1 March 28, 2018 Mr. Carlos Ramirez Project Manager YORK Developments 303 Richmond St, Suite 201 London, ON N6B 2H8 Re: Preliminary Pedestrian Wind Study 131 King Street - London, ON RWDI Project Dear Mr. Ramirez, Rowan Williams Davies & Irwin Inc. (RWDI) has prepared this Preliminary Wind Report to present our opinion on the potential pedestrian wind conditions on and around the proposed development at 131 King Street in London, Ontario. Our findings are based on a qualitative assessment of the wind conditions in the context of the local wind climate and our expert understanding of wind flows around buildings. This Preliminary Wind Study is required by the City of London in support of the Zoning Bylaw Amendment submission for this project. A more detailed study involving scale model tests in a boundary-layer wind tunnel will likely be required for the Site Plan Approval to quantify these wind conditions and, if necessary, develop wind control solutions. SITE AND BUILDING INFORMATION The proposed development will be located on the south side of King Street between Talbot Street and Richmond Street in London, Ontario (see Image 1). The site is currently a surface parking lot. It is immediately surrounded by low-rise buildings in all directions. Surrounding buildings farther away from the site are generally low-rise with groups of high-rise buildings to the east through north to west of the site. Based on the drawings received by RWDI on March 7, 2018, the proposed development will include a mixed-use 30-storey tower with the ground-level restaurant/retail/service, four levels of above-ground parking, and 25 levels of residential units (see Image 2). The main entrance to the building and the entrance to the commercial area are located along the north façade on King Street. Other pedestrian areas include public sidewalks along King, Talbot, York and Richmond Streets, a laneway on the west side of the building, a surface parking lot on the south side of the building, and outdoor amenity areas at Level 6 and on the roof top of the proposed tower.

2 Image 1: Aerial View of the Development Site and Surroundings (Photograph Courtesy of Google TM Earth) Image 2: North View of Proposed Development WIND DATA Long-term wind statistics recorded at London International Airport were analyzed for the summer (May through October) and winter (November through April) seasons (see Image 3 on the next page). This is the nearest weather station with long-term, reliable wind data. When all winds are considered (regardless of speeds), winds from south, south-southwest, west through northwest and east directions are predominant during summer. During winter, winds from the southwest through northwest and east directions are predominant. Strong winds of a mean speed greater than 30 km/h (yellow and red bands) occur more often in the winter than in the summer, and they are typically from the east and southwest through west directions. PEDESTRIAN WIND ASSESSMENT To provide an opinion on the overall wind conditions expected around the proposed development, RWDI reviewed the long-term meteorological data for the area, drawings and renderings of the proposed development, and information regarding the surroundings. These data, in conjunction with our engineering judgement, allow us to predict the expected wind conditions as outlined below (use plans in Image 4 for reference). Project # Page 2

3 Wind Speed (km/h) Probability (% Summer Wi Calm > Summer (May through October) Winter (November through April) Image 3: Directional Distribution of Winds Approaching London International Airport ( ) Image 4: Reference Plans and Elevation The proposed tower is considerably taller than its immediate surroundings and therefore is exposed to the prevailing winds in all directions. Taller buildings tend to intercept the stronger winds at higher elevations and redirect them down to the ground level. Such a downwashing flow (see Image 5a) is the main cause for increased wind activity around tall buildings at grade level. Project # Page 3

4 Tower setbacks on a podium and adjacent low buildings to the east and west will reduce the direct impact of downwashing wind flows at grade. However, higher wind speeds are expected on the terraces at the podium level (see Image 5b). Image 5a: Downwashing Flow Image 5b: Downwashing Flows on to a Podium The addition of the proposed development will increase the wind activity on King Street sidewalks (Locations A in Image 4), but the resultant wind conditions are generally expected to be comfortable for the intended use of sidewalks. Wind conditions on sidewalks along York, Talbot and Richmond Streets are not expected to be altered by the proposed development due to their farther distances from the proposed development. The main entrance to the tower and the entrance to the commercial area are located along the north façade on King St (Locations B1 and B2, respectively). The main entrance is recessed from the north façade and has a vestibule, which is a positive design feature, as it will provide a space for pedestrian to take shelter during high wind events. Also, the 5-storey podium is expected to keep winds accelerating down the building away from the ground and the entrances along this facade. There is also a canopy structure along the north building façade above these entrances that will provide additional wind protection. As a result, wind speeds at the main entrance are expected to be comfortable throughout the year. The commercial entrance (Location B2) is at the northwest corner of the building and there is a large gap under the vertical wall structure at the corner that allows winds to accelerate into the entrance area (lower corner diagram in Image 4). The wind conditions at this corner are expected to be uncomfortable from time to time in the winter and may exceed the wind safety criterion. Project # Page 4

5 We recommend extending the wall down to the ground (eliminating the gap) or installing a tall screen or a coniferous planter on the west side of the commercial entrance. Alternatively, the commercial entrance should be relocated northward away from the building corner and recessed from the main façade. Due to the prevailing westerly winds downwashing off the proposed tower, increased wind activity is expected along the west laneway (C in Image 4) and at the part of the parking lot that is close to the tower (Location D). These wind conditions, however, are considered appropriate for the intended use of these areas throughout the year since pedestrians are not expected to stay in these areas for a prolonged period of the time. The podium terraces are located on the north side of the building at Level 6. The east terrace (Location E1 in Image 4) is better sheltered than the west terrace (Location E2) from the prevailing westerly winds. In addition to the proposed perimeter guardrails, horizontal elements such as trellises, canopies and landscaping is recommended for the west terrace (Location E2) for wind control. Wind speeds at the rooftop terrace (Location F in Image 4) are expected to be higher than desired for passive activities in the summer due to its elevation and exposure. Typical wind control solutions would include tall guardrails along the entire perimeter to deflect winds up. Local wind control measures such as screens, trellises and landscaping should be considered for any proposed seating areas. The proposed development has several positive design features such as the 5-storey podium, the recessed main entrance, and the canopy structure along the north façade. Suitable wind conditions are expected at the main residential entrance, along sidewalks and the laneway west of the tower, in the parking lot south of the tower, and on the east podium terrace. Accelerated winds and potentially unsafe conditions during the winter are expected at the northwest corner of the proposed development where the commercial entrance is located. Project # Page 5

6 Higher-than-desired wind speeds are also expected at the west podium terrace and on the rooftop terrace. Mitigation measures have been provided herein to ensure comfortable wind conditions are achieved at these areas. Wind tunnel tests can be conducted to quantify these wind conditions and evaluate the effectiveness of these control measures. The wind tunnel tests, if required, are typically completed in support of the SPA submission. CLOSING We trust this meets your current requirements for this project. Should you have any questions or require additional information, please do not hesitate to contact us. Yours truly, Rowan Williams Davies & Irwin Inc. (RWDI) Hanqing Wu, Ph.D., P.Eng. Technical Director / Principal John Alberico, M.Sc., CCEP, WELL AP Senior Project Consultant / Principal Project # Page 6

SITE AND BUILDING INFORMATION

SITE AND BUILDING INFORMATION Page 1 Mr. Maneesh Poddar YORK Developments 303 Richmond St, Suite 201 London, ON N6B 2H8 Re: Preliminary Pedestrian Wind Assessment London, Ontario RWDI Reference Number: 1701848 Email: maneesh.poddar@yorkdev.ca

More information

31/10/17. October 31, HIP Developments Inc. 700 Rupert Street Waterloo, ON N2V 2B5

31/10/17. October 31, HIP Developments Inc. 700 Rupert Street Waterloo, ON N2V 2B5 University of Guelph Research Park 150 Research Lane, Suite 105 Guelph, ON, N1G 4T2 226.706.8080 www.novusenv.com 31/10/17 Date: To: HIP Developments Inc. 700 Rupert Street N2V 2B5 Re: Cambridge, Ontario

More information

Dear Ms. Maw: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street, Ottawa GWE File No.

Dear Ms. Maw: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street, Ottawa GWE File No. December 11, 2015 Jenna Maw LineBox Studio Inc. 126 York Street, Suite 502 Ottawa, Ontario K1N 5T2 Dear Ms. Maw: Re: Qualitative Pedestrian Level Wind Assessment St-Charles Market, 135 Barrette Street,

More information

June 3, Mr. Steven Grandmont, Chief Operating Officer Richcraft Group of Companies 2280 St. Laurent Boulevard Ottawa, Ontario K1G 4K1

June 3, Mr. Steven Grandmont, Chief Operating Officer Richcraft Group of Companies 2280 St. Laurent Boulevard Ottawa, Ontario K1G 4K1 June 3, 2013 Mr. Steven Grandmont, Chief Operating Officer Richcraft Group of Companies 2280 St. Laurent Boulevard Ottawa, Ontario K1G 4K1 Dear Mr. Grandmont: Re: Qualitative Pedestrian Wind Assessment

More information

Dear Mr. Nicolini: Qualitative Pedestrian Level Wind Assessment Montreal Road, Ottawa GWE File No.: DTPLW

Dear Mr. Nicolini: Qualitative Pedestrian Level Wind Assessment Montreal Road, Ottawa GWE File No.: DTPLW August 17, 2015 Anthony Nicolini 2068358 Ontario Inc. (Darwin Group) 183 Michael Cowpland Drive Ottawa, Ontario K2M 0M3 Dear Mr. Nicolini: Re: Qualitative Pedestrian Level Wind Assessment 807-825 Montreal

More information

Urban Design Terms of Reference. Pedestrian. Wind Comfort and Safety Studies. June 2014

Urban Design Terms of Reference. Pedestrian. Wind Comfort and Safety Studies. June 2014 Urban Design Terms of Reference Pedestrian June 2014 Wind Comfort and Safety Studies Table of contents 1 Introduction 1.1 Purpose 1.2 Who can conduct a wind study? 1.3 Consultation with Planning and Building

More information

March 25, Katherine Grechuta MCIP, RPP, LEED AP Planner FoTenn Planning & Urban Design 223 McLeod Street Ottawa, ON, K2P 0Z8. Dear Ms.

March 25, Katherine Grechuta MCIP, RPP, LEED AP Planner FoTenn Planning & Urban Design 223 McLeod Street Ottawa, ON, K2P 0Z8. Dear Ms. March 25, 2013 Katherine Grechuta MCIP, RPP, LEED AP Planner FoTenn Planning & Urban Design 223 McLeod Street Ottawa, ON, K2P 0Z8 Dear Ms. Grechuta: Re: 845 Carling Avenue, Ottawa Qualitative Pedestrian

More information

23/02/18. Pedestrian Wind Assessment Ladies Golf Club of Toronto Markham, Ontario Novus Project # February 23, 2018

23/02/18. Pedestrian Wind Assessment Ladies Golf Club of Toronto Markham, Ontario Novus Project # February 23, 2018 University of Guelph Research Park 150 Research Lane, Suite 105 Guelph, ON, N1G 4T2 226.706.8080 www.novusenv.com 23/02/18 Date: To: 2526574 Ontario Limited 4800 Dufferin Street Toronto, Ontario M3H 5S9

More information

1700 Webster Street Oakland, CA. Final Report. Pedestrian Wind Conditions Consultation Wind Tunnel Tests RWDI # July 16, 2015

1700 Webster Street Oakland, CA. Final Report. Pedestrian Wind Conditions Consultation Wind Tunnel Tests RWDI # July 16, 2015 Tel: 519.823.1311 Fax: 519.823.1316 Rowan Williams Davies & Irwin Inc. 650 Woodlawn Road West Guelph, Ontario, Canada N1K 1B8 1700 Webster Street Oakland, CA Final Report Pedestrian Wind Conditions Consultation

More information

Appendix 7. Wind and Comfort Impact Analysis

Appendix 7. Wind and Comfort Impact Analysis Appendix 7 Wind and Comfort Impact Analysis Donald Ballanti Consulting Meteorologist 1424 Scott Street El Cerrito, CA 94530 (510) 234-6087 Abe Leider Rincon Consultants 449 15th Street, Suite 303 Oakland,

More information

Re: Wind Impact Assessment Marina del Rey Tower Marina del Rey, California RWDI Reference No Description of Proposed Development

Re: Wind Impact Assessment Marina del Rey Tower Marina del Rey, California RWDI Reference No Description of Proposed Development December 15, 2006 Mr. Marc Melinkoff Christopher A. Joseph & Associates Environmental Planning and Research 30851 Agoura Road, Suite 210 Agoura Hills, CA USA 91301 Re: Wind Impact Assessment Marina del

More information

Brad Caco Group M8X 2X9. Mr. Caco: Gradient. for mitigation

Brad Caco Group M8X 2X9. Mr. Caco: Gradient. for mitigation December 16, 2015 Brad Caco Trinity Development Group Sun Life Financial Center, East Tower 3250 Bloor Street West, Suite 1000 Toronto, Ontario M8X 2X9 Mr. Caco: Re: Qualitative Pedestrian Wind Assessment

More information

Fig$1.!Wind!Rose!Shearwater! ! August 7th, 2015

Fig$1.!Wind!Rose!Shearwater! ! August 7th, 2015 August 7th, 2015 HRM Planning & Development Eastern Region, Alderney Gate 40 Alderney Drive, 2 nd Floor Dartmouth, NS To Whom It May Concern, RE: Proposed 6030 Pepperell Road Wind Impact Qualitative Assessment

More information

2 Bowen Crescent Residential Development, Melbourne

2 Bowen Crescent Residential Development, Melbourne WUZHONG INTERNATIONAL 2 Bowen Crescent Residential Development, Melbourne Desktop Pedestrian Level Wind Report Document No. GWTS-DPR-1024-2015-2 Bowen Crescent Residential Development, Melbourne PREPARED

More information

Wellington Street : Wind Impact Qualitative Assessment. To Whom It May Concern, RE: Proposed Wellington Street Wind Impact Qualitative Assessment

Wellington Street : Wind Impact Qualitative Assessment. To Whom It May Concern, RE: Proposed Wellington Street Wind Impact Qualitative Assessment March 19, 2018 Alex Halef, President, BANC Investments Ltd. Inverse Developments Ltd. BANC Group To Whom It May Concern, RE: Proposed Wellington Street Wind Impact Qualitative Assessment The proposed 8

More information

Computer-Based Pedestrian Level Wind Study Scott Street. Ottawa, Ontario

Computer-Based Pedestrian Level Wind Study Scott Street. Ottawa, Ontario Computer-Based Pedestrian Level Wind Study 1960 Scott Street Ottawa, Ontario REPORT: GWE16-043-CFDPLW Prepared For: Kelly Rhodenizer Colonnade BridgePort 100 Argyle Avenue, Suite 100 Ottawa, Ontario K2P

More information

Subject: Wind Impact Evaluation for the Facebook Campus Project, Menlo Park

Subject: Wind Impact Evaluation for the Facebook Campus Project, Menlo Park Donald Ballanti Certified Consulting Meteorologist 1424 Scott Street El Cerrito, CA 94530 (510) 234-6087 Fax: (510) 234-6087 Justin Murphy, AICP Community Development Department City of Menlo Park 701

More information

Preliminary Pedestrian Level Wind Study. Westgate Shopping Centre Redevelopment. Ottawa, Ontario

Preliminary Pedestrian Level Wind Study. Westgate Shopping Centre Redevelopment. Ottawa, Ontario Preliminary Pedestrian Level Wind Study Westgate Shopping Centre Redevelopment Ottawa, Ontario REPORT: GWE15-067 CFD PLW Prepared For: Stuart Craig 2300 Yonge Street, Suite 500 Toronto, Ontario M4P 1E4

More information

Donald Ballanti, Certified Consulting Meteorologist, Wind Impact Evaluation for the Menlo Park Facebook Campus Project, August 26, 2011.

Donald Ballanti, Certified Consulting Meteorologist, Wind Impact Evaluation for the Menlo Park Facebook Campus Project, August 26, 2011. 3.4 WIND Introduction This section describes wind conditions in the Project area and at the Project site. This section provides a general discussion of the relationship between building design and wind

More information

Assembly Committee Document 7.5

Assembly Committee Document 7.5 Assembly Committee Document 7.5 Proposed Section 21.07.130C., Tall Buildings, amending and replacing the Tall Buildings section content as it appeared in Assembly Document 7.4.A. May 6, 2010 C. Tall Buildings

More information

Pedestrian Level Wind Study. 350 Sparks Street. Ottawa, Ontario

Pedestrian Level Wind Study. 350 Sparks Street. Ottawa, Ontario Pedestrian Level Wind Study 350 Sparks Street Ottawa, Ontario REPORT: GWE15-029-PLW Prepared For: Robert Sampson, OAA, MRAIC, Principal WZMH Architects 1500 95 St. Clair Ave. W. Toronto, Ontario M4V 1N6

More information

Pedestrian Level Wind Study. Westgate Shopping Centre Redevelopment, Phase 1. Ottawa, Ontario

Pedestrian Level Wind Study. Westgate Shopping Centre Redevelopment, Phase 1. Ottawa, Ontario Pedestrian Level Wind Study Westgate Shopping Centre Redevelopment, Phase 1 Ottawa, Ontario REPORT: GWE15-067-CFDPLW-2018 Prepared For: Stuart Craig Catherine Truong 2300 Yonge Street, Suite 500 P.O Box

More information

Pedestrian Level Wind Study. 83 East Street. Oakville, Ontario

Pedestrian Level Wind Study. 83 East Street. Oakville, Ontario Pedestrian Level Wind Study 83 East Street Oakville, Ontario REPORT: GWE15-105-PLW Prepared For: Mr. Konstantine Simionopoulos Symel Group 23 Woodcliff Place Toronto, Ontario M3B 3A5 Prepared By: Andrew

More information

Pedestrian Level Wind Study. 409 Brant Street. Burlington, Ontario

Pedestrian Level Wind Study. 409 Brant Street. Burlington, Ontario Pedestrian Level Wind Study 409 Brant Street Burlington, Ontario REPORT: GWE17-195-CFDPLW Prepared For: Kelly Edwards Project Coordinator 110 Eglington Avenue East, Suite 500 Toronto, ON M4P 2Y1 Prepared

More information

APPENDIX 11 WIND EFFECTS ASSESSMENT

APPENDIX 11 WIND EFFECTS ASSESSMENT APPENDIX 11 WIND EFFECTS ASSESSMENT Summerset Villages (Lower Hutt) Ltd District Plan Change Request Prepared by Urban Perspectives Ltd 17 September 2014 341 49 342 Opus Research Report 14-529D84.00 Wind

More information

Design Features to Change and/or Ameliorate Pedestrian Wind Conditions. Leighton Cochran 1 PhD CPEng

Design Features to Change and/or Ameliorate Pedestrian Wind Conditions. Leighton Cochran 1 PhD CPEng Design Features to Change and/or Ameliorate Pedestrian Wind Conditions Leighton Cochran 1 PhD CPEng 1 Senior Associate, Cermak Peterka Petersen Inc., 1415 Blue Spruce Drive, Fort Collins, CO 80524; PH

More information

Pedestrian Level Wind Study. 383 Slater Street. Ottawa, Ontario

Pedestrian Level Wind Study. 383 Slater Street. Ottawa, Ontario Pedestrian Level Wind Study 383 Slater Street Ottawa, Ontario REPORT: GWE15-045-PLW Prepared For: James Beach, Development Manager Broccolini Construction 130 Slater Street Ottawa, Ontario K1P 6E2 Prepared

More information

Pedestrian Level Wind Study. 979 Wellington Street West. Ottawa, Ontario

Pedestrian Level Wind Study. 979 Wellington Street West. Ottawa, Ontario Pedestrian Level Wind Study 979 Wellington Street West Ottawa, Ontario REPORT: GWE16-150-CFDPLW Prepared For: Charles Guilbault CDG Consulting 111 Albert Street #81062 Ottawa, ON K1P 1A5 Prepared By: Andrew

More information

Wind Microclimate Assessment

Wind Microclimate Assessment Australian Catholic University Pedestrian comfort at 115B Victoria Parade Pedestrian comfort at 115B Victoria Parade Quality Information Document 60519200 Client: Australian Catholic University ABN: 15050192660

More information

Pedestrian Level Wind Study. Greystone Village 10 Oblats Avenue. Ottawa, Ontario

Pedestrian Level Wind Study. Greystone Village 10 Oblats Avenue. Ottawa, Ontario Pedestrian Level Wind Study Greystone Village 10 Oblats Avenue Ottawa, Ontario REPORT: GWE18-022-CFDPLW Prepared For: Erin O Connor Manager, Land Development 1737 Woodward Drive Ottawa, ON, K2C 0P9 Prepared

More information

Pedestrian Level Wind Study. Château Laurier Hotel Addition. Ottawa, Ontario

Pedestrian Level Wind Study. Château Laurier Hotel Addition. Ottawa, Ontario Pedestrian Level Wind Study Château Laurier Hotel Addition Ottawa, Ontario REPORT: GWE16 068 PLW Prepared For: Larco Investments Ltd. c/o Dennis Jacobs, MCIP, RPP Momentum Planning & Communications 1165

More information

Pedestrian Level Wind Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario

Pedestrian Level Wind Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario Pedestrian Level Wind Study 383 Slater Street / 400 Albert Street Ottawa, Ontario REPORT: GWE16-104-CFDPLW Prepared For: Anand Aggarwal 2507701 Ontario Inc. Manor Park Management 231 Brittany Drive, Suite

More information

Pedestrian Level Wind Study Bank Street. Ottawa, Ontario

Pedestrian Level Wind Study Bank Street. Ottawa, Ontario Pedestrian Level Wind Study 890 900 Bank Street Ottawa, Ontario REPORT: GWE16 080 PLW Prepared For: Amica Mature Lifestyles & Canderel c/o Steven Cohen, Vice President Succession Development Corporation

More information

UDB. Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013

UDB. Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013 UDB Urban Design Brief (Continued - Section 6) 137 and 141 George Street, 321 Dalhousie Street May 2013 Prepared by: Prepared for: FOTENN Consultants Urban Design Review Panel NEUF Architects HEIGHT LIMIT

More information

Preliminary Pedestrian Level Wind Study. Elmvale Acres Shopping Centre Redevelopment. Ottawa, Ontario

Preliminary Pedestrian Level Wind Study. Elmvale Acres Shopping Centre Redevelopment. Ottawa, Ontario Preliminary Pedestrian Level Wind Study Elmvale Acres Shopping Centre Redevelopment Ottawa, Ontario REPORT: GWE15-067 CFD PLW Prepared For: Stuart Craig 2300 Yonge Street, Suite 500 Toronto, Ontario M4P

More information

Three Springs Design Guidelines Fencing and Wall Standards

Three Springs Design Guidelines Fencing and Wall Standards Three Springs Design Guidelines Fencing and Wall Standards Original Adopted: June 12, 2006 Minor Amendment: December 2012 Minor Amendment: March 23, 2017 TABLE OF CONTENTS: FENCING AND WALLS 1.0 INTRODUCTION

More information

300 George Street, Brisbane Pedestrian Level Winds - Wind Tunnel Test

300 George Street, Brisbane Pedestrian Level Winds - Wind Tunnel Test Vipac Engineers & Scientists Ltd. Level 2, 146 Leichhardt Street, Spring Hill, QLD 4000 PO Box 436, Toowong, QLD 4066 t. +61 7 3377 0400 f. +61 7 3377 0499 e. brisbane@vipac.com.au w. www.vipac.com.au

More information

Pedestrian Level Wind Study. 12 Stirling Avenue. Ottawa, Ontario

Pedestrian Level Wind Study. 12 Stirling Avenue. Ottawa, Ontario Pedestrian Level Wind Study 12 Stirling Avenue Ottawa, Ontario REPORT: GWE13-009-CFPLW Prepared For: Ken Hoppner Morley Hoppner 1818 Bradley Side Road Carp, ON K0A 1L0 Prepared By: Andrew Sliasas, M.A.Sc.,

More information

Pedestrian Wind Impact Study for Atlantic Yard Area & Redevelopment Project NEWMERICAL TECHNOLOGIES INTERNATIONAL.

Pedestrian Wind Impact Study for Atlantic Yard Area & Redevelopment Project NEWMERICAL TECHNOLOGIES INTERNATIONAL. Pedestrian Wind Impact Study for Atlantic Yard Area & Redevelopment Project by NEWMERICAL TECHNOLOGIES INTERNATIONAL November 15, 2006 Atlantic Yards Report Preliminary Draft. 3-2006, November 2006, page

More information

Pedestrian Level Wind Study. 398, 402, 406 Roosevelt Avenue. Ottawa, Ontario

Pedestrian Level Wind Study. 398, 402, 406 Roosevelt Avenue. Ottawa, Ontario Pedestrian Level Wind Study 398, 402, 406 Roosevelt Avenue Ottawa, Ontario REPORT: GWE17-179-CFDPLW Prepared For: David S. Renfroe Director of Business Development and Planning Domicile Developments Inc.

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 CASE STUDIES ON THE IMPACT OF SURROUNDING BUILDINGS ON WIND-INDUCED RESPONSE John Kilpatrick Rowan Williams Davies and Irwin, Guelph, Ontario, Canada ABSTRACT In

More information

DUNDONALD LINKS CLUBHOUSE

DUNDONALD LINKS CLUBHOUSE DUNDONALD LINKS CLUBHOUSE Members Update Document October 2015 6-8 Cole Street, Studio 11, SE1 4YH London CONTENTS PAGE 1.0 INTRODUCTION 1.1 Summary 3 1.2 Client 3 1.3 Design Team 3 2.0 APPRAISAL 2.1 Location

More information

June 11, RE: Comments on the ENF for The Boston Garden project, MEPA # Dear Mr. Sullivan:

June 11, RE: Comments on the ENF for The Boston Garden project, MEPA # Dear Mr. Sullivan: June 11, 2013 Secretary Richard K. Sullivan, Jr. Executive Office of Energy and Environmental Affairs (EEA) Attn: Deirdre Buckley 100 Cambridge Street, Suite 900 Boston MA 02114 RE: Comments on the ENF

More information

Advisory Circular. Legal Land Survey for AZR Clearance Attestation

Advisory Circular. Legal Land Survey for AZR Clearance Attestation Advisory Circular Subject: Legal Land Survey for AZR Clearance Attestation Issuing Office: Civil Aviation, Standards Document No.: AC 602-003 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.:

More information

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia

PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PROPOSED BICYCLE AND PEDESTRIAN FACILITY Vicinity of Route 123/I-495 Interchange Tysons, Fairfax County, Virginia PRELIMINARY ENGINEERING REPORT Prepared for: Prepared by: July 2017 Table of Contents 1

More information

Guthriesville Village Manual of Written & Graphic Design Guidelines

Guthriesville Village Manual of Written & Graphic Design Guidelines Exhibit B Revisions: May 23, June 21, July 20, September 20, & October 9, 2012 Updated: December 13, 2012; June 27, 2013; February 7, 2014 Outline of Contents: 1. Purpose and Applicability 2. Overall Form

More information

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines

City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines City of Elizabeth City Neighborhood Traffic Calming Policy and Guidelines I. Purpose: The City of Elizabeth City is committed to ensure the overall safety and livability of residential neighborhoods. One

More information

FINAL REPORT. Wind Assessment for: NEW OFFICE BUILDING AT ESSENDON FIELDS Essendon, Victoria, Australia

FINAL REPORT. Wind Assessment for: NEW OFFICE BUILDING AT ESSENDON FIELDS Essendon, Victoria, Australia FINAL REPORT Wind Assessment for: NEW OFFICE BUILDING AT ESSENDON FIELDS Essendon, Victoria, Australia Prepared for: Essendon Fields Pty Ltd Essendon Fields House Level 2, 7 English Street Essendon Fields

More information

Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin

Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin NOISE IMPACT STUDY - Project: 16099 Melancthon Pits Extension Noise Study Part of West Half of Lots 12 and 14, Concession 3 O.S. Township of Melancthon, County of Dufferin Prepared for: MHBC Planning c/o

More information

Technical Memorandum. I. Introduction and Overview. Nancy Clark Turnstone Consulting 330 Townsend Street, Suite 216 San Francisco, CA 94107

Technical Memorandum. I. Introduction and Overview. Nancy Clark Turnstone Consulting 330 Townsend Street, Suite 216 San Francisco, CA 94107 Technical Memorandum TO: FROM: Nancy Clark Turnstone Consulting 330 Townsend Street, Suite 216 San Francisco, CA 94107 Charles Bennett Environmental Science Associates 225 Bush Street, Suite 1700 San Francisco,

More information

Public Workshop #2. September 14, 2016

Public Workshop #2. September 14, 2016 Public Workshop #2 September 14, 2016 Agenda Welcome Project Overview Where We Have Been Alternatives for State Street Land Use Street Design Next Steps 2 Project Overview Create a Vibrant State Street

More information

STATE OF VERMONT ENVIRONMENTAL COURT } } } } } Decision and Order

STATE OF VERMONT ENVIRONMENTAL COURT } } } } } Decision and Order STATE OF VERMONT ENVIRONMENTAL COURT In re: Appeal of Ted S. Gladstone and Kathleen Hoisington Docket No. 190-10-99 Vtec Decision and Order Appellants appealed from a decision of the Planning Commission

More information

AERODYNAMIC FEATURES AS AUXILIARY ARCHITECTURE

AERODYNAMIC FEATURES AS AUXILIARY ARCHITECTURE N. Gu, S. Watanabe, H. Erhan, M. Hank Haeusler, W. Huang, R. Sosa (eds.), Rethinking Comprehensive Design: Speculative Counterculture, Proceedings of the 19th International Conference on Computer- Aided

More information

Highland Park Glengarry Court. Landscape design and Fencing rules

Highland Park Glengarry Court. Landscape design and Fencing rules Highland Park Glengarry Court Landscape design and Fencing rules Introduction Glengarry Court is to be developed as a comprehensive precinct with its own identity within Highland Park. This includes the

More information

Southside Pilot Proposal

Southside Pilot Proposal To improve bicycle access and mobility to UC Berkeley, Downtown Berkeley, and the Southside area, a pilot project could include a two-way parking-protected cycle track. Turn pockets and island bus stops

More information

Swimming Pool/Hot Tub Package

Swimming Pool/Hot Tub Package Planning and Building Department 426 Brant Street, PO Box 5013, Burlington, ON L7R 3Z6 Tel: 905-335-7731 Fax: 905-335-7876 Swimming Pool/Hot Tub Package Swimming Pool/Hot Tub Permit Application Requirements

More information

An Overview of Wind Engineering Where Climate Meets Design

An Overview of Wind Engineering Where Climate Meets Design An Overview of Wind Engineering Where Climate Meets Design Presented by Derek Kelly, M.Eng., P.Eng. Principal/Project Manager www.rwdi.com RWDI Leadership & Consulting Expertise RWDI Consulting Engineers

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016

Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016 Arapahoe Square Zoning + Design Standards & Guidelines Task Force Meeting 9 January 27, 2016 Agenda 3:00 Opening/Welcome 3:15 Touch Base on Schedule and Milestones Moving Forward 3:20 Review the Overall

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION

TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction

More information

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction

Incentive Zoning. Zoning Ordinance Advisory Committee June 21, Pam Thompson, Senior Planner, Sustainable Development and Construction Incentive Zoning Zoning Ordinance Advisory Committee June 21, 2018 Pam Thompson, Senior Planner, Sustainable Development and Construction Presentation Overview Stakeholder questions Updated charts Design

More information

Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm

Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, :30-8:30pm Community Meeting: Proposed Development 4520 Penn Ave. Notes January 30, 2017 6:30-8:30pm Attendance: 17 community members Welcome and Introductions- Christina Howell Christina introduced herself as the

More information

Can Wind Energy Be Captured in New York City? Case Study on Urban Wind based on a Feasibility Study by Orange Line Studio. Spark 101 Educator Resource

Can Wind Energy Be Captured in New York City? Case Study on Urban Wind based on a Feasibility Study by Orange Line Studio. Spark 101 Educator Resource Can Wind Energy Be Captured in New York City? Case Study on Urban Wind based on a Feasibility Study by Orange Line Studio Spark 101 Educator Resource Copyright 2013 Defining Key Concepts What is wind power?

More information

EMPIRICAL EVALUATION OF THREE WIND ANALYSIS TOOLS FOR CONCEPT DESIGN OF AN URBAN WIND SHELTER

EMPIRICAL EVALUATION OF THREE WIND ANALYSIS TOOLS FOR CONCEPT DESIGN OF AN URBAN WIND SHELTER Y. Ikeda, C. M. Herr, D. Holzer, S. Kaijima, M. J. Kim. M, A, Schnabel (eds.), Emerging Experience in Past, Present and Future of Digital Architecture, Proceedings of the 20th International Conference

More information

2013 Wall of Wind (WoW) Contest Informational Workshop

2013 Wall of Wind (WoW) Contest Informational Workshop 2013 Wall of Wind (WoW) Contest Informational Workshop Presented By: Ioannis Zisis February 22, 2013 With Contributions By: Dr. Girma Bitsuamlak, Roy Liu, Walter Conklin, Dr. Arindam Chowdhury, Jimmy Erwin,

More information

Strolling down the Avenue

Strolling down the Avenue Strolling down the Avenue Experience the neighbourhood character of Yonge Street between Glengrove and Roselawn Avenues. West Don Ravine Burke Brook Ravine Yonge-Eglinton Centre 1 Strolling down the Avenue

More information

FALL PROTECTION

FALL PROTECTION 115500 FALL PROTECTION PART 1 GENERAL 1.01 General A. Cornell University seeks to prevent exposures to fall hazards whenever possible and protect personnel that may be exposed to fall hazards. Therefore,

More information

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO

MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO MARLWOOD GOLF & COUNTRY CLUB WASAGA BEACH, ONTARIO Prepared for: Marlwood Golf & Country Club 445 Golf Course Road Wasaga Beach, Ontario L0L 2P0 Prepared by: MBTW Golf Design 255 Wicksteed Avenue Unit

More information

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division

TOWN OF AURORA. Pool Enclosure Permit Guide. PLANNING AND BUILDING SERVICES Building Division TOWN OF AURORA Pool Enclosure Permit Guide PLANNING AND BUILDING SERVICES Building Division Phone: 905-727-3123 ext. 4388 Fax: 905-726-4731 Email: building@aurora.ca Town of Aurora 100 John West Way, Box

More information

Aspects of Using CFD for Wind Comfort Modeling Around Tall Buildings

Aspects of Using CFD for Wind Comfort Modeling Around Tall Buildings 8 th International Congress on Advances in Civil Engineering, 15-17 September 2008 Eastern Mediterranean University, Famagusta, North Cyprus Aspects of Using CFD for Wind Comfort Modeling Around Tall Buildings

More information

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15

Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15 2 Bentleigh GLEN EIRA COUNCIL TRANSFORMATIONAL CONCEPTS 15 Bentleigh Bentleigh urban design context The Bentleigh activity centre is a busy strip shopping centre that runs along Centre Road and is dissected

More information

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim

Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Wards 3 and 22 Official Plan Transportation Master Plan Cycling Plan Pedestrian Plan October 2013 ottawa.ca/liveableottawa

More information

Site Improvements

Site Improvements Sections Included In This Standard: 1.1 Bicycle Facilities 1.2 Guardrails 1.3 Parking Bumpers 1.4 Traffic Signage 1.5 Traffic Signals 1.6 Traffic Impact Studies 1.7 Vision Triangle 1.8 Bus Stop Shelters

More information

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses Wyldewood Estates Pre-Application Public Engagement Summary of Issues and Responses March 2016 Executive Summary Morguard Residential Properties has been thoughtfully planning the redevelopment of Wyldewood

More information

Neighborhood Traffic Calming Policy & Guidelines

Neighborhood Traffic Calming Policy & Guidelines Policy & Guidelines Town of Lantana 500 Greynolds Circle Lantana, FL 33462-4594 Index Topic Page Introduction 3 Definitions 4 Objectives 5 Policies 5 Process 6 Phases of Traffic Calming Study 7 Rating

More information

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy

Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Town of Mooresville, North Carolina Neighborhood Traffic Calming and Control Device Policy Adopted January 6, 2014 Town of Mooresville Development Services Department TOWN OF MOORESVILLE NEIGHBORHOOD TRAFFIC

More information

1.3 Pedestrian Environments

1.3 Pedestrian Environments SECTION 1: COMMERCIAL DEVELOPMENT 1.3 Pedestrian Environments Design Principle The quality of the pedestrian environment often defines the overall success of a commercial project. Attention to the development

More information

Compliance with Section 18-52(4) City of Thornton Development Code

Compliance with Section 18-52(4) City of Thornton Development Code May 25, 2016 Jay Ruchti City of Thornton City Development Department 9500 Civic Center Drive Thornton, CO 80229 RE: Golf Safety Netting TOPGOLF Entertainment Complex (Southeast Corner of East 136 th Avenue

More information

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca

COUNTY ROAD 22 HORSESHOE VALLEY ROAD. Municipal Class Environmental Assessment. simcoe.ca OCTOBER 2014 Municipal Class Environmental Assessment COUNTY ROAD 22 HORSESHOE VALLEY ROAD Project A Truck Climbing Lanes Project B Intersection Improvements simcoe.ca CORPORATE COMMUNICATIONS DEPARTMENT

More information

CPHA Pre-conference Toronto May 2014

CPHA Pre-conference Toronto May 2014 CPHA Pre-conference Toronto May 2014 Olivier Bellefleur, Julie Castonguay, François Gagnon and Louise St-Pierre National Collaborating Centre for Healthy Public Policy Émile Tremblay Direction de la santé

More information

Fall Protection on Low Sloped Roofs for General Industry. Presented by: Brian Stickler

Fall Protection on Low Sloped Roofs for General Industry. Presented by: Brian Stickler Fall Protection on Low Sloped Roofs for General Industry Presented by: Brian Stickler Learning Objectives: Learn how to identify hazard areas on the roof Determine what OSHA considers to be a hole on the

More information

The Art of Natural Ventilation Balancing Heat and Air Flows?

The Art of Natural Ventilation Balancing Heat and Air Flows? The Art of Natural Ventilation Balancing Heat and Air Flows? Rowan Williams Davis & Irwin (RWDI) Inc. Consulting in the Science of Buildings, Structures and Environment Duncan.Phillips@rwdi.com Acknowledgements

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Your views are important. Please fill in a form before you leave. Or alternatively

Your views are important. Please fill in a form before you leave. Or alternatively Drum Property Group is delighted to welcome you to this exhibition which sets out our initial proposals for a mixed-use development at Stead s Place, Edinburgh. We are keen to hear the views of local people

More information

Town of Beaumont Sidewalk Café Guidelines

Town of Beaumont Sidewalk Café Guidelines Town of Beaumont Sidewalk Café Guidelines 0 Table of Contents 1. Purpose... 1 2. Definition... 1 3. Project Area... 1 3.1 Town Centre-Mixed Use... 1 3.2 Direct Control... 1 4. Types of Sidewalk Cafés Permitted...

More information

Site Analysis and Parti Development

Site Analysis and Parti Development Site Analysis and Parti Development 32_43 06.11N, 117_09 25.15W Dean Sartain Assignment # 4 AR 650: Programming Instructor: Mirkovich 1. LOCATION within the city. - The site is located between A St & B

More information

URBAN DESIGN BRIEF / BOOKLET

URBAN DESIGN BRIEF / BOOKLET URBAN DESIGN BRIEF / BOOKLET FUTURE BUILDING / ARCHITECTURAL THEME AND PEDESTRIAN ENTRANCE TANGER OUTLET MALL VISION / IDENTITY The proposed Tanger retail outlet will provide a uniquely themed specialty

More information

Wind Field Modifications in Habitable Urban Areas

Wind Field Modifications in Habitable Urban Areas Current World Environment Vol. 7(2), 267-273 (2012) Wind Field Modifications in Habitable Urban Areas SEEMI AHMED and ALKA BHARAT Department of Architecture and Planning, M.A.Natonal Institute of Technology,

More information

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION

PLACEMENT OF SIGNS RECOMMENDED PRACTICES SUB-SECTION Page 1 of 6 RECOMMENDED PRACTICES PART SECTION SUB-SECTION HIGHWAY SIGNS GENERAL General Proper positioning of signs is an important element in the overall control of traffic within a roadway network.

More information

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America.

The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America. Construction & Utilities Division Planning Tools The content of this resource has been generously provided by the AGC Houston, the Associated General Contractors of America. Guidelines for Creation of

More information

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives.

DRAFT. A fifth objective, other considerations, has been added to capture considerations not captured by the four primary objectives. TECHNICAL MEMORANDUM Albany - Washington Avenue Traffic Calming Evaluation Matrix of Conceptual Alternatives Date: May 17, 2017 Project #: 17356 To: Aleida Andrino-Chavez From: Laurence Lewis, Sara Muse,

More information

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST

Obey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST THE VILLAGE AT PEDESTRIAN CIRCULATION MAIN STREETS NORTH/SOUTH MAIN STREETS EAST/WEST SLIP STREET CREEK SIDE LANE PEDESTRIAN CIRCULATION DESCRIPTION: Circulation through the downtown of is organized by

More information

Section 1. Global Wind Patterns and Weather. What Do You See? Think About It. Investigate. Learning Outcomes

Section 1. Global Wind Patterns and Weather. What Do You See? Think About It. Investigate. Learning Outcomes Chapter 5 Winds, Oceans, Weather, and Climate Section 1 Global Wind Patterns and Weather What Do You See? Learning Outcomes In this section, you will Determine the effects of Earth s rotation and the uneven

More information

Comments on KXLY DRB Submittal from Southgate Neighborhood Council

Comments on KXLY DRB Submittal from Southgate Neighborhood Council Final revision January 21, 2017 Introduction - Narrative and Summary (Page 3) Paragraph 3 states that Future-phase buildings are not part of this application. We understand that the final submittal clarifies

More information

See Figure 38, Existing Nonmotorized Connections.

See Figure 38, Existing Nonmotorized Connections. Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length

More information

Prepared By: Town of Waxhaw Traffic Calming Policy

Prepared By: Town of Waxhaw Traffic Calming Policy Policy For Resolutions for Town Meetings Prepared By: Town Manager Michael McLaurin Director Greg Mahar CPD Waxhaw N.C. Community Planning &Development Administrative Department Department: Date Approved

More information

SAFE ROUTES TO SCHOOL

SAFE ROUTES TO SCHOOL SAFE ROUTES TO SCHOOL Forest Ridge Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries

More information

To: Planning Commission Date: September 19, 2012 From: By: Subject:

To: Planning Commission Date: September 19, 2012 From: By: Subject: To: Planning Commission Date: September 19, 2012 From: By: Subject: City of Woodinville, WA Report to the planning commission 17301 133 rd Avenue NE, Woodinville, WA 98072 www.ci.woodinville.wa.us Richard

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information