1 Sconser Quarry, Caol Mor AUTODEPOMOD MODELLIN G REPORT Registered in Scotland No Registered Office, 1st Floor, Admiralty Park, Admiralty Road, Rosyth, FIFE, KY11 2YW Marine Harvest ( Scotland) Limited, Stob Ban House, Glen Nevis Business Park, Fort William, PH33 6RX Marine Harvest ( Scotland) Limited, Stob Ban House, Glen Nevis Business Park, Fort William, PH33 6RX marineharvest. com

2 CONTENTS Page EXECUTIVE SUMMARY 1 1 INTRODUCTION 2 2 MODEL INPUT DETAILS HYDROGRAPHIC DATA SITE DETAILS RUN DETAILS 6 3 MODELLING RESULTS BIOMASS RESULTS TRANSECT AND SAMPLING STATIONS IN-FEED TREATMENTS SLICE BATH MODEL RESULTS 11 4 RESULTS AND CONCLUSIONS 12 REFERENCES 14 1

3 List of Figures Figure 1 Location of the Salmon Farm... 2 Figure 2 Site current direction frequency from the surface current meter... 4 Figure 3 bathymetry and cage layout... 6 Figure 4 Benthic impact for run 7, Int-Spring current data... 7 Figure 5 Location of the selected and spare transects... 8 Figure 6 Cross-sections of both the selected and spare transects respectively... 9 Figure 7 EmBZ concentrations for run 1 (118 days) List of Tables Table 1 Summary of Results... 1 Table 2 A summary of the mean and residual currents recorded at the site... 4 Table 3 Project Information... 5 Table 4 Selected and Spare Transect Starting Points... 8 Table 5a&b The details of the three selected and spare survey stations respectively... 9 Table 6 Modelling Results Summarised

4 EXECUTIVE SUMMARY This report has been prepared by Marine Harvest ( Scotland) Ltd. to meet the requirements of the Scottish Environment Protection Agency ( SEPA) for the purpose of assessing an application to install equipment and consequent biomass, and for consent to use sufficient sealice treatments in a marine salmon farm, via AutoDepomod and dispersion modelling. The report describes biomass, in-feed and bath treatment modelling results for the Sconser Quarry site, a summary of which is provided in Table 1 below. The report held centrally, and previously accredited, by SEPA (AMMR11v02) details modelling methods used. Table 1 Summary of Results Site Name: Site location: SITE DETAILS Sconser Quarry Caol Mor, Skye Peak biomass ( T): 2,500 CAGE DETAILS Number of cages: 12 Cage dimensions: 120m Circumference Working Depth ( m): 12 Cage group configuration: Surface Currents Middle Currents Seabed Currents HYDROGRAPHIC SUMMARY 1(2x6), 80m matrix Average Speed (m/s) Residual Direction 0.064m/s at 321 G Wind-Influence Average Speed (m/s) Slight 0.067m/s Residual Direction 0.039m/s at 305 G Average Speed (m/s) 0.047m/s Residual Direction 0.016m/s at 347 G BENTHIC MODELLING Max fish biomass proposed (T) 2,500t Max Average Stocking Density ( kg/m³) Distance to the 30ITI contour (m) 163 Direction of transect ( T) IN-FEED TREATMENTS Recommended consent mass EmBZ (g) 1,575 Equivalent Fish Biomass (T) 4500 Maximum Treatment Amount EmBZ ( g) 829 BATH TREATMENTS Recommended consent mass in 3hrs Azamethiphos 332.7g cage/treatment, 2.6 treatment/ day Recommended consent mass in 24 hrs Azamethiphos 378.2g cage/treatment, 3 treatment/ day Recommended consent mass in 3 hrs Cypermethrin Recommended consent mass in 3 hrs Deltamethrin 60.2g cages/treatment, 9.6 treatments/ day 22.6g cages/treatment, 9 treatments/ day 1

5 1 INTRODUCTION This report has been prepared by Marine Harvest to meet the requirements of the Scottish Environment Protection Agency ( SEPA) for the purpose of assessing an application to install equipment and consequent biomass, and for consent to use sufficient sealice treatments, via AutoDepomod and dispersion modelling. The report describes modelling results for the Sconser Quarry site ( Figure 1) to determine EQS-compliant biomass and sea-lice treatment levels for the proposed equipment. Report number AMMR11v02, which is held centrally by SEPA, provides details of the generic modelling methods used. Figure 1 Location of the Salmon Farm 2

6 2 MODEL INPUT DETAILS 2.1 HYDROGRAPHIC DATA The site data was collected by Marine Harvest for the purpose of assessing a consent application with the AutoDepomod software. Methods of the data collection and analysis followed current SEPA guidelines (SEPA, 2005); the data used were of 15 days duration and were analysed using both the appropriate SEPA hydrographic excel template for 20 minute data and the hg-analysis spreadsheet, also provided by SEPA. The Admiralty Hydrographic Office tide prediction software Total Tide was used to determine the start dates of spring and neap tides and to determine the times of high water and mean tidal height for the area (see Table 3). Following SEPA guidelines the start points in the current meter record used for modelling are those closest to midday on the day of the intermediate spring tides and the intermediate neap tides. In the current meter data used, after hourly averaging, the times of intermediate HW spring and HW neap corresponded to records 168 and 360 respectively. Prior to commencement of modelling the current data required correction to Grid North and was thus corrected by 4.25W. The hourly averaged current data for the surface, middle and bottom bins were then saved as space delimited files, as detailed in AMMR11v02 and following the default AutoDepomod file structure. Using the hg-analysis spreadsheet the mean speed and the residual current speed and direction were established for each of the three current meter depths. The mean and residual currents, and the histogram frequency peaks are summarised in Table 2 below. The data showed a predominant current in a northerly direction at each surface-, mid- & seabed - depth. A slight correlation was found between the surface current speeds and the wind speeds ( Figure 2); however a tidal pattern can still be seen. The mean wind speed over this period was 4.52m/s. 3

7 Figure 2 Site current direction frequency from the surface current meter SURFACE Mean Speed m/s Residual Speed m/s Residual Parallel m/s Residual Normal m/s Tidal Amplitude Parallel m/s Tidal Amplitude Normal m/s Frequency Peak 321 MIDDLE Mean Speed m/s Residual Speed m/s Frequency Peak 305 BOTTOM Mean Speed m/s Residual Speed m/s Frequency Peak 347 Table 2 A summary of the mean and residual currents recorded at the site 4

8 2.2 SITE DETAILS The proposed site is situated off the shore of Sconser Quarry in the Caol Mor body of water on Skye. Marine Harvest proposes to install a salmon farm at the site and AutoDepomod and the Bath Treatment models have been run to determine EQS-compliant biomass and medicinal consents for this new equipment. Details of the site are provided in Table 3. The receiving water is defined as strait. Table 3 Project Information SITE DETAILS Site Name: Sconser Quarry Site location: Caol Mor, Skye Peak biomass (T): 2500 Proposed feed load (T/yr): Proposed treatment use: CAGE DETAILS Azamethiphos, Cypermethrin, Deltamethrin & Emamectin Benzoate Group location: E N Number of cages: 12 Cage dimensions: 120m circumference, 80m matrix Working Depth ( m): 12 Cage group configuration: 1(2x6) Cage group orientation ( G): Cage group distance to shore (km): 0.33 Water depth at site (m): 45 HYDROGRAPHIC DATA Current meter position: E156262, N Depth at deployment position ( m): 37.6 Surface bin centre height above bed (m): 33.7 Middle bin centre height above bed (m): 26.7 Bottom bin centre height above bed (m): 2.7 Duration of record: 15 days: from 28/06/2013 to 13/07/2013 Current meter averaging interval: 20 mins ADDITIONAL DATA Magnetic correction to grid North: Predicted Spring Tide 2.4 Predicted Neap Tide 2.1 Predicted Spring Tide 2.7 Mean Tidal Level at Site (m): 3.15 Closest Standard Port Broadford Bay Date of Intermediate- Spring Tides: 05/07/2013 Date of Intermediate- Neap Tides: 13/07/2013 5

9 2.3 RUN DETAILS A new project was created in AutoDepomod and named Sconser Quarry. The site and cage details provided in Table 3 were entered into the appropriate files and all other data were set to default. The resulting site bathymetry and cage layout is shown in Figure 3. Modelling of both the biomass and chemotherapeutants was undertaken following the methods outlined in the Methods Report AMMR11v02 which is held centrally by SEPA. Details of the modelling results have been provided in the next section according to SEPA requirements. Figure 3 bathymetry and cage layout Two types of treatment are used to control sea lice infestation in marine salmon farms and these require different modelling approaches. The in-feed treatment Slice (active ingredient Emamectin Benzoate) requires deposition modelling using AutoDepomod to predict the chemical accumulation on the seabed beneath the fish cages associated with fish faeces and uneaten treated feed. The bath treatments Salmosan (chemical name Azamethiphos), Excis chemical name Cypermethrin) and Alphamax ( Deltamethrin), where the salmon are immersed in a diluted solution of the treatment chemical require dispersion modelling to predict the concentration in the water column after release. Results from both AutoDepomod and the Bath model have been provided in the next section. 6

10 3 MODELLING RESULTS 3.1 BIOMASS RESULTS AutoDepomod was run initially with the company s preferred stocking density of kg/ m3, and proposed cage layout, using the model s auto-distribute biomass function. The model did not require to iterate to an EQS-complaint solution as a pass was achieved at this stocking density and pen volume for the resultant maximum allowable biomass of 2,500 tonnes. At this biomass the model predicts the 80% solids area to be 106,860m2 while the flux in this area is expected to be 1464g/m2/ year. The proposed layout and tonnage results in a benthic cage area of 51,794m2 with a minimum ITI of 3.1 within the area. The flux in the benthic cage group area is predicted not to exceed the trigger value (10,000g/m2/year) at 9,215g/m2/year. The benthic sampling area (ITI = 30) is expected to be 160,948.7m2 while the flux inside this area will be 191.8g/m2/year. The plotted AutoDepomod output for the passing Int-Spring run 7 is shown in Figure 4. A summary with all of this information can be found in Sconser Quarry_marine_sum_v3.xls and in Table 7 of this report. Figure 4 Benthic impact for run 7, Int-Spring current data The mass of solids released in run 7 is estimated to be 1,020,816kg with 96% ( 975,536kg) predicted to remain within the 1km2 modelling grid, thus 4% ( 42,195kg) of the input load is predicted to be transported from the model grid as a result of resuspension. Current data recorded at the site results in a vector average residual of 0.064m/s at 321 G at the surface; Figure 4 shows a tendency for waste to be dispersed away from the cages in a northerly direction. 7

11 3.1.1 TRANSECT AND SAMPLING STATIONS Two transect profiles were created ( figure 5) as part of SEPA s requirements to determine site-specific sampling locations. The selected and spare transect information have been saved to the Sconser Quarry-BcnstFI- S-7_000.xls file located in the mapping folder. Details of both transect starting points are provided in Table 4 below. Table 5 describe the location and details of the three selected and spare survey stations. Figure 6 shows the cross- sections of the selected and spare transects, and the relevant survey stations. Figure 5 Location of the selected and spare transects Transect X1 Y1 X2 Y2 Bearing Length Depth T T Table 4 Selected and Spare Transect Starting Points 8

12 SELECTED EQS - 10m 1st Station) S1 EQS 2nd Station) S2 EQS + 10m 3rd Station) S3 SPARE EQS - 10m 1st Station) S1 EQS 2nd Station) S2 EQS + 10m 3rd Station) S3 NGR Easting NGR Easting NGR Northing NGR Northing Distance ( m) Distance ( m) CD depth (m) CD depth (m) Modelled ITI Modelled ITI Table 5a&b The details of the three selected and spare survey stations respectively Figure 6 Cross-sections of both the selected and spare transects respectively 9

13 3.2 IN-FEED TREATMENTS SLICE The SLICE aspect of AutoDepomod was run initially for a Total Allowable Quantity sufficient to treat 1.9 times the proposed peak biomass (1,575g & 4,500 tonnes respectively). Marine Harvest have followed SEPA s guidance and used the maximum feedload for the site in the model, resulting in a feedload of 6,387T. The model did not require to iterate to an EQScomplaint solution as a pass was achieved at this quantity and biomass. The predicted area inside the g/kg contour (73,537m2) was smaller than the predicted far field AZE area 188,709m2). The mean concentration of Slice in the near field AZE exceeds the EQS trigger value of 7.63g/kg by 79.77g/kg and thus enhanced monitoring will be required at the site if Slice is used. The plotted AutoDepomod output for this run is shown in figure 7. A further run for 223 days duration was performed to obtain a site residual curve for this biomass. Figure 7 EmBZ concentrations for run 5 (118 days) The mass of EmBZ remaining on the bed at the end of run 5 was 1086g. For Slice, in the absence of resuspension, 95% or g of the input EmBZ load would remain on the seabed after 118 days. This indicates that less than half of the original input load is lost through resuspension ( 5%). The mass of EmBZ lost from the grid ( 79.5g) represents an equivalent area of 0.86km2 if it assumed to distribute evenly at the far field EQS concentration of 0.763g/kg sediment. This level of export is below the threshold of 922g, which is based on the receiving area being unconstrained. 10

14 3.3 BATH MODEL RESULTS Cage details are given in section 2. The cage treatment depth used for the bath treatments was 1.1m. Using the results from the analysis of the surface current meter data in the short term bath treatment model EQS compliance for both Deltamethrin and Cypermethrin at this cage depth was predicted. EQS compliance for Azamethiphos was predicted at a cage depth of 1.1m. Cypermethrin & Deltamethrin Results: Cage Treatment Depth = 1.1m Permissible Quantity of Cypermethrin = 60.2g; 9.6 cages/3 hours Permissible Quantity of Deltamethrin = 22.6g; 9.0 cages/3 hours Azamethiphos Results: Cage treatment depth = 1.1m Permissible Quantity of Azamethiphos = 332.7g; 2.6 cages/3 hours Permissible Quantity of Azamethiphos = 378.2g; 3.0 cages/24 hours The permissible quantities means that full treatment of the 12 pens at the site, would take a maximum of 4 days to treat. The bath treatment model files are saved in the folder Sconser Quarry\Bath 11

15 4 RESULTS AND CONCLUSIONS It is recommended that the biomass and treatment amounts are consented at this site as given below. The results of the modelling performed at this site are given in the file : Sconser Quarry_marine_sum_v3.xls in the Sconser Quarry folder. BENTHIC MODELLING: Max fish biomass proposed (T) 2500 Cage depth (m) 12 Max Average Stocking Density (kg/m³) Maximum number of cages 12 loss of solids from model grid (%) 4 Cage area equivalent ( m²) 51,794 Flux in the cage area (g/m²/y) 13,042 ITI in the cage area 3.1 Flux under cages does not exceed the trigger value 80% solids area (m²) 106,860 Flux in the 80% solids area (g/m²/y) 1464 ITI in the 80% solids area 10.5 Benthic sampling area (m²) 160,949 Flux in the benthic sampling area (g/m²/y) ITI in benthic sampling area 30 SITE SPECIFIC SAMPLING: Transect start coordinates E N Direction () CD Depth (m) 42.4 Distance to the 30ITI contour ( m) SPARE TRANSECT INFORMATION Transect start coordinates E N Direction () 320 CD Depth (m) 36.1 Distance to the 30ITI contour (m) IN-FEED TREATMENTS Peak fish biomass at site (T) 2500 Near Field AZE (m²) 73,537 Far Field AZE (m²) 188,709 Recommended consent mass EmBZ ( g) 1575 Equivalent Fish Biomass ( T) 4500 Maximum Treatment Amount EmBZ ( g) 350 Area of Impact at Far Field EQS (m2) loss of EmBZ from model grid (% 5 12

16 BATH TREATMENTS Recommended consent mass in 3hrs Azamethiphos Recommended consent mass in 24 hrs Azamethiphos Recommended consent mass in 3 hrs Cypermethrin Recommended consent mass in 3 hrs Deltamethrin 332.7g cage/treatment, 2.6 treatment/ day 378.2g cage/treatment, 3 treatment/ day 60.2g cages/treatment, 9.6 treatments/ day 22.6g cages/treatment, 9.0 treatments/day Table 6 Modelling Results Summarised 13

17 REFERENCES SEPA Regulation and monitoring of marine cage fish farming in Scotland - a procedures manual: Annex G Models for assessing the use of medicines in bath treatments (January 2007). SEPA, Regulation and monitoring of marine cage fish farming in Scotland - a procedures manual: Annex H - Methods for Modelling In-Feed Anti-Parasitics and Benthic Effects (June 2005) SEPA, Regulation and monitoring of marine cage fish farming in Scotland - a procedures manual: Attachment VIII Hydrographic data requirements for applications to discharge from Marine Cage Fish Farm (May 2005). UKHO, Admiralty Tide Tables; volume 1 UK and Ireland. United Kingdom Hydrographic Office, Taunton. 14

Bagh Dail nan Ceann ( BDNC) Salmon Farm, Loch Shuna

Bagh Dail nan Ceann ( BDNC) Salmon Farm, Loch Shuna Bagh Dail nan Ceann ( BDNC) Salmon Farm, Loch Shuna AUTODEPOMOD MODELLIN G REPORT 09. 2016V1 REPORT WRITTEN BY ENVIRONMENTA L ANALYST) CHECKED BY ENVIRONMENTAL MAN AGER) Registered in Scotland No. 138843

More information

Fish Farm Consent Modelling. Poll na Gille

Fish Farm Consent Modelling. Poll na Gille Poll na Gille February 2014 Report Written by Environental Manager Marine Harvest Scotland Fars Office Blar Mhor Industrial Estate Fort Willia, PH33 7PT Tel: + 44(0)1397 70 1550 Fax: + 44(0)1397 70 1174

More information

SHORT- AND LONG- TERM MODELLING IN SUPPORT OF SEA LICE BATH TREATMENTS AZAMETHIPHOS, CYPERMETHRIN AND DELTAMETHRIN

SHORT- AND LONG- TERM MODELLING IN SUPPORT OF SEA LICE BATH TREATMENTS AZAMETHIPHOS, CYPERMETHRIN AND DELTAMETHRIN ANDERSON MARINE SURVEYS LTD. Croabh, Tighnabruaich, Argyll. PA21 2DY Tel/Fax: 01700 811677 Email: amsl@sol. co.uk Report To: The Scottish Salmon Company Ltd Report No: 14/12.2 Issued By: Checked By: Status:

More information

HYDROGRAPHIC AND SITE SURVEY REPORT

HYDROGRAPHIC AND SITE SURVEY REPORT HYDROGRAPHIC AND SITE SURVEY REPORT Proposed Pen Site at Dounie, Sound of Jura Prepared for: Kames Fish Farming Ltd Kilmelford Argyll PA34 4XA Tel: +44 (0)1631 720699 TransTech Limited www.transtechltd.com

More information

Contents. Tables and Figures. G Models for assessing the use of medicines in bath treatments

Contents. Tables and Figures. G Models for assessing the use of medicines in bath treatments Regulation and monitoring of marine cage fish farming in Scotland - a procedures manual G-1 of 16 G Models for assessing the use of medicines in bath treatments Contents G.1 Introduction G-2 G.2 Environmental

More information

Skye District Salmon Fishery Board

Skye District Salmon Fishery Board Skye District Salmon Fishery Board SEPA Registry Grasser House Fodderty Way Dingwall IV15 9XB registrydingwall@sepa. org.uk By e-mail only 24 April 2018 Ref: Application CAR/L/1002991 Leinish Bay Marine

More information

Skye District Salmon Fishery Board

Skye District Salmon Fishery Board Skye District Salmon Fishery Board SEPA Registry Grasser House Fodderty Way Dingwall IV15 9XB registrydingwall@sepa. org.uk By e-mail only 24 April 2018 Ref: Application CAR/L/1033775 Gob Na Hoe Marine

More information

An Camus, Lochboisdale, South Uist

An Camus, Lochboisdale, South Uist An Camus, Lochboisdale, South Uist BASELINE VIDEO SURVE Y REPORT 2016 Contents 1.0 Video Survey Analysis... 3 2.0 Appendix 1. Species identified and stills extracted from raw video footage... 5 1.0 Video

More information

SALMON & TROUT CONSERVATION SCOTLAND S AQUACULTURE CAMPAIGN

SALMON & TROUT CONSERVATION SCOTLAND S AQUACULTURE CAMPAIGN SALMON & TROUT CONSERVATION SCOTLAND S AQUACULTURE CAMPAIGN LOCH FYNE UPDATE Executive summary 1. In the second year of their production cycle, the ten fish farms on Loch Fyne operated by The Scottish

More information

BASELINE SURVEY, VISUAL - SITE SPECIFIC

BASELINE SURVEY, VISUAL - SITE SPECIFIC BASELINE SURVEY, VISUAL - SITE SPECIFIC Introduction As stated in SEPA s policy and in the Fish Farm Manual (1998), scientific data are required by SEPA in order to assess the existing condition on the

More information

Appendix 5: Currents in Minas Basin. (Oceans Ltd. 2009)

Appendix 5: Currents in Minas Basin. (Oceans Ltd. 2009) Appendix 5: Currents in Minas Basin (Oceans Ltd. 29) Current in Minas Basin May 1, 28 March 29, 29 Submitted To: Minas Basin Pulp and Power P.O. Box 41 53 Prince Street Hansport, NS, BP 1P by 22, Purdy

More information

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling

Marine Renewables Industry Association. Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling Marine Renewables Industry Association Marine Renewables Industry: Requirements for Oceanographic Measurements, Data Processing and Modelling October 2009 Table of Contents 1. Introduction... 1 2. Measurements

More information

: Hydrodynamic input for 2D Vessel Simulations (HY- 0027)

: Hydrodynamic input for 2D Vessel Simulations (HY- 0027) Technical Note To : Christian Taylor (PoHDA) From : Rohan Hudson Cc : Ben Gray Date : 1/04/2015 (Final Draft) Subject : Hydrodynamic input for 2D Vessel Simulations (HY- 0027) Introduction This Technical

More information

ARDMORE SEWAGE SCHEME MARINE OUTFALL SURVEY REPORT

ARDMORE SEWAGE SCHEME MARINE OUTFALL SURVEY REPORT Document Ref.: 845/1/2001 ARDMORE SEWAGE SCHEME MARINE OUTFALL SURVEY REPORT Submitted to:- E. G. Pettit & Co. Limited, Consulting Engineers, Blackrock Road, Cork. Prepared by:- Irish Hydrodata Limited,

More information

E. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences

E. Agu, M. Kasperski Ruhr-University Bochum Department of Civil and Environmental Engineering Sciences EACWE 5 Florence, Italy 19 th 23 rd July 29 Flying Sphere image Museo Ideale L. Da Vinci Chasing gust fronts - wind measurements at the airport Munich, Germany E. Agu, M. Kasperski Ruhr-University Bochum

More information

The rate versus time can then be the subject of whatever calculation the user chooses, for example:

The rate versus time can then be the subject of whatever calculation the user chooses, for example: Using Neptune Planner Plus to Export Tidal Rates to Excel These notes are intended to assist the interested user in exporting predicted tidal stream rates into a spreadsheet for the estimation of tidal

More information

CONSTRUCTION OF LNG RECEIVING TERMINAL ON THE SAINT LAWRENCE TIDAL CURRENT CONDITIONS IN THE LEVIS AREA

CONSTRUCTION OF LNG RECEIVING TERMINAL ON THE SAINT LAWRENCE TIDAL CURRENT CONDITIONS IN THE LEVIS AREA RABASKA PROJECT CONSTRUCTION OF LNG RECEIVING TERMINAL ON THE SAINT LAWRENCE TIDAL CURRENT CONDITIONS IN THE LEVIS AREA FINAL REPORT MARCH 2006 N/Réf. : 24237.360 3075, ch. des Quatre-Bourgeois Sainte-Foy

More information

FINAL REPORT APPENDIX A. Physical Description of the Shubenacadie River

FINAL REPORT APPENDIX A. Physical Description of the Shubenacadie River FINAL REPORT APPENDIX A Physical Description of the Shubenacadie River Smart Solutions for Engineering, Science and Computing Physical Description of the Shubenacadie River Martec Technical Report # TR-07-12

More information

ICES Guidelines for Multibeam Echosounder Data (Compiled September 2006)

ICES Guidelines for Multibeam Echosounder Data (Compiled September 2006) ICES Guidelines for Multibeam Echosounder Data (Compiled September 2006) If you are considering producing a hydrographic survey please read the following information first. Your survey could be used to

More information

Three Rivers Cockle Abundance Survey Report April 2016

Three Rivers Cockle Abundance Survey Report April 2016 Three Rivers Cockle Abundance Survey Report April 16 May 16 Crown Copyright WG 2884 ISBN digital 978-1-4734-669-6 1. Introduction The annual Three Rivers Estuaries cockle abundance survey was conducted

More information

Currents measurements in the coast of Montevideo, Uruguay

Currents measurements in the coast of Montevideo, Uruguay Currents measurements in the coast of Montevideo, Uruguay M. Fossati, D. Bellón, E. Lorenzo & I. Piedra-Cueva Fluid Mechanics and Environmental Engineering Institute (IMFIA), School of Engineering, Research

More information

NEED FOR SUPPLEMENTAL BATHYMETRIC SURVEY DATA COLLECTION

NEED FOR SUPPLEMENTAL BATHYMETRIC SURVEY DATA COLLECTION 305 West Grand Avenue, Suite 300 Montvale, New Jersey 07645 Phone 201.930.9890 Fax 201.930.9805 www.anchorqea.com M EMORANDUM To: Caroline Kwan and Nica Klaber U.S. Environmental Protection Agency Region

More information

POOLE HARBOUR APPROACH CHANNEL DEEPENING EIA: SEDIMENT MANAGEMENT PLAN

POOLE HARBOUR APPROACH CHANNEL DEEPENING EIA: SEDIMENT MANAGEMENT PLAN POOLE HARBOUR APPROACH CHANNEL DEEPENING EIA: SEDIMENT MANAGEMENT PLAN 1. Introduction The purpose of the Poole Harbour Sediment Management Plan (SedMP) is twofold: to mitigate the predicted impact of

More information

14/10/2013' Bathymetric Survey. egm502 seafloor mapping

14/10/2013' Bathymetric Survey. egm502 seafloor mapping egm502 seafloor mapping lecture 10 single-beam echo-sounders Bathymetric Survey Bathymetry is the measurement of water depths - bathymetry is the underwater equivalent of terrestrial topography. A transect

More information

13. TIDES Tidal waters

13. TIDES Tidal waters Water levels vary in tidal and non-tidal waters: sailors should be aware that the depths shown on the charts do not always represent the actual amount of water under the boat. 13.1 Tidal waters In tidal

More information

SEISMIC SURVEY GREENLAND 2014 Underwater sound propagation for North East Greenland offshore seismic survey

SEISMIC SURVEY GREENLAND 2014 Underwater sound propagation for North East Greenland offshore seismic survey TGS February 2014 SEISMIC SURVEY GREENLAND 2014 Underwater sound propagation for North East Greenland offshore seismic survey Appendix: NEG14 modelling results Mark Mikaelsen PROJECT Seismic Survey Greenland

More information

Training program on Modelling: A Case study Hydro-dynamic Model of Zanzibar channel

Training program on Modelling: A Case study Hydro-dynamic Model of Zanzibar channel Training program on Modelling: A Case study Hydro-dynamic Model of Zanzibar channel Mayorga-Adame,C.G., Sanga,I.P.L., Majuto, C., Makame, M.A., Garu,M. INTRODUCTION Hydrodynamic Modeling In understanding

More information

Paper for Consideration by HSSC8 Development of an Additional Bathymetry Layer standard based on S-57/S-52

Paper for Consideration by HSSC8 Development of an Additional Bathymetry Layer standard based on S-57/S-52 Paper for Consideration by HSSC8 Development of an Additional Bathymetry Layer standard based on S-57/S-52 Submitted by: CIRM, Germany, USA (NOAA) Executive Summary: Proposal for the standardization of

More information

Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Harbour Technical Note 2 WITHOUT PREJUDICE

Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Harbour Technical Note 2 WITHOUT PREJUDICE Poole Harbour Channel Deepening and Beneficial Use Review of Physical monitoring in Poole Harbour Technical Note WITHOUT PREJUDICE. Introduction This technical note reviews the physical data that was collected

More information

Tide Gauge 00,04 13, /09/90 03J9 15, /09/ /09/90 03,44 16,09 04,44 16,19 05,14 17,04

Tide Gauge 00,04 13, /09/90 03J9 15, /09/ /09/90 03,44 16,09 04,44 16,19 05,14 17,04 DATE Tide Tables Tide Gauge Tide Tables Tide Gauge 30/08/90 00,lO 12,52 00,04 13,04 2.9 3.1 3.10 3.40 31/08/90 02,03 14,18 02.19 14.19 3.0 3.3 3.01 3.49 01/09/90 03,12 15,16 03J9 15,14 3.2 3.5 3.39 3.78

More information

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 11 APPENDIX B TIDEROUT 2 USERS MANUAL APRIL 2011 APRIL 2011 Page 1 Preface TIDEROUT 2, Build 1.22 dated June 29, 2006 is the current

More information

Influence of wind direction on noise emission and propagation from wind turbines

Influence of wind direction on noise emission and propagation from wind turbines Influence of wind direction on noise emission and propagation from wind turbines Tom Evans and Jonathan Cooper Resonate Acoustics, 97 Carrington Street, Adelaide, South Australia 5000 ABSTRACT Noise predictions

More information

Environment, Climate Change and Land Reform Committee. Environmental impacts of salmon farming. Written submission from Fisheries Management Scotland

Environment, Climate Change and Land Reform Committee. Environmental impacts of salmon farming. Written submission from Fisheries Management Scotland Environment, Climate Change and Land Reform Committee Environmental impacts of salmon farming Written submission from Fisheries Management Scotland Fisheries Management Scotland are the representative

More information

5 HUMAN BEINGS ELECTRICAL AND MAGNETIC FIELDS

5 HUMAN BEINGS ELECTRICAL AND MAGNETIC FIELDS 5 HUMAN BEINGS ELECTRICAL AND MAGNETIC FIELDS 5.1 INTRODUCTION 1 This chapter of the (EIS) presents an evaluation of the proposed development as set out in Chapter 6, Volume 3B of the EIS, in relation

More information

Examples of Carter Corrected DBDB-V Applied to Acoustic Propagation Modeling

Examples of Carter Corrected DBDB-V Applied to Acoustic Propagation Modeling Naval Research Laboratory Stennis Space Center, MS 39529-5004 NRL/MR/7182--08-9100 Examples of Carter Corrected DBDB-V Applied to Acoustic Propagation Modeling J. Paquin Fabre Acoustic Simulation, Measurements,

More information

1 st Tidal and Water Level Working Group Meeting DHN, Niteroi, Brazil 31/03/09 02/04/09 Vertical Offshore Reference Framework (VORF) Chris Jones

1 st Tidal and Water Level Working Group Meeting DHN, Niteroi, Brazil 31/03/09 02/04/09 Vertical Offshore Reference Framework (VORF) Chris Jones 1 st Tidal and Water Level Working Group Meeting DHN, Niteroi, Brazil 31/03/09 02/04/09 Vertical Offshore Reference Framework (VORF) Chris Jones United Kingdom Hydrographic Office Presentation Structure

More information

Available online at ScienceDirect. Procedia Engineering 116 (2015 )

Available online at  ScienceDirect. Procedia Engineering 116 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 116 (2015 ) 320 325 8th International Conference on Asian and Pacific Coasts (APAC 2015) Department of Ocean Engineering, IIT

More information

Beach Wizard: Development of an Operational Nowcast, Short-Term Forecast System for Nearshore Hydrodynamics and Bathymetric Evolution

Beach Wizard: Development of an Operational Nowcast, Short-Term Forecast System for Nearshore Hydrodynamics and Bathymetric Evolution Beach Wizard: Development of an Operational Nowcast, Short-Term Forecast System for Nearshore Hydrodynamics and Bathymetric Evolution Ad Reniers Civil Engineering and Geosciences, Delft University of Technology

More information

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT

AGGREGATE DREDGING AND THE MARINE ENVIRONMENT AGGREGATE DREDGING AND THE MARINE ENVIRONMENT The marine Aggregate Levy Sustainability Fund ( marine ALSF ) programme represents one of the most substantial investments in UK marine research. The research

More information

MAY0 COUNTY COUNCIL W.ESTPORT MARINE SURVEY

MAY0 COUNTY COUNCIL W.ESTPORT MARINE SURVEY MAY0 COUNTY COUNCIL W.ESTPORT MARINE SURVEY VOLUME 1 HYDRODYNAMIC & WATER QUALITY MODELLINQ Tolaphano 0232 667914 Fwlmlk a=z 668288 Morton PREFACE,*.--. -- - -I Kirk McClure Morton, in conjunction with

More information

Guidelines on Collection of Water Samples for Phytoplankton Analysis

Guidelines on Collection of Water Samples for Phytoplankton Analysis Guidelines on Collection of Water Samples for Phytoplankton Analysis Principle of the Method The aim of this method is to collect samples of phytoplankton that are representative of the phytoplankton community

More information

Appendix M: Durras Lake Tailwater Conditions

Appendix M: Durras Lake Tailwater Conditions Appendix M: Durras Lake Tailwater Conditions M.1 Preamble WRL has completed a tailwater condition assessment for the entrance to Durras Lake, to be used as an ocean boundary condition for a future flood

More information

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER

CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER CERTIFICATES OF COMPETENCY IN THE MERCHANT NAVY MARINE ENGINEER OFFICER EXAMINATIONS ADMINISTERED BY THE SCOTTISH QUALIFICATIONS AUTHORITY ON BEHALF OF THE MARITIME AND COASTGUARD AGENCY STCW 95 CHIEF

More information

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA

Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Evaluation of June 9, 2014 Federal Emergency Management Agency Flood Insurance Study for Town of Weymouth, Norfolk, Co, MA Prepared For: Woodard & Curran 95 Cedar Street, Suite 100 Providence, RI 02903

More information

PROPERTIES OF NEARSHORE CURRENTS

PROPERTIES OF NEARSHORE CURRENTS Terry Hendricks PROPERTIES OF NEARSHORE CURRENTS During this past year, we have initiated a program to obtain a better understanding of the properties of the currents flowing over the nearshore shelf area

More information

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS

ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS Annex 4, page 1 ANNEX 4 ALTERNATIVE TEXT FOR OPERATIONAL GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY REQUIREMENTS FOR TANKERS GUIDELINES FOR VERIFICATION OF DAMAGE STABILITY FOR TANKERS PART 2 OPERATIONAL

More information

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING

HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology

More information

A FINAL REPORT BY PARTRAC LIMITED: MAY 2006

A FINAL REPORT BY PARTRAC LIMITED: MAY 2006 A FINAL REPORT BY PARTRAC LIMITED: MAY 26 Measurement of Suspended Sediment Concentration & Tidal Current During Dredging Operations and Post-Dredge at the Offshore Disposal Area, Poole, Dorset QUALITY

More information

SUBMISSION FROM SALMON AND TROUT CONSERVATION SCOTLAND

SUBMISSION FROM SALMON AND TROUT CONSERVATION SCOTLAND RURAL ECONOMY AND CONNECTIVITY COMMITTEE SALMON FARMING IN SCOTLAND SUBMISSION FROM SALMON AND TROUT CONSERVATION SCOTLAND Salmon and Trout Conservation Scotland (S&TCS) would like to thank the Petitions,

More information

Request Number IR1-12: Flow Passage. Information Request

Request Number IR1-12: Flow Passage. Information Request Request Number IR1-12: Flow Passage Information Request Provide additional information about the 100 metre flow passage channel scenario between the Westshore Terminals and the proposed Project terminal

More information

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc)

Paper for consideration by ENC Working Group. Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Paper for consideration by ENC Working Group Use of AU6 ENC cells as an option for Bathymetric ENCs (benc) Submitted by: Alvaro Sanchez (AHS) Executive Summary: Compilation of high density bathymetric

More information

Project Context. Legend. Jacky. Project Boundary. Fixed Platform/Structure Existing Demonstrator Turbine. Scottish Territorial Waters Boundary

Project Context. Legend. Jacky. Project Boundary. Fixed Platform/Structure Existing Demonstrator Turbine. Scottish Territorial Waters Boundary 3 0'0"W Legend C A Jacky B Project Boundary Fixed Platform/Structure Existing Demonstrator Turbine Scottish Territorial Waters Boundary 58 0'0"N British Crown and SeaZone Solutions Limited. All rights

More information

CAS Guidance (CAS-G-004)

CAS Guidance (CAS-G-004) Water Use CAS Guidance (CAS-G-004) Flow Recording and Reporting at Sewage Treatment Works and on the Sewer Network Version: v2 Released: Jan 2017 Copyright and Legal Information Copyright 2017 Scottish

More information

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 *

GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER SHIPS CONSTRUCTED BEFORE 1 JANUARY 2014 * E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 MSC.1/Circ.1589 24 May 2018 GUIDELINES ON OPERATIONAL INFORMATION FOR MASTERS IN CASE OF FLOODING FOR PASSENGER

More information

Policy on the Management of Sea Lice

Policy on the Management of Sea Lice Suite 3/11 King James VI Business Centre Friarton Road Perth PH2 8DG Tel: 01738 472032 Policy on the Management of Sea Lice August 2010 www.atlanticsalmontrust.org 2 Atlantic Salmon Trust Policy on the

More information

Name Assessor or Approver Date

Name Assessor or Approver Date T: +44 (0)1224 295579 F: +44 (0)1224 295524 E: ms.majorprojects@gov.scot MARINE SCOTLAND LICENSING OPERATIONS TEAM S (MS-LOT) ASSESSMENT OF THE PROJECT S IMPLICATIONS FOR DESIGNATED SPECIAL AREAS OF CONSERVATION

More information

Inshore wrasse pot fishery What are the issues?

Inshore wrasse pot fishery What are the issues? Our Position - Summary Devon Wildlife Trust is calling for the immediate ban on live capture of all wrasse species in the South West from within Marine Protected Areas. Wrasse are being captured live from

More information

Impact of Dredging the Lower Narrow River on Circulation and Flushing

Impact of Dredging the Lower Narrow River on Circulation and Flushing Impact of Dredging the Lower Narrow River on Circulation and Flushing Craig Swanson Ph.D. Swanson Environmental Alex Shaw Ocean Engineering, URI Prof. Malcolm L. Spaulding Ocean Engineering, URI 29 January

More information

Structure and discharge test cases

Structure and discharge test cases Chapter 28 Structure and discharge test cases 28.1 Introduction Three test case have been implemented to test the performance and applicability of the structures and discharges modules. drythin Simulates

More information

CMM Conservation and Management Measure for the Management of Bottom Fishing in the SPRFMO Convention Area

CMM Conservation and Management Measure for the Management of Bottom Fishing in the SPRFMO Convention Area CMM 03-2018 1 Conservation and Management Measure for the Management of Bottom Fishing in the SPRFMO Convention Area The Commission of the South Pacific Regional Fisheries Management Organisation; RECOGNISING

More information

LLANBRYNMAIR WIND FARM

LLANBRYNMAIR WIND FARM LLANBRYNMAIR WIND FARM October 2013 Volume III Supporting Appendices BAT APPENDICES 1 BAT SURVEY METHODS 1.1 Materials and Data Analysis Use of Bat Detectors 1.1.2 The bat detectors used for automated

More information

Uncertainty Estimates in Satellite Derived Bathymetry

Uncertainty Estimates in Satellite Derived Bathymetry Uncertainty Estimates in Satellite Derived Bathymetry Richard Flemmings, TCarta #chcnsc2018 Introduction and Overview 1. TCarta 2. Satellite Derived Bathymetry Overview 3. Satellite Derived Bathymetry

More information

Appendix 3. Hydrodynamic and sedimentation studies

Appendix 3. Hydrodynamic and sedimentation studies Appendix 3 Report EX 4945 Rev 3.0 November 2004 Document Information Project Report title Client Borough of Poole Client Representative Mr Stuart Terry Project No. DDR3553 Report No. EX 4945 Doc. ref.

More information

ESB TONAL NOISE ASSESSMENT. 30 May West Offaly Power Station. Report Author: Stephen Kearney

ESB TONAL NOISE ASSESSMENT. 30 May West Offaly Power Station. Report Author: Stephen Kearney Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +353 (0) 1 4140485 ESB West Offaly Power Station TONAL NOISE ASSESSMENT 30 May 2016 Report Author: Stephen

More information

Background noise maps

Background noise maps Background noise maps WHY IT IS CONVENIENT TO CREATE BACKGROUND NOISE MAPS DURING PLANNING PHASE THROUGH CFD WIND MODELS Ing. Andrea Bartolazzi Ing. Simone Marletti Ing. Beatrice Pistoni Windsim User Meeting

More information

N. Robinson and A. Pyne

N. Robinson and A. Pyne ISSN 0375 8192 March 2004 Antarctic Data Series No 26 WATER COLUMN CURRENT PROFILE ANALYSIS FROM BENEATH THE MCMURDO ICE SHELF AT WINDLESS BIGHT AND UNDER THE SEA ICE IN GRANITE HARBOUR, ANTARCTICA N.

More information

Windcube FCR measurements

Windcube FCR measurements Windcube FCR measurements Principles, performance and recommendations for use of the Flow Complexity Recognition (FCR) algorithm for the Windcube ground-based Lidar Summary: As with any remote sensor,

More information

CONTRACTOR DOCUMENT FRONT SHEET NOT PROTECTIVELY MARKED H P C - D E V X X R E T

CONTRACTOR DOCUMENT FRONT SHEET NOT PROTECTIVELY MARKED H P C - D E V X X R E T CONTRACTOR DOCUMENT FRONT SHEET NOT PROTECTIVELY MARKED PROJECT CONTRACT CODE ASSET SYSTEM BUILDING DOCUMENT TYPE DOCUMENT DETAILS SEQUENTIAL NUMBER H P C - D E V 0 2 4 - X X - 0 0 0 - R E T - 1 0 0 0

More information

OCN 201 Tides. Tsunamis, Tides and other long waves

OCN 201 Tides. Tsunamis, Tides and other long waves OCN 201 Tides Tsunamis, Tides and other long waves Storm surges Caused by winds and low atmospheric pressure associated with large storms Can raise sea surface by up to 25 ft, bottom contours magnify effect

More information

NOTIFICATION OF PROPOSED RESEARCH CRUISE

NOTIFICATION OF PROPOSED RESEARCH CRUISE 1 NOTIFICATION OF PROPOSED RESEARCH CRUISE PART A: GENERAL 1. NAME OF RESEARCH SHIP: "G.O.Sars" CRUISE NO. 2012102 2. DATES OF CRUISE From: 15 February 2012 To: 14 March 2012 3. OPERATING AUTHORITY: Institute

More information

Observed and simulated wavetide interaction in a region of. high tidal flow

Observed and simulated wavetide interaction in a region of. high tidal flow Observed and simulated wavetide interaction in a region of high tidal flow Lewis M*; Chang W; Neill S; Robins P; Hashemi R;Ward S; Piano M * m.j.lewis@bangor.ac.uk (1/12) Summary Dynamically coupled wave-tide

More information

Undertow - Zonation of Flow in Broken Wave Bores

Undertow - Zonation of Flow in Broken Wave Bores Nearshore Circulation Undertow and Rip Cells Undertow - Zonation of Flow in Broken Wave Bores In the wave breaking process, the landward transfer of water, associated with bore and surface roller decay

More information

CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED

CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED CONDITIONS OF USE OF THIS REPORT COPYRIGHT NAMIBIAN MARINE PHOSPHATE (PTY) LTD 2014 ALL RIGHTS RESERVED. All rights to the intellectual property and/or contents of this document remain vested in Namibian

More information

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 6 Guidelines for the Construction, Equipment and Testing of Closed Fuel Oil Overflow Systems Edition

More information

METHODS PAPER: Downstream Bathymetry and BioBase Analyses of Substrate and Macrophytes

METHODS PAPER: Downstream Bathymetry and BioBase Analyses of Substrate and Macrophytes Mactaquac Aquatic Ecosystem Study Report Series 2015-006 METHODS PAPER: Downstream Bathymetry and BioBase Analyses of Substrate and Macrophytes Ben Wallace, Jae Ogilvie and Wendy Monk 17 February 2015

More information

July Ballast Water Management FAQ

July Ballast Water Management FAQ July 2018 Ballast Water Management FAQ Contents Contents... i Forward... iii 1. Has the UK ratified the BWM Convention?... 5 2. To what ships does the Convention apply?... 5 2.1 Internationally operating

More information

SeaSmart. Jonathan Evans

SeaSmart. Jonathan Evans SeaSmart A new approach for rapid, on-site resource assessment at potential tidal stream energy array sites using MAS Marine Solutions for the Deep Data World Jonathan Evans Presentation Outline Marine

More information

Ocean Wave Forecasting

Ocean Wave Forecasting Ocean Wave Forecasting Jean-Raymond Bidlot* Marine Prediction Section Predictability Division of the Research Department European Centre for Medium-range Weather Forecasts (E.C.M.W.F.) Reading, UK * With

More information

Council CNL(16)37. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year EU - UK (Northern Ireland)

Council CNL(16)37. Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year EU - UK (Northern Ireland) Agenda item 6.1 For information Council CNL(16)37 Annual Progress Report on Actions Taken Under the Implementation Plan for the Calendar Year 2015 EU - UK (Northern Ireland) CNL(16)37 Annual Progress

More information

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014

DUKC Chart Overlay. Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014 DUKC Chart Overlay Presentation to IHO TWL and DQ Working Groups Wollongong, March 2014 Outline Who is OMC? DUKC description & methodology. DUKC Chart Overlay concept. Chart Overlay application example.

More information

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement

Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement SHEPD Section ID 154 Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement Contents Definitions and Abbreviations...

More information

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version

Taranaki Tsunami Inundation Analysis. Prepared for Taranaki Civil Defence Emergency Management Group. Final Version Taranaki Tsunami Inundation Analysis Prepared for Taranaki Civil Defence Emergency Management Group Final Version June 2012 AM 12/07 HBRC Plan Number 4362 Asset Management Group Technical Report Prepared

More information

Real-Time Smoothness Measurements on Concrete Pavements During Construction

Real-Time Smoothness Measurements on Concrete Pavements During Construction Recommended Practice for Real-Time Smoothness Measurements on Concrete Pavements During Construction XX-## (2017) 1. SCOPE 1.1. This document provides language that can be used by an Owner-Agency to develop

More information

DUKC DYNAMIC UNDER KEEL CLEARANCE

DUKC DYNAMIC UNDER KEEL CLEARANCE DUKC DYNAMIC UNDER KEEL CLEARANCE Information Booklet Prepared in association with Marine Services Department 10/10/2005 Dynamic Under Keel Clearance (DUKC) integrates real time measurement of tides and

More information

Towards Ecosystem-Based Management Modelling Techniques 2. Whole Ecosystem Models

Towards Ecosystem-Based Management Modelling Techniques 2. Whole Ecosystem Models Towards Ecosystem-Based Management Modelling Techniques 2 Ecopath with Ecosim: : Mass-Balance and Dynamic Whole Ecosystem Models Ecospace spatial ecosystem simulation tool predicting spatial patterns of

More information

The Orkney Creel Fishery

The Orkney Creel Fishery The Orkney Creel Fishery Fishery Improvement Project Work Plan Michael Bell, Kate Walker 2/21/2013 Introduction This work plan has been developed as part of the Fishery Improvement Project (FIP) of the

More information

Status: Rev: Comments Date: Author: Reviewer:

Status: Rev: Comments Date: Author: Reviewer: MT EMERALD WIND FARM REVISED A-WEIGHTED NOISE ASSESSMENT Rp 002 R01 2015545ML 30 January 2017 6 Gipps Street Collingwood VIC 3066 Australia T: +613 9416 1855 ABN: 53 470 077 191 www.marshallday.com Project:

More information

A Review of the Bed Roughness Variable in MIKE 21 FLOW MODEL FM, Hydrodynamic (HD) and Sediment Transport (ST) modules

A Review of the Bed Roughness Variable in MIKE 21 FLOW MODEL FM, Hydrodynamic (HD) and Sediment Transport (ST) modules A Review of the Bed Roughness Variable in MIKE 1 FLOW MODEL FM, Hydrodynamic (HD) and Sediment Transport (ST) modules by David Lambkin, University of Southampton, UK 1 Bed roughness is considered a primary

More information

MTS Restan. Automatic System for Residual Stress Measurement by Hole-Drilling

MTS Restan. Automatic System for Residual Stress Measurement by Hole-Drilling Automatic System for Residual Stress The MTS3000 - Restan system for measuring residual stresses Fully automatic drilling and acquisition process ensuring high repeatability High speed drilling (400,000

More information

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan

Admiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan Appendix C Derelict Gear Monitoring Plan ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 DERELICT GEAR MONITORING PLAN (submitted with the Final Application for a New Pilot Project License)

More information

Completion of Hydrometric Survey Notes (HSN)

Completion of Hydrometric Survey Notes (HSN) Completion of Hydrometric Survey Notes (HSN) Hydrometric Survey Notes provide a place to record results and applied proper procedures for tasks undertaken in the field, such as levelling, measurements,

More information

Agilent Dimension Software for ELSD User Manual

Agilent Dimension Software for ELSD User Manual Agilent Dimension Software for ELSD User Manual Agilent Dimension Software for ELSD User Manual Agilent Technologies Notices Agilent Technologies, Inc. 2011 No part of this manual may be reproduced in

More information

GLMM standardisation of the commercial abalone CPUE for Zones A-D over the period

GLMM standardisation of the commercial abalone CPUE for Zones A-D over the period GLMM standardisation of the commercial abalone for Zones A-D over the period 1980 2015 Anabela Brandão and Doug S. Butterworth Marine Resource Assessment & Management Group (MARAM) Department of Mathematics

More information

Energy capture performance

Energy capture performance Energy capture performance Cost of energy is a critical factor to the success of marine renewables, in order for marine renewables to compete with other forms of renewable and fossil-fuelled power generation.

More information

Workshop 1: Bubbly Flow in a Rectangular Bubble Column. Multiphase Flow Modeling In ANSYS CFX Release ANSYS, Inc. WS1-1 Release 14.

Workshop 1: Bubbly Flow in a Rectangular Bubble Column. Multiphase Flow Modeling In ANSYS CFX Release ANSYS, Inc. WS1-1 Release 14. Workshop 1: Bubbly Flow in a Rectangular Bubble Column 14. 5 Release Multiphase Flow Modeling In ANSYS CFX 2013 ANSYS, Inc. WS1-1 Release 14.5 Introduction This workshop models the dispersion of air bubbles

More information

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project

Description of Underwater Noise Attenuation System Design Unit 2. New NY Bridge Project New NY Bridge Project Description of Underwater Noise Attenuation System (NAS) Design Unit 2 Description of Underwater Noise Attenuation System Design Unit 2 for the New NY Bridge Project Revision 1 May

More information

APPENDIX 3E HYDROACOUSTIC ANALYSIS OF FISH POPULATIONS IN COPCO AND IRON GATE RESERVOIRS, CALIFORNIA NOVEMBER

APPENDIX 3E HYDROACOUSTIC ANALYSIS OF FISH POPULATIONS IN COPCO AND IRON GATE RESERVOIRS, CALIFORNIA NOVEMBER APPENDIX 3E HYDROACOUSTIC ANALYSIS OF FISH POPULATIONS IN COPCO AND IRON GATE RESERVOIRS, CALIFORNIA NOVEMBER 23 February 24 PacifiCorp Fish Resources FTR Appendix 3E.doc Hydroacoustic Analysis of Fish

More information

GNX 20/21 Owner s Manual

GNX 20/21 Owner s Manual GNX 20/21 Owner s Manual February 2014 190-01659-00_0B Printed in Taiwan All rights reserved. Under the copyright laws, this manual may not be copied, in whole or in part, without the written consent of

More information

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE Copyright SFA - InterNoise 2000 1 inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering 27-30 August 2000, Nice, FRANCE I-INCE Classification: 4.5 THE PROPAGATION

More information

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok

Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified: 5/22/06 Compiled by: Cliff Dolchok 813 W. Northern Lights Blvd. Anchorage, AK 99503 Phone: 907-269-3000 Fax: 907-269-3044 www.akenergyauthority.org SITE SUMMARY Wind Resource Assessment for NOME (ANVIL MOUNTAIN), ALASKA Date last modified:

More information