1 City of San Mateo Bicycle Master Plan ppendix B. Bicycle Parking This appendix presents a Downtown San Mateo bicycle parking plan, locations for recommended bicycle parking upgrades, and recommended bicycle parking requirements for new development. B.. Downtown Bicycle Parking Plan The Downtown Bike Parking Plan (Plan) presents recommendations for bicycle parking throughout the City of San Mateo s downtown as well as designs for bicycle parking at seven specific locations. The recommended locations and layouts were chosen based on available right-of-way, proximity to businesses that attract bicyclists, and impacts to pedestrian activity and automobile parking. The seven designs presented on the following pages include descriptions of the proposed modifications and identification of benefits, impacts to the pedestrian activity and automobile parking. The seven locations discussed in the Downtown Bike Parking Plan are: 3rd venue and San Mateo Drive 3rd venue and B Street 5th venue and B Street 4th venue between El Camino Real and San Mateo Drive 3rd venue and Ellsworth venue 3rd venue between El Camino Real and San Mateo Drive Ellsworth venue between st venue and 2nd venue This Plan recommends the City conduct outreach in English and Spanish to visitors, employers and employees regarding use of Downtown bicycle parking. lta Planning + Design B-
2 ppendix B Bicycle Parking Requirements This page intentionally left blank. B-2 lta Planning + Design
3 Figure B-: Downtown Bicycle Parking Map City of San Mateo Bicycle Master Plan lta Planning + Design B-3
4 ppendix B Bicycle Parking Requirements Figure B-2: 3 rd venue and San Mateo Drive Bicycle Parking Photo Simulation B-4 lta Planning + Design
5 B... 3 rd venue and San Mateo Drive B... Description The recommended bicycle parking at 3rd venue and San Mateo Drive is adjacent to several businesses that attract patrons on bicycles, including Baskin Robins and Togo s, in the heart of downtown San Mateo. The project would create four bicycle parking spaces at a red curb zone area in an area with limited available right-ofway. The bicycles would be protected with bollards and rubber parking blocks. B...2. Benefits Parking spaces for four bicycles would be placed in an area where there is little available space for siting bicycle racks in the sidewalk zone. B...3. Impacts to Pedestrian ctivity None. The bicycle racks would be placed outside of the pedestrian zone and will not block pedestrians exiting their automobile and accessing the sidewalk. B...4. Impacts to utomobile Parking None. This project will occupy unused on-street space and no automobile parking spaces will be removed. City of San Mateo Bicycle Master Plan Figure B-3: 3 rd venue and San Mateo Drive Bicycle Parking Plan View lta Planning + Design B-5
6 ppendix B Bicycle Parking Requirements B-6 lta Planning + Design Figure B-4: 3rd venue and B Street Photo Simulation
7 B..2. 3rd venue and B Street B..2.. Description The recommended bicycle parking at 3rd venue and B Street is adjacent to a major bicycle attractor, Peet s Coffee, in the heart of downtown San Mateo. The project would replace one auto parking space with parking for eight bicycles in an area with limited available right-of-way. The bicycles would be protected with bollards and rubber parking blocks. In addition, edgeline striping and cross hatching would direct motorists around the turn when entering 3rd venue from B Street and away from the bollards outside the travel lane. B Benefits Parking spaces for eight bicycles would be placed in an area where there is little available space in the sidewalk zone. B Impacts to Pedestrian ctivity None. The bicycle racks would be placed outside of the pedestrian zone and will not block pedestrians exiting their automobile and accessing the sidewalk. B Impacts to utomobile Parking Removal of one auto parking space. City of San Mateo Bicycle Master Plan Figure B-5: 3rd venue and B Street Bicycle Parking Plan View lta Planning + Design B-7
8 ppendix B Bicycle Parking Requirements B-8 lta Planning + Design Figure B-6: 5th venue and B Street Photo Simulation
9 B..3. 5th venue and B Street B..3.. Description The recommended bicycle parking on B Street at 5th venue between is adjacent to a major bicycle attractor, Talbots Toyland and Cyclery. The project would replace one auto parking space with parking for eight bicycles in an area with limited available right-of-way. The bicycles would be protected with bollards and rubber parking blocks. B Benefits Parking spaces for eight bicycles would be placed in an area where there is little available space in the sidewalk zone. B Impacts to Pedestrian ctivity None. The bicycle racks would be placed outside of the pedestrian zone and will not block pedestrians exiting their automobile and accessing the sidewalk. B Impacts to utomobile Parking Removal of one auto parking space. City of San Mateo Bicycle Master Plan Figure B-7: 5th venue and B Street Bicycle Parking Plan View lta Planning + Design B-9
10 ppendix B Bicycle Parking Requirements Figure B-8: 4th venue between El Camino Real and San Mateo Drive Photo Simulation B-0 lta Planning + Design
11 B..4. 4th venue between El Camino Real and San Mateo Drive B..4.. Description The recommended bicycle parking on 4th venue between El Camino Real and San Mateo Drive is adjacent to several food service businesses that regularly attract customers on bicycles, including Starbucks, Noah s Bagels and Jamba Juice. The project would replace one auto parking space with parking for eight bicycles in an area with limited available right-of-way. The bicycles would be protected with bollards and rubber parking blocks. B Benefits Parking spaces for eight bicycles would be placed in an area where there is little available space in the sidewalk zone. Existing conditions include automobile impacts to the adjacent midblock crosswalk. Cars backing out of the parking space impede on the crosswalk. This bicycle parking project will remove that conflict. B Impacts to Pedestrian ctivity The bicycle racks would be placed outside of the pedestrian zone and will not block pedestrians exiting their automobile and accessing the sidewalk. This project would remove automobile conflict with pedestrians in the crosswalk and therefore improve the pedestrian environment. B Impacts to utomobile Parking Removal of one auto parking space. City of San Mateo Bicycle Master Plan Figure B-9: 4th venue between El Camino Real and San Mateo Drive Bicycle Parking Plan View lta Planning + Design B-
12 ppendix B Bicycle Parking Requirements B-2 lta Planning + Design Figure B-0: 3rd venue and Ellsworth venue Photo Simulation
13 B..5. 3rd venue and Ellsworth venue B..5.. Description The recommended bicycle parking on 3rd venue at Ellsworth is on an existing curb extension in an area with otherwise limited available right-of-way. The project would place parking for six bicycles near attractors such as Walgreens, aron Brothers and many restaurants. The bicycles would be adjacent to the through pedestrian zone but would not impact pedestrian activity. B Benefits Parking spaces for six bicycles would be placed in an area where there is little available space. B Impacts to Pedestrian ctivity The bicycle racks would be placed outside the through pedestrian zone or path of travel and will not impact pedestrian activity B Impacts to utomobile Parking None. City of San Mateo Bicycle Master Plan Figure B-: 3rd venue and Ellsworth venue Bicycle Parking Plan View lta Planning + Design B-3
14 ppendix B Bicycle Parking Requirements Figure B-2: 3rd venue between El Camino Real and San Mateo Drive Photo Simulation B-4 lta Planning + Design
15 B..6. 3rd venue between El Camino Real and San Mateo Drive B..6.. Description The recommended bicycle parking on 3rd venue between El Camino Real and San Mateo Drive is on an existing curb extension in an area with otherwise limited available right-of-way. The project would place parking for four bicycles near attractors such as restaurants and banks. The bicycles would be adjacent to the commercial loading zone however they will be outside the area used for loading and unloading. B Benefits Parking spaces for four bicycles would be placed in an area where there is little available space. B Impacts to Pedestrian ctivity The bicycle racks would be placed outside the through pedestrian zone or pedestrian path of travel. The bicycles will be near the pedestrian seating area but will not impact access or enjoyment. B Impacts to utomobile Parking None. City of San Mateo Bicycle Master Plan Figure B-3: 3rd venue between El Camino Real and San Mateo Drive Bicycle Parking Plan View lta Planning + Design B-5
16 ppendix B Bicycle Parking Requirements Figure B-4: Ellsworth venue between st venue and 2nd venue Photo Simulation B-6 lta Planning + Design
17 B..7. Ellsworth venue between st venue and 2nd venue B..7.. Description The recommended bicycle parking on Ellsworth venue between st and 2nd venues would be in the existing sidewalk furnishing zone in an area with otherwise limited available right-of-way. The project would place parking for two bicycles in front of a large downtown office building at a red curb. The bicycles would not impact pedestrian activity. B Benefits Parking spaces for two bicycles would be placed in an area where there is little available space. B Impacts to Pedestrian ctivity The bicycle racks would be placed outside the through pedestrian zone or path of travel and will not impact pedestrian activity. B Impacts to utomobile Parking None. City of San Mateo Bicycle Master Plan Figure B-5: Ellsworth venue between st venue and 2nd venue Bicycle Parking Plan View lta Planning + Design B-7
18 ppendix B Bicycle Parking Requirements B.2. Recommended Locations for Bicycle Parking at Civic Facilities Community members expressed desire for improved bicycle parking at civic facilities including parks and recreation centers. Specific locations for improved bicycle parking are presented on the following pages. B-8 lta Planning + Design
19 B.2.. Bay Meadows Linear Park 00 Park Place, Uses: Open space, seating Proposed Parking Table B-: Bay Meadows Linear Park Proposed Bicycle Parking ID Type Notes 4 U-racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-9
20 ppendix B Bicycle Parking Requirements B.2.2. Bayside-Joinville Park Swim Center 2 Kehoe ve., Uses: Medium size playground, open space, recreation and swim center, baseball field, soccer field, and two tennis courts Existing Parking Proposed Parking Table B-2: Bayside-Joinville Park Swim Center Proposed Bicycle Parking ID Type Notes wave rack Existing 2 wave rack Existing 2 U-racks Install B 2 U-racks Install B 2 2 B-20 lta Planning + Design
21 City of San Mateo Bicycle Master Plan B.2.3. Beresford Park and Recreation Center 2720 lameda de las Pulgas, Uses: Recreation center, 4 tennis courts, bocce ball court, 3 baseball fields, 2 playground areas, basketball court, and community garden Existing Parking Proposed Parking 3 B C Table B-3: Beresford Park and Recreation Center Proposed Bicycle Parking ID Type Notes wheel Remove and install ID C bender 2 wave rack Existing 3 wave rack Existing 2 U-racks Install B 2 U-racks Install C 4 U-racks Install lta Planning + Design B-2
22 ppendix B Bicycle Parking Requirements B.2.4. Central Park and Recreation Center 50 E. 5th ve., 9440 Uses: Recreation center, rose garden, Japanese tea garden, 6 tennis courts, baseball field, large playground area, picnic areas, and open space B E Table B-4: Central Park and Recreation Center Proposed Bicycle Parking ID Type Notes 2 U-racks Install B 4 U-racks Install C 4 U-racks Install D 4 U-racks Install E 4 U-racks Install C D Proposed Parking B-22 lta Planning + Design
23 B.2.5. City Hall 330 W. 20 th venue, Uses: Civic facility Existing Parking Proposed Parking 2 3 City of San Mateo Bicycle Master Plan Table B-5: City Hall Proposed Bicycle Parking ID Type Notes wave rack Existing 2 6 lockers Existing 3 wave rack Existing 4 U-racks (covered) Install lta Planning + Design B-23
24 ppendix B Bicycle Parking Requirements B.2.6. Concar Playground 650 Connie ve., Uses: Medium size playground and open space B-24 lta Planning + Design Proposed Parking Table B-6: Concar Playground Proposed Bicycle Parking ID Type Notes 4 U-racks Install
25 B.2.7. Central Parking Structure Downtown Under San Mateo Drive ramp Uses: Parking garage Existing Parking Proposed Parking Table B-7: Central Parking Structure Proposed Bicycle Parking ID Type Notes wave rack Existing (under ramp) 8 lockers and 4 U racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-25
26 ppendix B Bicycle Parking Requirements B.2.8. Harbor View Park 775 Monte Diablo ve., 9440 Uses: Medium size playground area, baseball field, half basketball court, and Bay trail access Existing Parking Proposed Parking Table B-8: Harbor View Park Proposed Bicycle Parking ID Type Notes 3 U-racks Existing 3 U-racks Install B-26 lta Planning + Design
27 B.2.9. East Hillsdale Park 23 3st ve., Uses: Small size playground, open space, and tennis court Proposed Parking B Table B-9: East Hillsdale Park Proposed Bicycle Parking ID Type Notes 2 U-racks Install B 2 U-racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-27
28 ppendix B Bicycle Parking Requirements B.2.0. Fiesta Meadows Park 4 Bermuda Dr., Uses: Open space and soccer field Proposed Parking Table B-0: Fiesta Meadows Park Proposed Bicycle Parking ID Type Notes 4 U-racks Install B-28 lta Planning + Design
29 B.2.. Gateway Park 800 E. 3rd ve., 9440 Uses: Open space, creek, and small size playground Proposed Parking Table B-: Gateway Park Proposed Bicycle Parking ID Type Notes 2 U-racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-29
30 ppendix B Bicycle Parking Requirements B.2.2. Indian Springs Park 33 W. 39th ve., Uses: Open space and small size playground Proposed Parking Table B-2: Indian Springs Park Proposed Bicycle Parking ID Type Notes 4 U-racks Install B-30 lta Planning + Design
31 B.2.3. Library, Hillsdale Branch 205 W. Hillsdale Blvd, Uses: Library, meetings Existing Parking Proposed Parking Table B-3: Hillsdale Branch Library Proposed Bicycle Parking ID Type Notes wave rack Existing 4 U-racks (covered) Install City of San Mateo Bicycle Master Plan lta Planning + Design B-3
32 ppendix B Bicycle Parking Requirements B.2.4. Library, Main Branch 55 W. 3 rd ve, Uses: Library, meetings Existing Parking Proposed Parking Table B-4: Main Branch Library Proposed Bicycle Parking ID Type Notes 6 circle racks Existing 4 U-racks (covered) Install B-32 lta Planning + Design
33 B.2.5. Library, Marina Branch 530 Susan Ct., Uses: Library, meetings Existing Parking Proposed Parking Table B-5: Marina Branch Library Proposed Bicycle Parking ID Type Notes wave rack Existing 4 U-racks (covered) Install City of San Mateo Bicycle Master Plan lta Planning + Design B-33
34 ppendix B Bicycle Parking Requirements B.2.6. Lakeshore Park and Recreation Center 500 Marina Court, Uses: Recreation center, 2 baseball fields, small playground, basketball court, and beach access Existing Parking Proposed Parking 2 Table B-6: Lakeshore Park and Recreation Center Proposed Bicycle Parking ID Type Notes 4 U-racks Existing 2 4 U-racks Existing 4 U-racks Install B-34 lta Planning + Design 2
35 B.2.7. Laurelwood Park 347 Glendora Dr., Uses: 2 playgrounds, open space, access to Sugarloaf Mountain, and trails Existing Parking Proposed Parking Playground 2 Playground Table B-7: Laurelwood Park Proposed Bicycle Parking ID Type Notes 3 U-racks Existing 2 3 U-racks Existing 4 U-racks Install City of San Mateo Bicycle Master Plan 2 lta Planning + Design B-35
36 ppendix B Bicycle Parking Requirements B.2.8. Laurie Meadows Park Laurie Meadows Dr., Uses: Open space, 2 small playgrounds, and batting cage Existing Parking Proposed Parking Table B-8: Laurie Meadows Park Proposed Bicycle Parking ID Existing Notes 2 wave racks Existing 2 U-racks Install B-36 lta Planning + Design
37 B.2.9. Los Prados Park 837 Bahia St., Uses: Open space, soccer field, 2 baseball fields, basketball court, 2 tennis courts, and small playground Proposed Parking B C Table B-9: Los Prados Park Proposed Bicycle Parking ID Type Notes 4 U-racks Install B 4 U-racks Install C 4 U-racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-37
38 ppendix B Bicycle Parking Requirements B Mariners Island Park 550 Shoal Dr., Uses: Small size playground, open space, baseball field, lagoon, and picnic area Existing Parking Proposed Parking B ` Table B-20: Mariners Island Park Proposed Bicycle Parking ID Type Notes 2 8-capacity wheel bender racks Remove and replace with ID 6 U-racks (replace existing parking) Install to replace ID B 4 U-racks Install B-38 lta Planning + Design
39 City of San Mateo Bicycle Master Plan B.2.2. Martin Luther King Jr. Community Center and Park 725 Monte Diablo ve., 9440 Uses: Recreation center, basketball court, baseball field, small playground, soccer field, and swimming pool Existing Parking Proposed Parking 2 B 2 Table B-2: Martin Luther King Jr. Community Center and Park Proposed Bicycle Parking ID Existing Notes wave rack Remove and replace with ID 2 toaster rack Remove and replace with ID B 6 U-racks, covered (replace existing parking) Install to replace ID B 4 U-racks (replace existing parking) Install to replace ID 2 lta Planning + Design B-39
40 ppendix B Bicycle Parking Requirements B Meadow Square Park Between David St. & Wayne Way Uses: Small playground and open space Proposed Parking Table B-22: Meadow Square Park Proposed Bicycle Parking ID Type Notes 4 U-racks Install B-40 lta Planning + Design
41 B Parkside quatic Park 00 Seal Ct., Uses: Open space, small playground, picnic tables, beach access, and lagoon Existing Parking Proposed Parking Table B-23: Parkside quatic Park Proposed Bicycle Parking ID Type Notes wave rack Existing 4 U-racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-4
42 ppendix B Bicycle Parking Requirements B Saratoga Square Park Between David St. & Saratoga Drive Uses: Open space, medium playground, and picnic tables Existing Parking Proposed Parking Table B-24: Saratoga Square Park Proposed Bicycle Parking ID Type Notes wave rack Existing 4 U-racks Install B-42 lta Planning + Design
43 B Senior Center 2645 lameda de las Pulgas, Uses: Community center Table B-25: Senior Center Proposed Bicycle Parking ID Type Notes 2 U-racks Install Proposed Parking City of San Mateo Bicycle Master Plan lta Planning + Design B-43
44 ppendix B Bicycle Parking Requirements B Shoreview Park and Recreation Center 950 Ocean View ve., 9440 Uses: Recreation center, small playground, skate park, tennis court, basketball court, and baseball field B C Table B-26: Shoreview Park and Recreation Center Proposed Bicycle Parking ID Existing Notes toaster rack Existing 2 5 U-racks Existing 3 5 U-racks Existing 4 U-racks Install B 4 U-racks Install C 4 U-racks Install Existing Parking Proposed Parking B-44 lta Planning + Design
45 B Sunnybrae Playground 625 Folkstone ve., Uses: Medium playground Table B-27: Sunnybrae Playground Proposed Bicycle Parking ID Type Notes 4 U-racks Install Proposed Parking City of San Mateo Bicycle Master Plan lta Planning + Design B-45
46 ppendix B Bicycle Parking Requirements B Trinta Park 50 9th ve., Uses: 2 baseball fields, small playground, and half basketball court Existing Parking Proposed Parking Table B-28: Trinta Park Proposed Bicycle Parking ID Type Notes toaster rack Existing 4 U-racks Install B-46 lta Planning + Design
47 B Washington Playground 768 Washington ve., Uses: Medium playground and basketball court Proposed Parking Table B-29: Washington Playground Proposed Bicycle Parking ID Type Notes 4 U-racks Install City of San Mateo Bicycle Master Plan lta Planning + Design B-47
48 ppendix B Bicycle Parking Requirements B West Hilldale Park 345 3st ve., Uses: Open space, small playground and basketball court Proposed Parking Table B-30: West Hillsdale Park Proposed Bicycle Parking ID Type Notes 4 U-racks Install B-48 lta Planning + Design
49 City of San Mateo Bicycle Master Plan B.3. Recommended Locations for Bicycle Rack Upgrades Through the public workshop and input from the Plan website, community members expressed desire for the City to replace, as funding allows, existing racks that do not meet City standards. Bicycle racks that do not meet City standards include wheelbender and wave racks. These do not meet City standards because they do not provide two points of contact and therefore bicycles are not stable and can fall over becoming tripping hazards. The locations of the bicycle racks recommended for upgrade are presented in Table B-3. Location Table B-3: Recommended Bicycle Racks Upgrades Rack Quantity ragon High School Wheelbender Existing Rack Type Bayside cademy, parking enclosed by fence Wheelbenders (enclosed by fence) Fiesta Gardens International School Wheelbender Fiesta Gardens International School Wheelbender Hillsdale, Shopping Center Lower floor of parking structure Wheelbender Hillsdale, Shopping Center Upper floor of parking structure Wheelbender Horrall Elementary School Wheelbender Laurelwood Elementary School Wheelbender Martin Luther King Jr. Park, by front door Wheelbender Mid Peninsula Boys and Girls Club Wheelbender Near Bank of merica Wheelbender Near California Pizza Kitchen, in alcove Wheelbender Near Safeway Wheelbender Near Trader Joe's Wheelbender Shoreview Rec Center, at entrance to main building Wheelbender Shoreview Shopping Center Wheelbender lta Planning + Design B-49
50 ppendix B Bicycle Parking Requirements B.4. Example Bicycle Parking Code Language and Rates The following text presents language and rates for inclusion in the City s Zoning Code in [Definition of a] Bicycle Parking Facility and Off-street Parking and Loading, I. Off-street Parking, Bicycle parking facilities. B.4.. Code Language DEFINITIONS BICYCLE PRKING FCILITY. "Bicycle parking facility" means a space exclusively for the storage of bicycles OFF-STREET PRKING ND LODING BICYCLE PRKING FCILITIES These bicycle parking requirements shall apply to the indicated activities as specified below. (a) Bicycle Parking Required for New and Existing Uses. Bicycle parking shall be provided for new development projects, additions to existing buildings, and new living units in existing buildings. Bicycle parking as prescribed hereafter shall be provided for activities occupying buildings, or portions of, which are constructed, established, wholly reconstructed, or moved onto a new lot, except to the extent that existing bicycle parking exceeds such requirements for any existing facilities. The required amount of new bicycle parking shall be based on the cumulative increase in floor area, or other applicable unit of measurement prescribed hereafter. If an existing building is altered or changed in occupancy so as to result in an increase in the number of residential living units, bicycle parking shall be provided for the new units. (b) More Than One () ctivity on a Lot. Whenever a single lot contains different activities with the same bicycle parking requirement, the overall bicycle parking requirement shall be based on the sum of all such activities. Whenever a single lot contains activities with different bicycle parking requirements, the overall requirement shall be the sum of the requirements for each activity calculated separately. (c) Determination by Zoning dministrator. For uses not listed in the schedules of bicycle parking requirements, bicycle parking spaces shall be provided on the same basis as required for the most similar listed use, or as determined by the Zoning dministrator. (d) Standards for Required Bicycle Parking. () Types of Required Bicycle Parking. () Long-Term Bicycle Parking. Each long-term bicycle parking space shall consist of a locker or a rack located within a locked enclosure, such as a secure room or controlled access area, providing protection for each bicycle from theft, vandalism and weather. Long-term bicycle parking is meant to accommodate employees, students, residents, commuters, and others expected to park more than two (2) hours. (B) Short-Term Bicycle Parking. Short-term bicycle parking shall consist of a bicycle rack or racks and is meant to accommodate visitors, customers, messengers, and others expected to park not more than two (2) hours. B-50 lta Planning + Design
51 City of San Mateo Bicycle Master Plan (2) Minimum Specifications for Required Bicycle Parking. () ll bicycle parking facilities shall be dedicated for the exclusive use of bicycle parking and shall not be intended for the use of motorized two-wheeled or similar vehicles. (B) ll required short-term bicycle parking spaces shall permit the locking of the bicycle frame and one () wheel with a U-type lock, support the bicycle in a stable horizontal position without damage to wheels, frame, or components, and provide two (2) points of contact with the bicycle s frame. rt racks are subject to review by the Zoning dministrator. (C) ll required long-term bicycle parking spaces, with the exception of individual bicycle lockers, shall permit the locking of the bicycle frame and one () wheel with a U-type lock and support the bicycle in a stable position without damage to wheels, frame, or components. (D) Bicycle parking facilities shall be securely anchored so they cannot be easily removed and shall be of sufficient strength and design to resist vandalism and theft. (E) The overall design and spacing of such facilities shall meet the standards of subsection (3). (3) Location and Design of Required Bicycle Parking. Required bicycle parking shall be placed on site(s) as set forth below: () short-term bicycle parking space shall be at least two and one-half (2.5) feet in width by six (6) feet in length to allow sufficient space between parked bicycles. (B) Bicycle parking facilities shall not impede pedestrian or vehicular circulation. (i)bicycle parking racks located on sidewalks should be kept clear of the pedestrian through zone. (C) Bicycle parking facilities are subject to the following standards: (i) Short-term bicycle racks shall be located with at least 30 inches clearance in all directions from any obstruction, including but not limited to other racks, walls, and landscaping. Large retail uses, supermarkets, and grocery stores are encouraged to locate racks with a 36-inch clearance in all directions from any vertical obstruction, including but not limited to other racks, walls, and landscaping. (ii) ll bicycle facilities shall provide a minimum four (4) foot aisle to allow for unobstructed access to the designated bicycle parking area. (iii) ll long-term bicycle parking facilities shall include a variety of rack types to accommodate different bicycle sizes, styles, and users, as determined by the Zoning dministrator. (D) Bicycle parking facilities within auto parking facilities shall be protected from damage by cars by a physical barrier such as curbs, wheel stops, poles, bollards, or other similar features capable of preventing automobiles from entering the designated bicycle parking area. (E) Short-term bicycle parking facilities serving community activity centers such as libraries and community centers should incorporate weather-protective enclosures shielding the designated bicycle area from typical inclement weather when feasible. lta Planning + Design B-5
52 ppendix B Bicycle Parking Requirements (F) Bicycle parking facilities shall be located in highly visible well-lighted areas. In order to maximize security, whenever possible short-term bicycle parking facilities shall be located in areas highly visible from the street and from the interior of the building they serve (i.e., placed adjacent to windows). (G) The location and design of required bicycle parking shall be of a quality, character and color that harmonize with adjoining land uses. Required bicycle parking shall be incorporated whenever possible into building design or street furniture. (H) Long-term bicycle parking shall be covered and shall be located on site or within 200 feet of the main building entrance. The main building entrance is defined as publicly accessible entrances and shall exclude gated private garage entrances, trash room entrances, and other building entrances that are not publicly accessible. (I) Short-term bicycle parking must be along project frontage and within 50 feet of the main entrance to the building or commercial use or up to 00 feet where existing conditions do not allow placement within 50 feet. It should be in a well-trafficked location visible from the entrance. When the main entrance fronts the sidewalk, the installer must apply for an encroachment permit from the City to install the bicycle parking in the public right-of-way. The main building entrance excludes garage entrances, trash room entrances, and other building entrances that are not publicly accessible. (J) If required bicycle parking is not visible from the street or main building entrance, a sign must be posted at the main building entrance indicating the location of the bicycle parking. (e) Minimum Number of Required Bicycle Parking Spaces. The rules for calculating the minimum number of bicycle parking spaces are: () If after calculating the number of required bicycle parking spaces a quotient is obtained containing a fraction of one-half or more, an additional space shall be required; if such fraction is less than one-half it may be disregarded. (2) When the bicycle parking requirement is based on number of employees or number of students, the number of spaces shall be based on the number of working persons on the lot during the largest shift of the peak season or the highest expected student capacity. If the Zoning dministrator determines that this number is difficult to verify for a specific facility, then the number of required long-term bicycle parking spaces shall be a minimum of two (2) spaces or five (5) percent of the amount of required automobile spaces for the proposed facility, whichever is greater. (3) When the bicycle parking requirement is based on number of seats, in the case of pews or similar facilities each 8 inches shall be counted as one seat. (4) The calculation of short-term bicycle parking may include existing racks that are in the public right-of-way and are within 00 feet of the main entrance. B-52 lta Planning + Design
53 City of San Mateo Bicycle Master Plan (f) Bicycle Parking Rates. Required bicycle parking rates vary depending on whether the associated land use is located within or outside the Downtown rea as shown below: lta Planning + Design B-53
54 ppendix B Bicycle Parking Requirements () Downtown rea. () Minimum Parking Requirements. Where a parcel of real property is located within the Downtown rea, new projects to be located on said parcel shall meet the bicycle parking requirements as follows: MINIMUM BICYCLE PRKING STLLS REQUIRED Downtown Planning rea Uses Minimum Short-Term Bike Parking Spaces Required Minimum Long-Term Bike Parking Spaces Required () Hotels, excluding accessory restaurants and bars per 20 units per 20 employees (B) Indoor Theatres and Cinemas Weekly matinees per 20 fixed seats per 40 fixed seats Weekend matinees and evenings per 20 fixed seats per 40 fixed seats (C) Offices Financial per 20,000 s.f. per 0,000 s.f. General per 20,000 s.f. per 0,000 s.f. Medical per 20,000 s.f. per 0,000 s.f. (D) Residential uses (within the Retail Core Subarea as defined in the Down-town Specific Plan) Studio 0.05 per unit.0 per unit One-bedroom 0.05 per unit.0 per unit Two-bedrooms 0.0 per unit.25 per unit Three or more bedrooms 0.5 per unit.5 per unit (E) Restaurants and bars, excluding fast food restaurants per 5,000 s.f. per 2,000 s.f. (F) Retail stores per 2,000 s.f. per 2, 000 s.f. (G) Services per 0,000 s.f. per 20,000 s.f. (H) Fast food, drive-in, drive-thru, and take-out restaurants per 0,000 s.f. per 20,000 s.f. (2) Outside Downtown rea. () Minimum Parking Requirements. For the following uses on property located outside the Downtown rea, bicycle parking stalls shall be provided as listed below. Bicycle parking stalls required on an employee basis shall be based on the maximum number of employees on duty, or residing, or both, on the premises at any one () time. B-54 lta Planning + Design
55 City of San Mateo Bicycle Master Plan MINIMUM BICYCLE PRKING STLLS REQUIRED Outside Downtown Specific Planning rea Uses Minimum Short-Term Bike Parking Spaces Required Minimum Long-Term Bike Parking Spaces Required. Residential Uses: a. Single Family Dwelling (Detached with private garage. If No spaces required No spaces required includes shared garage, bicycle parking requirements for Multiple Family Dwelling shall apply.) Under 3,000 sq. ft. of floor area* No spaces required No spaces required 3,000-3,749 sq. ft. of floor area* No spaces required No spaces required 3,750 sq. ft. of floor area* and above No spaces required No spaces required b. Secondary Unit No spaces required No spaces required c. Multiple Family Dwelling (two-family, townhouse, condominium, apartments and apartment hotels) Studio 0.05 per unit.0 per unit One-bedroom 0.05 per unit.0 per unit Two-bedroom 0.0 per unit.25 per unit Three or more bedroom (or any dwelling unit over,400 square feet in floor area 0.5 per unit.5 per unit * Excluding enclosed parking facilities, uninhabitable accessory structures and covered patios. 2. Commercial Shopping Centers: a. Community Shopping Center per 5,000 s.f. per 2,000 s.f. b. Regional Shopping Center per 0,000 s.f. per 20,000 s.f. Note: The above requirements will apply for all commercial shopping centers in the city; however, whenever the zoning administrator determines that delineation of independent uses is required, the following standards shall apply: 3. Commercial, Retail, and Service Uses: a. utomobile service and gas stations (see Section ) 2 spaces Min. of space b. utomobile washing and cleaning establishments, except None Min. of 2 spaces self-service. c. Barber shops or beauty parlors per 2,000 s.f. per 2,000 s.f. d. Buildings used solely for coin-operated laundromats per 2,000 s.f. per 5,000 s.f. e. Cemeteries, mausoleums, and columbaria 0.05 per acre 0.05 per acre f. Contractors' storage yards in connection with contractor's No spaces required No spaces required business; salvage yard; junk yard; automobile wrecking yard; storage yard g. Dry cleaners per 2,000 s.f. per 2,000 s.f. h. Home improvement centers per 0,000 s.f. per 20,000 s.f. i. Retail stores, food stores, and drugstores per 2,000 s.f. per 2,000 s.f. j. Self-service automobile washes No spaces required No spaces required lta Planning + Design B-55
56 ppendix B Bicycle Parking Requirements Outside Downtown Specific Planning rea Uses Minimum Short-Term Bike Parking Spaces Required Minimum Long-Term Bike Parking Spaces Required 4. Commercial and Public Recreation Uses: a. Public Parks [ Public parks are considered a single lot with different activities. Rates shall be a sum of activities as described in (c)]. Parks of any size. per acre No spaces required Sports courts (e.g., tennis, bocci ball and basketball) per court No spaces required Ball fields (e.g., soccer and softball) per acre No spaces required Group picnic areas 2 spaces per picnic No spaces required table or per 0 seats Passive useable turf whose primary purpose is for per 20,000 s.f. No spaces required informal play, family picnics or relaxation and play/courtyards. (Excludes areas that are less than 5,000 square feet.) Play areas (children) per acre No spaces required Recreation center per 5,000 s.f. per 20,000 s.f. b. Health studios and spas per 2,000 s.f. per 20,000 s.f. c. Dance Studio per 2,000 s.f. per 2,000 s.f. 5. Educational Uses: a. Colleges, universities, and institutions of higher learning, for every 0 per 0 employees parochial and private students of planned capacity b. Day nurseries, including preschools and nursery schools per 20 students per 20 employees c. Elementary and junior high schools per 20 students per 0 employees d. Senior high schools per 20 students per 0 employees e. Trade schools, business colleges, and commercial schools per 20 students per 0 employees 6. Health Uses: a. Dental clinics or offices; medical clinics or offices per 5,000 s.f. per 2,000 s.f. b. Health centers, government operated per 5,000 s.f. per 2,000 s.f. c. Hospitals per 20,000 s.f. per 20 employees or 70,000 s.f., whichever fewer d. Veterinary hospitals & clinics per 5,000 s.f. per 2,000 s.f. 7. Office, Professional Uses: a. Commercial banks, savings and loan office, other financial per 2,000 s.f. per 2,000 s.f. institutions, including stock brokerages b. Offices per 20,000 s.f. per 0,000 s.f. B-56 lta Planning + Design
57 City of San Mateo Bicycle Master Plan Outside Downtown Specific Planning rea Uses Minimum Short-Term Bike Parking Spaces Required Minimum Long-Term Bike Parking Spaces Required 8. Manufacturing Plants and Kindred Uses: a. Wholesale establishments, warehouses, storage buildings, or per 5,000 s.f. per 20,000 s.f. structures 9. Places of ssembly: a. Fast food, drive-in, drive-thru, and take-out restaurants per 0,000 s.f. per 20,000 s.f. b. Libraries, art galleries and museums; Public per 0,000 s.f. per 20,000 s.f. c. Restaurants, taverns, lounges, and other establishments for per 0,000 s.f. per 20,000 s.f. the sale and consumption on the premises of food and beverages d. Theaters (indoor) per 40 fixed seats per 80 fixed seats (Ord ; Ord ; Ord ; Ord ; Ord ) lta Planning + Design B-57
58 ppendix B Bicycle Parking Requirements This page intentionally left blank. B-58 lta Planning + Design
B. Appendix B: Bicycle Parking
City of San Mateo Bicycle Master Plan B. Appendix B: Bicycle Parking This appendix presents a Downtown San Mateo bicycle parking plan, locations for recommended bicycle parking upgrades, and recommended
More informationORDINANCE NO
ORDINANCE NO. 2011-10 AMENDING SECTION 11.56.100, RIDING -- ON ROADWAY OR SIDEWALK," OF CHAPTER 11.56 BICYCLES, OF TITLE 11, VEHICLES AND TRAFFIC, AND SECTION 27.04.058, BICYCLE PARKING FACILITY, OF CHAPTER
More informationChapter BICYCLE PARKING REQUIREMENTS
The following are proposed text changes to Chapter 17.117. Additions to the chapter are underlined; deletions are in strikeout. Chapter 17.117 BICYCLE PARKING REQUIREMENTS Sections: Article I. - General
More informationORDINANCE NO
ORDINANCE NO. 2017-02 AN ORDINANCE OF THE CITY OF SANTA CRUZ AMENDING CHAPTERS 24.12 OF THE CITY OF SANTA CRUZ MUNICIPAL CODE AND THE LOCAL COASTAL PROGRAM RELATING TO OFF-STREET PARKING REQUIREMENTS TO
More informationCity of San Mateo Bicycle Master Plan. Adopted October 17, PREPARED BY: Alta Planning + Design. PREPARED FOR: The City of San Mateo
City of San Mateo Bicycle Master Plan Adopted October 17, 2011 PREPARED BY: Alta Planning + Design PREPARED FOR: The City of San Mateo City of San Mateo Bicycle Master Plan Adopted October 17, 2011 Updated
More informationSupplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013)
Supplemental Plan Check Corrections Sheet for Bicycle Parking Ordinance (Effective 3/13/2013) Plan Check/PCIS Application No.: Date: Job Address: Zone: Plan Check Engineer: Telephone: E-mail: firstname.lastname@lacity.org
More informationBE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CHARLOTTE:
Petition No. 2010-066 Petitioner: Charlotte-Mecklenburg Planning Department 10-5-10 AN ORDINANCE AMENDING APPENDIX A OF THE CITY CODE ZONING ORDINANCE ORDINANCE NO. BE IT ORDAINED BY THE CITY COUNCIL OF
More informationSite Improvements
Sections Included In This Standard: 1.1 Bicycle Facilities 1.2 Guardrails 1.3 Parking Bumpers 1.4 Traffic Signage 1.5 Traffic Signals 1.6 Traffic Impact Studies 1.7 Vision Triangle 1.8 Bus Stop Shelters
More informationLEED Pilot Credit Library
Pilot Credit 13: Bicycle Network, Storage, and Shower Rooms Applicable Rating Systems >> Requirements >> Submittals >> Additional Questions >> Background Information >> Changes >> Applicable Rating Systems
More informationTHE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:
CPC-2016-4216-CA As modified by the Planning Commission on 3-9-17 Page 1 ORDINANCE NO. An ordinance amending Sections 12.03, 12.21 and 12.26 of the Los Angeles Municipal Code (LAMC) to improve and refine
More informationTHE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:
CPC-2016-4216-CA Proposed Ordinance with Recommended Changes Page 1 ORDINANCE NO. An ordinance amending Sections 12.03, 12.21 and 12.26 of the Los Angeles Municipal Code (LAMC) to improve and refine the
More informationSection 6. Off-street Bicycle Space Regulations
Section 6 Off-street Bicycle Space Regulations 6.1 Number of Bicycle Spaces 6.1.1 General Requirements Unless otherwise provided in Schedule C or a CD-1 By-law, in all districts, the number of spaces required
More information2016 Updates to the Downtown bicycle parking map (pg 5) and bicycle parking capacity (pg 7) located in Appendix A on page 11.
2016 Updates to the Downtown bicycle parking map (pg 5) and bicycle parking capacity (pg 7) located in Appendix A on page 11. Bicycle Parking in Downtown Lawrence Inventory Summer 2010 Introduction The
More informationBedfordshire County Council Cycle Parking Guidance Annex 1 Development standards Annex 2 Parking dimensions and layouts
Bedfordshire County Council Cycle Parking Guidance Annex 1 Development standards Annex 2 Parking dimensions and layouts Page 1 of 10 August 2006 Annex 1 Development standards Developers should supply the
More informationCPC CA Appendix A: Proposed Ordinance Page 1 ORDINANCE NO.
CPC-2016-4216-CA Appendix A: Proposed Ordinance Page 1 ORDINANCE NO. An ordinance amending Sections 12.03, 12.21 and 12.26 of the Los Angeles Municipal Code (LAMC) to improve and refine the bicycle parking
More information7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More informationCity of Sanibel Planning Department
City of Sanibel Planning Department STAFF REPORT Planning Commission Meeting February 12, 2013 Agenda Item 6 Application Number 13-7193 LDC Applicant Name: City of Sanibel RE: Draft Amendment to the Land
More informationIntroduction. Using the Checklist. TDM-Supportive Development Design and Infrastructure Checklist Version 1.0 (30 June 2017) City of Ottawa
Introduction The s Transportation Impact Assessment (TIA) Guidelines (specifically Module 4.1 Development Design) requires proponents of qualifying developments to use the City s TDM-Supportive Development
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More information11/28/2016 VIA
11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building
More informationObey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST
THE VILLAGE AT PEDESTRIAN CIRCULATION MAIN STREETS NORTH/SOUTH MAIN STREETS EAST/WEST SLIP STREET CREEK SIDE LANE PEDESTRIAN CIRCULATION DESCRIPTION: Circulation through the downtown of is organized by
More informationCreating walkable, bikeable and transit-supportive communities in Halton
Creating walkable, bikeable and transit-supportive communities in Halton By presenting current research and best practices, the information in this paper is meant to support and broaden discussion on how
More informationCURBSIDE ACTIVITY DESIGN
5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented
More informationBicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013
Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:
More informationcomplete streets design and construction standards public primer City of Edmonton
complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are
More informationActive Neighborhood Checklist: Protocol
Active Neighborhood Checklist: Protocol Version 2.0 (February 2011) Contact: Christine Hoehner, PhD, MSPH Washington University in St. Louis hoehnerc@wustl.edu or (314) 362-9647 1 Audit Tool - Definition
More informationDISCUSSION DRAFT 12 PARKING & MOBILITY
12 PARKING & MOBILITY 12.1 PARKING DESIGN...429 Standards for all Bicycle Parking 429 Short-Term Bicycle Parking 429 Long-Term Bicycle Parking 430 Alternative Compliance 430 Standards for all Motor Vehicle
More informationNASHVILLE BICYCLE PARKING GUIDE
NASHVILLE BICYCLE PARKING GUIDE TABLE OF CONTENTS ABOUT WALK BIKE NASHVILLE 3 WHY BICYCLE PARKING MATTERS 4 BICYCLE PARKING GUIDANCE 5 Build for a Purpose 5 Staff Parking vs. Customer Parking 5 Good Frame
More informationMagnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.
Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationRural Exceptions 101r-200r (Section 240)
Rural s 101r-200r (Section 240) I 101r AG[101r] - the maximum number of persons in a group home is 25 102r RC [102r] all uses other than hotel and restaurant, take-out 103r RU [103r] - service and repair
More informationUPDATE ARLINGTON COUNTY. Bicycle Parking Standards
2018 UPDATE ARLINGTON COUNTY Bicycle Parking Standards INTRODUCTION This guide is designed to give developers, architects, property managers, construction professionals, and County staff, the knowledge
More informationRegional Commercial District Summary of Allowable Uses
Regional Commercial District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory outside display of merchandise Accessory outside
More informationAppendix C. TRAFFIC CALMING PROGRAM TOOLBOX
Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationCITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER MISSION VIEJO, CA (949)
CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER MISSION VIEJO, CA 92691 (949) 470-3054 RESIDENTIAL BARRIERS FOR SWIMMING POOLS, SPAS AND HOT TUBS BARRIERS FOR SWIMMING POOLS, SPAS AND
More informationTransportation 6. A. Transit Center Circulation and Access. 1. Transit Center Circulation
Transportation 6 This chapter describes the transportation system in and around the Hillsdale Station Area, with a focus on the Transit Center at the relocated Hillsdale Caltrain Station. The transportation
More informationRoadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004
Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationAnne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES
Anne Arundel County BICYCLE, PEDESTRIAN, TRANSIT ASSESSMENT GUIDELINES December 2018 TABLE OF CONTENTS I. Executive Summary 3 II. When Is A Bicycle Pedestrian Transit Assessment (BPTA) Required? 4 III.
More information10/30/2012 VIA
10/30/2012 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: The Cannery On-Site
More informationHealthy Corridor Audit Tool
Healthy Corridor Audit Tool How to Use:»» Complete the first section for the entire study area. Many indicators can be collected from existing data; they do not have to be collected on site.»» To assess
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationVillage of Plainfield Design and Operational Guidelines for Outdoor Uses within the Public Right-of-Way
Village of Plainfield Design and Operational Guidelines for Outdoor Uses within the Public Right-of-Way Table of Contents 1. Applicability... 2 Purpose: The Village of Plainfield wishes to allow outdoor
More informationEast Burke Transportation, Safety and Capacity Improvements
East Burke Transportation, Safety and Capacity Improvements The purpose of this project is to increase mobility and improve safety for pedestrians, cyclists, and motor vehicles along VT Route 114 in the
More information3/10/2016 VIA th Street, Suite 203 Sacramento, CA
3/10/2016 VIA EMAIL Arwen Wacht, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Natomas Fountains (P16-012) Dear Ms. Wacht:
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationCity of Los Angeles Department of Building & Safety Disabled Access Section Supplemental Plan Review Checklist No. 8 RECREATION FACILITIES
AMUSEMENT RIDES, BOAT SLIPS, BOWLING LANES, COURT SPORTS, FISHING PIERS Plan Check No. 1. Amusement rides required to comply with 11B-234, Amusement Rides shall provide accessible routes in accordance
More informationNeighborhood Environment Walkability Scale Youth (NEWS-Y) Adolescent Version
Neighborhood Environment Walkability Scale Youth (NEWS-Y) Adolescent Version From Active Where? study Information on scoring can be found at: http://www.drjamessallis.sdsu.edu/documents/news-yscoring.pdf
More information5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)
5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village
More informationBuilding Permit Valuation Table
1 Air Condition Central - Resid 8 2 Air Condition Central - Comm 9 3 Air Condition Central - Tract 8 4 Apartment - Sr. Citizen I 128 5 Apartment - Sr. Citizen III 110 6 Apartment - Sr. Citizen V 105 7
More informationNM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.
Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility
More informationMARTIN LUTHER KING JR. WAY
OCTOBER 2011 40 Vision and Goals The Martin Luther King, Jr. Way Illustrative Master Plan that follows has been developed through a process of community involvement. It expresses a long term vision for
More informationSunPAC Traffic, Circulation, and Parking Goal-Making Matrix
Applicable 1992 Summerland Community Plan Policies 2009 Recommended SunPAC Polices ROW Policy CIRC-S-18: Existing public rights-of-way shall not be abandoned Policy CIRC S-18: Existing public rights-of-way
More informationBroad Street Bicycle Boulevard Design Guidelines
Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified
More informationSwimming Pool Requirements
Swimming Pool Requirements 1. Definitions: Approved Safety Pool Cover. Means a manually or power-operated safety pool cover that meets all of the performance standards of the American Society for Testing
More informationNeighborhood Environment Walkability Scale Youth (NEWS-Y) Parent Version
Neighborhood Environment Walkability Scale Youth (NEWS-Y) Parent Version From Active Where? study Information on scoring can be found at: http://www.drjamessallis.sdsu.edu/documents/news-yscoring.pdf Suggested
More informationTraffic Impact Memorandum. May 22, 2018
BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared
More informatione. 173rd/AVALON bicycle boulevard Shaker Heights Review Meeting - May 9, 2013
e. 173rd/AVALON bicycle boulevard Shaker Heights Review Meeting - May 9, 2013 Transforming a neighborhood barrier into Greater Cleveland s First Bicycle Boulevard Project Schedule Phase 1 Site Visit (Documentation
More informationRIVERSIDE, Newton MA BH NORMANDY RIVERSIDE LLC. Riverside Station. A green, transit-oriented community
Riverside Station A green, transit-oriented community October 6, 2011 TONIGHT S AGENDA: 1. Project Update (5 min.) 2. Master Plan Update (10 min.) 3.Traffic Plan Update (10 min.) Questions & Answers MASTER
More informationArlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014
Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal
More informationCITY OF TORONTO. BY-LAW No
Authority: Planning and Transportation Committee Report No. 5, Clause No. 9, as adopted by City of Toronto Council on June 7, 8 and 9, 2000 Enacted by Council: June 8, 2000 CITY OF TORONTO BY-LAW No. 394-2000
More informationMainstreet Master Plan Land Use
Mainstreet Master Plan 04 Land Use Top Recommendations Active Uses: Promote active ground-floor uses such as retail, restaurants, galleries and personal services with interactive storefronts for Mainstreet
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationRedondo Beach Boat Launch Ramp Facility
Redondo Beach Boat Launch Ramp Facility Feasibility Report for the California Department of Boating and Waterways 2015 Grant Cycle For the City of Redondo Beach Submitted by March 13, 2014 Table of Contents
More information3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811
3/20/2015 VIA EMAIL Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811 RE: Ice Blocks (P14-062) Dear Ms. Haenggi: WALKSacramento has reviewed the
More informationIf a person walks within this focus area, these are examples of the places he or she could walk to or from:
Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationMEETINGS & CONFERENCES
MEETINGS & CONFERENCES EXPERIENCE THE SOUL OF THE MOUNTAINS. BE WELCOMED BY A LEGENDARY VALLEY. FIND NEW INSPIRATION AMIDST CENTURY-OLD TREES AND STUNNING GRANITE MOUNTAIN PEAKS. THE SQUAW VALLEY ALPINE
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More informationClarkson Walkability Audit: Results and Recommendations Summary
Clarkson Walkability Audit: Results and Recommendations Summary The following document was prepared by the Region of Peel and includes a summary of comments made by participants during our breakout discussion
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationCity of Oakland Bicycle Parking Rack Guidelines
City of Oakland Bicycle Parking Rack Guidelines City of Oakland, Community & Economic Development Agency Transportation Services Division, Bicycle & Pedestrian Facilities Program 250 Frank Ogawa Plaza,
More informationHILLSDALE/US101 BICYCLE/PEDESTRIAN BRIDGE PROJECT
HILLSDALE/US101 BICYCLE/PEDESTRIAN BRIDGE PROJECT PUBLIC WORKSHOP AUGUST 19, 2014 DEPARTMENT OF PUBLIC WORKS STEWARDS OF THE INFRASTRUCTURE AND ENVIRONMENT PROJECT TEAM Aaron Lam, Associate Engineer Tracy
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationBusiness Park District Summary of Allowable Uses
Business Park District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory outside display of merchandise Accessory outside
More information11.1 BICYCLE PARKING. Bicycle Parking. FIGURE 11.1 (a) Bicycle Parking Spaces
Bicycle Parking 11.1 BICYCLE PARKING 1. General a. Design Guidance i. The City of Somerville s Bicycle Parking Guide and the latest version of the Association of Pedestrian and Bicycle Professionals Bicycle
More informationSingle Family Detached District Summary of Allowable Uses
Single Family Detached District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory community center private (SUP) Accessory
More informationChapter 13 ORANGE COVE
Chapter 13 ORANGE COVE This chapter describes the current status and future plans for biking and walking in the City of Orange Cove. RELATIONSHIP TO CITY PLANS AND POLICIES The Orange Cove General Plan
More informationTRAFFIC ACTION PLAN. North Central Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN North Central Neighborhood CITY OF SAN MATEO Draft February 2017 Table of Contents Introduction... 1 The Traffic Forum Process... 4 Neighborhood Traffic Issues... 6 Neighborhood Recommendations
More informationWALK- AND bike-friendly TURLOCK
WALK- AND bike-friendly TURLOCK Ideas to Encourage Walking and Biking Benefits to the COMMUNITY Get Connected People who walk and bike have many more opportunities for casual interactions with friends
More informationTRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.
TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary
More informationEXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES
EECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES Topic and Purpose In 2007, the Mayor of Ottawa s Task Force on Transportation suggested adding a
More informationIncentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction
Incentive Zoning Zoning Ordinance Advisory Committee June 21, 2018 Pam Thompson, Senior Planner, Sustainable Development and Construction Presentation Overview Stakeholder questions Updated charts Design
More informationChapter 3.9 Timbercrest Elementary School. Volusia County MPO. November 2008
Chapter 3.9 Timbercrest Elementary School Deltona, FL Volusia County MPO November 2008 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3B School Summary Timbercrest Elementary School
More informationWHEREAS delivery trucks also pass through the Narrows, into the northern parking lot, to loading docks in the back of the building.
CEDAR-ISLES-DEAN NEIGHBORHOOD ASSOCIATION ( CIDNA ) RESOLUTION OPPOSING A DRUG STORE DRIVE THRU, AND COMMENDING DORAN COMPANIES FOR PROPOSING MITIGATING AMENITIES INCLUDING NEW LANDSCAPING AND A DEDICATED
More informationREAR YARDS - There shall be a rear yard no less than forty (40) feet.
ARTICLE VII - RESIDENCE R-2 DISTRICT 700-PURPOSE - The purpose of the R-2 District is to permit the establishment of medium density one and two family dwellings. 701-PERMITTED USES - After obtaining a
More informationLADBS Valuation Table August 17, 2015
Index # Description Construction/Occupancy Type $/sf. 1 Air Condition Central - Resid 9 2 Air Condition Central - Comm 10 3 Air Condition Central - Tract 9 4 Apartment - Sr. Citizen I 144 5 Apartment -
More informationSan Bernardino County Non-Motorized Transportation Plan - Chapter 5
City of Upland Population 76,106 City Overview The City of Upland was incorporated on May 15, 1906, after previously being named North Ontario. The City was originally established as an irrigation colony
More informationRECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.
CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 wvvw.ci.woodinville.wa.us To: Honorable City Council Date: 02/05/2013 From: Richard A. Leahy, City Manager
More information11 PARKING & MOBILITY
11 PARKING & MOBILITY 11.1 BICYCLE PARKING...497 General 497 Short-Term Bicycle Parking 497 Long-Term Bicycle Parking 498 Alternative Compliance 498 11.2 MOTOR VEHICLE PARKING...498 General 498 Parking
More informationBike Rack Design and Placement Design Standards
Bike Rack Design and Placement Design Standards Table of Contents Overview... 1 Design Specifications... 2 Short Term Parking... 3 Long Term Parking... 6 Overview Sacramento has been a city supportive
More informationOcean Park Boulevard Green Street Project Alternatives & Trade Offs
Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs
More informationStrategies to Promote the Availability of Affordable Healthy Food and Beverages
Strategies to Promote the Availability of Affordable Healthy Food and Beverages CDC Recommended Strategies and Measurements Strategy #1: Communities Should Increase Availability of Healthier Food and Beverage
More informationORDINANCE NO. _ THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS:
182386 ORDINANCE NO. _ An ordinance amending Sections 12.03, 12.21, and 12.21.1 ofthe Los Angeles Municipal Code (LAMC) to extend bicycleparking requirements to some multi-family residential developments;
More informationSTEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan
STEERING COMMITTEE MEETING June 17, 2015 Streetscape Overview Burlington Comprehensive Master Plan 1 Introduction Slide This slide show was presented to the Burlington Steering Committee on June 17, 2015
More informationRE: Park Plaza Walgreens (P12-016)
12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:
More information