1 Enabling Magnetic Track Brakes on GB Mainline Rail RSSB Research Project T1099 Presentation to V/T SIC Annual Seminar, 31 st January 2017 Liam Purcell, Senior Consultant, Ricardo Rail

2 Introduction: What Are Magnetic Track Brakes? Magnetic Track Brakes (MTBs) are a form of brake, mounted on the bogie frame between the wheels When the MTB is lowered to contact the rail, a magnetic clamping force is developed between the MTB and the rail. Friction between the MTB and the rail creates a braking force which contributes to train deceleration. + Improve braking performance + Beneficial in low adhesion + Optional / complementary technology to sanders No benefit in traction Image credit Alan Lawton 2

3 What Did the Research Set Out To Achieve? MTBs widely used in Europe, and on GB Tramways: but not on GB Mainlines Why? Need a consistent approach. Called up by Infrastructure TSI The research is a precursor to the drafting of a new Railway Standard to enable the use of MTBs on GB Mainline Rail The project objective is to deliver a detailed feasibility assessment of MTB deployment on GB Mainline Rail, considering: Application scenario Cost-benefit analysis Technical compatibility Short timeframe (kick-off meeting to final deliverables in six months) 3

4 MTB Basics; Low vs High Suspension Low Suspension 6-12mm clearance Activated by energising electromagnet Time ~0.5 seconds More suited to Light Rail / Tram High Suspension mm clearance Activated by air cylinders Time ~ 2 seconds More suited to Mainline application Images credit Knorr Bremse 4

5 MTB Basics; Rigid vs Articulated Rigid Single piece pole shoe Simpler, cheaper Performance tails off with speed More suited to Light Rail / Tram Image credit Knorr Bremse Articulated End pieces and intermediate pieces Pieces can move to align conformably with the rail head More suited to Mainline applications Image credit Alan Lawton 5

6 MTB Basics; Operation & Specification Operation Current is passed through a coil wrapped around the pole pieces Magnetic field flows through railhead (via small air gaps) MTB tends to self-centre over the railhead Very little leakage of the magnetic field outside railhead Specification: Typically 1.2 m long Approximately 1 kw power consumption Magnetic attraction / clamping force 85kN Pole pieces steel / iron / sintered Eddy Current Brakes are fundamentally different! 6

7 MTB Basics; Example Performance: Normal & Low Adhesion Conventional Brakes (13%g) Low Adhesion: Conventional Brakes + every bogie with MTB (6.4%) Conventional Brakes + every fourth bogie with MTB (15.7%g) Low Adhesion: Conventional Brakes + every fourth bogie with MTB (3.1%) Conventional Brakes + every bogie with MTB (24%g) Low Adhesion: Conventional Brakes (2%) Emergency Braking Distance from 50mph Braking Distance From 50mph (Emergency Brake) Normal Adhesion Very Low Adhesion Normal Adhesion: Conventional Brakes + every bogie with MTB (24%) Conventional Brakes (2%g) Normal Adhesion: Conventional Brakes + every fourth bogie with MTB (15.7%) Conventional Brakes + every fourth bogie with MTB (3.1%g) Conventional Normal Adhesion: Brakes Conventional + every Brakes bogie (13%) with MTB (6.4%g) T1046 estimated 63% of low adhesion incidents prevented by a 1%g improvement MTBs might condition rail / remove contaminant 7

8 Project Approach Initial Questionnaire (29 responses from 33 recipients) 17 Readily Identified Mitigations Longitudinal Forces Proposed Mitigations Start Detailed Questionnaire (targeted 11 organisations) Industry Workshop (21 compatibility issues) Rail Discontinuities Switch Lifting Signalling Compatibility Compatibility Checklist Case Study (St Pancras to Corby) End Economic Case 8

9 Findings: Application Scenario The research recommends that MTBs should be allowed on GB Mainline Rail infrastructure Although use should be restricted such that they are only used as a supplementary brake in emergency braking scenarios Or in circumstances where a manual MTB application by the driver could avoid an emergency brake deployment The research recommends that MTBs should not be used for normal service braking 9

10 Project Impact and Benefits & Where to Find Out More Successful research project Identified the potential issues Developed mitigations for majority of issues Identified areas to focus on for technical compatibility Foundation for drafting a new Railway Standard to enable the use of MTBs on GB Mainline Rail The report and further information on RSSB project T1099 can be found on 10

Key. counterweight. Lifting capacities on outriggers 360. Superlift

Key. counterweight. Lifting capacities on outriggers 360. Superlift Specifications Dimensions Lifting capacities main boom with Superlift Lifting capacities main boom Working ranges main boom Working ranges main boom extension Working ranges fixed fly jib Working ranges

More information

SYDNEY TRAMWAY MUSEUM WORKING ON ELEVATED PLATFORMS PROCEDURE

SYDNEY TRAMWAY MUSEUM WORKING ON ELEVATED PLATFORMS PROCEDURE WORKING ON ELEVATED PLATFORMS PROCEDURE DECEMBER 2008JANUARY 2014 1. Document Details: SYDNEY TRAMWAY MUSEUM Document Control Record Name: Working On Elevated Platforms Procedure Number STM 6161 Version

More information

Automatic Warning System (AWS)

Automatic Warning System (AWS) Automatic Warning System Synopsis This document defines the functional, performance and application requirements for the Automatic Warning System. [This document contains one or more pages which contain

More information

REGIONAL MEETING ON HARMONISATION

REGIONAL MEETING ON HARMONISATION REGIONAL MEETING ON HARMONISATION ASTANA, KAZAKHSTAN 20-21 DECEMBER 2017 D.P Pande Asian Institute of Transport Development ( AITD), INDIA Minutes of Last Meeting had 3 catch phrases Advanced Information

More information

Table of Contents Documentation for PIT TROLLEY A4

Table of Contents Documentation for PIT TROLLEY A4 Table of Contents Documentation for PIT TROLLEY A4 Declaration of conformity 1 Safety instructions and routines to check for safety 2 Description of features and technical data 3 Assembly instructions

More information

DISCOVER NEW OPTIONS THE NEW GENERATION X

DISCOVER NEW OPTIONS THE NEW GENERATION X DISCOVER NEW OPTIONS THE NEW GENERATION X MULTIFUNCTIONAL ALL MOUNTAIN FRAME CONCEPT 3 VERSIONS: CARBON ALUMINIUM EMTB 3 WHEEL SIZES WITH TYRE WIDTH UP TO 3.00 IN 1 FRAME: TRAIL: 27.5 WHEELS TRACTION:

More information

User Manual. User Manual

User Manual. User Manual Thank you Thank you for buying RGK We hope the product and service you have received has met your expectations. Please take time to read the instructions contained within, to familiarise yourself with

More information

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Superseded by Iss 1.1 (to correct formatting) Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for assessing the driveability of lineside signalling

More information

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Document supersedes Iss 1 (to correct formatting) and supersedes in part GERT8071 Iss 2, Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for

More information

Hub Bearings for Automobiles that Conserve Resources

Hub Bearings for Automobiles that Conserve Resources New Product Hub Bearings for Automobiles that Conserve Resources Isao HIRAI Automotive parts are being expected to respond to environmental issues such as global warming and to effectively use natural

More information

Cantilever Brake. Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike

Cantilever Brake. Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike (English) DM-RCBR001-00 Dealer's Manual ROAD MTB Trekking City Touring/ Comfort Bike URBAN SPORT E-BIKE Cantilever Brake BR-CX70 BR-CX50 BL-4700 BL-4600 BL-R780 BL-R3000 ST-7900 ST-6700 ST-5700 ST-4600

More information

4. Guided Bus Explained

4. Guided Bus Explained 4. Guided Bus Explained Contents 1 INTRODUCTION... 2 Structure of this report... 2 2 KERB GUIDED BUS... 3 Overview... 3 Kerb guidance... 3 Figures Figure 2.1 Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5

More information

University of Huddersfield Repository

University of Huddersfield Repository University of Huddersfield Repository Bevan, Adam Wheel Damage Research Original Citation Bevan, Adam (2017) Wheel Damage Research. In: ICRI Workshop, 01/02/2017, London. (Unpublished) This version is

More information

NESC WORKSHOP Revisions to Part 4 (Work Rules) Sam Stonerock. October 18, 2016

NESC WORKSHOP Revisions to Part 4 (Work Rules) Sam Stonerock. October 18, 2016 NESC WORKSHOP 2017 Revisions to Part 4 (Work Rules) Sam Stonerock October 18, 2016 Work Rules for the Operation of Electric Supply and Communications Lines and Equipment 2017 edition Reconcile existing

More information

Infrastructure Standards Committee

Infrastructure Standards Committee Based on draft minutes Infrastructure Standards Committee 15 ovember 2017 Record of ecisions Minute o. Minutes of previous meetings 17/IS/11/184 General 17/IS/11/189 17/IS/11/191-194 17/IS/11/195 Minutes

More information

THE NEW ZEALAND CYCLE TRAIL APPLICATION FORM

THE NEW ZEALAND CYCLE TRAIL APPLICATION FORM THE NEW ZEALAND CYCLE TRAIL APPLICATION FORM PLEASE REFER TO THE NZCT S ROUTE PLANNING & SELECTION GUIDELINES & CYCLE T RAIL DESIGN G UIDE PRIOR TO COMPLETING THIS APPLICATION Post or email your proposal

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Accessory P/N 08L07-E09-100 Application 2013 ODYSSEY Publications No. AII 13265 Issue Date AUG 2012 Put this information in the glove box with the vehicle owner s manual. PARTS

More information

TeSys protection components

TeSys protection components Presentation, description -pole thermal overload relays TeSys D Presentation TeSys D thermal overload relays are designed to protect a.c. circuits and motors against: b overloads, b phase failure, b excessively

More information

TENSOREX C+ TENSOREX C+

TENSOREX C+ TENSOREX C+ Installation instruction TENSOREX C+ TENSOREX C+ is a new spring automatic tensioning device for tramway, light and heavy railways Overhead Contact Lines ( OCL ). TENSOREX Products are only by PFISTERER

More information

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014

Module TS8. One-train working regulations. GE/RT8000/TS8 Rule Book. Issue 4. March 2014 GE/RT8000/TS8 Rule Book Module TS8 One-train working s Issue 4 March 2014 Comes into force 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved by Traffic

More information

Installation and Training Manual

Installation and Training Manual AirForce1 Tower Kit Installation and Training Manual FuturEnergy Limited Ettington Park Business Centre Stratford upon Avon CV37 8BT +44 (0)1789 451070 Table of Contents Safety Notes... 3 Parts Supplied

More information

2003 CRF450R PRESS INFORMATION

2003 CRF450R PRESS INFORMATION 2003 CRF450R PRESS INFORMATION Cleared for take-off by the FIM in 2003, and primed to grab big air on motocross and supercross circuits the length and breadth of Europe, Honda s spectacular CRF450R has

More information

H8 Signs, Supports and Poles

H8 Signs, Supports and Poles Alberta Infrastructure and Transportation Roadside Design Guide November 2007 H8 Signs, Supports and Poles H8.1 Introduction This section identifies the appropriate roadside safety treatment for signs,

More information

Rail Safety and Standards Board

Rail Safety and Standards Board Rail Safety and Standards Board Certificate of Derogation from a Railway Group Standard (under 8.3 of the Railway Group Standards Code) Derogation Number: Applicant: Subject Matter of Derogation: RGS Number:

More information

Supported by. A seven part series exploring the fantastic world of science.

Supported by. A seven part series exploring the fantastic world of science. Supported by A seven part series exploring the fantastic world of science. A force is a push or pull. Find out about pushing and pulling forces. Pull During a tug-of-war, both teams pull as hard as they

More information

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete.

Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. Thank you for this opportunity to discuss with you how we can work together to make our streets more complete. 1 2 3 Thank you for this opportunity to discuss with you how we can work together to make

More information

West Midlands Cycle Design Guidance Cycling and the Midland Metro

West Midlands Cycle Design Guidance Cycling and the Midland Metro Transport for the West Midlands Cycling and the Midland Metro September 2017 Project Code: 02821 Phil Jones Associates Ltd Seven House High Street Longbridge Birmingham B31 2UQ philjonesassociates.co.uk

More information

Safer, Better, Faster, More Cost-Effective. CTruk Vessel Specifications 2012

Safer, Better, Faster, More Cost-Effective. CTruk Vessel Specifications 2012 Safer, Better, Faster, More Cost-Effective CTruk Vessel Specifications 2012 CTruk 20T MPC CTruk 20T MPC Technical Specifications MAIN PARTICULARS Length over all 18.5m Beam over all 6.1m Draft 0.86m -1.26m

More information

Uphill / Downhill. Super Elevations. Wide-Width 2/15/2016. March 22-24, 2016 Nashville, TN

Uphill / Downhill. Super Elevations. Wide-Width 2/15/2016. March 22-24, 2016 Nashville, TN Uphill / Downhill Wide-Width 1 Uphill Issue Loss of traction Downhill Issue Spills caused by truck rollaway Uphill Paving Obvious things Apply correct amount of tack Wait for tack to break 2 Uphill Paving

More information

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN

3-13 UFC - GENERAL PROVISIONS AND GEOMETRIC DESIGN FOR ROADS, STREETS, WALKS, AND OPEN maintenance, and erosion. Stability is required to maintain the integrity of the pavement structure, and a slope stability analysis should be conducted for cuts and fills greater than 15 feet. For lower

More information

Accident Precursor Monitoring in Metro Railways

Accident Precursor Monitoring in Metro Railways Accident Precursor Monitoring in Metro Railways Workshop on accident/ incident precursor analysis in air transport and railways Imperial College, 9 February 2006 The data and sponsors: the and Nova groups

More information

INSTALLATION INSTRUCTIONS FOR: RE4548 JK FRONT COILOVER KIT

INSTALLATION INSTRUCTIONS FOR: RE4548 JK FRONT COILOVER KIT RUBICON EXPRESS 3290 MONIER CIR., RANCHO CORDOVA, CA. 95742 866-533-7706, www.rubiconexpress.com INSTALLATION INSTRUCTIONS FOR: RE4548 JK FRONT COILOVER KIT Safety Warning: Suspension systems or components

More information

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 50th session Agenda item 5 DE 50/WP.8 7 March 2007 Original: ENGLISH INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION

More information

Figure 1: Piyasena uses his cycle trailer as a mobile mini store and kitchen. Hambamtota District, Sri Lanka.

Figure 1: Piyasena uses his cycle trailer as a mobile mini store and kitchen. Hambamtota District, Sri Lanka. BICYCLE TRAILERS Introduction In many developing countries people live in regions away from the main transport infrastructure. This means transport services are expensive Many villages in the South are

More information

Taiwan Bicycle Industry Standard

Taiwan Bicycle Industry Standard Taiwan Bicycle Industry Standard TBIS 4210-9 First edition 2016.01.01 Cycles Safety requirements for bicycles Part 9: Saddles and seat post test methods Reference number: TBIS 4210-9:2015 (FDTS) Contents

More information

References 6 k thermal overload relays, adjustable from 0.11 to 16 A

References 6 k thermal overload relays, adjustable from 0.11 to 16 A s 6 k thermal overload relays, adjustable from 0.11 to 16 A 3-pole relays with screw clamp terminals These overload relays are designed for the protection of motors. They are compensated and phase failure

More information

INSTRUCTIONS. for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties. For 4-Axle and 6-Axle Locomotives and all Freight Cars

INSTRUCTIONS. for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties. For 4-Axle and 6-Axle Locomotives and all Freight Cars INSTRUCTIONS for installing ALDON Two-Way LOCOMOTIVE Hinged Derail on wooden ties For 4-Axle and 6-Axle Locomotives and all Freight Cars Manual Lift Sign Holder 4014-18-5-D size 5 4014-18-6-D size 6 4014-18-7-D

More information

Smart tips! These are the important things with stairs and bridging steps!

Smart tips! These are the important things with stairs and bridging steps! Smart tips! These are the important things with stairs and bridging steps! Smart tip 1 Large stepping and standing surfaces: Safe, comfortable and fatigue-free working also with tools and for a longer

More information

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book GERT8000-TS10 Rule Book ERTMS level 2 train signalling s Issue 4 Module TS10 September 2018 Comes into force 01 December 2018 Conventions used in the Rule Book A black line in the margin indicates a change

More information

LIFTING MAGNETS ERIEZ MAGNETICS

LIFTING MAGNETS ERIEZ MAGNETICS MJ-2300E Installation, Operation and Maintenance Instructions LIFTING MAGNETS ERIEZ MAGNETICS HEADQUARTERS: 2200 ASBURY ROAD, P.O. BOX 10608, ERIE, PA 16514 0608 U.S.A. WORLD AUTHORITY IN ADVANCED TECHNOLOGY

More information

Technical Service Bulletin 10001

Technical Service Bulletin 10001 Technical Service Bulletin 10001 THIS APPLIES TO ALL AIR SPRINGS USED IN USSC LLC AIR SUSPENSIONS Issue: USSC has made a change to the air spring used in operator seat suspensions. This bulletin will identify

More information

Dual Pivot Caliper Brake

Dual Pivot Caliper Brake (English) DM-RBBR001-01 Dealer's Manual ROAD MTB Trekking City Touring/ Comfort Bike URBAN SPORT E-BIKE Dual Pivot Caliper Brake SORA BL-R3000 BR-R3000 CLARIS BL-R2000 BR-R2000 Brake cable BC-1051 CONTENTS

More information

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016

Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016 Adjustment of the Night Time Quiet Period (NTQP) - Dec 2016 Frequently Asked Questions Background Level crossings are the main interface between the rail network and road, footpath and bridleway networks.

More information

Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h

Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h Submitted by France Informal Document: ACSF-04-03 Proposal based on ACSF-03-16 Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h The modifications to the Regulation are marked in bold

More information

Front Derailleur. Shifters and derailleurs work together!

Front Derailleur. Shifters and derailleurs work together! The drivetrain consists of the cranks, chainring(s), chain, and cog(s). On multispeed bikes, derailleurs, which move the chain to change gears, are also considered part of the drivetrain. ANATOMY of the

More information

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M

Fall Protection. 29 CFR Appendix C 29 CFR 1926 Subpart M Fall Protection 29 CFR 1910.66 Appendix C 29 CFR 1926 Subpart M Duty to Have Fall Protection Provide fall protection systems which meet the criteria of 1926 and 1910 Make fall protection an integral part

More information

Transport Research Laboratory Creating the future of transport

Transport Research Laboratory Creating the future of transport Transport Research Laboratory Creating the future of transport PUBLISHED PROJECT REPORT PPR662 Conspicuity M Palmer, B Lawton, J Manning and C Reeves Prepared for: Highways Agency, Project Ref: Package

More information

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council

Sustainable Urban Mobility Plan for Aberdeen, Scotland. Louise Napier Senior Planner Aberdeen City Council Sustainable Urban Mobility Plan for Aberdeen, Scotland Louise Napier Senior Planner Aberdeen City Council A bit about me.. Louise Napier Senior Planner (Transport Strategy & Programmes) Aberdeen City Council

More information

DM-MBRD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Rear Derailleur SLX RD-M7000 DEORE RD-M6000

DM-MBRD (English) Dealer's Manual. ROAD MTB Trekking. City Touring/ Comfort Bike. Rear Derailleur SLX RD-M7000 DEORE RD-M6000 (English) DM-MBRD001-04 Dealer's Manual ROAD MTB Trekking City Touring/ Comfort Bike URBAN SPORT E-BIKE Rear Derailleur SLX RD-M7000 DEORE RD-M6000 CONTENTS IMPORTANT NOTICE... 3 TO ENSURE SAFETY... 4

More information

Devonport City Cycling Network Strategy

Devonport City Cycling Network Strategy Devonport City Cycling Network Strategy 2010-2013 Devonport City Cycling Network Strategy Introduction In February 2010 a draft master plan for cycleways was presented to the community. The feedback received

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE OPTIMUM 8.1 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or

More information

GANTRY CRANES CAPACITIES: SPANS: TRACKS: OPTIONS: Up to 5 tons Up to 30' Steel Fixed or Adjustable

GANTRY CRANES CAPACITIES: SPANS: TRACKS: OPTIONS: Up to 5 tons Up to 30' Steel Fixed or Adjustable GANTRY CRANES CAPACITIES: SPANS: TRACKS: OPTIONS: Up to 5 tons Up to 30' Steel Fixed or Adjustable Material Handling Solutions For Your Unique Applications Since 1977, Gorbel has been an innovator and

More information

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft

American Railway Engineering and Maintenance of Way Association Letter Ballot. Draft American Railway Engineering and Maintenance of Way Association Letter Ballot 1. Committee and Subcommittee: Committee 5 Track Subcommittee 9 Road Crossings 2. Letter Ballot Number: 05-17-16 3. Assignment:

More information

NHTSA's Surrogate Strikeable Vehicle for Forward Collision Avoidance and Mitigation Testing

NHTSA's Surrogate Strikeable Vehicle for Forward Collision Avoidance and Mitigation Testing NHTSA's Surrogate Strikeable Vehicle for Forward Collision Avoidance and Mitigation Testing 2013 SAE Government / Industry Meeting January 31, 2013 Garrick J. Forkenbrock NHTSA / VRTC 1 Acronyms CIB: Crash

More information

Hazards Associated with High-Speed Rail (HSR) Operation Adjacent to Conventional Tracks

Hazards Associated with High-Speed Rail (HSR) Operation Adjacent to Conventional Tracks Slide 1 Hazards Associated with High-Speed Rail (HSR) Operation Adjacent to Conventional Tracks Chen-Yu Lin Dr. M. Rapik Saat Dr. Christopher P.L. Barkan 4 th June 2015 NURail Annual Meeting, Chicago,

More information

1998 F-150/250 Workshop Manual

1998 F-150/250 Workshop Manual Page 1 of 7 SECTION 206-02: Drum Brake 1998 F-150/250 Workshop Manual REMOVAL AND INSTALLATION Procedure revision date: 03/07/2000 Shoes Standard Special Tool(s) Brake/Clutch/Service Vacuum 164-R3622 or

More information

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book GERT8000-S5 Rule Book Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) Issue 8 Module S5 September 2018 Comes into force 01 December 2018 Conventions used in the

More information

ATOC Guidance Note- Investigation of Station Stopping Incidents

ATOC Guidance Note- Investigation of Station Stopping Incidents Date: February 2013 Submitted by ATOC Guidance Note- Investigation of Station Stopping Incidents Gary Cooper Head of Operations, ATOC Authorised by Synopsis This Guidance Note provides advice on the investigation

More information

Active Travel Strategy Dumfries and Galloway

Active Travel Strategy Dumfries and Galloway Active Travel Strategy Dumfries and Galloway Our Active Travel Strategy The agreed Interventions for Dumfries and Galloway Council s Local Transport Strategy includes an action to Develop an Active Travel

More information

Aquashield to Mitigate Water Ingress of Gas Pipes

Aquashield to Mitigate Water Ingress of Gas Pipes IGEM Young Persons Paper Competition 2017 Aquashield to Mitigate Water Ingress of Gas Pipes Assistant Engineer Technical Development Section, Distribution Operation Department The Hong Kong and China Gas

More information

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT

PLANT HAZARD AND EQUIPMENT RISK ASSESSMENT PLAT HAZARD AD EQUIPMET RISK ASSESSMET Plant Identification : HAULOTTE STAR 10 Potential Hazard Entanglement Can anything become entangled in moving parts? Crushing/Striking Can anyone be crushed or struck

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry 1 of 8 level: 3 credit: 7 planned review date: October 2006 sub-field: purpose: Civil Works and Services This unit standard is a component of the selfregulation system for operations in the civil infrastructure.

More information

LIGHTHOUSE SAFETY TRAINING 2018

LIGHTHOUSE SAFETY TRAINING 2018 Specialists in Fall Protection, Rescue and Confined Spaces tele (262) 790.1155 fax (262) 783-6211 www.lighthousesafety.com csr@lighthousesafety.com 3620 North 126th Street Brookfield, WI 53005 LIGHTHOUSE

More information

RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS July

RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS July RULES PUBLICATION NO. 44//P PILOT TRANSFER ARRANGEMENTS 2016 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory where applicable.

More information

Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h

Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h Informal Document ACSF-02-03 Submitted by the expert from Germany Proposal for amendments to Regulation No. 79 to include ACSF > 10 km/h The modifications to the Regulation are marked in blue bold and

More information

Top Drive Lifting Configuration Manual Update

Top Drive Lifting Configuration Manual Update Model: Standard 500/750T and 275T Serial #: See Serial Numbers Affected Aug. 31, 2016 Product Bulletin # TDS-162 Top Drive Lifting Configuration Manual Update The Standard 500/750T and 275T Top Drive Parts

More information

Technical Briefing Note

Technical Briefing Note Technical Briefing Note Subject Date Issued Revision Glossary of Terms 14th Nov 2017 Rev 3 The purpose of this Technical Briefing Note is to provide a glossary of terms commonly used in fall injury prevention

More information

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha

Operation and safety of tramways in interaction with public space. COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha Operation and safety of tramways in interaction with public space COST Action TU1103 «STATE OF THE ART» On behalf of the action: Matus Sucha Introduction The COST Action TU1103 deals with the improvement

More information

Begleitheft Activity booklet Manual d accompagnement Begeleidend boekje Cuaderno adjunto Folheto Libretto di istruzioni Сопроводительная инструкция

Begleitheft Activity booklet Manual d accompagnement Begeleidend boekje Cuaderno adjunto Folheto Libretto di istruzioni Сопроводительная инструкция Begleitheft Activity booklet Manual d accompagnement Begeleidend boekje Cuaderno adjunto Folheto Libretto di istruzioni Сопроводительная инструкция 附带说明书 Contents PROFI DYNAMIC XXL 2 What does dynamics

More information

Stringway ML100 Review. Stringway ML100. A Review MSRP $1,195.00

Stringway ML100 Review. Stringway ML100. A Review MSRP $1,195.00 Stringway ML100 A MSRP $1,195.00 The Stringway ML100 is a technical table top machine with features that are unique. The racquet support plate is adequate and the internal supports and hold down mechanics

More information

Shared Use Path Design

Shared Use Path Design 12B-2 Design Manual Chapter 12 - Sidewalks and Bicycle Facilities 12B - Bicycle Facilities Shared Use Path Design A. Accessible Shared Use Path Design 1. General: Applicable portions from the following

More information

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40M-12 and all WIDE DRUM variations of this HAND OPERATED WINCH.

OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40M-12 and all WIDE DRUM variations of this HAND OPERATED WINCH. W. W. Patterson Company 3 Riversea Road Pittsburgh, PA 15233 Phone: 800-322-2018 FAX: 412-322-2785 OPERATIONS/PARTS MANUAL FOR PATTERSON'S WWP40M-12 and all WIDE DRUM variations of this HAND OPERATED WINCH.

More information

User Instructions 1790 Rail Anchor

User Instructions 1790 Rail Anchor User Instructions 1790 Rail Anchor This document is intended to meet the Manufacturer s Instruction requirements as stated by ANSI Z359.1, and should be used as part of an employee training program as

More information

Mitigating Risky Behavior of Delayed Road Users at Occupied Highway-Railway Crossings: Review of Research and Issues Daniel Blais, Project Officer,

Mitigating Risky Behavior of Delayed Road Users at Occupied Highway-Railway Crossings: Review of Research and Issues Daniel Blais, Project Officer, Mitigating Risky Behavior of Delayed Road Users at Occupied Highway-Railway Crossings: Review of Research and Issues Daniel Blais, Project Officer, Accessibility and Human Factors Outline Background Objective

More information

Cadence Sensor W.I.N.D. User Manual

Cadence Sensor W.I.N.D. User Manual Cadence Sensor W.I.N.D. User Manual Polar Cadence Sensor W.I.N.D. is designed to measure cadence, i.e. crank revolutions per minute when cycling. No other use is intended or implied. Please follow the

More information

Safety System Installation Guide for ARE Wind Poles

Safety System Installation Guide for ARE Wind Poles Safety System Installation Guide for ARE Wind Poles V. 1 May 2011 ** Climbing pegs and ladder should be installed before the pole is erected.** A. Install climbing pegs Install climbing pegs (bolt set)

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

Summary Safety Investigation Report

Summary Safety Investigation Report Investigation Body for Railway Accidents and Incidents Summary Safety Investigation Report Collision between a work train and the rear of a passenger train Linkebeek, Monday 3 November 2014 December 2015

More information

Off-Road Facilities Part 1: Shared Use Path Design

Off-Road Facilities Part 1: Shared Use Path Design Off-Road Facilities Part 1: Shared Use Path Design Presentation by: Eric Mongelli, P.E. Tom Huber October 9, 2012 FOLLOW THE CONVERSATION ON TWITTER Toole Design Group is live tweeting this webinar @tooledesign

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

SRAM NX EAGLE DRIVETRAIN / JUNE 14, 2018

SRAM NX EAGLE DRIVETRAIN / JUNE 14, 2018 SRAM NX EAGLE DRIVETRAIN / JUNE 14, 2018 START WITH EAGLE Eagle Technology revolutionized the mountain bike experience by offering riders a 1x drivetrain solution that is purpose-built to be lightweight,

More information

Guidance on Hazard Identification and Classification. Rail Industry Guidance Note. Published by:

Guidance on Hazard Identification and Classification. Rail Industry Guidance Note. Published by: GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8642 Issue Two: June 2014 Rail Industry Guidance Note Issue record Issue

More information

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge

Safety Flash. IMCA Safety Flash 08/10 December Welding of Shackles. 2 Lacerated Chin Caused by Flying Wedge AB Safety Flash IMCA Safety Flash 08/10 December 2010 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been

More information

Answers Written Exam Public Transport

Answers Written Exam Public Transport Faculty of Engineering Technology Answers Written Exam Public Transport Written Exam Public Transport (195421200-1A) Teacher van Zuilekom Course code 195421200 Date and time 6-11-2014, 8:45-11:45 Location

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

Security and confidence at height.

Security and confidence at height. A Security and confidence at height. Vertical Systems DISTRIBUTED BY M DBI-SALA Vertical Systems are designed to complement your ability to work while meeting all applicable OSHA and ANSI standards. Vertical

More information

Pneumatic valve islands

Pneumatic valve islands Pneumatic valve islands The MEGA solenoid air operated spool valve JOUCOMATIC offers a concept of solenoid air operated spool valves which can be fitted together to form islands. Due to its new patented

More information

ì<(sk$m)=bdhjhi< +^-Ä-U-Ä-U

ì<(sk$m)=bdhjhi< +^-Ä-U-Ä-U Genre Comprehension Skill Text Features Science Content Nonfiction Put Things in Order Captions Glossary Forces and Motion Scott Foresman Science 2.10 ì

More information

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements 1836 Blake Street Denver, CO 80202 720.524.7831 ww.altaplanning.com MEMO 3 Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements Based on field reconnaissance, best practices

More information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors 5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors

More information

Why do we need a Gondola?

Why do we need a Gondola? Why do we need a Gondola? Volume Translink buses serve 25,000 transit trips a day on and off Burnaby Mountain. To serve this volume, a bus leaves the bus loop at the top of the mountain every 90 seconds

More information

TECHNICAL DATA - CHASSIS 179

TECHNICAL DATA - CHASSIS 179 TECHNICAL DATA - CHASSIS 179 Frame Fork Shock absorber Suspension travel (Supermoto) Front Rear Suspension travel (Supermoto R, Supermoto T) Front Rear Brake system Front Rear Brake discs - diameter Front

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated

More information

NEW 2015 AJP MODEL RANGE

NEW 2015 AJP MODEL RANGE NEW 2015 AJP MODEL RANGE AJP is Portugal's premier manufacturer of Enduro motorcycles. Since 1987, the company develops, manufactures and sells motorcycles, devoted to the practice of recreational enduro,

More information

Crane Rental Heavy Machinery Moving Project Management

Crane Rental Heavy Machinery Moving Project Management 2 3 4 5 6 7 8 9 10 Link-Belt TG-2300B lifting crane capabilities - heavy duty boom Boom - tubular: 90" x 90" (2.29 x 2.29 m) with open throat top section, 2" (51 mm) diameter boom pendants. Mast - 43'

More information

Instruction Sheet. CP2000: 2000 lb Cable Puller IMPORTANT RECEIVING INSTRUCTIONS SAFETY ISSUES

Instruction Sheet. CP2000: 2000 lb Cable Puller IMPORTANT RECEIVING INSTRUCTIONS SAFETY ISSUES Instruction Sheet CP2000: 2000 lb Cable Puller RPS-0148 07/02 IMPORTANT RECEIVING INSTRUCTIONS Visually inspect all components for shipping damage. If shipping damage is found, notify carrier at once.

More information

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision Page 1 of 5 Location of Equipment Written By: Approved By: Date Created Last Revision School: Facilities & Operations Brent Vandenbosch Gordon Howe October 14, 2009 new Room: n/a Barry Hamilton HAZARDS

More information

TECHNOLOGIES. M Series. Positive return metering pumps [API675]

TECHNOLOGIES. M Series. Positive return metering pumps [API675] M Series Positive return metering pumps [API675] Hydraulic double diaphragm metering pump in AISI 316L stainless steel A line of plunger and hydraulic double diaphragm metering pumps designed according

More information