Updates on CA Pipeline Safety Program

Size: px
Start display at page:

Download "Updates on CA Pipeline Safety Program"

Transcription

1 Updates on CA Pipeline Safety Program Kenneth Bruno Program Manager Gas Safety Branch Safety and Enforcement Division California Public Utilities Commission 1

2 Mission To ensure that intrastate natural gas and liquefied petroleum gas (LPG) pipeline systems are designed, constructed, operated, and maintained according to safety standards set by the CPUC and the federal government 2

3 Pipeline Safety Team 30 Gas Safety Engineers 1 Damage Prevention Expert 6 Supervisory 2 Administrative 3

4 Jurisdictional Metrics Distribution: ,317 miles (Main) 92,996 miles (Services) 1 st in the Nation (TX, IL, OH, MI) 4

5 Jurisdictional Metrics Transmission: ,391 Miles 5 th behind (TX, LA, KS, OK) HCA 2,838 Miles (~27%) 5

6 Operators 11 NG Operators 12 Storage Fields 2,479 Master Meters 655 LPG 6

7 Operators Bare Steel: 1.6% CP Steel: 36.4% Plastic 55% Other 7% 7

8 Inspection Types O&M TIMP, DIMP, OQ Emergency Management D&A, CRM, PAP, Damage Prevention Construction 8

9 9 CPUC Safety Assurance

10 10 CPUC Safety Assurance

11 11 CPUC Safety Assurance

12 12

13 13 Inspection Types

14 Large Scale Incidents 1. First Responders 2. Make Safe Stop the flow of gas and conduct a leak migration survey 3. Set up a perimeter and stay off the scene until CPUC completes its investigation 4. Chain of Custody Procedures 14

15 Incidents Reporting Requirements per GO-112F 151 incidents through July 31, 2017 Reporting Requirements per 49 CFR incidents through July 31,

16 16 Incident by Category

17 2016 Enforcement Four Citations Issued and CPUC-OII for a total of $44,376,000 Distribution Facilities Records Keeping Unqualified Personnel Atmospheric corrosion inspections & Cross bores Failure to take prompt remedial action to correct cathodic protection deficiencies 17

18 September 9, 2010 Pipeline Failure of 30 Transmission Line in San Bruno, CA 8 Fatalities, numerous injuries Pipeline had MAOP established under 49 CFR C NTSB Accident Report identified exemptions for pre-code pipelines from pressure testing as a contributing factor to the failure 18

19 Safety Assurance Actions Post San Bruno PUC Code 958 Required Intrastate NG Transmission Operators to submit a plan to either Pressure Test or Replace all segments that were not pressure tested or that lack sufficient records of pressure testing 19

20 Progress Update of PU Code 958 CA NG Transmission Pressure Tested: ~875 Miles, 12 Failures Replaced: ~190 Miles Remaining Transmission Lines to be either Pressure Tested or Replaced: ~3,027 Miles Estimated time to completion: SouthWest Gas: Completed PG&E: SoCalGas and SDG&E: 2036

21 NG Transmission - Safety Measures Average Cost of Hydrostatic Test Range: $MM New Automated Valves (RCV and ASV) 268, 267$MM (PG&E) 131, 151$MM (Sempra) 21

22 Goals Better technology on Inspections Process Owners for Specialized Areas Continuous Improvement in Pipeline Safety Assurance and Program Performance Regionally based Inspectors 22

23 Aliso Canyon SS-25 Failure occurred on or around October 23, 2015 October 24 th : 1 st Kill Attempt After several additional failed attempts, well was eventually controlled on February 12, 2016 via relief well 23

24 Aliso Canyon CPUC is conducting an active investigation in SS-25 failure PU Code 315 and 701 Root Cause Analysis Blade Energy Partners Department of Conservation s DOGGR 24

25 25

26 26

27 Tree Tubing Head Ground Line Casing Head 11-3/4 -in Casing 990 ft 2-7/8 -in TOC at 7,590 ft TOC at 8175 ft Packer = 8,486 ft 7.0 -in Casing 8,585 ft 8,749 ft Page 27

28 Tubing Extraction - Ongoing 0 Free point tubing Cut Tubing C&C Mud, POH to 1050, Circ. clear brine PU to 850, Run video camera to 1000 RIH to 1050 C&C mud, POH Log 7 Casing 1000 OSS Fault 2000 COMPLETED YSS Fault COMPLETED _4652' _4910' Pause Operations Submit Supplementary Notice for Proposed Operations above 7590 Aliso _5645' Porter Upper DA TOC B Annulus 7000' Mid DA Low DA 8000 Cap Rock Sesnon 9000 _xxxx' = OH DST TOC A Annulus 7590' 7 Casing 8585' 3 barite plugs pumped down tubing during kill attempt location and disposition unknown Run video camera ONGOING

29 29 Thank you! For Additional Information:

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations

New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations. MINIMUM Pipeline Safety Regulations New Hampshire Public Utilities Commission CFR 49 Part 192 Regulations MINIMUM Pipeline Safety Regulations Application for Jurisdictional LPG Operators 1 Pipeline Safety Regulations 49 CFR Part 192 (NOTE:

More information

Investigation of failures

Investigation of failures 49 CFR 192.617 192.617 Investigation of failures Each operator shall establish procedures for analyzing accidents and failures, including the selection of samples of the failed facility or equipment for

More information

O&M MANUAL HIGHLIGHTS

O&M MANUAL HIGHLIGHTS O&M MANUAL HIGHLIGHTS GENERAL PROVISIONS Each pipeline must be operated according to this SUBPART 192.603(a) RECORDS 192.603(b) Keep records necessary to administer the procedures of 192.605 RECORDS Life

More information

2017 LGA 191/192 & 195 Pipeline Safety Conference

2017 LGA 191/192 & 195 Pipeline Safety Conference 2017 LGA 191/192 & 195 Pipeline Safety Conference Presented by: Wallace Jones Director, Gas Pipeline Safety Division Alabama Public Service Commission Issues that GPS/PSC Staff are having with Pipeline

More information

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014

PIPELINE SAFETY. Darin Burk, Manager Pipeline Safety. January 28, 2014 PIPELINE SAFETY Darin Burk, Manager Pipeline Safety January 28, 2014 Congressional Delegation of Authority Pipeline Safety Act of 1968 Congress Delegated Inspection and Enforcement Authority to the Secretary

More information

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director

SPE Forum: Source Control for Wells in Shallow Water. Lars Herbst, Gulf of Mexico Regional Director SPE Forum: Source Control for Wells in Shallow Water Lars Herbst, Gulf of Mexico Regional Director Agenda Introduction and Background Historical Well Control Events Scope of Discussion Scenario Driven

More information

LP Gas Odorization and Testing

LP Gas Odorization and Testing LP Gas Odorization and Testing CFR 29 Labor OSHA Storage and Handling of Liquefied petroleum Gases CFR 29 1910 (b) 1 (b) Basic rules (1) Odorizing gases. (i) All liquefied petroleum gases shall be effectively

More information

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Leticia Santos Hernández Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Email: leticia.santos@dot.gov Office: 405-686-2310 192.605(b) Gas Reports

More information

BSR GPTC Z TR GM References and Reporting Page 1 of 8

BSR GPTC Z TR GM References and Reporting Page 1 of 8 Page 1 of 8 PRIMARY: 192.605 SECONDARY: 191.23 PURPOSE: Review guide material added by TR 2009-17 to 5.1(e) and consider restructuring the guide material under 192.605 as discussed further below. ORIGIN/RATIONALE

More information

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if

Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) , even if 1 Striking an underground pipeline or underground electric line can lead to serious injury or death. If you hit either, call (800) 477-5050, even if there is no apparent damage. Call 911 if gas is blowing

More information

Gas System Restoration and Remediation: Post Katrina. Perry Dufrene Manager, Engineering

Gas System Restoration and Remediation: Post Katrina. Perry Dufrene Manager, Engineering Gas System Restoration and Remediation: Post Katrina Perry Dufrene Manager, Engineering 1 Agenda 1. Overview of ENOI Gas System 2. Impact of Katrina 3. Restoration Progress 2 Overview of ENOI Gas System.

More information

National Transportation Safety Board Washington, DC 20594

National Transportation Safety Board Washington, DC 20594 Accident/Incident Number: Operator: Accident: Location: National Transportation Safety Board Washington, DC 20594 Safety Recommendation Report Installation of PermaLock Mechanical Tapping Tee Assemblies

More information

The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents.

The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents. Purpose: The purpose of this policy is to provide operational guidelines for San Diego County Fire Departments (FD) responses to natural gas incidents. Policy: This policy shall apply to all FD personnel

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

Part 192 Subparts J & K. Testing & Uprating

Part 192 Subparts J & K. Testing & Uprating Part 192 Subparts J & K Testing & Uprating MAOP, Testing, & Uprating Are All Linked MAOP = Maximum Pressure Allowed By Regulations (192.619 et seq.) MAOP Determined By Operator for Each Pipeline or Segment

More information

NATURAL GAS MAINTENANCE. Part 192 Subpart "M"

NATURAL GAS MAINTENANCE. Part 192 Subpart M NATURAL GAS MAINTENANCE Part 192 Subpart "M" CONTACT INFORMATION Pamela West Pipeline Safety Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Main: (405) 686-2310

More information

PSM TRAINING COURSES. Courses can be conducted in multi-languages

PSM TRAINING COURSES. Courses can be conducted in multi-languages Courses can be conducted in multi-languages One set of hardcopy course notes will be sent to client for printing and distribution to course participants. The courses will be held at the client s training

More information

PE 2708 CTS & IPS GAS PIPE

PE 2708 CTS & IPS GAS PIPE Specifications: Resin Chevron Phillips TR418Q PE 2708 Resin formulation listed in PPI TR4 Hydrostatic Design Basis: 1250 psi @ 73 F, 800 psi @ 140 F Cell Classification per ASTM D3350 = 234373E or 234375E

More information

Statewide Rule 36: H2S

Statewide Rule 36: H2S Statewide Rule 36: H2S Sam Birdwell, State H2S Coordinator August 2018 RRC Jurisdiction Oil and natural gas industry Intrastate Pipelines, natural gas and hazardous liquid pipeline industry Liquefied Petroleum

More information

Pressure Relief Device Investigation Testing Lessons Learned

Pressure Relief Device Investigation Testing Lessons Learned Pressure Relief Device Investigation Testing Lessons Learned 2018 General Meeting Presentation Prepared by: Joseph F. Ball, P.E. Overview National Board Investigation Testing Process Summary of Results

More information

Charlottetown Marine Terminal Pipeline Decommissioning Project Description

Charlottetown Marine Terminal Pipeline Decommissioning Project Description Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning

More information

Responding to Natural Gas Pipeline Emergencies

Responding to Natural Gas Pipeline Emergencies Responding to Natural Gas Pipeline Emergencies Who is Florida Gas Transmission? Florida Gas Transmission operates nearly 5,000-miles of interstate natural gas transmission pipelines, a system that extends

More information

We re good at what we do! Anywhere, TX SITE

We re good at what we do! Anywhere, TX SITE 2224 East 39 th Street North Sioux Falls, SD 57104 (800).653.3392 605.332-7833 fax We re good at what we do! SURFACE ANCHOR INSPECTION FOR ABC COMMUNICATION S Anywhere, TX SITE This is an actual inspection

More information

APPENDIX B PHMSA 57 Special Conditions for Keystone XL and Keystone Compared to 49 CFR 195

APPENDIX B PHMSA 57 Special Conditions for Keystone XL and Keystone Compared to 49 CFR 195 APPENDIX B PHMSA 57 Special Conditions for Keystone XL and Keystone Compared to 49 CFR 195 -This page intentionally left blank- PHMSA 57 SPECIAL CONDITIONS FOR KEYSTONE XL COMPARED TO 49 CFR 195 1 Steel

More information

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process

Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process 29CFR1910.119 Process Safety Management is the application of management principles and systems to the identification, understanding, and control of process hazards to protect employees, facility assets

More information

PRESSURE TESTING AND RECORDKEEPING: RECONCILING HISTORIC PIPELINE PRACTICES WITH NEW REQUIREMENTS

PRESSURE TESTING AND RECORDKEEPING: RECONCILING HISTORIC PIPELINE PRACTICES WITH NEW REQUIREMENTS Originally published February 2013 by Michael J Rosenfeld of Kiefner and Associates, Inc., and Rick W. Gailing of Southern California Gas Company Pressure testing and recordkeeping: Reconciling historic

More information

Metering and Measuring of Multi-Family Pool Pumps, Final Report - Phase 1 & 2

Metering and Measuring of Multi-Family Pool Pumps, Final Report - Phase 1 & 2 Metering and Measuring of Multi-Family Pool Pumps, Final Report - Phase 1 & 2 Prepared for: Southern California Edison Company San Diego Gas and Electric Company Southern California Gas Company Pacific

More information

A quantitative risk analysis method for the natural gas pipeline network

A quantitative risk analysis method for the natural gas pipeline network PI-195 A quantitative risk analysis method for the natural gas pipeline network Y.-D. Jo1, K.-S. Park1, H.-S. Kim1, J.-J. Kim1, J.-Y. Kim2 & J. W. Ko3 1 Institute of Gas Safety Technology, Korea Gas Safety

More information

2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION. Steven Giambrone Director of Pipeline Safety

2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION. Steven Giambrone Director of Pipeline Safety 2017 LGA SMALL OPERATOR SEMINAR MAOP VERIFICATION Steven Giambrone Director of Pipeline Safety 1 1998 WHITE PAPER Written by Lane Miller (PHMSA TQ) and Don Stursma (Iowa Utilities Board) For onshore pipelines,

More information

Materials Performance November Nitrogen generator inhibits corrosion within fire protection systems

Materials Performance November Nitrogen generator inhibits corrosion within fire protection systems Materials Performance November 2014 Nitrogen generator inhibits corrosion within fire protection systems When dry and pre-action fire protection systems experience internal corrosion in their piping network,

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

Be our partner in safe, reliable natural gas delivery

Be our partner in safe, reliable natural gas delivery Wide Web at. pipeline operators. The industry has a proven record of safety. Por favor visite para Main, House Main Wide Web at. pipeline operators. The industry has a proven record of safety. Por favor

More information

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations

Yakima County Fire District 12 Standard Operating Guidelines SOG 5-1 Hazardous Materials Operations 1. General Yakima County Fire District 12 Standard Operating Guidelines 1.1 Purpose. This Standard Operating Guideline is intended to provide general guidelines for District personnel in responding to

More information

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION)

East Building, PHH-30 U.S. Department New Jersey Avenue S.E. of Transportation Washington, D.C DOT-SP (TWENTY-THIRD REVISION) East Building, PHH-30 U.S. Department 1200 New Jersey Avenue S.E. of Transportation Washington, D.C. 20590 Pipeline and Hazardous Materials Safety Administration DOT-SP 11054 (TWENTY-THIRD REVISION) EXPIRATION

More information

Elgin G4 Leak. 25 March 16 May 2012

Elgin G4 Leak. 25 March 16 May 2012 Elgin G4 Leak 25 March 16 May 2012 Elgin: key facts & figures Operated by Total for 8 x JV partners Production Utilities Quarters (PUQ) & wellhead platforms linked by 90m bridge On stream since 2001 6

More information

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal

Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal Aliso Canyon Gas-Electric Coordination Phase 3 Draft Final Proposal Cathleen Colbert Senior Market Design and Regulatory Policy Developer Market & Infrastructure Policy June 23, 2017 Agenda Time Topic

More information

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2).

the annulus between the second casing string and the surface casing [must be] open to the atmosphere in the manner described in subsection (2). Bulletin 2011-35 December 20, 2011 Surface Casing Vent Requirements for Wells This bulletin clarifies Section 6.100(4) of the Oil and Gas Conservation Regulations (OGCR) and provide additional surface

More information

NATURAL GAS RESPONSE SOG

NATURAL GAS RESPONSE SOG SCOPE NATURAL GAS RESPONSE SOG This guideline shall apply to all members of the Stoney Point Fire Department and shall be adhered to by all members. PURPOSE The purpose of this guideline is to explain

More information

49 CFR 195 Regulatory Overview

49 CFR 195 Regulatory Overview 49 CFR 195 Regulatory Overview Overview DOT PHMSA OPS Relates to public safety, governs materials, design, construction, operations and maintenance Applies to either transmission, distribution or jurisdictional

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Anomaly Evaluation, Response, and Repair Summit. Presentation by INGAA June 3, 2008

Anomaly Evaluation, Response, and Repair Summit. Presentation by INGAA June 3, 2008 Anomaly Evaluation, Response, and Repair Summit Presentation by INGAA June 3, 2008 Context of Today s Meeting Basis for Anomaly evaluation and response has become an issue on: Enforcement Integrity Management

More information

Operation & Maintenance Manual

Operation & Maintenance Manual Operation & Maintenance Manual OPERATING AND MAINTENANCE PROCEDURES FOR THE NATURAL GAS SYSTEM OF SEVIER COUNTY UTILITY DISTRICT APPROVED BY: Executive Administrator Executive Administrator Executive Administrator

More information

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS

A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS A PROACTIVE APPROACH TO ADDRESSING ANNULAR PRESSURE ISSUES AND STRAY GAS MIGRATION IN THE UNCONVENTIONAL SHALE PLAYS Authors: J. Daniel Arthur, P.E., SPEC, Tom Tomastik, Senior Geologist, Kris Anderson,

More information

Pressures MAOP MOP OP

Pressures MAOP MOP OP MAOP Pressures MAOP MOP OP MAOP "Maximum Allowable Operating Pressure" means the maximum pressure at which a pipeline or segment of a pipeline may be operated under this part. 192.3 MOP "Maximum Actual

More information

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM NEW PROGRAM! PROGRAM Mechanical Maintenance MODEL H-IRT-1 Industrial Refrigeration Trainer MODEL H-RIG-1C Rigging Systems Trainer MODEL H-IMTS-1 Industrial Maintenance Training System MODEL H-FP-223-14

More information

Policy Contact Melissa Chaney, Director, Human Resources Department, (916)

Policy Contact Melissa Chaney, Director, Human Resources Department, (916) Pepper Spray Policy Scope: CITYWIDE Policy Contact Melissa Chaney, Director, Human Resources Department, (916) 808-7173 Table of Contents 1-Pepper Spray Policy 2-Pepper Spray Procedure 3-Attachment A-Penal

More information

Failure Investigation Report. January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C.

Failure Investigation Report. January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C. Failure Investigation Report January 10, 2010 Third Party Damage to Terasen Gas Line at Bay Street and Pleasant Street, Victoria, B.C. September 1, 2011 Table of Contents Incident Summary...4 Investigation

More information

Engineered solutions for complex pressure situations

Engineered solutions for complex pressure situations SPECIAL SERVICES Engineered solutions for complex pressure situations Cudd Energy Services (CES) delivers custom engineered solutions to resolve complex pressure situations resulting from equipment failure

More information

KEY FACTORS FOR THE ESTIMATION OF CROSS-COUNTRY PIPELINES FAILURE RATES

KEY FACTORS FOR THE ESTIMATION OF CROSS-COUNTRY PIPELINES FAILURE RATES KEY FACTORS FOR THE ESTIMATION OF CROSS-COUNTRY PIPELINES FAILURE RATES Glenn Pettitt, Environmental Resources Management, UK This paper provides a description of the different databases and various influencing

More information

Regulated Oil and Gas Companies under National Energy Board Jurisdiction

Regulated Oil and Gas Companies under National Energy Board Jurisdiction File 185-A000-41 8 August 2003 Regulated Oil and Gas Companies under National Energy Board Jurisdiction Dear Sir / Madam: Guidance Notes for Pressure Equipment under National Energy Board Jurisdiction

More information

Guidance Manual for Operators of Small Natural Gas Systems January 2017

Guidance Manual for Operators of Small Natural Gas Systems January 2017 Guidance Manual for Operators of Small Natural Gas Systems January 2017 US Department of Transportation Pipeline and Hazardous Materials Safety Administration Office of Pipeline Safety TO THE READER The

More information

CONTACT INFORMATION. Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications

CONTACT INFORMATION. Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications ODORIZATION ISSUES CONTACT INFORMATION Wayne St. Germain Transportation Specialist U.S. Department of Transportation PHMSA Inspector Training and Qualifications Email: wayne.stgermain@dot.gov GAS REPORTS

More information

TAQA North Ltd. Well Blowout W4M June 8, 2009

TAQA North Ltd. Well Blowout W4M June 8, 2009 TAQA North Ltd. Well Blowout 10-10-28-29W4M June 8, 2009 ERCB Investigation Report January 11, 2010 Report prepared by Brian Temple (Incident Investigator), Rondine Cabot (Field Surveillance), Mark R.

More information

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health REPORT OF INVESTIGATION UNITED STATES DEPARTMENT OF LABOR MINE SAFETY AND HEALTH ADMINISTRATION Metal and Nonmetal Mine Safety and Health MAI-2018-07 REPORT OF INVESTIGATION Surface Nonmetal Mine (Construction Sand and Gravel)

More information

EQUIPMENT AND MATERIALS

EQUIPMENT AND MATERIALS SCUD Procedure # EMER004 Page 1 of 5 SCOPE AND PURPOSE This procedure is to provide performing outside leak investigations with the necessary procedures for prompt and effective response and to protect

More information

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN

NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN CITY OF WESTLAKE FOR NATURAL GAS DISTRIBUTION SYSTEM MAYOR: ROBERT BOB HARDY OPERATOR: MICHAEL WARREN Prepared by: Pipeline Integrity Partners, LLC January 2019 TABLE OF CONTENTS Emergency Plans (192.615)...

More information

HAZARDOUS INCIDENT SITE SAFETY PLAN

HAZARDOUS INCIDENT SITE SAFETY PLAN HAZARDOUS INCIDENT SITE SAFETY PLAN NOTE: A site-specific Site Safety Plan must be developed and implemented for each site where investigators may potentially be exposed to hazardous substances while conducting

More information

Subpart E. Pressure Testing

Subpart E. Pressure Testing Subpart E Pressure Testing 195.300 Scope This subpart prescribes minimum requirements for pressure testing of steel pipelines. However, this subpart does not apply to movement of pipe covered by 195.424.

More information

CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP

CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP CEPA Initiative: Response Time Guideline 2015 EMERGENCY SECURITY MANAGEMENT WORK GROUP Response Time Guideline aboutpipelines.com 1 of 8 Contents Table of Contents 1.0 Background 3 Purpose 3 Scope 3 Definitions

More information

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General...

1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... American Petroleum Institute Contents Page 1 Scope... 2 Functions of cementing float equipment... 3 Definitions... 4 Calibration... 5 Test Categories... 6 General... 7 Apparatus and Materials... 8 High-temperature/high-pressure

More information

Success Paths: A Risk Informed Approach to Oil & Gas Well Control

Success Paths: A Risk Informed Approach to Oil & Gas Well Control API Winter E&P Standards Conference, Austin January 18, 2017 Success Paths: A Risk Informed Approach to Oil & Gas Well Control Dr. Dan Fraser Director, Strategic Alliances for Global Energy Solutions,

More information

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public

1995 Metric CSJ SPECIAL PROVISION ITEM 7. Legal Relations And Responsibilities To The Public 1995 Metric CSJ 0915-12-242 SPECIAL PROVISION TO ITEM 7 Legal Relations And Responsibilities To The Public For this project, Item 7 "Legal Relations and Responsibilities to the Public", of the Standard

More information

Safe Work Permits A Safety Advantage

Safe Work Permits A Safety Advantage Safe Work Permits A Safety Advantage AMI Safety Conference March 20, 2013 J. Dan McCausland Senior Director, Worker Safety & HR Safe Work Permits Everyone knows what a Hot Work Permit is -- right? Where

More information

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company

Appalachian Basin Gas Well. Marietta College, Marietta, Ohio June 7-8, Development. Robert McKee, P.E. Design Engineer Multi Products Company Appalachian Basin Gas Well Marietta College, Marietta, Ohio June 7-8, 2010 Casing Plunger Applications & Development Robert McKee, P.E. Design Engineer Multi Products Company Casing Plunger A.L. Lift Without

More information

In the spring of 2006, national newspaper headlines screamed

In the spring of 2006, national newspaper headlines screamed Toll vs. Nontoll: Toll Facilities Are Safer By Jeff Campbell In the spring of 2006, national newspaper headlines screamed that toll plazas were the most dangerous place on the highway. The articles were

More information

July 12, Subject: California Underground Gas Storage Projects Rulemaking. Dear Mr. Harris,

July 12, Subject: California Underground Gas Storage Projects Rulemaking. Dear Mr. Harris, July 12, 2017 Kenneth Harris State Oil and Gas Supervisor Division of Oil, Gas and Geothermal Resources 801 K Street, MS 18-05, Sacramento, CA 95814-3530 Fax: (916) 323-0424 Subject: California Underground

More information

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL PRESSURE REDUCING STATION INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

LP-GAS BLEVES RESULT IN FIRE FIGHTER FATALITIES

LP-GAS BLEVES RESULT IN FIRE FIGHTER FATALITIES LP-GAS BLEVES RESULT IN FIRE FIGHTER FATALITIES National Fire Protection Association Fire Investigations Albert City, Iowa / Burnside, Illinois / Ste. Elisabeth de Warwick, Quebec, Canada http://ncsp.tamu.edu/reports/nfpa/vapor_explosion.htm

More information

APPENDIX A GLOSSARY AND ACRONYMS

APPENDIX A GLOSSARY AND ACRONYMS APPENDIX A GLOSSARY AND ACRONYMS GLOSSARY To understand this manual, operators of small natural gas systems need to know the meaning of some commonly used terms. The terms are defined below for the purpose

More information

Albany Connecticut Vermont Westchester

Albany Connecticut Vermont Westchester Natural Gas Sampling Sample Cylinders Grab Sample Panels Natural Gas field sampling is performed to determine gas composition, specific gravity, hydrocarbon dew point and natural gas value. Accurate gas

More information

Hydrostatic Testing of In-Situ Pipelines & Spike Testing. Colin Silla, PE, PMP Southeast District Manager 6/27/18

Hydrostatic Testing of In-Situ Pipelines & Spike Testing. Colin Silla, PE, PMP Southeast District Manager 6/27/18 Hydrostatic Testing of In-Situ Pipelines & Spike Testing Colin Silla, PE, PMP Southeast District Manager 6/27/18 Hydrotest Design and Support: Statistics Piping and Test Heads Overall: GTS has designed

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of September 24, 2014 (Information subject to editing)

NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of September 24, 2014 (Information subject to editing) NATIONAL TRANSPORTATION SAFETY BOARD Public Meeting of September 24, 2014 (Information subject to editing) Special Investigation Report: Railroad Roadway Worker Safety September 24, 2014 This is a synopsis

More information

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR

Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR Process Safety Management Of Highly Hazardous Chemicals OSHA 29 CFR 1910.119 PSM - Definition Not all refining hazards are caused by the same factors or involve ve the same degree of potential damage.

More information

Operating Committee Strategic Plan

Operating Committee Strategic Plan Operating Committee Strategic Plan September 2017 NERC Report Title Report Date I Table of Contents Preface... ii Introduction... iii Operating Committee Strategic Plan...1 Purpose of Strategic Plan...1

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) 1. An IU Slug Control Plan must include sufficient general information to enable the POTW to: (1) categorize and restrict

More information

System Pressure Manager Standard & System Pressure Manager Plus

System Pressure Manager Standard & System Pressure Manager Plus System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,

More information

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company

EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC. Tennessee Operations Eastman Chemical Company EXAMPLES OF COMPLIANCE METHODS FOR MONITORING AND RECORDKEEPING RCRA SUBPARTS BB AND CC Tennessee Operations Eastman Chemical Company 1 Tennessee Operations of Eastman Chemical Company Large Manufacturing

More information

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM

CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM CONTROL OF HAZARDOUS ENERGY LOCKOUT/TAGOUT PROGRAM 1.0 REGULATORY AUTHORITY Code of Federal Regulations, 29 CFR 1910.147; California Code of Regulations, Title 8, Sections 2320.1 and 3314; CSU, Fullerton

More information

Management of Change (MOC) Could Have Prevented Death

Management of Change (MOC) Could Have Prevented Death Management of Change (MOC) Could Have Prevented Death Lessons Learned Volume 03 Issue 16 2004 USW Management of Change (MOC) Could Have Prevented Death Purpose To conduct a small group lessons learned

More information

RULE 36 & H 2 S SAFETY

RULE 36 & H 2 S SAFETY OUTLINE OF RULE 36 RULE 36 & H 2 S SAFETY RULE 36 IS A SAFETY RULE DESIGNED TO PROTECT THE GENERAL PUBLIC FROM THE HAZARDS OF H 2 S RESULTING FROM INTENTIONAL AND ACCIDENTAL RELEASES. PROPERTIES OF H 2

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3788:2006 AS/NZS 3788:2006 Australian/New Zealand Standard Pressure equipment In-service inspection AS/NZS 3788:2006 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee

More information

Compressed Gases and Cryogens

Compressed Gases and Cryogens Compressed Gases and Cryogens University of Tennessee Safety Guide HM-011 Document Contact: EHS Date effective: January 1, 2009 Revision Date: October 1, 2015 Purpose This guideline adheres to the Occupational

More information

Gas Distribution Connection Forms

Gas Distribution Connection Forms Gas Distribution Connection Forms Updated on: 1 April 18 Gas Distribution Connection Forms S/No. Form No. Description 1 GDP101 Application for Gas Distribution Connection 2 GDP102 Consumer Project Data

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

ORDER: APPENDIX: 3 BULLETIN TYPE: Flight Standards Handbook Bulletin for Airworthiness (HBAW)

ORDER: APPENDIX: 3 BULLETIN TYPE: Flight Standards Handbook Bulletin for Airworthiness (HBAW) ORDER: 8300.10APPENDIX: 3 BULLETIN TYPE: Flight Standards Handbook Bulletin for Airworthiness (HBAW) BULLETIN NUMBER: BULLETIN TITLE: HBAW 02-01B (Amended) Maintenance of Pressure Cylinders in Use as Aircraft

More information

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT

CITY AND COUNTY OF DENVER POLICY DENVER FIRE DEPARTMENT Reference: IFC, Denver Amendments, NFPA Approved: Joseph L. Gonzales, Division Chief, Fire Prevention and Investigation Division Number: IFC- 3001-1 Effective Date: February 1, 2012 Page 1 of 5 This policy

More information

Item ID: Rev.: 00 Status: Final Effective Date: 29-Feb-2015 EXECUTIVE SUMMARY

Item ID: Rev.: 00 Status: Final Effective Date: 29-Feb-2015 EXECUTIVE SUMMARY EXECUTIVE SUMMARY The objective of this report is to demonstrate that sections of pipeline between MLV 401 and MLV 402 on the Canadian Mainline Line 400-2 meet the applicable requirements in CSA Z662-15

More information

Written Programs Listing

Written Programs Listing Written Programs Listing Bloodborne Pathogens (BBP) (29CFR1910.1030) This standard requires that precautions be taken to prevent the transmission of bloodborne pathogens. Viruses and bacteria can be found

More information

Texas Administrative Code

Texas Administrative Code TITLE 16 PART 1 CHAPTER 3 RULE 3.13 Texas Administrative Code ECONOMIC REGULATION RAILROAD COMMISSION OF TEXAS OIL AND GAS DIVISION Casing, Cementing, Drilling, Well Control, and Completion Requirements

More information

Bladder Damper PP/PVC

Bladder Damper PP/PVC Operating instructions Bladder Damper PP/PVC EN Please carefully read these operating instructions before use. Do not discard. The operator shall be liable for any damage caused by installation or operating

More information

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157 1 of 6 1.0 PURPOSE To establish minimum requirements and guidelines for controlling hazardous exposure of personnel to falls from working elevations in conformance with Federal and State OSHA rules and

More information

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012

Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012 Student Pedestrian Safety Fiddlers Canyon Elementary Community Council 2012 Introduction Fiddlers Canyon Elementary students must cross North Wedgewood Lane and Fiddlers Canyon Drive in order to come to

More information

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001

Investigation of Loss of Well Control Eugene Island Block 277 OCS-G Well A-2 Off the Louisiana Coast July 6, 2001 OCS Report MMS 2002-040 Investigation of Loss of Well Control Eugene Island Block 277 OCS-G 10744 Well A-2 Off the Louisiana Coast July 6, 2001 U.S. Department of the Interior Minerals Management Service

More information

Series Confined Space Rescue - Draft Page 1 of 6 Adopted: Revised: INCIDENT MANAGEMENT SYSTEM AND TACTICAL OPERATIONS MANUAL

Series Confined Space Rescue - Draft Page 1 of 6 Adopted: Revised: INCIDENT MANAGEMENT SYSTEM AND TACTICAL OPERATIONS MANUAL Series 387 - Confined Space Rescue - Draft Page 1 of 6 INCIDENT MANAGEMENT SYSTEM AND TACTICAL OPERATIONS MANUAL SERIES 387 PURPOSE OPERATIONAL GUIDELINE CONFINED SPACE RESCUE To establish guidelines relative

More information

Incident Investigation AEGIS Insurance Services, Inc. All rights reserved.

Incident Investigation AEGIS Insurance Services, Inc. All rights reserved. Incident Investigation. 1 Discussion Items AEGIS Loss Control Loss Data 2007-2016 Definition of an Incident Incident Investigation Is the Emergency Over? Lessons Learned Practice AEGIS Background Information

More information

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017 INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL Graça Bravo 26th September 2017 SUMMARY 1. IDENTIFICATION OF THE LPG ESTABLISHMENTS 2. GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 3. INSPECTION SUPPORTING

More information

Overview Assessment of the 16 Inch Diameter Olympic Pipeline Integrity

Overview Assessment of the 16 Inch Diameter Olympic Pipeline Integrity Report on Overview Assessment of the 16 Inch Diameter Olympic Pipeline Integrity to City-County Pipeline Safety Consortium of Washington November, 2001 by Bob Eiber Robert J. Eiber, Consultant Inc. 4062

More information