RISK ASSESSMENT FOR Philips Smart Touch Installation 03/04/2012

Size: px
Start display at page:

Download "RISK ASSESSMENT FOR Philips Smart Touch Installation 03/04/2012"

Transcription

1 RISK ASSESSMENT FOR Philips Smart Touch Installation Myatt Garden Primary School Myatt Garden Primary School Rokeby Road London SE4 1DF Tel: /04/2012 INTRODUCTION The purpose of this method statement is to provide detailed guidance for a safe method of working for our employees and sub-contractors who may be under our control. Conditions may change on site which may result in amendment of this method statement during the course of this work to reflect changing conditions. Mr Chris Jones is authorised to vary the method of working in consultation with others as necessary and where appropriate amend this method statement. STAFF INFORMATION & INDUCTION EMERGENCY NUMBER Lewisham Healthcare NHS Trust University Hospital Lewisham Lewisham High Street London SE13 6LH Telephone: Fax: General Health & Safety Read and adhere to asbestos register

2 DESCRIPTION OF WORK TO BE CARRIED OUT Page 2 Take down whiteboard and projector Supply 2 x Philips Smart Touch Screen. Install on to brick wall a TV Mount into each classroom as specified. Frames to be erected and wall mounted. Commission systems. Fitting AV boxes with plates Take down whiteboard and projector Supply 2 x Philips Smart Touch Screen. Install on to Floor standing TV Mount into each classroom as specified. Frames to be erected and fixed to unistrut frame. Commission systems. Fitting AV boxes with plates SUPERVISION & PERSONNEL KEY PERSONNEL MR CHRIS JONES ( ) MR ALAN JONES ( ) OFFICE ( ) PLANT/EQUIPMENT Battery Drills ACCESS No change to exit routes SEQUENCE OF WORK Work start date 03rd April Receive order from Maytts Garden Primary School 2. Supply Screens direct from Manufacturer. 3. Settlement Cheque by return 4. The supply and installation of 4 Interactive Touch Screens.

3 PERSONAL PROTECTIVE EQUIPMENT Page 3 Hard Hats, Protective footwear, Gloves, Hi-Visual, Eye protection. PROTECTION OF PUBLIC Not applicable ENVIRONMENTAL CONSIDERATIONS Not applicable GENERAL RISK ASSESSMENTS 1 CR01 Use of mobile scaffold towers 2 CR02 Use of step ladders 3 CR03 Use of materials on site 4 CR04 Use of portable electrical equipment 5 CR05 Cable pulling RISK ASSESSMENT Use of mobile scaffold towers. Not Required Falls of persons Falls of objects Collapse of tower Overturning tower High risk Low risk Low risk Action taken to reduce above risks COMPLIANCE WITH Work at Height Regulations 2005, Provision and use and work equipment regulations 1998 and ACoP L22 British Standards. BS EN :2003. Temporary works equipment. Scaffolds. Performance requirements and general design. BS EN 1004:2004. Mobile access and working towers made of prefabricated elements. Materials, dimensions, design loads, safety and performance requirements. PLANNING Only authorised personnel will erect, modify or dismantle scaffolding towers. Towers should not be used in the vicinity of overhead power lines. Specification of tower scaffolds will take into account ground conditions expected, access, height restrictions and obstructions. Work will be tendered for taking into account relevant standards. Creates an exclusion zone, where necessary, beneath areas where work is taking place.

4 Page 4 PHYSICAL Towers will be erected by adequately trained and competent personnel in accordance with the relevant standards and compliance to the manufacturers instructions. Ladder access should be internal and fixed to the narrowest side. Maximum height to base ratios, as specified by the manufacturer, which will not be exceeded. Ties will be used in exposed or windy conditions. All tower platforms will be fully boarded and fitted with toe boards and guardrails whilst maintaining a safe distance from an edge. Wheels will be braked or locked when the tower is in use. Personnel, tools and materials must be removed prior to the tower being moved. Manufacturers instructions and advice will be observed MANAGEMENT / SUPERVISORY NOT REQUIRED All scaffold inspections will be carried out by a competent person. Mobile towers will be inspected before use each time they have been erected, adapted or moved. Where the platform is two metres or more in height the inspection results will be in written form. The use of a SCAFFTAG system may be used to update the formal weekly inspection report where towers are frequently dismantled and re-erected. All working platforms will be inspected on handover to or from other contractors. Scaffolds will be checked regularly to ensure their correct use and that unauthorised adaptations have not been made. TRAINING NOT REQUIRED Erecting scaffolding will be done by competent personnel. Hires proof of training should be obtained. Inspection of scaffolding will only be carried out by those who are trained and competent. Falling objects NOT REQUIRED (1) Every employer shall, where necessary to prevent injury to any person, take suitable and sufficient steps to prevent, so far as is reasonably practicable, the fall of any material or object. (2) Where it is not reasonably practicable to comply with the requirements of paragraph (1), every employer shall take suitable and sufficient steps to prevent any person being struck by any falling material or object which is liable to cause personal injury. (3) Every employer shall ensure that no material or object is thrown or tipped from height in circumstances where it is liable to cause injury to any person. (4) Every employer shall ensure that materials and objects are stored in such a way as to prevent risk to any person arising from the collapse, overturning or unintended movement of such materials or objects. CIRCUMSTANCES REQUIRING ADDITIONAL ASSESSMENT 1 Base to height ratio will be exceeded 2 Tower scaffold use close to overhead power lines 3 If platform loadings will exceed manufacturers advised limits 4 Should tower need to moved a significant distance by hand. 5 Where there is a risk of falling (2mtrs or more) 6 Working near a traffic route or above a dangerous surface USE OF A STEP LADDER Falls of persons Step Ladder overbalance COMPLIANCE WITH Work at Height Regulations 2005, Provision and use and work equipment regulations 1998 and ACoP L22 HSE Guidance HSG 150 Health and Safety in construction. BS 1129:1990. No ladders should be used if there is the possibility of contact with overhead electric wires or unprotected electrical equipment. Further information on electrical safety is contained in HSE's publication Electrical safety at places of entertainment GS50. PLANNING Step ladders work is to be restricted to that which ensures the stability of the stepladder is maintained throughout. If the user cannot maintain a handhold whilst carrying a load the risk assessment must demonstrate that the use of a step ladder is justified because of the low risk and short duration of use. PHYSICAL All stepladders should meet the required British or European standards - check this whenever you buy, hire or borrow one. BS 1129:1990 (British) applies to wooden ladders.

5 BS 2037:1994 (British) applies to metal ladders. Page 5 BS EN 131:1993 (European) applies to both. BS 7377:1994 (British) applies to step-stools. Is the stepladder generally sound? No damage to the stiles (the outside uprights) or steps or top platform? Dents, bends, cracks and splits are all hazards. If you do find any structural damage, don't attempt to repair it - you need a new stepladder. Are the rubber or plastic non-slip feet all safely in position? Before you use the stepladder, any missing ones must be replaced - you can usually get these from the manufacturer. Make sure the steps are all clean and dry. Avoid falls and injuries from equipment by following the points below for every job. Getting ready Wear flat, firm soled shoes. Never work in high heels, bare feet or slippers. Setting up Check that there are no overhead hazards near where you are going to work. Check that the stepladder is locked into its correct position. If it is a multi-way design, make sure it is in the right configuration for the job you are doing. Always follow the manufacturer's instructions. On the stepladder Rest it on a firm and level base. If you are working outside, place a large, flat board on any soft ground to make a suitable base. Position it front-on to the work. Never work sideways. Keep a secure grip at all times. Never have more than one person on the stepladder at a time. Do not put loose tools where they could move or fall and cause an injury. Use a fixed-on work tray if necessary. Always have both your feet on a step. Never stand on the top handrail to gain extra height. Never over-reach. When the job is done Keep your stepladder protected from the weather in a covered, ventilated area. Never hang it vertically from one of its steps. Keep it out of the way of children. Meets British or European standard - BS 2037, BS 1129, BS 7377, BS EN 131 (or EN 131)

6 Page 6 Ladder undamaged Right height for the job Flat shoes Clean steps FOUR non-slip feet No over-reaching Good grip Front-on Firm and level base MANAGEMENT / SUPERVISORY Supervisors must check step ladders before use to ensure they are sound. Damaged step ladders will not be used. Step ladders must be fully open, with opening restraint cords taut. Step ladders must be of sufficient length to enable the operatives to reach work being undertaken without the risk of overbalancing. Step ladders must not be used adjacent to, or in the vicinity of, edges or voids where guard rails or other fall protection measures may be compromised. Step ladders should not be used as means of access to roof void/loft hatches because of the risk of overturning. TRAINING All operatives must be trained in the safe use of step ladders and specifically of the risks of falling as a result of inappropriate or misuse. USE OF PORTABLE ELECTRICAL EQUIPMENT Electrocution Fire Vibration High risk COMPLIANCE WITH Provision and Use of Work Equipment Regulations 1998 and ACoP L22 Electricity at Work Regulations 1989 Control of Vibration at Work Regulations HS-25 Memorandum of Guidance to Electricity at Work Regulations 1989 HSE Guidance HS(G)107 Maintaining portable and transportable electrical equipment PLANNING All portable electrical equipment will be individually identified and subject to planned maintenance. Equipment supplied to site will be fit for purpose with regard to it s voltage, power and environmental conditions. Where tool vibration ia a significant factor that is likely to lead operatives being exposed to hand arm vibration in excess of the statutory exposure action value (2.5meters/sec2 8 hour TWA) control measures will be introduced having first assessed the type and duration of the work and the equipment being used with a view to reducing exposure levels to below the exposure action value and below the exposure action limit (5.0 metere/sec2 8hourTWA) in any case. PHYSICAL All equipment found to be defective will be switched off and reported immediately. Visual inspection of equipment will be carried out before use. Leads and extension cables are to be routed so as to minimise the likelihood of damage and trip hazards. Damaged lamps on festoon leads will be replaced, and only moulded socket holders will be used on sites. Only equipment operating at 110 volts or less will be permitted on site, higher voltage items must be authorised in writing by management prior to use.

7 Page 7 MANAGEMENT / SUPERVISORY Sub-Contractors will be made aware of the above policy concerning the use of electrical equipment. Trained firstaider(s) will be available on site at all times when electrical equipment is in use. Management are responsible for ensuring that attention is paid to site electrical requirements, including arrangements for design, testing and installation of circuits and their protection by fuses, residual current devices or similar. The use of electrical equipment will be monitored to ensure safe use. Management will ensure that only trained and competent persons test, repair and maintain portable electrical equipment. TRAINING Operatives will be trained in the precautions and safe use of portable electrical equipment. Site first-aiders will receive training in electric shock treatment. CIRCUMSTANCES REQUIRING ADDITIONAL ASSESSMENT Work in wet or damp conditions, includes sewers, tunnels and quarries Battery charging Use of electrical equipment in flammable atmospheres Working near a traffic route or above a dangerous surface

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

HS26 Working at Height Policy and Procedure

HS26 Working at Height Policy and Procedure HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8 1. Scope This policy applies to all staff, students and visitors to The Shared Learning

More information

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee. Working at Height Policy and Procedures Author: Beth Webster Assistant Safety Advisor Authorised by: Issued by: John Stephenson Safety Office On behalf of School Safety Committee Review Date: NO LATER

More information

Safe Use of Access Equipment

Safe Use of Access Equipment Safe Use of Access Equipment Guidance Note 2 Nov 17 1 Safe Use of Access Equipment Introduction This Guidance Note gives practical information about using access equipment. Sample templates have been included

More information

Safety Risk Assessment Working at Height: Mobile Tower Scaffold

Safety Risk Assessment Working at Height: Mobile Tower Scaffold Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees Mark Bloxidge H&S Manager 0208 821 5197 Working at height from Mobile Tower B Contractors/Sub contractors

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

Work At Height Health & Safety Management Standard Issue 3 (April 2011)

Work At Height Health & Safety Management Standard Issue 3 (April 2011) Work At Height Health & Safety Management Standard Issue 3 (April 2011) Introduction This document contains corporate standards and guidance on the management of risks arising from work at height. It is

More information

Working at Height Procedure

Working at Height Procedure Page: 1 of 16 Working at Height Procedure Approval & Authorisation Submitted by: Brett Chalkley Senior Consultant Stokes Associates Limited Approved by: Gary Stokes Managing Director Stokes Associates

More information

Chinthurst Preparatory School

Chinthurst Preparatory School Chinthurst Preparatory School Work At Height Policy Reviewed by TB/WB/SN/JV - September 2016 Next review date September 2017 Contents The Policy in 4 sections Work at Height Policy Appendix A Appendix

More information

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016 Ormiston Academies Trust Ormiston Horizon Academy Working at Height Policy Project/job number: Author: Sharlene Smith/Handsam Date: 25/10/16 Contributors: Sharlene Smith Version number: 1.1 Reviewed by:

More information

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors

EXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have

More information

HEALTH AND SAFETY GUIDANCE NOTE WORK AT HEIGHT

HEALTH AND SAFETY GUIDANCE NOTE WORK AT HEIGHT HEALTH AND SAFETY GUIDANCE NOTE WORK AT HEIGHT INTRODUCTION Working at height remains one of the biggest causes of fatalities and major injuries. Work at height means work in any place where, if there

More information

What we are already doing Working at Height comes within the framework of St. Matthew s Health and Safety and Fire arrangements policy

What we are already doing Working at Height comes within the framework of St. Matthew s Health and Safety and Fire arrangements policy Risk Assessment For: Assessment signed off by (Warden): Assessment signed off by (Clergy): Working at Height Please also see separate risk assessment for Use of Stepladders Assessment carried out by (H&S):

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT LADDERS Ladders and stepladders Ladders and stepladders are commonly used in churches. There is no ban on this and they offer a practical option for low

More information

Prevention of Falls and Working at Heights

Prevention of Falls and Working at Heights Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,

More information

Working at Height Policy Edition 1 27 th October Authorized by. ... Managing Director

Working at Height Policy Edition 1 27 th October Authorized by. ... Managing Director Working at Height Policy Edition 1 27 th October 2007 Authorized by... Managing Director ISSUE CONTROL This Policy is a controlled document and amendments to this document are affected by the re-issue

More information

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Low Voltage Electricity System Safety Rules & Associated Safety Guidance Annex J To Loughborough University Facilities Management (FM) Health and Safety Policy Low Voltage Electricity System Safety Rules & Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

Method Statement Author

Method Statement Author Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO HIGH LEVEL LIGHT UNITS Project: (insert Client) Replacement/ Repair of high level light units/ high

More information

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome

Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome Health & Safety Policy HSP 13 Working at Height Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review 1.1 Approved 10.01.2017 David Maine

More information

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment

TUDOR PARK EDUCATION TRUST. Working at Heights and Risk Assessment TUDOR PARK EDUCATION TRUST Working at Heights and Risk Assessment Person(s) responsible for updating the policy: Chief Executive Officer Date Approved: Board of Directors on 7 July 2016 Period of Review:

More information

Health and Safety Code of Practice. SCP38 Working at Height

Health and Safety Code of Practice. SCP38 Working at Height Health and Safety Code of Practice Responsibility for Policy: Relevant to: Approved by: Responsibility for Document Review: SCP38 Working at Height Date introduced: February 2007 Date(s) modified: Finance

More information

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT INTRODUCTION Cwmni CYNNAL recognises that accidents can arise from working at height. Falls from height can be a cause of injury and absence

More information

FALL PROTECTION / ELEVATED WORK

FALL PROTECTION / ELEVATED WORK SEPTEMBER CORE REFRESHER HSE TOOL BOX FALL PROTECTION / ELEVATED WORK FALL PROTECTION Falls from elevations are one of the most common causes of death in this industry. OSHA requires fall protection when

More information

Working At Height Policy (including Safe Use of Stepladders guidance)

Working At Height Policy (including Safe Use of Stepladders guidance) LONG FIELD ACADEMY Working At Height Policy (including Safe Use of Stepladders guidance) Formulation Date: April 2014 Senior Team Responsibility Governors Reviewing Committee FRHP Reviewed: May 2017 Review

More information

Work at Height Procedure

Work at Height Procedure Work at Height Procedure Version Number 1.3 Effective from 01 April 2008 Author: Head of Operations Estates & Facilities Document Control Information Revision History incl. Authorisation: (most recent

More information

GUIDELINES FOR HEALTH AND SAFETY

GUIDELINES FOR HEALTH AND SAFETY GUIDELINES FOR HEALTH AND SAFETY 1. Summary 2. Introduction 3. Health & safety guidelines a. Masts erecting and dismantling b. Avoiding danger from overhead power lines c. Generators d. Installing radio

More information

(Health, Safety, and Welfare)

(Health, Safety, and Welfare) An Appreciation of The Construction (Health, Safety, and Welfare) Regulations 1996 Course Notes Mark Mallen Health and Safety Manager Fenlock Hansen Ltd October 2002 The Construction Regs 1996: Version

More information

Working at Height Regulation 2005

Working at Height Regulation 2005 1 Working at Height Regulation 2005 The Governors of the Ilford Ursuline Prep School are committed to the provision of a service that is fair, accessible and meets the needs of all individuals 1. Function

More information

Edinburgh Napier University Working at Heights Policy

Edinburgh Napier University Working at Heights Policy Edinburgh Napier University Working at Heights Policy Working at Heights Policy Date of Issue: May 2015 Policy Reference: WHP: 8.0 2015 Date of Review: May 2016 Lead Reviewer: Asst Director, Property &

More information

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary

HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE. 2. Clean filters and screens when necessary HEALTH AND SAFETY METHOD STATEMENT AIR CONDITIONING/REFRIGERATION MAINTENANCE/SERVICE Air Conditioning Indoor/Outdoor Unit as applicable 1. Check Pressures 2. Clean filters and screens when necessary 3.

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Working at Height

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Working at Height Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Working at Height Everyday tasks involving work at height are common in many churches and these can pose a risk of serious injury from falls. Thankfully

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

User Instructions. Mobile Ladders with Platform to BS EN 131-7:2013

User Instructions. Mobile Ladders with Platform to BS EN 131-7:2013 User Instructions Mobile Ladders with Platform to BS EN 131-7:2013 User Instructions for Mobile Ladders with Platform to BS EN 131-7:2013 All mobile steps are built to the highest engineering standards

More information

S31 Opening Statement Working at Height

S31 Opening Statement Working at Height S31 Opening Statement Working at Height Falls from height are by far the most common cause of workplace deaths and one of the main causes of major injury in the workplace. Latest figures reveal that 46

More information

Why Update. OSHA updated Walking Working Standard. Who & What it Covers. Housekeeping (a) 6/25/ nd Leading cause of Workplace fatalities

Why Update. OSHA updated Walking Working Standard. Who & What it Covers. Housekeeping (a) 6/25/ nd Leading cause of Workplace fatalities OSHA updated Walking Working Standard Why Update 2nd Leading cause of Workplace fatalities $70 Billion Workers Comp Cost - US 100+ Million lost workdays/year - US Cari Gray, CSP Safety Consultant Ohio

More information

Instructions for assembly and use ZAP telescopic platform ladder Z600

Instructions for assembly and use ZAP telescopic platform ladder Z600 en Instructions for assembly and use ZAP telescopic platform ladder Z600 291361 English Instructions for assembly and use ZAP telescopic platform ladder Contents 1. Information on this manual... 2 1.1

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS

PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS PLANNED LIGHTING MAINTENANCE LTD METHOD STATEMENT & RISK ASSESSMENT REPLACEMENT OF LAMPS OR REPAIRS TO LOW LEVEL LIGHT UNITS Project: Insert Client Repair/ Replacement of low level light units/ low level

More information

Safety Checklist for Events Held at Hillbrook

Safety Checklist for Events Held at Hillbrook Safety Checklist for Events Held at Hillbrook Hazards/ Issues or Tasks 1. EVENT ACCESS AND EGRESS Entry / Exit areas are kept clear and accessible. For an evening event, that you have appropriate Lighting.

More information

HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT

HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT KENSWORTH PRIMARY SCHOOL HEALTH AND SAFETY POLICY APPENDIX B WORKING AT HEIGHT GUIDE AND RISK ASSESMENT KPS-005 RISK ASSESSMENT FOR: Title of activity / person Working at height low level activities What

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

Work at height Policy

Work at height Policy Work at Policy Introduction This policy procedure outlines the Forces responsibility to provide guidance to all police officers and staff when working at. Many serious incidents involving working at occur

More information

Type: Policy. Working at Heights Policy. Register No: Status: Public. Developed in response to: Work at Height Regs 2007

Type: Policy. Working at Heights Policy. Register No: Status: Public. Developed in response to: Work at Height Regs 2007 Working at Heights Policy Type: Policy Register No: 09085 Status: Public Developed in response to: Work at Height Regs 2007 Contributes to CQC Outcome: Regulation 15 - Premises and equipment Consulted

More information

FALL PROTECTION PLAN FALL PROTECTION PROGRAM

FALL PROTECTION PLAN FALL PROTECTION PROGRAM FALL PROTECTION PLAN IMPORTANT: This document is intended to provide guidance only for developing site-specific fall protection plans for working at heights. FALL PROTECTION PLAN IMPORTANT: This document

More information

Safety Risk Assessment Roofing Works / Surveying / Inspections

Safety Risk Assessment Roofing Works / Surveying / Inspections One Direct aintenance td Persons at (Groups) Assessor Appointment Tel. No. Description of Task or Activity A One Direct employees ark Bloxidge H&S anager 0208 821 5197 One Direct Operatives accessing roof

More information

NZQA Expiring unit standard version 7 Page 1 of 8. Demonstrate knowledge of safe working practices in telecommunications.

NZQA Expiring unit standard version 7 Page 1 of 8. Demonstrate knowledge of safe working practices in telecommunications. Page 1 of 8 Title Demonstrate knowledge of safe working practices in telecommunications Level 2 Credits 4 Purpose This unit standard covers basic instruction in safe working practices in the telecommunications

More information

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices.

2.2. Anchorage Point A secure point of attachment for Lifelines, lanyards or deceleration devices. Title: Elevated Walking/Working Surfaces (Fall Protection) Site Function: Safety Procedure No.: MC032.122 Page: 1 of 16 McIntosh Site Reviewed: 02/2013 Effective: 03/2013 Supersedes: 08/2012 Preparer:

More information

Contractors' Code of Safe Practice

Contractors' Code of Safe Practice Contractors' Code of Safe Practice Introduction As the controller of premises, The University of Hong Kong has a duty to ensure, so far as is reasonably practicable, the health and safety of all its employees,

More information

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment.

This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall protection equipment. Page 1 of 7 REFERENCES Personal Protective Equipment Standards 1.31 PURPOSE This subject outlines procedures to prevent accidents or injuries to you and others from inappropriate selection and use of fall

More information

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998

FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 FEDERATION OF PILING SPECIALISTS CODE OF INDUSTRY BEST PRACTICE LIFTING OPERATIONS AND LIFTING EQUIPMENT REGULATIONS 1998 CONTENTS 1. Introduction 2. Definitions and Statements 3. LOLER Considerations

More information

HSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS

HSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS HSE guidelines SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS Work safely or do not work at all There are strict procedures when working on electrical installations

More information

Contractor / Exhibitor Handbook

Contractor / Exhibitor Handbook Contractor / Exhibitor Handbook Health and Safety This booklet outlines the basic rules that must be followed by contractors and other visitors working on Live Promotions Events sites. The contractors

More information

CHAPTER 10 FALL PROTECTION

CHAPTER 10 FALL PROTECTION CHAPTER 10 FALL PROTECTION A. INTRODUCTION... 1 B. CHAPTER-SPECIFIC ROLES and RESPONSIBILITIES... 2 C. HAZARD IDENTIFICATION... 3 1. Job Hazard Analysis (Jha).... 3 2. Fall Hazards... 3 D. HAZARD CONTROL...

More information

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.

More information

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:

The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: Electrical Safety Guidance Note 1 - General Guidance Competent Person The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: "A person in the possession

More information

Permit-To-Work Guidance and Templates

Permit-To-Work Guidance and Templates Managing Contractors Policy - Appendix E Permit-To-Work Guidance and Templates This document has been constructed to provide guidance in how to use a permit to work correctly. The first part explains the

More information

This policy is a sub-policy of the main University Health and Safety Policy Statement

This policy is a sub-policy of the main University Health and Safety Policy Statement HR Services UEL Health and Safety Handbook POLICY ON WORKING AT HEIGHT This policy is a sub-policy of the main University Health and Safety Policy Statement 1.0 Introduction Working at height is a high-risk

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

Syllabus for Licensable Work with Asbestos (Category C)

Syllabus for Licensable Work with Asbestos (Category C) Syllabus for Licensable Work with Asbestos (Category C) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of licensed asbestos training

More information

Electrical Equipment Protocol

Electrical Equipment Protocol Policy No: RM18 Version: 6.0 Name of Policy: Electrical Equipment Protocol Effective From: 11/03/2016 Date Ratified 14/01/2016 Ratified Health and Safety Committee Review Date 01/01/2018 Sponsor Deputy

More information

8. Fall Protection Procedures WAC

8. Fall Protection Procedures WAC 1.0 Fall Protection Introduction 8. Fall Protection Procedures WAC 296-155-245 If an employee is exposed to a fall hazard of ten (10) feet or more in height, the employee must use a fall restraint, fall

More information

Health & Safety: Electrical safety

Health & Safety: Electrical safety NEWLANDS GIRLS SCHOOL POLICY DOCUMENT Health & Safety: Electrical safety Last Updated By N Piggott Nov 2015 Last Reviewed by N Piggott Jan 2017 Policy Type Review Frequency Statutory Annually Responsible

More information

TRADE AREA: ELECTRICAL INDUSTRY

TRADE AREA: ELECTRICAL INDUSTRY TRADE AREA: ELECTRICAL INDUSTRY Some possible workplace hazards and possible ways for Host employers and Apprentices/Trainees in controlling these hazards. What are possible hazards? What could be possible

More information

Management Plan for Electrical Safety ISD #535

Management Plan for Electrical Safety ISD #535 Management Plan for Electrical Safety ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9 ½ Street Rochester, MN 55904 507-328-4507 MANAGEMENT PLAN FOR ELECTRICAL SAFETY Table of Contents

More information

Input relevant details relating to your trading name, address and any relevant contact details. Organisation Name Trading address

Input relevant details relating to your trading name, address and any relevant contact details. Organisation Name Trading address 1.0 My Company Information Key Actions for Contractor Input relevant details relating to your trading name, address and any relevant contact details. Organisation Name Trading address CRO Number (Where

More information

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996

THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996 A G U I D E T O THE CONSTRUCTION (HEALTH, SAFETY AND WELFARE) REGULATIONS 1996 C ONSTRUCTION (H EALTH, S AFETY AND W ELFARE) C INTRODUCTION The Construction (Health, Safety and Welfare) Regulations 1996

More information

FATAL AND SEVERE RISK PROGRAM

FATAL AND SEVERE RISK PROGRAM FATAL AND SEVERE RISK PROGRAM LEADER SESSION FALL FROM HEIGHTS Only do the task if it can be done safely FALL FROM HEIGHTS OUR COMMITMENT LIFE SAVING BEHAVIOUR: I WILL ALWAYS USE ADEQUATE PROTECTION WHERE

More information

Don t let a fall shatter your life!

Don t let a fall shatter your life! Safety Training Courses 2014-2015 Don t let a fall shatter your life! Browns Ladders & Ceilings Ltd In House Safe Use & Pre-Use Inspection of Ladders & Steps What tests will I undertake? Lecture, theory

More information

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , , ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths

More information

Charmborough Bells Risk Assessment and Method Statement

Charmborough Bells Risk Assessment and Method Statement Charmborough Bells Risk Assessment & Method Statement Charmborough Bells Risk Assessment and Method Statement Introduction This risk assessment and method statement has been prepared to outline the procedures

More information

MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY

MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY 'Published in consultation with The Health & Safety Executive' TECHNOLOGY WORK - SAFELY The Electrical Contractors'

More information

OSHA s new walking working surfaces standards

OSHA s new walking working surfaces standards OSHA s new walking working surfaces standards changes and new requirements Inspection of walking working surfaces 1910.22(d) Regularly and as needed and correct, repair, or guard against hazardous conditions;

More information

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height.

1. Objective of the initiative To ensure that all employees and subcontractors are aware of the risks associated with working at height. Safety Initiative 02 Working at Height May 2011 CONTENTS 1. Objective of the initiative 2. Overview. 3. Implementation 4. Duties 5. Hierarchy of Controls 6. Workplace Inspections 7. Fragile Surfaces 8.

More information

HEALTH & SAFETY POLICY OF

HEALTH & SAFETY POLICY OF HEALTH & SAFETY POLICY OF Ben Nock Ltd T/A Ben Nock Fencing & Landscaping Little Dunley Farm Dunley Lane Bovey Tracey Newton Abbot Devon TQ13 9PW Date 17 th January 2011 Phone: 01626 834323 Fax: 01626

More information

METHOD STATEMENT. Temporary Installation of Mobile Disco. Version 1.0 Dated 19th December Published by Andy Przybyla. Document Ref: APDJ004

METHOD STATEMENT. Temporary Installation of Mobile Disco. Version 1.0 Dated 19th December Published by Andy Przybyla. Document Ref: APDJ004 METHOD STATEMENT Temporary Installation of Mobile Disco Version 1.0 Dated 19th December 2014 Published by Andy Przybyla Document Ref: APDJ004 Attack the Dance Floor 2014 Content Section 1 - Scope of Work

More information

Specialists Window Cleaning Induction

Specialists Window Cleaning Induction Specialists Window Cleaning Induction Mobile Tower Scaffolds Mobile tower scaffolds are used on flat firm, stable ground to access higher levels. They have toe boards, mid rails & guard rails to prevent

More information

CITB Construction site safety update

CITB Construction site safety update D: High risk activities Underground and overhead services This text replaces the text from the current GE700 2015, Section D, Chapter D08, Underground and overhead services, pages 133 to 136. 8.6 Overhead

More information

PAT Testing Procedures WYMONDHAM RUGBY FOOTBALL CLUB. Wymondham RFC PAT Testing Procedure Version 1 Revision 3 Wednesday, 27 July 2016 Page 1

PAT Testing Procedures WYMONDHAM RUGBY FOOTBALL CLUB. Wymondham RFC PAT Testing Procedure Version 1 Revision 3 Wednesday, 27 July 2016 Page 1 WYMONDHAM RUGBY FOOTBALL CLUB PAT Testing Procedures Wednesday, 27 July 2016 Page 1 Contents 1 Introduction 2 Explanation of Terms Used 3 What Does the Law Require? 4 Controlling the Risk 5 Maintenance

More information

Policies, Procedures, Guidelines and Protocols

Policies, Procedures, Guidelines and Protocols Policies, Procedures, Guidelines and Protocols Document Details Title Portable Electrical Equipment Management Policy Trust Ref No 701-29768 Local Ref (optional) Main points the document Responsibilities

More information

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along

More information

J&S Cooper Utilities

J&S Cooper Utilities Working at Heights Inspection conducted for J&S Cooper Utilities Conducted on 17 Apr 2018 08:35 AM Location 11953 Tyler Rd, Red Bluff, CA 96080, USA Prepared by SafetyCulture Staff Completed on 17 Apr

More information

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene

Reviewed: New Effective: 5/18/12 Supersedes: New Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene Procedure No.: BC032.027 Page: 1 of 15 Preparer: Owner: Approver: Team Member, Occupational Safety Industrial Hygiene Manager, Occupational Safety Industrial Hygiene Vice President, Ecology & Safety (Signature

More information

WORKING AT HEIGHT RESOURCE BOOKLET. Working at Height 1

WORKING AT HEIGHT RESOURCE BOOKLET. Working at Height 1 WORKING AT HEIGHT RESOURCE BOOKLET Working at Height 1 Falls constantly top the HSENI Construction Group Statistics as the biggest cause of major injuries. The Construction Employers Federation Health

More information

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT)

Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT) Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT) Reviews and Revisions Action Date Reason Reviewer Updated details of External PAT Contractor 17/02/16 New contract

More information

CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd. METHOD STATEMENT Commissioning and Final connections to IHT Skid

CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd. METHOD STATEMENT Commissioning and Final connections to IHT Skid CLIENT: UNIVERSAL TOOL & PRODUCTION COMPANY Ltd METHOD STATEMENT Commissioning and Final connections to IHT Skid UNITS 15/16 DAEDALUS HANGERS EAST GOSPORT Development: Title & Company Name Signature Date

More information

Portable Appliance Testing

Portable Appliance Testing The University of Edinburgh E Brief description of the paper University Health and Safety Committee Tuesday 18 th November 2014 Portable Appliance Testing This Paper presents the review of the University

More information

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada)

FALL PROTECTION WORK PLAN (Alstom Power Installation Canada) FALL PROTECTION WORK PLAN (Alstom Power Installation Canada) Location: Unit: Foreman: Task: Supervisors Ensure: Workers must review and sign this fall protection work plan prior to starting work in an

More information

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)

Safety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.

More information

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision Page 1 of 5 Location of Equipment Written By: Approved By: Date Created Last Revision School: Facilities & Operations Brent Vandenbosch Gordon Howe October 14, 2009 new Room: n/a Barry Hamilton HAZARDS

More information

PROCEDURES FOR STANDBY

PROCEDURES FOR STANDBY 1 SCOPE This Procedure details both the circumstances in which standby shall be provided and the responsibilities borne by the Standby Man in such circumstances. 2 ISSUE RECORD This is a maintained/controlled

More information

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field.

The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field. Purpose The purpose of this training is to give field technicians awareness training and guidelines on potential hazards they may encounter in the field. Fall Protection and Prevention JELD-WEN Field Employees

More information

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5

Method Statement. Method Statement Details. Signatures. Emergency Contact Details 1/5 Highway Traffic Safety Ltd Lakeside House, 1 Furzeground Way Stockley Business Park Heathrow London UB11 1BD Tel: 02071 111655 Method Statement Method Statement Details Method statement number 4 Method

More information

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type)

RISK ASSESSMENT Installation of electrically operated service lifts (non passenger type) RISK ASSESSMENT 2011 WALLINGTON LIFT MAINTENANCE CO LTD Installation of electrically operated service lifts (non passenger type) 1 1 L a k e s i d e, W a l l i n g t o n, S u r r e y, S M 6 7 J Y T e l

More information

Walking and Working Surfaces: Comprehensive Training

Walking and Working Surfaces: Comprehensive Training Walking and Working Surfaces: Comprehensive Training PROGRAM SYNOPSIS: To ensure workers are provided with safe working and traveling surfaces, OSHA has developed and recently updated its regulation 29

More information

LADDERS FIXED AND PORTABLE

LADDERS FIXED AND PORTABLE CONTRACTOR WHS HAZARD STANDARD LADDERS FIXED AND PORTABLE EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

Risk assessment part 1 of 3

Risk assessment part 1 of 3 Risk assessment part 1 of 3 All exhibitors MUST complete all sections. Emergency information The AA s National Amenity Arboriculture Conference 2018 9 12 September 2018 LOCATED AT: University of Exeter,

More information