1 A New Ventilation Method for a Thin Seam Room and Pillar Coal Mine Alan Bilton 1 & Bill Tonks 2 1 Mine Manager, New Crofton Co-op Colliery, c/o Blast Log Ltd, 30 Grovehall Parade, Leeds. LS11 7AE Tel: albilton@newcroftoncoopcolliery.co.uk 2 Director, Bill Tonks Ventilation Services Ltd, Edwinstowe House, High Street, Edwinstowe, Notts. NG21 9PR Tel: billtonks@gmail.com Presented at the Midland Institute of Mining Engineers 10 th Annual Safety Seminar, 10 th April 2015, Royal Victoria Hotel, Sheffield. Introduction The New Crofton Colliery project proposes to open a new drift mine - operating as a worker s co-operative - that will produce 200,000 tons of coal per year and employ 50 people for 20 years. The New Crofton site is located 6 miles South East of Wakefield and 1 mile South of Nostell Priory (Figure 1). Figure 1 Location map of mine site Surface Arrangements The proposed mine surface (Figure 2) is a disused open-cast coal disposal site (Figure 3) which still has a working rail connection. The reserves are in the Sharlston s Top, (Muck) Low, and Yard seams in an area of coal that was originally proposed to be worked as an open cast coal site. Figure 2 Red line shows mine boundary including access road Figure 3 Previous use of mine site as coal disposal point 1

2 The proposed layout of the surface is as shown in Figure 4. Figure 4 Proposed surface layout A radial stacker will be used as the main coal stocking distribution device. It can drop coal onto the usual radial area, or swing round to feed the first vertical bunker. The vertical bunkers (Nos. 6 and 7 on the plan) for power station coal are situated above the main drift belt, and will discharge onto a feed-out belt mounted above the drift belt. When the first bunker (No 6) is full the stacker can feed a bunker-to-bunker belt to fill the second bunker (No 7) (Figure 5). Figure 5 Section of upcast drift and bunkers Geological Information The major faults in the area can be seen on the geological map in Figure 6, which also shows the coal-take area in the red dashed line. Figure 6 Geological map showing coal-take area and faults 2

3 The seam sections of interest to New Crofton are in the Sharlston group as follows (Figure 7): The Top seam is approximately 1.2m thick in the close vicinity of the drifts and is 50m from the surface. The Low seam is 20m below the Top seam and is approximately 1.2m thick, it has a 0.6m rock band above it and sitting on the rock band is the Muck seam approximately 1.2m thick. The Muck seam is multi-banded coal and rock about half coal and half rock. The Yard seam is approximately 0.9m thick and 20m below the Low seam. Figure 7 Section data from boreholes There are a multitude of boreholes in the New Crofton mining area that confirm these seams continuity (Figure 8). Figure 8 Boreholes and section-line across the mine site The reserves are split into 2 main areas by an East-West fault of approximately 40m throw on the line of the main drifts. This allows a convenient level access from the lowest seam (Yard) in the North area to the highest seam (Top) in the South area (Figure 9). 3

4 Figure 9 Cross-section across north of mine Consultation with the Surrounding Population Preparations for the planning application started with consultations with the locals. New Crofton did not want to force their way into the area instead explaining what they wanted to do - and how the area would benefit from the mine. Figure 10 Working layout for the north area (Sharlston Top seam) 4 From these meetings the main concerns raised were that there was to be: no subsidence; no mine dirt tip; and employment for as many locals as possible. These criteria were all accommodated in the design. In addition, a share of the profit from the mine was proposed to be used to benefit the local area, and create new co-operative ventures that should continue to flourish well after the mine has ceased production. In-seam room and pillar mining was chosen in favour of long wall extraction which would have caused subsidence. Room and pillar mining is also considered to minimise dirt make. In addition, the shallow depths allow small pillars, which helps maximize coal recovery. Underground dirt disposal was designed in favour of a spoil heap. As many locals as possible were proposed to be employed Figure 11 Working layout for the south area (Sharlston Top seam) (tempered by the initial need for qualified miners to get the mine started). The basic working layout for the North and South areas is shown in Figure 10 and Figure 11.

5 Mining Equipment Mining equipment will consist of: a low height continuous miner (Figure 12); 3-off battery powered coal scoops (Figure 13); a feeder breaker (Figure 14); a twin boom roof bolter (Figure 15); and 1.05m wide belt conveyors. Figure 12 Low height continuous miner Figure 13 Battery powered coal-scoops The usual lowest working height is planned to be 1.2m, but a very low-profile continuous miner (CM) has been specified for New Crofton, which is able to mine the Yard seam within the 0.9m section then pull back and rip down 0.3m of roof to give a working height of 1.2m wherever required. The CM is proposed to have on-board dust extraction and scrubbing ideal for working in conjunction with forced air auxiliary ventilation (this essentially creates a shortened version of the force / exhaust overlap arrangement more commonly seen in longwall drivages). The bolting machinery proposed is to be fitted with vacuum dust capture ideal for dust control as drilling dust will not be disturbed by forcing ventilation. The loading machinery proposed is battery scoop. Battery chargers will be situated inbye, ventilated through X slits, with charging gases being vented to the return. The number of conveyor belts used underground has been minimised. They are planned to be: a drift belt; a trunk belt (East and West bound in the Northern area & South bound in the Southern area); a district belt; and where needed a small mop-up belt to get to any outlying coal areas. Figure 14 Feeder-breaker Figure 15 Twin-boom roof bolter 5

6 Mining Method In the Top and Yard seams, it is proposed to take extra height in the belt road and supply road using the continuous miner, the dirt being stowed behind the working area by scoops - between the intake and return roadways - to create air control seals. The preferred method of support is by mechanised roof bolting. As the standard bolt length is 1.8m and the section worked is only 1.2m, coupled or flexible bolts will be required and trials have already successfully matched the characteristics of a solid 1.8m bolt. The proximity between the Muck seam and the Low seam creates a problem in that the Muck seam is within the bolt length of the Low seam and the strata may not be sufficiently competent. If it is not, then an alternative is to mine the muck seam first and support its roof, then after a suitable distance has been mined (around 3 pillars in advance) dint out the Low seam coal (this was common practice in a recent room and pillar mine in the North East). Once again the dirt would be used to create air control seals. Battery powered scoops were chosen because they are versatile. As well as being used for coaling, they can also pack the dirt into the old roadways to form air seals and even clean-up roadways when required, whereas shuttle cars would only be able to drop dirt onto the floor. The supply transport system from the surface will also use a battery scoop charged and loaded on the surface with sufficient range to deliver its load as required - anywhere in the mine. Because drift gradients can quickly drain the battery, to enhance range, a rope assist via a constant pull winch will be used to cancel-out the gradient effect. The scoop driver will control the rope by driving towards or away from the winch while on the gradients and then drop the rope when it is no longer needed. The three scoops will all be interchangeable and will be rotated for coaling or supply duty, thus allowing each of their servicing schedules to be carried out on the surface. Coal Preparation The Top, Low and Yard seams will be clean-mined. This is achievable with continuous miners which are ideal for small mines - as most do not have coal washing facilities. The Muck seam would require washing, to produce a power station product. As there is no spoil heap planned, this dirt must be returned underground for disposal. Returning the dirt to the mined voids removes the need for waste disposal permit. The dirt would be crushed to a suitable size and then transported hydraulically by gravity to the required old workings. Water drain-off would be cleaned by weirs and pumped back to surface via the pit bottom sumps for re-use, so water losses from this cycle should be minimised. Ventilation Design The ventilation of the mine has required some changes to the normal style used in the UK. The ventilation at New Crofton will by force fan from surface and will be homotropal i.e. with belts in the returns. This mine infrastructure is designed to minimise sources of ignition and fuel in the intake airways, allow simple mine degassing and remove the need for belt airlocks. Because of the shallow depths, the virgin strata temperature is only likely to be around 12 C so heat will not be a problem. At shallow depth, coal seams also have a lower gas contents and in addition - room and pillar mining minimises gas emission from any overlying and underlying seams - so methane is unlikely to be a problem - neither from production in the homotropal returns - nor during barometric pressure falls in the mine as a whole. 6

7 Coal sampled from Boreholes drilled within this region during the NCB regime show that the seams typically have low gas contents between 1.4 m 3 and 2.7 m 3 of CH 4 per tonne. Even using the high figure of 2.7 m 3 per tonne it is calculated that a New Crofton heading would typically release only 14 litres/second of CH4 during cut-down resulting in less than 0.3% CH 4 vol/vol when ventilated by 5 m 3 /s. Table 1 Local boreholes analysed for gas content by the NCB BH261 Brierley Road Location: E N Seam (Sh = Sharlston) Depth below surface Total CH 4 m 3 /tonne Total C 2 H 6 m 3 /tonne Ash content % by weight Ash free CH 4 m 3 /t Ash free C 2 H 6 m 3 /t Sh Top No name Sh Yard BH121 Two Gates Location: E N Seam (Sh= Sharlston) Depth below surface Total CH 4 m 3 /tonne Total C 2 H 6 m 3 /tonne Ash content % by weight Ash free CH 4 m 3 /t Ash free C 2 H 6 m 3 /t Sh Yard BH359 Cliff Lane Location: E N Seam (Sh = Sharlston) Depth below surface Total CH 4 m 3 /tonne Total C 2 H 6 m 3 /tonne Ash content % by weight Ash free CH 4 m 3 /t Ash free C 2 H 6 m 3 /t Sh Top Sh Low Sh Yard The room and pillar mining method proposed at New Crofton is conventional throughout the world and has been re-introduced into the UK in recent times in the North East, Midlands and latterly into South Wales where it is currently being worked with modern continuous miner and mechanised bolting machinery similar to that proposed at New Crofton. The concept of ventilation of headings in the UK has always relied upon auxiliary fans and ducting. Although the series ventilation using brattice lines prevalent in USA s room and pillar mines (Figure 16) is not illegal, its use has largely been precluded in the UK following lengthy discussion with HMI. This is because the high panel resistance they create produces a reduction in continuity and control of ventilation during machine movement. There is a general leakiness and there is an increased risk regarding series accumulations of dust and CH4 passed from heading to heading. Conversely, fan and ducting systems deliver a continuous known level of clean feed air to each working place, and when using regulation discs, can deliver an accurate jet flow of regulated airflow in each of those headings that are stood down i.e. never leaving headings unventilated (Figure 17). 7

8 Figure 16 Brattice layout in the USA Figure 17 Example of force fan ventilation (UK) New Crofton districts will each have 7 headings. The perimeter force duct ventilation design of headings within each district is novel and takes into account the UK ducted air philosophy, whilst still accommodating machine movement in very low seam heights. To allow the positive ventilation of headings by fan and duct, arrangements in the production districts had to be rethought. With a worked height of just 1.2m and a machine height of 1.0m, it was impossible to run machines under any suitable size of air ducting and it was considered that even letter-box style air crossings would quickly become damaged. So after consideration of the place changing method of working, it was noted that only two rooms were actually working at any one time: the miner room; and the bolter room. All the others were stood down waiting to be cut then bolted. The main ventilation flows were only required in these two rooms and the others only needed to be kept sweet until they were re-visited. The innovative concept at new Crofton was to use two auxiliary fans each fan running its ducting around the outer walls of the district - before running along the last cross cut to feed the 2 working rooms. 8

9 This way, the centre of the district was left totally free from ducting, allowing free movement of scoops and continuous miner. The waiting rooms would be ventilated with T-offs from the main ducting run regulated by air jetting discs installed at the face end. The working rooms ventilation system was designed to mimic the place changing of the machines i.e. each time the machines moved - the ducting was to be moved too, but always hugging the side and front walls to leave clear passage routes for machinery (Figure 18). Figure 18 New Crofton perimeter ventilation ducts Dust control will achieved by the CM on-board scrubber, by dry exhausters on the bolter and because the mine is homotropal, dust from the belts will be carried away from the working area in the returns, so intake air will be as clean as possible and also offer the safest possible exit route from the mine. The system felt right but would it actually work? Brief History of Ventilation Engineering In the past, ventilation has been considered by many to be a black art. Actually however, it can be designed, calculated and predicted very accurately - using a process otherwise known as Engineering. The fathers of the engineering approach to ventilation engineering in the UK were: John Buddle, ( ) An English engineer who made safer furnaces, invented parallel splits and worked with Davy testing flame safety lamps after the Felling mine explosion; John Job Atkinson ( ) an English mines Inspector, who wrote his work of genius On the Theory of Ventilation in upon which all ventilation calculations are based today - and who s work showed that with ventilation surveys, longhand calculations could be used to predict and design ventilation in mines perfectly accurately; Hardy Cross ( ), an American who developed an iterative method for solving fluid flows in networks (did he know how good computers would eventually become at iteration?); Professor Frederick Hinsley ( ) and Malcolm J McPherson ( ) who both advanced and modified this work to create computer programs for solving airflows in networks at Nottingham University. 9

10 Ventilation Modelling Ventilation modelling quickly became significant in the UK coal mining industry with the introduction of commercially available computers. Early models were created by the NCB s technical department at Bretby firstly run on mainframes with punch cards - then latterly run on smaller department based Tektronix machines by the mid 80 s. By the late 80s, the first desktop PC s had become available and the NCB s numerical Vent3 program was written to work on a twin floppy drive IBM PC; then a pen-plotter version Vent4 to work on an IBM AT or PS2; and finally an Autocad Vent5 version to work on Compaq 386 machines just before the demise of British Coal in Later variants were the XEagle MinCAD version MinEnet program written by Mike Clayton, David Darns and Bill Tonks in the mid 90 s and an American commercial package written by Malcolm J McPherson s company MVS called VnetPC available in the early 2000 s. All of these models were numeric and latterly strived to give a 2D plan presentation with the universally recognised intake and return colours and the facility to superimpose numerical levels of air quantity, pressure and roadway resistance as desired. A revelation however was the introduction of Ventsim (Figure 19) in around 2010, written by Craig Stewart of Chasm Consulting on a gaming platform. This allowed dynamic 3D models to be created and for the first time, you could now see air flowing around a mine in real time in exact scale roadways from any aspect up down and all around, whilst still retaining numerical superimposition facilities where required. In addition, this powerful software also incorporates thermodynamic algorithms, pollutant and fire toolbars (by Dr Rick Brake), together with auxiliary fan and main fan charting graphics. To avoid inputting errors, the import facility can pull-in Autocad or DXF files straight from the Surveyors desk resulting in a perfect mimic of the mine. Figure 19 A screen grab of some VentSim features New Crofton Ventilation Parameters The Sharlston Top, Sharlston Mid and Sharlston Yard working heights in general are 1.2m, 1.2m (plus 1.2m a Muck inferior seam separated by 0.6m dirt) and 0.9m thick respectively. The drifts and South extension roads are to be extracted at an effective 5.2m wide and 2m high square section (assumed supported by steel) and the coal will be extracted at 6.0m wide by 1.2m high (assume bolted) except for the far right hand intake supply roadway which will be 1.8m high 10

11 and the central return belt road which will also be 1.8m high. The belt will be 42 wide on heavy duty structure. For dust control, the minimum air velocity required to prevent dust backing up is 0.3 m/s. Because New Crofton could extract at up to 3m height (in the muck/mid seam), this meant that a maximum of 5 m 3 /s would be required in both the continuous miner and bolter headings. This would however generally be far in excess of requirements where (the majority of) cutting was only to be at 1.2m height or less. Airflow requirements were calculated to be minimum18 m 3 /s to feed the auxiliary fans and another 6 m 3 /s to prevent recirculation, so a minimum of 24 m 3 /s was required to be delivered to the inbye end of the working district. The water pumping sump area to the North was planned to be ventilated by return air in parallel with the main return so no additional air would be consumed whereas the water pumping sump area to the South had to be ventilated by fresh air that was bled back onto the return. A nominal 10 m 3 /s was assigned for this. New Crofton Modelling New Crofton was designed in 3D using Vulcan software. Once drawings had been imported from this directly into Ventsim, it then took just a couple of days to create a series of accurate and fully working models of Crofton that showed various ventilation-critical stages likely to be encountered throughout the mine s life. The objective was to fix sufficient quantity at the surface fan to be able to deliver over 24m 3 /s into the working place of the furthermost district at different stages in time. The models calculated the pressure required to do this so fan duties and sizes could be determined. The modelling process also allowed other critical aspects and sensitivities to be tested. An Atkinson friction factor of kg/m 3 was used for the roadways throughout the model, whilst a friction factor of kg/m 3 was used for the flexible ducting blowing into the headings. Within the models, pit bottom doors and cross cuts local to the inbye end of the districts were assigned a resistance of 50 gauls (a typical resistance of a reasonable set of doors) and as per above, the roadways dimensions, obstructions and layout were input accordingly and their resistances were calculated automatically in the program. The auxiliary fan outlet and perimeter duct were assigned 0.9 m diameter and the manifold face road and heading feed ducts were assigned 0.6 m diameter. Figure 20 Crofton auxiliary ventilation 11 The auxiliary ventilation was shown to be easily achieved using two off 37 kw centrifugal fans (ex NCB design). This was based on any two working headings having 5 m 3 /s delivered and the remaining stood headings being ventilated by a nominal 0.5 m 3 /s through jetting blank plates - ideal for sweeping faces of stood headings (Figure 20).

12 The ventilation models were constructed to illustrate two stages Stage 1 up to 6 years then Stage 2 for remaining life-of-mine. The six year point was selected to broadly coincide with the mine venturing into the mid and lower end of the South take. The first model showed year 2 as the concept for all of Stage 1, where the Sharlston Top seam has been mined by taking districts in a clockwise sequence and has reached the furthest extent to the West (Figure 21). Figure 21 Crofton northern extremities The second model showed the furthest extent of the mine in the South in the lowest seam as the concept for Stage 2 (Figure 22). Figure 22 Crofton southern extremities In Stage 1, the logic was that once the extents were reached, then shortening back would only require less airflow from that point on. The logic also led to the idea that whatever surface fan air this stage required to achieve 24 m 3 /s inbye, then this airflow would also be capable of ventilating to similar extents in the Mid and Yard seams below in the West take too. Extending the logic further, it also pointed to the mine being able to venture into the South workings to a similar extent to that in the North with the same airflow. 12

13 Note: At any distances less than these extents, the Stage 1 fan could be turned down on the VSD - matching the duty exactly and only to the airflow required to deliver 24 m 3 /s inbye - thus saving power. Results It was shown that for Stage 1, the mine could be ventilated adequately using a fan (or fans) having a duty of 80 m 3 /s at 844 Pa total pressure, for 2m diameter fan. This meant an airpower of 67 kw was required. This meant that for a fan of typically 75% efficiency, an electrical load of 90 kw would be created. This meant that to prevent overloading a 112 kw motor would be required (Figure 23). Figure 23 Crofton surface fan: Stage 1 In Stage 2, the logic was that a fan capable of maximum duty for the remaining life of the mine was required. Any lesser duties (during periods of working towards this extent and working away from this extent in each seam) could likewise be achieved by turning the fan duty down on the VSD, saving power during the approach/ retreat from this stage. It was shown that for Stage 2, the mine could be ventilated adequately using a fan (or fans) having a duty of 105 m 3 /s at 2356 Pa total pressure. This meant an airpower of 247 kw was required. This meant that for a fan of typically 75% efficiency, an electrical load of 330 kw would be created. This meant that a standard motor of 375 kw would be required to prevent overloading (Figure 24). Figure 24 Crofton surface fan: Stage 2 13

14 Critical Findings One of the critical aspects of room and pillar work is the conservation of airflow and faced with a profusion of poorly sealed cross cuts, air can quickly leak away. With this in mind, the room and pillar roads to the West and the drift extension roads to the South were originally tested in the models at 50 gauls, but had to be assigned a tighter resistance of 200 gauls to preserve airflow to the districts. A proven technique to achieve this is by foam injection - which is quick, cheap and effective (Figure 25). Figure 25 Crofton cross-cut sealing In addition, an arbitrary 1 m 3 /s was initially assigned to stood headings to keep them sweet, but this was shown to be too excessive for a 37 kw auxiliary fan to deliver when at full stretch (i.e. feeding one working and five stood headings). A stood heading flow of 0.5 m 3 /s was tried in sensitivity tests and found to be achievable. Examination of the 0.5 m 3 /s figure showed it still to be suitable - providing that the air was jetted into the face of the heading to prevent layering (Figure 26). Figure 26 Crofton auxiliary ventilation headings (velocity when regulated to 0.5 m 3 /s) 14

15 Conclusion New Crofton has been carefully designed to exploit the reserve as thoroughly as possible whilst still fulfilling the wishes of the general public in the immediate area. The extensive knowledge of the strata and topography of the area and existence of essential local services has given New Crofton a unique advantage in planning and logistics. The Ventsim 3D modelling process has enabled Engineers to visualize ventilation at New Crofton in an unprecedented manner and has shown that all of their proposals can be achieved. Specifically, it has shown how the auxiliary fans would perform in the headings; how air would be distributed around the districts, pumping lodges and drifts; has highlighted a cross-slit leakage problem in trunk airways; and has allowed the Engineers to specify duties for the main surface fan for life of mine. It has been shown that two standard 37 kw auxiliary fans per district can deliver the quantities of air required in the headings. To support these fans with the correct levels of airflow, sufficient surface fan airflows have been demanded and the pressure required to achieve that flow have been illustrated. Using these flows and pressures it has been determined that a surface fan up to year 6 would require around 112 kw motor size and up to year 20 would require around 375 kw motor size (both assuming 75% fan efficiency). The surface fan is proposed to be powered using a variable speed drive (VSD) that can deliver a full range of duties between the initial and final stages. Using VSD s it is envisaged that these fan(s) would rarely be used at full speed, the concept being that the large size simply ensures there is sufficient power available whenever the far-extents of the mine are reached in each seam. Additionally (or as an alternative to VSD), depending upon the fan design, it may be possible to upgrade from Stage 1 to Stage 2 simply by adding extra fans in series as future demand dictates (Figure 27). 2 No. red line fans (100%) in series Covers all situations, including Stage 2. If a single fan was used, then a 374 kw motor would be needed. For 2 fans in series, 2 No. 225 kw motors will be adequate. 1 fan at 100% duty This speed would need more than 112 kw motor (e.g. 225 kw), but could then run beyond Stage 1 duties 1 fan at 78% duty A 112 kw motor would be enough to provide the Pa required during Stage 1. Figure 27 Crofton surface fan options 15

T.I. Mayes and A.D.S Gillies. A Review of Current Australian Longwall Mine Ventilation Practice, Proceedings, First Mine Environment and Ventilation

T.I. Mayes and A.D.S Gillies. A Review of Current Australian Longwall Mine Ventilation Practice, Proceedings, First Mine Environment and Ventilation Published as: T.I. Mayes and A.D.S Gillies. A Review of Current Australian Longwall Mine Ventilation Practice, Proceedings, First Mine Environment and Ventilation Symposium, Dhanbad, India, Oxford and

More information

Applied Modelling of Ventilation and Gas Management to Increase Production in a Single Entry Longwall Panel

Applied Modelling of Ventilation and Gas Management to Increase Production in a Single Entry Longwall Panel University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2016 Applied Modelling of Ventilation and Gas Management to Increase Production in a

More information

T.I. Mayes and A.D.S Gillies. An Analysis of Current Australian Longwall Ventilation Methods, Proceedings, Seventh International Mine Ventilation

T.I. Mayes and A.D.S Gillies. An Analysis of Current Australian Longwall Ventilation Methods, Proceedings, Seventh International Mine Ventilation Published as: T.I. Mayes and A.D.S Gillies. An Analysis of Current Australian Longwall Ventilation Methods, Proceedings, Seventh International Mine Ventilation Congress, Editor, S Wasilewski, Krakow, Polish

More information

Australian longwall panel ventilation practices

Australian longwall panel ventilation practices University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2013 Australian longwall panel ventilation practices Stewart Gillies Missouri University

More information

Evaluation of the optimum conditions for a local ventilation system in connection with the mine ventilation network

Evaluation of the optimum conditions for a local ventilation system in connection with the mine ventilation network Underground Mining Technology 2017 M Hudyma & Y Potvin (eds) 2017 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-7-0 https://papers.acg.uwa.edu.au/p/1710_55_lee/ Evaluation of the optimum

More information

! Time required for inertisation output to interact with and extinguish a fire.

! Time required for inertisation output to interact with and extinguish a fire. ISSUES IN USE OF INERTISATION OF FIRES IN AUSTRALIAN MINES Stewart Gillies and H.W. Wu Gillies Wu Mining Technology Pty Ltd AIM Under ACARP supported project examine the use of modern inertisation approaches

More information

Developments in Longwall Ventilation

Developments in Longwall Ventilation 7 Developments in Longwall Ventilation Jiirgen F. Brune, Joseph P. Aman, and Mike Kotch CONSOL Inc., 18 Washington Road, Pittburgh, P A 15241 ABSTRACT Rapid development in longwall mining technology has

More information

The principal mechanism for taking medium air velocity measurement is the Anemometer.

The principal mechanism for taking medium air velocity measurement is the Anemometer. 1 Introduction Face Ventilation Stoppings Check Curtains Air Measurements Principals of Airflow Respirable Dust Control Use of Scrubbers Actions for Excessive Methane Rock Dusting Permissibility 2 The

More information

Gas Emission Modelling of Gate Road Development

Gas Emission Modelling of Gate Road Development University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2001 Gas Emission Modelling of Gate Road Development R. J. Williams GeoGAS Systems Pty

More information

Mine Foreman Training Ventilation Unit 7 Part 2 Ventilating A Mine. Program developed by Wayne Collett Office of Mine Safety & Licensing 2006

Mine Foreman Training Ventilation Unit 7 Part 2 Ventilating A Mine. Program developed by Wayne Collett Office of Mine Safety & Licensing 2006 Mine Foreman Training Ventilation Unit 7 Part 2 Ventilating A Mine Program developed by Wayne Collett Office of Mine Safety & Licensing 2006 1 The purpose of mine ventilation is to provide a safe and productive

More information

LECTURE 1 THE CONTENTS OF THIS LECTURE ARE AS FOLLOWS:

LECTURE 1 THE CONTENTS OF THIS LECTURE ARE AS FOLLOWS: LECTURE 1 THE CONTENTS OF THIS LECTURE ARE AS FOLLOWS: 1.0 HOW AIR FLOWS IN MINES 2.0 CATEGORIZATION OF VENTILATION SYSTEM IN MINES 3.0 ELEMENTS OF PRIMARY VENTILATION SYSTEM 3.1 Downcast and Upcast 3.2

More information

LECTURE 1 THE CONTENTS OF THIS LECTURE ARE AS FOLLOWS: 1.0 AIRWAYS CONNECTED IN SERIES AND PARALLEL. 1.1 Airways Connected in Series

LECTURE 1 THE CONTENTS OF THIS LECTURE ARE AS FOLLOWS: 1.0 AIRWAYS CONNECTED IN SERIES AND PARALLEL. 1.1 Airways Connected in Series LECTURE 1 THE CONTENTS OF THIS LECTURE ARE AS FOLLOWS: 1.0 AIRWAYS CONNECTED IN SERIES AND PARALLEL 1.1 Airways Connected in Series 1.2 Airways Connected in Parallel 1.3 Ratio of Resistances of Series

More information

VENTILATION DURING TUNNEL CONSTRUCTION INDUSTRY CONSIDERATIONS

VENTILATION DURING TUNNEL CONSTRUCTION INDUSTRY CONSIDERATIONS VENTILATION DURING TUNNEL CONSTRUCTION INDUSTRY CONSIDERATIONS Air Quality Working Group Information Package - Part 7 of 12 December 2018 Doc No. AQWG_5_0.08 Page 1 of 12 Ventilation during Tunnel Construction

More information

Application of the QMRS GAG at Crinum North Mine

Application of the QMRS GAG at Crinum North Mine Application of the QMRS GAG at Crinum North Mine Emma Westthorp Emma Westthorp BHP Billiton Mitsubishi Alliance Abstract Final mine sealing was recently undertaken at BMA s Crinum North Mine located near

More information

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN

ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN (This page intentionally blank) ATTACHMENT O WIPP MINE VENTILATION RATE MONITORING PLAN TABLE OF CONTENTS O- Definitions... O- Objective... O- Design

More information

VENTILATION PLANNING AND DESIGN OF THE OMERLER B MINE

VENTILATION PLANNING AND DESIGN OF THE OMERLER B MINE UNDERGROUND MINING ENGINEERING 21 (2012) 121-130 UDK 62 FACULTY OF MINING AND GEOLOGY, BELGRADE YU ISSN 03542904 Review paper VENTILATION PLANNING AND DESIGN OF THE OMERLER B MINE Lilić Nikola 1, Čokorilo

More information

EFFECTS OF WATER SPRAYS AND SCRUBBER EXHAUST ON FACE METHANE CONCENTRATIONS

EFFECTS OF WATER SPRAYS AND SCRUBBER EXHAUST ON FACE METHANE CONCENTRATIONS Chapter 65 EFFECTS OF WATER SPRAYS AND SCRUBBER EXHAUST ON FACE METHANE CONCENTRATIONS Ch.D. Taylor NIOSH/Pittsburgh Research Laboratory Pittsburgh, PA J.A. Zimmer NIOSH/Pittsburgh Research Laboratory

More information

MINING INQUIRY BOX FLAT COLLIERY REPORT, FINDINGS AND RECOMMENDATIONS

MINING INQUIRY BOX FLAT COLLIERY REPORT, FINDINGS AND RECOMMENDATIONS MINING INQUIRY BOX FLAT COLLIERY REPORT, FINDINGS AND RECOMMENDATIONS Before commencing its deliberations on the evidence which has been given before it, the tribunal must keep firmly in mind that the

More information

EFFECTIVE DESIGN OF CONVERTER HOODS. 111 Ferguson Ct. Suite 103 Irving, Texas U.S.A. 400 Carlingview Dr. Toronto, ON M9W 5X9 Canada.

EFFECTIVE DESIGN OF CONVERTER HOODS. 111 Ferguson Ct. Suite 103 Irving, Texas U.S.A. 400 Carlingview Dr. Toronto, ON M9W 5X9 Canada. EFFECTIVE DESIGN OF CONVERTER HOODS Paykan Safe 1, Sam Matson 1, and John Deakin 2 1 Gas Cleaning Technologies 111 Ferguson Ct. Suite 103 Irving, Texas 75062 U.S.A. 2 H.G. Engineering, Ltd. 400 Carlingview

More information

Item 404 Driving Piling

Item 404 Driving Piling Item Driving Piling 1. DESCRIPTION Drive piling. 2. EQUIPMENT 2.1. Driving Equipment. Use power hammers for driving piling with specified bearing resistance. Use power hammers that comply with Table 1.

More information

CENTENNIAL COAL. Handling Gas Problems at Tahmoor Colliery Bob Newman, Ventilation Officer

CENTENNIAL COAL. Handling Gas Problems at Tahmoor Colliery Bob Newman, Ventilation Officer CENTENNIAL COAL Handling Gas Problems at Tahmoor Colliery Bob Newman, Ventilation Officer Tahmoor Colliery Located approx. 70km SW of Sydney Underground Coal Mine Depth of cover 380 500 m Commissioned

More information

excavation work and necessary for the exhalation of workers. After conducting the ventilation network analysis, the result should be checked whether t

excavation work and necessary for the exhalation of workers. After conducting the ventilation network analysis, the result should be checked whether t Abstract FEASIBILITY STUDY OF VENTILATION DESIGN FOR UNDERGROUND FACILITIES Naoki Katsumata 1, Ryoji Yahagi 2, Hiromi Kurosaki 2, Shigeru Kubota 1 Nuclear Waste Management Organization of Japan (NUMO)

More information

VENTILATION FOR SINKING VERTICAL, SUB VERTICAL AND DECLINE SHAFTS. D M Walters Turgis Consulting

VENTILATION FOR SINKING VERTICAL, SUB VERTICAL AND DECLINE SHAFTS. D M Walters Turgis Consulting VENTILATION FOR SINKING VERTICAL, SUB VERTICAL AND DECLINE SHAFTS. Turgis Consulting Abstract To achieve safe and healthy working conditions in shaft sinking operations, ventilation, and where necessary

More information

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios

Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Sizing of extraction ventilation system and air leakage calculations for SR99 tunnel fire scenarios Yunlong (Jason) Liu, PhD, PE HNTB Corporation Sean Cassady, FPE HNTB Corporation Abstract Extraction

More information

USER S INFORMATION MANUAL

USER S INFORMATION MANUAL USER S INFORMATION MANUAL UPFLOW, DOWNFLOW, UPFLOW/HORIZONTAL & HORIZONTAL ONLY INDUCED DRAFT GAS FURNACES Recognize this symbol as an indication of Important Safety Information If the information in this

More information

Applied Fluid Mechanics

Applied Fluid Mechanics Applied Fluid Mechanics 1. The Nature of Fluid and the Study of Fluid Mechanics 2. Viscosity of Fluid 3. Pressure Measurement 4. Forces Due to Static Fluid 5. Buoyancy and Stability 6. Flow of Fluid and

More information

Dust Control Strategies for Continuous Miners in High Mining Areas and Longwall Shearers

Dust Control Strategies for Continuous Miners in High Mining Areas and Longwall Shearers Dust Control Strategies for Continuous Miners in High Mining Areas and Longwall Shearers Harrold Gurley, Dr. Y. P. Chugh, Ahmad MdZami, John Pulliam, Akshat Chandna, Sawyer Schrader, Richard Lyon Mining

More information

Vision Painting Inc Safety Management System

Vision Painting Inc Safety Management System Abrasive Blasting 1. PURPOSE The purpose of this program is to provide training and qualification guidelines for the safe operation of Abrasive Blasting. The Safety Officer is responsible for facilitating

More information

Guidance on room integrity testing and its interpretation

Guidance on room integrity testing and its interpretation Guidance Note Guidance on room integrity testing and its interpretation Guidance on room integrity testing and its interpretation 1. SCOPE... 6 2. INTRODUCTION AND BACKGROUND... 6 2.1. DEVELOPMENT OF INTEGRITY

More information

AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE

AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE - 247 - AIRFLOW GENERATION IN A TUNNEL USING A SACCARDO VENTILATION SYSTEM AGAINST THE BUOYANCY EFFECT PRODUCED BY A FIRE J D Castro a, C W Pope a and R D Matthews b a Mott MacDonald Ltd, St Anne House,

More information

The practice of mine ventilation engineering

The practice of mine ventilation engineering The practice of mine ventilation engineering Keith Wallace, Brian Prosser*, J. Daniel Stinnette Mine Ventilation Services, Inc. Fresno, California, 93611 USA Abstract: The practice of ventilation is continually

More information

West Virginia Office of Miners Health, Safety and Training. July 31, Report of Investigation Underground Coal Mine Fatality (Crushing)

West Virginia Office of Miners Health, Safety and Training. July 31, Report of Investigation Underground Coal Mine Fatality (Crushing) West Virginia Office of Miners Health, Safety and Training July 31, 2012 Report of Investigation Underground Coal Mine Fatality (Crushing) ICG Beckley, LLC Beckley Pocahontas Mine U-3011-95A Region IV

More information

Chapter 2 Ventilation Network Analysis

Chapter 2 Ventilation Network Analysis Chapter 2 Ventilation Network Analysis Abstract Ventilation network analysis deals with complex working procedures to calculate the air currents flowing in the various meshes or branches of a mine network.

More information

COAL AND GAS OUTBURST COMMITTEE. HALF DAY SEMINAR Wollongong 22 nd June, 2011

COAL AND GAS OUTBURST COMMITTEE. HALF DAY SEMINAR Wollongong 22 nd June, 2011 COAL AND GAS OUTBURST COMMITTEE HALF DAY SEMINAR Wollongong 22 nd June, 2011 Contents Raising the Outburst Threshold at Tahmoor Colliery Peter Wynne Page 1 Virtual Reality Training - Jeff Buchanan, NSW

More information

THE IMPACT ON ENERGY CONSUMPTION CAUSED BY PRESSURE DROP IN A COMPRESSED AIR SYSTEM

THE IMPACT ON ENERGY CONSUMPTION CAUSED BY PRESSURE DROP IN A COMPRESSED AIR SYSTEM THE IMPACT ON ENERGY CONSUMPTION CAUSED BY PRESSURE DROP IN A COMPRESSED AIR SYSTEM What is pressure drop in a compressed air utility? Pressure drop is a term used to characterize the reduction in air

More information

CONSIDERATION OF DENSITY VARIATIONS IN THE DESIGN OF A VENTILATION SYSTEM FOR ROAD TUNNELS

CONSIDERATION OF DENSITY VARIATIONS IN THE DESIGN OF A VENTILATION SYSTEM FOR ROAD TUNNELS - 56 - CONSIDERATION OF DENSITY VARIATIONS IN THE DESIGN OF A VENTILATION SYSTEM FOR ROAD TUNNELS Gloth O., Rudolf A. ILF Consulting Engineers Zürich, Switzerland ABSTRACT This article investigates the

More information

6000SLX HYDRAULIC CRAWLER CRANE

6000SLX HYDRAULIC CRAWLER CRANE HYDRAULIC CRAWLER CRANE HYDRAULIC CRAWLER CRANE Contents Specifications 3-4 Symbols 4 Outline Winch Assingment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications : Luffing

More information

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR

AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR - 9 - AN INVESTIGATION OF LONGITUDINAL VENTILATION FOR SHORT ROAD TUNNELS WITH HIGH FIRE HRR O Gorman S., Nuttall R., Purchase A. Parsons Brinckerhoff, Australia ABSTRACT Recent fire tests for tunnels

More information

FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN

FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN FLOW CONSIDERATIONS IN INDUSTRIAL SILENCER DESIGN George Feng, Kinetics Noise Control, Inc., 3570 Nashua Drive, Mississauga, Ontario Vadim Akishin, Kinetics Noise Control, Inc., 3570 Nashua Drive, Mississauga,

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

6000SLX SL-N HYDRAULIC CRAWLER CRANE

6000SLX SL-N HYDRAULIC CRAWLER CRANE SL-N SL-N HYDRAULIC CRAWLER CRANE 1804 05H.EA292 SL-N Specifications Contents Specifications 3-4 Symbols 4 Outline Winch Assignment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications

More information

Continuous Miner Ventilation Dust Mitigation Research at UK

Continuous Miner Ventilation Dust Mitigation Research at UK Continuous Miner Ventilation Dust Mitigation Research at UK KY Professional Engineers in Mining Seminar August 26, 2016 Dr. Chad Wedding MSHA New Dust Rule August 1 st, 2014 Revised full shift samplingimmediate

More information

VENTILATION. l.l.l. The primary objective should be to reduce emissions of contaminants at source and hence reduce the need for ventilation.

VENTILATION. l.l.l. The primary objective should be to reduce emissions of contaminants at source and hence reduce the need for ventilation. VENTILATION 1.1. GENERAL l.l.l. The primary objective should be to reduce emissions of contaminants at source and hence reduce the need for ventilation. l.l.2. Where atmospheric contaminants remain, a

More information

Control the air. Control your business.

Control the air. Control your business. Serpent ventilation A complete ventilation system for successful tunneling and mining operations, including system design, fan station, ducting and installation 1 Control the air. Control your business.

More information

CHAPTER 5. BLEEDER SYSTEMS IN UNDERGROUND COAL MINES

CHAPTER 5. BLEEDER SYSTEMS IN UNDERGROUND COAL MINES CHAPTER 5. BLEEDER SYSTEMS IN UNDERGROUND COAL MINES By John E. Urosek, P.E., 1 William J. Francart, P.E., 2 and Dennis A. Beiter 3 63 In This Chapter Designing bleeder systems Examining and maintaining

More information

Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India

Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India AusRock2014-5/6 th November Application of Design by Measurement for Support and Pillar Design in Mechanised Room and Pillar Coal Mining in India Keith MacAndrew Alex Garcia Ian Gregson Atul Gandhe Indian

More information

Multi Fibres. MiniFant M99 insulation blowing MacHinE

Multi Fibres. MiniFant M99 insulation blowing MacHinE Multi Fibres MiniFant M99 insulation blowing MacHinE the compact professional blowing machine standard option the Minifant M99 is a compact yet powerful insulation blowing machine. the M99 is suitable

More information

Ventilation optimization at the La Camorra mine

Ventilation optimization at the La Camorra mine Ventilation optimization at the La Camorra mine B.S. Prosser & J.D. Stinnette Mine Ventilation Services, Inc., Fresno, California, USA J. Paredes Hecla Mining Company, Mina La Camorra, Bolivar, Venezuela

More information

Review of Dust Control Strategy Optimisation using Real-time Respirable Dust Monitoring

Review of Dust Control Strategy Optimisation using Real-time Respirable Dust Monitoring Review of Dust Control Strategy Optimisation using Real-time Respirable Dust Monitoring Hsin Wei Wu, Stewart Gillies and Muhammad Usman Khan Abstract Respirable dust is a continuing problem in mines where

More information

Multiple Pressure Booster Systems With Variable Speed Controller Type BL

Multiple Pressure Booster Systems With Variable Speed Controller Type BL Multiple Pressure Booster Systems With Variable Speed Controller Type BL General Characteristics - Single or multistage pumps - Horizontal or vertical mounting - Total head 30m ~ 250m - Material construction:

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

Goaf Inertisation and Sealing Utilising Methane from In-Seam Gas Drainage System

Goaf Inertisation and Sealing Utilising Methane from In-Seam Gas Drainage System University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2011 Goaf Inertisation and Sealing Utilising Methane from In-Seam Gas Drainage System

More information

ISE Subsea Tools and Toolsleds

ISE Subsea Tools and Toolsleds 1734 Broadway St. Port Coquitlam, B.C. V3C 2M8, Canada +1.604.942.5223 +1.604.942.7577 info@ise.bc.ca www.ise.bc.ca ISE Subsea Tools and Toolsleds 1 INTRODUCTION The value of an ROV is increased by its

More information

NZQA unit standard version 3 Page 1 of 8. Manage the mine ventilation system at an extractive site

NZQA unit standard version 3 Page 1 of 8. Manage the mine ventilation system at an extractive site Page 1 of 8 Title Manage the mine ventilation system at an extractive site Level 7 Credits 30 Purpose This unit standard covers the development and management of the operation and maintenance of a mine

More information

Hot extractive multi-channel gas analyser for continuous process and emissions monitoring.

Hot extractive multi-channel gas analyser for continuous process and emissions monitoring. Product Data Sheet CODEL Continuous Emission Monitoring GCEM4100 Extractive Gas Analyser CO, CO2, NO, NO2, SO2, HCL, CH4 & H2O Hot extractive multi-channel gas analyser for continuous process and emissions

More information

AUTOMATIC HOSE TEST UNIT, TYPE SPU

AUTOMATIC HOSE TEST UNIT, TYPE SPU VALVES AND FITTINGS UP TO 14,000 BAR TEST AND CONTROL EQUIPMENT H IGH PRESSURE TECHNOLOGY AUTOMATIC HOSE TEST UNIT, TYPE SPU Pressure range from 1 up to 10,000 bar User-friendly touch panel operation HIGH-PRESSURE

More information

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems

TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems ILEVE -Institute of LEV Engineers CPD & Information Day TExT Thorough Examination & Test of LEV Local Exhaust Ventilation Systems Jane Bastow CMIOSH Chartered Safety and Health Practitioner OSCHR Registered

More information

PRESSURE BALANCING TECHNIQUES TO CONTROL SPONTANEOUS COMBUSTION

PRESSURE BALANCING TECHNIQUES TO CONTROL SPONTANEOUS COMBUSTION PRESSURE BALANCING TECHNIQUES TO CONTROL SPONTANEOUS COMBUSTION Felipe Calizaya, University of Utah, Salt Lake city, UT Michael G. Nelson, University of Utah, Salt Lake city, UT Christopher Bateman, University

More information

Sandvik Jaw Crushers

Sandvik Jaw Crushers Sandvik Jaw Crushers Excellent durability thanks to welded frame. Range including models for mobile applications. 2 The product of decades of experience At Sandvik we have over a century of experience

More information

The system design must obey these constraints. The system is to have the minimum cost (capital plus operating) while meeting the constraints.

The system design must obey these constraints. The system is to have the minimum cost (capital plus operating) while meeting the constraints. Computer Algorithms in Systems Engineering Spring 2010 Problem Set 6: Building ventilation design (dynamic programming) Due: 12 noon, Wednesday, April 21, 2010 Problem statement Buildings require exhaust

More information

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

Standard Operating and Maintenance Instructions for Pumping System Model PS-90 Standard Operating and Maintenance Instructions for Pumping System Model PS-90 High Pressure Equipment Company 2955 West 17th Street, Suite 6 PO Box 8248 Erie, PA 16505 USA 814-838-2028 (phone) 814-838-6075

More information

Vent Lab. #9 & 10 Computer Simulation

Vent Lab. #9 & 10 Computer Simulation Vent Lab. #9 & 10 April 14, 1999 1. Introduction Network analysis of mine ventilation systems dates back to 1854 when Atkinson solved a small network problem using a method of succession approximation.

More information

Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework)

Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework) Crab and Lobster Live Holding System Part II (Water Pumps, Air Pumps and Pipework) 1990/2/SF/AM The increased demand for crabs and lobsters, and the requirement to export live shellfish has led to the

More information

Autodesk Moldflow Communicator Process settings

Autodesk Moldflow Communicator Process settings Autodesk Moldflow Communicator 212 Process settings Revision 1, 3 March 211. Contents Chapter 1 Process settings....................................... 1 Profiles.................................................

More information

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600

EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY MARINE AGGREGATE DREDGER (MAD) 5600 EXECUTIVE SUMMARY Damen offers a range of trailing suction hopper dredgers, dedicated for aggregate dredging. The innovative standard designs are future

More information

Hot extractive multi-channel gas analyser for continuous process and emissions monitoring.

Hot extractive multi-channel gas analyser for continuous process and emissions monitoring. Product Data Sheet CODEL Continuous Emission Monitoring GCEM4100 Extractive Gas Analyser CO, CO2, NO, NO2, SO2, HCL, CH4 & H2O Hot extractive multi-channel gas analyser for continuous process and emissions

More information

In Vessel Composter Installation & Commissioning Manual

In Vessel Composter Installation & Commissioning Manual In Vessel Composter Installation & Commissioning Manual Contents Customer responsibilities Transportation Lifting Delivery Pre-installation requirements Installation Drainage Ventilation Levelling Unpacking

More information

Auxiliary ventilation operation practices

Auxiliary ventilation operation practices Auxiliary ventilation operation practices E. De Souza Department of Mining Engineering, Queen s University, Kingston, Canada ABSTRACT: A series of visits to underground operations have been performed to

More information

The Future of Hydraulic Control in Water-Systems

The Future of Hydraulic Control in Water-Systems The Future of Hydraulic Control in Water-Systems A. Heimann Manager of R&D and of Technical Support & Applications Engineering departments at Dorot Automatic Control Valves Dorot Control Valves, Kibbutz

More information

Ingersoll Rand. X-Series System Automation

Ingersoll Rand. X-Series System Automation Ingersoll Rand -Series System Automation Energy Savings on Demand! Ingersoll Rand As much as 20% to 60% of the energy used to operate compressed air systems is wasted. This is primarily due to operating

More information

DNVGL-CP-0187 Edition March 2016

DNVGL-CP-0187 Edition March 2016 CLASS PROGRAMME Type approval DNVGL-CP-0187 Edition March 2016 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD

More information

(Refer Slide Time: 2:16)

(Refer Slide Time: 2:16) Fluid Machines. Professor Sankar Kumar Som. Department Of Mechanical Engineering. Indian Institute Of Technology Kharagpur. Lecture-23. Diffuser and Cavitation. Good morning and welcome you all to this

More information

White Paper. Electrical control valve actuators on oil and gas production separators

White Paper. Electrical control valve actuators on oil and gas production separators White Paper Electrical control valve actuators on oil and gas production separators Electrical control valve actuators on oil and gas production separators White Paper 18 th August 2014 Electrical control

More information

Tradition & Technology

Tradition & Technology Gaterotor Support Gaterotor Single Screw Compressors Design & Operation Bearing Bearings Main Screw Parallex Slide System The VSM Single Screw Compressor has one main rotor and two gaterotors. All bearings

More information

AGRI-VAC HIGH PERFORMANCE PNEUMATIC GRAIN MOVING UNITS

AGRI-VAC HIGH PERFORMANCE PNEUMATIC GRAIN MOVING UNITS AGRI-VAC HIGH PERFORMANCE PNEUMATIC GRAIN MOVING UNITS The only system you ll ever need. Gives one person total grain-handling capability! Do it all with the Walinga Agri-Vac. Fill or empty any storage

More information

Title: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015

Title: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015 Title: Abrasive Blasting Effective Date: 11/17/2014 Control Number: THG_0034 Revision Number: 1 Date: 10/22/2015 Annual Review Completed: 5/13/2015 Abrasive Blasting CONTENTS I. PURPOSE II. SCOPE III.

More information

NZQA unit standard version 5 Page 1 of 5. Describe, develop, and maintain basic ventilation systems for an underground coal mine

NZQA unit standard version 5 Page 1 of 5. Describe, develop, and maintain basic ventilation systems for an underground coal mine Page 1 of 5 Title Describe, develop, and maintain basic ventilation systems for an underground coal mine Level 4 Credits 15 Purpose People credited with this unit standard are able to: describe the basic

More information

MODELLING OF FUME EXTRACTORS C. R.

MODELLING OF FUME EXTRACTORS C. R. LD8 19th International Symposium of Ballistics, 7 11 May 21, Interlaken, Switzerland MODELLING OF FUME EXTRACTORS C. R. Woodley WS4 Guns and Warheads Department, Defence Evaluation and Research Agency,

More information

Models 461-S, 461-8S and S Regulators. R-1330 Rev. 7

Models 461-S, 461-8S and S Regulators. R-1330 Rev. 7 Models 461-S, 461-8S and 461-12S Regulators R-1330 Rev. 7 461-S, 461-8S and 461-12S Regulators The Sensus Models 461-S, 461-8S and 461-12S are balanced valve, spring type regulators designed for distribution

More information

Early evap monitors. Photo courtesy Toyota Motor Sales, U.S.A., Inc.; diagram courtesy University of Toyota

Early evap monitors. Photo courtesy Toyota Motor Sales, U.S.A., Inc.; diagram courtesy University of Toyota Early evap monitors checked for leaks greater than.040 in. (1mm), but starting in model year 2000, the allowable leak was reduced to.020 in. (.5mm), which was phased in over several years. The reduced

More information

Proactive Strategies for Prevention and Control of Fires in Bord and Pillar Mines Working in Thick Coal Seams

Proactive Strategies for Prevention and Control of Fires in Bord and Pillar Mines Working in Thick Coal Seams University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2011 Proactive Strategies for Prevention and Control of Fires in Bord and Pillar Mines

More information

Milking center performance and cost

Milking center performance and cost A3574 Milking Center Advisor Interactive software for estimating milking center costs and performance by Douglas J. Reinemann Milking center performance and cost depend upon many variables, such as the

More information

CO, NO, NO 2, NO x, SO 2, CH 4, HCl, CO 2 & H ² O. Extractive low cost, low maintenance devices for continuous process and emissions monitoring.

CO, NO, NO 2, NO x, SO 2, CH 4, HCl, CO 2 & H ² O. Extractive low cost, low maintenance devices for continuous process and emissions monitoring. Product Data Sheet CODEL Continuous Emission Monitoring GCEM 40 Series Extractive Gas Analyser CO, NO, NO 2, NO x, SO 2, CH 4, HCl, CO 2 & H ² O Extractive low cost, low maintenance devices for continuous

More information

This test shall be carried out on all vehicles equipped with open type traction batteries.

This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4. Determination of hydrogen emissions page 1 RESS-6-15 5.4.1. This test shall be carried out on all vehicles equipped with open type traction batteries. 5.4.2. The test shall be conducted following

More information

The latest automotive systems require innovative leak test methods and fixturing.

The latest automotive systems require innovative leak test methods and fixturing. Leak Testing Auto Parts The latest automotive systems require innovative leak test methods and fixturing. In the past, automobile manufacturers only required basic forms of leak testing to check standard

More information

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet. Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet. Planning and regulatory requirements (Regulatory requirements) The role or duties

More information

SEMIC05 Installing mechanical equipment

SEMIC05 Installing mechanical equipment Overview This unit identifies the competences you need to install mechanical equipment, in accordance with approved procedures. This will require you to survey the site for the proposed installation, and

More information

icon i150 / i350 Installation / Operation Manual

icon i150 / i350 Installation / Operation Manual i150 Concentrator i350 Concentrator icon i150 / i350 Installation / Operation Manual www.iconcentrator.com What You Will Need to Install Your icon In order to install your icon you will have to consider

More information

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS

MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS 24 TH July 2013 MITIGATING PIPE AND RISER HYDRAULIC PIPELINE ISSUES WITH THE I-RISER PLUS Vern Costelow Business Development Consultant AWMA Water Control Solutions INTRODUCTION Surface irrigation is still

More information

UNIQUE ADVANTAGES OF PIPENET

UNIQUE ADVANTAGES OF PIPENET UNIQUE ADVANTAGES OF PIPENET TRANSIENT MODULE Sunrise Systems Limited Section 1: Unique Advantages of the leading hydraulic analysis software engineers prefer to use: PIPENET s schematic design is unique.

More information

Free Surface Flow Simulation with ACUSIM in the Water Industry

Free Surface Flow Simulation with ACUSIM in the Water Industry Free Surface Flow Simulation with ACUSIM in the Water Industry Tuan Ta Research Scientist, Innovation, Thames Water Kempton Water Treatment Works, Innovation, Feltham Hill Road, Hanworth, TW13 6XH, UK.

More information

Modelling Today for the Future. Advanced Modelling Control Techniques

Modelling Today for the Future. Advanced Modelling Control Techniques CwMAG 1 st Autumn Conference 2012 Modelling Today for the Future Advanced Modelling Control Techniques What are advanced modelling controls? Why do we have them? How can we use them? What are the differences

More information

Introduction to Pumps

Introduction to Pumps Introduction to Pumps 1 Introduction to Pumps 1.0 INTRODUCTION There are many different types of pump now available for use in pumped fluid systems. A knowledge of these pump types and their performance

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

MINE VENTILATION AND ENVIRONMENTAL ENGINEERING COURSE Perth, Western Australia 8 th April to 13th April 2018

MINE VENTILATION AND ENVIRONMENTAL ENGINEERING COURSE Perth, Western Australia 8 th April to 13th April 2018 12 th February 2018 Dear Sir/Madam, MINE VENTILATION AND ENVIRONMENTAL ENGINEERING COURSE Perth, Western Australia 8 th April to 13th April 2018 I would like to invite you to the next Mine Ventilation

More information

1. Outline of the newly developed control technologies

1. Outline of the newly developed control technologies This paper describes a vertical lifting control and level luffing control design for newly developed, fully hydraulicdriven floating cranes. Unlike lattice boom crawler cranes for land use, the floating

More information

Discussion and guidance on the definition and qualification of porous loads

Discussion and guidance on the definition and qualification of porous loads SUMMARY Porous Loads requiring Sterilisation are often a Critical Control Point for the manufacture of Sterile products. Particularly Aseptically filled products. Regulatory guidance in this area is not

More information

AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL

AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL AUTOMATIC DREDGING PROFILE AND CONTOUR CONTROL Jay Wise 1 ABSTRACT Phillips and Jordan, a leading excavating and disaster recovery contractor, was faced with the challenge to manage a civil contract involving

More information

Heat pumps for swimming pools

Heat pumps for swimming pools Heat pumps for swimming pools Full range of heat pumps for indoor and outdoor swimming i pools The best heating for your pool Reliable and effective Made in Europe www.calorex.com THE CHALLENGE: To provide

More information

2017 DAY #1 MINE RESCUE PROBLEM

2017 DAY #1 MINE RESCUE PROBLEM 2017 AY #1 MINE RESCUE PROBLEM September 12 th, 2017 Beaver, WV Judges Packet NATIONAL MINE RESCUE CONTEST AY #1-SUPERINTENENT STATEMENT Thank you for answering our call for help and a quick response.

More information