Savannah Harbor Expansion Project
|
|
- Darren Fox
- 5 years ago
- Views:
Transcription
1 Savannah Harbor Expansion Project SHEP Progress Report April 1 st April 30 th 2016 Task 1: SCDNR would acquire and insert 10 sonic transmitters per year into Atlantic sturgeon in the Savannah River Estuary and an additional 10 sonic transmitters into shortnose sturgeon. These fish should be collected and tagged with sonic transmitters within or as close as possible to the estuary. The goal would be a 50/50 split between adults/sub-adults and juvenile fish. All sturgeon collected will be weighed, measured, Passive Integrated Transponder (PIT) tagged, and have a fin clip taken for genetic analysis before being released. Overview 1: A total of 46 Atlantic and 47 shortnose sturgeon were captured and five adult/13 juvenile Atlantic and 13 adults/9 juvenile shortnose were transmitted in year 1 and 2 of the study (Table 1). In year three, 35 Atlantic and 26 shortnose have been captured with five adult/five juvenile Atlantic and five adult shortnose transmitted. (Table 2). Fish condition precludes some fish from receiving transmitters. Efforts will continue in order to catch juvenile shortnose sturgeon in year three of study. *Note: Differences in numbers of sturgeon captured from earlier progress reports are due to a corrupted excel database used to store the capture data. The current numbers of sturgeon captured in this April report have been validated and are correct. Task 2: SCDNR would acquire and insert 10 sonic transmitters per year into Atlantic sturgeon in the Savannah River, 10 sonic transmitters into shortnose sturgeon, and 20 transmitters into other species representative of the New Savannah Bluff Lock and Dam (NSBL&D) area fish community (Striped bass, Robust redhorse, and American shad). These fish should be collected and tagged with sonic transmitters within or as close as possible to the NSBL&D. If sufficient numbers of sturgeon are not available for capturing, tagging and tracking in the upper river, transmitters can be implanted in other species representative of the NSBL&D fish community, preferably American shad. Overview 2: Task 2 was not funded by the USACE Task 3: Acquisition, operation, and maintenance of 23 receivers per year are included in the statement of work. Receivers would be concentrated in the estuary, where the impacts of harbor deepening are anticipated (Figure 1). Overview 3: Twenty-five receivers have been deployed from the South Channel of Savannah River to Front River at river kilometer (rkm) 50, Middle, and Back River (Table 3). GPS locations of receivers and locations of tagged fish (residency master list) are also included as part of this progress report. All receivers were downloaded, and resulting telemetry data will continue to be shared with UGA with provided residency master list. 1
2 Task 4: To allow identification of fish movement upstream of the NSBL&D, the contractor should locate 5 receivers between NSBL&D and the Augusta Shoals. Overview 4: Task 4 was not funded by the USACE Task 5: Manual tracking of instrumented fish will occur monthly July September and at least quarterly for the remainder of the year. Overview 5: Manual tracking efforts were completed on April 8 th with an emphasis on locating transmitted fish in Front, Middle, and Back Rivers. Temperature, salinity, dissolved oxygen, and conductivity were recorded at 1-meter water depth intervals at the location of each detected sturgeon. Planned downloads of estuarine receivers should provide information for missing fish with subsequent manual tracking efforts based on those locations. Manual tracking data is updated and available in the provided manual tracking database. 2
3 Table 1. Sturgeon, Striped Bass, and American Shad Capture Data for the Savannah River SHEP - Project Year 1 and 2 3
4 Table 1. Sturgeon, Striped Bass, and American Shad Capture Data for the Savannah River SHEP - Project Year 1 and 2 (continued) 4
5 Table 2. Sturgeon Capture Data for the Savannah River SHEP - Project Year 3 5
6 Table 3. GPS Coordinates of Savannah River Receiver Locations Receiver # Station Name Latitude Longitude Savannah Jetty 32⁰02.074'N 80⁰51.064'W RM 0 32⁰02.248'N 80⁰53.990'W RM 3 32⁰04.274'N 80⁰57.289'W RM 6 32⁰04.616'N 80⁰57.394'W RM 9 32⁰05.390'N 81⁰01.173'W RM 15 32⁰04.972'N 81⁰05.615'W RM 'N 'W RM 'N 'W RM ⁰08.699'N 81⁰08.416'W RM ⁰09.647'N 81⁰09.256'W RM ⁰10.971'N 81⁰09.368'W RM 24 32⁰11.816'N 81⁰09.259'W RM ⁰14.164'N 81⁰09.012'W MR RM 0 32⁰08.794'N 81⁰07.974'W MR RM ⁰09.523'N 81⁰08.253'W MR RM ⁰10.342'N 81⁰08.150'W MR RM 4 32⁰11.602'N 81⁰08.252'W MR RM 5 32⁰12.613'N 81⁰08.289'W BR RM 4 32⁰06.673'N 81⁰06.471'W BR RM 7 32⁰08.704'N 81⁰07.236'W BR RM ⁰10.068'N 81⁰07.790'W BR RM ⁰11.574'N 81⁰07.096'W BR RM ⁰13.280'N 81⁰08.598'W RM ⁰16.141'N 81⁰08.052'W Abercorn RM 0 32⁰14.952'N 81⁰09.191'W Abercorn RM 1 32⁰15.127'N 81⁰10.057'W RM 39 32⁰20.490'N 81⁰07.932'W RM 45 32⁰22.882'N 81⁰10.856'W RM 53 32⁰27.582'N 81⁰11.424'W RM ⁰31.723'N 81⁰16.084'W RM 68 32⁰33.678'N 81⁰18.593'W RM 74 32⁰35.544'N 81⁰22.437'W RM ⁰38.516'N 81⁰24.591'W RM ⁰41.699'N 81⁰24.622'W 6
7 Table 3. GPS Coordinates of Savannah River Receiver Locations (continued) Receiver # Station Name Latitude Longitude RM ⁰43.956'N 81⁰24.958'W RM ⁰46.322'N 81⁰25.766'W RM ⁰48.034'N 81⁰25.761'W RM ⁰50.435'N 81⁰26.475'W RM ⁰52.905'N 81⁰27.962'W RM ⁰54.521'N 81⁰28.952'W RM ⁰56.234'N 81⁰30.159'W RM ⁰58.508'N 81⁰29.767'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 'N 'W RM 190 (Jason's Dock) 'N 'W Rm (Marina) 'N 'W Lower Shoals 'N 'W Upper Shoals 'N 'W I20 Downstream 'N 'W 7
8 Figure 1. Vemco receiver locations within proximity to the King Island Turn Basin. 8
9 Appendix 1 Pictures of Project 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
Performance Report. B. Project Title: Evaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project
Performance Report A. Grantee: S. C. Department of Natural Resources B. Project Title: Evaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project C. Principle
More informationSavannah River, Georgia and South Carolina
Scope of Work for Use of the Fish Bypass at New Savannah Bluff Lock and Dam for the Savannah Harbor Expansion Project Monitoring and Adaptive Management Program Savannah River, Georgia and South Carolina
More informationEvaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project
Evaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project Cooperative Agreement Numbers W912EP-13-2-0002-0004 & W912EP-13-2-0002-0003 Annual Report FY 2014 (November
More informationNear-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report July 1 September 30, 2014
Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee Quarterly Report July 1 September 30, 2014 Prepared by AKRF, Inc. 7250 Parkway Drive, Suite 210 Hanover, MD 21076 for New York State Thruway
More informationDistribution of Shortnose Sturgeon in the Lower Savannah River
Distribution of Shortnose Sturgeon in the Lower Savannah River Results of Research Conducted 1999-2000 Final Report to Georgia Ports Authority Mark R. Collins, William C. Post, and Daniel C. Russ South
More informationSan Joaquin River Restoration Program Juvenile Salmonid Survival and Migration Preliminary Report July 2011
San Joaquin River Restoration Program Juvenile Salmonid Survival and Migration Preliminary Report July 2011 1 2011 Juvenile Salmonid Survival and Migration Study 1.1 Introduction The Fisheries Management
More informationTo link to this article:
This article was downloaded by: [University of Georgia] On: 21 November 2013, At: 10:42 Publisher: Taylor & Francis Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office:
More informationSession B7 - Santee-Cooper: A Lock on Fish Passage Success
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationKlamath River Green Sturgeon Acoustic Biotelemetry Monitoring 2008 FINAL Technical Memorandum
Klamath River Green Sturgeon Acoustic Biotelemetry Monitoring Barry W. McCovey Jr. January 2009 Yurok Tribal Fisheries Program Klamath River Division Box 196 Hwy. 96, Weitchpec Rt. Hoopa, CA, 95546 Introduction
More informationSALUDA HYDROELECTRIC PROJECT (FERC NO. 516) STUDY PLAN
SALUDA HYDROELECTRIC PROJECT (FERC NO. 516) STUDY PLAN Study Plan Name: Status of the Shortnose Sturgeon in the Lower Saluda and Upper Congaree Rivers Applicable Hydro Projects: Saluda Hydro FERC No. 516
More informationThe Life History and Management of Alewife (Alosa pseudoharengus)
The Life History and Management of Alewife (Alosa pseudoharengus) Abigail Franklin, University of Massachusetts, Amherst Department of Natural Resources Conservation The Biology and Management of Alewife
More informationSan Joaquin River Chinook Salmon Trap and Haul Donald E. Portz, PhD Bureau of Reclamation Fisheries & Wildlife Resources Group
San Joaquin River Chinook Salmon Trap and Haul Donald E. Portz, PhD Bureau of Reclamation Fisheries & Wildlife Resources Group Water Management Technical Feedback Group Visalia, CA Adult Chinook Salmon
More informationModeling of Oxygen Injection Experiment in Savannah Harbor
593 Modeling of Oxygen Injection Experiment in Savannah Harbor S. Davie 1, H. Moorer 2, H. Rodriguez 1, Y. Plis 1 1 Tetra Tech, Inc., 2110 Powers Ferry Road, Suite 202, Atlanta, GA 30339, PH (770) 850-0949;
More informationHabitat use, site fidelity, and growth of juvenile black sea bass, Centropristis striata, in the Maryland Coastal Bays using mark-recapture
Habitat use, site fidelity, and growth of juvenile black sea bass, Centropristis striata, in the Maryland Coastal Bays using mark-recapture Rebecca Peters and Paulinus Chigbu University of Maryland Eastern
More informationASMFC American Shad Sustainable Fishing Plan for Georgia
ASMFC American Shad Sustainable Fishing Plan for Georgia Introduction: Submitted by Don Harrison Georgia Department of Natural Resources Wildlife Resources Division P.O. Box 289, 18 Darling Avenue Waycross,
More informationE.D. Chapman, A.R. Hearn, A.P. Klimley, P.E. LaCivita, W.N. Brostoff & A.M. Bremner
Migration of late-fall Chinook and steelhead smolts relative to dredge removal and disposal sites in San Francisco Bay US Army Corps of Engineers E.D. Chapman, A.R. Hearn, A.P. Klimley, P.E. LaCivita,
More informationSummary Report of the North Carolina Division of Marine Fisheries Cobia (Rachycentron canadum) Acoustic Tagging. Stephen J. Poland SEDAR58-SID-06
Summary Report of the North Carolina Division of Marine Fisheries Cobia (Rachycentron canadum) Acoustic Tagging Stephen J. Poland SEDAR58-SID-06 Submitted: 29 March 2018 This information is distributed
More informationJuvenile Salmonid Outmigration Studies in the San Francisco Estuary
Juvenile Salmonid Outmigration Studies in the San Francisco Estuary Allison Bremner¹, Peter LaCivita¹, Bill Brostoff¹, Tom Keegan², Justin Taplin³, Chuck Hanson³, and David Woodbury 4 ¹US Army Corps of
More informationI. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Redlands Diversion Dam on the Gunnison River
COLORADO RIVER RECOVERY PROGRAM FY 2017 ANNUAL PROJECT REPORT RECOVERY PROGRAM PROJECT NUMBER: C4-b-RED I. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Redlands
More informationI. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Government Highline Diversion Dam on the Upper Colorado River
COLORADO RIVER RECOVERY PROGRAM FY 2011 ANNUAL PROJECT REPORT RECOVERY PROGRAM PROJECT NUMBER: C4b-GVP I. Project Title: Annual Operation and Maintenance of the Fish Passage Structure at the Government
More information[FWS R5 FR 2018 N053; FF05F FXFR ; OMB Control. Agency Information Collection Activities; Submission to the Office of Management
This document is scheduled to be published in the Federal Register on 04/19/2018 and available online at https://federalregister.gov/d/2018-08186, and on FDsys.gov 4333 15 DEPARTMENT OF THE INTERIOR Fish
More informationSEA GRANT PROGRESS REPORT
SEA GRANT PROGRESS REPORT Project Title: The relationship between seasonal migrations of berried female lobster Homarus americanus, egg development and larval survival. Principal Investigator: Winsor H.
More informationLOWER MOKELUMNE RIVER UPSTREAM FISH MIGRATION MONITORING Conducted at Woodbridge Irrigation District Dam August 2014 through July 2015.
LOWER MOKELUMNE RIVER UPSTREAM FISH MIGRATION MONITORING Conducted at Woodbridge Irrigation District Dam August 2014 through July 2015 August 2015 Casey Del Real and Matt Saldate East Bay Municipal Utility
More informationKlamath River Green Sturgeon Acoustic Tagging and Biotelemetry Monitoring, 2009
Klamath River Green Sturgeon Acoustic Tagging and Biotelemetry Monitoring, 2009 Final Technical Report March 2010 Barry W. McCovey Jr. Klamath River Division Box 196 Hwy. 96, Weitchpec Rt. Hoopa, CA, 95546
More informationFY 2015 ANNUAL PROJECT REPORT PROJECT NUMBER: 163
COLORADO RIVER RECOVERY PROGRAM RECOVERY PROGRAM FY 2015 ANNUAL PROJECT REPORT PROJECT NUMBER: 163 I. Project Title: Monitoring multi-life stages of the fish community in the lower Gunnison and upper Colorado
More informationTHE OREGON. PLAN for Salmon and Watersheds
THE OREGON PLAN for Salmon and Watersheds Life History Variability, Habitat Use, and Migratory Behavior of Coastal Cutthroat Trout in the Salmon River, Oregon Report Number: OPSW-ODFW-2012-10 The Oregon
More informationU. S. Fish and Wildlife Service Connecticut River Coordinator s Office. Ken Sprankle Connecticut River Coordinator
U. S. Fish and Wildlife Service Connecticut River Coordinator s Office Ken Sprankle Connecticut River Coordinator Largest river basin in New England 400 miles long 11,250 mile 2 area Over 2,700 dams identified
More informationDaniel ) t of Natural ) )
Spawning location, size structure, and year-class strength of robust redhorse Moxostoma robustum stocked in the Ogeechee River, Georgia Patrick C. Ely * and Steven P. Zimpfer Georgia Cooperative Fish and
More informationABSTRACT. The purpose of the research was to determine if shortnose sturgeon, Acipenser
ABSTRACT OAKLEY, NATHANIEL COREY. Status of shortnose sturgeon, Acipenser brevirostrum, in the Neuse River, North Carolina. (Under the direction of Joseph E. Hightower) The purpose of the research was
More informationSUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2012
SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2012 Michael L. Hendricks Pennsylvania Fish and Boat Commission 1735 Shiloh Rd. State College, Pa 16801 INTRODUCTION The shore-based trapping device at
More informationPreliminary Summary of Out-of-Basin Steelhead Strays in the John Day River Basin
Preliminary Summary of Out-of-Basin Steelhead Strays in the John Day River Basin Prepared by: James R. Ruzycki and Richard W. Carmichael Oregon Department of Fish and Wildlife La Grande, Oregon Introduction
More informationSTURGEON CONSERVATION
MIDDLE SCHOOL DISCUSSION GUIDE DISCUSSION GUIDE STURGEON CONSERVATION Natural Resource Science DISCUSSION GUIDE OVERVIEW GRADE LEVELS - Grades 6-8 ENDURING KNOWLEDGE Students should know the history of
More informationJuly 17, Fish and Wildlife Resource Conservation Group Members Saluda Hydro Relicensing Team
July 17, 2006 Fish and Wildlife Resource Conservation Group Members Saluda Hydro Relicensing Team South Carolina Electric & Gas Company FERC Project No. 516 2005 Lower Saluda River Crayfish Assessment
More informationAPPENDIX A-6 SALUDA HYDROELECTRIC PROJECT STURGEON PROTECTION AND ADAPTIVE MANAGEMENT PROGRAM
APPENDIX A-6 SALUDA HYDROELECTRIC PROJECT STURGEON PROTECTION AND ADAPTIVE MANAGEMENT PROGRAM SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT (FERC NO. 516)
More information2015 Lower Cowlitz River Rotary Screw Trap (CRST) 2016 Cowlitz River Fisheries and Aquatic Science Annual Conference
2015 Lower Cowlitz River Rotary Screw Trap (CRST) 2016 Cowlitz River Fisheries and Aquatic Science Annual Conference Chris Wagemann - WDFW April 20, 2016 Presentation Overview Objectives Site Selection
More informationEXECUTIVE SUMMARY FISH COMMUNITY AND HABITAT EXISTING CONDITIONS REPORT
EXECUTIVE SUMMARY FISH COMMUNITY AND HABITAT EXISTING CONDITIONS REPORT First Mining Gold (First Mining) has completed a comprehensive Fish Community and Habitat Existing Conditions Report which has utilized
More informationMeeting Summary Fisheries Management Technical Feedback Group Meeting Friday, November 2, 2012
Meeting Summary Fisheries Management Technical Feedback Group Meeting Friday, November 2, 2012 Bureau of Reclamation, 2800 Cottage Way, Sacramento, CA 95825 Cafeteria Conference Room C1003 FINAL: 2013.1.14
More informationStudy 9.5 Fish Distribution and Abundance in the Upper Susitna River
Initial Study Report Meeting Study 9.5 Fish Distribution and Abundance in the Upper Susitna River October 15, 2014 Prepared by R2 Resource Consultants, Inc. 10/15/2014 1 Study 9.5 Objectives 1. Describe
More informationSurvival of razorback sucker stocked into the lower Colorado River
Survival of razorback sucker stocked into the lower Colorado River Trip Report 2-6: Palo Verde and Cibola Divisions 9-13 and 23-27 October 2006 Prepared by Brian R. Kesner and Joshua R. Campbell Submitted
More informationKlamath River Green Sturgeon Acoustic Tagging and Biotelemetry Monitoring 2010
Klamath River Green Sturgeon Acoustic Tagging and Biotelemetry Monitoring 2010 Final Technical Report May 2011 Barry W. McCovey Jr. Klamath River Division Hwy. 96, Weitchpec Route Box 196 Hoopa, CA 95546
More informationConsigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood
Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood 1 Ivars Reinfelds, 2,3 Chris Walsh and 1 Tim Haeusler 1 Department of Water and Energy,
More informationSan Joaquin River Restoration Program, 2013 Chinook Salmon Trap and Haul Summary
San Joaquin River Restoration Program, 2013 Chinook Salmon Trap and Haul Summary Introduction The Hills Ferry Barrier (HFB) is constructed annually by California Department of Fish and Wildlife (CADFW)
More informationDiadromous Fish Assemblage Assessment in the Saco River Estuary, ME
Diadromous Fish Assemblage Assessment in the Saco River Estuary, ME Kayla Smith James Sulikowski, Ph.D. and Carrie Byron, Ph.D. Dept of Marine Sciences Saco River Estuary Nursery ground Foraging stop-over
More information4. Instruction in telemetry requires IACUC review if live vertebrates are used in the training session. a. True b. False
Name: Quiz for Module 5: Field Biology - Mammals Date: 1. The Guidelines for the Capture, Handling, and Care of Mammals as Approved by the American Society of Mammalogists: were prepared by mammalogists
More informationRestoration of Spawning Habitat for Native Fish in the Central Great Lakes
Restoration of Spawning Habitat for Native Fish in the Central Great Lakes D. H. B E N N I O N 1, E. R O S E M A N 1, B. M A N N Y 1, G. K E N N E D Y 1, J. B O A S E 2, J C R A I G 1 1 U S G S - G R E
More informationExamination of pallid sturgeon use, migrations and spawning in Milk River and Missouri. River below Fort Peck Dam during 2013.
Examination of pallid sturgeon use, migrations and spawning in Milk River and Missouri River below Fort Peck Dam during 2013 Prepared by: David B. Fuller and Tyler M. Haddix Montana Department of Fish,
More informationNEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT
NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 Lake Tahoe Rainbow Trout Study WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION
More information2006 Progress Report. Bull Trout X Brook Trout Hybrid captured in Swan Lake. Swan Lake
2006 Progress Report Bull Trout X Brook Trout Hybrid captured in Swan Lake Swan Lake Swan Valley Bull Trout Working Group May, 2007 Background The Swan Valley has historically been home to a stable, healthy
More informationAppendix F: Ecology F-6 Methodology for Estimating Potential Hydroacoustic Impacts to Abundant Hudson River Fish Species and Shortnose Sturgeon from
Appendix F: Ecology F-6 Methodology for Estimating Potential Hydroacoustic Impacts to Abundant Hudson River Fish Species and Shortnose Sturgeon from Pile-driving Activities during Construction of the Tappan
More informationPallid Sturgeon. Pallid sturgeon. Life history
Pallid Sturgeon Pallid Sturgeon: biology & techniques for monitoring a large river fish Actinopterygii (ray finned fishes) Acipenseriformes (Sturg. & paddlefishes) Acipenseridae (Sturgeons) Scaphirhynchinae
More informationKlamath River Green Sturgeon Acoustic Biotelemetry Monitoring FY 2007 FINAL REPORT
Klamath River Green Sturgeon Acoustic Biotelemetry Monitoring Barry W. McCovey Jr. November 2008 Yurok Tribal Fisheries Program Klamath River Division Box 196 Hwy. 96, Weitchpec Rt. Hoopa, CA, 95546 Introduction
More informationKOOTENAI RIVER WHITE STURGEON SPAWNING AND RECRUITMENT EVALUATION
KOOTENAI RIVER WHITE STURGEON SPAWNING AND RECRUITMENT EVALUATION ANNUAL PROGRESS REPORT May 1, 2008 April 30, 2009 Prepared by: Pete Rust Senior Fisheries Research Biologist Virginia Wakkinen Senior Fisheries
More informationFreshwater Mussel Tagging, Release, and Monitoring Date Prepared: 11/20/2017
PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Freshwater Mussel Tagging, Release, and Monitoring Date Prepared: 11/20/2017 Prepared By: Kurt Cheng Suggested Citation: Cheng, K. 2017. Freshwater Mussel
More informationAlberta Conservation Association 2009/10 Project Summary Report. Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment
Alberta Conservation Association 2009/10 Project Summary Report Project Name: North Saskatchewan and Ram Rivers Bull Trout Spawning Stock Assessment Fisheries Program Manager: Peter Aku Project Leader:
More informationDate: 25 September Introduction
To: David Clugston, USACE Portland District From: Matt Keefer, Eric Johnson, Tami Clabough, Mike Jepson, Chris Caudill, Mary Moser RE: Preliminary evaluation of radiotelemetry and half-duplex PIT tag data
More informationTracking Juvenile Summer Flounder
Tracking Juvenile Summer Flounder East Coast MARE Materials For the leader: Whiteboard Markers (different colors) For each group: Copies of student group packets Copies of student worksheet Overview Scientists
More informationRefined Designated Uses for the Chesapeake Bay and Tidal Tributaries
A-1 appendixa Refined Designated Uses for the Chesapeake Bay and Tidal Tributaries BACKGROUND Federal water quality standards regulations establish that states must specify appropriate water uses to be
More informationGreen Bay Lake Sturgeon Spawning Fidelity
University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish
More informationAlberta Conservation Association 2017/18 Project Summary Report
Alberta Conservation Association 2017/18 Project Summary Report Project Name: Mountain Whitefish Overwintering Habitat Fisheries Program Manager: Peter Aku Project Leader: Britt Schmidt Primary ACA staff
More informationThree Lakes Association Hydrolab for Dummies. Table of Contents:
Three Lakes Association Hydrolab for Dummies 1 Table of Contents: 1. Know before you start:...2 a-introduction b-unpacking c-general use d-be careful 2. Calibration:...3 a-step by step guide 3. Using the
More informationSpilling Water at Hydroelectric Projects in the Columbia and Snake Rivers How Does It Benefit Salmon?
Spilling Water at Hydroelectric Projects in the Columbia and Snake Rivers How Does It Benefit Salmon? Hydropower development in the Columbia and Snake rivers has left its mark on salmonid populations,
More informationJob 1 Part JOB 1, PART 2: SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS, 2009
2.0 JOB 1, PART 2: SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS, 2009 Lawrence M. Miller Normandeau Associates U. S. Fish and Wildlife Service 1921 River Road Harrisburg, Pennsylvania Drumore, Pennsylvania
More informationR & E Grant Application Biennium
R & E Grant Application 05-07 Biennium Project #: 05-141 Project Information R&E Project Request: $50,000.00 Match Funding: $36,500.00 Total Project: $86,500.00 Start Date: 3/1/2007 End Date: 6/30/2007
More informationLake Butte des Morts Commercial Seining Project Report
Lake Butte des Morts Commercial Seining Project Report Adam Nickel, Winnebago Gamefish (excluding sturgeon) Biologist, 22 December 2014 Conducting comprehensive fish surveys on the Upriver Lakes, including
More informationMETHODS REPORT: Fish Taging
Mactaquac Aquatic Ecosystem Study Report Series 2015-021 METHODS REPORT: Fish Taging Mark Gautreau, Ben Wallace, and Tommi Linnansaari 28 July 2015 Correct citation for this publication: Gautreau, M.,
More informationAtlantic Sturgeon Update NER Protected Resources
Atlantic Sturgeon Update NER Protected Resources June 18, 2013 Outline Brief background Update on information available for Atlantic sturgeon Overview of draft batched fisheries Biological Opinion (BiOp)
More informationADULT PACIFIC LAMPREY MIGRATION IN THE LOWER COLUMBIA RIVER: 2008 RADIOTELEMETRY AND HALF-DUPLEX PIT TAG STUDIES
Technical Report 29-8 IDAHO COOPERATIVE FISH AND WILDLIFE RESEARCH UNIT ADULT PACIFIC LAMPREY MIGRATION IN THE LOWER COLUMBIA RIVER: 28 RADIOTELEMETRY AND HALF-DUPLEX PIT TAG STUDIES A Report for Study
More informationProposed Critical Habitat for Atlantic Sturgeon. Atlantic States Marine Fisheries Commission August 2, 2016
Proposed Critical Habitat for Atlantic Sturgeon Atlantic States Marine Fisheries Commission August 2, 2016 Proposed Rules Federal Register, June 3, 2016 Two Rules with the same public comment period 81
More informationFigure 4, Photo mosaic taken on February 14 about an hour before sunset near low tide.
The Impact on Great South Bay of the Breach at Old Inlet Charles N. Flagg and Roger Flood School of Marine and Atmospheric Sciences, Stony Brook University Since the last report was issued on January 31
More informationJOB 1, PART 2. SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2011
JOB 1, PART 2. SUMMARY OF CONOWINGO DAM WEST FISH LIFT OPERATIONS 2011 Michael L. Hendricks Pennsylvania Fish and Boat Commission 1735 Shiloh Rd. State College, Pa 16801 INTRODUCTION The shore-based trapping
More informationAcoustic tracking of Atlantic salmon smolt migration in the Lomond system
Acoustic tracking of Atlantic salmon smolt migration in the Lomond system Han Honkanen Supervisors: Prof. Colin Adams Dr. Paddy Boylan A project supported by the European Union's INTERREG IVA Programme
More informationBULL TROUT LIFE HISTORY, GENETICS, HABITAT NEEDS, AND LIMITING FACTORS IN CENTRAL AND NORTHEAST OREGON 1998 ANNUAL REPORT.
BULL TROUT LIFE HISTORY, GENETICS, HABITAT NEEDS, AND LIMITING FACTORS IN CENTRAL AND NORTHEAST OREGON 1998 ANNUAL REPORT Prepared by: Alan R. Hemmingsen Blane L. Bellerud Stephanie L. Gunckel Oregon Department
More informationBlue Creek Chinook Outmigration Monitoring Technical Memorandum
Blue Creek Chinook Outmigration Monitoring 2012 Technical Memorandum Prepared by: Andrew Antonetti and Erika Partee Yurok Tribe Fisheries Program PO Box 1027 Klamath, California 95548 In Partnership with:
More informationEcology of Columbia River redband trout (Oncorhynchus mykiss gairdneri) in high desert streams
Ecology of Columbia River redband trout (Oncorhynchus mykiss gairdneri) in high desert streams Dry Creek October 2012 Chris A. Walser Ph.D., Professor of Biology Department of Biology and Environmental
More informationU. S. Fish and Wildlife Service Moab Field Station Vernal, UT S. Hwy 191 Suite 4 (435) x14 Moab, UT 84532
COLORADO RIVER RECOVERY PROGRAM FY 2013 PROPOSED SCOPE-OF-WORK for: Smallmouth Bass control in the Green River Project No.: 123a Lead Agency: USFWS Submitted by: Tildon Jones Colorado River Fish Project
More informationAmerican Eel sampling at Conowingo Dam. Steve Minkkinen, Ian Park, Maryland Fishery Resources Office 9/26/2014
American Eel sampling at Conowingo Dam 2014 Steve Minkkinen, Ian Park, Maryland Fishery Resources Office 9/26/2014 Background Eels are a catadromous species that ascend freshwater environments as juveniles
More informationMovement patterns, habitat use, and home range of adult robust redhorse Moxostoma robustum released into the Oconee River, Georgia
Movement patterns, habitat use, and home range of adult robust redhorse Moxostoma robustum released into the Oconee River, Georgia Patrick C. Ely Georgia Cooperative Fish and Wildlife Research Unit Daniel
More informationCrews collected 5,874 fish of 49 species and 1 hybrid group, which included 120 Banded Killifish (state threatened species).
June Summary Bottom Line: Monitoring occurred in the CAWS and upper Illinois Waterway downstream of the Electric Dispersal Barrier in May. NO BIGHEAD CARP OR SILVER CARP were any found in new locations
More informationConfederated Tribes of the Warm Springs Reservation Cyndi Baker Jen Graham
Confederated Tribes of the Warm Springs Reservation Cyndi Baker Jen Graham Issue Abundance or escapement of Pacific lamprey in the Willamette Basin has never been estimated. until 2010 Willamette Falls
More information2016 Milltown Fishway Research Trap Report St. Croix River, New Brunswick and Maine R. Goreham and H. Almeda Summary 1
Summary 2016 Milltown Fishway Research Trap Report St. Croix River, New Brunswick and Maine R. Goreham and H. Almeda St. Croix International Waterway Commission P.O. Box 610, Calais, ME 04619 and P. O.
More informationAppendix O. Gulf Sturgeon Monitoring Report
Appendix O Gulf Sturgeon Monitoring Report FINAL REPORT (2012-14) GULF STURGEON MONITORING STUDY FOR THE PROPOSED PORT OF GULFPORT EXPANSION PROJECT GULFPORT, MISSISSIPPI Prepared by: Mark S. Peterson
More informationc h a p t e r 6 n n n Related to the VAMP
c h a p t e r 6 n n n Complimentary Studies Related to the VAMP Throughout 27 several fishery studies were conducted to advance the understanding of juvenile salmon abundance and survival in the San Joaquin
More informationLocation of Radio-tagged Juvenile Coho Salmon in Swift Reservoir
TABLE OF CONTENTS 4.14A MIGRATORY BEHAVIOR OF RADIO-TAGGED JUVENILE COHO SALMON THROUGH SWIFT RESERVOIR, 2001 (AQU 14A)...AQU 14A-1 4.14A.1 Study Objectives...AQU 14A-1 4.14A.2 Study Area...AQU 14A-1 4.14A.3
More informationTechnical Report 99-4 EFFECTS OF A SHAD FISHERY ON PASSAGE OF ADULT CHINOOK SALMON THROUGH THE OREGON-SHORE FISHWAY LADDER AT THE DALLES DAM
Technical Report 99-4 EFFECTS OF A SHAD FISHERY ON PASSAGE OF ADULT CHINOOK SALMON THROUGH THE OREGON-SHORE FISHWAY LADDER AT THE DALLES DAM - 1996 A report for Project MPE-P-95-1 by C.A. Peery, T.C. Bjornn,
More informationJamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist
Jamie Laatsch, Conservation & Outreach Coordinator Christina Morrisett, Research Assistant Dr. Rob Van Kirk, Senior Scientist 1 1. Chester Fish Ladder Project history Monitoring progress 2. Buffalo River
More informationA Report on the Collection of Lake Trout Eggs and Milt from Lake of Bays for the Purpose of Rehabilitation Stocking in Mary Lake
A Report on the Collection of Lake Trout Eggs and Milt from Lake of Bays for the Purpose of Rehabilitation Stocking in Mary Lake Andrew Ivany Fisheries Technician Ontario Ministry of Natural Resources
More informationPatterns of migration and delay observed in Summer Steelhead from the Upper Columbia and Snake River Basins from PIT tag data
West Coast Region Patterns of migration and delay observed in Summer Steelhead from the Upper Columbia and Snake River Basins from PIT tag data Blane Bellerud August, 2015 Columbia River Basin Columbia
More informationMiramichi Salmon Association Conservation Field Program Report 2014
Miramichi Salmon Association Conservation Field Program Report 2014 Prepared by: Holly Labadie Biologist Miramichi Salmon Association South Esk, NB In Cooperation with: Atlantic Salmon Federation Department
More informationFISH PROTECTION ACTIVITIES AT PRADO DAM, CORONA, CA.
San Marino Environmental Associates 560 South Greenwood Avenue, San Marino, CA 91108 (626) 792-2382 FAX (626) 792-8233 s FISH PROTECTION ACTIVITIES AT PRADO DAM, CORONA, CA. Prepared for: U. S. Army Corps
More information2010 Tule Lake Sucker Relocation Project
2010 Tule Lake Sucker Relocation Project Summary Report June 1, 2010 Prepared for: The Bureau of Reclamation Klamath Basin Area Office Authors: Ian Courter Jay Vaughan Shadia Duery BACKGROUND AND OBJECTIVES
More informationA GUIDE TO THE LAWS AND REGULATIONS ON COMMERCIAL FRESHWATER FISHING
A GUIDE TO THE LAWS AND REGULATIONS ON COMMERCIAL FRESHWATER FISHING Commercial fishing is defined by Georgia Code Title 27 as fishing for the purpose of sale, or the sale or offering for sale of fish
More information2001 BULL TROUT LIFE HISTORY, GENETICS, HABITAT NEEDS, AND LIMITING FACTORS IN CENTRAL AND NORTHEAST OREGON
March 21 BULL TROUT LIFE HISTORY, GENETICS, HABITAT NEEDS, AND LIMITING FACTORS IN CENTRAL AND NORTHEAST OREGON THIS IS INVISIBLE TEXT TO KEEP VERTICAL ALIGNMENT THIS IS INVISIBLE TEXT TO KEEP VERTICAL
More informationFISH PASSAGE CENTER 847 NE 19 th Avenue, #250, Portland, OR Phone: (503) Fax: (503) us at
FISH PASSAGE CENTER 847 NE 19 th Avenue, #250, Portland, OR 97232 Phone: (503) 833-3900 Fax: (503) 232-1259 www.fpc.org/ e-mail us at fpcstaff@fpc.org MEMORANDUM TO:. Joe Skalicky, USFWS FROM: Michele
More informationMigratory Characteristics and Passage Efficiency of Fishes at Two Dams on the Alabama River, Alabama. Brandon Simcox
Migratory Characteristics and Passage Efficiency of Fishes at Two Dams on the Alabama River, Alabama by Brandon Simcox A thesis submitted to the Graduate Faculty of Auburn University in partial fulfillment
More informationMIRAMICHI SALMON ASSOCIATION
MIRAMICHI SALMON ASSOCIATION CONSERVATION FIELD PROGRAM REPORT 2015 In Cooperation with: Atlantic Salmon Federation Barbour s Department of Fisheries and Oceans J.D. Irving Ltd. Miramichi Headwaters Salmon
More informationAppendix F: Ecology F-1 Aquatic Sampling Program
Appendix F: Ecology F-1 Aquatic Sampling Program Aquatic Sampling Program AECOM April 2011 Appendix F, Attachment 1 Introduction In support of the DEIS, this appendix contains aquatic ecological studies
More informationChapter I: Marine Resources
NOTE TO READERS: This is a draft of the Kennebunk Comprehensive Plan. The Comprehensive Plan provides us with a description of the town today in a range of categories, and identifies issues and recommendations
More informationJanuary 2012 (Revised July 2012) US Army Corps of Engineers Savannah District South Atlantic Division
ENVIRONMENTAL IMPACT STATEMENT APPENDIX B: Biological Assessment of Threatened and Endangered Species SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina January
More informationAdult Sockeye survival in the Bonneville to McNary Dam Reach
FISH PASSAGE CENTER 1827 NE 44 th Ave., Suite 240, Portland, OR 97213 Phone: (503) 230-4099 Fax: (503) 230-7559 http://www.fpc.org/ e-mail us at fpcstaff@fpc.org MEMORANDUM TO: Stuart Ellis (CRITFC) FROM:
More informationThompson Falls Dam Fish Passage Studies Annual Report for 2004
Thompson Falls Dam Fish Passage Studies Annual Report for 2004 Thompson Falls, MT Submitted to: PPL Montana 45 Basin Creek Road Butte, MT 59701 March 1, 2005 Project 050070 Ginger Gillin Project Manager
More information