TECHNICAL SCHEDULE TS16 SMOKE VENTS

Size: px
Start display at page:

Download "TECHNICAL SCHEDULE TS16 SMOKE VENTS"

Transcription

1 TECHNICAL SCHEDULE TS16 SMOKE VENTS Page 1 of 25 This document is the exclusive property of. It shall

2 CONTENTS ISSUE STATUS AND AMENDMENT 3 FOREWORD 5 1 SCOPE 6 2 REFERENCES 6 3 APPRAISAL 7 4 DEFINTIONS 8 5 GENERAL REQUIREMENTS 9 6 CONSTRUCTION & DESIGN PARAMETERS 9 7 TEST PROCEDURES 12 ANNEX A Factory Production Control Checklist 13 ANNEX B Temperature Rise & Expansion Test 17 ANNEX C Fire Test 20 ANNEX D Coefficient of Discharge Test 23 ANNEX E Participating Organisations 25 Page 2 of 25 This document is the exclusive property of. It shall

3 ISSUE STATUS AND AMENDMENT i. This is a controlled copy of the. Scheme members to which it has been issued will be provided with details of any changes in accordance with the amendment procedure below. ii. iii. iv. From here on in, references to will be shown as. Each page of the document is identified by a page number, issue number and date. Where an amendment is made, the revised page will bear a new issue number and date of amendment. Where an amendment requires an extra page to be inserted, this is numbered with the number of the preceding page but with the addition of a letter suffix, e.g. 10A will be inserted between pages 10 and 11 and 10B will follow 10A. The new pages are dated in the normal way. v. Any amendment to this document will be identified on the Amendment Page, which will be re-issued to holders of controlled copies with the amended sections/pages. Revised pages shall be inserted in place of existing pages or between existing pages and superseded pages shall be discarded. Where a significant number of amendments are made to this document the entire document will be re-issued under a new issue number. In such cases holders of the document shall destroy the previous issue. vi. vii. The Amendment Page and the relevant revised pages will be produced by Warrington Certification following agreement with the Sector Liaison Group, and issued to the holders of each controlled copy of the document, together with an acknowledgment slip (document transmittal) which shall be signed and returned to to confirm that the document has been amended. It shall be the responsibility of the nominated representative of the organisation to ensure that the document is maintained in an up to date condition at all times. To ensure that a permanent record is available of all amendments, Warrington Certification maintains a file of all superseded pages which are marked with the date of withdrawal. The record is held on file indefinitely in order to allow to determine the past requirements of the scheme at any time. Page 3 of 25 This document is the exclusive property of. It shall

4 AMENDMENT PAGE To ensure that each controlled copy of this contains a complete record of amendments, the Amendment Page is updated and issued with each set of revised/new pages of the document. Details of the procedures for amending this document are given in section 1 of this document. Amendment Discard Insert No Date *Sections Changed Page(s) Issue no Page(s) Issue no All- Updated to new format, also to include references to BS EN ISO/IEC and ISO Management Council renamed to Impartiality Committee Name change from WCL to Exova (UK) Limited trading as All 2 All 3 All 3 All 4 Page 4 of 25 This document is the exclusive property of. It shall

5 TECHNICAL SCHEDULE (TS 16) SMOKE VENTS FOREWORD This (TS) forms part of a series of controlled documents which comprise the CERTIFIRE product certification scheme. It has been prepared in accordance with the requirements of BS EN ISO IEC for product certification bodies. In addition to this Schedule the other controlled documents relevant to CERTFIRE certification are: TS00 - General Requirements for CERTIFIRE Certification of Passive Fire Protection Products/Systems CERTIFIRE Quality Manual Certificates in the CF000 series, together with any appendices Documentation from the manufacturer Rules for use of the CERTIFIRE logo This CERTIFIRE scheme aims to provide confidence that installed fire resisting pedestrian doorsets and door assemblies used with the appropriate building hardware, seals and glass and glazing systems will be capable of achieving the designated fire resistance level and also to demonstrate compliance with performance specifications. This document is intended for the certification of all pedestrian fire resisting doors and doorsets. It has been prepared and agreed by the organisations listed in Annex G and is in accordance with the requirements of BS EN ISO IEC Page 5 of 25 This document is the exclusive property of. It shall

6 1. SCOPE This relates to the CERTIFIRE system for the appraisal of natural smoke and heat exhaust ventilators (fire vents) designed to provide exhaust ventilation of smoke and heat in the case of fire. The detailed scope of CERTIFIRE approval is given in the Appendices associated with the Certificate of approval. Smoke and heat exhaust ventilators should only be installed as part of a properly designed smoke and heat exhaust system. Assessment of a smoke and heat exhaust ventilator under the CERTIFIRE system is not an assessment of a complete smoke and heat ventilation system. 2. REFERENCES EN Standards are published by National Standards body and may include National Annexes. For CERTIFIRE purposes the definitive version of any EN standard is that published by BSi and prefixed BS EN. References contained in TS00 may also be relevant. BS 476: Part 5 BS 476: Part 7 BS 476: Part 20: BS 970: Part 1 BS EN ISO IEC ISO 9001 Fire tests on building materials and structures. Method of test for ignitability Fire tests on building materials and structures. Surface spread of flame tests for materials Fire tests on building materials and structures Specification for wrought steels for mechanical and allied engineering purposes. General inspection and testing procedures and specific requirements for carbon, carbon manganese, alloy and stainless steels Conformity assessment. Requirements for bodies certifying products, processes and services Model for quality assurance in design, development, production, installation and servicing Page 6 of 25 This document is the exclusive property of. It shall

7 3. APPRAISAL Appraisal will be based on information derived from the procedures and test specified in this document. Data from other sources may also be used if felt appropriate in forming an evaluation. Tests specified in the appendices to this document should be carried out at UKAS approved laboratories where possible. Where no UKAS approved laboratory is available, other laboratories approved by CERTIFIRE may be used. Where test and/or documentary evident is called for, test evidence should either be from tests carried out by an independent laboratory approve by CERTIFIRE or from tests witnessed by an assessor approved by CERTIFIRE. Note: The appraisal and test procedures described in this document are similar to those described in the Smoke Ventilation Association Specification of Requirements for Natural Smoke and Heat Exhaust Ventilators. Page 7 of 25 This document is the exclusive property of. It shall

8 4. DEFINITIONS Automatic Smoke and Heat Exhaust Ventilator A ventilator, that is fitted into a building, which is designed to open automatically after the outbreak of fire, to allow smoke and hot gases to escape. (These ventilators are sometimes referred to as Fire Ventilators). Dual Purpose Ventilator A smoke and heat exhaust ventilator which has been provided to allow its use for comfort ventilation. Natural Ventilation Ventilation that is caused by buoyancy forces due to difference in density of the air because of the effects of temperature differences. Measured Free Area The clear throat area of a natural heat and smoke exhaust ventilator. This is the smallest clear opening (normally between drainage channels) no reduction being made for controls, louvres or other obstructions. Aerodynamic Free Area The measured free area multiplied by the coefficient of discharge. Coefficient of Discharge The ratio of Actual Flow Rate to Theoretical Flow rate through the open ventilator. The Theoretical Flow Rate is the flow rate calculated for an obstructed opening with same measured free area. The Actual Flow Rate is that measured over a range of pressure differences across the ventilator in a suitable wind tunnel. The coefficient is a constant figure over the range of pressure differences. Page 8 of 25 This document is the exclusive property of. It shall

9 5. GENERAL REQUIREMENTS The performance of the ventilator will be assessed by the following methods: 5.1 Study of manufacturers design, construction methods, materials used and quality assurance methods (see Quality Assessment Schedule). It will be necessary for the vents to comply with the constructional and design parameters specified in this Technical Schedule. Suppliers may be required to furnish details of appropriate tests or other evidence to substantiate claims of compliance. 5.2 Test procedures shall be carried out by a laboratory accredited by UKAS for the purpose. Where such facilities are unavailable, tests may be undertaken by, or on behalf of, the firm manufacturing or supplying the ventilators using suitable test rigs with calibrated measuring and recording equipment. All such testing shall be either carried out at a laboratory approved by CERTIFIRE for that purpose or witnessed by an independent assessor recognised by CERTIFIRE as having competence in that area. Reports shall be appropriately endorsed by the witnessing assessor. 6. CONSTRUCTION AND DESIGN PARAMETERS 6.1 The ventilator shall be constructed so that when in use there is no possibility of flames or hot gases emerging from the ventilator being deflected downward onto the roof or adjacent structure. 6.2 The design of the ventilator and its proposed application must ensure that when in use, the component parts do not form a scoop which could deflect the wind from any direction into the ventilator opening. 6.3 The design of the ventilator must ensure that none of the component parts can reduce the ventilation opening if the ventilator disintegrates or collapses due to the effects of fire. This will be verified by the test described in Appendix The materials used in the construction of the ventilator shall not add to the fire risk of the building, nor materially contribute to a fire during use. Insulation materials, plastic louvres, flaps, sheets or slopes shall have a Class 1 spread of flame rating when tested in accordance with BS 476: Part 7 and be classified as not easily ignitable to BS 476: Part 5. The supplier will be required to provide documentary and/or test evidence to show compliance with this clause. Page 9 of 25 This document is the exclusive property of. It shall

10 6.5 The ventilator shall be constructed from materials resistant to natural atmospheric corrosion and sunlight. The materials shall be selected so as to prevent the possibility of galvanic corrosion between adjacent components. The supplier will be required to provide documentary and/or test evidence to show compliance with this clause. 6.6 The vent must be fitted with a means of automatically opening to vent hot smoke or air. This may take one of the following forms: a) A fusible link. The link shall be a single link mounted within the throat of the ventilator, the parting of which will release the opening flaps or louvres. Where double flaps are used in the construction these shall be operated by a single link. Unless an alternative temperature is specified, the link shall fuse at between 68 and 74 degrees C. b) Multiple control of several ventilators via a frangible bulb or fusible link/plug activated valve. The valve will be at high level and will release compressed air from pressurised pipework. Unless an alternative temperature is specified, the frangible bulb or fusible link/plug will break at between 68 and 74 degrees C. Loss of pressure in the pipework will automatically result in the opening of the ventilator. c) Automatic opening of the ventilator following an alarm condition initiated by an automatic heat or smoke detection system conforming to BS Ventilators with other methods of operation may be offered for assessment, but to be acceptable it will be necessary for their method of operation to be at least as reliable as one of the methods above. The supplier may be required to provide test and/or documentary evidence to show compliance with this clause Whatever automatic means of opening the ventilator is provided the ventilator system should be provided with manual overriding controls to allow fire brigade operation in a fire. 6.7 Cables or linkages for operating release mechanisms and fittings to which they are attached must be corrosion resistant (see clause 6.5) and be of adequate strength. Cables and linkages must be freely operable and there must be no possibility of them fouling the operation of the ventilator under normal or fire conditions. Cables should be Page 10 of 25 This document is the exclusive property of. It shall

11 manufactured from materials that do not take a permanent set. All springs shall be in stainless steel to a suitable specification such as BS 970: Part 1 grade Other types of device, such as gas springs, may also be used in place of tension and compression springs. 6.8 The ventilator shall be designed to open against and withstand without closing a side wind of 18m/s (Beaufort Force 8). The supplier may be required to provide documentary and/or test evidence to show compliance with this clause. 6.9 The ventilator shall be designed to ensure satisfactory operation throughout a life expectancy of at least 15 years. Where the ventilator is designed to provide ventilation under normal as well as fire conditions it shall be designed to be operated at least 30,000 times without developing any fault. Where the ventilator is used only as a fire ventilator, it shall be designed to be opened 2000 times without developing any fault. The supplier may be required to provide documentary and/or test evidence to show compliance with this clause The ventilator shall be designed so that it is not possible for sufficient water (including condensation), snow or ice to collect in or upon the ventilator (nor in or upon its operating mechanism) and thus render the ventilator inoperative. Insulated roof ventilators shall be designed to withstand a minimum snow load of 300N/m 2 and to be able to open against this load. Un-insulated roof ventilators shall be designed to withstand a minimum snowload of 125N/m 2 and be able to open against this load. The supplier will be required to provide documentary and/or test evidence to show compliance with this clause The ventilator shall be designed to withstand a minimum wind load of 2.4 kn/m 2 suction and pressure without permanent distortion or bucking. (If higher wind loads are likely to be imposed on the ventilator it shall be designed with withstand these). The supplier will be required to provide documentary and/or test evidence to show compliance with this clause. Page 11 of 25 This document is the exclusive property of. It shall

12 7. TEST PROCEDURES 7.1 A standard production ventilator shall be provided for test. If the ventilator belongs to a standard range then, subject to test rig limitations, the largest ventilator in the range should be tested. If a ventilator is designed to be used in both the horizontal and vertical position then two ventilators shall be provided to enable testing in both positions. A test on any one size of ventilator will allow an appraisal of other smaller ventilators of similar construction, but unless otherwise specified appraisals will not normally be possible on larger ventilators. 7.2 Visual Inspection and Documentation Check The ventilator shall be inspected to ensure that it complies with published descriptive data and documentation supplied with it, that it is a production sample, and is finished to an acceptable quality standard. Data supplied with the ventilator should include its coefficient of discharge when open and its air leakage coefficient when closed. Documentation should include a specimen service and maintenance contract (see Clause 7) and a Certificate of Compliance with the construction and design parameters in this document. 7.3 Temperature Rise and Expansion Test The ventilator will be required to pass the temperature rise and expansion test detailed in Appendix Fire Test The ventilator will be required to pass the fire test detailed in Appendix Coefficient of Discharge Test The coefficient of discharge test detailed in Appendix 4 will be undertaken on all sizes of ventilators within the product range for which approval is sought. The measured values of the coefficient will be stated in any approval certificate. Page 12 of 25 This document is the exclusive property of. It shall

13 APPENDIX A Checklist for Initial Inspection of Factory and Factory Production Control For CERTIFIRE Registration This checklist must be used in conjunction with the initial TS00 checklist. 2. SPECIFIC QUESTIONS Questions to be considered Q/M or Procedure Ref Inspector Comments: A How are any drawings controlled? How do the operators know they have the correct drawing issue? What records are generated? Page 13 of 25 This document is the exclusive property of. It shall

14 Questions to be considered B Do tests being carried out include: - Q/M or Procedure Ref Inspector Comments: Motor function Dimensions of laths Operation of curtain Closed Open C Review test records for recent (and current production). Do the findings of this review of records correlate with the requirements laid down in the company s technical specification for the product for type testing, and for testing for surveillance purposes of the FPC? Identify any anomalies found. Page 14 of 25 This document is the exclusive property of. It shall

15 Questions to be considered Q/M or Procedure Ref Inspector Comments: D Have labelling requirements for the finished product been agreed? How does manufacturer intend to apply any labels? What records does he intend to keep of labels used? Minimum 5 years Have these been approved by Exova Warrington Fire? E What installation instructions will be provided? Have these been approved by Bodycote Warrington Fire? Page 15 of 25 This document is the exclusive property of. It shall

16 Summary of Inspection Findings: Observations / Recommendations: List of Attachments: Non Conformances Raised: Signed by Inspector: Signed for client by: Reviewed by: (Office use only) Date: Date: Date: Page 16 of 25 This document is the exclusive property of. It shall

17 APPENDIX B TEMPERATURE RISE AND EXPANSION TEST A2.1 Objective A2.2 Scope This test simulates the rise in temperature above a developing fire and tests. a) The response of any heat sensitive detecting element of the ventilator to this rise in temperature b) The effects of expansion upon the construction Two sets of conditions are simulated: a) A slowly developing fire producing a slow rate of rise of temperature. b) A rapidly developing fire producing a rapid rate of rise of temperature. This test is applicable to ventilators having an integral heat sensitive detection element similar to that described on 6.7(a). Ventilators operated by separate detector system as described in 6.7(b) and 6.7 (c) shall be tested in accordance with this procedure using a manually operated means of trigger and actuation device. Suppliers of such ventilators may be required to submit test and/or documentary evidence that the detection systems intended to be used with their ventilators will perform equally satisfactorily as a ventilator with integral heat sensitive detectors which passes this test, but any appraisal of a ventilator with a non-integral detection system is not an appraisal of that detection system. A2.3 Temperature Rise Test Rig (Note: This rig can be the same as the Fire Test Rig - see Appendix 3). A2.3.1 The rig should consist of an open-top box constructed from non-combustible materials. A2.3.2 A horizontal ventilator to be tested should form part of the lid of the box. Any gap between the ventilator and the rig shall be sealed with suitable heat-resistant materials. Page 17 of 25 This document is the exclusive property of. It shall

18 A2.3.3 A vertical ventilator will need to be mounted in a specially constructed enclosure forming the lid of the box. The enclosure should have walls and roof constructed of noncombustible materials and all gaps between the ventilator and the enclosure, and the enclosure and the rig, should be sealed with suitable heat-resistant materials. A2.3.4 The rig should be provided with means of controlling the air temperature within the rig and the rate of rise of this air temperature. The temperature control of the rig should be such that the air temperature may be raised at 3 degrees C/min and at 30 degrees C/min with air temperature in the rig being at all times within plus or minus 2 degrees C of that required by the set rate of change of temperature. It should be possible to control the rate of rise of temperature as described at least over the range degrees C. A2.3.5 The air temperature in the rig should be measured by temperature measuring equipment (e.g. thermocouples) having a time constant not greater than 2s. The temperature measuring device(s) should be situated as close as possible to the heat detector/operating mechanism (e.g. fusible link) of the ventilator (where fitted). A2.3.6 As well as controlling the temperature in the rig via a temperature controller, the temperature measured by the temperature measuring device(s) should also be recorded against time, for example continuously on a chart recorder. If this temperature is to be recorded by a device measuring at set intervals of time (e.g. a data logger) these intervals should be no longer than 2s. A2.4 Test Procedure A2.4.1 With the ventilator in position, and the temperature recording equipment running, the air temperature in the rig shall be raised from ambient (25 degrees C maximum) at 3 degrees C/min until 65 0 C is reached. The air temperature shall be held at 65 0 C for 1 hour and then be increased at 3 degrees C/min until the heat sensitive device operates. Ventilators without an integral heat sensitive device shall be actuated manually 3 minutes after the initiation of the increase in temperature after 1 hour dwell period. Both the air temperature and the time at which the ventilator opens should be noted. In addition, any distortion or defect which impairs the operation of the ventilator should be noted. A2.4.2 When the ventilator has operated, the heating elements or burners should be switched off. The rig should then be allowed to cool to at least 25 degrees C and a new heat detector/operating mechanism fitted to the ventilator (where relevant). Page 18 of 25 This document is the exclusive property of. It shall

19 A2.4.3 The test should then be repeated as in A2.4.1 but this time with the air temperature raised at a rate of 30 degrees C/min until the heat sensitive device operates. Ventilators without an integral heat sensitive device shall be manually actuated 4 minutes after the start of the test. There is no 1 hour dwell period in this test. A2.5 Results A2.5.1 Full details of the ventilator under test should be recorded - this must include details of the heat detector operation mechanism (e.g. fusible link) and its temperature rating. A2.5.2 This report should state: a) The air temperature at which the ventilator operated b) The time since the beginning of the test when the ventilator operated c) The time since the beginning of the test at which the air temperature reached the stated operating temperature of the heat detector/operating mechanism or the temperature reached at the time of manual actuation. a-c should be recorded for both the slow and the rapid rate of rise of temperature tests. A2.5.3 Any distortion or defect which impaired the operation of the detector should be noted in the report. A2.6 To pass the test, the ventilator should: a) For both slow and rapid rate of rise of temperature tests have opened smoothly and swiftly to a fully open position so that there was no obstruction of passage of air through the ventilator at any time during the test. b) For the slow rate of rise of temperature test have opened within 3 minutes of the air temperature reaching the stated operating temperature of the heat detector/operating mechanism. c) For the rapid rate of rise of temperature test have opened within 90 seconds of the air temperature reaching the stated operating temperature of the heat detector/mechanism. Page 19 of 25 This document is the exclusive property of. It shall

20 APPENDIX C FIRE TEST A3.1 Objective To ensure that the ventilator opens under fire conditions and also to ensure that during the course of a fire the ventilator throat area does not reduce the available airway for smoke release. A3.2 Scope The test can be used for ventilators incorporating any of the detection and operating mechanisms described in 6.6. However, if the detection mechanism is not integral with the ventilator (as in 6.6(b) and 6.6(c)) it is not practical for the detection mechanism to be incorporated into the test. In such cases operation of the ventilator can be manually initiated provided this is done in a similar way to operation under fire conditions (e.g. air may be released from a compressed air line to simulate the breaking of a frangible bulb or an electric signal may be used to simulate the operation of an electric heat or smoke detection system). Nevertheless, any test and subsequent appraisal of a ventilator with a non-integral detection mechanism is not an appraisal of the detection mechanism. The ventilator should be tested at maximum size subject to maximum dimensions of 1.2 x 1.2m. Testing of ventilators of this size will permit appraisal of larger ventilators of similar construction. A3.3 Fire Test Rig (Note: this rig can be the same rig as tat used in the Temperature Rise and Expansion Test - see Appendix 2). A3.3.1 The test is to be carried out on a suitable rig. The rig should be constructed of noncombustible materials and be large enough to accommodate the test ventilator. Also, the rig design should ensure that adequate air for combustion is always available. A3.3.2 The air temperature in the rig should be measured by temperature measuring equipment (e.g. thermocouples) having a time constant not greater than 2s. The temperature measuring device should be situated: a) As close as possible to the heat detecting/operating mechanism (where applicable) b) Centrally immediately below the ventilator (horizontally mounted ventilators) Page 20 of 25 c) Centrally immediately adjacent to the bottom and the top of the ventilator (vertically mounted ventilators). This document is the exclusive property of. It shall

21 A3.3.3 The temperature measured by the temperature measuring device(s) should be recorded against time, for example continuously on a chart recorder. If this temperature is to be recorded by a device measuring at set intervals of time (e.g. a data logger) these intervals should be no longer than 2s. A3.4 Test Procedures A3.4.1 The ventilator should be set up in the rig as described in A3.3. The ambient temperature of the rig should be no greater than 25 0 C. A3.4.2 The burners or heating elements shall be such as to provide a temperature regime at least as severe as that described by the time/temperature curve of BS 476: Part 20 (i.e. the time/temperature curve of BS 476: Part 20 is the minimum acceptable heating regime) the test shall be for a minimum period of 10 minutes. A3.4.3 If the opening of the ventilator is to be initiated manually as described in A3.2 this should be done when the air temperature reaches 100 degrees C. A3.4.4 The ventilator under test should be observed throughout the test and anything that may effect the successful operation of the ventilator should be noted. A3.4.5 On completion of the test the ventilator should be allowed to cool and then examined to ensure that the fire/heat has not caused any blockage of the airway, thus reducing its efficiency in the release of smoke and hot gases. A3.5 Results A3.5.1 Full details of the ventilator under test should be recorded - this must include details of the heat sensitive/detector mechanism (i.e. fusible link, and its rating). If opening of the ventilator was initiated manually as described in A3.2, this should clearly be stated, including details of the exact method used. A3.5.2 The report should state the time, after ignition, that the ventilator opened, an any other observations, with the relevant times, noted during the course of the test. A3.5.3 A graph of time against air temperature should be drawn and, if required, graphs of any other temperatures measured. The temperature at which the ventilator opened should be noted in the report. A3.5.4 Any structural damage to the ventilator should also be stated and whether or not this influenced the release of smoke and/or hot gasses. Page 21 of 25 This document is the exclusive property of. It shall

22 A3.5.5 Finally, the report should state whether the ventilator passed or failed the test. A ventilator will have failed the test if: a) It failed to open b) It failed to open fully, or having opened, it reclosed or partially closed subsequently c) The ventilator area became blocked or partially blocked after the ventilator had opened d) When open, the ventilator because of its design: i) Disturbed the free flow of smoke and hot gasses from the rig ii) Deflected smoke and/or hot air downwards onto the roof of the rig. Note: If the ventilator failed the test because of (b) or (c), the supplier has the right to retest the ventilator to determine the partially closed/blocked coefficient of discharge. Two further ventilators must then be fully tested in accordance with A3.4. After this test, these also shall be discharge coefficient tested and the lowest coefficient of all three ventilators will be that described in the CERTIFIRE Certificate. Under these conditions the ventilator will be said to have a qualified pass. Page 22 of 25 This document is the exclusive property of. It shall

23 A4.1 Objective A4.2 Scope APPENDIX D COEFFICIENT OF DISCHARGE TEST This test is to determine the coefficient of discharge of the ventilator so that the aerodynamic free area can be calculated for scheme design. This test is to be used for all natural smoke and heat exhaust ventilators. A4.3 Apparatus/Equipment Required A4.3.1 The test is to be carried out in a suitable wind tunnel with the facility to cater for a range of air flow rates and pressures. The face of the tunnel should be a minimum of 3.3m x 2.0m to allow for the fitting of the largest size test ventilator. A4.3.2 The open ventilator should be mounted into the face of the tunnel with a minimum of 1/6 of the throat width each side and 1/6 of the throat length top and bottom. This is to ensure that status pressure tappings inside the tunnel are not disturbed by the airflow. The airflow must be in the correct direction. A4.3.3 There must be a minimum clear space in front of the tunnel equal to 1.5 times the largest throat dimension of the ventilator. There must be a minimum clear distance inside the tunnel (i.e. from the ventilator to the beginning of any narrowing of the tunnel) either equal to 1.5 the largest throat dimension of the ventilator or 2 meters whichever is the smaller. A4.3.4 A suitable manometer must be used to measure the static pressures inside the tunnel. A suitable barometer must be used to measure static pressure outside the tunnel. A4.3.5 A suitable method, such as a calibrated orifice plate or a Pitot tube scan, must be used to accurately measure the airflow s through the ventilator. Page 23 of 25 This document is the exclusive property of. It shall

24 A4.4 Test Procedure A4.4.1 The fan driving the tunnel should be operated to produce a range of different airflow s through the ventilator. The static pressure, barometer pressure, airflow and ambient temperature must be recorded for each flow rate. Six sets of readings should be taken evenly spaced across the range Pa static pressure difference across the ventilator. From these readings the coefficient of discharge of the ventilator can be calculated using the formula:- cd = Qn At ( 2Ps/ ) ½ where cd = coefficient of discharge Qn = airflow rate at pressure difference Ps At = measured free area Ps = pressure difference across the ventilator = air density at measured ambient temperature and pressure Qn and Ps should be obtained from the best straight line produced graphically or mathematically from a plot of Qn 2 against Ps using actual measured values of Qn and Ps. A4.5 Results A4.5.1 Full details of the ventilator under test must be recorded, this must include details of the size and type, the measurements recorded during the tests, and the calculations to determine the coefficient of discharge. Page 24 of 25 This document is the exclusive property of. It shall

25 ANNEX E PARTICIPATING ORGANISATIONS BODIES AUTHORISED TO OPERATE CERTIFICATION TO THE PROVISIONS OF THIS SCHEDULE THIS SCHEDULE IS RATIFIED BY MEMBERS OF THE WARRINGTON CERTIFICATION IMPARTIALITY COMMITTEE Association for Specialist Fire Protection (ASFP) British Automatic Fire Sprinkler Association (BAFSA) British Retail Consortium (BRC) British Woodworking Federation (BWF) Chief Fire Officers Association (CFOA) Construction Products Association (CPA) Department of Communities and Local Government (DCLG) Door and Hardware Federation (DHF) Fire Protection Association (FPA) Glass and Glazing Federation (GGF) Guild of Architectural Ironmongers (GAI) Institute of Fire Prevention Officers (IFPO) Institute of Fire Safety Manager (IFSM) London Underground Limited (LUL) Royal Institute of Chartered Surveyors (RICS) RISC Authority Secured By Design (SBD) Local Authority Building Control (LABC) Exova Warringtonfire (EWF) Users of documents are reminded that copyright exists in all CERTIFIRE publications. No part of this publication may be reproduced in any form without prior permission in writing from Warrington Certification. Permission to copy this document for internal use and promotional purposes only is automatically granted to companies holding CERTIFIRE certification. Such copies are uncontrolled and this status should be identified on each copy Copyright Holmesfield Road, Warrington, Cheshire, WA1 2DS Reg. Office: Exova (UK) Limited, Lochend Industrial Estate, Newbridge, Midlothian EH28 8PL United Kingdom. Tel: +44 (0) EWCL@exova.com Website: Page 25 of 25 This document is the exclusive property of. It shall

Title: The Air Leakage Performance of Timber Doorsets fitted with NOR710 Series Smoke Seals in Accordance with BS 476: Part 31, Section 31.

Title: The Air Leakage Performance of Timber Doorsets fitted with NOR710 Series Smoke Seals in Accordance with BS 476: Part 31, Section 31. Exova Warringtonfire Holmesfield Road Warrington WA1 2DS United Kingdom T : +44 (0) 1925 655 116 F : +44 (0) 1925 655 419 E : warrington@exova.com W: www.exova.com Title: The Air Leakage Performance of

More information

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs)

Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 Edition 4 December 2018 Accreditation for In-Service Inspection of Transportable Pressure Receptacles (TPRs) RG 3 / Edition: 4 Page 1 of 8 Contents 1. Introduction 2 2. Scope - Inspection Services

More information

BS EN ISO : 1999

BS EN ISO : 1999 Exova Warringtonfire Holmesfield Road Warrington WA1 2DS United Kingdom T : +44 (0 1925 655116 F : +44 (0) 1925 655419 E : warrington@exova.com W: www.exova.com BS EN ISO 4589-2: 1999 Determination of

More information

Smoke and heat Ventilator Testing

Smoke and heat Ventilator Testing Instituut vir Termodinamika en Meganika Institute for Thermodynamics and Mechanics Smoke and heat Ventilator Testing by CJ Zietsman and GR Smith November 2005 Departement Meganiese Ingenieurswese Privaat

More information

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS

BRITISH STANDARD BS 341-4: Transportable gas container valves. Part 4: Pressure relief devices ICS BRITISH STANDARD BS 341-4:2004 Transportable gas container valves Part 4: Pressure relief devices ICS 23.060.40 This British Standard, having been prepared under the direction of the Standards Policy and

More information

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification.

VENTILATOR OPTIONS. Please visit our web page to view all the available options and for a specification. Seefire Natural Louvred Ventilator Seefire is a natural louvred ventilator that is available in a wide range of sizes, louvre options and control options. Seefire has been exhaustively tested and certified

More information

Method Statement: Testing Dry Riser System

Method Statement: Testing Dry Riser System Method Statement: Testing Dry Riser System Page 1 of 6 Scope of work Test dry riser system in accordance with BS 5306. Definitions For the purposes of this document, the following definitions apply Rising

More information

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE

Government of Bermuda Department of Maritime Administration BERMUDA SHIPPING NOTICE Government of Bermuda Department of Maritime Administration 2015 027 BERMUDA SHIPPING NOTICE Maintenance and Inspection of Fixed Carbon Dioxide Fire Extinguishing Systems Ref: SOLAS 74/88 as amended, Regulation

More information

Type Testing Procedure for Crankcase Explosion Relief Valves

Type Testing Procedure for Crankcase Explosion Relief Valves (Jan 2005) (Corr.1 Nov 2005) (Rev.1 Oct 2006) (Corr.1 Mar 2007) (Rev.2 Sept 2007) (Corr.1 Oct 2007) (Rev.3 Jan 2008) Type Testing Procedure for Crankcase Explosion Relief Valves 1. Scope 1.1 To specify

More information

Guidance on room integrity testing and its interpretation

Guidance on room integrity testing and its interpretation Guidance Note Guidance on room integrity testing and its interpretation Guidance on room integrity testing and its interpretation 1. SCOPE... 6 2. INTRODUCTION AND BACKGROUND... 6 2.1. DEVELOPMENT OF INTEGRITY

More information

DNVGL-CP-0187 Edition March 2016

DNVGL-CP-0187 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0187 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

AMT-Ex Dewpoint Transmitter

AMT-Ex Dewpoint Transmitter AMT-Ex Dewpoint Transmitter Instruction Manual Alpha Moisture Systems Alpha House 96 City Road Bradford BD8 8ES England Tel: +44 1274 733100 Fax: +44 1274 733200 email: mail@amsytems.co.uk web: www.amsystems.co.uk

More information

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service

GUIDELINES. Systems. Pressure. Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service GUIDELINES Pressure Systems Guidelines Acceptance of equipment, establishment of safe operating limits and fitness for service Document Reference: PSG 16 Issue 04 Dated 13/09/16 The Safety Assessment Federation

More information

CAST IRON SAFETY VALVE TYPE 6301

CAST IRON SAFETY VALVE TYPE 6301 CHARACTERISTICS The 6301 safety valve is dedicated to protect the equipment from potential overpressure. This is an automatic device that closes when the pressure conditions are back to normal. It is a

More information

CERTIFICATE OF APPROVAL No ME 5088

CERTIFICATE OF APPROVAL No ME 5088 CERTIFICATE OF APPROVAL No ME 5088 1 Unit C, Alexander Bell Centre, Hopkinson Way, West Portway Business Park, Andover, Hampshire, SP10 3UR Tel: 01264 333305 Have been assessed against the requirements

More information

Air Leakage Detailing & Awareness Services

Air Leakage Detailing & Awareness Services Tel: 08456 808048 Mob: 07866 948200 www.aldas.co.uk Info@aldas.co.uk Report on the Repeat Air Permeability Testing of the Passivhaus Refurbishment of: 57 Portfield Street, Hereford 16 th July 2010 Address:

More information

CORESTA RECOMMENDED METHOD N 6

CORESTA RECOMMENDED METHOD N 6 CORESTA RECOMMENDED METHOD N 6 DETERMINATION OF VENTILATION DEFINITIONS AND MEASUREMENT PRINCIPLES (2015 Revision September 2016) 1. SCOPE This CORESTA Recommended Method specifies a method for the determination

More information

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7 Page 2 of 22 CONTENTS 1. INTRODUCTION...3 2. DESCRIPTION OF TEST SAMPLE...4 3. TEST RIG GENERAL ARRANGEMENT...6 4. TEST SEQUENCE...7 5. SUMMARY AND CLASSIFICATION OF TEST RESULTS...8 6. WATERTIGHTNESS

More information

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems

ISO INTERNATIONAL STANDARD. Small craft Liquefied petroleum gas (LPG) systems INTERNATIONAL STANDARD ISO 10239 Second edition 2008-02-15 Small craft Liquefied petroleum gas (LPG) systems Petits navires Installations alimentées en gaz de pétrole liquéfiés (GPL) Reference number ISO

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1048 - REVISED: 2009 Double Check Detector Fire Protection Backflow Prevention Assemblies Separate, complete laboratory

More information

BCGA GUIDANCE NOTE 17

BCGA GUIDANCE NOTE 17 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF THIRD-PARTY OWNED AND / OR MAINTAINED TANKS Revision 2: 2013 BCGA GUIDANCE NOTE 17 BCGA POLICY AND GUIDANCE FOR THE SAFE FILLING OF

More information

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society

Guideline No.M-05(201510) M-05 AIR COMPRESSOR. Issued date: 20 October China Classification Society Guideline No.M-05(201510) M-05 AIR COMPRESSOR Issued date: 20 October 2015 China Classification Society Foreword This Guideline constitutes the CCS rules, and establishes the applicable technical requirements

More information

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four

GM/GN2646. Guidance on Axle Bearing Maintenance. Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue Four GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GM/GN2646 Issue One: March 2011 Rail Industry Guidance Note for GM/RT2004 Issue

More information

CalCheck. Instrument User Manual V1.8

CalCheck. Instrument User Manual V1.8 CalCheck Instrument User Manual V1.8 Unrivalled Part number: 21518 Detection. Part number: 21518 Declaration of conformity Manufacturer:, The Way, Fowlmere, Cambridge, England. SG8 7UJ Product: CalCheck

More information

SUMMARY STEPS TO CERTIFY AIRFLOW MEASUREMENT PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM

SUMMARY STEPS TO CERTIFY AIRFLOW MEASUREMENT PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM AMCA International Member Logo cannot be used in catalogs containing performance data. AMCA International Corporate Identity Logo can only be used by AMCA International, Inc. SUMMARY STEPS TO CERTIFY AIRFLOW

More information

ASSE International Product (Seal) Listing Program

ASSE International Product (Seal) Listing Program ASSE International Product (Seal) Listing Program ASSE 1070-2015 / ASME A112.1070-2015 / CSA B125.70-15 Performance Requirements for Water Temperature Limiting Devices Manufacturer: Contact Person: E-mail:

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland

SUP 15 Health & Safety Management Pressure Systems. Unified procedures for use within NHS Scotland SUP 15 Health & Safety Management Pressure Systems Unified procedures for use within NHS Scotland September 2015 Contents Page Acknowledgements... 3 1. Introduction... 4 2. Purpose of this Procedure...

More information

NSAI Agrément Approval Scheme for. Certified Air Tightness Tester Scheme Master Document

NSAI Agrément Approval Scheme for. Certified Air Tightness Tester Scheme Master Document NSAI Agrément Document Title Air Tightness Tester Page Page 1 of 10 Scheme NSAI Agrément Approval Scheme for Certified Master Document to I.S. EN ISO 9972:2015 - Thermal Performance of Buildings - Determination

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 8655-4 First edition 2002-09-15 Piston-operated volumetric apparatus Part 4: Dilutors Appareils volumétriques à piston Partie 4: Diluteurs Reference number ISO 8655-4:2002(E)

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR WATER HEATER SUPPLY SHUTOFF VALVE WITH A / THERMAL EXPANSION CONTROL VALVE IGC 128-2006a8 1. PURPOSE 1.1 The purpose

More information

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073

Operating instructions Safety Rope Emergency Stop Switches ZB0052 / ZB0053 ZB0072 / ZB0073 Operating instructions Safety Rope Emergency Stop Switches UK ZB0052 / ZB0053 ZB0072 / ZB0073 7390878 / 02 03 / 2011 Contents 1 Safety instructions...3 2 Installation / set-up...4 2.1 Applications...4

More information

Reg No: 1999/027771/07 ACCREDITED AND APPROVED TEST LABORATORY IN TERMS OF ARP 0108: REGULATORY REQUIREMENTS FOR EXPLOSION PROTECTED APPARATUS

Reg No: 1999/027771/07 ACCREDITED AND APPROVED TEST LABORATORY IN TERMS OF ARP 0108: REGULATORY REQUIREMENTS FOR EXPLOSION PROTECTED APPARATUS Government Approved Test Laboratory (Previously AIA) Reg No: 1999/027771/07 ACCREDITED AND APPROVED TEST LABORATORY IN TERMS OF ARP 0108: REGULATORY REQUIREMENTS FOR EXPLOSION PROTECTED APPARATUS ZEST

More information

CERTIFICATE OF APPROVAL No CF 877 ZOO HARDWARE LIMITED

CERTIFICATE OF APPROVAL No CF 877 ZOO HARDWARE LIMITED CERTIFICATE OF APPROVAL No CF 877 1 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of Unit B, Dukes Drive,

More information

6301 TYPE CAST IRON SAFETY VALVES

6301 TYPE CAST IRON SAFETY VALVES Pressure (bar) 6301 TYPE CAST IRON SAFETY VALVES FEATURES The 6301 type safety valve is a device designed to protect installations against possible overpressure. It operates automatically and closes when

More information

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints

P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Guideline No.P-04 (201510) P-04 Stainless Steel Corrugated Hoses and Metal Bellows Expansion Joints Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS

More information

INSPECTORATE FOR DIVING EQUIPMENT SERVICING & TESTING CODE OF PRACTICE CP11:2011

INSPECTORATE FOR DIVING EQUIPMENT SERVICING & TESTING CODE OF PRACTICE CP11:2011 D003 INSPECTORATE FOR DIVING EQUIPMENT SERVICING & TESTING CODE OF PRACTICE CP11:2011 For INSPECTING and TESTING Transportable Pressure Receptacles (Cylinders) for Breathing Gases manufactured from Steel

More information

ARCHIVED. Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source. Prepared by the Department of Building and Housing

ARCHIVED. Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source. Prepared by the Department of Building and Housing Compliance Document for New Zealand Building Code Clause G11 Gas as an Energy Source Prepared by the Department of Building and Housing This Compliance Document is prepared by the Department of Building

More information

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE PRODUCT CONFORMITY CERTIFICATE This is to certify that the Endura AZ20 / AZ30 measuring system Manufactured by: ABB Ltd Oldends Lane Stonehouse Gloucestershire GL10 3TA has been assessed by Sira Certification

More information

Test Report. Test Report Smart Systems Limited Incorporating Smart Extrusions. Page 1 of 78

Test Report. Test Report Smart Systems Limited Incorporating Smart Extrusions. Page 1 of 78 Test Report 8365614. Smart Systems Limited Incorporating Smart Extrusions Page 1 of 78 Introduction. This report has been prepared by Adam Pearce and relates to the activity detailed below: Job/Registration

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 24431 Second edition 2016-11-01 Gas cylinders Seamless, welded and composite cylinders for compressed and liquefied gases (excluding acetylene) Inspection at time of filling

More information

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group Pressure I. MISCELLANEOUS Guideline I-01 Guideline related to: Article 4 paragraph 3 What is to be understood by "sound engineering practice"? Sound engineering practice means, without prejudice to Article 5, paragraph

More information

WP2 Fire test for toxicity of fire effluents

WP2 Fire test for toxicity of fire effluents Pagina 3 di 89 TRA SFEU VTT 22.6.2009 v.2 WP2 Fire test for toxicity of fire effluents Task 2.1.2 Development of small-scale test method for fire effluents Step 1: Use of modeling Plans according to DoW:

More information

IA CERTIFICATE (Revision 3 Revised for Annual Review) Hazel Grove Stockport Cheshire SK14 6NG United Kingdom

IA CERTIFICATE (Revision 3 Revised for Annual Review) Hazel Grove Stockport Cheshire SK14 6NG United Kingdom Certificate Number: MASC MS/11-358X Issued: 22 September 2014 Expire: 22 September 2015 Page: 1 of 5 IA CERTIFICATE (Revision 3 Revised for Annual Review) IN TERMS OF REGULATION 21.17.2 OF THE MINERALS

More information

LEGIONELLA MANAGEMENT PROCEDURE

LEGIONELLA MANAGEMENT PROCEDURE LEGIONELLA MANAGEMENT PROCEDURE This procedure sets out the aims and objectives of the school and outlines responsibilities for managing the risk of exposure to legionella. General Statement of Intent

More information

ISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves

ISO INTERNATIONAL STANDARD. Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves INTERNATIONAL STANDARD ISO 21013-1 First edition 2008-06-15 Cryogenic vessels Pressure-relief accessories for cryogenic service Part 1: Reclosable pressure-relief valves Récipients cryogéniques Dispositifs

More information

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1

HANDBOOK SAFETY DEVICES. Ed SAFETY DEVICES DS-ED 01/ ENG 1 HANDBOOK Ed. 2017 DS-ED 01/2017 - ENG 1 CHAPTER 9 BURSTING DISC DEVICES IN SERIES 3070 SCOPE Use: protection against possible overpressure of the apparatuses listed below, with regard to the operating

More information

1811G/H PITOT-STATIC TEST SET

1811G/H PITOT-STATIC TEST SET 1811G/H PITOT-STATIC TEST SET USER INSTRUCTION MANUAL M/N: 1811G/H, P/Ns: 101-00165 101-00168 101-00169 Doc. P/N: 56-101-00165_00168_00169 Revision C December 9, 2014 BARFIELD, INC. Corporate Headquarters

More information

Pressure Systems Safety Regulation

Pressure Systems Safety Regulation Pressure Systems Safety Regulation Introduction This document informs Faculty of the key requirements of the UK and Chinese Pressure Systems Safety regulations. The aim of these regulations is to prevent

More information

Intertek Testing Services Taiwan Ltd.

Intertek Testing Services Taiwan Ltd. 1) The testing results relate only to the items tested. Page 2 of 21 2) The test report shall not be reproduced except in full, without written approval of the laboratory. 3) This test report only allows

More information

ST/SG/AC.10/C.3/2016/8. Secretariat. United Nations. Transport of gas tanks for motor vehicles. Introduction

ST/SG/AC.10/C.3/2016/8. Secretariat. United Nations. Transport of gas tanks for motor vehicles. Introduction United Nations Secretariat Distr.: General 29 March 2016 ST/SG/AC.10/C.3/2016/8 Original: English Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification

More information

Loss Prevention Standard

Loss Prevention Standard Loss Prevention Standard LPS 1186: Issue 3.1 Requirements and testing methods for check valves This standard specifies the design and performance requirements for check valves used in wet automatic sprinkler

More information

The evolution of the Ex-proof flame path

The evolution of the Ex-proof flame path April 2017 The evolution of the Ex-proof flame path As written in previous dissertation, the most critical part of a flameproof enclosure 'Ex d' is the flame path. Although the Standards are divided into

More information

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English

Steam Trap BK 15 (DN40, DN 50) Original Installation Instructions English Steam Trap BK 15 (DN40, DN 50) EN English Original Installation Instructions 810682-03 1 Contents Page Important Notes Usage for the intended purpose... 4 Safety note... 4 Danger... 4 Attention... 4 Application

More information

Fire Safety Hot Work Permit Policy/ Procedures

Fire Safety Hot Work Permit Policy/ Procedures Fire Safety Hot Work Permit Policy/ Procedures INTRODUCTION Serious fires frequently occur during maintenance and construction operations, where work is proceeding on either machinery, plant or the fabric

More information

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013

Changes to the Gas. (Safety and Measurement) Regulations. effective 1 July 2013 Changes to the Gas (Safety and Measurement) Regulations effective 1 July 2013 www.energysafety.govt.nz www.pgdb.co.nz www.standards.co.nz Changes to the gas certification regime under the Gas (Safety and

More information

Specification For Water Meters. Pr10068

Specification For Water Meters. Pr10068 Specification For Water Meters Pr10068 Documents Details This document is only valid on the day it was printed. Version Review Revision Date issued Reviewed by Approved by Date approved Revision type 0.1

More information

Transferring and Storage

Transferring and Storage Organometallics Transferring and Storage A dip tube is available for Container 2 which can be screwed into the neck to permit safe transfer of product. Small quantities of metal alkyl can be withdrawn

More information

SUMMARY STEPS TO CERTIFY ACOUSTIC DUCT SILENCER PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM

SUMMARY STEPS TO CERTIFY ACOUSTIC DUCT SILENCER PERFORMANCE UNDER AMCA INTERNATIONAL S CERTIFIED RATINGS PROGRAM AMCA International Member Logo cannot be used in catalogs containing performance data. AMCA International Corporate Identity Logo can only be used by AMCA International, Inc. SUMMARY STEPS TO CERTIFY ACOUSTIC

More information

Examples of pressure systems and equipment are:

Examples of pressure systems and equipment are: Pressure systems Safety and you Introduction If pressure equipment fails in use, it can seriously injure or kill people nearby and cause serious damage to property. Each year in Great Britain, there are

More information

Users Guide for the Vertical Bunsen Burner Test for Cabin and Cargo Compartment Materials FAA Handbook Chapter 2

Users Guide for the Vertical Bunsen Burner Test for Cabin and Cargo Compartment Materials FAA Handbook Chapter 2 Issue 1.1: May 2010 REF: FAA Chapter 2 Bunsen Burner Test Manual.doc Users Guide for the Vertical Bunsen Burner Test for Cabin and Cargo Compartment Materials FAA Handbook Chapter 2 Issued by: Fire Testing

More information

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE

IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC PURPOSE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS IAPMO GUIDE CRITERIA FOR BALL VALVES IAPMO IGC 157-20067 1 PURPOSE 1.1 The purpose of this standard is to establish an acceptable standard

More information

Vehicle-mounted meters, pump supplied

Vehicle-mounted meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Vehicle-mounted

More information

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant

Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Health and Safety Executive Safe management of industrial steam and hot water boilers A guide for owners, managers and supervisors of boilers, boiler houses and boiler plant Background Accidents involving

More information

Doors in watertight bulkheads of cargo ships and passenger ships

Doors in watertight bulkheads of cargo ships and passenger ships (June 2002) (Rev.1 Oct 2018) Doors in watertight bulkheads of cargo ships and passenger ships Application This unified interpretation pertains to doors 1 located in way of the internal watertight subdivision

More information

International Civil Aviation Organization DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE. Montreal, 18 to 22 April 2005

International Civil Aviation Organization DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE. Montreal, 18 to 22 April 2005 International Civil Aviation Organization WORKING PAPER 24/3/05 DANGEROUS GOODS PANEL (DGP) MEETING OF THE WORKING GROUP OF THE WHOLE Montreal, 18 to 22 April 2005 Agenda Item 2: Development of recommendations

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

Vehicle- or rack-mounted liquefied gas meters, pump supplied

Vehicle- or rack-mounted liquefied gas meters, pump supplied Purpose This inspection procedure outline (IPO) defines the minimum tests which must be performed to ensure that basic volumetric measuring devices comply with the legislation. Application Rack/fixed metering

More information

INFLATOR TDUX-IT-16 AND GAS CYLINDER E

INFLATOR TDUX-IT-16 AND GAS CYLINDER E INFLATOR TDUX-IT-16 AND GAS CYLINDER E7512-0160 Operating manual Inflator TDUX-IT-16 together with the special gas cylinder E7512-0160 is specifically designed for inflating TDUX duct seals. The inflator

More information

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing INTERNATIONAL STANDARD ISO 6406 Second edition 2005-02-01 Gas cylinders Seamless steel gas cylinders Periodic inspection and testing Bouteilles à gaz Bouteilles à gaz en acier sans soudure Contrôles et

More information

Working in Gas Hazard Areas

Working in Gas Hazard Areas / Health & Safety OPERATIONS STANDARDS Ref.: Aperam Safety ST 012 Working in Gas Hazard Areas Issue: 15.05.2012 Vers.: v0 Rev.: AM Safety ST 012 v1.2 08.05.2012 Working in Gas Hazard Areas Controlled Updated

More information

INTERNATIONAL OIML R 32 RECOMMENDATION. Rotary piston gas meters and turbine gas meters ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION

INTERNATIONAL OIML R 32 RECOMMENDATION. Rotary piston gas meters and turbine gas meters ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION INTERNATIONAL OIML R 32 RECOMMENDATION Edition 1989 (E) Rotary piston gas meters and turbine gas meters Compteurs de volume de gaz à pistons rotatifs et compteurs de volume de gaz à turbine OIML R 32 Edition

More information

ISO 5367 INTERNATIONAL STANDARD. Breathing tubes intended for use with anaesthetic apparatus and ventilators

ISO 5367 INTERNATIONAL STANDARD. Breathing tubes intended for use with anaesthetic apparatus and ventilators INTERNATIONAL STANDARD ISO 5367 Fourth edition 2000-06-01 Breathing tubes intended for use with anaesthetic apparatus and ventilators Tuyaux de ventilation destinés à être utilisés avec des appareils d'anesthésie

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 10462 Third edition 2013-12-15 Gas cylinders Acetylene cylinders Periodic inspection and maintenance Bouteilles à gaz Bouteilles d acétylène Contrôle et entretien périodiques

More information

Transport of gas tanks for motor vehicles

Transport of gas tanks for motor vehicles United Nations Secretariat ST/SG/AC.10/C.3/2016/51 Distr.: General 30 August 2016 Original: English Committee of Experts on the Transport of Dangerous Goods and on the Globally Harmonized System of Classification

More information

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing

ISO 6406 INTERNATIONAL STANDARD. Gas cylinders Seamless steel gas cylinders Periodic inspection and testing INTERNATIONAL STANDARD ISO 6406 Second edition 2005-02-01 Gas cylinders Seamless steel gas cylinders Periodic inspection and testing Bouteilles à gaz Bouteilles à gaz en acier sans soudure Contrôles et

More information

Flexible hoses - Non-metallic materials

Flexible hoses - Non-metallic materials CLASS PROGRAMME Type approval DNVGL-CP-0183 Edition December 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL

CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL CPX EMERGENCY STANDBY MANIFOLD INSTALLATION, OPERATIONS & MAINTENANCE MANUAL Company Registered Office: Crown House, Stockport, Cheshire, SK13RB No. 850 0700 67 Registered in England and Wales No. 05058855

More information

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers

Deans, Directors, Heads of Schools and Departments and Research Institute Directors and Managers Working at Height 1. PURPOSE 1.1 To ensure that any work at height is carried out in accordance with the legal requirements and associated guidance. This includes the use of scaffolds, towers, ladders,

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 6185-4 First edition 2011-07-01 Inflatable boats Part 4: Boats with a hull length of between 8 m and 24 m with a motor power rating of 15 kw and greater Bateaux pneumatiques

More information

Approved Installation Method (AIM)

Approved Installation Method (AIM) AIM-08-01 Issue 2 (DRAFT) 2015 Water Undertakers Approved Installation Method (AIM) Type BA Device Verifiable Backflow Preventer with Reduced Pressure Zone (RPZ Valve) Requirements for installation, commissioning

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

WaterSense Specification for Spray Sprinkler Bodies. Version 1.0

WaterSense Specification for Spray Sprinkler Bodies. Version 1.0 Version 1.0 September 21, 2017 WaterSense Specification for Spray Sprinkler Bodies 1.0 Scope and Objective This specification establishes the criteria for labeling bodies of spray sprinklers 1 under the

More information

DK46 - DK800 Supplementary instructions

DK46 - DK800 Supplementary instructions DK46 - DK800 Supplementary instructions Variable area flowmeter Device category II2G with electrical internals Additional Ex manual KROHNE CONTENTS DK46 - DK800 1 Safety instructions 3 1.1 General... 3

More information

ISO INTERNATIONAL STANDARD. Cranes and lifting appliances Selection of wire ropes Part 1: General

ISO INTERNATIONAL STANDARD. Cranes and lifting appliances Selection of wire ropes Part 1: General INTERNATIONAL STANDARD ISO 4308-1 Third edition 2003-05-01 Cranes and lifting appliances Selection of wire ropes Part 1: General Grues et appareils de levage Choix des câbles Partie 1: Généralités Reference

More information

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which

TECHNICAL DATA. System water supply pressure enters the priming chamber of the deluge valve (A.1) through the 1/4 (8 mm) priming line, which January 27, 2012 307a 1. (Refer to Figures 1-3.) A Viking Non-Interlocked Preaction system utilizes a Viking Deluge Valve to control water flow into system piping equipped with closed sprinklers. Under

More information

ISO INTERNATIONAL STANDARD. Gas cylinders Cylinder valves with integrated pressure regulators Specification and type testing

ISO INTERNATIONAL STANDARD. Gas cylinders Cylinder valves with integrated pressure regulators Specification and type testing INTERNATIONAL STANDARD ISO 22435 First edition 2007-09-01 Gas cylinders Cylinder valves with integrated pressure regulators Specification and type testing Bouteilles à gaz Robinets de bouteilles avec détendeur

More information

TABLE OF CONTENTS International Racquetball Federation officially approved specifications. Copyright 01/13/1983; rev.

TABLE OF CONTENTS International Racquetball Federation officially approved specifications. Copyright 01/13/1983; rev. Racquetball Court Specifications TABLE OF CONTENTS International Racquetball Federation officially approved specifications. Copyright 01/13/1983; rev. 1988; 1997, 2013 SECTION ONE: Performance and Specifications

More information

Report on Pre-improvement Air Leakage Testing, in compliance with ATTMA TSL1 (2010)

Report on Pre-improvement Air Leakage Testing, in compliance with ATTMA TSL1 (2010) 54 Melville Road Churchdown Gloucester GL3 2RG Mob: 07866 948200 Report on Pre-improvement Air Leakage Testing, in compliance with ATTMA TSL1 (2010) Result: Unsatisfactory Site address: 8 Benson Place,

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL UPFLOW, DOWNFLOW, UPFLOW/HORIZONTAL & HORIZONTAL ONLY INDUCED DRAFT GAS FURNACES Recognize this symbol as an indication of Important Safety Information If the information in this

More information

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS.

EVALUATION SUBJECT: DIVISION: HEATING, VENTILATING AND AIR CONDITIONING (HVAC) SECTION: HVAC DUCTS AND CASINGS. ICC-ES Report PMG-1171 Reissued 11/2018 This report is subject to renewal 11/2019 EVALUATION SUBJECT: UNDERGROUND SINGLE WALL & DOUBLE WALL INSULATED DUCT FOR HVAC DIRECT BURIAL APPLICATIONS AND UNDERGROUND

More information

CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE

CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE CABLE ENTRIES IN HAZARDOUS AREAS CORRECT SELECTION, INSTALLATION AND MAINTENANCE Compiled by: Arthur Cameron NOT SO CORRECT SELECTION AND INSTALLATION OF CABLE GLANDS AND JUNCTION BOXES IN HAZARDOUS AREAS

More information

Airfix D-E-B Installation and operating instructions

Airfix D-E-B Installation and operating instructions www.flamco.nt-rt.ru Airfix D-E-B Installation and operating instructions Dear Customer, With the Airfix D-E-B membrane expansion vessel you have acquired a Flamco quality product. This expansion vessel

More information

Model PDT Dewpoint Transmitter

Model PDT Dewpoint Transmitter Model PDT Dewpoint Transmitter Instruction Manual Alpha Moisture Systems Alpha House 96 City Road Bradford BD8 8ES England Tel: +44 1274 733100 Fax: +44 1274 733200 email: mail@amsytems.co.uk web: www.amsystems.co.uk

More information

Piped Air SCBA Refilling System Standard

Piped Air SCBA Refilling System Standard WALT WHITE Fire Chief 5770 Freeport Blvd., Suite 200 Sacramento, CA 95822-3516 Ph: (916) 808-1300 Fax: (916) 808-1629 www.sacfire.org Piped Air SCBA Refilling System Standard SCOPE: This specification

More information

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION

INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION ISSN 1172-3416 NZ GCP 1 : 1993 NEW ZEALAND GAS CODE OF PRACTICE for INSPECTION, TESTING AND CERTIFICATION OF GASFITTING WORK DONE UNDER SUPERVISION Issued by the Secretary of Commerce in accordance with

More information

Health and Safety Executive/Local Authorities Enforcement Liaison Committee (HELA)

Health and Safety Executive/Local Authorities Enforcement Liaison Committee (HELA) Health and Safety Executive/Local Authorities Enforcement Liaison Committee (HELA) Local Authority Circular Subject: Food Industry Open Government Status: Open LAC Number: 31/2 Rev 1.0 Keywords: Fire and

More information

WHTM Supplement

WHTM Supplement WHTM 04-01 Supplement Welsh Health Technical Memorandum Performance specification D 08: thermostatic mixing valves (healthcare premises) 2017 edition Disclaimer The contents of this document are provided

More information

NZQA unit standard New US 1Non-coal of 7145 version 1 Page 1 of 5

NZQA unit standard New US 1Non-coal of 7145 version 1 Page 1 of 5 Page 1 of 5 Title Design and maintain effective ventilation systems for a non-coal underground operation Level 5 Credits 20 Purpose People credited with this unit standard are able to: explain the principles

More information

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information