation (1000+ participants) 2013: Phase 2 consultation (1000+

More information

George Massey Tunnel Replacement Project

George Massey Tunnel Replacement Project George Massey Tunnel Replacement Project Project Update Corporation of Delta Council January 9, 2017 Existing Challenges Collisions Impacts on: Congestion People Unreliability Goods Seismic vulnerability

More information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide)

Current Travel Needs and Operating Conditions (See pages 4 9 of the Discussion Guide) Phase 1 Consultation: Understanding the Need Feedback Form Thank you for participating in this phase of planning for the George Massey Tunnel Replacement. Your feedback is important to us. Input received

More information

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form

McKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form Fall 2015 Engagement Appendix 2: Engagement Materials and Feedback Form Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project

More information

Welcome to the McKenzie Interchange Project Open House!

Welcome to the McKenzie Interchange Project Open House! Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project and for you to have the opportunity to share your input on design concepts.

More information

City of Richmond. Report to Committee CNCL - 411

City of Richmond. Report to Committee CNCL - 411 City of Richmond Report to Committee To: From: Re: General Purposes Committee Date: January 12, 2016 Victor Wei, P. Eng. File: 01-0150-20- Director, Transportation THIG1/2015-Vol 01 George Massey Tunnel

More information

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report.

ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology decision. That the Mayors Council on Regional Transportation receive this report. TO: FROM: Mayors Council on Regional Transportation Geoff Cross, Vice President of Planning and Policy DATE: September 27, 2017 SUBJECT: ITEM 2.3 South of Fraser Rapid Transit Surrey-Langley technology

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling

Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling Climate Change Action Plan: Transportation Sector Discussion Paper: Cycling ontario.ca/climatechange Contents 1. Minister of Transportation s message... 3 2. Introduction... 5 3. Sector Overview and Support

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary

Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary The City of Surrey Anniedale-Tynehead NCP Best Practices Transportation Summary This document provides a summary of the Bunt &

More information

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form

McKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form McKenzie Interchange Project Spring 2016 Comment Period Appendix 1: Display Boards and Feedback Form August 2016 Welcome to the McKenzie Interchange Project Information Session! Purpose of this Information

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

CHIEF PEGUIS TRAIL EXTENSION WEST

CHIEF PEGUIS TRAIL EXTENSION WEST 1 PRELIMINARY DESIGN OF THE CHIEF PEGUIS TRAIL EXTENSION WEST Public Information Session June 6, 2017 Welcome 1 Thank you for attending today s public information session. The following boards provide

More information

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031

TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031 TRANSPORTATION STUDY REPORT DRAFT - APRIL 2015 A BLUEPRINT FOR HOW WE CAN GET AROUND GREATER SUDBURY, FROM NOW UNTIL 2031 A summary of what s there, what more is needed, how to find information about your

More information

Frequently Asked Questions (FAQ)

Frequently Asked Questions (FAQ) Frequently Asked s (FAQ) Study Process... 2 Rapid Transit Service and Operations... 5 Public Consultation... 8 Business Impacts... 8 Design and Property Impacts... 9 Construction Impacts...12 Traffic,

More information

River Road - Proposed Road Safety Enhancement Measures

River Road - Proposed Road Safety Enhancement Measures City of Richmond Report to Committee To: From: Re: Public Works and Transportation Committee Victor Wei, P. Eng. Director, Transportation Date: June 6, 2017 River Road - Proposed Road Safety Enhancement

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

North Vancouver Community Associations Network. November 15, pm to 9 pm

North Vancouver Community Associations Network. November 15, pm to 9 pm North Vancouver Community Associations Network November 15, 2017 7 pm to 9 pm Topics Decision-making processes and constraints What is TransLink? What financial and planning requirements does TransLink

More information

Design of Stanley Park S-Curve

Design of Stanley Park S-Curve ADMINISTRATIVE REPORT Date: May 4, 2001 TO: FROM: Author/Local: F. Klotzbach/7118 RTS NO. 01644 CC File No. Standing Committee on Transportation and Traffic General Manager of Engineering Services, in

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

Traffic Data Overview

Traffic Data Overview George Massey Tunnel Replacement Project Traffic Data Overview DRAFT November 2015 TABLE OF CONTENTS LIST OF FIGURES... ii LIST OF TABLES... iii LIST OF DEFINITIONS... iv 1. INTRODUCTION... 1 2. HISTORICAL

More information

Port Mann/Highway 1 Improvements

Port Mann/Highway 1 Improvements Port Mann/Highway 1 Improvements McGill St. Hastings St. First Ave. Port Coquitlam Boundary Rd. Willingdon Ave. Grandview Hwy. Sprott St. Kensington Ave. Gaglardi Way Brunette Ave. Cape Horn Port Mann

More information

Welcome to the Open House

Welcome to the Open House Leslie Street Between 19 th Avenue and Stouffville Road Addendum to Class Environmental Assessment Study Welcome to the Open House Please sign in at the front desk. March 28, 2017 Richmond Green Sports

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

BC Ministry of Transportation and Infrastructure

BC Ministry of Transportation and Infrastructure BC Ministry of Transportation and Infrastructure Highway 99 () Corridor Assessment DRAFT V 1.5 TABLE OF CONTENTS 1.0 BACKGROUND...1 2.0 REGIONAL CONTEXT...2 3.0 HIGHWAY 99 CONFIGURATION...4 4.0 HIGHWAY

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

Highway 1 Kamloops to Alberta Four-Laning Program

Highway 1 Kamloops to Alberta Four-Laning Program Highway 1 Kamloops to Alberta Four-Laning Program COMMUNITY ENGAGEMENT DISCUSSION GUIDE AND FEEDBACK FORM February 7 March 1, 2013 www.bchwy1.ca 1 FEEDBACK FORM INSIDE HOW INPUT WILL BE CONSIDERED FAST

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA

5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA 5 REQUEST FOR GRADE-SEPARATED PEDESTRIAN UNDERPASS CROSSINGS OF LESLIE STREET AND ST. JOHN S SIDEROAD TOWN OF AURORA The Transportation Services Committee recommends the adoption of the recommendations

More information

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement

Standing Committee on Policy and Strategic Priorities. Potential Granville Bridge Connector Public Engagement ADMINISTRATIVE REPORT Report Date: January 22, 2019 Contact: Paul Storer Contact No.: 604.873.7693 RTS No.: 12877 VanRIMS No.: 08-2000-20 Meeting Date: January 30, 2019 TO: FROM: SUBJECT: Standing Committee

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment

Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Coquitlam Cross-town Bike Route Improving Bicycle Facilities in a Mature Suburban Environment Sarah Rocchi, Vice-President, Projects, Opus International Consultants (Main Presenter) Catherine Mohoruk,

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

Chapter 3 DESIGN SPECIFICATIONS

Chapter 3 DESIGN SPECIFICATIONS Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically

More information

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL 4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of

More information

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting

72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting 72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets

More information

Downey Road. Transportation Improvement Study

Downey Road. Transportation Improvement Study Downey Road Transportation Improvement Study Workshop 2 Participant Handbook Workshop 1 May 18 and 19, 2016 Workshop 2 June 23 and 28, 2016 Prepared By: City of Guelph Paradigm Transportation Solutions

More information

Standing Committee on Policy and Strategic Priorities

Standing Committee on Policy and Strategic Priorities POLICY REPORT Report Date: January 15, 2019 Contact: Steve Brown Contact No.: 604.873.9733 RTS No.: 12955 VanRIMS No.: 08-2000-20 Meeting Date: January 30, 2019 TO: FROM: SUBJECT: Standing Committee on

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Update from Port Metro Vancouver Deltaport Third Berth Project Community Liaison Group. Meeting Date: August 28, Construction Update

Update from Port Metro Vancouver Deltaport Third Berth Project Community Liaison Group. Meeting Date: August 28, Construction Update Update from Port Metro Vancouver Deltaport Third Berth Project Community Liaison Group Meeting Date: August 28, 2008 Construction Update General Update The Marine Works portion of the project is progressing

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS STURT ST BALLARAT WATERGARDENS TAYLORS LAKES SIMPSON ST YARRAVILLE CHAPEL ST SOUTH YARRA RINGWOOD STATION MONASH FREEWAY SA NSW VIC

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

MEETING NOTES. 26 Street Station Committee. October 22, Westgate Community Hall

MEETING NOTES. 26 Street Station Committee. October 22, Westgate Community Hall MEETING NOTES 26 Street Station Committee Westgate Community Hall Attendance 26 Street Station Committee There were 11 representatives from the following communities and stakeholder groups: Killarney Sunalta

More information

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT

More information

NEW WESTMINSTER AREA STUDY

NEW WESTMINSTER AREA STUDY NEW WESTMINSTER AREA STUDY Prepared by UMA Engineering Ltd. 1998 NEW WESTMINSTER AREA STUDY Introduction... 1 Phase 1: Background Profile... 3 New Westminster Area Study Level 3... 4 New Westminster Area

More information

Low Level Road Improvements Traffic Analysis. Report

Low Level Road Improvements Traffic Analysis. Report Low Level Road Improvements Traffic Analysis Report June, 22 Table of Contents. INTRODUCTION.... LOW LEVEL ROAD PROJECT....2 STUDY AREA....2. West-End Corridor Improvements... 2.2.2 East-End Corridor Improvements...

More information

Anniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis

Anniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis Highway 15 & Golden Ears Way Analysis Stage 1 Conclusions Analysis indicated capacity constraints at Highway 15 & Golden Ears Way Grade Separation required for safe and efficient traffic movement Supports

More information

Eastern PA Trail Summit October 1, 2018

Eastern PA Trail Summit October 1, 2018 Eastern PA Trail Summit October 1, 2018 WHO WE ARE + WHY + WE RE * HERE * * * * * * Session Goals: Discuss how to coordinate planning and design in small, urbanized towns Consider how to develop alternative

More information

York Region Population and Employment Growth

York Region Population and Employment Growth March 1, 2016 1 York Region Population and Employment Growth York Region needs to comply with The Provincial Growth Plan and new forecasts introduced to 2036 and 2041 2 Regional Official Plan Review York

More information

41st Avenue B-Line Kerrisdale Village Street Improvements

41st Avenue B-Line Kerrisdale Village Street Improvements 1. WELCOME! 41st Avenue B-Line Kerrisdale Village Improvements Public Open House Please sign in so we can provide updates and information on construction The City of Vancouver is working with TransLink

More information

What is the status of the CPR Yards Crossing Study?

What is the status of the CPR Yards Crossing Study? September 2015 Project Advisory Committee (PAC) Sectors RESIDENTS Centennial Community Improvement Association Dufferin Residents Association of Winnipeg William Whyte Residents Association LOCAL BUSINESS

More information

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017

A127/A130 Fairglen Interchange Improvement Schemes. Information Leaflet February 2017 A127/A130 Fairglen Interchange Improvement Schemes Information Leaflet February 2017 1 2 Foreword By Councillor Kevin Bentley Essex is continuing to grow as a vibrant economic hub and as a fantastic place

More information

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit 2.1.1 Encourage community partners to engage London Transit Commission through the Get On Board program to educate Londoners on how to use the bus system (current initiative)(year 1 to 3) -Current Get

More information

Welcome. Background. Goals. Vision

Welcome. Background. Goals. Vision Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara

More information

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED

Executive Summary BEYOND THE B-LINE: RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST. Final Draft December 13, Appendix B BROADWAY/LOUGHEED BEYOND THE B-LINE: BROADWAY/LOUGHEED RAPID TRANSIT LINE PHASE II - COMMERCIAL DRIVE WEST Appendix B Executive Summary Final Draft December 13, 1999 UMA Lloyd Lindley Davidson Yuen Simpson Architects BROADWAY/LOUGHEED

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Public Event 1 Community Workshops

Public Event 1 Community Workshops Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn

More information

Welcome! Public Open House on UBC s Transportation Plan

Welcome! Public Open House on UBC s Transportation Plan 1 Welcome! Public Open House on UBC s Transportation Plan Public open house hours: to When it comes to on-campus transportation, what do you think is working well and what are some opportunities for improvement?

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS

AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS AUTOMATED AND ZERO EMISSION VEHICLES HOW THEY MIGHT RESHAPE OUR STREETS BACKGROUND: This study is a collaboration between Urban Circus (Visualisation) and Ethos Urban (Urban Design) Ideas were workshopped

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

Comments The Plan for Port Whitby

Comments The Plan for Port Whitby Comments The Plan for Port Whitby April 24th, 2013 Community Meeting #2 Summary Report Prepared by GLPi April 29th, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement

More information

Sixth Line Development - Transit Facilities Plan

Sixth Line Development - Transit Facilities Plan Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

PROJECT FACT SHEET May 25, 2018

PROJECT FACT SHEET May 25, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

Develop a Multi-Modal Transportation Strategy (Theme 6)

Develop a Multi-Modal Transportation Strategy (Theme 6) DEVELOP A MULTI-MODAL TRANSPORTATION STRATEGY (THEME 6) WHY IS THIS THEME ADDRESSED? Develop a Multi-Modal Transportation Strategy (Theme 6) Statement of Ideal Reduce resident and visitor reliance on single

More information

Public Event 1 Community Workshops

Public Event 1 Community Workshops Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn

More information

Frome Street Bicycle Route

Frome Street Bicycle Route The Adelaide City Council invites engagement from the community about Frome Street Bicycle Route Project Summary Adelaide City Council is seeking feedback on design options to construct bicycle facilities

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

SH3 Waitara to Bell Block

SH3 Waitara to Bell Block SH3 Waitara to Bell Block NZ Transport Agency August 2017 Community feedback report Copyright information This publication is copyright NZ Transport Agency. Material in it may be reproduced for personal

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

#!! "$% ##! &! # '#! % $ #!

#!! $% ##! &! # '#! % $ #! Executive Summary US Highway 16 (US 16) is the primary corridor connecting Rapid City to the Black Hills region. It serves a growing population of commercial and residential traffic, as well as seasonal

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements

Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner

More information

Pennsylvania Avenue (CR 484) Design Alternatives Study

Pennsylvania Avenue (CR 484) Design Alternatives Study MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

102 Avenue Corridor Review

102 Avenue Corridor Review February 26, 2015 102 Avenue Corridor Review Transportation Association of Canada Road Safety Engineering Award Submission for the City of Edmonton Introduction Transportation Association of Canada Road

More information

PROJECT FACT SHEET March 21, 2018

PROJECT FACT SHEET March 21, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information