Snake River Salmon Recovery Board Lead Entity 2017 SRFB Grant Round. Project Tour May 31 st and June 1 st

Size: px
Start display at page:

Download "Snake River Salmon Recovery Board Lead Entity 2017 SRFB Grant Round. Project Tour May 31 st and June 1 st"

Transcription

1 Snake River Salmon Recovery Board Lead Entity 2017 SRFB Grant Round Project Tour May 31 st and June 1 st Tucannon River PA-28 Phase II Habitat Restoration Project Site Visit, June, 2016

2 Table of Contents Snake River Salmon Recovery Board Lead Entity Committee Membership 2 Tour Schedule SRSRB Lead Entity Score Card 5 Regional Priority Map 7 Map with Project Locations 8 Summary Table of Habitat Factors and Objectives for Each MSA 9 Critical Habitat Uncertainties within the Snake River Salmon Recovery Region 11 SRSRB Draft Application Summaries 12 Touchet River Conceptual Restoration Plan 13 Tucannon salmonid survival & habitat utilization 2 15 Asotin IMW Monitoring Mill Creek Passage Segment E1 Design 19 Mill Creek Passage Park to Otis 21 Bridge to Bridge Restoration Phase 2 23 Alpowa Creek Instream PALS Phase II 25 Restoring Native Riparian on Pataha Creek 27 NF Touchet River Reach 2 Implementation Phase I 29 Draft Application Scoring Summary from April 18 th Lead Entity Committee Meeting 31 1

3 Snake River Salmon Recovery Board Lead Entity Committee 2017 Jerry Hendrickson Rod Hostetler Don Howard Larry Fairchild Billy Bowles Del Groat David Crabtree Larry Hooker Bryan Jones Jon Jones Kris Fischer Diane Driscoll or Bob Reis Ed Teel or Sean Taylor Heidi McRoberts Chris Pinney Erin Kuttle Bill Dowdy Chad Atkins Tom Schirm Megan Stewart (non-voting) Terry Bruegman (non-voting) Randy Stevens (non-voting) Duane Bartels (non-voting) Brian Burns (non-voting) Joanna Cowles (non-voting) Chris Highland (non-voting) Brad Johnson (non-voting) Michelle Cramer (non-voting) Jennifer O'Neal (non-voting) Kay Caromile (non-voting) Steve Martin (non-voting) Kris Buelow (non-voting) Debbie Seney (non-voting) John Foltz (non-voting) Asotin County Asotin County Columbia County Columbia County Garfield County Garfield County Walla Walla County Walla Walla County Whitman County Whitman County Confederated Tribes of the Umatilla Indian Reservation National Oceanic and Atmospheric Administration Natural Resources Conservation Service Nez Perce Tribe United States Army Corp of Engineers United States Fish and Wildlife Service United States Forest Service Washington Department of Ecology Washington Department of Fish and Wildlife Asotin County Conservation District Co-Lead Columbia County Conservation District Co-Lead Palouse Conservation District Co-Lead Pomeroy Conservation District Co-Lead Regional Fisheries Enhancement Group Walla Walla County Conservation District Co-Lead WRIA 32 Walla Walla Watershed Partnership WRIA 35 Planning Unit Salmon Recovery Funding Board Review Panel Salmon Recovery Funding Board Review Panel Recreation and Conservation Office Grant Manager SRSRB/LE Staff SRSRB/LE Staff SRSRB/LE Staff SRSRB/LE Staff 2

4 Snake River Salmon Recovery Board Lead Entity SRFB Review Panel Draft Application Project Tour Schedule for May 31, :00 am Meet at SRSRB Office in Dayton, 410B East Main St. Introductions and Overview John Foltz, SRSRB Staff SRFB Review Panel, SRSRB Staff, Project Sponsors, and Attendees 9:05 am Touchet River Conceptual Restoration Plan ( ) Justin Pearson Columbia Conservation District 9:50 am Tucannon salmonid survival & habitat utilization 2 ( ) Ethan Crawford Washington Department of Fish and Wildlife 10:35 am Asotin IMW Monitoring 2017 ( ) Steve Bennett Eco Logical Research Inc. 11:20 am Leave Dayton Office 12:00 pm Lunch Provided (Rooks Park) 1:00 pm Mill Creek Passage Segment E1 Design ( ) Brian Burns Tri-State Steelheaders 1:45 pm Mill Creek Passage Park to Otis ( ) Brian Burns Tri-State Steelheaders *time available to visit completed Mill Creek Passage 9 th Ave. Construction ( ) 3:00 pm Bridge to Bridge Restoration Phase 2 ( ) Brian Burns Tri-State Steelheaders *time available to visit completed Bridge to Bridge Levee Removal ( ) 5:00 pm Return to Dayton 3

5 Snake River Salmon Recovery Board Lead Entity SRFB Review Panel Draft Application Project Tour Schedule for June 1, :15 am Meet at SRSRB Office in Dayton, 410B East Main St. Introductions and Overview John Foltz, SRSRB Staff SRFB Review Panel, SRSRB Staff, Project Sponsors, and Attendees 8:20 am Load up on Bus 9:30 am Alpowa Creek Instream PALS Phase II ( ) Brad Johnson Palouse Conservation District *time available to visit completed Alpowa Instream PALS ( ) 11:00 am Restoring Native Riparian on Pataha Creek ( ) Duane Bartels Pomeroy Conservation District *time available to visit completed Pataha Creek Working with Beaver to Restore Habitat ( ) 12:15 pm Lunch Provided (City of Dayton Park) 1:15 pm North Touchet River Reach 2 Implementation Phase I ( ) Jerry Middel Confederated Tribes of the Umatilla Indian Reservation 2:30 pm Return to Dayton 4

6 2017 SRSRB Lead Entity Score Card 5

7 6

8 7

9 8

10 Summary Table of Habitat Factors and Objectives for Each MSA Priority Habitat Factor and Objective Mainstem Walla Walla River MSA Imminent Threats: Fish Screens, Fish Passage Barriers, Low/Dewatered Streams I. Temperature: < 4 day > 72ºF II. Large Woody Debris: > 1 key pieces per channel width III. Embeddedness: < 10% embeddedness IV. Riparian:> 40 to 90% of maximum V. Channel Confinement: reduce to 40% to 60% of stream length Mill Creek MSA Imminent Threats: Fish Passage Barriers (including gravel berms), Fish Screens, Low/Dewatered Streams I. Embeddedness: < 10% II. Temperature < 4 day > 72ºF III. Large Woody Debris: > 1 key piece per channel width IV. Riparian: > 40 to 90% of maximum Middle Touchet River MSA (mainstem from Coppei creek to Patit Creek) Imminent Threats: Fish Screens, Fords, Low Stream Flows, Gravel Berms I. Embeddedness: < 10% II. Temperature: < 4 days > 72ºF III. Large Woody Debris: > 1 key piece per channel width IV. Channel Confinement: <15 to 40% of stream bank length Upper Touchet River MSA (Patit Creek upstream to Touchet headwaters) Imminent Threats: Fish Passage Barriers, Fish Screens, Fords, Low Stream Flows, Gravel Berms I. Temperature: < 4 days > 72ºF II. Riparian: >62 to 82% of maximum III. Large Woody Debris: > 1 key piece per channel width IV. Channel Confinement: <10 to 40% of stream bank length Upper Tucannon River MSA (from Pataha Creek upstream to Tucannon headwaters) Imminent Threats: Fish Screens, Low Stream Flows I. Riparian: > 40 to 75% of maximum II. Large Woody Debris: >1 key piece per channel width III. Channel Confinement: < 25 to 50% of stream bank length IV. Temperature: < 4 days > 72ºF Lower Tucannon River msa (from Pataha Creek downstream to Tucannon mouth) Imminent Threats: Fish Passage Barriers, Screens, Low Stream Flows I. Temperature: < 4 days > 72ºF II. Embeddedness: < 20% III. Large Woody Debris: > 1 key piece per channel width IV. Riparian: >40 to 75% of maximum V Channel Confinement: < 25 to 50% of stream bank length Summary Table of Habitat Factors and Objectives for Each MSA (continued) Priority Habitat Factor and Objective 9

11 Priority Habitat Factor and Objective I. Riparian: > 80% of maximum II. Embeddedness: < 10% III. Temperature: < 4 day > 72ºF IV. Alpowa Creek MSA Imminent Threats: Fish screens, Low Stream Flows, Remove Obstructions Large Woody Debris: > 1 key piece per channel width Joseph Creek MSA Joseph Creek lies primarily in Oregon. Therefore, priority actions for the portion of Joseph Creek within Washington are to address imminent threats. Lower Grande Ronde MSA Objectives for the Lower Grande Ronde are currently being developed in consultation with ODFW. Wenaha River MSA The vast majority of the Wenaha River lies entirely within a wilderness area administered by the USFS. The proposed action for this river is to continue protective status. Asotin Creek MSA (mouth to headwaters including all tributaries except George Creek) Imminent Threats: Fish Passage Barriers, Fish Screens, Dewatered Streams I. Large Woody Debris: > 1 key piece per channel width II. Embeddedness: < 20% III. IV. Bed Scour: Reduce to < 10 cm Riparian: >75% to 90% of maximum I. Embeddedness: < 10% II. III. George Creek MSA (tributary of Asotin Creek) Imminent Threats: Dewatered Streams Large Woody Debris: > 1 key piece per channel width Riparian: >75% of maximum IV. Temperature: < 4 day > 72ºC Pataha Creek MSA (tributary of Tucannon River) Imminent Threats: Fish Passage Barriers, Fish Screens, Ford, Dewatered Streams I. Embeddedness: Protect existing condition II. III. IV. Temperature: Protect existing condition Riparian: Protect existing condition Large Woody Debris: Protect existing condition V. Channel Confinement: Protect existing condition 10

12 Critical Habitat Uncertainties within the Snake River Salmon Recovery Region Subbasin/Stream Asotin Creek Sub basin Tucannon River Sub basin Walla Walla River Sub basin Almota Creek (Lower Snake River Sub basin) Deadman Creek (Lower Snake River Sub basin) Grande Ronde Sub basin Critical Uncertainties Large woody debris, Embeddedness, Turbidity, Fines, Riparian function, Bed scour, Natural temperature regime, Natural base flow condition Anthropogenic stream confinement, Habitat type (pools), Riparian function, Harassment, Woody debris, Carcasses Turbidity, Obstructions, Riparian function, Anthropogenic stream confinement, Temperature Large woody debris, Riparian function, Embeddedness, Low flow, Anthropogenic stream confinement Turbidity, Large woody debris, Riparian function Sediment, Temperature, Flows, Key habitat quality and diversity 11

13 Draft Application Summaries Snake River Salmon Recovery Board Lead Entity 2017 SRFB Grant Round Prepared by the Snake River Salmon Recovery Board Lead Entity Staff Dry Creek at Collins Bridge, Pre- Project Construction, August 2016 Dry Creek at Collins Bridge, Post-Project Construction, September

14 Touchet River Conceptual Restoration Plan Sponsor: Justin Pearson Columbia Conservation District Location: Middle and Upper Touchet River MSA Priority Restoration and Protection Reaches 3 Year Plan: Yes Project Type: Planning (Assessment) Request+Match: 211, ,290 $248,443 Species: Mid-Columbia Steelhead (DPS), Columbia River Bull Trout (DPS), Mid-Columbia River Chinook Description: The Columbia Conservation District (CCD) will use this grant to develop a conceptual restoration plan for the Touchet River and its tributaries in Columbia and Walla Walla Counties in the middle and upper Touchet River (MSA) and Patit Creek (msa) as identified in the SE WA Salmon Recovery Plan (2011). These tributaries are inhabited by native ESA threatened Mid-Columbia steelhead and Bull Trout and re-introduced spring Chinook. The planning process will expand upon the Touchet River Geomorphic Assessment (GeoEngineers, 2011, PRISM # ) of existing information; conduct habitat surveys; identify priority stream reaches and habitat enhancement potential; and develop prioritized conceptual restoration plans. The guiding principle of this restoration plan will be to focus on improving the habitat factors limiting all salmonid life-cycle stages. To meet this goal, we will work closely with the Snake River Salmon Recovery Board, Regional Technical Team, co-managers WDFW/CTUIR, WWCCD, BPA, landowners and other partners at all stages of the project to ensure high priority salmonid limiting factors and restoration actions are identified. This project is identified in the Snake River Salmon Recovery Plan and regional work plan in WRIA 32 Assessment and Planning Restoration; deliverables will serve as the basis for future restoration project development in both the MSA and msa. Goals and Objectives: The goal of this project is to expand upon the geomorphic/watershed assessments, build a prioritized conceptual restoration plan for the identified watersheds and to produce at least conceptual reach designs for as much of the project areas identified throughout the project that addresses the current degraded habitat condition and function by increasing channel complexity and confinement, restoration of riparian areas, and implement BMP s on distinct potential project areas. Specific project objectives are: Use existing data and support from the existing Touchet Geomorphic Assessment while filling in the gaps of information to complete a conceptual restoration plan. Develop a citizen work group and work with the Voluntary Stewardship Program s Watershed Work Group (WWG) to develop working relationships and seek input and feedback on the conceptual restoration plan to make it implementable. Coordinate and collaborate amongst local technical partners and landowners throughout the project to assist in scoping and developing the assessment and to provide input and vet project details. Develop discrete conceptual habitat restoration plans for middle and upper Touchet MSA and Patit msa stream reaches. The conceptual restoration plan will be used to communicate project concepts that address the identified limiting factors incorporating information that has been gleaned through the assessment process with input from project partners. This plan will include project prioritization for the watersheds identified in this proposal and will provide the basis to move forward to final design and project implementation. Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Witnessed good spawning below Boles Bridge, will project go below? Staying within the MSA, budget limited. Fundamentally this project is important, RTT comments and two letters of support (BPA and CTUIR) for the project were passed along. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: None. Previously discussed in March, see notes above. Project Tour Questions/Comments/Notes: 13

15 14

16 Tucannon salmonid survival & habitat utilization 2 Sponsor: Ethan Crawford Washington Department of Fish and Wildlife Location: Tucannon River MSA Priority Restoration and Protection Reach 3 Year Plan: Yes Project Type: Planning (Assessment) Request+Match: 218, ,000 $273,958 Species: Snake River Steelhead (DPS), Snake River Spring/Summer Chinook (ESU) Columbia River Bull Trout (DPS) Description: WDFW will use this grant to perform an assessment that will evaluate the abundance of juvenile spring Chinook salmon and summer steelhead in the fall, their survival through four segments of the Tucannon River and to Lower Monumental Dam, and their seasonal distribution within CHaMP sites and treatment/control strata, as well winter habitat utilization via mobile PIT tag detection building upon two previous projects ( & ). This suite of information will provide critical information to direct restoration actions at limiting life stages with appropriate habitat actions. The proposed project would yield life-stage-specific survival rates for wild-origin juvenile spring Chinook salmon and summer steelhead in the Tucannon River, which in turn will help direct habitat restoration efforts based on survival and distribution of PIT tagged fish. In addition to the overwintering survival that past projects have investigated, we would also quantify egg-to-parr survival which may identify deficiencies in incubation, high flow, or summer survival. This project will attempt to identify if, when, and where the population bottlenecks exist for spring Chinook and summer steelhead in the Tucannon River. It builds on the four instream PIT detection sites, existing smolt trap, and habitat information available through the CHaMP sites in order to provide an improved method for identifying limiting factors and prioritizing restoration actions than are currently implemented in the basin. Goals and Objectives: The goal of this project is to identify life-stage- and reach-specific survival, abundance, and habitat utilization (i.e., seasonal distribution of fall-tagged fish), and to use this information to identify restoration priorities and potential population limiting factors. Specific project objectives are: Estimate survival of fall-tagged parr to the lower Tucannon River and Lower Monumental Dam. Calculate reach-specific survival rates in the upper, middle, and lower Tucannon River according to successful migration of tagged individuals past instream PIT tag detection sites. Describe the spatial distribution of overwintering juvenile spring Chinook salmon and steelhead within the Tucannon River mainstem with fine-scale habitat associations determined through mobile detection surveys. Produce unbiased estimates of fall parr abundance that can be used to infer egg-to-parr survival and build fish-habitat relationships from associated CHaMP habitat information. Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Pursing additional BPA funding for this. The Lower/Middle Tucannon is a migratory corridor designation for sp. Chinook, do you see them there? Yes, wintering in the middle Tucannon reach. What would we like to see for juvenile survival? At least 2-3 times higher than current number suggest. Project is to identify where and why. What is the time period of fish movement? After tagging, late fall-overwinter. Make sure we are clear on what data has been collected to date and what additional data will provide is critical for project; additionally lifecycle of steelhead is such that we need data for more complete picture. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: None. Project Tour Questions/Comments/Notes: 15

17 16

18 Asotin IMW Monitoring 2017 Sponsor: Steve Bennett Eco Logical Research Inc. Location: Asotin Creek MSA Priority Restoration and Protection Reach 3 Year Plan: Yes Project Type: Monitoring Request+Match: 150, ,529 $403,529 (Monitoring proposal max 10% of Regional allocation) Species: Snake River Steelhead (DPS), Snake River Spring/Summer Chinook (ESU) Columbia River Bull Trout (DPS) Description: ELR Inc is the project sponsor and the project type is a monitoring project. This request is to support ongoing monitoring in the Asotin Creek Intensively Monitored Watershed project (Asotin IMW). The project was started in 2008 and is expected to run until The funds are being requested to support i) juvenile steelhead PIT tagging and mark-recapture surveys and replace damaged PIT tag array equipment, and ii) habitat monitoring using the Columbia Habitat Monitoring protocol (CHaMP). These two monitoring efforts are being used to assess the effectiveness of large woody debris restoration at increasing juvenile productivity in Asotin Creek. Three tributaries in Asotin Creek need to be monitored: Charley Creek, North Fork Asotin Creek, and South Fork Asotin Creek. It is critical at this stage in the Asotin IMW to maintain the basic monitoring levels to ensure that the goals of the IMW can be completed: namely to determine the effectiveness of LWD restoration methods, determine the casual mechanisms of habitat and fish responses, and to provide recommendations for implementing LWD restoration in other watersheds. The extent of fish monitoring is 12 sites m in length, 4 in each tributary (see attached map). The extent of the habitat monitoring is 12 CHaMP sites (length m) in Charley and North Fork Creek Tetra Tech is funding CHaMP monitoring in South Fork Creek in This project will support the ESA listed summer steelhead recovery. All of the fish and habitat data collected will be made publically available in the PTAGIS (ptagis.org) and on the CHaMP website (champmonitoring.org). Analyses of the data will be conducted with other funds provided to the Asotin IMW by PSMFC. Goals and Objectives: Project goals are to monitor juvenile steelhead populations pre- and post-restoration and determine 1) if populations responded to restoration, 2) what habitat changes were linked to fish responses, and 3) how to extrapolate the results to other watersheds. Objectives are to: Continue monitoring at permanent Fish (12) and Habitat (18) sites in IMW study area Partially or completely replace components of all of five PIT tag antennae arrays damaged in during 2017 spring floods Manage and analyze the data Report results Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Are all fish that have been identified during monitoring wild? Yes. Where can we get the project information? Project Reports online, can be found on SRSRB website too. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: None. Project Tour Questions/Comments/Notes: 17

19 18

20 Mill Creek Passage Segment E1 Design Sponsor: Brian Burns Tri-State Steelheaders Location: Mill Creek MSA Priority Restoration and Protection Reach 3 Year Plan: Yes Project Type: Design Only Request+Match: 141, $141,246 Species: Mid-Columbia Steelhead (DPS), Columbia River Bull Trout (DPS), Mid-Columbia River Chinook Description: Flood measures on Mill Creek at Walla Walla include a levee confined channel, with 263 energy dissipating stabilizers (weirs). The stabilizers span the channel width, creating low flow passage problems. This project will complete designs and construct passage improvements at nine of the stabilizers, and create a low flow channel. These structures were identified as barriers in the Mill Creek Barrier Assessment completed in ESA listed steelhead, and bull trout, and reintroduced spring chinook utilize the flood control channel during migrations. Often by mid-may adults and juveniles become trapped in the flood control channel where they experience lethal temperatures. Many of these passage issues are considered as imminent threats in the Snake River Salmon Recovery Plan. Mill Creek, upstream of the flood control project, is a critical and under-utilized area for spawning and rearing of ESA listed species, and provides for an important recovery opportunity for those listed fish, as well as good habitat for other native fish and reintroduction efforts for spring chinook. Goals and Objectives: The goals of the project are to improve low flow passage for juvenile and adult steelhead, bull trout, and spring chinook, and improve thermal and habitat conditions. Project objectives are to improve fish passage and thermal and habitat conditions for approximately 565 feet of Mill Creek channel. Specifically: Add a passage notch to nine weirs Create a 565 foot thalweg between the weirs to concentrate low flow. Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Will WW County provide cost share? Yes, but uncertain. What is the best case scenario for match? Maybe 50/50% (original total budget was $633,534). Why these 9 baffles? These are the two ends that need to be replaced, channel thalweg will be created too. Would this reach be planted for shade? No, ACOE policy. If not funded, would the replacement baffles have to be notched for passage? Not likely, could be fixed under maintenance. NOAA would require consultation, require passage, but would be tough (ACOE has been tough to work with on this). SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: Imminent threat determination local scale for scoring purposes (split decision). The whole population has to pass through; from a recovery plan perspective, without significant number of fish from Mill Creek, Walla Walla MPG isn t viable. Consider cost effectiveness for next year; also concern regarding this, don t evaluate on cost effectiveness. Project Tour Questions/Comments/Notes: 19

21 20

22 Mill Creek Passage Park to Otis Sponsor: Brian Burns Tri-State Steelheaders Location: Mill Creek MSA Priority Restoration and Protection Reach 3 Year Plan: Yes Project Type: Restoration Request+Match: 826, ,000 $976,034 Species: Mid-Columbia Steelhead (DPS), Columbia River Bull Trout (DPS), Mid-Columbia River Chinook Description: This project will begin implementation of fish passage designs completed in June 2017 (project ). In this phase, 880 feet of the concrete flood control channel will be remodeled to provide hydraulic conditions favorable for passage of adult and juvenile salmonids. Flood control measures on Mill Creek include a concrete channel that extends over two miles through Walla Walla. The Mill Creek Barrier Assessment completed in 2009 identified and described barriers for ESA listed steelhead and bull trout, and for reintroduced spring chinook. Returning adults encounter flow dependent depth and velocity barriers, and a lack of resting opportunities. Juvenile fish encounter low spring flows, and high water temperatures in late spring. Often by mid-may adults and juveniles become trapped in the flood control channel where they experience lethal temperatures. Many of these passage issues are considered as imminent threats in the Snake River Salmon Recovery Plan. Mill Creek, upstream of the flood control project, is a critical and under-utilized area for spawning and rearing of ESA listed species, and provides for an important recovery opportunity for those listed fish, as well as good habitat for other native fish and reintroduction efforts for spring chinook. Goals and Objectives: The goals of the project are to improve low flow passage for juvenile and adult steelhead, bull trout, and spring chinook, improve high flow passage for adult steelhead, bull trout, and spring chinook, and provide resting opportunities where none currently exist. Project objectives are to implement final fish passage designs for approximately 880 feet of Mill Creek channel. The project will address low flow and high flow barriers, and will incorporate resting pools providing fish passage through a 1,100 foot section of Mill Creek at multiple life stages for steelhead, Chinook, and bull trout. Specifically: Reconfigure concrete baffles in Mill Creek channel This proposal: 7 existing baffles will be removed, and 30 will be installed; Project total: 16 existing baffles removed, 65 installed. Install surface roughness to provide a low velocity boundary layer for discharges up to 320 cfs. This proposal: Forty 7 x10 panels will cover 400 feet in length of channel (2,800 square feet). Project Total: One hundred and ten 7 x10 panels will cover 1,100 feet in length of channel (7,700 square feet) Install 5 resting pools in the concrete channel pools are 12 feet by 7 feet, covering 60 feet in length of channel. Project total: Install 16 resting pools, covering 192 feet of channel length Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Are there plans for monitoring? Yes, design engineers have been monitoring flows; current implementation has met passage and design criteria. How many feet are there in total, how much is left? 2.2 miles or ~10,000 feet, 1,600 feet completed to date. Access is the number one prioritizing factor for the identified reaches. Are there any problems with debris after implementation? Not yet, seems like it is self-cleaning. Where is match coming from and how much? No match from WW Basin Council as hoped, verbal from CTUIR, looking for other match. Is there an estimate of fish entering Mill Creek? Not at this time. There is a camera on Bennington ladder. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: Imminent threat determination local scale for scoring purposes (split decision). The whole population has to pass through; from a recovery plan perspective, without significant number of fish from Mill Creek, Walla Walla MPG isn t viable. Consider cost effectiveness for next year; also concern regarding this, don t evaluate on cost effectiveness. Project Tour Questions/Comments/Notes: 21

23 22

24 Bridge to Bridge Restoration Phase 2 Sponsor: Brian Burns Tri-State Steelheaders Location: Walla Walla River MSA Priority Restoration Reach 3 Year Plan: Yes Project Type: Restoration Request+Match: 535, ,000 $635,807 Species: Mid-Columbia Steelhead (DPS), Columbia River Bull Trout (DPS), Mid-Columbia River Chinook Description: The Bridge to Bridge Restoration Design completed in 2010 provided 30% plans for nearly two miles of the Walla Walla River. Final designs were completed for the upper third of the design reach, and implementation of those plans was completed in Final designs are now complete for the remaining part of the design reach. This project will address limiting factors by placing logs and log structures to improve channel complexity, maintain pools, create off-channel areas, and establish riparian vegetation on eroding banks. Riparian plantings will also address limiting factors by increasing shading, and improving riparian function. This section of the Walla Walla River is identified by The Snake River Salmon Recovery Plan as a priority restoration reach in the Walla Walla mainstem MSA. Adult and juvenile summer steelhead and spring chinook use the project reach during their migrations and bull trout occur there seasonally. Other species of cultural value and state concern that utilize the project reach are margined sculpin, leopard dace, and river lamprey. Goals and Objectives: The goals of the project are to improve width/depth ratio in the project reach, improve pool and cover habitat in the project reach, increase instream complexity, improve riparian buffer width and function in the project reach, increase shading to reduce thermal loading, and create self-sustaining conditions to maintain improved habitats. Specific project objectives are to: Increase large wood in the project reach to at least one piece per stream width Increase pool and cover habitat by installing 30 large wood structures Improve floodplain function and wood recruitment with 5,000 new riparian plants Improve 2,800 feet of side channel and off-channel areas by installing 24 large wood structures Install 13 wood structures to increase floodplain inundation and hyporheic exchange Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Is this the same proposal as last year? Yes, 98% the same. Were the Review Panel s concerns from last year addressed? Not with more wood at this point, working to balance cost/benefit. Will try to add more wood, not highly engineered, but more habitat. How certain are we that the landowners are on board? 100%, there is just one landowner. Where is the cost share coming from? Unknown at this point, working on that. Hoping to reduce costs with PALS in side channel using WCC crew (for planting too). What is the total length of project? ~3000 feet of channel and side channel. Is there juvenile Chinook rearing in the reach now? Yes, high losses seen by CTUIR now. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: None. Project Tour Questions/Comments/Notes: 23

25 24

26 Alpowa Creek Instream PALS Phase II Sponsor: Brad Johnson Palouse/Pomeroy Conservation District Location: Alpowa River MSA Priority Restoration and Protection Reach 3 Year Plan: Yes Project Type: Restoration Request+Match: 83, ,700 $98,000 Species: Snake River Steelhead (DPS), Snake River Spring/Summer Chinook (ESU) Description: The Pomeroy CD will use this grant to improve instream wood and pool habitat for wild steelhead in the Alpowa Creek watershed in a restoration reach. Approximately 200 PALs (with at least 3 key pieces of wood) will be installed in a 2 mile reach located in prime spawning and rearing habitat that was identified with SRFB Project # Alpowa Habitat Assessment and also expands restoration efforts of SRFB Project # Alpowa Instream Post Assisted Log Structures that previously installed 202 PALs upstream in 2014/15 field seasons. We are looking at increasing pool habitat and large wood by hand placing material at an additional 200 locations within the stream channel and using 3 inch wooded posts to hold the structures in place for juvenile and adult steelhead habitat. These structures have also been installed in the North and South forks and Charley Creek in Asotin Creek watershed, the Little Tucannon within Tucannon watershed and Alpowa Creek watershed. They are a very cost effective way to install instream structure without damaging the existing riparian habitat and leaving a small footprint that is very cost effective resulting in project funding being available for other project sponsors. SRFB Project # P identified a need for more wood and pool habitat within the Alpowa creek watershed and this project is a result of not only that project assessment but also SRFB Project # that resulted in 202 structures. There is no fishing allowed within this watershed, yet landowners understand the importance of this population and have agreed to the installation of instream habitat for wild steelhead by increasing pool habitat from the current 2 pools per 100 meters to over 8 suitable pools per 100 meters. Goals and Objectives: The goal of this project is to increase habitat quantity and quality in Alpowa Creek, specifically pools, bars and wood which appear to be low compared to similar surveys in Asotin Creek. Specific project objectives are: Install 200 PALS between 2018 and 2019 where there are available floodplain and landowner support. Increase the available pool habitat from current condition of 2.8 pools/100meters to more than 8 pools/100 meters over the two year period. Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: MOU between Palouse and Pomeroy CD s on project Project is currently in CREP, no disturbance planned in riparian. Landowner intereste after seeing VSP. What are the numbers of adult steelhead in Alpowa? ~162 wild adults/year at weir over the last several years. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: None. Project Tour Questions/Comments/Notes: 25

27 26

28 Restoring Native Riparian on Pataha Creek Sponsor: Duane Bartels Pomeroy Conservation District Location: Pataha Creek MSA Priority Protection Reach 3 Year Plan: Yes Project Type: Restoration Request+Match: 22, ,000 $28,000 Species: Snake River Steelhead (DPS) Description: The Pomeroy Conservation District will use this grant to restore native woody riparian species, specifically, willow and cottonwood, along 4 miles of Pataha Creek. The project is located 15 miles downstream of Pomeroy, WA, between the Hwy 127-Hwy 12 junction where Archer Rd meets Hwy 12. Restoring native woody riparian species will benefit steelhead by addressing many of the limiting factors that have been identified in Pataha Creek, including: fine sediment, lack of large woody debris, habitat diversity, habitat quality, temperature and riparian function. This project is proposed in a MSA, priority protection reach for ESA listed mid-columbia Steelhead and is identified as a priority in the Snake River Salmon Recovery Plan for SE Washington (2011) and three year work plan. Reed canary grass, an invasive perennial grass, is the dominant riparian vegetation along Pataha Creek, and has promoted an incised and simplified channel with cohesive vertical banks that limit the creek s ability to create complex habitat. Restoring native woody vegetation will mitigate the influence of reed canary grass, create a source of woody material to promote more complex habitat and provide an important source of forage for beaver populations and promote beaver activity. This project will also enhance existing restoration structures designed to increase floodplain connectivity in order to improve the success of riparian plantings by increasing access to water resources. Goals and Objectives: The goal of the proposed project is to create a functioning riparian area to improve stream health and steelhead habitat by restoring native woody riparian vegetation along Pataha Creek. A functioning riparian area provides flow refugia for juvenile steelhead during high flow events, promotes sediment deposition, decreases stream temperatures by providing shading, and can provide a source of woody material to the stream to promote the formation of pool-riffle habitat for spawning. Another goal of this project to provide a food and dam building source for beaver to expand their habitat along Pataha Creek. This goal could enhance current projects designed to increase instream and floodplain conditions in Pataha Creek (previous SRFB and DOE Beaver Dam analog project). The objective of our proposed project is to establish clusters of native woody riparian vegetation along Pataha Creek by While the proposed treatment reach spans four miles of stream, we anticipate significant difficulties due to unpredictable flow patterns, competition from reed canary grass and beaver herbivory. There is almost no native woody vegetation in the treatment reach so our objective is to establish clusters of native woody vegetation (a cluster being 5-10 stems in 100 yard stretch of stream) along the treatment reach each year. The hope is that these clusters will begin to expand if they establish and can outcompete the reed canary grass. Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Is fish passage a problem with the BDA s installed or with beaver? No, the structures aren t static, beaver and salmon/steelhead co-evolved. SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: Project Tour Questions/Comments/Notes: 27

29 28 Basic allocation of planting treatments. a) Divide each BDA location into quadrants (two upstream and two downstream of BDA) and plant ~ 20 willows in each quadrant spaced ~ 3 m apart.

30 NF Touchet River Reach #2 Implementation Phase 1 Sponsor: Jerry Middel CTUIR Location: Middle Touchet River MSA Priority Restoration and Protection Reach 3 Year Plan: Yes Project Type: Restoration $ Request+Match: 444, ,600 $661,400 Species: Mid-Columbia Steelhead (DPS), Columbia River Bull Trout (DPS), Mid-Columbia River Chinook Description: The CTUIR will use these grant funds to implement designs currently being developed under project to restore fish habitat and connect floodplain on the N. Touchet River upstream of Dayton, WA. This is a restoration project involving the cooperation of the Tribes, SRSRB, and at least 3 private landowners the project will be phased due to size. The overall goal is to restore much needed salmonid habitat along a priority reach of the N. Touchet. While primarily focused on juvenile rearing habitat, the project will benefit all life stages of ESA listed mid- Columbia Steelhead, bull trout, redband trout, and now Chinook salmon that were re-introduced in This phase of the project (site 25+00) involves approximately 200 feet of levee breaching, adding approximately 31 LWD structures to act as roughness and as a mechanism to sort sediment, provide habitat cover and scour pools. Two alcoves will be constructed along the project reach to relieve the current firehouse effect providing approximately 1.5 acres of off-channel habitat for juvenile salmonids. Floodplain connectivity is anticipated to be increased by approximately ~5 acres at the modeled 25 year return flow. This project is in a designated priority restoration reach in the Touchet River major spawning area as identified in the Salmon Recovery Plan for SE Washington (2011) and regional three year work plan. Goals and Objectives: The goal is to implement a restoration design agreed upon by multiple landowners to restore the reach to functional system that has connected floodplain (to the extent possible) and improved instream habitat conditions. This would primarily effect juvenile summer steelhead, and restore natural stream processes over 8500 foot long project reach. Specific objectives are: Create two off-channel alcoves for juvenile rearing increasing off-channel rearing habitat by approximately 1.5 acres perennially. Pull approximately 200 linear feet of channel constricting levee and set back to allow up to 5 acres of floodplain to be reconnected with the stream at a modeled 25 year return flow. Construct 31 large wood structures to provide juvenile rearing habitat and adult holding and spawning habitat along 0.45 miles of main and side channel; each structure will either provide velocity reductions and cover (immediate) or have an associated scour pool (approximately 19 pools). Riparian plating for approximately 6 acres. Draft Application LE Meeting (4/18/17) Questions/Comments/Notes: Does Phase 1 stand alone as a project? Yes, not dependent on upstream components. How long is Station 25+00? ~1,200 feet and 2 acres of alcoves plus side channels. Big request (entire project all phases $3+ million), what are the odds of moving forward with just station 25+00? Good, this station makes the most sense to construct first based on design and engineers input. How do alcoves help with temperature? They are aligned with historic channels on landscape, designed to utilize subsurface flows. They also provide much needed high flow refuge and will be connected at higher flows. Will alcoves be a death trap for fish? No, designed to be connected at the bottom (not isolated). SRSRB RTT Meeting (4/19/17) Questions/Comments/Notes: None. Project Tour Questions/Comments/Notes: 29

31 30

32 Draft Application Scoring Summary from April 18th Lead Entity Committee Meeting Project Ranking 2017 Grant Round Draft Applications Draft Score Average SRFB Request Running Total Draft Review Notes 1 Walla Walla Fish Screens $ 49,672 $49,672 See number 3 in comments below 2 Alpowa PALS - Phase II $ 83,300 $132,972 See number 3 and 4 in comments below 3 NF Touchet Reach $ 539,000 $671,972 See number 3 and 5 in comments below 4 Bridge to Bridge Restoration - Phase $ 535,807 $1,207,779 See number 3 in comments below 5 IMW Monitoring $ 150,000 $1,357,779 See number 3 in comments below 6 Touchet River Conceptual Restoration Plan $ 211,153 $1,568,932 See number 3 in comments below 7 Restoring Native Riparian on Pataha Creek $ 22,000 $1,590,932 See number 3 and 6 in comments below 8 Tucannon Salmonid Survival & Habitat Utilization $ 218,958 $1,809,890 See number 3 in comments below 9 Mill Creek Passage - Park to Otis $ 826,034 $2,635,924 See number 3 in comments below 10 Mill Creek Passage - Segment E $ 568,534 $3,204,458 See number 3 in comments below General Comments and Notes 1. Anticipated Regional Allocation $1,500, All projects are viable at the draft application stage. 3. LE Committee requested that sponsors tighten and reduce budgets across all projects and seek additional match - consider reducing project scope or phased options as well. The group wants to maximize our regional funding to fund as many projects as possib 4. Option to reduce cost? LE Committee Requests seeking 50% Match to stretch project funding. 5. Determine what WW County's costs would be for this fix, SRFB request should be the difference between County's projected expense and cost for improved passage. Determine what NOAA will require for consultation. 31

Snake River Salmon Recovery Board Lead Entity 2018 SRFB Grant Round. Project Tour June 5 th 7 th

Snake River Salmon Recovery Board Lead Entity 2018 SRFB Grant Round. Project Tour June 5 th 7 th Snake River Salmon Recovery Board Lead Entity 2018 SRFB Grant Round Project Tour June 5 th 7 th Restoring Native Riparian on Pataha Creek Project Site Visit, May, 2017 2 Table of Contents Tour Schedule

More information

Snake River Salmon Recovery Board Lead Entity 2016 SRFB Grant Round. Project Tour June 1-3, 2016

Snake River Salmon Recovery Board Lead Entity 2016 SRFB Grant Round. Project Tour June 1-3, 2016 Snake River Salmon Recovery Board Lead Entity 2016 SRFB Grant Round Project Tour June 1-3, 2016 Buford Creek Barrier Fish Passage Design Project, June, 2015 Table of Contents Tour Schedule 2 2016 SRSRB

More information

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16

Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region SRFB Grant Round Version: 2/19/16 2016 SRFB Grant Round Version: 2/19/16 Funding Habitat Restoration Projects for Salmon Recovery in the Snake River Region The Project Funding Process Presented by the Snake River Salmon Recovery Lead Entity

More information

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc.

Fish Habitat Restoration and Monitoring in Southeast Washington. Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Andy Hill Eco Logical Research, Inc. Fish Habitat Restoration and Monitoring in Southeast Washington Talk overview: Restoration projects

More information

MCCAW REACH RESTORATION

MCCAW REACH RESTORATION Final Report MCCAW REACH FISH RESTORATION PHASE B Jack McCaw Inland Empire Action Coalition http://www.wwccd.net/ Phone: 509-956-3777 Hours: 8:00-4:30 Walla Walla County Conservation District Snake River

More information

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1.

3. The qualification raised by the ISRP is addressed in #2 above and in the work area submittal and review by the ISRP as addressed in #1. Please find attached a response from The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO) for Project # 2008-301-00, Habitat Restoration Planning, Design and Implementation within

More information

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mission Statement The mission of the Mid-Columbia Fisheries Enhancement Group is to restore self-sustaining

More information

Planning and Combination (Planning and Acquisition) Project Proposal

Planning and Combination (Planning and Acquisition) Project Proposal Planning and Combination (Planning and Acquisition) Project Proposal Project Number 16-2095 Project Name Tucannon Mobile PIT Tag Detection Sponsor Washington Dept of Fish and Wildlife List all related

More information

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP

OVERVIEW OF MID-COLUMBIA FISHERIES ENHANCEMENT GROUP Mid-Columbia Fisheries Enhancement Group MISSION STATEMENT The Mid-Columbia Fisheries Enhancement Group is a non-profit organization dedicated to restoring selfsustaining salmon and steelhead populations

More information

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013 Program - Aquatic Organisms and Stream Crossings Ecological Connectivity A watershed is a network of channels that drain a common boundary. Channel characteristics formed by interaction of precipitation,

More information

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ

OKANAGAN RIVER RESTORATION INITIATIVE - FAQ OKANAGAN RIVER RESTORATION INITIATIVE - FAQ Initiative background: The health of the q awsitk w (Okanagan River) has been severely impacted by the channelization works that occurred in the mid-1950 s.

More information

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project #

Burns Paiute Tribe Fisheries Department. Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # Burns Paiute Tribe Fisheries Department Evaluate The Life History Of Native Salmonids Within The Malheur Subbasin Project # 199701900 Prior to 1990 Technical and/or scientific background Malheur population,

More information

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Executive Summary. Map 1. The Santa Clara River watershed with topography. Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa

More information

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES

CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES CHAPTER 4 DESIRED OUTCOMES: VISION, GOALS, AND OBJECTIVES Vision One of the first steps in developing this Plan was articulating a vision - a clear statement of what the Plan strives to achieve and what

More information

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Susan Ireland, Kootenai Tribe of Idaho Future of our Salmon Conference Technical Session August 2016 Healthy Floodplains,

More information

LIFE HISTORY DIVERSITY AND RESILIENCE

LIFE HISTORY DIVERSITY AND RESILIENCE LIFE HISTORY DIVERSITY AND RESILIENCE SPRING CHINOOK IN THE WILLAMETTE RIVER BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department of Fish and Wildlife Corvallis Research Lab Thanks

More information

Riparian Planting Projects Completed within Asotin Creek Watershed. Final Report

Riparian Planting Projects Completed within Asotin Creek Watershed. Final Report Riparian Planting Projects Completed within Asotin Creek Watershed Final Report 2000-2002 DOE/BP-00006436-1 October 2002 Field37: This Document should be cited as follows: Johnson, Bradley, ''Riparian

More information

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG)

April 26, Chairman Rockefeller and members of the Fish and Wildlife Committee. Briefing from Mid-Columbia Regional Fish Enhancement Group (RFEG) Joan M. Dukes Chair Oregon Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Rhonda Whiting Vice-Chair Montana Bill Bradbury Oregon Tom Karier Washington Phil Rockefeller Washington April

More information

STEELHEAD SURVEYS IN OMAK CREEK

STEELHEAD SURVEYS IN OMAK CREEK STEELHEAD SURVEYS IN OMAK CREEK 2002 Annual Report Prepared by Chris Fisher John Arterburn Colville Confederated Tribes Fish and Wildlife Department P.O. Box 150 Nespelem, WA 99155 Prepared for Project

More information

Sub-watershed Summaries

Sub-watershed Summaries Project Description The Salmon Drift Creek Watershed Council (SDCWC) has focused their efforts in the Salmon River estuary for the past few years. The multifaceted partnership effort is nearing completion

More information

South Fork Chehalis Watershed Culvert Assessment

South Fork Chehalis Watershed Culvert Assessment South Fork Chehalis Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson March 2003 Funded by: The Washington State

More information

The Blue Heron Slough Conservation Bank

The Blue Heron Slough Conservation Bank 1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River

More information

Hatchery Scientific Review Group Review and Recommendations

Hatchery Scientific Review Group Review and Recommendations Hatchery Scientific Review Group Review and Recommendations Walla Walla River Summer Steelhead Population and Related Hatchery Programs January 31, 2009 Note: Spawning reaches likely vary from those depicted.

More information

September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning

September 4, Update on Columbia basin Salmon and Steelhead Recovery Planning Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington September

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Kootenai River Habitat Restoration Program Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Decline of native species Kootenai River White Sturgeon ENDANGERED

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Restoration & Management Program Oncorhynchus mykiss irideus California Steelhead Distinct Population Segments

More information

Hatchery Scientific Review Group Review and Recommendations

Hatchery Scientific Review Group Review and Recommendations Hatchery Scientific Review Group Review and Recommendations Lochsa River Spring Chinook Population and Related Hatchery Programs January 31, 2009 Lochsa River Spring Chinook Population Report Page - 1

More information

Strategies for mitigating ecological effects of hatchery programs

Strategies for mitigating ecological effects of hatchery programs Strategies for mitigating ecological effects of hatchery programs Some case studies from the Pacific Northwest Kathryn Kostow Oregon Department of Fish and Wildlife Ecological risks occur when the presence

More information

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL

TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL Agenda Item E.2.f Supplemental Tribal Report April 2012 TESTIMONY OF THE COLUMBIA RIVER TREATY TRIBES BEFORE PACIFIC FISHERIES MANAGEMENT COUNCIL April 2, 2012 Seattle, WA Good day Mr. Chairman and members

More information

Anadromous Fish Committee Columbia Basin Fish and Wildlife Authority Project Implementation Review Conference

Anadromous Fish Committee Columbia Basin Fish and Wildlife Authority Project Implementation Review Conference Anadromous Fish Committee Columbia Basin Fish and Wildlife Authority Project Implementation Review Conference September 21-24, 2004 Red Lion Hotel Richland Hanford House Richland, Washington In April 2004,

More information

Okanagan Sockeye Reintroduction

Okanagan Sockeye Reintroduction Okanagan Sockeye Reintroduction Backgrounder Elders accounts, and other forms of Traditional Ecological Knowledge (TEK) tell us that many species of salmon once came into the Okanagan Valley and tell us

More information

COA-F17-F-1343 YEAR END REPORT

COA-F17-F-1343 YEAR END REPORT DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,

More information

Reintroduction of Pacific lamprey in the Umatilla River in Northeast Oregon

Reintroduction of Pacific lamprey in the Umatilla River in Northeast Oregon Reintroduction of Pacific lamprey in the Umatilla River in Northeast Oregon Goal Restore natural production of Pacific lamprey to self sustaining and harvestable levels. CTUIR Restoration Strategies Utilize

More information

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011. Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011. Pam Harrington TU,1020 W. Main Street Suite 440, Boise,

More information

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is

More information

Draft Central Valley Salmon and Steelhead Recovery Plan

Draft Central Valley Salmon and Steelhead Recovery Plan Draft Central Valley Salmon and Steelhead Recovery Plan for Sacramento River winter-run Chinook salmon Central Valley spring-run Chinook Salmon Central Valley Steelhead National Marine Fisheries Service

More information

PRE- PROPOSAL FORM - Lewis River Aquatic Fund

PRE- PROPOSAL FORM - Lewis River Aquatic Fund PRE- PROPOSAL FORM - Lewis River Aquatic Fund 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest 2. Organization purpose Resource management agency 3. Project manager (name,

More information

Yakima/Klickitat Fisheries Project

Yakima/Klickitat Fisheries Project Yakima/Klickitat Fisheries Project Lower Yakima River Supplementation and Research Project Operations and Maintenance Annual Report 2002-2003 March 2004 DOE/BP-00006677-1 This Document should be cited

More information

Hatchery Scientific Review Group Review and Recommendations

Hatchery Scientific Review Group Review and Recommendations Hatchery Scientific Review Group Review and Recommendations Willamette McKenzie Spring Chinook Salmon Population and Related Hatchery Programs January 31, 2009 Columbia River Hatchery Reform Project -

More information

Union Pacific Railroad

Union Pacific Railroad Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity

More information

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT:

MEMORANDUM. July 2, Council members. Tony Grover, Fish and Wildlife Division Director SUBJECT: Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington July 2, 2013

More information

September 27, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky. Update on Geographic Review

September 27, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky. Update on Geographic Review Rhonda Whiting Chair Montana Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Bill Bradbury Vice-Chair Oregon Henry Lorenzen Oregon Tom Karier Washington Phil Rockefeller Washington September

More information

middle deschutes progress in restoration

middle deschutes progress in restoration middle deschutes progress in restoration Acknowledgements prepared by: Upper Deschutes Watershed Council Deschutes River Conservancy Oregon Department of Fish and Wildlife DESIGN & PRODUCTION FUNDED by:

More information

Interim Guidance Fish Presence Absence

Interim Guidance Fish Presence Absence Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced

More information

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD

PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD PROTECTING LAND & RESTORING RIVERS FOR SALMON & STEELHEAD Whychus Creek at Camp Polk Meadow Preserve. Photo: Russ McMillan Top photo: Deschutes River Conservancy 1 Photo: Byron Dudley A Unique Collaboration

More information

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries Sources of Habitat Impairment Sedimentation Channelization

More information

Newaukum Watershed Culvert Assessment

Newaukum Watershed Culvert Assessment Newaukum Watershed Culvert Assessment Water Resource Inventory Area 23 Lewis County Conservation District Final Report By: Kelly Verd and Nikki Wilson July 2002 Funded by: Chehalis Fisheries Restoration

More information

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer

Washington State Fish Passage Barrier Removal Projects. Casey Kramer, PE WSDOT State Hydraulics Engineer Washington State Fish Passage Barrier Removal Projects Casey Kramer, PE WSDOT State Hydraulics Engineer 2014 National Hydraulic Engineering Conference Iowa City, IA August 20 th, 2014 WSDOT Fish Passage

More information

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council Annual Report for Fiscal Year 2012-2013 and Future Plans for the Tillamook Bay Watershed Council A report prepared for the Tillamook County Board of Commissioners August 2013 Table of Contents: Recently

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Management, Research and Restoration Program Oncorhynchus mykiss irideus California Steelhead - Hot Topics Implementation

More information

COLUMBIA LAKE DAM REMOVAL PROJECT

COLUMBIA LAKE DAM REMOVAL PROJECT COLUMBIA LAKE DAM REMOVAL PROJECT Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

Backgrounder and Frequently Asked Questions

Backgrounder and Frequently Asked Questions Backgrounder and Frequently Asked Questions Who Sent the Letter? The 60-day Notice of Intent to File Suit was sent by Conservation Angler, Wild Fish Conservancy, Snake River Waterkeeper, Friends of the

More information

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON

THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON THE CONFEDERATED TRIBES OF THE WARM SPRINGS RESERVATION OF OREGON To: Branch of Natural Resources P.0. Box C, Warm Springs, Oregon 97761 Phone (541) 553-2002/2003 Fax (541) 553-1994 The Independent Science

More information

10 is bounded by wetlands between RM 1.8 and 3.1 on the south shore and more are scattered

10 is bounded by wetlands between RM 1.8 and 3.1 on the south shore and more are scattered The Ozette System The Ozette watershed is made up of several lakes and large streams that combine to a total drainage area of 88.4 square miles. The most significant feature of the Ozette watershed is

More information

Conserving the Forests, Lakes and Streams of Northeast Michigan

Conserving the Forests, Lakes and Streams of Northeast Michigan 4241 Old US 27 South, Suite 2, Gaylord, Michigan 49735 (989) 448-2293 www.huronpines.org info@huronpines.org Prioritized Restoration Projects in the AuSable River Watershed Summer 2015 Update from Huron

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California scanned for KRIS Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California Prepared for: Marin Municipal Water District 220 Nellen Drive Corte Madera, California

More information

2012 Bring Back the Natives Awarded Projects

2012 Bring Back the Natives Awarded Projects 2012 Bring Back the Natives Awarded Projects EZG # Organization Project Title Project Description Location Description Total Award Amount Grantee Non- Federal Match 31904 Sanctuary Forest, Inc. Mattole

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

Don Pedro Project Relicensing

Don Pedro Project Relicensing Don Pedro Project Relicensing M ODESTO I RRIGATION D ISTRICT TURLOCK I RRIGATION D ISTRICT FERC PROJECT N O. 2299 Resident Fish in Don Pedro Reservoir Don Pedro Reservoir Fish Stocking (1971-Present) CDFG

More information

Klamath Lake Bull Trout

Klamath Lake Bull Trout Klamath Lake Bull Trout Existing Populations The Klamath Lake Bull Trout SMU is comprised of seven existing populations and four populations classified as extinct or functionally extinct (Table 189). Populations

More information

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5

PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5 PRE- PROPOSAL FORM - 1. Applicant organization. USDA Forest Service Gifford Pinchot National Forest & WDFW Region 5 2. Organization purpose USFS-Resource management agency WDFW-Fish and Wildlife management

More information

Deschutes WRIA 13 Salmon Habitat Recovery Committee SRFB / PSAR Letter of Intent Form

Deschutes WRIA 13 Salmon Habitat Recovery Committee SRFB / PSAR Letter of Intent Form Deschutes WRIA 13 Salmon Habitat Recovery Committee SRFB / PSAR Letter of Intent Form Project Sponsor: Sponsor Contact lnfo: Project Name: Key Partners: Project Location: lnclude wotershed Project Description:

More information

Southern Oregon Coastal Cutthroat Trout

Southern Oregon Coastal Cutthroat Trout Species Management Unit Description Southern Oregon Coastal Cutthroat Trout The Southern Oregon Coastal Cutthroat Trout SMU includes all populations of cutthroat trout inhabiting ocean tributary streams

More information

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins

5B. Management of invasive species in the Cosumnes and Mokelumne River Basins 5B. Management of invasive species in the Cosumnes and Mokelumne River Basins Cosumnes River The Cosumnes River basin has a number of distinct habitat types that require different management strategies

More information

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management

Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management Oregon Department of Fish and Wildlife: Inland Fisheries - Hatchery Management Primary Outcome Area: Economy & Jobs Secondary Outcome Area: Healthy Environments Program Contact: Ed Bowles, 503-947-6206

More information

Mountain Snake Province

Mountain Snake Province Rolling Provincial Review: Implementation 2001-2003 Province 253 Columbia Basin Fish & Wildlife Authority Province FY 2001-2003 Spending Summaries NPCC Recommendations and BPA Spending by Project Category,

More information

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP FISHERIES A warming climate, by itself, substantially affects the hydrology of watersheds in the Blue Mountains. Among the key hydrologic changes projected under all scenarios for the 2040s and beyond

More information

Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers. Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA

Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers. Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA Evaluate Bull Trout Movements in the Tucannon & Lower Snake Rivers Mike Faler - USFWS, Ahsahka, ID Glen Mendel - WDFW, Dayton, WA Background Occurrence of bull trout at the Snake River dams is only incidentally

More information

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT

NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT Attachment 4 NATIVE FISH CONSERVATION PLAN FOR THE SPRING CHINOOK SALMON ROGUE SPECIES MANAGEMENT UNIT Figures in Draft Plan of February 28, 27 Figure 1. Map of the Rogue River Basin. PASSAGE ESTIMATES

More information

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Steelhead Society of BC Presents: Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Application for Funding December 2013 1.0 BACKGROUND

More information

Deschutes Bull Trout

Deschutes Bull Trout Deschutes Bull Trout Existing Populations The Deschutes Bull Trout SMU is comprised of eight populations, three of which are classified as extinct (Table 1). Populations are identified according to those

More information

MEMORANDUM. Ron Boyce, ODFW Bob Heinith, CRITFC. Michele DeHart. DATE: November 30, Operations

MEMORANDUM. Ron Boyce, ODFW Bob Heinith, CRITFC. Michele DeHart. DATE: November 30, Operations FISH PASSAGE CENTER 1827 NE 44 th Ave., Suite 240, Portland, OR 97213 Phone: (503) 230-4099 Fax: (503) 230-7559 http://www.fpc.org/ e-mail us at fpcstaff@fpc.org MEMORANDUM TO: Ron Boyce, ODFW Bob Heinith,

More information

STREAM SURVEY File form No..

STREAM SURVEY File form No.. scanned for KRIS THE RESOURCES AGENCY OF CALIFORNIA California Department of Fish and Game STREAM SURVEY File form No.. Date: September 4, 1969. NAME: North Fork Schooner Gulch Creek COUNTY: Mendocino.

More information

Chagrin River TMDL Appendices. Appendix F

Chagrin River TMDL Appendices. Appendix F Appendix F The following are excerpts from the Eastern Brook Trout Joint Venture s Conservation Strategy (Working Draft v.6), Conserving the Eastern Brook Trout: Strategies for Action Found at: http://www.easternbrooktrout.org/constrategy.html

More information

Patterns of migration and delay observed in Summer Steelhead from the Upper Columbia and Snake River Basins from PIT tag data

Patterns of migration and delay observed in Summer Steelhead from the Upper Columbia and Snake River Basins from PIT tag data West Coast Region Patterns of migration and delay observed in Summer Steelhead from the Upper Columbia and Snake River Basins from PIT tag data Blane Bellerud August, 2015 Columbia River Basin Columbia

More information

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension

WFC 10 Wildlife Ecology & Conservation Nov. 29, Restoration Ecology: Rivers & Streams. Lisa Thompson. UC Cooperative Extension Restoration Ecology: Rivers and Streams WFC 10 29 Nov 2010 Restoration of ecosystems often involves creating new systems with only partial resemblance to the original ecosystems Lisa Thompson Fisheries

More information

Implementation Toolkit

Implementation Toolkit Conservation and Recovery Plan for Oregon Steelhead s in the Middle Columbia Steelhead Distinct Segment: Implementation Toolkit Oregon Department of Fish & Wildlife September 2012 0 Introduction The Implementation

More information

Upper Columbia Redband Trout: Conservation for the Future

Upper Columbia Redband Trout: Conservation for the Future Upper Columbia Redband Trout: Conservation for the Future Bryan Jones and Holly McLellan Colville Confederated Tribes Fish and Wildlife Department Historic Notes Upper Columbia River Large runs of steelhead,

More information

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel

Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River. Kris Homel Addressing Critical Uncertainties in the Reintroduction of Chum Salmon to Oregon Tributaries of the Columbia River Kris Homel NW Fish Culture Concepts Wilsonville, OR 2015 Historic distribution and abundance

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County has been proposed for

More information

Mountain Columbia Province

Mountain Columbia Province Rolling Provincial Review: Implementation 2001-2003 Province 229 Columbia Basin Fish & Wildlife Authority Province FY 2001-2003 Spending Summaries NPCC Recommendations and BPA Spending by Project Category,

More information

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT

OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT OREGON DEPARTMENT OF FISH AND WILDLIFE ROGUE FISH DISTRICT REPORT TITLE: Upper Rogue Smolt Trapping Project, 1999 STREAM: Big Butte, Little Butte, South Fork Big Butte, Slate and West Fork Evans Creeks

More information

Appendix C-3: Restoration Project Proposal

Appendix C-3: Restoration Project Proposal Appendix C-3: Restoration Project Proposal Project Number 17-1299 Project Name Alpowa Creek Instream PALS Phase II Sponsor Pomeroy CD List all related projects previously funded or reviewed by RCO: Project

More information

January 4, Addresses water quality within the Council program.

January 4, Addresses water quality within the Council program. Phil Rockefeller Chair Washington Tom Karier Washington Henry Lorenzen Oregon Bill Bradbury Oregon W. Bill Booth Vice Chair Idaho James Yost Idaho Pat Smith Montana Jennifer Anders Montana January 4, 2016

More information

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary

Potlatch River Drainage: Salmonid Presence: Largest lower Clearwater River tributary X Y Potlatch River Drainage: Largest lower Clearwater River tributary Area = 1500 km 2 Mouth ~ 13 km upstream of Snake/Clearwater confluence X Y Dominated by private land Salmonid Presence: Steelhead,

More information

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened

Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened Throughout the Pacific Northwest, salmon and steelhead have been listed under the Endangered Species Act because their existence is either threatened or endangered. The Upper Willamette River Basin s spring

More information

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Prepared by: Phil Edwards, Rhode Island Department of Environmental

More information

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest

1998 Willow Creek Downstream Migrant Trap Report. Draft. Prepared By: C. A. Walker. Lower Trinity Ranger District. Six Rivers National Forest 1998 Willow Creek Downstream Migrant Trap Report Draft Prepared By: C. A. Walker Lower Trinity Ranger District Six Rivers National Forest September 1998 Executive Summary The downstream migrant trap was

More information

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA

2 nd Steelhead Summit. October 27 & 28, 2016 in San Luis Obispo, CA + 2 nd Steelhead Summit October 27 & 28, 2016 in San Luis Obispo, CA 1 + Session Overview Sponsors: California Trout City of San Luis Obispo Sustainable Conservation California Conservation Corps Cachuma

More information

Eastern Brook Trout Joint Venture Completed Project Report Form

Eastern Brook Trout Joint Venture Completed Project Report Form Eastern Brook Trout Joint Venture Completed Project Report Form Project Title: Assessing the Efficacy of Remediating Episodic Low ph (and High Aluminum) Concentrations in Headwater Brook Trout Streams

More information

2012 Summary Report on the Juvenile Salmonid and Stream Habitat Monitoring Program

2012 Summary Report on the Juvenile Salmonid and Stream Habitat Monitoring Program 2012 Summary Report on the Juvenile Salmonid and Stream Habitat Monitoring Program Prepared by: Kristen Kittleson, Fishery Resource Planner County of Santa Cruz Water Resources Program January 10, 2012

More information

October 25, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky, Program Development Manager. Update on Geographic Review

October 25, 2012 MEMORANDUM. Fish and Wildlife Committee. Lynn Palensky, Program Development Manager. Update on Geographic Review Rhonda Whiting Chair Montana Bruce A. Measure Montana James A. Yost Idaho W. Bill Booth Idaho Bill Bradbury Vice-Chair Oregon Henry Lorenzen Oregon Tom Karier Washington Phil Rockefeller Washington October

More information

1.Mill Creek Watershed Summary Description and Land Use

1.Mill Creek Watershed Summary Description and Land Use 1.Mill Creek Watershed Summary Description and Land Use Table xxx: Mill Creek Watershed Overview Watershed Size 31,435 acres/49.1 sq miles/ 127.1 sq km Elevation Range 5,594 feet [4,967-10,561] Stream

More information

Lewis River Bull Trout Habitat Restoration Project Identification Assessment

Lewis River Bull Trout Habitat Restoration Project Identification Assessment Lewis River Bull Trout Habitat Restoration Project Identification Assessment Jamie Lamperth 1, Bryce Michaelis 2, and Abi Groskopf 3 1 Washington Department of Fish and Wildlife, Fish Ecology and Life

More information

Yakima River Basin Coho Reintroduction Feasibility Study

Yakima River Basin Coho Reintroduction Feasibility Study Yakima River Basin Coho Reintroduction Feasibility Study Yakima Klickitat Fisheries Project Goals and Mission The purposes of the YKFP are to: enhance existing stocks of anadromous fish in the Yakima and

More information

Gold Action #1: Instream and Floodplain Habitat Restoration

Gold Action #1: Instream and Floodplain Habitat Restoration Gold Action #1: Instream and Floodplain Habitat Restoration Action Type: Recovery Threat addressed: Severity: Significant Spawning/egg incubation, Pre/post spawning migrations, Juvenile rearing Action

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010

Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative. November 2010 Ecology of Place: What salmon need Eric Beamer Skagit River System Cooperative November 2010 Acknowledgements NOAA Fisheries NW Fisheries Science Center Tim Beechie George Pess Correigh Greene Talk overview

More information