Electrical Equipment Protocol
|
|
- Joseph Bradley
- 5 years ago
- Views:
Transcription
1 Policy No: RM18 Version: 6.0 Name of Policy: Electrical Equipment Protocol Effective From: 11/03/2016 Date Ratified 14/01/2016 Ratified Health and Safety Committee Review Date 01/01/2018 Sponsor Deputy Chief Executive Expiry Date 13/01/2019 Withdrawn Date Unless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version This policy supersedes all previous issues Electrical Equipment Protocol v6
2 Version Control Version Release Author/Reviewer 1.0 Ratified by/authorised by Date Changes (Please identify page no.) /03/2006 S Bell Health and Safety Committee /01/2009 K Smeaton Health and Safety Committee /11/2013 K Smeaton Health and Safety Committee /03/2016 D Jones Health and Safety Committee 13/12/ /01/ /11/2013 Rewritten in new trust OP27 policy format 14/01/2016 Minor modifications Electrical Equipment Protocol v6 2
3 Contents Section Page 1 Introduction Protocol scope Aim of Protocol Duties (Roles and responsibilities) Definitions Arrangements Training Equality and diversity Monitoring compliance with the protocol Consultation and review Implementation of protocol (including raising awareness) References Associated documentation (policies) Appendices Appendix A - Visual Inspection Guidance Appendix B - Guidance on the frequency of appliance testing Electrical Equipment Protocol v6 3
4 ELECTRICAL EQUIPMENT PROTOCOL 1. Introduction This document sets out safety responsibilities and advice associated with portable electrical equipment which managers are required to incorporate into their directorate/department health and safety arrangements. The Trust s specialist policy on Electricity at Work is held within the estates department. 2. Protocol scope This protocol applies to all portable electrical appliances owned by the Trust. 3. Aim of the protocol To minimise the risks from electricity through development of a proactive approach to the management of portable electrical equipment. To ensure compliance with legislative requirements. To establish and maintain a risk assessment process with documented records, where appropriate. 4. Duties roles and responsibilities 4.1 Chief Executive The Chief Executive is responsible to the Trust Board for the effective implementation of the Electrical Equipment Protocol 4.2 Deputy Chief Executive The Deputy Chief Executive is responsible to the Chief Executive for the overall implementation of the protocol within Gateshead Health NHS Foundation Trust. 4.3 Estates Technical Manager The Head of Estates is the senior designated officer for Estates maintenance services and is responsible to the Deputy Chief Executive for the implementation of this protocol by Estates engineering staff. 4.4 Managers Responsibilities Managers are responsible for ensuring that this protocol is complied with and all named groups discharge their stated roles and that periodic maintenance is carried out on all electrical equipment. a) New Equipment Prior to the purchase of any portable electrical equipment seek advice from the Estates Department as to the suitability for the equipment s use, maintenance and requirements of any associated works i.e. new sockets/supplies necessary to operate the proposed new equipment as well as any specialist testing equipment and safe storage so far as is reasonably practicable. New equipment may also Electrical Equipment Protocol v6 4
5 affect environmental conditions where it is installed therefore Estates should again be contacted for advice b) Safety Testing Portable appliances are required to be safety tested by the Estates department prior to use. The equipment will be numbered and a tested label affixed. Contact the Estates Department call-logging system to have this carried out. c) Routine Testing Ensure equipment is made available for testing on a routine basis as requested by Estates staff i.e. portable appliance testing. See section 6.6 for information on the frequency of testing. d) Use of Equipment 4.5 Staff Responsibilities 5 Definitions Ensure staff have received suitable information, instruction or training as necessary in the use of equipment. Staff should regularly visually inspect cables for wear, ensuring they are securely fixed to plugs and equipment. Visually check the plugs for signs of damage or overheating. This is particularly important for portable appliance. Staff should not attempt any repair themselves, no matter how minor, to any cables or equipment. Staff are responsible for reporting defective devices as per section Portable Electrical Equipment Portable equipment is not part of a fixed installation but when used is connected to a fixed installation (or a generator), by means of a flexible cable, plug and socket. It includes equipment that is hand held or hand operated while connected to the supply. It also includes extension leads, plugs and sockets, and cord sets that supply portable equipment and are not part of the fixed installation, since they operate in the same environment and are subject to similar use as the equipment they serve. 6 Arrangements 6.1 All portable electrical equipment shall be of safe construction conforming to UK and/or EC product safety standards. Manufacturers of new electrical equipment have an obligation to ensure their equipment is safe for proper use. Any special operating instructions should be included and adhered to. Wherever possible equipment shall be double insulated (Class II type 2 wires) to ensure it is constructed with high integrity insulation without need for an earth connection. Any Class I type equipment (3 wires) shall be effectively earthed. [Note: Double insulated equipment is marked by the double square symbol or similar.] 6.2 Portable electrical equipment shall only be used for the purpose for which it was intended and in the environments for which it was designed and constructed. [Note: It is unlikely that maintenance will remedy any situation where equipment is not being used for its intended purpose or in an environment for which it was not designed.] Electrical Equipment Protocol v6 5
6 6.3 All portable electrical equipment shall be adequately maintained to determine whether it is fully serviceable or in need of any remedial action. Such maintenance may include: Occasional user checks (visual) Formal visual inspection by appointed competent persons (recorded) Combined inspection and testing (by competent persons/contractor) Repair Replacement 6.4 User checks and formal visual inspections shall be carried out in accordance with the guidance given at Appendix A. 6.5 All portable electrical equipment shall be included on a suitable register, including its location and use, and maintenance and test records. This register shall be reviewed at least annually and be kept up-to-date. Equipment shall be suitably marked so that it can be easily identified and cross-referenced with the register. 6.6 Items of portable electrical equipment shall be assessed to determine a suitable maintenance regime for each piece of equipment, based on the schedule given at Appendix B Occasions when testing is likely to be considered justified are : When there is a reason to suspect the equipment is faulty or damaged but this cannot be confirmed by visual inspection. After any repair: modification or similar work to equipment. At periods appropriate to the equipment, the manner and frequency of use and the environment in which it is used. 6.7 Formally tested portable electrical equipment shall be suitably labelled including an indication as to who carried out the test, whether it passed or failed the test, a date by which passed equipment must next be tested and the initials of the tester. Failed equipment, or equipment carrying an out of date test label, shall be immediately taken out of use and shall not be returned to use until suitable actions are taken and it passes a test carried out by a competent person. 6.8 Any calibration of equipment shall include appropriate safety testing. 6.9 A residual current device (RCD) shall be used to provide enhanced protection against the effects of electric shock where portable electrical equipment is used outdoors, or otherwise, and there is a risk of the equipment or cables becoming damaged, wet or cut (e.g. by vehicles) 6.10 Any hired equipment shall carry up-to-date certification that it passed testing prior to issue to Trust staff. Appropriate information, instruction and training shall be received prior to Trust staff using hired equipment Personal portable appliances Employees and Agency staff Employees and agency staff should not bring personal items of portable electrical equipment onto Trust property without first having obtained authorisation from their line manager. Where authorisation is granted the equipment is subject to the same inspection procedure as detailed in Section 6. Electrical Equipment Protocol v6 6
7 Contractors Battery operated hand tools and equipment are to be utilised where practicable. Mains powered portable electrical work equipment, including vacuum cleaners, used for construction work and work in other environments at the Trust must be supplied via a 110v 1 phase (55v to earth) transformer. Portable electrical equipment used in the Trust must be in date for test, including all extension leads, transformers and splitter boxes. Patients and visitors The Trust has a duty to test all portable electrical equipment brought onto the premises, including items that are owned by patients or visitors. Engineering staff can refuse to test equipment if they have any concerns about its condition. Patients and visitors should be informed that there is a risk that their electrical equipment will be damaged by the test, and the Trust cannot accept responsibility if the equipment is damaged by the test, or fails the test. Patients and visitors who do not wish to have their electrical equipment tested should ensure it is permanently removed from site Persons carrying out visual checks and inspections All persons carrying out visual checks and inspections shall be given a suitable level of information and instruction, and access to advice as necessary Persons carrying out testing of portable electrical equipment Persons carrying out testing of portable electrical equipment shall be deemed competent for the work they are to undertake. This may be a suitably trained member of Trust staff or a contractor. [Note: A competent person must be adequately trained to use the portable appliance tester correctly. Where the tester is more sophisticated than a simple pass/fail type it may involve some interpretation of readings - in these cases the competent person will need more technical knowledge, such as an electrician.] 6.14 Repairs Repairs to portable electrical equipment shall only be carried out by a qualified electrician Extension leads Extension leads are often used inappropriately leading to increased risk, either of an electrical accident or of a trip or fall. Their use is generally not permitted, the only exceptions being: Where there are insufficient permanent socket outlets in a particular location and application via a Cat D request has already been submitted to the Estates Department for the installation of additional socket outlets. Where their use is in conjunction with temporary mobile equipment installations such as overhead projectors, laptop computers etc. Extension leads are subject to the same policy as other portable electrical equipment and must be appropriately tested before and during their use. Due to the difficulty of keeping track of the location of extension leads, it is the users responsibility to ensure that the Estates Department is informed when further testing is required. Electrical Equipment Protocol v6 7
8 6.16 Multi plug adapters The use of multi plug adapters is not permitted in the Trust Small plug in air fresheners The use of small plug in devices such as air fresheners is not acceptable in the Trust due to the risk of overheating and fire Reporting of faults In the event of an electrical fault the member of staff should not touch the equipment but, if safe to do so, isolate it from the mains by switching off and unplugging the item. The fault should be reported via the Call Logging procedure. When the fault is discovered out of hours, the above procedure should be adhered to unless the equipment is needed for immediate use when the on call engineer should be contacted. Staff should ensure that all faulty equipment has warning notices affixed to it to prevent other staff from using it until repairs are made Disposal of equipment Equipment that is condemned or requires disposal should be disposed of via the Estates Department to ensure it cannot be re-used and disposed of in accordance with the relevant disposal regulations covering electric and electronic equipment (W.E.E.E. Regulations) 6.20 Vending machines etc. Vending machines are to be electrically tested by the owner of the equipment and a proof of test supplied to the Estates Department before the machine is installed and connected to the Trust electrical supply. Ongoing testing at a suitable frequency is also the responsibility of the owner of the machine Medical Devices For Medical Devices equipment the medical devices policy and relevant Control of Infection Policy (decontamination of equipment) should be strictly adhered to Portable electrical equipment is to be used in accordance with the manufacturer s instructions and by competent persons. 7 Training All individuals who are carrying out portable appliance testing or repairs will be trained or qualified to an appropriate level of competence. The level of competence depends on the activity the individual is carrying out: Appointed Person A person who has been suitably trained by a technically competent person (such as an electrician or electrical engineer) to be able to carry out a formal basic safety inspection of portable electrical equipment (including the inside of the plug and fuse) using safe working practices. PAT Tester Competent Person A person who is suitably trained to use a basic PAT tester (demonstrated by a certificate of competence) with the ability to interpret its findings and record the information it presents. (Note: Where a complex PAT tester is used interpretation of findings would normally require the competence of a qualified electrician) Electrical Equipment Protocol v6 8
9 Qualified Electrician Somebody with the correct skills, knowledge and experience to carry out electrical work, including City and Guilds IEE Wiring Regulations latest Edition qualifications (should have certificate(s) as proof). 8 Equality and diversity The Trust is committed to ensuring that, as far as is reasonably practicable, the way that services are provided to the public and the way staff are treated, reflects their individual needs and does not discriminate against individuals or groups on any grounds. This policy aims to ensure that no employee receives less favourable treatment on the grounds of a protected characteristic in accordance with the Equality Act 2010.This policy has been appropriately assessed. This policy when implemented should reflect anti-discriminatory practice. Any services, interventions or actions must take into account any needs arising from race, gender, age, religion and belief, language, communication, sensory impairment, disability and sexuality. 9 Monitoring compliance with the protocol The overall protocol will be monitored by the Estates Technical Manager and the Health and Safety Team using the Datix Incident Reporting System, the Estates Department Call Logging System, and health and safety Inspection reports, and any relevant incidents will be reported to the Health and Safety Committee. Standard / process / issue Regular review of incidents using the Datix Incident Reporting System and the Estates Department Call Logging System Monitoring and audit Method By Committee Frequency Regular review of Estates Health and Annually incidents Technical Safety Manager Committee and H&S Team 10 Consultation and review The protocol has been reviewed by QE Facilities staff and the Health and Safety Team, in consultation with members of the Health and Safety Committee. It has been reviewed and approved by the Health and Safety Committee and will be regularly reviewed according to OP27 Policy or more frequently depending on updates in health and safety legislation or building regulations. 11 Implementation of protocol (including raising awareness) This protocol reflects the Trust s stance on management of risk and the provision of good health and safety standards and will be implemented in accordance with OP27 Policy for the development, management and authorisation of policies and through appropriate training. Electrical Equipment Protocol v6 9
10 12 References HSE leaflet Maintaining portable electrical equipment in offices and other low-risk environments. HSE Guidance Note Maintaining portable and transportable electrical equipment (HSG107). HSE Approved Code of Practice on Safe use of work equipment (L22). IEE Wiring Regulations, 17th Edition 13 Associated documentation (policies) RM02 Health and Safety Policy RM04 Incident reporting and investigation policy RM05 Reporting of Defects & Failures Policy RM13 Provision and Use of Work Equipment Policy RM30 Policy for the Procurement Management and Use of Medical Devices RM79 Fire Policy Electrical Equipment Protocol v6 10
11 Visual Inspection Guidance Appendix A Visual inspections are usually the most important components of a portable electrical equipment maintenance regime. The majority of potentially dangerous faults can be picked up by such inspections, which are normally carried out by users themselves and/or periodically by an appointed person. Any visual inspection should critically examine the equipment to check that it appears to be in sound condition and should include any extension leads and associated plugs and sockets. User visual inspections should not include taking any equipment apart. When carrying out a visual inspection ensure the electrical equipment is turned off and check for: Damage to plugs (e.g. cracked casing or bent pins) Damage to the external cover/casing of the equipment, loose parts or loose/missing screws Damage to outer coverings/insulation to leads, wires or cables (apart from light scuffing). Cable located where it might be subject to damage or forced into a tight bend as it exits equipment. Inadequate joints, including taped joints in the cable Burn marks, staining or discoloration that may suggest overheating Whether the equipment has been subjected to conditions for which it is not suitable, e.g. spillage of fluids or solids, overly dirty or dusty, or excessively contaminated in some other way. Ensure no containers (flowerpots, coffeepots, etc.) are located such that spillage could occur to equipment. The absence of inappropriate pieces of equipment or foreign objects on or inside the equipment That there are no trailing wires; if there are, tuck them out of the way, for example under a suitable protective cover or a desk/table to prevent accidents The formal inspection by an appointed person (not the user) may also include checking the plug by removing the plug cover, particularly if there are any concerns (not applicable for moulded plugs, where only the fuse can be checked). This would only involve checking the correct fuse for the equipment is in use, the cord grip is effective, the cable terminations are secure and correct (including an earth where appropriate), and that there are no signs of internal damage, overheating or entry of liquid or foreign matter. Further guidance is given in the table and diagram below. Should a visual inspection indicate equipment to be unsafe for use (or reveal the lack of a valid PAT test where required) it should be reported to management and immediately taken out of use (disconnect from the power source and, if necessary, label as faulty and/or disable by removing the plug). Electrical Equipment Protocol v6 11
12 Appendix B The tables below have been prepared in line with guidance offered by the HSE and will satisfy many situations of average use. These frequencies can be used until sufficient data is built up to establish what is appropriate for particular circumstances. GENERAL GUIDANCE Type of Business Visual Inspection Full PAT Test Equipment Hire Before issue and on return Before Issue Construction Daily 3 monthly Industrial Before Use 6 monthly Premises used by public 3 6 months 12 monthly GUIDELINES FOR OFFICES AND OTHER LOW RISK ENVIRONMENTS ONLY Equipment/Environment User Check Visual Inspection Inspection Testing Gateshead NHS Battery operated (less than No No No No 20 volts) Extra Low Voltage (Less No No No No than 50 volts) IT Equipment (PC s/vdu s) No 2-4 years Up to 5 years Inspect and tested Up to 4 years Photocopiers/faxes. Not hand held (rarely moved) No 2-4 years 1 2 years Inspected and tested every 2years. Double insulated. Not hand held e.g. fans, table lamps, (moved occasionally) Double insulated hand held e.g. floor cleaners Earthed equipment (Class 1) e.g. electric kettles, some floor cleaners Lead and plugs/extension Also patient beds Plug in rcd s No 6 months 1 year 6 months 1 year 6 months 1 year 6 months 1 years 1 2 years 1-2 years 1 2 years 1-2 years Inspected annually and tested every 2years. Inspected and tested annually Inspected and tested annually Inspected and tested annually If a portable appliance includes a portable RCD this should accompany the appliance. So that it can be inspected and tested at the same time. Note: Inspection and testing should also be carried out: a) When there is a reason to suspect the equipment is faulty or damaged but this cannot be confirmed by visual inspection b) After any repair: modification or similar work to equipment. Electrical Equipment Protocol v6 12
2.25 Work Equipment Policy and Procedure Table of Contents
Table of Contents Section 1 - Policy... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 Requirements... 3 1.4 Responsibilities... 3 Section 2 - Procedure... 4 Section 3 - References... 5 3.1 Statutory Documents...
More informationElectrical Safety (Portable Electric Equipment) Policy
Electrical Safety (Portable Electric Equipment) Policy Version No Author Date Comments Approved by V1.0 Lynne Sharp 13-10-16 First draft Health and Safety Sub-Group V2.0 13-10-16 Comments from H&S Group
More informationPolicies, Procedures, Guidelines and Protocols
Policies, Procedures, Guidelines and Protocols Document Details Title Portable Electrical Equipment Management Policy Trust Ref No 701-29768 Local Ref (optional) Main points the document Responsibilities
More informationPAT Testing Procedures WYMONDHAM RUGBY FOOTBALL CLUB. Wymondham RFC PAT Testing Procedure Version 1 Revision 3 Wednesday, 27 July 2016 Page 1
WYMONDHAM RUGBY FOOTBALL CLUB PAT Testing Procedures Wednesday, 27 July 2016 Page 1 Contents 1 Introduction 2 Explanation of Terms Used 3 What Does the Law Require? 4 Controlling the Risk 5 Maintenance
More informationThe definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows:
Electrical Safety Guidance Note 1 - General Guidance Competent Person The definition of a competent person given in the Electricity at Work Regulations 1989 (EWR) is as follows: "A person in the possession
More informationUnless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version
Policy No: RM13 Version: 7.0 Name of Policy: Provision and Use of Work Equipment Policy Effective From: 26/04/2016 Date Ratified 10/03/2016 Ratified Health and Safety Committee Review Date 01/03/2018 Sponsor
More informationPortable Appliance Testing
The University of Edinburgh E Brief description of the paper University Health and Safety Committee Tuesday 18 th November 2014 Portable Appliance Testing This Paper presents the review of the University
More informationHealth & Safety: Electrical safety
NEWLANDS GIRLS SCHOOL POLICY DOCUMENT Health & Safety: Electrical safety Last Updated By N Piggott Nov 2015 Last Reviewed by N Piggott Jan 2017 Policy Type Review Frequency Statutory Annually Responsible
More informationLifting Equipment Protocol
Policy No: RM19 Version: 5.0 Name of Policy: Lifting Equipment Protocol Effective From: 31/05/2016 Date Ratified 12/05/2016 Ratified Health & Safety Committee Review Date 01/05/2018 Sponsor Deputy Chief
More informationMAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY
MAKING ELECTRICAL A GUIDE ON HOW TO INSPECT AND TEST PORTABLE APPLIANCES SAFELY AND EFFECTIVELY 'Published in consultation with The Health & Safety Executive' TECHNOLOGY WORK - SAFELY The Electrical Contractors'
More informationCode of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT)
Code of Practice for the Inspection and Testing of Portable Electrical Equipment (PAT) Reviews and Revisions Action Date Reason Reviewer Updated details of External PAT Contractor 17/02/16 New contract
More informationPortable Appliance Testing (PAT) Standard Higher risk environments or activities
Portable Appliance Testing (PAT) Standard Higher risk environments or activities This section of the PAT Standard provides information in addition to that given in low risk environments and so should be
More informationGround Fault Circuit Interrupter(GFCI) Policy
NewStar Netronics, LLC American Products for the World Ground Fault Circuit Interrupter(GFCI) Policy 3926 East 3 rd Street Tulsa, OK 74112 Phone (918)894-5006 Fax (918)836-9909 tech@newstarnetronics.com
More informationTHE INSPECTION OF PORTABLE ELECTRICAL EQUIPMENT
THE INSPECTION OF PORTABLE ELECTRICAL EQUIPMENT Introduction This document, provides a mechanism by which departments can fulfil their duty to assess and manage portable electrical equipment testing. This
More informationHealth and Safety Inspection Procedure
Template v4 WILTSHIRE POLICE FORCE PROCEDURE Health and Safety Inspection Procedure Effective from: 25.03.2012 Last Review Date: 10.05.2015 Version: 2.0 Next Review Date: 10.05.2018 TABLE OF CONTENTS PROCEDURE
More informationMEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY
MEDICAL GAS CYLINDERS AND MEDICAL PIPELINE SYSTEMS (MGPS) POLICY Version: 4 Date issued: April 2018 Review date: April 2021 Applies to: All staff (excluding office and clerical staff) This document is
More informationIMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY
IMMANUEL CHURCH, CHICHESTER HEALTH AND SAFETY POLICY Approved by the Trustees: November 2016 Health and Safety Policy Introduction The main piece of health and safety legislation is the Health and Safety
More informationList all key terms and acronyms used in the procedure, and their definitions.
Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,
More informationQPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems
Performing Engineering Operations QPEO2/037N Credit Value: 15 QCF Level: 2 GLH: 68 Maintaining electrical equipment/systems Learner Name: 2013 Excellence, Achievement & Learning Ltd EAL Assessment Route
More informationMaintaining electrical equipment/systems
Unit 037 Maintaining electrical equipment/systems Level: 2 Credit value: 15 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover
More informationLoughborough University (incl. London Campus) Health and Safety Policy. Policy for the Electricity at Work Policy and Code of Practice
UNIVERSITY MANAGEMENT POLICY Loughborough University (incl. London Campus) Health and Safety Policy Policy for the Electricity at Work Policy and Code of Practice Version No. Revision 10 Author James Brooks
More informationLow Voltage Electricity System Safety Rules & Associated Safety Guidance
Annex J To Loughborough University Facilities Management (FM) Health and Safety Policy Low Voltage Electricity System Safety Rules & Associated Safety Guidance 1. Introduction a. These Safety Rules are
More informationGUIDELINES FOR HEALTH AND SAFETY
GUIDELINES FOR HEALTH AND SAFETY 1. Summary 2. Introduction 3. Health & safety guidelines a. Masts erecting and dismantling b. Avoiding danger from overhead power lines c. Generators d. Installing radio
More informationEdinburgh Napier University
Edinburgh Napier University Electrical Portable Appliance Testing Policy (PAT) Electrical Portable Appliance Testing (PAT) Policy Date of Issue: May 2015 Policy Reference: Date of Review: Jan 2019 Lead
More informationSEGMENT NINE - Electricity
71 SEGMENT NINE - Electricity After studying this segment you should have a greater understanding of the potential danger posed by electricity and the steps taken in the workplace to ensure that electrical
More informationLIFT MAINTENANCE POLICY
LIFT MAINTENANCE POLICY Originator: Policy and Strategy Team Approval date: August 2018 Review date: August 2019 1 Introduction 1.1 1.2 Pine Court Housing Association (PCHA) treats the health and safety
More informationSAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures
SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.
More informationBCGA GUIDANCE NOTE 17
BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF
More informationES18 Security Theory/Regulations Answer Schedule
ES18 Security Theory/Regulations Answer Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the expected answers to the examination questions. The marker
More informationHS26 Working at Height Policy and Procedure
HS26 Working at Height Policy and Procedure HS26: Working at Height Policy and Procedure v2-0.jun 2016 Page 1 of 8 1. Scope This policy applies to all staff, students and visitors to The Shared Learning
More informationGas Network Craftsperson
Gas Network Craftsperson Unit EIAU016 Carrying out Fault Diagnosis on Electrical Equipment and Circuits This assessment specification has been developed as part of the network maintenance craftsperson
More informationLifting Operation & Lifting Equipment Procedure
SRSS Lifting Equipment Procedure 1. DOCUMENT CONTROL Management System Element Title SRSS SMS PROCEDURE Lifting Operation & Lifting Equipment Procedure SMS_HS_PR_033_ Version # & V1 10/08/2016 Lifting
More informationSEMEMI SQA Unit Code H2AP 04 Carrying out fault location on electrical equipment and circuits
Carrying out fault location on electrical equipment and circuits Overview This unit identifies the competences you need to locate faults on electrical equipment and circuits, in accordance with approved
More informationFacilities and Estates. Natural Gas: Standard Operating Procedure. Document Control Summary. Contents
Facilities and Estates Natural Gas: Standard Operating Procedure Document Control Summary Status: Version: Author/Title: Owner/Title: Approved by: Ratified: Related Trust Strategy and/or Strategic Aims
More informationVENUE RISK ASSESSMENT CHECKLIST
VENUE RISK ASSESSMENT CHECKLIST U3A Name: Location/Postcode: Date: U3A Interest Group Description of Activity: HAZARD Yes No N/A COMMENTS 1 Is the access suitable for the group attending the activity?
More informationIn-Service Inspection and Testing of Electrical Equipment Certificate
In-Service Inspection and Testing of Electrical Equipment Certificate Health and Safety at work Act 1974 (HSWA) / Electricity at Work Regulations 1989 (EAWR). Management of Health and Safety at Work Regulations
More informationRISK ASSESSMENT FOR Philips Smart Touch Installation 03/04/2012
RISK ASSESSMENT FOR Philips Smart Touch Installation Myatt Garden Primary School Myatt Garden Primary School Rokeby Road London SE4 1DF Tel: 020 8691 0611 03/04/2012 INTRODUCTION The purpose of this method
More informationContractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.
Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on
More informationDiving Operations Procedure
Diving Operations Procedure UNIVERSITY OF PORTSMOUTH Diving Operations Procedure 1 Document title Diving Operations Procedure Document author and department Laura Sayers Health & Safety Office Corporate
More informationManagement Plan for Electrical Safety ISD #535
Management Plan for Electrical Safety ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9 ½ Street Rochester, MN 55904 507-328-4507 MANAGEMENT PLAN FOR ELECTRICAL SAFETY Table of Contents
More informationElectrical Safety in the Food Industry
Health and and Safety Executive Electrical Safety in the Food Industry John Chamberlain HM Principal Specialist Inspector (Electrical & Control Systems) Manchester CROWN COPYRIGHT What I ll cover Legal
More informationISOLATION ISSUE 2 1 AIM 2 4 REASONS FOR INCLUSION 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6
CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASONS FOR INCLUSION 3 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM & PROCEDURAL REQUIREMENTS 4 8 PEOPLE REQUIREMENTS 6 APPENDIX
More informationElectrical Machines & Drives Group Safety Policy 2018/2019
Electronic & Electrical Engineering. Electrical Machines & Drives Group Safety Policy 2018/2019 1 Introduction This Safety Policy provides the safety information and procedures that must be followed to
More informationOriginal Date of Issue: 04/09
POLICIES AND PROCEDURES DEPARTMENT: Environmental Health and Safety SUBJECT: Electrical Safety Program Original Date of Issue: 04/09 Reviewed 12/2011 Revised 12/2011 BACKGROUND ELECTRIC SHOCK It is well
More informationPORTABLE WORK LIGHT MODEL NO: CL6FS OPERATION INSTRUCTIONS PART NO: GC0315
PORTABLE WORK LIGHT MODEL NO: CL6FS PART NO: 4003530 OPERATION INSTRUCTIONS GC0315 INTRODUCTION Thank you for purchasing this CLARKE Worklight. Before attempting to use this product, please read this manual
More informationPRESSURE SYSTEMS POLICY
PRESSURE SYSTEMS POLICY PRESSURE SYSTEMS POLICY 1. Introduction 2. Policy Statement 3. Scope 4. Background 5. Roles & Responsibilities 6. Training 7. Contractors 8. Policy Review 1. Introduction The Kilmarnock
More informationEXHIBITION Guide. Roles and Responsibilities OS11. A handbook for exhibitors and contractors
Appendix 1 Health & Safety Declaration, Roles and Responsibilities Each exhibitor and Informa appointed contractor must complete the Health and Safety Declaration form provided below to confirm they have
More informationLONE WORKING HEALTH AND SAFETY GUIDANCE
LONE WORKING HEALTH AND SAFETY GUIDANCE Revised March 2017: Version 3.1 Name of Policy: Purpose of the Policy: Policy Applies to: Approved by: Responsible for its Updating: Final Approval by: Lone Working
More information15 Appendix 15 Notes on periodic inspecting and testing
Guide to the Wiring Regulations 15 Appendix 15 Notes on periodic inspecting and testing 15.1 Introduction scope and statutory requirements After an electrical installation is constructed, commissioned
More informationCode of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 Guidance for Landlords. Fourth Edition April 2011
Fourth Edition April 2011 Code of Practice for Electrical Safety in Beer Dispense in Licensed Premises 2011 Guidance for Landlords Issued by the British Beer and Pub Association 1 Contents Preface 3 1.
More informationLifting Operations and Lifting Equipment Regulations (LOLER) Policy. Version No. 2. Review: May 2019
Livewell Southwest Lifting Operations and Lifting Equipment Regulations (LOLER) Policy Version No. 2 Review: May 2019 Notice to staff using a paper copy of this guidance The policies and procedures page
More informationLifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016
Title of Standard Operation Procedure: Lifting Equipment Procedure ocedure: Person(s) responsible for the Health and Safety Manager production of report e Reference Number: H&S Procedure 16 Version No:
More informationOPERATING AND MAINTENANCE MANUAL GOLD LINE EXTRACTION CLEANERS M14-M26
OPERATING AND MAINTENANCE MANUAL GOLD LINE EXTRACTION CLEANERS M14-M26 Made For: Spitwater Australia Pty Ltd 953 Metry St North Albury, NSW, Australia WARNING: FAILURE TO FOLLOW OPERATING, SAFETY AND MAINTENANCE
More informationAbu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)
Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 35.0 Portable Power Tools Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude Abu Dhabi
More informationELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,
ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths
More informationCOMPLIANCE GUIDELINES FOR. Departmental Health and Safety Inspections
COMPLIANCE GUIDELINES FOR Departmental Health and Safety Inspections CONTENTS 1 INTRODUCTION...1 2 WHY INSPECTION...1 3 OBJECTIVES AND METHODS...2 3.1 Safety Tours...2 3.2 Safety Inspection...2 3.3 Other
More informationGeneral maintenance engineering applications
Unit 868 General maintenance engineering applications UAN: J/600/6007 Level: Level 2 Credit value: 12 GLH: 55 Relationship to NOS: Endorsement by a sector or regulatory body: Aim: This unit has been derived
More informationDocument Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:
Corporate Electricity High Voltage SOP Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: John Biggs/Estates Officer
More informationInspection and Testing
Chapter 16 Inspection and Testing 16.1 INTRODUCTION The Purpose of Inspection, Testing and Certification or Reporting The fundamental reason for inspecting and testing an electrical installation is to
More informationLOCK-OUT / TAG-OUT SYSTEM & PROCEDURE
Date Adopted 8/04/2008 Due for Review 8/4/2009 Business Unit HR & Safety Current Policy Date 8/4/2008 LOCK-OUT / TAG-OUT SYSTEM & PROCEDURE 1.0 PURPOSE 2.0 SCOPE To prevent injuries to persons or damage
More informationWork Health and Safety (Managing Electrical Risks at the Workplace Code of Practice) Approval 2015
Australian Capital Territory Work Health and Safety (Managing Electrical Risks at the Workplace Code of Practice) Approval 2015 Notifiable instrument NI2015 331 made under the Work Health and Safety Act
More informationKettleshulme Parish Council Risk Assessment 2015 Kettleshulme Memorial Hall
HAZARD IDENTIFICATION AND CONTROL MEASURES: Step 1 Identify significant hazards Step 2 Identify who might be harmed and how Step 3 Identify precautionary measures already in place List of significant hazards
More informationKeeping People Safe CHURCH HEALTH & SAFETY TOOLKIT. Health and Safety Policy
Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT Health and Safety Policy Our Health and Safety Policy Name of Church: Address: As a church we understand that we owe a duty of care to ensure the safety
More informationGeneral maintenance engineering applications
Unit 068 General maintenance engineering applications Level: 2 Credit value: 12 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover
More informationPROCEDURES FOR STANDBY
1 SCOPE This Procedure details both the circumstances in which standby shall be provided and the responsibilities borne by the Standby Man in such circumstances. 2 ISSUE RECORD This is a maintained/controlled
More informationSafety Services Guidance. Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER)
Guidance on: The Provision and Use of Work Equipment Regulations 1998 (PUWER) Key word(s) : Work equipment. Using, maintaining and repairing. Information, instruction and supervision. Risk Assessment.
More informationHealth & Safety Policy HSP 07 Legionella Management Version Status Date Title of Reviewer Purpose/Outcome
Health & Safety Policy HSP 07 Legionella Management Version Status Date Title of Reviewer Purpose/Outcome 1.0 Draft 07.03.2016 David Maine 1 st Draft for consultation/review 1.1 Approved 22.12.2016 David
More informationCode of Practice and Instructions to Contractors Working for Viridor
Date of issue: 20 Code of Practice and Instructions to Contractors Working for Viridor Prepared by: Ian Powell Head of Safety Management 4.6.3 Revision: 2.0 Contents Introduction... 2 Legal obligations...
More informationElectrical Safety PPT-SM-ELECTSFTY V.A.0.0
Electrical Safety 1 Electrical Safety OSHA s electrical safety standard covers Work on or near exposed energized equipment Proper use of electrical protective equipment Safe use of portable electric equipment
More informationSEMEM3-65 Servicing anaesthetic and ventilation equipment
Overview This unit identifies the competences you need to carry out servicing activities on anaesthetic and ventilation equipment, in accordance with approved procedures. You will be required to service
More informationUSER MANUAL. JET TST and JET TST S.
USER MANUAL JET TST and JET TST S www.sisteven.com Types of Jet fans: JET TST UNI: Impulse axial fan single direction JET TST S UNI: Impulse axial fan single direction (short case) JET TST REV: Impulse
More informationPressure Systems Safety Regulation
Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent
More informationRigel 601 CHECKBOX. Instruction Manual. 348A551 Issue 2.0. April Seaward Electronic Ltd. Issue 2.0
Rigel 601 CHECKBOX Instruction Manual 348A551 Issue 2.0 April 2006 2006 Seaward Electronic Ltd. Issue 2.0 Limited Warranty & Limitation of Liability Rigel Medical guarantees this product for a period of
More informationEdinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment
Edinburgh Napier University Safe Working Procedure Gas Safety, Gas Systems and Equipment Gas Safety Policy Date of Issue: July 2015 Policy Reference: Date of Review: July 2016 Lead Reviewer: Maintenance
More informationHealth & Safety Plan `
Rolleston Men s Shed Charitable Trust Health & Safety Plan ` 54 Dynes Rd Rolleston Ph. (03) 347-3173 Cell: 027 430-3076 E-mail: rollyshed@xtra.co.nz Version 3 15/12/2016 Page 1 of 20 TABLE OF CONTENTS
More informationE PGN-11. Part of NTW (O)32 Estates Operations and Maintenance Policy Paul McCabe Head of Estates and Facilities-NTW Solution Ltd
Estates Operations and Maintenance Practice Guidance Note Management of Pressure Systems V01 Date Issued Planned Review PGN No: Issue 1 - Nov 2015 Issue 2 Nov 2017 Author / Designation Responsible Officer
More informationSUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers
SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder
More informationAccreditation for In-Service Inspection of Pressure Systems/Equipment
RG 2 Edition 5 November 2018 - Draft for consultation Accreditation for In-Service Inspection of Pressure Systems/Equipment RG 2 / Edition: 5 Page 1 of 10 Contents 1. Introduction 2 2. Scope - Inspection
More informationThe invisible killer - electrical safety in the food and drink industry
The invisible killer - electrical safety in the food and drink industry Jackie Wooldridge Head of Health & Safety 2 Sisters Food Group A game of chance? - Introduction to electrical hazards 1. Take turns
More informationVERTICAL AIR COMPRESSORS
VERTICAL AIR COMPRESSORS MODEL NO: VE15C150, VE18C150, VE25C150 PART NO: 2226010, 2226020, 2226025 OPERATION & MAINTENANCE INSTRUCTIONS LS0715 INTRODUCTION Thank you for purchasing this CLARKE Vertical
More informationHSE guidelines. SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS
HSE guidelines SMay 2015 ELECTRICAL SAFETY HSE LIFE THE NATIONAL OIL&GAS INDUSTRY STANDARD FOR PROFESSIONALS Work safely or do not work at all There are strict procedures when working on electrical installations
More informationThe Sample Company Pty Ltd
Job Safety and Environmental Analysis (JSEA) / Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process Initiators of SWMSs are responsible for consulting the Project Supervisor,
More informationGas Safety Code of Practice
Gas Safety Code of Practice Reviews and Revisions Action Date Reason Reviewer Gas Safety Code of Practice 1 Contents Reviews and Revisions... 1 1. Code of Practice Statement... 3 2. Introduction... 4 3.
More informationMeasurement accessories METPOINT OCV for the measurement in systems up to 40 bar
EN - english Instructions for installation and operation Measurement accessories METPOINT OCV for the measurement in systems up to 40 bar Dear customer, Thank you for deciding in favour of the METPOINT
More informationPECIMEN IMM6. Minor Electrical Installation Works Certificates. Amd 3: In accordance with BS 7671
IMM6 NCR (No Carb o n Requi red) Minor Electrical Installation Works Certificates Installer s Reference Number IRN/ PART 1: DETAILS OF THE MINOR WORKS Client: minor works completed: IMM6/ MINOR ELECTRICAL
More informationElectricity Hazard Guide
Electricity Hazard Guide Table of Contents Disclaimer... 2 1. Overview... 3 2. Key Considerations Electricity... 4 2.1 Design and Planning... 4 2.2 Event Delivery... 5 3. General Guide Electricity... 6
More informationSUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland
SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...
More informationHEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT
HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT INTRODUCTION Cwmni CYNNAL recognises that accidents can arise from working at height. Falls from height can be a cause of injury and absence
More informationHAZARD MANAGEMENT PROCEDURE
TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk
More informationSOAS LONE WORKING GUIDANCE
SOAS LONE WORKING GUIDANCE Introduction This guidance is intended to assist managers and heads of department in assessing the risks associated with lone working and their staff. While there are no specific
More informationGSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS)
GSA POLICY ON LOCAL EXHAUST AND OTHER VENTILATION (FUME CUPBOARDS) Local Exhaust Ventilation Inspection & Maintenance 1 LOCAL EXHAUST AND OTHER VENTILATION Contents 1. Introduction 2. Design specifications
More informationHealth & Safety Policy & Plan. Rightway Roofing.
Health & Safety Policy & Plan. Rightway Roofing. Valid: 02/2012-02/2013 Contents ( 1 ) Policy Statement. ( 2 ) Hazard Identification. ( 3 ) Hazard Management. ( 4 ) Induction & Training. ( 5 ) Monitoring
More informationNew Licensed Asbestos Operative Training
TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Operative Training This unit has twenty-two learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials
More informationAligning EDIS with Guidance Note 3
EDIS USER GUIDE Aligning EDIS with Guidance Note 3 Using EDIS to adhere to Guidance Note 3: Inspection & Testing (Electrical Regulations), incorporating amendment 3 2015 Doc Version: 27 Feb 2017 www.electricalcertificates.co.uk
More informationHealth and Safety Policy
Health and Safety Policy It is the policy of Riverside to create a safe environment and to encourage ways of working which will ensure the safety of children, employees and all other persons who come onto
More informationPLEASE READ CAREFULLY BEFORE INSTALLING OR USING MEGA POOL SAVER MPS 1100
MPS-1100 User Manual Mega Pool Saver Ltd PLEASE READ CAREFULLY BEFORE INSTALLING OR USING MEGA POOL SAVER MPS 1100 For further up to date instructions on how to install Mega Pool Saver MPS 1100, please
More informationWork Health and Safety Risk Management Procedures
Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard
More informationPAT testing guide (4th Edition)
PAT testing guide (4th Edition) The word Megger is a registered trademark 2 PAT testing guide - 4th Edition www.megger.com Contents What is Portable Appliance Testing?...1 Why should electrical equipment
More informationINFORMATION NOTE No 353: MICROBIOLOGICAL TESTING
INFORMATION NOTE No 353: MICROBIOLOGICAL TESTING First issued: January 2007 Updated: June 2010 ABOUT ISRM This is one of a series of Information Notes produced by the Institute of Sport and Recreation
More informationGround Fault Protection on Construction Sites
Ground Fault Protection on Construction Sites Course No: E01-001 Credit: 1 PDH Gilbert Gedeon, P.E. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800
More information