NM Network Operations Report ANNEX II - ACC

Size: px
Start display at page:

Download "NM Network Operations Report ANNEX II - ACC"

Transcription

1 NM Network Operations Report ANNEX II - ANNEX II: CAPACITY EVOLUTION INTRODUCTION ALBANIA TIRANA ARMENIA YEREVAN AUSTRIA VIENNA AZERBAIJAN BAKU BELGIUM BRUSSELS BULGARIA SOFIA CROATIA ZAGREB CYPRUS NICOSIA CZECH REPUBLIC PRAGUE DENMARK COPENHAGEN ESTONIA TALLINN EUROCONTROL MAASTRICHT FINLAND TAMPERE FRANCE BORDEAUX FRANCE BREST FRANCE MARSEILLE FRANCE PARIS FRANCE REIMS FYROM SKOPJE GERMANY BREMEN GERMANY KARLSRUHE GERMANY LANGEN GERMANY MUNICH GREECE ATHENS GREECE MAKEDONIA HUNGARY BUDAPEST IRELAND DUBLIN IRELAND SHANNON ITALY BRINDISI ITALY MILAN ITALY PADOVA ITALY ROME LATVIA RIGA LITHUANIA VILNIUS NM Network Operations Report ANNEX II - 1

2 NM Network Operations Report ANNEX II MALTA MALTA MOLDOVA CHISINAU THE NETHERLANDS AMSTERDAM NORWAY BODO NORWAY OSLO NORWAY STAVANGER POLAND WARSAW PORTUGAL LISBON ROMANIA BUCHAREST SERBIA & MONTENEGRO BELGRADE SLOVAK REPUBLIC BRATISLAVA SLOVENIA LJUBLJANA SPAIN BARCELONA SPAIN CANARIAS SPAIN MADRID SPAIN PALMA SPAIN SEVILLA SWEDEN MALMO SWEDEN STOCKHOLM SWITZERLAND GENEVA SWITZERLAND ZURICH TURKEY ANKARA /ISTANBUL UKRAINE DNIPROPRETROVSK UKRAINE KYIV UKRAINE L VIV UKRAINE ODESA UKRAINE SIMFEROPOL UNITED KINGDOM LONDON UNITED KINGDOM LONDON TC UNITED KINGDOM PRESTWICK NM Network Operations Report ANNEX II - 2

3 NM Network Operations Report ANNEX II - INTRODUCTION The following annex provides a detailed analysis of ATC capacity evolution in 213 for s within the ECAC States for which data is available. The source of statistics is the NMOC unless otherwise indicated. The analysis covers: & The chart and data table provide comprehensive information concerning the evolution of traffic and delay from 29 to 213 (where data is available). It includes the following values: Peak day traffic is the number of flight entries to the on the peak day of each year. Summer & Yearly is the daily average number of flight entries during the summer season (May to October inclusive) and over the whole year (January to December). Summer & Yearly Enroute is the average enroute delay per flight (including and special events e.g. industrial action), attributed to the during the summer season (May to October inclusive) and over the whole year (January to December). 213 Realisation of Plan Evolution gives the percentage difference between the total traffic (number of flight entries) in 213 compared to 212, for the summer and the full year. Enroute gives the number of minutes per flight of enroute delay attributed to all causes and also excluding delays attributed to and special events. s are provided for the summer and the full year. per is the delay breakdown to achieve the European delay target of.6 min/flight for the full year, and.85 min/flight in the Summer season, as published in the NOP Offered: ESS or Reverse CASA was used to measure the capacity actually offered by the during the reference periods (3-16 June 213, 8-21 July 213). This is calculated from actual delay (Reverse CASA) or from projected delay (ESS). Projected delay is obtained by increasing the traffic and creating a regulation scheme for the studied using traffic volume capacities and configuration data (sector opening schemes) provided by ANSPs. Plan (increase for Summer 213) is the percentage value provided by ANSPs in the Network Operations Plan This figure represents the ANSP commitment to increasing capacity for Summer 213, when compared to Summer 212. enhancement: planned enablers This information was taken from the local capacity plan in the Network Operations Plan An indication is given as to whether each measure was implemented as planned. Summer 213 Performance Assessment This provides an analysis of the observed performance and of the achievement of the planned capacity increase. performance has been assessed by analysing traffic and delay statistics for each and the evolution of the capacity baseline. Where relevant, other significant factors were also taken into account, such as industrial action or planned major events that resulted in a temporary reduction in capacity. ocation of and for Enroute delay The table lists the reference locations (sectors) causing most of the delay, the number of minutes of enroute delay attributed to each location and the percentage of the total enroute delay. The graph shows the total ATFM enroute delay generated by each, broken down into the 5 most significant given for the delay in 213 compared to 212. Note: The scale on all graphs varies from to - graphs should not be directly compared. NM Network Operations Report ANNEX II - 3

4 NM Network Operations Report ANNEX II - 1. ALBANIA TIRANA & LAAA - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Tirana LAAA Evolution (213 v 212) Enroute (min. per flight) The average en-route delay per flight was at zero minutes per flight during Summer 213. (% difference v 212) Year H: 3.1% +3.%...26 B:.6% L: -1.8% +5.8%...38 No 65 (%) Plan +2% Achieved Comments ATS route network improvements benefits from new ATM system Net availability of 3 additional ATCOs (July) STCA No In the system but not active. We are in the testing phase. Implementation of ILS CAT1 procedures Reassessment of sector capacities with CAPAN MET services for upper levels No In 214 MFCR with LIBB Maximum configuration: 4 sectors (3 ENR + 1 APP) Summer 213 performance assessment The capacity baseline of 65 was calculated with ESS and represents the capacity delivered during the Summer season in the. During the period June/July, the average peak 1 hour demand was 58 and the peak 3 hour demand was 52. NM Network Operations Report ANNEX II - 4

5 NM Network Operations Report ANNEX II - 2. ARMENIA YEREVAN & UDDD - and en-route ATFM delays Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Yerevan UDDD Evolution (213 v 212) Plan : Sufficient to meet demand Source: STATFOR Enroute (min. per flight) Comments (% difference v 212) Year H: 4.2% -6.4%...5 Summer B: 2.5% +9% L: 1.3% -8.4%...7 No 25 (%) Summer 213 performance assessment The capacity baseline was measured with ESS. During the measured period, the average peak 1 hour demand was 12 and the average peak 3 hour demand was 9. NM Network Operations Report ANNEX II - 5

6 NM Network Operations Report ANNEX II - 3. AUSTRIA VIENNA & LOVV - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Vienna LOVV The average en-route delay per flight for all remained at.3 minutes per flight in Summer % of the delays were for the reason ATC, 8% for ATC Staffing, 14% for Special event, 1% for Equipment (ATC) and 33% for Weather. Plan +1% Achieved Comments Enhanced sectorization according to the FAB CE Airspace Plan Improved operational procedures including FMP/AMC ATS route network improvements Sector configuration management 1 additional controller COOPANS Maximum configuration: 12 sectors Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) The capacity baseline of 18 was calculated with ESS, showing the capacity offered during the measured period. During the period June/July, the average peak 1 hour demand was 167 and the average peak 3 hour demand was 155. (% difference v 212) Year H: 3.7% -2.3% Summer B: 1.7% +12% L: -.4% -1.2% No 18 (+%) ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 LOVVNSL % 213 LOVVNLU % 213 LOVVB5A % 213 LOVVEAL % 213 LOVVSOU % 213 LOVVWHT % Avg daily delay (min) Vienna en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 6

7 NM Network Operations Report ANNEX II - 4. AZERBAIJAN BAKU & UBBA - and en-route ATFM delays Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Baku UBBA Evolution (213 v 212) Data Source: STATFOR Enroute (min. per flight) Plan - Sufficient to meet demand Achieved Comments (% difference v 212) Year H: 7.2% -3.6%...13 B: 5.4% L: 4.1% -1.%...11 No 4 (%) Summer 213 performance assessment It is assessed that the capacity offered was enough to meet demand. During the measured period, the average peak 3 was 19 and the average peak 1 hour demand was 33. NM Network Operations Report ANNEX II - 7

8 NM Network Operations Report ANNEX II - 5. BELGIUM BRUSSELS & EBBU - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Brussels EBBU Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H:.7% -1.4% B: -.9% L: -2.% -.6% No 131 (%) The average en-route delay per flight increased from. minutes per flight in 212 to.1 minutes per flight in % of the delays were for the reason ATC Staffing, and 68% for Weather. Plan +1% Achieved Comments Dynamic use of sector configurations Improved ATFCM Procedures using occupancy counts Occupancy counts to be implemented end of 214 Extension of CDR1 opening time New ATCOs to maintain level of controllers Maximum configuration: 7 sectors Maximum configuration: 6 sectors was sufficient for the levels of traffic Summer 213 performance assessment The capacity baseline was estimated to be at the same level as in Summer 212. During the measured period, the average peak 1 hour demand was 12 and the average peak 3 hour demand was 19. ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 EBBUNWC % 213 EBBUEEC % 213 EBBUHLC % 213 EBBUESC % 213 EBBUWLS 1 8.2% 213 EBBUWSC 5 4.% Avg daily delay (min) Brussels en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 8

9 NM Network Operations Report ANNEX II - 6. BULGARIA SOFIA & LBSR - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Sofia LBSR Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: 7.3% +2.7%...14 B: 5.5% L: 3.6% +3.5%...2 No 149 (%) The en-route delay per flight remained at zero during Summer 213. Plan - Sufficient capacity to meet demand Achieved Comments ATS route network development and increase of maximum sector configurations available Maximum configuration: Up to 12 sectors No Maximum configuration: 7 sectors was sufficient to cope with traffic demand Summer 213 performance assessment The capacity baseline was estimated at the same level as last year. During the measured period, the peak 1 hour demand was 135 and the peak 3 hour demand was 124. NM Network Operations Report ANNEX II - 9

10 NM Network Operations Report ANNEX II - 7. CROATIA ZAGREB & LDZO - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Zagreb LDZO The average en-route delay per flight decreased from.4 minutes per flight in Summer 212 to.1 minutes per flight in Summer % of the delays were for the reason ATC, 26% for and 7% for ATC Staffing. Plan +5% Achieved Comments 5 Additional ATCOs No Optimisation of manpower planning Sectorisation changes Revision of DFL Improved sector opening times Revision of sector capacities according to CAPAN study after change of DFL Enhanced sectorisation according to the FAB CE Airspace Plan Optimisation of ATS route network and sectorisation, cross-border DCT routes as part of phased FRA implementation Maximum configuration: 9/1 sectors Summer 213 performance assessment The capacity baseline was measured using ESS at 142. During the measured period, the average peak 1 hour demand was 136, and the average peak 3 hour demand was 121. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 LDZON % 213 LDZOULW % 213 LDZOTHW % 213 LDZOULA % 213 LDZOTHN % 213 LDZOHW 8 6.7% Avg daily delay (min) Enroute (min. per flight) No Zagreb en-route delays in 213 (% difference v 212) Year H: 3.3% -.4% B:.8% L: -1.2% +1.9% No 142 (+7%) CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 1

11 NM Network Operations Report ANNEX II - 8. CYPRUS NICOSIA & LCCC - and en-route ATFM delays Enroute (minutes per flight) Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Realisation of Plan Nicosia LCCC Evolution (213 v 212) The average en-route delay per flight increased from 1.6 minutes per flight in Summer 212 to 2.7 minutes per flight in Summer % of the delays were for the reason ATC, 28% for Special event, 12% for ATC staffing and 11% for Equipment. Plan +18% Achieved Comments ATS route network and sectorization optimisation June 213: Transition to the new ATM system EUROCAT C No September 213: Transition to TOPSKY as main system New Cyprus TMA implementation No New STARs implemented on a trial basis Operation of a 5th en-route sector (Subject to improvements in HRM) No 4 sectors for extended hours Improve Civil-Military cooperation in the South-East part of the FIR CAPAN study revised capacity figures No flows and complexity changed in the south sectors following the Syrian airspace closure Mature ATFCM function Partly New configurations designed with NMOC and implemented New configurations and minor sector adaptations allowing more flexibility in June Additional ATCOs Maximum configuration: 4/5 sectors No Maximum configuration: 4 sectors Summer 213 performance assessment The capacity baseline was evaluated to be 48 with ESS/Reverse CASA, based on the traffic and delay situation for the full Summer season. During the measured period, the average peak 1 hour demand was 55 and the average peak 3 hour demand was 49. ocation of and Reasons for Enroute Enroute (min. per flight) (% difference v 212) Year H: 9.2% +3.2% Summer B: 6.7% +6% L: 4.4% +3.1% (-4%) Year Location Avg Daily ER s % of Total ER 213 LCCCS % 213 LCCCE2S1Y % 213 LCCCE2S % 213 LCCCS % 213 LCCCS % 213 LCCCS12W % Avg daily delay (min) Nicosia en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 11

12 NM Network Operations Report ANNEX II - 9. CZECH REPUBLIC PRAGUE & LKAA - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Prague LKAA The average en-route delay per flight increased from zero minutes per flight in Summer 212 to.1 minutes per flight in Summer % of the delays were for the reason ATC and 25% for ATC Staffing. Plan +% Achieved Comments Improved flow and capacity management techniques Adaptation of sector opening times depending on available staff Improved ATS route network Additional controllers Enhanced sectorisation according to the FAB CE Airspace Plan Minor improvements of system functionalities Night FRA to be implemented spring 213 Maximum configuration of 1 sectors Maximum configuration: CU6A + CL3A sufficient to cover the traffic demand Summer 213 performance assessment The capacity baseline was assessed to be at the same level as last year. During the measured period, the average peak 1 hour demand was 153 and the average peak 3 hour demand was 142. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 LKAANET % 213 LKAALM % 213 LKAANLM 7 9.2% 213 LKAASELM 3 4.2% 213 LKAAL 3 4.% 213 LKAAWLM 2 3.3% Avg daily delay (min) Enroute (min. per flight) Prague en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER (% difference v 212) Year H: 2.4% +.6%...16 Summer B:.4% -13% L: -1.3% +2.3% No 161 (%) NM Network Operations Report ANNEX II - 12

13 NM Network Operations Report ANNEX II - 1. DENMARK COPENHAGEN & EKDK - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Copenhagen EKDK Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: 2.1% +3.5%...6 B:.8% L: -1.% +6.4%...1 No 125 (%) Plan 1 % Achieved Comments Continuous improvements on the ATS route network Sector configurations adapted to traffic demand Minor updates of COOPANS Maximum configuration: 4/5 (E) + 3 (W) Maximum configuration: E3W2 was sufficient given the levels of traffic demand Summer 213 performance assessment The capacity baseline was estimated to be at the same level as in Summer 212. During the measured period, the average peak 1 hour demand was 117 and the average peak 3 hour demand was 18. NM Network Operations Report ANNEX II - 13

14 NM Network Operations Report ANNEX II ESTONIA TALLINN & EETT - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Tallinn EETT Average enroute ATFM delay decreased from.1 minutes per flight in Summer 212 to minutes per flight in Summer 213. Planned Increase: sufficient to meet demand Achieved Comments Adaptation of sector opening times Evolution (213 v 212) Consolidation of operations with the new ATM system Maximum configuration: 2 (+1 FEEDER) 2 sectors opened Summer 213 performance assessment Enroute (min. per flight) The capacity baseline of 62 was measured with ESS, indicating the capacity actually offered. During the measured period, the average peak 1 hour demand was 52 and the average peak 3 hour demand was 45. (% difference v 212) Year H:.% -1.5%...16 Summer B: -2.% -8% L: -4.% -1.2%...22 No 62 (+%) NM Network Operations Report ANNEX II - 14

15 NM Network Operations Report ANNEX II EUROCONTROL MAASTRICHT & EDYYUAC - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Maastricht EDYY UAC Evolution (213 v 212) Enroute (min. per flight) The average en-route delay per flight slightly increased from. minutes per flight in 212 to.1 minutes per flight in % of the delays were for the reason ATC and 51% for Weather. Plan +2 % Achieved Comments Dutch Mil Virtual Centre No Implemented October 213 (% difference v 212) Year H: 1.1% +1.9% Summer B: -.4% +6% L: -1.8% +3.1% No 337 (+3%) CPDLC monitoring concept & reduction in verbal coordination Ongoing Management System (TMS) Level 1 Maximum configuration: 19 sectors (Possible if required according to traffic levels - would be achieved by releasing available capacity in the ) 17 sectors sufficient to handle the demand. Brussels group - 6 sectors, DECO group - 5 sectors and Hannover group - 6 sectors. Summer 213 performance assessment The capacity baseline was measured with ESS at 337. During the same period, the peak 3 hour demand was 315 and the peak 1 hour was 332. ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 EDYYDELHI % 213 EDYYBEH % 213 EDYYBWH 2 6.2% 213 EDYYUCE % 213 EDYYDELLO % 213 EDYYLUX % Avg daily delay (min) Maastricht UAC en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 15

16 NM Network Operations Report ANNEX II FINLAND TAMPERE & EFIN - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Tampere EFIN CTA Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: -1.1% -6.9%...13 Summer B: -4.% +1% L: -4.8% -5.9%...8 No 58 (%) The average en-route delay per remained at zero minutes per flight in Summer 213. Plan : sufficient to meet demand Achieved Comments 5 additional controllers New sectorisation with 1 additional sector No Improved flexibility in sector openings Night free route airspace (Dec 212) Enlarge feeder sector OKLOR to Helsinki Maximum configuration: Feeders Maximum configuration: 5 sectors+3 Feeders was sufficient No to cope with traffic demand Summer 213 performance assessment The capacity baseline was estimated at the same level as last year. During the measured period, the average peak 1 hour demand was 4 and the average peak 3 hour demand was 33. NM Network Operations Report ANNEX II - 16

17 NM Network Operations Report ANNEX II FRANCE BORDEAUX & LFBBALL - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Bordeaux LFBB Average enroute delay per flight increased to.5 minutes per flight in Summer 213, mainly due to the strike June 213. per flight industrial action is.1 minutes per flight, well below the reference value. 75% of the delays were for the reason Industrial action, and 16% for ATC. Plan +2% Achieved Comments Improved Airspace Management and ATFCM Procedures Staff deployment / Flexible rostering Improvement of profiles for LFPG arrivals from the south-west (IBBP)-Study for dualization of UN859 ERATO training (from Autumn 213) Maximum configuration: 21 UCESO Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. During the measured period, the average peak 1 hour demand was 19 and the average peak 3 hour demand was 178. ocation of and Reasons for Enroute No (% difference v 212) Year H: -1.4% +.7% Summer B: -2.6% +5% L: -3.8% No 21 (%) Year Location Avg Daily ER s % of Total ER 213 LFBBUSUD % 213 LFBBRL % 213 LFBBNH % 213 LFBOTMA % 213 LFBBBDX % 213 LFBBL % Avg daily delay (min) Bordeaux en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 17

18 NM Network Operations Report ANNEX II FRANCE BREST & LFRR - and en-route ATFM delays Enroute (minutes per flight) Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Realisation of Plan Brest LFRR Average enroute delay per flight increased to.5 minutes per flight in Summer 213, mainly due to the strike June 213. per flight industrial action is.2 minutes per flight. 58% of the delays were for the reason Industrial Action (ATC), and 35% for ATC. Plan % Achieved Comments Improved airspace management and ATFM procedures Staff redeployment / flexible rostering Improvement of profiles for LFPG arrivals from the south-west (IBBP)-Study for dualization of UN859 ERATO training (January 213 to March 214) Maximum configuration: 18 UCESO Summer 213 performance assessment The capacity baseline was assessed to be at the same level as in Summer 212. During the measured period, the average peak 1 hour demand was 217 and the average peak 3 hour demand was 199. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 LFRRFNORD % 213 LFRRMZU % 213 LFRRNGA % 213 LFRRGA % 213 LFRREST 43 5.% 213 LFRRA 35 4.% Avg daily delay (min) Enroute (min. per flight) No Brest en-route delays in 213 (% difference v 212) Year H: -.6% +2.5% B: -1.5% L: -2.9% +3.5% No 26 (%) CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 18

19 NM Network Operations Report ANNEX II FRANCE MARSEILLE & LFMM - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Marseille LFMM Average en-route delay per flight increased to.7 minutes per flight in Summer 213. per flight industrial action is.4 minutes per flight. 47% of the delays were for the reason Industrial Action, 35% for ATC, and 16% for Weather. Plan +2% Achieved Comments Improved airspace management and ATFM procedures Staff redeployment / flexible rostering Improvement of LUMAS CDRs availability Provence project Phase 1 Enhanced sector availability during WEs Reorganisation of sectors E and K Stepped implementation of FRA FABEC Maximum configuration: 28 UCESO Summer 213 performance assessment The capacity baseline was evaluated to be 237. During the measured period, the average peak 1 hour demand was 245 and the average peak 3 hour demand was 229. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 LFMMWM % 213 LFMMFDZ % 213 LFMMSBAM % 213 LFMMB % 213 LFMMMALY 72 6.% 213 LFMMRAEE % Avg daily delay (min) Enroute (min. per flight) Marseille en-route delays in 213 (% difference v 212) Year H: -1.5% -.6% B: -3.% L: -4.8% +.1% (%) CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 19

20 NM Network Operations Report ANNEX II FRANCE PARIS & LFFFALL - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Paris LFFF Average enroute delay per flight decrased from.3 minutes per flight in Summer 212 to.2 minutes per flight in Summer % of the delays were for the reason ATC, 46% for Weather, and 14% for Industrial Action. Plan +2% Achieved Comments Improved airspace management and ATFM procedures Staff redeployment / flexible rostering Improvement of profiles for LFPG arrivals from the south-west (IBBP) IBP 213 (TP/UK/UZ) IRP 213 (transfer) Maximum configuration: 21 UCESO Summer 213 performance assessment The capacity baseline was assessed to be at the same level as in Summer 212. During the measured period, the average peak 1 hour demand was 247 and the average peak 3 hour demand was 227. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 LFFFUJ % 213 LFFFTE % 213 LFFFLMH % 213 ODILO % 213 LFFFTML % 213 LFFFTNTB % Avg daily delay (min) Enroute (min. per flight) Paris en-route delays in 213 (% difference v 212) Year H:.7% -3.7% B: -.6% L: -2.4% -3.5% No 268 (%) CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 2

21 NM Network Operations Report ANNEX II FRANCE REIMS & LFEE - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Reims LFEE Average enroute delay per flight slightly increased from.4 minutes per flight in Summer 212 to.5 minutes per flight in Summer 213. per flight industrial action is.3 minutes per flight. 41% of the delays were for the reason ATC, 31% for Industrial Action, and 19% for Weather. Plan +2% Achieved Comments Improved airspace management and ATFM procedures Staff redeployment / flexible rostering IRP 213 (transfer) Change DFL from 375 to 365 between K and H (H, E and N) Stepped implementation of FRA FABEC Maximum configuration: 18 UCESO Summer 213 performance assessment The capacity baseline was measured at 192. During the measured period, the average peak 1 hour demand was 195 and the average peak 3 hour demand was 178. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 LFEEHYR % 213 LFEE4EH % 213 LFEEKR % 213 LFEEUXR % 213 LFEE5R % 213 LFEEKN % Avg daily delay (min) Enroute (min. per flight) Reims en-route delays in 213 (% difference v 212) Year H: -.1% +4.1% Summer B: -1.1% +11% L: -2.8% +5.1% No 192 (+8%) CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 21

22 NM Network Operations Report ANNEX II FYROM SKOPJE & LWSS - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Skopje LWSS Evolution (213 v 212) The delays remained at zero during Summer 213. Enroute (min. per flight) (% difference v 212) Year H: 3.4% -1.9%...12 Summer B: 1.% +18% L: -1.5% +1.5%...16 No 59 (%) Plan % Achieved Comments Controller ratings Free route airspace No Postponed to Winter 214/215 Maximum configuration: 4 sectors Maximum configuration: 2 sectors 4 sectors not required during Summer 213 Summer 213 performance assessment The capacity baseline was estimated to be at the same level as in Summer 212. During the measured period the average peak 1 hour was 38 and the average peak 1 hour was 33. NM Network Operations Report ANNEX II - 22

23 NM Network Operations Report ANNEX II - 2. GERMANY BREMEN & EDWW - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Bremen EDWW Evolution (213 v 212) The yearly traffic decreased by 2.7%. The Average ATFM En-route per Movement was stable at.1 min/flight in Summer 213. The ADM Summer is lower than expected and nearly by the optimum. There no capacity deficit was observed. Planned Measures Achieved Comments The commissioning of the new Berlin airport BER (expansion of Schönefeld) and closure of Berlin Tegel including new airspace structure and implementation of AMAN Enroute (min. per flight) No Summer 213 performance assessment (% difference v 212) Year H: -1.7% -2.7% B: -3.3% L: -5.3% -2.6% No 151 (%) The commissioning is postponed provisionally to 215 The traffic decreased by 2.6% to last year's level. It is assessed that the offered capacity was the same as 212. The delays were mainly due to ATC Staffing (51%), ATC (27%) and Weather (2%). A maximum configuration of 14 en-route sectors and 3 en-route/app- sectors (Hamburg, Hannover) and 4 APP/TMA- sectors (Berlin) was available. Only 12 en-route sectors were opened during the whole year. The ALLER LOW sector was combined, the sectors EIDER EAST and MÜRITZ LOW only open for military exercises. ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 EDWWHAMC % 213 EDWWHEIC % 213 EDWWDBAN % 213 EDWWDBAS % 213 EDWWSOUT 3 3.2% 213 EDWWFRIC 3 3.2% Avg daily delay (min) Bremen en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 23

24 NM Network Operations Report ANNEX II GERMANY KARLSRUHE & EDUUUAC - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Karlsruhe EDUU Evolution (213 v 212) The yearly traffic growth is 15.3%. The Average ATFM En-route per Movement increased from.1 during Summer 212 to.3 during Summer 213. The significant increase in traffic and the increase of the delay are due to the relocation of the upper airspace from Munich to Karlsruhe end of 212. The ADM Summer is lower than expected and in line with the reference value. There no capacity deficit was observed. Planned Measures Achieved Comments Relocation of Munich Upper airspace to Karlsruhe ( ) Positive effects of the new ATS system (P1/VAFORIT) implemented 212 Reduction of staffing problems Summer 213 performance assessment The realisation was completed successfully on 16./ The traffic growth 17.1% to last year's level. It is assessed that the offered capacity increased continuously in 213. The delays were mainly due to ATC Staffing (26%), ATC (23%) and Weather (39%). A maximum configuration of 38 en-route sectors was available. ocation of and Reasons for Enroute Enroute (min. per flight) (% difference v 212) Year H: 2.% (+15%) +15.3% Summer B:.3% (+15%) +5% L: -1.6% (+15%) +17.1% No 334 (+12%) Year Location Avg Daily ER s % of Total ER 213 EDUUALP2C % 213 EDUUALP % 213 EDUUCHI1K % 213 EDUUALP1L 5 6.4% 213 EDUUTGO % 213 EDUUNTM % Avg daily delay (min) Karlsruhe UAC en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 24

25 NM Network Operations Report ANNEX II GERMANY LANGEN & EDGG - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Langen EDGG The yearly traffic decreased by 1.7%. The Average ATFM En-route per Movement decreased from.9 min/flight in Summer 212 to.3 min/flight in Summer 213. The ADM Summer is lower than expected and nearly by the reference value. There no capacity deficit was observed. Planned Measures Achieved Comments ATFCM measures to reduce delay in SF1 in cooperation with NMOC and Reduction of staffing problems Upgrade of P1/ATCAS system (PSS) EBG2/8 The realisation was completed successfully on Summer 213 performance assessment The traffic decreased by 1.3% to last year's level. It is assessed that the offered capacity increased continuously in 213. The delays were mainly due to ATC Staffing (36%), ATC (35%) and Weather (25%). A maximum configuration of 23 en-route sectors (including 3 sectors with predominantly military traffic) and 2 en-route/app- sectors (Stuttgart) and 1 APP/TMA- sectors (Düsseldorf, Frankfurt, Cologne/Bonn) were opened. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 EDGG % 213 EDGGDLSN % 213 EDGG % 213 EDGGHMM 55 7.% 213 EDGGPAD % 213 EDGGGEHE % Avg daily delay (min) Enroute (min. per flight) Langen en-route delays in 213 (% difference v 212) Year H: -1.5% -1.7% B: -2.5% L: -4.% -1.3% No 254 (+4%) CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 25

26 NM Network Operations Report ANNEX II GERMANY MUNICH & EDMM - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Munich EDMM Evolution (213 v 212) The yearly traffic decreased by 26.5%. The significant decrease in traffic is due to the relocation of the upper airspace from Munich to Karlsruhe end of 212. The Average ATFM En-route per Movement decreased from.5 minutes/flight during Summer 212 compared to.1 minutes/flight in the Summer 213. The ADM Summer 213 was below the reference value. Planned Measures Achieved Comments Relocation of Munich Upper airspace to Karlsruhe ( ) Implementation of C-PDLC procedure (D/-Link Karlsruhe above FL285) Implementation of the TEEGERNSEE sector instead of CHIM Low sector Re-structure airspace FÜSSEN, ZUGSPITZE and STARNBERG sector Summer 213 performance assessment The realisation was completed successfully on 16./ The realisation was completed successfully on The realisation was completed successfully on The realisation was completed successfully on The traffic decreased by 28.8% to last year's level. The delays were mainly due to Weather (95%), ATC (5%). A maximum configuration of 15 en-route sectors and 3 en-route /APP- sectors (Nuremberg, Dresden and Leipzig) and 4 APP/TMA- sectors (Munich) was available. ocation of and Reasons for Enroute Enroute (min. per flight) (% difference v 212) Year H: -.2% (-28%) -26.5% B: -1.9% (-28%) L: -3.5% (-28%) -28.8% No 246 (-14%) Year Location Avg Daily ER s % of Total ER 213 EDMMCN % 213 EDMMALB % 213 EDMMKPTH 13 9.% 213 EDMMTRGH % 213 EDMMTEG % 213 EDMMFRKHU 1 7.% Avg daily delay (min) Munich en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 26

27 NM Network Operations Report ANNEX II GREECE ATHENS & LGGG - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Athens LGGG The average en-route delay per flight decreased from.3 minutes per flight in Summer 212 to.1 minutes per flight in Summer % of the delays were for the reason ATC Staffing, 25% for ATC, and 16% for Industrial action. Plan % Achieved Comments Improved ATS route network and airspace management Improved civil/military coordination ATFCM Actions (traffic volume monitoring, traffic management scenarios etc ) OLDI with Nicosia (Athens ready) Evolution (213 v 212) Maximum configuration: 6/7 sectors 7/8 sectors Summer 213 performance assessment The capacity baseline was measured with ESS, representing the delivered capacity (123). The average demand was 16 (peak 3 hour) and 116 (peak 1 hour). ocation of and Reasons for Enroute Enroute (min. per flight) No (% difference v 212) Year H:.7%.% B: -1.1% L: -3.1% +2.6% No 123 (+2%) Year Location Avg Daily ER s % of Total ER 213 LGGGMILL % 213 LGGGAL % 213 LGGGKRK % 213 LGGGRDS 9 1.9% 213 LGGGRDSL 9 1.6% 213 LGGGMLST 8 9.5% Avg daily delay (min) Athens en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 27

28 NM Network Operations Report ANNEX II GREECE MAKEDONIA & LGMD - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Makedonia LGMD Average en-route delay per flight decreased from.1 minutes per flight in Summer 212 to zero minutes per flight in Summer 213. Plan +% Achieved Comments Improved ATS route network and airspace management Improved civil/military coordination Evolution (213 v 212) ATFCM actions (traffic volume monitoring, traffic management scenarios etc ) Maximum configuration: 3/4 sectors 4 sectors Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was measured with ESS, representing the delivered capacity (98). The average demand was 84 (peak 3 hour) and 93 (peak 1 hour). (% difference v 212) Year H: 2.9% -2.3%...26 B:.8% L: -1.% -.3%...36 No 98 (+1%) NM Network Operations Report ANNEX II - 28

29 NM Network Operations Report ANNEX II HUNGARY BUDAPEST & LHCC - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Budapest LHCC Evolution (213 v 212) Enroute (min. per flight) The average en-route delay per flight remained at zero minutes per flight in Summer 213. (% difference v 212) Year H: 5.5% +2.6%...7 Summer B: 4.2% -4% L: 2.1% +3.1%...12 No 165 (%) Plan +6% Achieved Comments Optimization of airspace structure Ongoing project Recruitment and training of controllers 5 new controllers were licensed in 213 replacing 5 retired ones, 7 trainees start OJT early 214, and no retirement expected New ATM software Continuous upgrades New ATCC building Inaugurated in early 213 Maximum configuration: 1 for Budapest Maximum configuration: 7 sectors were sufficient to cope with traffic demand in Budapest Summer 213 performance assessment The capacity baseline was estimated to be at the same level as in Summer 212. During the measured period the peak 1 hour demand was 154 and the peak 3 hour demand was 134. NM Network Operations Report ANNEX II - 29

30 NM Network Operations Report ANNEX II IRELAND DUBLIN & EIDW - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Dublin EIDW Evolution (213 v 212) Average enroute delay per flight remained at zero minutes per flight in Summer 213 as 212. Plan +2%* Achieved Comments TMA Improvement of route network at Prestwick & London interface (Dec 212) - Point merge and sector split Implementation of Y124 On-going recruitment to maintain staff levels Developing Queue Management programme UK / Ireland FAB initiatives Maximum configuration: 4 sectors Summer 213 performance assessment Enroute (min. per flight) *Up to 2% additional capacity will be available as a result of TMA 212 and point merge. This will be gradually realised as demand increases in the coming years. The Dublin airport runway capacity will continue to be the main constraint. The capacity baseline was estimated at the same level as last year. The peak 1 hour demand was 46 and the peak 3 hour demand was 39. No (% difference v 212) Year H: -1.6% +3.7%...26 B: -3.6% L: -4.7% +4.4%...41 No 59 (+%) NM Network Operations Report ANNEX II - 3

31 NM Network Operations Report ANNEX II IRELAND SHANNON & EISN - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Shannon EISN Average enroute delay per flight remained at zero minutes per flight in Summer 212, same as 211. Plan +3% Achieved Comments Extra sectors as required Dynamic sectorisation available Sector capacity re-evaluation (CAPAN) Data Linking On-going recruitment to maintain staff levels UK / Ireland FAB initiatives Evolution (213 v 212) Developing Queue Management programme Maximum configuration: 12 sectors Summer 213 performance assessment Enroute (min. per flight) (% difference v 212) Year H: 1.9% -.1%...5 B:.8% L: -1.% +.8%...9 No 124 (+2%) Maximum configuration: 7 sectors was sufficient to cope with traffic demand The ESS measured baseline of 124 indicates the capacity available during the measured period. The peak 1 hour demand was 99 and the peak 3 hour demand was 91. NM Network Operations Report ANNEX II - 31

32 NM Network Operations Report ANNEX II ITALY BRINDISI & LIBB - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Brindisi LIBB Average en-route delay per flight remained at zero, the same as during Summer 212. Plan +% Achieved Comments Sector loads and sector optimisation assessment according to traffic demand and system enablers implementation Airspace management and ATS route assessment and/or improvements according to network needs, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Mode S implementation No Planned for implementation in June 214 Free-route implementation program On-going Implementation started 12/12/213 PBN Program Evolution (213 v 212) Maximum configuration: 5 sectors if needed Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. During the period June/July, the average peak 1 hour demand was 73 and the peak 3 hour demand was 68. No (% difference v 212) Year H: -1.1% -2.7%...1 Summer B: -2.7% +9% L: -4.3% -1.7%...2 No 117 (%) NM Network Operations Report ANNEX II - 32

33 NM Network Operations Report ANNEX II - 3. ITALY MILAN & LIMM - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Milan LIMM Average en-route delay per flight stayed at zero in Summer 213. Plan +% Achieved Comments Sector loads and sector optimisation assessment according to traffic demand and system enablers implementation Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Mode S implementation Implemented in December 213 Free-route implementation program On-going Implementation started 12/12/213 Activity to optimize the NW Upper Area of Milano UIR Implementation of CDO in LIMC (12/212) and LIML (12/213) according to ENV1 PBN Program Maximum configuration: 17 sectors Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. During the period June/July, the average peak 1 hour demand was 129 and the peak 3 hour demand was 138. (% difference v 212) Year H: -2.7% -5.6%...9 B: -4.% L: -5.5% -5.4%...16 No 164 (%) NM Network Operations Report ANNEX II - 33

34 NM Network Operations Report ANNEX II ITALY PADOVA & LIPP - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Padova LIPP Average en-route delay per flight was zero minutes per flight during Summer 213. Plan +2% Achieved Comments Sector loads and sector optimisation according to traffic demand and system enablers implementation Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Sectorisation and configuration revision to optimise ATM and sectors loads according to network needs Implementation of CDO in LIPZ (12/213) according to ENV1 Mode S implementation No Planned for March 214 Free-route implementation program PBN Program Evolution (213 v 212) Maximum configuration: 12/13 sectors Maximum configuration: 13 sectors Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. During the period June/July, the average peak 1 hour demand was 175 and the average peak 3 hour demand was 164. No (% difference v 212) Year H: -.8% -1.2%...1 B: -2.5% L: -4.2% -.6%...17 No 187 (%) NM Network Operations Report ANNEX II - 34

35 NM Network Operations Report ANNEX II ITALY ROME & LIRR - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Rome LIRR Evolution (213 v 212) Enroute (min. per flight) Average enroute delay per flight remained at zero, the same as during Summer 212. (% difference v 212) Year H: -2.6% -.7%...9 B: -4.3% L: -6.1% -.5%...15 No 244 (%) Plan +1% Achieved Comments Sector loads and sector optimisation according to traffic demand and system enablers implementation Airspace management and ATS route assessment and/or improvements according to network needs, Airspace Users expectations, ENAV s Flight Efficiency Plan and/or BLUEMED FAB implementation Implementation of CDO in LIRF according to ENV1 Mode S implementation Free-route implementation program PBN Program Maximum configuration: 21 sectors if required Maximum configuration: 19 sectors was sufficient to cope with traffic demand Summer 213 performance assessment The capacity baseline was assessed to be at the same level as in Summer 212. During the period June/July, the average peak 1 hour demand was 222 and the average peak 3 hour demand was 21. NM Network Operations Report ANNEX II - 35

36 NM Network Operations Report ANNEX II LATVIA RIGA & EVRR - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Riga EVRR As in 212, Riga did not generate enroute ATFM delay. Plan: Sufficient to meet demand Achieved Comments Additional APP sector Various ATM system improvements Maximum configuration: APP Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was estimated at the same level as in 212. The average peak 1 hour demand was 63 and the peak 3 hour demand was 57 flights during the measured period, indicating that the offered sufficient capacity to meet the demand. (% difference v 212) Year H: 2.1% +1.3%...4 Summer B: -1.4% -7% L: -3.7% +1.5%...3 No 85 (+%) NM Network Operations Report ANNEX II - 36

37 NM Network Operations Report ANNEX II LITHUANIA VILNIUS & EYVC - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Vilnius EYVC In Summer 213, no en route ATFM delay was generated by Vilnius, as in Summer 212. Planned Increase: sufficient to meet demand Achieved Comments Maximum configuration: 3 sectors Evolution (213 v 212) Summer 212 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. The peak 1 hour demand was 55 and the peak 3 hour demand was 49 during the measured period. (% difference v 212) Year H: 2.4% +3.9%...5 B: -.8% L: -2.7% +5.2%...8 No 77 (+%) NM Network Operations Report ANNEX II - 37

38 NM Network Operations Report ANNEX II MALTA MALTA & LMMM - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Malta LMMM Evolution (213 v 212) Average enroute delay per flight remained at zero, as in Summer 212. Planned Increase: sufficient to meet demand Maximum configuration: 2 sectors Summer 213 performance assessment Enroute (min. per flight) Comments (% difference v 212) Year H: 2.9% +13.%...3 Summer B: 1.4% -11% L:.1% +8.6%...5 No 39 (+%) The capacity baseline was measured with ESS. During June and July, the average peak 1 hour demand was 26 flights and the peak 3 hour demand was 22, indicating that the has sufficient capacity to meet the demand with spare capacity in the system. NM Network Operations Report ANNEX II - 38

39 NM Network Operations Report ANNEX II MOLDOVA CHISINAU & LUUU - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Chisinau LUUU Evolution (213 v 212) Average enroute delay per flight remained at zero, as in Summer 212. Enroute (min. per flight) Planned Increase: sufficient to meet demand Achieved Comments New ATM system MAATS Implementation December 213 (% difference v 212) Year H: 7.1% +15.3%...1 Summer B: 4.2% +9% L: 2.1% +19.2%...1 No 4 (%) Increased sector capacities As a result of implementation of New ATM system Reduces longitudinal separation (from ) In accordance with the planning dates, since Maximum configuration: 3 sectors No Maximum configuration: 2 sectors (The third sector is planned for implementing during 214) Summer 213 performance assessment The capacity baseline was measured with NEVAC. The peak 1 hour demand was 23 flights and the peak 3 hour demand was 2, indicating that the has sufficient capacity to meet the demand with spare capacity in the system. NM Network Operations Report ANNEX II - 39

40 NM Network Operations Report ANNEX II THE NETHERLANDS AMSTERDAM & EHAA - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Amsterdam EHAA The average en-route delay per flight slightly decreased from.3 minutes per flight during Summer 212 to.1 minutes per flight in Summer % of the delays were for the reason ATC, 1% for reason. Plan % Achieved Comments Civil-military co-location ANS and FUA No Temporary for upper airspace (> FL195) only; on hold due to training military ATCos Maximum configuration: 5 sectors Summer 213 performance assessment The capacity baseline was measured with ESS at 137, representing the delivered capacity. This was sufficient to accommodate the traffic demand, with an average peak 1 hour of 12 during the measured period and an average peak 3 hour of 18. ocation of and Reasons for Enroute Year Location Evolution (213 v 212) Avg Daily ER s % of Total ER 213 EHAACBAS % 213 EHAASECT % 213 EHAASECT3 1.8% Enroute (min. per flight) Avg daily delay (min) (% difference v 212) Year H: 1.4% +1.% B:.2% L: -1.1% +1.6% No 137 (%) Amsterdam en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 4

41 NM Network Operations Report ANNEX II NORWAY BODO & ENBD - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Bodo ENBD Average enroute delay per flight remained at zero in Summer 213. Planned Increase: sufficient to meet demand Achieved Comments Flexible rostering of ATC staff Additional controllers Revision of FUA operations Evolution (213 v 212) Maximum configuration: 6 sectors + 1 oceanic Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. During the measured period, the average peak hour demand was 46 and the average peak 3 hour demand was 42. No No (% difference v 212) Year H:.2% +1.9%...3 B:.% L: -1.2% +2.7%... No 57 (%) NM Network Operations Report ANNEX II - 41

42 NM Network Operations Report ANNEX II NORWAY OSLO & ENOS - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Oslo ENOS Average enroute delay per flight decreased from.8 minutes per flight in Summer 212 to zer minutes per flight in Summer 213. Planned Increase: sufficient to meet demand Achieved Comments 4 to 5 additional controllers Operations Resource Management system (rostering) Enhanced sector configurations Re-assessment of sector capacities following CAPAN study Revision of FUA operations Evolution (213 v 212) Maximum configuration: 5 (Summer), 7 (Winter) Summer 213 performance assessment Enroute (min. per flight) The capacity offered was measured with ESS at a level of 86, for an average peak demand of 79 (peak 1 hour) and 73 (peak 3 hour). No No No (% difference v 212) Year H: 1.6% +5.7%... B: 1.% L: -.7% +7.4%... No 86 (+28%) NM Network Operations Report ANNEX II - 42

43 NM Network Operations Report ANNEX II - 4. NORWAY STAVANGER & ENSV - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Stavanger ENSV Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: 1.6% +6.1% Summer B: 1.% -4% L: -.3% +6.7% No 58 (+%) Average enroute delay per flight increased from zero minutes per flight in Summer 212 to.1 minutes per flight in Summer % of te delays were for the reason ATC. Planned Increase: +% Achieved Comments Flexible rostering of ATC staff Additional controllers Revision of FUA operations No Not currently a limiting factor Maximum configuration: helicopter Summer 213 performance assessment The capacity baseline of 58 was measured with ESS, indicating the capacity actually offered. During the measured period, the average peak demand was 56 (peak 1 hour) and 5 (peak 3 hour).. ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 ENSVSSX % 213 ENSV % 213 ENSVSS 2 3.4% 213 ENSV % 213 ENSVN 1 1.3% Avg daily delay (min) Stavanger en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 43

44 NM Network Operations Report ANNEX II POLAND WARSAW & EPWW - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Warsaw EPWW The average en-route delay per flight decreased from.8 minutes per flight in Summer 212 to.5 minutes per flight in Summer % of the delays were for the reason ATC, 21% for ATC staffing, 13% for and 7% for Equipment. Plan + 3 % Achieved Comments Improved traffic handling through enhanced cooperation FMP/DNM Flexible use of configurations Release of new sector s capacity reference values Maintain number of ATCOs Improved sector configurations and management of configurations Maximum configuration: 8 Sectors Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was measured with ESS / Reverse CASA and represents the capacity actually offered during the measured period. During the same period, the average peak demand was 149 (peak 1 hour) and 141 (peak 3 hour). (% difference v 212) Year H: 2.3% +1.3% B:.4% L: -1.5% +2.3% (+3%) ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 EPWWJ % 213 EPWWG % 213 EPWWD % 213 EPWWTC 9 9.6% 213 EPWWT % 213 EPWWBD % Avg daily delay (min) Warsaw en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 44

45 NM Network Operations Report ANNEX II PORTUGAL LISBON & LPPC - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Lisbon LPPC Evolution (213 v 212) s decreased from.8 min/flight in Summer 212 to.2 min/flight in Summer % of the delays were for the reason ATC capacity, 17% for Industrial action, and 2% for ATC Staffing. Plan +2 % Achieved Comments Improved rostering and sector opening schemes 4 net additional ATCOs Partially 3 net additional ATCOs Free route extension to LECM FIR No Postponed to March 214, Lisbon ready Update traffic volume definition to take new traffic pattern into account in line with the free route extension to LECM FIR No Postponed to March 214 Maximum configuration: 8 sectors (6 ENR+2 TMA) 8 to 9 sectors Summer 213 performance assessment The capacity baseline (88) was calculated with ESS and represents the capacity delivered during the Summer season in the. During the measured period, the average peak 1 hour demand was 9 and the peak 3 hour demand was 81. ocation of and Reasons for Enroute Enroute (min. per flight) (% difference v 212) Year H:.% +2.6% B: -1.8% L: -3.8% +3.% No 88 (+6%) Year Location Avg Daily ER s % of Total ER 213 LPPCWEST % 213 LPPCNXUPP % 213 LPPCNORTH % 213 LPPCSOUTH % 213 LPPCMAD % 213 LPPCSULEX % Avg daily delay (min) Lisbon en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 45

46 NM Network Operations Report ANNEX II ROMANIA BUCHAREST & LRBB - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Bucharest LRBB Average enroute ATFM delay per flight remained at zero in Summer 213, the same as in Summer 212. Planned Increase: sufficient to meet demand ATS route network and sectorisation improvements Maximum configuration: 2 sectors Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) Comments 13 sectors sufficient (% difference v 212) Year H: 4.7% +5.7%... Summer B: 3.2% +5% L: 1.2% +7.%... No 183 (%) The capacity baseline was assessed to be at the same level as in Summer 212. It was calculated with NEVAC, giving the potential capacity of the. During the measured period, the peak 1 hour demand was 123 flights and the peak 3 hour demand was 115, indicating that the had sufficient capacity to meet the demand with spare capacity in the system. NM Network Operations Report ANNEX II - 46

47 NM Network Operations Report ANNEX II SERBIA & MONTENEGRO BELGRADE & LYBA - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Belgrade LYBA En-route delay remained at zero in Summer 213. Plan +1% Achieved Comments Route network Development Improved airspace management Flexible use of staff Civil/military coordination improvement (FUA) No National high-level policy body not established Additional controllers Radar sharing project CPR CCAMS No Postponed for 214 due KFOR Sector Cross border DCTs Evolution (213 v 212) Elementary Mode S implementation Phase 1 No Postponed for 216, with enhanced Mode S Maximum configuration: 12 sectors No Maximum opened configuration: 8 sectors Summer 213 performance assessment Enroute (min. per flight) The capacity baseline was assessed to be at the same level as in Summer 212. The peak 1 hour demand was 137 and the peak 3 hour demand was 124 during the measurement period. (% difference v 212) Year H: 4.% -2.9%...21 Summer B: 2.% -7% L:.1% -.6%...31 No 164 (%) NM Network Operations Report ANNEX II - 47

48 NM Network Operations Report ANNEX II SLOVAK REPUBLIC BRATISLAVA & LZBB - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Bratislava LZBB The average en-route delay per flight remained at zero minutes per flight in Summer 213. Plan +3% Achieved Comments Continuous improvements of the route network and sectorisation ATS Route Network v.7 has been implemented in 5/213 Adaptation of sector opening times Sector opening times are optimised on monthly basis Improved flow and capacity management techniques Continuous recruitment to maintain staff levels Enhanced sectorization according to the FAB CE Airspace Plan (partly) No Improved methodology of flow and capacity evaluation has been implemented Staff level is temporarily decreasing. We work constantly on stabilizing and increasing of operational staff level through intensive training We are currently in a process of optimizing sector configuration within FIR borders (W-E configuration) Ops from the new building (Spring 213) Transfer was managed seamlessly Maximum configuration: 5 sectors Evolution (213 v 212) Summer 213 performance assessment Enroute (min. per flight) The capacity baseline of 11 was calculated with ESS, representing the capacity offered during Summer 213. During the measured period, the peak 1 hour demand was 19 flights, indicating that the offered sufficient capacity to meet demand. The peak 3 hour demand was 96. (% difference v 212) Year H: 6.3% +5.%...22 Summer B: 4.6% -14% L: 2.5% +4.9%...35 No 11 (+2%) NM Network Operations Report ANNEX II - 48

49 NM Network Operations Report ANNEX II SLOVENIA LJUBLJANA & LJLA - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes)..... Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Ljubljana LJLA The average en-route delay per flight remained zero in Summer 213. Plan : Up to +5% Achieved Comments Implementation of new OPS room (March 213) ATS route network and traffic organisation changes Enhanced sectorization according to the FAB CE Airspace Plan Flexible sector configurations Maximum configuration: 4 sectors Evolution (213 v 212) Enroute (min. per flight) Summer 213 performance assessment The capacity baseline was measured with ESS, representing the delivered capacity (87). The peak 1 hour demand was 75 and the peak 3 hour demand was 67 during the measurement period. (% difference v 212) Year H: 3.6% -4.3%...26 Summer B: 1.2% +4% L: -1.6% -2.1%...37 No 87 (%) NM Network Operations Report ANNEX II - 49

50 NM Network Operations Report ANNEX II SPAIN BARCELONA & LECB - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Barcelona LECB Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: -1.6% -.3% B: -3.4% L: -4.9% +.4% (+1%) Average en-route delay per flight slightly decreased from.8 minutes per flight in Summer 212 to.7 minutes per flight in Summer % of the delays were for the reason ATC and 14% for Weather. Plan +4% Achieved Comments Partial implementation of SACTA CF2 version (March 213) Optimised sector configurations Additional staff from TWR liberalization process New set of night direct routes Improvement in the interface with LFBB Maximum configuration: 11 sectors Summer 213 performance assessment The capacity baseline was measured at 138 with ESS/Reverse CASA. During the measured period, the peak 1 hour demand was 136 and the peak 3 hour demand was 129. ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 LEBLT1E % 213 LECBP1U % 213 LECBMNI % 213 LECBLGU % 213 LECBP1I 6 6.3% 213 LECBCCC 57 6.% Avg daily delay (min) Barcelona en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 5

51 NM Network Operations Report ANNEX II SPAIN CANARIAS & GCCC - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Canarias GCCC Evolution (213 v 212) Average enroute delay per flight decreased from.2 minutes per flight in Summer 212 to.1 in Summer % of the delays were for ATC, and 9 % for Weather. Plan +1% Achieved Comments Optimised sector configurations Additional staff from TWR liberalization process Minor ATC system upgrades Integration of airports in ATFM operations No Maximum configuration: 9 (5 APP/3+1ENR) Summer 213 performance assessment Maximum configuration Summer: 8 sectors Maximum configuration Winter: 9 sectors The capacity baseline was measured with ESS at 65. During the measured period, the peak 1 hour demand was 57 and the peak 3 hour demand was 51. ocation of and Reasons for Enroute Enroute (min. per flight) (% difference v 212) Year H: -4.9% -3.3% B: -5.5% L: -6.6% -3.9% No 65 (+%) Year Location Avg Daily ER s % of Total ER 213 GCCCINB % 213 GCCCRE % 213 GCCCAAC % 213 GCCCIGC % 213 GCCCRC % 213 GCCCRWS % Avg daily delay (min) Canarias en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 51

52 NM Network Operations Report ANNEX II SPAIN MADRID & LECMALL - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Madrid LECM Evolution (213 v 212) Average enroute delay per flight remained at.2 minutes per flight in Summer % of delays were for the reason ATC, and 32% for Other. Plan +1% Achieved Comments Optimised sector configurations Partial implementation of SACTA CF2 version (April 213) Additional staff from TWR liberalization process New set of night direct routes Maximum configuration: 17 sectors No Maximum configuration: 16 sectors Summer 213 performance assessment The capacity baseline was measured with ESS/Reverse CASA at 182. During the measured period, the peak 1 hour demand was 18 and the peak 3 hour demand was 169. ocation of and Reasons for Enroute Enroute (min. per flight) (% difference v 212) Year H: -3.2% -4.2% B: -5.% L: -6.3% -3.7% No 182 (-3%) Year Location Avg Daily ER s % of Total ER 213 LECMBLI % 213 LASNO % 213 LECMASI % 213 LECMTZI % 213 LECMZMU % 213 LECMPAU % Avg daily delay (min) Madrid en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 52

53 NM Network Operations Report ANNEX II - 5. SPAIN PALMA & LECP - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Palma LECP Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: -1.2% -1.1% B: -2.9% L: -4.4% -.2% No 92 (%) Average enroute delay per flight decreased from.3 minutes in Summer 212 to.2 minutes per flight in Summer % of the delays were for the reason ATC, and 5% for Weather. Plan +2% Achieved Comments Optimised sector configurations Partial implementation of SACTA CF2 version (March 213) Additional staff from TWR liberalization process Maximum configuration: 7 sectors (3 APP + 4 ENR) Summer 213 performance assessment The capacity baseline was measured with ESS/REVERSE CASA at 92. During the measured period, the peak 1 hour demand was 87, the peak 3 hour demand was 77. ocation of and Reasons for Enroute Year Location Avg Daily ER s % of Total ER 213 LECPMXX % 213 LECPIXX % 213 LECPIRX 3 3.3% 213 LECPGOX 2 1.9% 213 LECPIAX 1 1.1% Avg daily delay (min) Palma en-route delays in 213 CAPACITY STAFFING DISRUPTION EVENTS WEATHER NM Network Operations Report ANNEX II - 53

54 NM Network Operations Report ANNEX II SPAIN SEVILLA & LECS - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Sevilla LECS Evolution (213 v 212) Enroute (min. per flight) (% difference v 212) Year H: -3.4% -1.7%...34 B: -4.2% L: -5.6% +.2% No 89 (+%) Average enroute delay remained at.1 minutes per flight in Summer % of the delays were for the reason ATC, and 9% for Weather. Plan +1% Achieved Comments Optimised sector configurations Partial implementation of SACTA CF2 version (March 213) Maximum configuration: 7 (5 + 2 APP) Summer 213 performance assessment The capacity baseline was measured with ESS at 89. During the measured period, the peak 1 hour demand was 75 and the peak 3 hour demand was 68. NM Network Operations Report ANNEX II - 54

55 NM Network Operations Report ANNEX II SWEDEN MALMO & ESMM - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Malmo ESMM Average enroute delay per flight was at zero minutes per flight in Summer 213. Plan: +1% Achieved Comments Minor updates of COOPANS Evolution (213 v 212) Sector configurations adapted to traffic demand Continuous improvements on the ATS route network Maximum configuration: 4/5 (E) + 3/4 (W) + 2 (L) Summer 213 performance assessment Enroute (min. per flight) (% difference v 212) Year H: 2.6% +1.3%...4 B: 1.% L: -1.4% +2.6%...5 No 124 (%) Maximum configuration: 3/4E + 2L + 3W was sufficient given the levels of traffic demand The capacity baseline was assessed to be at the same level as in Summer 212. During the measured period, the average peak 1 hour demand was 113 and the peak 3 hour demand was 14. NM Network Operations Report ANNEX II - 55

56 NM Network Operations Report ANNEX II SWEDEN STOCKHOLM & ESOS - and en-route ATFM delays Peak Day Summer Yearly Summer enroute delay (all causes) Yearly enroute delay (all causes) Enroute (minutes per flight) 213 Realisation of Plan Stockholm ESOS Average enroute delay per flight was at zero minutes per flight in Summer 213. Plan: +1% Achieved Comments COOPANS implementation Evolution (213 v 212) Sector configurations adapted to traffic demand Continuous improvements on the ATS route network Enroute (min. per flight) Maximum configuration: 3 (M) + 4 (N) + 4 (S) Maximum configuration: 3M + 2N + 3S was sufficient given the levels of traffic demand Summer 213 performance assessment The capacity baseline was assessed to be at the same level as in Summer 212. During the measured period, the average traffic demand was 79 for the peak 1 hour and 74 for the peak 3 hour. (% difference v 212) Year H:.4% +.7%... Summer B: -.7% +6% L: -2.4% +2.1%... No 112 (%) NM Network Operations Report ANNEX II - 56

NETWORK OPERATIONS REPORT 2011

NETWORK OPERATIONS REPORT 2011 ANNEX I: CAPACITY EVOLUTION INTRODUCTION...3 1. ALBANIA TIRANA...5 2. ARMENIA YEREVAN...6 3. AUSTRIA VIENNA...7 4. AZERBAIJAN BAKU...8 5. BELGIUM BRUSSELS...9 6. BULGARIA SOFIA...1 7. CROATIA ZAGREB...11

More information

Summer Study: Europe. A look at European hotel performance during summer 2017 (June - August) Key Findings

Summer Study: Europe. A look at European hotel performance during summer 2017 (June - August) Key Findings Summer Study: Europe A look at European hotel performance during summer 2017 (June - August) Key Findings - This was the strongest summer overall for European hotels dating back to 2000 - with record-breaking

More information

Time series of Staff PPPs

Time series of Staff PPPs Luxembourg, 28 August 2013 Unit C3 A64/13/12 Meeting of the Working Group on Article 64 of the Staff Regulations Luxembourg, 27 th September 2013 Bech Building Room "Ampère" 9.30 a.m. Time series of Staff

More information

European Association of Establishments for Veterinary Education. EAEVE Establishments Status

European Association of Establishments for Veterinary Education. EAEVE Establishments Status This table is listing the outcome status of the Veterinary Education Establishments, members of EAEVE, after following the European System of Evaluation of Veterinary Training (ESEVT). Information on the

More information

EAEVE Establishments Status

EAEVE Establishments Status EAEVE Establishments Status This table is listing the outcome status of the Veterinary Universities and Faculties, members of EAEVE, after following the European System of Evaluation of Veterinary Training

More information

EAEVE Establishments Status

EAEVE Establishments Status This table is listing the outcome status of the Veterinary Education Establishments, members of EAEVE, after following the European System of Evaluation of Veterinary Training (ESEVT). Information on the

More information

UEFA EURO 2020 Qualifying Draw Procedure

UEFA EURO 2020 Qualifying Draw Procedure UEFA EURO 2020 Qualifying Draw Procedure UEFA EURO 2020 Qualifying Draw Procedure Date and time: Place: Duration: Regulations: Participants: Objective: Seeding: Sunday, 2 nd December 2018, 12h00 (start

More information

EAEVE Establishments Status

EAEVE Establishments Status EAEVE Establishments Status This table is listing the outcome status of the Veterinary Universities and Faculties, members of EAEVE, after following the European System of Evaluation of Veterinary Training

More information

UEFA Nations League 2018/19 League Phase Draw Procedure

UEFA Nations League 2018/19 League Phase Draw Procedure Date and time: Wednesday, 24 January 2018 Place: Duration: Regulations: Participants: Objective: Seeding: Lausanne, Switzerland approx. 40 minutes for technical part Art. 12-13 of the competition regulations

More information

2016/17 UEFA European Under-17 and Under-19 Championships Qualifying round draws. 3 December 2015, Nyon, Switzerland

2016/17 UEFA European Under-17 and Under-19 Championships Qualifying round draws. 3 December 2015, Nyon, Switzerland 2016/17 UEFA European Under-17 and Under-19 Championships Qualifying round draws 3 December 2015, Nyon, Switzerland DRAW PROCEDURE Qualifying rounds 16th UEFA European Under-17 and Under-19 Championships,

More information

TomTom European Congestion Index

TomTom European Congestion Index TomTom European Congestion Index Disclaimer All copyrights, commercial rights, design rights, trademarks and other elements considered intellectual property that are published in this report are reserved

More information

Selection statistics

Selection statistics Selection statistics ERASMUS+ Sport Call for proposals EAC-A03-2016 Selection year 2017 Collaborative Partnerships Small Collaborative Partnerships Not-for-profit European Sport Events Erasmus+ Applications

More information

23 November 2018, Nyon, Switzerland. 2019/20 UEFA European Women s Under-17 and Women s Under-19 Championships. Qualifying round draws

23 November 2018, Nyon, Switzerland. 2019/20 UEFA European Women s Under-17 and Women s Under-19 Championships. Qualifying round draws 23 November 208, Nyon, Switzerland 209/20 UEFA European Women s Under-7 and Women s Under-9 Championships Qualifying round draws DRAW PROCEDURE Qualifying rounds 3th UEFA European Women s Under-7 and 9th

More information

2016/17 UEFA European Women s Under 17 and Women s Under 19 Championships Qualifying draws

2016/17 UEFA European Women s Under 17 and Women s Under 19 Championships Qualifying draws 2016/17 UEFA European Women s Under 17 and Women s Under 19 Championships Qualifying draws 13 November 2015, Nyon, Switzerland DRAW PROCEDURE Qualifying rounds UEFA European Women s Under-17 and Women

More information

NEW COMMERCIAL VEHICLE REGISTRATIONS EUROPEAN UNION 1. July and August 2017

NEW COMMERCIAL VEHICLE REGISTRATIONS EUROPEAN UNION 1. July and August 2017 PRESS EMBARGO: NEW COMMERCIAL VEHICLE REGISTRATIONS EUROPEAN UNION 1 July and August 2017 Next press release: Tuesday 24 October 2017 1 Data for Malta unavailable Page 1 of 12 Commercial vehicle registrations:

More information

Selection statistics

Selection statistics Selection statistics ERASMUS+ Sport Call for proposals EAC-A05-2017 Selection year 2018 Collaborative Partnerships Small Collaborative Partnerships Not-for-profit European Sport Events Applications received

More information

UEFA Futsal EURO Preliminary & Main Round Draw Procedure

UEFA Futsal EURO Preliminary & Main Round Draw Procedure UEFA Futsal EURO 2015-16 Preliminary & Main Round Draw Procedure UEFA Futsal EURO 2013/14 Preliminary & Main Round Draw Procedure Date: Friday, 26 September 2014 Time: Location: 14.00 hours CET UEFA Headquarters,

More information

11 th UEFA Futsal Cup Season 2011/12 Preliminary & Main Round Draw Draw Procedure

11 th UEFA Futsal Cup Season 2011/12 Preliminary & Main Round Draw Draw Procedure 11 th UEFA Futsal Cup Season 2011/12 Preliminary & Main Round Draw 1 UEFA Futsal Cup 2011/12 Preliminary & Main Round Date: Wednesday, 6 July 2011 Time: Location: 14.00 hours CET UEFA Headquarters, Nyon

More information

2014/15 UEFA European Under-17 and Under-19 Championships Elite round draws. 3 December 2014, Nyon, Switzerland

2014/15 UEFA European Under-17 and Under-19 Championships Elite round draws. 3 December 2014, Nyon, Switzerland 0/5 UEFA European Under-7 and Under-9 Championships Elite round draws December 0, Nyon, Switzerland DRAW PROCEDURE Elite rounds th UEFA European Under-7 and Under-9 Championships, 0/5 TEAMS QUALIFYING

More information

Organizing Entity Host City Start Date End Date Remarks Held in New York 04 December December 2017 Confirmed

Organizing Entity Host City Start Date End Date Remarks Held in New York 04 December December 2017 Confirmed Organizing Entity Host Start Date End Date Remarks France 04 December 2017 05 December 2017 Confirmed United Kingdom 13 November 2017 14 November 2017 Confirmed Senegal Held in Dakar 02 November 2017 03

More information

Architecture - the Market

Architecture - the Market 2 Architecture - the Market Architect: Ibelings van Tilburg architecten Project: De Karel Doorman Winner of the BNA Building of the Year 2013 Public Prize Photographer: Ossip van Duivenbode Place: Rotterdam

More information

Selection statistics

Selection statistics Selection statistics ERASMUS+ Sport Call for proposals EAC/S11/13 Selection year 2014 Collaborative Partnerships: Selection round 1 Not-for-profit European Sport Events: Selection rounds 1 and 2 Applications

More information

RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018

RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018 RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018 Competitions calendar 2017-2018 updated on February 7th 15-a-side Men Senior Competitions Competing Teams Details (dates and venues) North South North South

More information

RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018

RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018 RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018 Competitions calendar 2017-2018 updated on December 6th 15-a-side Men Senior Competitions Competing Teams Details (dates and venues) North South North South

More information

EUROPEAN RIDERS, HORSES AND SHOWS AT THE FEI 2012

EUROPEAN RIDERS, HORSES AND SHOWS AT THE FEI 2012 EUROPEAN RIDERS, HORSES AND SHOWS AT THE FEI 2012 Presentation to the EEF Sports Forum Essen, 21 st March 2013 1 Introduction In 2010 the Small Nations Working Group started this study, to know exactly

More information

DEVELOPMENT AID AT A GLANCE

DEVELOPMENT AID AT A GLANCE DEVELOPMENT AID AT A GLANCE STATISTICS BY REGION 5. EUROPE 2018 edition All the data in this report are available at: http://www.oecd.org/dac/financing-sustainable-development/ 5.1. ODA TO EUROPE - SUMMARY

More information

Table 34 Production of heat by type Terajoules

Table 34 Production of heat by type Terajoules Table 34 Production of heat by type Table Notes geo represents heat used directly for district heating, agriculture etc. without a commercial transaction taking place. represents heat used for the production

More information

RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018

RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018 RUGBY EUROPE COMPETITIONS CALENDAR 2017 / 2018 Competitions calendar 2017-2018 updated on October 5th 15-a-side Men Senior Competitions Competing Teams Details (dates and venues) Championship Trophy Conference

More information

Selection statistics

Selection statistics Selection statistics ERASMUS+ Sport Call for proposals EAC-A04-2015 Selection year 2016 Collaborative Partnerships: Selection round 2 Small Collaborative Partnerships: Selection round 1 Not-for-profit

More information

THE WORLD COMPETITIVENESS SCOREBOARD 2011

THE WORLD COMPETITIVENESS SCOREBOARD 2011 THE WORLD COMPETITIVENESS SCOREBOARD 2011 98.557 94.063 92.588 92.011 90.782 90.219 89.259 87.824 86.475 86.418 86.313 85.707 84.380 84.120 81.629 81.619 81.100 80.278 79.799 78.499 77.599 77.101 76.827

More information

EVENT LOCATION DATE. Training Course 2 London 19 June. Study Club Clinical Topic High Wycombe 24 June

EVENT LOCATION DATE. Training Course 2 London 19 June. Study Club Clinical Topic High Wycombe 24 June United Kingdom. Training Course 2 London 19 June Study Club Clinical Topic High Wycombe 24 June MasterClass (carried from previous year) London 26 June Training Course 2 London 26 June MasterClass (carried

More information

Selection statistics

Selection statistics Selection statistics ERASMUS+ Sport Call for proposals EAC-A04-2014 Selection year 2015 Collaborative Partnerships: Selection round 2 Not-for-profit European Sport Events: Selection round 2 Applications

More information

OECD employment rate increases to 68.4% in the third quarter of 2018

OECD employment rate increases to 68.4% in the third quarter of 2018 Paris, 17th January 2019 News Release: 3rd Quarter 2018 OECD employment rate increases to 68.4% in the third quarter of 2018 The OECD area employment rate the share of the working-age population with jobs

More information

13 December 2016, Nyon, Switzerland. 2016/17 UEFA European Under-17 and Under-19 Championships. Elite round draws

13 December 2016, Nyon, Switzerland. 2016/17 UEFA European Under-17 and Under-19 Championships. Elite round draws December 06, Nyon, Switzerland 06/7 UEFA European Under-7 and Under-9 Championships Elite round draws DRAW PROCEDURE Elite rounds 6th UEFA European Under-7 and Under-9 Championships, 06/7 TEAMS WHO HAVE

More information

Common Market Organisation (CMO) Fruit and vegetables sector Evolution of EU prices of certain F&V

Common Market Organisation (CMO) Fruit and vegetables sector Evolution of EU prices of certain F&V Common Market Organisation (CMO) Fruit and vegetables sector Evolution of EU prices of certain F&V Unit C.2. - Wine, spirits, horticultural products, specialised crops DG Agriculture and Rural Development

More information

GDP GDP , 2004, (%) 2002, ) EU15=100, 2002 EU25

GDP GDP , 2004, (%) 2002, ) EU15=100, 2002 EU25 Europe - Profile Total Population Unemployment GDP GDP per capita 2004, (Mil.) Rate 2004, (%) 2002, (Bil. ) EU15=100, 2002 EU25 454.9 9.0 9,613 91 EU15 380.8 8.0 9,169 100 10 ACC. 74.1 14.3 444 47 U.S.

More information

Dear Friends, We hope you will enjoy your stay in Sofia and wish you good luck at our competition. Best Regards, Nikolay Tsanev, Organizer

Dear Friends, We hope you will enjoy your stay in Sofia and wish you good luck at our competition. Best Regards, Nikolay Tsanev, Organizer 1 Dear Friends, On behalf of Karate Club Nikon, I would like to invite you to the 3 rd International Nikon Open Karate Tournament, which will take place on 16 th May 2015 in Gorna Malina/ Sofia, Bulgaria.

More information

Architect: Dekleva Gregoric Architects Project: Compact Karst House Photo: James Maroti Place: Vrhovlje, Slovenia

Architect: Dekleva Gregoric Architects Project: Compact Karst House Photo: James Maroti Place: Vrhovlje, Slovenia Architect: Dekleva Gregoric Architects Project: Compact Karst House Photo: James Maroti Place: Vrhovlje, Slovenia 4.1 EARNINGS Average architects earnings are 32 068 (adjusted for PPP). This is 10 per

More information

Max Sort Sortation Option - Letters

Max Sort Sortation Option - Letters Max Sort Sortation Option - Letters Western Europe Prices Product Code PS5 PS6 Austria* 0.330 7.550 0.330 7.400 Belgium* 0.370 3.700 0.370 3.540 Denmark* 0.620 5.350 0.620 4.215 Finland* 0.385 4.400 0.385

More information

Beer statistics edition. The Brewers of Europe

Beer statistics edition. The Brewers of Europe Beer statistics 2015 edition The Brewers of Europe Beer statistics 2015 edition The Brewers of Europe Editor: Marlies Van de Walle October 2015 ISBN 978-2-9601382-5-2 EAN 9782960138252 1 TABLE OF CONTENTS

More information

The Baltic economies: Current situation and future trends, possibilities and pitfalls

The Baltic economies: Current situation and future trends, possibilities and pitfalls The Baltic economies: Current situation and future trends, possibilities and pitfalls Riga, 15 October 2015 Morten Hansen Head of Economics Department, Stockholm School of Economics in Riga Member of the

More information

Medal Standing. ECH Seville, Spain 31 May - 2 June As of 2 JUN INTERNET Service: Men.

Medal Standing. ECH Seville, Spain 31 May - 2 June As of 2 JUN INTERNET Service:   Men. Medal Standing Men Women Total 1 GER - Germany 2 1 2 5 1 3 4 3 4 2 9 1 2 ITA - Italy 1 1 1 3 1 1 2 2 1 2 5 =3 3 CZE - Czech Republic 1 1 2 1 1 2 1 3 =5 3 ROU - Romania 1 1 2 2 2 1 3 =5 5 DEN - Denmark

More information

LaSalle E-REGI Index 2017 EUROPEAN REGIONAL ECONOMIC GROWTH INDEX

LaSalle E-REGI Index 2017 EUROPEAN REGIONAL ECONOMIC GROWTH INDEX LaSalle E-REGI Index 2017 EUROPEAN REGIONAL ECONOMIC GROWTH INDEX LaSalle Investment Management LaSalle E-REGI Index 2017 1 01 METHODOLOGY 02 2017 RESULTS 03 THE CONSISTENT: KEY TARGET MARKETS 04 THE AFFLUENT:

More information

Lecture 3 The Lisbon Strategy

Lecture 3 The Lisbon Strategy Lecture 3 The Lisbon Strategy Outline The Lisbon European Council held in March 2000 recognized the need of reforming labour,, product, and financial markets in order the performance of the EU economy

More information

History. Best Result World Championships 22 nd place Page 5

History. Best Result World Championships 22 nd place Page 5 03/14/23 Switzerland Spain 12 0 European Championships In Milan, Italy 03/15/23 Sweden Spain 5 0 European Championships In Milan, Italy (F) 12/29/23 Belgium Spain 6 4 Challenge de Haute-Garonne In Luchon,

More information

Road Safety Vademecum

Road Safety Vademecum Road Safety Vademecum Road safety trends, statistics and challenges in the EU 2010-2013 March, 2014 European Commission DG for Mobility and Transport Unit C.4 Road Safety Contents Summary of findings...

More information

CURRENT DEMOGRAPHIC SITUATION IN LATVIA

CURRENT DEMOGRAPHIC SITUATION IN LATVIA CURRENT DEMOGRAPHIC SITUATION IN LATVIA Peteris Zvidrins University of Latvia Workshop Very old people s housing and housing and health situation in Latvia 21 May, 2013 Population and its change in 10

More information

AREA TOTALS OECD Composite Leading Indicators. OECD Total. OECD + Major 6 Non Member Countries. Major Five Asia. Major Seven.

AREA TOTALS OECD Composite Leading Indicators. OECD Total. OECD + Major 6 Non Member Countries. Major Five Asia. Major Seven. Reference series Composite leading indicators OECD Composite Leading Indicators AREA TOTALS 7-03- 19 OECD Total 19 OECD + Major 6 Non Member Countries 19 Major Seven 19 Major Five Asia 19 Euro area 19

More information

Fibre to the Home: Taking your life to new horizons!

Fibre to the Home: Taking your life to new horizons! Fibre to the Home: Taking your life to new horizons! Hartwig Tauber, Director General FTTH Council Europe Press Conference - Milan, 13 January 2011 FTTH Council Europe Photo by Nicolo Baravalle FTTH Council

More information

Golf Participation Report for Europe 2018

Golf Participation Report for Europe 2018 Golf Participation Report for Europe 218 Golf Advisory Practice in EMEA golfbenchmark.com 2 Golf Participation Report for Europe 218 Foreword Andrea Sartori Partner KPMG Global Head of Sports Foreword

More information

24 November 2017, Nyon, Switzerland. 2017/18 UEFA European Women s Under-17 and Women s Under-19 Championships. Elite round draws

24 November 2017, Nyon, Switzerland. 2017/18 UEFA European Women s Under-17 and Women s Under-19 Championships. Elite round draws November 07, Nyon, Switzerland 07/8 UEFA European Women s Under-7 and Women s Under-9 Championships Elite round draws DRAW PROCEDURE Elite rounds th UEFA European Women s Under-7 and 7th UEFA Women s Under-9

More information

Country fact sheet South Korea

Country fact sheet South Korea ESRA results Country fact sheet South Korea The ESRA project is a joint initiative of research institutes in 25 countries aiming at collecting comparable national data on road users opinions, attitudes

More information

2015/16 UEFA European Women s Under-17 and Women s Under-19 Championships Elite round draws

2015/16 UEFA European Women s Under-17 and Women s Under-19 Championships Elite round draws 2015/16 UEFA European Women s Under-17 and Women s Under-19 Championships Elite round draws 13 November 2015, Nyon, Switzerland DRAW PROCEDURE Elite rounds UEFA European Women s Under-17 and Women s Under-19

More information

Standard Eurobarometer 84 Autumn Report. Media use in the European Union

Standard Eurobarometer 84 Autumn Report. Media use in the European Union Fieldwork November 2015 Survey requested and co-ordinated by the European Commission, Directorate-General for Communication This document does not represent the point of view of the European Commission.

More information

WHAT IS KING OF KINGS (KOK)?

WHAT IS KING OF KINGS (KOK)? WHAT IS KING OF KINGS (KOK)? T R A L IA T R A M L A S R E IV N U -A KOK is a contest of punching and kicking, defeating an opponent using the most elemental fighting techniques. The rules are deliberately

More information

SHARING GETS YOU FURTHER

SHARING GETS YOU FURTHER 16-22 SEPTEMBER 2017 #MOBILITYWEEK SHARING GETS YOU FURTHER ABOUT EUROPEANMOBILITYWEEK is an annual campaign on sustainable urban mobility, organised with the political and financial support of the European

More information

Introductions, Middle East, Israel, Jordan, Yemen, Oman Week 1: Aug Sept. 1

Introductions, Middle East, Israel, Jordan, Yemen, Oman Week 1: Aug Sept. 1 Introductions, Middle East, Israel, Jordan, Yemen, Oman Week 1: Aug. 28 - Sept. 1 ASSIGNMENT Monday Tuesday Wednesday Thursday Friday Due Wednesday pgs. 6-11 Do not start the workbook or study sheet assignments

More information

European Research Council

European Research Council European Research Council ERC Starting Grants 217 Outcome: Indicative statistics Reproduction is authorised provided the source 'ERC' is acknowledged. NB: In these graphs, 'grantee' refers to a candidate

More information

IIHF CALENDAR OF EVENTS

IIHF CALENDAR OF EVENTS IIHF ICE HOCKEY WORLD CHAMPIONSHIPS IIHF ICE HOCKEY WORLD CHAMPIONSHIP 2019 SLOVAKIA, Bratislava & Kosice 10.-26.05.2019 2020 SWITZERLAND, Zurich & Lausanne 08.-24.05.2020 2021 BELARUS, Minsk & LATVIA,

More information

UEFA European Qualifying Competition for the 2020 FIFA Futsal World Cup. Draw Procedure & Coefficient Ranking

UEFA European Qualifying Competition for the 2020 FIFA Futsal World Cup. Draw Procedure & Coefficient Ranking UEFA European Qualifying Competition for the 2020 FIFA Futsal World Cup Draw Procedure & Coefficient Ranking UEFA European Qualifying Competition for the 2020 FIFA Futsal World Cup Preliminary & Main Round

More information

Beer statistics edition. The Brewers of Europe

Beer statistics edition. The Brewers of Europe Beer statistics 2016 edition The Brewers of Europe Beer statistics 2016 edition The Brewers of Europe November 2016 ISBN 978-2-9601382-7-6 EAN 9782960138276 1 TABLE OF CONTENTS Foreword by President

More information

VISION 2020 ANNEX 2 Media Consumption Trends MEDIA INTELLIGENCE SERVICE

VISION 2020 ANNEX 2 Media Consumption Trends MEDIA INTELLIGENCE SERVICE VISION 2020 ANNEX 2 Media Consumption Trends MEDIA INTELLIGENCE SERVICE 1 TELEVISION 2 DAILY VIEWING TIME (1996-2012) PER INDIVIDUAL (HH:MM) 04:48 EUROPEAN DAILY VIEWING 04:19 03:50 03:21 03:14 03:16 03:20

More information

THE PEP Partnership on Cycling Pan-European Master Plan for Cycling

THE PEP Partnership on Cycling Pan-European Master Plan for Cycling THE PEP Partnership on Cycling Pan-European Master Plan for Cycling International Cycling Conference, Mannheim, September 2017 THE PEP Relay Race Robert Thaler Head of Division Mobility, Transport, Noise

More information

11 November 2016, Nyon, Switzerland. 2016/17 UEFA European Women s Under-17 and Women s Under-19 Championships. Elite round draws

11 November 2016, Nyon, Switzerland. 2016/17 UEFA European Women s Under-17 and Women s Under-19 Championships. Elite round draws 11 November 2016, Nyon, Switzerland 2016/17 UEFA European Women s Under-17 and Women s Under-19 Championships Elite round draws DRAW PROCEDURE Elite rounds 10th UEFA European Women s Under-17 and 16 th

More information

BlomURBEX 3D. Coverage Blom Internal, Partners & Customers. Provide an overview of BlomURBEX 3D coverage. Blom Document. Blom, ASA.

BlomURBEX 3D. Coverage Blom Internal, Partners & Customers. Provide an overview of BlomURBEX 3D coverage. Blom Document. Blom, ASA. BlomURBEX 3D Coverage 2010 Audience: Abstract: Blom Internal, Partners & Customers Provide an overview BlomURBEX 3D coverage. Date September 2010 Blom Document BU3DC2010 v1.0r1.doc Revision History Document

More information

TABLE 1: NET OFFICIAL DEVELOPMENT ASSISTANCE FROM DAC AND OTHER DONORS IN 2012 Preliminary data for 2012

TABLE 1: NET OFFICIAL DEVELOPMENT ASSISTANCE FROM DAC AND OTHER DONORS IN 2012 Preliminary data for 2012 TABLE 1: NET OFFICIAL DEVELOPMENT ASSISTANCE FROM DAC AND OTHER DONORS IN 2012 DAC countries: 2012 2011 2012 ODA ODA/GNI ODA ODA/GNI ODA Percent change USD million % USD million % USD million (1) 2011

More information

Beer statistics edition. The Brewers of Europe

Beer statistics edition. The Brewers of Europe Beer statistics 2017 edition The Brewers of Europe Beer statistics 2017 edition The Brewers of Europe December 2017 ISBN 978-2-9601382-9-0 EAN 9782960138290 1 TABLE OF CONTENTS Foreword by President

More information

LEAGUE PHASE DRAW PRESS KIT

LEAGUE PHASE DRAW PRESS KIT LEAGUE PHASE DRAW PRESS KIT SwissTech Convention Centre, Lausanne 24 January 2018 12:00 CET #NationsLeague CONTENTS INTRODUCTION... 1-2 ASSISTING WITH THE DRAW... 3-6 CALENDAR... 7 GROUPINGS... 8 POTS...

More information

Silver Date: Version: 1.0

Silver Date: Version: 1.0 1. IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY Product identifier: Commercial Product Name: Substance name: CAS number: 7440-22-4 REACH Registration Number: Please contact the supplier Relevant

More information

Copper Date: Version: 1.0

Copper Date: Version: 1.0 1. IDENTIFICATION OF THE SUBSTANCE/MIXTURE AND OF THE COMPANY Product identifier: Commercial Product Name: Substance name: CAS number: 7440-50-8 REACH Registration Number: Please contact the supplier Relevant

More information

European Values Study & World Values Study - Participating Countries ( )

European Values Study & World Values Study - Participating Countries ( ) GESIS Data Archive for the Social Sciences http://www.gesis.org/en/home/ ASEP/JD Data Archive http://www.jdsurvey.net/jds/jdsurvey.jsp European Values Study & World Values Study - Participating Countries

More information

Road Safety Pledge. Route to vision zero 2050 in Europe The Hague, June 14th, Malta. Luxembourg Lithuania Latvia Italy

Road Safety Pledge. Route to vision zero 2050 in Europe The Hague, June 14th, Malta. Luxembourg Lithuania Latvia Italy Malta Luxembourg Lithuania Latvia Italy Ireland The Netherlands Sweden Spain Slovenia Slovakia Romania Portugal Poland 1965 Road Safety Pledge Route to vision zero 2050 in Europe The Hague, June 14th,

More information

International Amateur Radio Union (IARU) Ukrainian Amateur Radio League (UARL) Vinnytsia city council. 3rd World Youth ARDF Championship

International Amateur Radio Union (IARU) Ukrainian Amateur Radio League (UARL) Vinnytsia city council. 3rd World Youth ARDF Championship International Amateur Radio Union (IARU) Ukrainian Amateur Radio League (UARL) Vinnytsia city council 3rd World Youth ARDF Championship TO ALL IARU SOCIETIES Dear ARDF Friends, The Ukrainian Amateur Radio

More information

Capacity of transport infrastructure networks

Capacity of transport infrastructure networks Most infrastructure extension work is concentrated on roads. The total length of the motorway network has increased dramatically during the past two decades (about 3 % per year). Construction of the high-speed

More information

EH LIVESTOCK TRANSPORT PAST - PRESENT - FUTURE

EH LIVESTOCK TRANSPORT PAST - PRESENT - FUTURE E.H.CONSULTANCY HARPER LIVESTOCK TRANSPORT PAST - PRESENT - FUTURE NATIONAL CHAIRMAN RHA LIVESTOCK GROUP MEMBER OF FAWC (FARM ANIMAL WELFARE COUNCIL) HARPER CHAIRMAN AATA ANIMAL WELFARE COMMITTEE PAST

More information

Implementation of Recommendations : EPR, ERJO, CoE Probation Rules

Implementation of Recommendations : EPR, ERJO, CoE Probation Rules Implementation of Recommendations : EPR, ERJO, CoE Probation Rules Sonja Snacken Council for Penological Cooperation (Chair) CDAP, Strasbourg, 13-14 October 2011 EPR (2006): Review of legislation (34 countries)

More information

PIN Flash 18 - Background tables

PIN Flash 18 - Background tables PIN Flash 18 - Background tables Definition of deaths on urban/rural rural roads How the urban/rural distinction is made in the statistics that your country provides to CARE CARE Deaths on rural roads

More information

STATISTICS

STATISTICS DGAGRI-G2 23 Novembre 2017 W O R K I N G D O C U M E N T Horticultural Products FLOWERS AND ORNAMENTAL PLANTS STATISTICS 2006-2016 This statistical document has been prepared by Unit G.2 of DG AGRI, in

More information

Better in than out? Economic performance inside and outside the European monetary union. Roma, Rapporto Europa 2015

Better in than out? Economic performance inside and outside the European monetary union. Roma, Rapporto Europa 2015 Better in than out? Economic performance inside and outside the European monetary union Rapporto Europa 2015 Roma, 9.7.2015 1 Table of Content I. The political threat Why European monetary union? II. Europe

More information

June Deadline Analysis: Domicile

June Deadline Analysis: Domicile June Deadline Analysis: Domicile Applicants by domicile at the 30 June deadline I.1.1 Applicants by domicile group Difference between cycle and 2017 cycle UK EU (excluding UK) Not EU All domiciles 10%

More information

FINAL REPORT for Sports Tourism Report For the Year 2013

FINAL REPORT for Sports Tourism Report For the Year 2013 FINAL REPORT for Sports Tourism Report For the Year 2013 Prepared for The Cyprus Tourism Orgaization September 201 CONTENTS Page 1. Main Findings 2 2. Appointment and Methodology 3. General Indicators:

More information

154074/EU XXV. GP. Eingelangt am 14/09/17 PE-CONS 25/1/17 REV 1 EUROPEAN UNION. Strasbourg, 13 September 2017 (OR. en) PE-CONS 25/1/17 REV 1

154074/EU XXV. GP. Eingelangt am 14/09/17 PE-CONS 25/1/17 REV 1 EUROPEAN UNION. Strasbourg, 13 September 2017 (OR. en) PE-CONS 25/1/17 REV 1 154074/EU XXV. GP Eingelangt am 14/09/17 EUROPEAN UNION THE EUROPEAN PARLIAMT THE COUNCIL Strasbourg, 13 September 2017 (OR. en) 2016/0186 (COD) LEX 1754 PE-CONS 25/1/17 REV 1 CULT 69 AELE 49 EEE 27 CODEC

More information

Swedish and European Opinions on Energy Production

Swedish and European Opinions on Energy Production Sören Holmberg Department of Political Science Göteborg University December 6 Swedish and European Opinions on Energy Production Paper/slides presented at a CEFOS international research seminar at the

More information

Welcome. Eurocodes Implementation: Training JRC report

Welcome. Eurocodes Implementation: Training JRC report Welcome Eurocodes Implementation: Training JRC report Artur Pinto Silvia Dimova Luisa Sousa Borislava Nikolova Joint Research Centre, European Commission J C Juncker (President Elect) 10 Political priorities

More information

January Deadline Analysis: Domicile

January Deadline Analysis: Domicile January Deadline Analysis: Domicile Applicants by domicile at the 15 January deadline D.1.1 Applicants by domicile group UK EU (excluding UK) Not EU All domiciles 20% 10% -0% -10% -20% -30% -40% -50% 2009

More information

Lithuanian export: is it time to prepare for changes? Aleksandr Izgorodin Expert

Lithuanian export: is it time to prepare for changes? Aleksandr Izgorodin Expert Lithuanian export: is it time to prepare for changes? Aleksandr Izgorodin Expert Export is the main locomotive behind growth in LT economy Lithuania: change in real GDP and its components, % 78,2 71,8

More information

THE PEP Partnership on Cycling

THE PEP Partnership on Cycling THE PEP Partnership on Cycling Pan-European Master Plan for Cycling THE PEP Bureau Meeting, July 4 th /5 th, 2017 Robert Thaler Head of Division Mobility, Transport, Noise Austrian Federal Ministry of

More information

Public Procurement Indicators 2015

Public Procurement Indicators 2015 Public Procurement Indicators 21 DG GROW G4 - Innovative and e-procurement December 19, 216 1 Summary of main facts This document provides various indicators describing the public procurement market in

More information

INFO 2017/5. Luxembourg, 13th November Dear Friends,

INFO 2017/5. Luxembourg, 13th November Dear Friends, 1. FROM YOUR PRESIDENT INFO 2017/5 Luxembourg, 13th November 2017 Dear Friends, This will probably be the last INFO of the calendar year 2017. A bit too early perhaps to look back over the past year, but

More information

Bathing water results 2010 Romania

Bathing water results 2010 Romania Bathing water results 2010 Romania 1. Reporting and assessment This report gives a general overview of bathing water quality in Romania during the 2010 bathing season. Romania reported eight parameters

More information

UEFA EURO Qualifying Draw Procedure

UEFA EURO Qualifying Draw Procedure UEFA EURO 2020 Qualifying Draw Procedure 2 UEFA EURO 2020 Qualifying Draw Procedure Date and time: Place: Duration: Regulations: Participants: Objective: Seeding: Sunday, 2 nd December 2018, 12h00 (start

More information

SW FAB Free route strategy

SW FAB Free route strategy SW FAB Free route strategy Inter-FAB workshop operations Langen, 2&3 of May 2016 SW FAB / NAV Portugal Introduction. Free Route Airspace concept of operations became one of the main priorities for aircraft

More information

Euro 16 Quiz. What do you know about the European championships?

Euro 16 Quiz. What do you know about the European championships? Euro 16 Quiz What do you know about the European championships? Euro 16 Quiz rounds on: Cities countries Teams players Euro 16 Quiz Cities Identify Cities that have staged Euro Finals and this year s Host

More information

2 nd Road Safety PIN Conference 23 June 2008 Countdown to only two more years to act!

2 nd Road Safety PIN Conference 23 June 2008 Countdown to only two more years to act! 2 nd Road Safety PIN Conference 23 June 2008 Countdown to 2010 - only two more years to act! EU ambition EU target to cut by 50% yearly road deaths between 2001 and 2010 Countries have similar national

More information

CISM Friendship through Sport

CISM Friendship through Sport Conseil International du Sport Militaire International Military Sports Council - Netherlands Delegation - Regional Military Basketball Championship INVITATION CISM Friendship through Sport Dear Chiefs

More information

CISM EUROPEAN CONFERENCE 18 th 21 st of September 2018 SOFIA, BULGARIA

CISM EUROPEAN CONFERENCE 18 th 21 st of September 2018 SOFIA, BULGARIA CONSEIL INTERNATIONAL DU SPORT MILITAIRE INTERNATIONAL MILITARY SPORTS COUNCIL CONSEJO INTERNACIONAL DEL DEPORTE MILITAR CISM EUROPEAN CONFERENCE 18 th 21 st of September 2018 SOFIA, BULGARIA INVITATION

More information

Total points. Nation Men kayak Women kayak Men canoe Women canoe Total 600 BELARUS KAZAKHSTAN 54. Page 1 of 4. powered by memórias

Total points. Nation Men kayak Women kayak Men canoe Women canoe Total 600 BELARUS KAZAKHSTAN 54. Page 1 of 4. powered by memórias Total points Nation Men kayak Women kayak Men canoe Women canoe Total HUN HUNGARY 80 4 37 6 803 RUS RUSSIA 5 7 03 8 77 3 GER GERMANY 5 9 8 09 644 4 ESP SPAIN 06 76 0 98 600 5 BLR BELARUS 5 30 6 70 587

More information

TEGMA Fall Transportation Symposium

TEGMA Fall Transportation Symposium TEGMA 2017 Fall Transportation Symposium John Wilson Senior Vice President Dairy industry trends 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 Million

More information

market overview TRENDY VÝVOJE STAVEBNICTVÍ V EVROPĚ Jan Blahoňovský

market overview TRENDY VÝVOJE STAVEBNICTVÍ V EVROPĚ   Jan Blahoňovský Construction market overview Jan Blahoňovský jan.blahonovsky@urspraha.cz www.euroconstruct.cz www.urspraha.cz TRENDY VÝVOJE STAVEBNICTVÍ V EVROPĚ 2 France [FR] BIPE Germany [GE] Ifo The EUROCONSTRUCT Network

More information

Swedish Opinion on Nuclear Power

Swedish Opinion on Nuclear Power Swedish Opinion on Nuclear Power 1986 2013 Sören Holmberg May 2014 The Research Project Energy Opinion in Sweden Financed by Swedish Energy Agency Swedes on the Use of Nuclear Power as an Energy Source

More information