Freshwater Mussel Tagging, Release, and Monitoring Date Prepared: 11/20/2017

Size: px
Start display at page:

Download "Freshwater Mussel Tagging, Release, and Monitoring Date Prepared: 11/20/2017"

Transcription

1 PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Freshwater Mussel Tagging, Release, and Monitoring Date Prepared: 11/20/2017 Prepared By: Kurt Cheng Suggested Citation: Cheng, K Freshwater Mussel Tagging, Release, and Monitoring. Partnership for the Delaware Estuary. PDE FMRP Method No pp. PDE-FMRP-Method (11/20/2017) Page 1

2 Freshwater Mussel Tagging, Release, and Monitoring Partnership for the Delaware Estuary (PDE) Freshwater Mussel Recovery Program Method Kurt Cheng Description This Freshwater Mussel Recovery Program Method (FMRPM) describes the general conduct of tagging, releasing, and monitoring freshwater mussels. Freshwater mussels are released following a collection and some form of tagging or data collection. Releases may be considered a natural release, tagged release, reintroduction, or a deployment into an underwater structure. Monitoring may be used to track mussels post release. Summary of Approach The general approach is to and tag release freshwater mussels into their natural habitat or some other suitable habitat, marking the end of a collection and/or the beginning of a restoration project. Tag and release data are recorded to allow for future monitoring purposes. Equipment Unique Plastic Tags Cyanoacrylate Disposable Gloves Clear Nail Polish Passive Integrated Transponder (PIT) Tags Marine Epoxy Small Wooden Dowels Forceps Paper Towels Scrub Brush Disposable plates Diving Mask PIT Tag Reader Waders Snorkel Swim fins Wetsuit Flotation Device Anchor weight Tether Datasheets Pen Clipboard Camera Handheld GPS unit Collection Bags Scientific Collection Permit Procedures 1. Permitting A freshwater mussel release will follow either a collection or other form of freshwater mussel procurement (e.g. hatchery propagation) and as such, a permit must be acquired for the initial collection as well as the ultimate release location of mussels (refer to FMRPM-01). 2. Tagging Mussels may be tagged before release with a plastic tag, PIT tag, or both. Tagging should match goals of the project and be appropriate for the size of mussel. Care must be exercised to only PDE-FMRP-Method (11/20/2017) Page 2

3 place cyanoacrylate or epoxy on face of valve, not on hinge or edge of valve. Wear gloves to keep hands free from tagging adhesives. Use a disposable plate as a work surface to contain adhesives. 2.1 Valve Preparation Prior to any tagging, mussel valves must be clean and free of debris. Use freshwater and a scrub brush to gently remove epiphytes or other debris from the valve. Let the mussel valve dry or pat dry with a towel before tagging. 2.2 Adhering Tags Plastic Tag To secure a plastic tag to a mussel valve, place a small bead of cyanoacrylate onto the desired spot where to adhere the tag to the valve. Then place the tag on top of the bead, adding more cyanoacrylate to cover the tag and hold with forceps or dowel until mostly dry. Once completely dry, add a layer of clear nail polish PIT Tag To secure a PIT tag to a mussel valve, create marine epoxy (generally a mix of two parts) and place a bead of epoxy on the valve using a wooden dowel. The bead should be the same size as the tag. Place the tag on top of the bead and push down, adding more epoxy to fully encase the tag. Roll the tag until completely covered in epoxy. Let the epoxy dry completely. Marine epoxy can cure underwater. 2.3 Recording Mussel and Tag Data Record the species and shell length (FMRPM-03) of each mussel. Additionally, record the plastic tag color and code. This can be done as adhesives dry. PIT tag information is recorded using a PIT tag reader. Turn on tag reader and press READ to identify each PIT tag. Record data on datasheet (Appendix A). If desired, split mussels into separate groups and record group numbers (Appendix B). 3. Holding Mussels If an immediate release is not possible after tagging, mussels may either be held in a water body with adequate flow or container with ambient water and sufficient aeration. Exercise care to keep epoxy from adhering to multiple mussels and tags from dislodging. PDE-FMRP-Method (11/20/2017) Page 3

4 4. Release Mussels may either be free released or deployed into a structure (e.g. cage, floating basket). Release type depends on project goals. When necessary, record release information on datasheet (Appendix C). 5. Monitoring 4.1 Free Release To free release a mussel, place the mussel back into its habitat with the anterior end sticking out of the substrate. If unsure of mussel orientation, lay the mussel on its side. Where necessary, mussels can be dropped into the water where they will sink to the bottom. Avoid burying mussels. 4.2 Release through Deployment To deploy mussels into a structure, install the structure and place mussels securely inside. If deploying in a partly buried cage, ensure enough space is available for normal mussel movement to avoid burying. Place mussel into substrate such that the anterior end protrudes out of the substrate. If unsure of mussel orientation, lay the mussel on its side. Monitor mussels by surveying for their presence or absence. If found, record mussel tag information and mussel shell length (FMRPM-03). Harvest mussels for further analysis or returned to their habitat. Monitor water quality in tandem with mussels (FMRPM-04). Record all observations on a datasheet (Appendix D). 5.1 Free Release Survey Free released mussels are monitored by hand or using a collection tool such as a clam rake. If the mussels were tagged with PIT tags, a PIT tag reader can aid in detection. The PIT tag surveyor sweeps back and forth along the release bed to detect all mussels. When a mussel is detected, it is removed from the substrate and the surveyor sweeps the area once more to ensure depletion. 5.2 Deployment Survey Monitor mussels within structures by removing any securing devices and removing mussels. Harvest mussels or return to structure after recording tag information and shell length. Note biofouling and other conditions that may affect structure and mussels. PDE-FMRP-Method (11/20/2017) Page 4

5 Appendix A Freshwater Mussels: TAGGING Source Stream: Date: Collection Personnel: Tagging Personnel: Page of Species Plastic Tag ID PIT Tag ID Shell Length (mm) 5x Species Plastic Tag ID PIT Tag ID Shell Length (mm) Notes: PDE-FMRP-Method (11/20/2017) Page 5

6 Appendix B Page of Freshwater Mussels: GROUPING ASSIGN group numbers and RECORD plastic tag IDs for each group column. (Deploy stream & bed # recorded deployment day) Source Stream: Date: Grouping Personnel: Deploy Stream Deploy Bed # Notes: Group Group Group Group Group Group Group Group Group PDE-FMRP-Method (11/20/2017) Page 6

7 Appendix C Freshwater Mussels: DEPLOYMENT Complete one datasheet for EACH deployment site Date: Stream: Field Personnel: Time Start: Time End: Positioning Data Waypoint Name: Sub-site 1 Coordinates Sub-site 3 Coordinates Site Coordinates (Demical ): Sub-site 2 Coordinates Sub-site 4 Coordinates Water Quality Data Air Temp C: Water Temp C: Conductivity (ms/cm): Salinity (ppt): Turbidity (NTU): DO: ph: Mussel Bag/Group # Free draw full site and LABEL sub-sites PDE-FMRP-Method (11/20/2017) Page 7

8 Appendix D Freshwater Mussels: MONITORING Complete one recovery survey data sheet for EACH subgroup within every survey stream (e.g. 5a, 5b ) Date: Stream: Waypoint / Subgroup: Field Personnel: Time Begin: Start Coordinates Time End: End Coordinates Water Quality Data Air Temp C: Water Temp C: Conductivity (ms/cm): Salinity (ppt): Turbidity (NTU): DO: ph: Recovered Mussel Data (if applicable) Tag ID PIT Tag ID Species Shell Height (mm) Dead/Alive Notes: PDE-FMRP-Method (11/20/2017) Page 8

Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017

Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017 PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017 Prepared By: Kurt Cheng Suggested Citation: Cheng, K. 2017. Quantitative Freshwater Mussel

More information

Semi-Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017

Semi-Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017 PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Semi-Quantitative Frehwater Muel Survey Date Prepared: 11/20/2017 Prepared By: Kurt Cheng Suggeted Citation: Cheng, K. 2017. Semi-Quantitative Frehwater

More information

Water Quality Monitoring Using a Handheld Sonde for in situ Measurements Date Prepared: 11/17/2017

Water Quality Monitoring Using a Handheld Sonde for in situ Measurements Date Prepared: 11/17/2017 PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Water Quality Monitoring Using a Handheld Sonde for in situ Measurements Date Prepared: 11/17/2017 Prepared By: Kurt Cheng Suggested Citation: Cheng,

More information

Safety Office. Reviewed: 17 July 2012

Safety Office. Reviewed: 17 July 2012 Safety Office Reviewed: 17 July 2012 Reviewed: DD Month Decontamination procedures This circular contains expanded guidance on the action which should be taken in the event of an incident involving radioactive

More information

I. Monitoring and Adaptive Management Approach. Potential Effects, Monitoring Studies & Mitigation

I. Monitoring and Adaptive Management Approach. Potential Effects, Monitoring Studies & Mitigation I. Monitoring and Adaptive Management Approach Define the problem or management objective. Determine potential effects of the project on indicator species. Emphasis on examining potentially negative, rather

More information

Bioerosion Monitoring Unit (BMU) SOP

Bioerosion Monitoring Unit (BMU) SOP Bioerosion Monitoring Unit (BMU) SOP I. Purpose II. Construction and predeployment analysis a. Materials b. Assembly procedure III. Deployment directions a. Materials b. Dive preparation c. Dive operation

More information

New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district

New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district New two-lane bridge to replace the existing structure spanning the Maple River just south of the Village s central business district Rehabilitate the old bridge Convert to a nonmotorized trail Restore

More information

What You ll Learn. Image credit, Bryan Fluech

What You ll Learn. Image credit, Bryan Fluech What You ll Learn 1. Useful information on scalloping regulations, safety, and handling practices 2. Basic biology and life history of the bay scallop 3. How bay scallop populations are monitored in Florida

More information

ATL 6.6 R/V ATLANTIS SWIMMER QUALIFICATIONS

ATL 6.6 R/V ATLANTIS SWIMMER QUALIFICATIONS 1. Purpose The purpose of this procedure is to set forth the requirements for a swimmer to qualify for Alvin Operations on the R/V Atlantis. The launch and recovery of the submersible, DSV Alvin, requires

More information

Rescue Technician: Dive Rescue I

Rescue Technician: Dive Rescue I Rescue Technician: Dive Rescue I Skill Sheet Package Based on NFPA 1006: Standard for Technical Rescue Professional Qualifications,. Alabama Fire College March 2015 REVISED 02/10/2017 Alabama Fire College

More information

Oyster Bed Mapping in the Great Bay Estuary,

Oyster Bed Mapping in the Great Bay Estuary, University of New Hampshire University of New Hampshire Scholars' Repository PREP Reports & Publications Institute for the Study of Earth, Oceans, and Space (EOS) 6-26-2013 Oyster Bed Mapping in the Great

More information

Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application

Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application Rising Tide Oyster Company 2.0 Acre Bellamy Site Marine Aquaculture License Application Joshua and Jessica Carloni 264 Swain Road Barrington, N.H. 03825 Summary This is an amendment to our existing license

More information

Protocol 1. Site Conditions Data Sheet

Protocol 1. Site Conditions Data Sheet Protocol 1. Site Conditions Data Sheet Field monitoring Initial Observations Name of site or water body: Coordinates: Date of monitoring: Time of monitoring: Name of monitor(s): (names of all group members)

More information

Savannah Harbor Expansion Project

Savannah Harbor Expansion Project Savannah Harbor Expansion Project SHEP Progress Report April 1 st April 30 th 2016 Task 1: SCDNR would acquire and insert 10 sonic transmitters per year into Atlantic sturgeon in the Savannah River Estuary

More information

Got Mussels? Freshwater Mussel Volunteer Survey Program

Got Mussels? Freshwater Mussel Volunteer Survey Program Got Mussels? Freshwater Mussel Volunteer Survey Program 1 What kind of mussels are we talking about? Umm.. Not these! And not these either (Saltwater musselsyummmmmm) Freshwater mussels! -Bivalves (meaning

More information

Performance Report. B. Project Title: Evaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project

Performance Report. B. Project Title: Evaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project Performance Report A. Grantee: S. C. Department of Natural Resources B. Project Title: Evaluating Atlantic and Shortnose Sturgeon Behavior Related to the Savannah Harbor Expansion Project C. Principle

More information

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015

EPA R6 Dive Team Operations Report. San Jacinto Waste Pits Channelview, TX December 9-10, 2015 EPA R6 Dive Team Operations Report San Jacinto Waste Pits Channelview, TX December 9-10, 2015 BACKGROUND The San Jacinto River Waste Pit Site history has been documented in several documents prepared for,

More information

Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood

Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood Consigned to the deep: requiem or recovery of VR2W receivers in a freshwater river gorge after a 1:2-3 3 year ARI flood 1 Ivars Reinfelds, 2,3 Chris Walsh and 1 Tim Haeusler 1 Department of Water and Energy,

More information

Method for HOBO Water Level Logger Deployment and Assessing Hydroperiods on Tidal Marsh Platforms

Method for HOBO Water Level Logger Deployment and Assessing Hydroperiods on Tidal Marsh Platforms PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Method for HOBO Water Level Logger Deployment and Assessing Hydroperiods on Tidal Marsh Platforms Date Prepared: 09/26/2016 Prepared By: LeeAnn Haaf Suggested

More information

LAKE JESUP VEGETATION MAPPING: AN INTER-AGENCY COLLABORATION. Lakshmi Sankaran, GISP Public Works Department, Seminole County

LAKE JESUP VEGETATION MAPPING: AN INTER-AGENCY COLLABORATION. Lakshmi Sankaran, GISP Public Works Department, Seminole County LAKE JESUP VEGETATION MAPPING: AN INTER-AGENCY COLLABORATION Lakshmi Sankaran, GISP Public Works Department, Seminole County LAKE JESUP Area - 12 sq miles Shoreline - 53 miles Watershed - 136 sq miles

More information

Manual for Volunteers

Manual for Volunteers Monitoring for Invasive Phytophthora Species in Western Washington Streams 2011 Manual for Volunteers Modified from Fishing for Phytophthora in Western Australia s Waterways by Dr. Daniel Huberli and A.

More information

Location: Barkley Canyon Date: September 9, 2013 Constraints: none

Location: Barkley Canyon Date: September 9, 2013 Constraints: none Page 1 of 11 DIVE PLAN R1650 Location: Barkley Canyon Date: September 9, 2013 Constraints: none Objectives Deploy POD 1 autonomous CTD Survey POD 3 for sediment enrichment sites; deposit cages; collect

More information

Saskatchewan Adult Invasive Mussel Monitoring (AIMM) Guide

Saskatchewan Adult Invasive Mussel Monitoring (AIMM) Guide Saskatchewan Adult Invasive Mussel Monitoring (AIMM) Guide Background Coordinated by the Government of Saskatchewan s Fish, Wildlife and Lands Branch, the Adult Invasive Mussel Monitoring (AIMM) Program

More information

NATIVE OYSTER RESTORATION AT ELKHORN SLOUGH, CALIFORNIA Summary of Elkhorn Slough National Estuarine Research Reserve and Elkhorn Slough Foundation

NATIVE OYSTER RESTORATION AT ELKHORN SLOUGH, CALIFORNIA Summary of Elkhorn Slough National Estuarine Research Reserve and Elkhorn Slough Foundation NATIVE OYSTER RESTORATION AT ELKHORN SLOUGH, CALIFORNIA Summary of Elkhorn Slough National Estuarine Research Reserve and Elkhorn Slough Foundation partnership project Pain%ng by Cory and Catska Ench,

More information

HOW TO DIG A TEST PIT

HOW TO DIG A TEST PIT HOW TO DIG A TEST PIT An archaeological test pit is a small 1m by 1m trench dug in a series of layers, or spits, to a depth of approximately 1m. The archaeological materials collected from these layers

More information

Lesson 10: Oyster Reefs and Their Inhabitants

Lesson 10: Oyster Reefs and Their Inhabitants Lesson 10: Oyster Reefs and Their Inhabitants Focus Question: What animals use oyster reefs for habitats? Objective: observe properties of animals found within a bag of oysters; Infer about the quality

More information

CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY

CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY CALCIFICATION ACCRETION UNIT (CAU) ASSEMBLY, DEPLOYMENT AND RECOVERY Purpose: CAUs are deployed on the seafloor for up to three years in order to detect changes in net reef accretion. I. CAU Assembly -CAU

More information

Mussel tagging methods

Mussel tagging methods Mussel tagging methods Dan Hua, Chris Barnhart, Todd Fobian, Monte McGregor, Jeremy Tiemann, Frankie Thielen, Haibo Wen Mussel propagation workshop FMCS 2015 Symposium St. Charles, Missouri - March 22,

More information

Alberta Conservation Association 2013/14 Project Summary Report

Alberta Conservation Association 2013/14 Project Summary Report Alberta Conservation Association 2013/14 Project Summary Report Project Name: Clearwater River Core Area Bull Trout Status Fisheries Program Manager: Peter Aku Project Leader: Mike Rodtka Primary ACA staff

More information

Essential Fish Habitat Description Atlantic herring (Clupea harengus)

Essential Fish Habitat Description Atlantic herring (Clupea harengus) Description Atlantic herring (Clupea harengus) In its Report to Congress: Status of the Fisheries of the United States (September 1997), NMFS determined Atlantic herring is not currently overfished. This

More information

Volunteer and Internships Programs ECUADOR

Volunteer and Internships Programs ECUADOR Volunteer and Internships Programs ECUADOR Equilibrio Azul is a non-for profit organization created in 2005 to protect the marine resources of Ecuador. Our mission is to integrate local communities, governmental

More information

Welcome to Paddle for the Edge!

Welcome to Paddle for the Edge! Welcome to Paddle for the Edge! Thank you for volunteering to conduct a survey of the Barnegat Bay s shorelines. As a citizen scientist, you become part of a project to collect critical data about current

More information

Restoration of Eelgrass to Upper Casco Bay: Feasibility Tests in Hilary A. Neckles US Geological Survey Augusta, ME

Restoration of Eelgrass to Upper Casco Bay: Feasibility Tests in Hilary A. Neckles US Geological Survey Augusta, ME Restoration of Eelgrass to Upper Casco Bay: Feasibility Tests in 2015 Hilary A. Neckles US Geological Survey Augusta, ME hneckles@usgs.gov Robert J. Orth Eelgrass: Zostera marina * marine flowering plant

More information

DECAL APPLICATION INSTRUCTIONS

DECAL APPLICATION INSTRUCTIONS DECAL APPLICATION INSTRUCTIONS 1. Measure where you want your decal to be. Then tape in place on 1 side only to use as a hinge, using regular masking tape. Place your tape on the top, bottom or either

More information

Inert Atmosphere Guide

Inert Atmosphere Guide Inert Atmosphere Guide The UV curing of acrylate monomers is a free radical polymerization process in which UV radiation is absorbed and activates a certain type of molecules, photoinitiators. The activated

More information

DOD Legacy Project No Contract No. HQ Dr. Paul Ayers, Emine Fidan, Mary Beth Iannuzzi University of Tennessee

DOD Legacy Project No Contract No. HQ Dr. Paul Ayers, Emine Fidan, Mary Beth Iannuzzi University of Tennessee Habitat Mapping for Aquatic Species at Risk on Military Installations using GPS based Underwater Video DOD Legacy Project No. 15 776 Contract No. HQ0034 15 2 0012 Dr. Paul Ayers, Emine Fidan, Mary Beth

More information

API Study on Detection and Recovery of Sunken Oil. API Study Objectives

API Study on Detection and Recovery of Sunken Oil. API Study Objectives API Study on Detection and Recovery of Sunken Oil Jacqueline Michel, Research Planning, Inc. Mark Ploen, QualiTech Jim Elliott, T&T Marine Salvage, Inc. William Key API Study Objectives 1. ID current best

More information

ATTACHMENT F. Minnesota Department of Natural Resources. Marsh Lake Ecosystem Restoration Project

ATTACHMENT F. Minnesota Department of Natural Resources. Marsh Lake Ecosystem Restoration Project ATTACHMENT F Minnesota Department of Natural Resources Marsh Lake Ecosystem Restoration Project Mussel Rescue and Translocation Plan for Pomme de Terre River Restoration (Prepared June, 2016) Attachment

More information

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey

Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA 92660 Eelgrass (Zostera marina) Survey Survey Date: July 19th, 2013 Report Date: July 26 th, 2013 Prepared by: Coastal Resources Management,

More information

Chateaugay Lakes Milfoil Control Program

Chateaugay Lakes Milfoil Control Program Chateaugay Lakes Milfoil Control Program Summary of Activities and Findings for June August 29 Prepared By: Daniel L. Kelting Executive Director Adirondack Watershed Institute Paul Smith's College P.O.

More information

Avery Dennison Instructional Bulletin 1.4 Application Methods for Pressure Sensitive Adhesive Films

Avery Dennison Instructional Bulletin 1.4 Application Methods for Pressure Sensitive Adhesive Films Rev. 2 (April 2016) Avery Dennison Instructional Bulletin 1.4 Application Methods for Pressure Sensitive Adhesive Films Introduction Avery Dennison pressure sensitive adhesive films are available in a

More information

CORALS OF OPPORTUNITY AS A RESTORATION TOOL

CORALS OF OPPORTUNITY AS A RESTORATION TOOL P CORALS OF OPPORTUNITY AS A RESTORATION TOOL Monitoring Manual Prepared by: Anne Chung, Jessica Hintzsche University of Hawaii, Hawaii Coral Reef Initiative 0 Contents Introduction... 2 Monitoring Plan...

More information

Overview of temperature protocols

Overview of temperature protocols Overview of temperature protocols 10:55-11:10 Water temperature - Jen Stamp (Tt), Aaron Moore (VT DEC) 11:10-11:25 Air temperature - Zack Holden (USFS) Water Resources Research Center Workshop: Continuous

More information

MINNESOTA FRESHWATER MUSSEL SURVEY AND RELOCATION PROTOCOL

MINNESOTA FRESHWATER MUSSEL SURVEY AND RELOCATION PROTOCOL MINNESOTA FRESHWATER MUSSEL SURVEY AND RELOCATION PROTOCOL Minnesota Department of Natural Resources, Division of Ecological and Water Resources U.S. Fish and Wildlife Service, Twin Cities Field Office

More information

3. Intro to Tech. 3.1 Introduction. 3.2 Qualifications of Graduates. 3.3 Who May Teach. 3.4 Student to Instructor Ratio

3. Intro to Tech. 3.1 Introduction. 3.2 Qualifications of Graduates. 3.3 Who May Teach. 3.4 Student to Instructor Ratio 3. Intro to Tech 3.1 Introduction The TDI Intro to Tech course introduces students to the world of technical diving. This course is designed as an introductory course to the TDI Advanced Nitrox course

More information

R & E Grant Application Biennium

R & E Grant Application Biennium R & E Grant Application 05-07 Biennium Project #: 05-141 Project Information R&E Project Request: $50,000.00 Match Funding: $36,500.00 Total Project: $86,500.00 Start Date: 3/1/2007 End Date: 6/30/2007

More information

Week 1 Task Note. NB. How to hold the stick and push the puck Tog out and pool side equipment check. Stick, hat, fins, mask, snorkel, glove

Week 1 Task Note. NB. How to hold the stick and push the puck Tog out and pool side equipment check. Stick, hat, fins, mask, snorkel, glove Week 1 Task Note 7.30-7.45 1. Disclaimer form 2. Payment collection 3. Brief description of the course and objectives. 4. What are we doing tonight? 5. A brief talk about how the game is played 6. Rules

More information

We currently conduct the Underwater Skills Program as follows:

We currently conduct the Underwater Skills Program as follows: 529 Upper Sherman Avenue Hamilton, Ontario L8V 3L9 905.385.0300 www.recandtekscuba.com mitch@recandtekscuba.com 2018 JOINING INSTRUCTIONS We currently conduct the Underwater Skills Program as follows:

More information

Junior Park Warden Reef Discovery Site

Junior Park Warden Reef Discovery Site Junior Park Warden Reef Discovery Site Reef Ball Restoration Project 2012 Sponsored by: Submitted By: Marsha Pardee and John Walch September 11, 2012 1 P a g e For 5 days in June 2012, Marsha Pardee and

More information

CB-40 Data Buoy Quick Start Guide

CB-40 Data Buoy Quick Start Guide CB-40 Data Buoy Quick Start Guide The NexSens CB-40 Data Buoy offers a compact and affordable platform for deploying water quality sondes and other instruments that integrate power and data logging. The

More information

Habitat use, site fidelity, and growth of juvenile black sea bass, Centropristis striata, in the Maryland Coastal Bays using mark-recapture

Habitat use, site fidelity, and growth of juvenile black sea bass, Centropristis striata, in the Maryland Coastal Bays using mark-recapture Habitat use, site fidelity, and growth of juvenile black sea bass, Centropristis striata, in the Maryland Coastal Bays using mark-recapture Rebecca Peters and Paulinus Chigbu University of Maryland Eastern

More information

Institute of Marine Research

Institute of Marine Research Institute of Marine Research CRUISE REPORT NO. ** R/V G.O. Sars Cruise No. 2005108 9 th June 24 th June 2005 Coral survey off Northern Norway Principal Scientist J. H. Fosså 2005 Benthic Habitat Research

More information

Jason Blackburn, Paul Hvenegaard, Dave Jackson, Tyler Johns, Chad Judd, Scott Seward and Juanna Thompson

Jason Blackburn, Paul Hvenegaard, Dave Jackson, Tyler Johns, Chad Judd, Scott Seward and Juanna Thompson Alberta Conservation Association (ACA) Date: 2014-2015 Project Name: Owl River Walleye and Aquatic Habitat Assessment Fisheries Program Manager: Peter Aku Project Leader: Tyler Johns Primary ACA staff

More information

Before you begin your job you will need: Tiling Hints: Factory Tile:

Before you begin your job you will need: Tiling Hints: Factory Tile: Before you begin your job you will need: 1. Solvent = Alcohol or Acetone 2. Pencil 3. Single edge razor blades 4. Small water pail 5. Liquid dish soap 6. Role of paper towels 7. Caulking gun 8. Use a wooden

More information

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan Appendix C Derelict Gear Monitoring Plan ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 DERELICT GEAR MONITORING PLAN (submitted with the Final Application for a New Pilot Project License)

More information

XRAY GLIDER Underwater Video Cruise Plan May 21, 22, 23, 2007 R. G. Sproul

XRAY GLIDER Underwater Video Cruise Plan May 21, 22, 23, 2007 R. G. Sproul XRAY GLIDER Underwater Video Cruise Plan May 21, 22, 23, 2007 R. G. Sproul Purpose The ONR program manager for the XRAY/Liberdade underwater flying wing glider has requested that an underwater video of

More information

The Oyster in Oyster Bay: Glaciers Set the Table

The Oyster in Oyster Bay: Glaciers Set the Table The in Bay: Glaciers Set the Table In cooperation with NYS Department of Environmental Conservation Bay Long Island was created about 15,000 years ago when the last of the glaciers melted leaving behind

More information

lwoods Hole Oceanographic Institution Woods Hole, MASSACHUSETTS U.S.A.

lwoods Hole Oceanographic Institution Woods Hole, MASSACHUSETTS U.S.A. BENTHIC MARICULTURE AND RESEARCH RIG DEVELOPED FOR DIVER OPERATIONS G.R. Hampsonl D.C. Rhoads2 D.W. Clark3 lwoods Hole Oceanographic Institution 2Science Applications International Corp. 89 Water Street

More information

Exhibit Diving. Revised December 5, 2012

Exhibit Diving. Revised December 5, 2012 Exhibit Diving Revised December 5, 2012 Arnold Postell Senior Biologist / Dive Safety Officer Work: (843) 579-8536 Email: apostell@scaquarium.org January 29, 2007 It is the mission of the South Carolina

More information

AQUACULTURE INDUSTRY METHODS. Seeding Site Prep & Mtnce Planting & Harvesting

AQUACULTURE INDUSTRY METHODS. Seeding Site Prep & Mtnce Planting & Harvesting AQUACULTURE INDUSTRY METHODS Species & Method Longline Seeding Site Prep & Mtnce Planting & Harvesting Mature larvae are placed in tanks where they are allowed to settle out onto screens or cultch. Seawater

More information

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell:

Steve Hemstrom Sr. Fisheries Biologist Chelan PUD Natural Resources Desk: Cell: From: To: Cc: Subject: Date: Attachments: Hemstrom, Steven "Lewis, Stephen" Sokolowski, Rosana 2014 Rocky Reach Bull Trout Report Wednesday, June 18, 2014 3:01:07 PM Final 2014 Rocky Reach Bull Trout Observations

More information

OTUMOETAI COLLEGE NCEA MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018

OTUMOETAI COLLEGE NCEA MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018 OTUMOETAI COLLEGE MARINE STUDIES LEVEL 2 & 3 (L2 & L3MAST) 2018 MARINE STUDIES L2MAST Course Relationship to the National Vocational Pathways Construction & Infrastructure Course Entry Course Overview

More information

PLANNING A TRIP TO THE SEASHORE CHECK LIST

PLANNING A TRIP TO THE SEASHORE CHECK LIST PLANNING A TRIP TO THE SEASHORE CHECK LIST Action: 1. Access / Facilities 2. Risk Assessment 3. First Aid / Emergency 4. Tide Tables / Changing Tides / Weather forecast 5. Volunteers 6. Plan the Day of

More information

O'opu Prints and Dissections

O'opu Prints and Dissections O'opu Prints and Dissections Tina Alcain Konawaena High School HCPS III Science Standards Addressed: SC.BS.4.6 Grade Level: 9 th -12th Project Time Span: 2-3 class periods To The Teacher: This lesson is

More information

Shellfish Division Annual Shellfish Resource Management Regulations

Shellfish Division Annual Shellfish Resource Management Regulations Shellfish Division 2017-2018 Annual Shellfish Resource Management Regulations September 10, 2018 1 TOWN OF FALMOUTH OYSTER REGULATIONS 2018-2019 SEASON Family/Recreational: Between October 1, 2018 and

More information

Identifying Critical Habitat of the Brook Floater in the Shediac Bay Watershed

Identifying Critical Habitat of the Brook Floater in the Shediac Bay Watershed Identifying Critical Habitat of the Brook Floater in the Shediac Bay Watershed Prepared for: New-Brunswick Wildlife Trust Fund Prepared by: Jolyne Hébert, Environmental Technician Shediac Bay Watershed

More information

Freshwater Mussels of the Delaware Estuary

Freshwater Mussels of the Delaware Estuary Freshwater Mussels of the Delaware Estuary Identification Guide & Volunteer Survey Guidebook MAP OF THE DELAWARE ESTUARY POTTSVILLE Maiden Creek are River w Dela READING Pennsylvania River Schuylkill POTTSTOWN

More information

Weedy Seadragon Ecology Project. Annual Report Underwater Research Group of NSW Fish Ecology Lab, UTS

Weedy Seadragon Ecology Project. Annual Report Underwater Research Group of NSW Fish Ecology Lab, UTS Weedy Seadragon Ecology Project Annual Report 2015 Underwater Research Group of NSW Fish Ecology Lab, UTS 1. Summary UTS and URG forged an informal partnership in 2015, to further the seadragon research

More information

Intro to Tech Instructor

Intro to Tech Instructor Intro to Tech Instructor 1 Introduction The TDI Intro to Tech Instructor course provides the training required to competently and safely introduce students to the world of technical diving. The objective

More information

Larval razorback sucker and bonytail survival and growth in the presence of nonnative fish in the Baeser floodplain wetland of the middle Green River.

Larval razorback sucker and bonytail survival and growth in the presence of nonnative fish in the Baeser floodplain wetland of the middle Green River. Larval razorback sucker and bonytail survival and growth in the presence of nonnative fish in the Baeser floodplain wetland of the middle Green River. Ronald E. Brunson and Kevin D. Christopherson FINAL

More information

FLOW MEASUREMENT (SEMI-SUBMERGIBLE OBJECT METHOD)

FLOW MEASUREMENT (SEMI-SUBMERGIBLE OBJECT METHOD) Page 83 of 232 OKLAHOMA CONSERVATION COMMISSION WATER QUALITY DIVISION STANDARD OPERATING PROCEDURE FLOW MEASUREMENT (SEMI-SUBMERGIBLE OBJECT METHOD) Page 84 of 232 1.0 PROCEDURAL SECTION 1.1 Scope and

More information

BAYKEEPER. Utilizing Volunteers in Baykeeper s Oyster Restoration Program

BAYKEEPER. Utilizing Volunteers in Baykeeper s Oyster Restoration Program NY/NJ BAYKEEPER Utilizing Volunteers in Baykeeper s Oyster Restoration Program Meredith Comi, Oyster Restoration Program Director Hooked on our Waters October 19, 2013 Baykeeper s Mission PROTECT, PRESERVE,

More information

Fine-Scale Survey of Right and Humpback Whale Prey Abundance and Distribution

Fine-Scale Survey of Right and Humpback Whale Prey Abundance and Distribution DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Fine-Scale Survey of Right and Humpback Whale Prey Abundance and Distribution Joseph D. Warren School of Marine and Atmospheric

More information

ALERT SERVICE LETTER

ALERT SERVICE LETTER Citation TITLE ALERT SERVICE LETTER ASL750-35-04 OXYGEN - TRANSMITTAL OF AVOX SYSTEMS SERVICE INSTRUCTION 833-35-01 REVISION D, REPACKING PROCEDURES FOR 289 PASSENGER OXYGEN MASKS EFFECTIVITY MODEL SERIAL

More information

PROCEDURE FOR MONITORING AN AQUATIC PLANT PROBLEM 1

PROCEDURE FOR MONITORING AN AQUATIC PLANT PROBLEM 1 PROCEDURE FOR MONITORING AN AQUATIC PLANT PROBLEM 1 The density, diversity, and growth patterns of aquatic plants are unique to each lake. Therefore, many of the details concerning sample site locations

More information

2014 Threatened and Endangered Fish Survey of. East Loon Lake and West Loon Lake. Lake County, Illinois

2014 Threatened and Endangered Fish Survey of. East Loon Lake and West Loon Lake. Lake County, Illinois 2014 Threatened and Endangered Fish Survey of East Loon Lake and West Loon Lake Lake County, Illinois Prepared by Integrated Lakes Management 120 LeBaron St. Waukegan, IL 60085. Chris Ryan Chris Rysso

More information

Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4)

Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4) Alberta Conservation Association (ACA) Date: 2014-2015 Project Name: Distribution and Abundance of the Migratory Bull Trout Population in the Castle River Drainage (Year 4 of 4) Fisheries Program Manager:

More information

METHODS REPORT: Fish Taging

METHODS REPORT: Fish Taging Mactaquac Aquatic Ecosystem Study Report Series 2015-021 METHODS REPORT: Fish Taging Mark Gautreau, Ben Wallace, and Tommi Linnansaari 28 July 2015 Correct citation for this publication: Gautreau, M.,

More information

FIGURE 1. TOTAL LENGTH OF FISH, IN THIS CASE A PILE PERCH, IS MEASURED FROM MOUTH TO TIP OF TAIL (ILLUSTRATION LARRY G. ALLEN).

FIGURE 1. TOTAL LENGTH OF FISH, IN THIS CASE A PILE PERCH, IS MEASURED FROM MOUTH TO TIP OF TAIL (ILLUSTRATION LARRY G. ALLEN). Fish Transect Updates- 2013 Sizing Fish Before discussing how to size fish underwater, we must have a picture of what we are measuring. For the purposes of Reef Check California, we will be measuring total

More information

ZEBRA MUSSEL MONITORING Guidelines for Stream Teams

ZEBRA MUSSEL MONITORING Guidelines for Stream Teams ZEBRA MUSSEL MONITORING Guidelines for Stream Teams How Stream Teams can help track the status of Missouri s latest threat to streams and lakes Zebra Mussels Are Here! Missouri has had its share of exotic

More information

Lesson Topic 3.1 Approaches & Carries

Lesson Topic 3.1 Approaches & Carries Lesson Topic 3.1 Approaches & Carries FRONT SURFACE APPROACH Approach survivor Utilizing modified crawl or breast stroke Head out of the water eyes on the survivor Execute quick reverse Arms length away

More information

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400

Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A Task 400 Memorandum 40600-HS-MEM-55036 Revision 0 Date: 26 July 2018 Subject: Eelgrass and Macroalgae Presence/Absence Preliminary Surveys BHP Proposed Grays Harbor Potash Export Facility A17.0202.00 Task 400 INTRODUCTION

More information

BULL TROUT OPERATIONAL PLAN

BULL TROUT OPERATIONAL PLAN BULL TROUT OPERATIONAL PLAN ROCKY REACH HYDROELECTRIC PROJECT FERC Project No. 2145 April 10, 2001 Public Utility District No. 1 of Chelan County Wenatchee, Washington BULL TROUT OPERATIONAL PLAN This

More information

13. Advanced Trimix Diver

13. Advanced Trimix Diver 13. Advanced Trimix Diver 13.1 Introduction The TDI Advanced Trimix course provides the training required to competently and safely utilize breathing gases containing helium for dives that require staged

More information

Shellfish Lease Program. February 13, Department of Environmental Quality

Shellfish Lease Program. February 13, Department of Environmental Quality Shellfish Lease Program February 13, 2016 Department of Environmental Quality NC Shellfish Lease History The State of North Carolina has provided for the private use of public trust waters for the production

More information

Fine-scale Focal DTAG Behavioral Study in the Gulf of Maine

Fine-scale Focal DTAG Behavioral Study in the Gulf of Maine DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Fine-scale Focal DTAG Behavioral Study in the Gulf of Maine Alessandro Bocconcelli Woods Hole Oceanographic Institution

More information

Test of new underwater television towed cone and new television sled off Redondo Beach, STRAIGHT ARROW II, 8 July 1975.

Test of new underwater television towed cone and new television sled off Redondo Beach, STRAIGHT ARROW II, 8 July 1975. Appendix D SAMPLING AT SEA During the past year. Project personnel conducted or participated in 109 cruises involving a total of 283 man-days at sea. The cruises are described below. Retrieval and installation

More information

Field Manual. Simple by Design

Field Manual. Simple by Design Simple by Design US Patents No. 6,481,300; No. 6,837,120; others pending Field Manual The HydraSleeve is a simple tool. In keeping with the Simple by Design motto, these are the basic instructions. Please

More information

California Steelhead: Management, Monitoring and Recovery Efforts

California Steelhead: Management, Monitoring and Recovery Efforts California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Management, Research and Restoration Program Oncorhynchus mykiss irideus California Steelhead - Hot Topics Implementation

More information

Lingcod* Culture. * and friends. Aquaculture Program Northwest Fisheries Science Center NOAA Fisheries Service Seattle, Washington

Lingcod* Culture. * and friends. Aquaculture Program Northwest Fisheries Science Center NOAA Fisheries Service Seattle, Washington Lingcod* Culture * and friends Aquaculture Program Northwest Fisheries Science Center NOAA Fisheries Service Seattle, Washington Outline Who and what we do Approach Lingcod Culture methods NWFSC Aquaculture

More information

PENNSYLVANIA COASTAL RESOURCES MANAGEMENT PROGRAM

PENNSYLVANIA COASTAL RESOURCES MANAGEMENT PROGRAM PENNSYLVANIA COASTAL RESOURCES MANAGEMENT PROGRAM FINAL REPORT Connecting People to Aquatic Biodiversity: Freshwater Mussel Surveys in Pennsylvania's Coastal Zone CZM:2011-PD.04 Completed: March 31, 2013

More information

Manta Tour Operator Standards Kona, Hawaii Drafted by Manta Tour Operators as a Voluntary Standards Finalized March 2013

Manta Tour Operator Standards Kona, Hawaii Drafted by Manta Tour Operators as a Voluntary Standards Finalized March 2013 Manta Tour Operator Standards Kona, Hawaii Drafted by Manta Tour Operators as a Voluntary Standards Finalized March 2013 The purpose of the Manta Tour Operator Standards is to increase the safety of manta

More information

Summary of Research within Lamlash Bay No-Take Zone - Science report for COAST July

Summary of Research within Lamlash Bay No-Take Zone - Science report for COAST July Summary of Research within Lamlash Bay No-Take Zone - Science report for COAST July 2013 - *Picture of a spider crab (Macropodia spp) inside a plumose anemone. Taken within Lamlash Bay No-Take Zone by

More information

OVERVIEW OF AN EXPERIMENTAL RELEASE METHOD OF THE SILVER SEA BREAM IN THE LAGOON AT ALBION (PETITE RIVIÈRE BAY)

OVERVIEW OF AN EXPERIMENTAL RELEASE METHOD OF THE SILVER SEA BREAM IN THE LAGOON AT ALBION (PETITE RIVIÈRE BAY) OVERVIEW OF AN EXPERIMENTAL RELEASE METHOD OF THE SILVER SEA BREAM IN THE LAGOON AT ALBION (PETITE RIVIÈRE BAY) ABSTRACT S Khadun, R Hassea, T Shimizu and H Iwamoto Albion Fisheries Research Centre A programme

More information

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019. MEMORANDUM Job No.10292 To: From: Jamie Cox, Wairoa District Council Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) Date: 11 September 2017 Subject: Task A2I2 Current Outfall Pipe Description

More information

Waikīkī Marine Life Conservation District Field Trip. September 14, 2012

Waikīkī Marine Life Conservation District Field Trip. September 14, 2012 Waikīkī Marine Life Conservation District Field Trip September 14, 2012 Aloha Students, On Friday, September 14, 2012 we re hoping to create an exciting and educational environment for everyone. The goal

More information

SWIFT WATER RESCUE PROCEDURES

SWIFT WATER RESCUE PROCEDURES SWIFTWATER RESCUE PROCEDURES Effective: 10-15-09 2900 Revision: 04-20-15 TFCA Best Practices: 4.05, 4.06 Fire Chief: Eric Thompson SWIFT WATER RESCUE PROCEDURES PURPOSE To provide procedures/guidelines

More information

EVOSTC ANNUAL PROJECT REPORT

EVOSTC ANNUAL PROJECT REPORT EVOSTC ANNUAL PROJECT REPORT Recipients of funds from the Exxon Valdez Oil Spill Trustee Council must submit an annual project report in the following format by Sept. 1 of each fiscal year for which project

More information

Biosecurity Protocol for Field Survey Work

Biosecurity Protocol for Field Survey Work Biosecurity Protocol for Field Survey Work Invasive species are an ever present threat in our aquatic and riparian systems and it is imperative that none of our field operations exacerbate the risks to

More information

STUDY PERFORMANCE REPORT

STUDY PERFORMANCE REPORT STUDY PERFORMANCE REPORT State: Michigan Project No.: F-35-R-24 Study No.: 682 Title: Pond rearing of juvenile lake sturgeon Period Covered: April 1, 1998 to September 30, 1999 Study Objective: To determine

More information