Demonstration BSL4 laboratory

Size: px
Start display at page:

Download "Demonstration BSL4 laboratory"

Transcription

1 Demonstration BSL4 laboratory CONTAMINEXPO exhibition - Paris, FRANCE March 29 th April 2 nd 2015 GOPURA asia

2 Construction of a Demonstration BSL4 laboratory within the framework of CONTAMINEXPO, the world renowned French exhibition dedicated to containment engineering field.

3 The aim of this project was to show the know-how of Clima Plus (the French Engineering company owned and managed by Thierry Morand) to international contracting authorities, researchers, professionals of health and research sectors, politicians, broader public for only 3 days

4 through A high quality simplified BSL4 laboratory On-site demonstrations and presentations led by Thierry Morand and his team Animations

5 14 companies decided to undertake this challenge and to embark on this adventure

6 4 months were necessary to think, design and organize this unique and tailored project

7 48 hours only were spent to build this demonstration BSL4 laboratory

8 The construction

9 Day 1 8:28AM Supply in construction materials. Some elements are prefabricated in order to save time.

10 Day 1 8:28AM Laying of prefabricated elements forming the base of the future laboratory.

11 Day 1 8:29AM Laying of prefabricated elements forming the base of the future laboratory.

12 Day 1 8:29AM Laying of prefabricated elements forming the base of the future laboratory.

13 Day 1 8:30AM Unloading of the air handling unit. The whole air system is already assembled.

14 Day 1 8:35AM Unloading of the air handling unit.

15 Day 1 8:48AM Unloading of the air handling unit.

16 Day 1 8:59AM Laying of the air handling unit close to its final position.

17 Day 1 9:06AM Unloading of the decontamination shower.

18 Day 1 9:09AM Unloading of the decontamination shower.

19 Day 1 9:31AM Laying of the decontamination shower to its final position.

20 AM Day 1 9:50AM Construction of the floor made of wood panels nailed on the wood base elements.

21 Day 1 10:23AM Construction of the floor.

22 Day 1 10:46AM - Construction of the floor.

23 Day 1 10:55AM Reading of execution plans.

24 Day 1 11:13AM Putting of the surround around the laboratory wood base, and of the bottom wall plates.

25 Day 1 11:25AM Cutting of wall plates.

26 Day 1 11:41AM Fixing of bottom wall plates on the floor.

27 Day 1 2:49PM Assembly of partition walls and ceiling panels.

28 Day 1 2:49PM Equipment of the laboratory with a lab table.

29 Day 1 3:13PM Assembly of partition walls, ceiling panels, and window panes.

30 Day 1 3:13PM Assembly of partition walls, ceiling panels, and window panes.

31 Day 1 3:16PM Assembly of partition walls, ceiling panels, and window panes.

32 Day 1 3:17PM The structure of the laboratory is almost achieved.

33 Day 1 6:40PM Removal of partition walls protective films, and assembly of double-flush doors.

34 Day 1 6:41PM Equipment of the laboratory ceiling, and constitution of the inner and external air and electric system.

35 Day 1 6:41PM Finishing touches of the interior (for ex. on seals, to ensure airtightness of the facility).

36 Day 1 6:42PM Covering of the floor with coving.

37 Day 2 10:56AM Assembly of air blowing and extraction system elements.

38 Day 2 11:12AM Assembly of air blowing and extraction system elements.

39 Day 2 11:12AM Finishing touches on the bottom of the laboratory.

40 Day 2 11:17AM Equipment of the facility with a breathable air compressor unit.

41 Day 2 11:18AM The breathable air compressor unit is in position.

42 Day 2 11:18AM Hanging of cable trays.

43 Day 2 11:27AM Hanging of lights and security cameras, and cabling.

44 Day 2 6:00PM Hanging and assembly of breathable air ducts.

45 Day 2 6:03PM The laboratory is finally supplied in electricity and air.

46 Day 2 6:06PM Finishing touches on the top of the laboratory.

47 Day 2 6:10PM Checking of the facility.

48 Day 2 6:12PM Checking of biocontainment suits and breathable air supply.

49 The realization

50 The achieved Demonstration BSL4 laboratory

51 The entrance of the facility View from the entrance towards the personnel airlock 1

52 The comfort shower The personnel airlock 2 and biocontainment suits

53 View from the personnel airlock 2 toward the personnel airlock 1 View from the personnel airlock 2 towards the decontamination shower

54 View from the decontamination shower towards the core laboratory area View from the decontamination shower towards the core laboratory area

55 View from the inside of the core laboratory area toward a decontamination unit View from the inside of the core laboratory area toward the main area and the lab table

56 View from the inside of the core laboratory area toward a decontamination unit

57 View from the inside of the core laboratory area toward the electricity and air supply system

58 View from the outside, on the back of the laboratory, towards the air blowing and extraction system but also the breathable air system

59 View from the outside, on the side of the laboratory, towards the air extraction duct

60 Presentations details Oral presentation inside the facility Entering and leaving procedures Design principles Static containment Aerial decontamination Operational qualification Oral presentation outside the facility Dynamic containment and air treatment system Characteristics of the air handling unit Presentation of the particle filter box Characteristics of the breathable air compressor unit The presentation and demonstration details and schedule

61 Opening to the public Demonstrations & Presentations

62

63

64

65

66

67

68

69

70 Specials thanks to our valuable partners in this successful project: Batimpro, Spie, Robatherm, Camfil, Belair, Bioquell, Igienair, Sperian, Bioshield, Sefra, Eiffel Industrie, Posseme, Forbo et Papillon and the Aspec

71 GOPURA asia

Facility management and equipment. Institut Pasteur du Maroc

Facility management and equipment. Institut Pasteur du Maroc Facility management and equipment Institut Pasteur du Maroc 08.11.2017 1 Laboratory biosafety is the term used to describe the containment principles, technologies and practices that are implemented to

More information

SOUTHBANK PLACE Asbestos Removal (Brief Guide)

SOUTHBANK PLACE Asbestos Removal (Brief Guide) SOUTHBANK PLACE Asbestos Removal (Brief Guide) The removal of asbestos is regulated by the Control of Asbestos Regulations 2012 and is only undertaken by licensed contractors. The licensing procedures

More information

ProSys Laboratory Analytical Isolators

ProSys Laboratory Analytical Isolators Custom and standard isolators for analytical and QA laboratories Contained handling of samples for dispensing and analysis Integration of a wide range of different weigh scale systems and other instrumentation

More information

Regulatory Basics for Facility Design (WHO GMP): Current GMP Requirements

Regulatory Basics for Facility Design (WHO GMP): Current GMP Requirements Regulatory Basics for Facility Design (WHO GMP): Current GMP Requirements Main Topics of the Presentation Clean Room Requirements Interior Finishes and Air Tightness of Clean Rooms Pressure Cascade Concept

More information

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Treatment of G1 Baskets at the CEA Marcoule Site 12027

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Treatment of G1 Baskets at the CEA Marcoule Site 12027 Treatment of G1 Baskets at the CEA Marcoule Site 12027 Line Fourquet, Didier Boya CEA Marcoule, France ABSTRACT In the dismantling program for the first-generation French reactors in accordance with the

More information

Inspection Checklist for BSL4 Laboratories (7CFR 331; 9 CFR 121; 42 CFR 73; BMBL 5th Edition)

Inspection Checklist for BSL4 Laboratories (7CFR 331; 9 CFR 121; 42 CFR 73; BMBL 5th Edition) Inspection Checklist for BSL4 Laboratories (7CFR 331; 9 CFR 121; 42 CFR 73; BMBL 5th Edition) Entity Name: Street Address: City, State, Zip: Lead Inspector: Other Inspectors: Building/Room(s): PI(s): HHS

More information

Hazardous Materials Spill Response

Hazardous Materials Spill Response Hazardous Materials Spill Response The University of Iowa Rev. 02/10 Department Lab/Room Number PI/Lab Coordinator After Hours Contact Number University Public Safety (Phone 911) Fire, Police, Ambulance

More information

Electronics Lab Advanced Electrical Engineering Lab Course II Spring 2006

Electronics Lab Advanced Electrical Engineering Lab Course II Spring 2006 Safety Instructions Electronics Lab Advanced Electrical Engineering Lab Course II Spring 2006 Instructor: H. Elgala, Dr. D. Knipp Ta http://www.faculty.iu-bremen.de/course/c300221a/ee_module_2 Purpose

More information

BFT Bollards. A complete range of bollards

BFT Bollards. A complete range of bollards BFT Bollards A complete range of bollards Fixed Bollards Gas Bollards Automatic Bollards Crash Rated Automatic & Fixed Bollards Crash Tested Automatic Bollards Bollards July 2015.indd 1 24/08/2015 10:53

More information

ROTHERHITHE BATH AND ASSEMBLY HALL OFFICIAL OPENING 27 NOVEMBER 1965

ROTHERHITHE BATH AND ASSEMBLY HALL OFFICIAL OPENING 27 NOVEMBER 1965 ROTHERHITHE BATH AND ASSEMBLY HALL OFFICIAL OPENING 27 NOVEMBER 1965 Consultants for Architectural, Structural Mechanical and Electrical Services: Sir Frederick Snow & Partners, Ross House, 144, Southwark

More information

CompacSas BA. Comfort and design for high-security access

CompacSas BA. Comfort and design for high-security access CompacSas BA Comfort and design for high-security access Manual Attack Resistance Ballistic Resistance Access Flow Recyclable product Eco-design Models: CompacSas BA6Q, CompacSas BA6, CompacSas BA9 CompacSas

More information

Series Environmental Chambers

Series Environmental Chambers 3119-600 Series Environmental Chambers Challenges in Non-Ambient Testing Testing at non-ambient temperatures adds another layer of challenges to your testing laboratory. Ensuring you get accurate and stable

More information

New Licensed Asbestos Operative Training

New Licensed Asbestos Operative Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Operative Training This unit has twenty-two learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

2 in. 18 Gauge Brad Nailer. User manual

2 in. 18 Gauge Brad Nailer. User manual 8504342 2 in. 18 Gauge Brad Nailer User manual Technical Data Capacity....100pcs Nail length... 15-50mm( 5/8-2 ) Fastener size....18gauge (1.25 1.00mm) Operation pressure 70-110PSI(4.8-7.5bar) Air inlet....1/4

More information

SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL

SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL 1 SERVICE MANUAL MODEL BA200AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2 GENERAL

More information

1. The laboratory supervisor must enforce the institutional policies that control access to the laboratory.

1. The laboratory supervisor must enforce the institutional policies that control access to the laboratory. APPENDIX E-3: Biosafety Level 3 (BSL-3) The following is taken from the Biosafety in Microbiological and Biomedical Laboratories (BMBL) 5 th Edition, February 2009 Centers for Disease Control and Prevention

More information

Specialists in HTM Medical Gas Pipeline Equipment AVSU/Module Operating and Maintenance Instructions

Specialists in HTM Medical Gas Pipeline Equipment AVSU/Module Operating and Maintenance Instructions The Area Value Service Units and Module format (AVSU) provide a local gas isolation facility for use during normal installation and maintenance or in the event of an emergency. They are built in accordance

More information

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ARCHITECTURAL 3300 SUMMIT BOULEVARD WEST PALM BEACH, FLORIDA 33406 TEL (561) 688-7687 FAX (561) 688-7654 http://www.palmbeach.k12.fl.us/fm/bd/index.htm

More information

Laboratory Emergency Response & Incident Reporting Guide. Occupational & Environmental Safety Office Duke University Health System.

Laboratory Emergency Response & Incident Reporting Guide. Occupational & Environmental Safety Office Duke University Health System. Laboratory Emergency Response & Incident Reporting Guide Occupational & Environmental Safety Office Duke University Health System Quick Reference Revised 2016 Blood/Body Fluid Hotline From a Duke phone...

More information

Syllabus for Licensable Work with Asbestos (Category C)

Syllabus for Licensable Work with Asbestos (Category C) Syllabus for Licensable Work with Asbestos (Category C) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of licensed asbestos training

More information

SERVICE MANUAL MODEL BA200AA-S1 BREATHING AIR PANEL

SERVICE MANUAL MODEL BA200AA-S1 BREATHING AIR PANEL SERVICE MANUAL MODEL BA200AA-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 1/00 2 GENERAL

More information

R2D2P. Working group report

R2D2P. Working group report R2D2P Working group report Working group members: Clédola Cassia Oliveira de Tello (Brazil), Farouk Abdel-Rahman (Egypt), Ibrahim Muhamad (Malaysia), Milan Vujovic (Serbia), Quang Huy Pham (Vietnam) Team

More information

(1) Minimum Required. At least one entrance of sufficient area shall be provided to

(1) Minimum Required. At least one entrance of sufficient area shall be provided to (B) Clear Spaces. Working space required by this section shall not be used for storage. When normally enclosed live parts are exposed for inspection or servicing, the working space, if in a passageway

More information

EuroBioConcept s.a.s Hospital Pharmacy Isolator Systems

EuroBioConcept s.a.s Hospital Pharmacy Isolator Systems EuroBioConcept s.a.s Hospital Pharmacy Isolator Systems Presented by: Joe Sacca Dynamic Design Pharma, Inc. Mission Viejo, California USA June 2014 INTRODUCTION EBC PRODUCTS TYPICAL INSTALLATIONS ISOLATION

More information

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL www.modsafe.com SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device.

More information

Refresher Licensed Asbestos Supervisor Training

Refresher Licensed Asbestos Supervisor Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS Refresher Licensed Asbestos Supervisor Training This unit has nineteen learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

New Licensed Asbestos Manager Training

New Licensed Asbestos Manager Training TRAINING SYLLABUS LICENSED WORK WITH ASBESTOS New Licensed Asbestos Manager Training This unit has twenty-three learning outcomes. 1. Recognise the types, uses and risks of asbestos containing materials

More information

Hazardous Materials Spill Response

Hazardous Materials Spill Response Hazardous Materials Spill Response The University of Iowa Rev. 01/2019 Department: Lab/Room Number: PI/Lab Coordinator: After-hours Contact Number: University Public Safety - 911 Fire, Police, Ambulance

More information

Webinar Expert Module 1: Garment Logistics and Gowning. Dupont September GOP-Innovations

Webinar Expert Module 1: Garment Logistics and Gowning. Dupont September GOP-Innovations Webinar Expert Module 1: Garment Logistics and Gowning Dupont 28-29 September 2017 GOP-Innovations your Partner for Practical Training and e-learning Milenko Pavičić Pharmaceutical microbiologist, trainer,

More information

Walk in Modular Material Transfer Chamber Including Integration of a Bioquell Clarus L2 hydrogen peroxide vapour (HPV) generator

Walk in Modular Material Transfer Chamber Including Integration of a Bioquell Clarus L2 hydrogen peroxide vapour (HPV) generator Walk in Modular Material Transfer Chamber Including Integration of a Bioquell Clarus L2 hydrogen peroxide vapour (HPV) generator Page 1 of 20 Walk in chamber and HPV integrated system - Product overview.

More information

MyoSure Setup Simplified

MyoSure Setup Simplified MyoSure Setup Simplified This is designed as a quick reference guide only. This guide is not a substitute for the Operator s Manual and/or Instructions for Use (IFU). MyoSure Setup with Aquilex MyoSure

More information

OBJECTIVE 22: EMERGENCY WORKERS, EQUIPMENT, AND VEHICLES - MONITORING AND DECONTAMINATION

OBJECTIVE 22: EMERGENCY WORKERS, EQUIPMENT, AND VEHICLES - MONITORING AND DECONTAMINATION OBJECTIVE Demonstrate the adequacy of procedures for the monitoring and decontamination of emergency workers, equipment, and vehicles. INTENT This objective is derived from NUREG-0654 which provides that

More information

Yeo Soh Bee A/Prof Dan Yock Young 28/03/2016 Prepared by Approved By Issue Date

Yeo Soh Bee A/Prof Dan Yock Young 28/03/2016 Prepared by Approved By Issue Date Page: 1 of 6 Yeo Soh Bee A/Prof Dan Yock Young 28//2016 Prepared by Approved By Issue Date 1. OBJECTIVE The purpose of this SOP is to outline the procedures of cleaning up chemical spills. It will provide

More information

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL

SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL SERVICE MANUAL MODEL BA600AMST-S1 BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 2/05 GENERAL

More information

SAMPLING SYSTEMS FOR LIQUIDS AND GASES FOR ALL TYPES OF APPLICATIONS

SAMPLING SYSTEMS FOR LIQUIDS AND GASES FOR ALL TYPES OF APPLICATIONS GLOBAL SOLUTIONS IN FLOW SYSTEMS INSTRUMENTATION AND AUTOMATION SAMPLING SYSTEMS FOR LIQUIDS AND GASES FOR ALL TYPES OF APPLICATIONS Process sampling systems In the current chemical and petrochemical industry,

More information

Information here is intended to assist the investigator in the

Information here is intended to assist the investigator in the Firearms and Ammunition Information here is intended to assist the investigator in the recognition, evaluation, marking, packaging, and transmittal of firearms exhibits and related items to the I. General

More information

INSPECTION & NON-DESTRUCTIVE TESTING

INSPECTION & NON-DESTRUCTIVE TESTING INSPECTION & NON-DESTRUCTIVE TESTING Stork delivers experienced and efficient Inspection and NDT solutions; as a tailored package or a standalone service. WWW.STORK.COM 1 GLOBAL SERVICE WITH A LOCAL PRESENCE

More information

AES-28/50/75/110/150 RFG Sterilization Autoclaves with counter pressure and fast cooling

AES-28/50/75/110/150 RFG Sterilization Autoclaves with counter pressure and fast cooling AES-75 RFG Advantages: Reduces the total cycle time until 50%. At the end of the process you can manipulate the sterilized materials thanks to output temperature set point. This equipment is design to

More information

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL Product Manual MST Portable Air Filtration System SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the

More information

Control of the Airlock (Amber Lodge Forensic Service) Standard Operating Procedure

Control of the Airlock (Amber Lodge Forensic Service) Standard Operating Procedure Control of the Airlock (Amber Lodge Forensic Service) Standard Operating Procedure DOCUMENT CONTROL: Version: 3 Ratified by: Quality and Safety Sub Committee Date ratified: 4 September 2017 Name of originator/author:

More information

RADIATION PROCEDURES MANUAL Procedure Cover Sheet

RADIATION PROCEDURES MANUAL Procedure Cover Sheet RADIATION PROCEDURES MANUAL Procedure Cover Sheet Procedure Title: Calibration of Eberline Portable Particulate Noble Gas Monitor Procedure Number: TSO-08-13-REV 1 Effective Date: July 1, 2008 Approved

More information

CYCLIC PERFORMANCE PER ASTM E 330 TEST REPORT. Rendered to: TRUSEAL TECHNOLOGIES, LTD. PRODUCT TYPE: Fixed Window

CYCLIC PERFORMANCE PER ASTM E 330 TEST REPORT. Rendered to: TRUSEAL TECHNOLOGIES, LTD. PRODUCT TYPE: Fixed Window CYCLIC PERFORMANCE PER ASTM E 330 TEST REPORT Rendered to: TRUSEAL TECHNOLOGIES, LTD. PRODUCT TYPE: Fixed Window Report No.: Test Dates: 07/30/07 Through: 08/03/07 Report Date: 08/20/07 Expiration Date:

More information

UK ASBESTOS TRAINING ASSOCIATION GUIDANCE

UK ASBESTOS TRAINING ASSOCIATION GUIDANCE UK ASBESTOS TRAINING ASSOCIATION GUIDANCE MINIMUM STANDARDS FOR TRAINING CENTRES Document No: MG003 Issue Date: 18/09/2017 Issue No: 01 UK Asbestos Training Association Limited / MG003 / Page 1 of 5 MINIMUM

More information

Ventam 85 Installation & Commissioning Instructions

Ventam 85 Installation & Commissioning Instructions Ventam Systems Ltd Unit D4 Seedbed Business Centre Vanguard Way Shoeburyness Essex SS3 9QY Phone 01702 382 307 Fax 01702 382 340 Ventam 85 Installation & Commissioning Instructions 1 General The Ventam

More information

Biological Safety Cabinet Guidelines

Biological Safety Cabinet Guidelines Biological Safety Cabinet Guidelines 2017 Table of Contents 1 Introduction... 2 2 BSC Start-Up Considerations... 3 3 Working in the BSC... 4 4 Completion of Work in the BSC... 5 5 Ultraviolet Lights...

More information

CTG Certification Protocol -- Version 3.0 SUMMARY

CTG Certification Protocol -- Version 3.0 SUMMARY Date of Test: Test Report Number: SUMMARY Date of Prior Certification: Certified by: Re-certification Due Date: Unit Description: Make : Model: Serial Number: Location: CERTIFIER INFORMATION Name: Client

More information

Customer Responsibilities

Customer Responsibilities Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

Getting out safely Our escape solutions FILTERING ESCAPE EQUIPMENT COMPRESSED AIR EQUIPMENT OXYGEN SELF-RESCUER REFUGE CHAMBERS TRAINING & SERVICE

Getting out safely Our escape solutions FILTERING ESCAPE EQUIPMENT COMPRESSED AIR EQUIPMENT OXYGEN SELF-RESCUER REFUGE CHAMBERS TRAINING & SERVICE 3 D-32698-2011 Getting out safely Our escape solutions FILTERING ESCAPE EQUIPMENT COMPRESSED AIR EQUIPMENT OXYGEN SELF-RESCUER REFUGE CHAMBERS TRAINING & SERVICE 2 ESCAPE SOLUTIONS D-84459-2013 03 Emergencies

More information

Service Parts Manual Drawer Microwave Models: MWD24-2 & MWD30-2

Service Parts Manual Drawer Microwave Models: MWD24-2 & MWD30-2 Service Parts Manual 28 14 40 49 68 29 73 5 11 55 38 75 56 4 44 8 7 45 1 52 2 22 10 46 50 71 25 26 62 15 27 3 24 48 9 39 57 13 63 39 74 36 64 51 53 50 6 35 66 42 70 21 18 37 55 16 17 76 60 33 67 19 54

More information

TEMPLE UNIVERSITY A Commonwealth University Environmental Health & Radiation Safety (EHRS)

TEMPLE UNIVERSITY A Commonwealth University Environmental Health & Radiation Safety (EHRS) Page 1 of 8 TEMPLE UNIVERSITY A Commonwealth University Environmental Health & Radiation Safety (EHRS) Standard Operating Procedure (SOP) Bromodeoxyuridine (BrdU) Principal Investigator: Room & Building

More information

Pneumatic Target Transfer System Model PT01

Pneumatic Target Transfer System Model PT01 Pneumatic Target Transfer System Model PT01 Technical Data Sheet ELEX Commerce LLC Bul. M. Pupina 10Z/IV 11070 Belgrade, Serbia www.elexcomm.com February 2018. Page 2/13 REVISION HYSTORY No. Description

More information

Facility design for containment. Gordon Farquharson, July 2016

Facility design for containment. Gordon Farquharson, July 2016 Facility design for containment Gordon Farquharson, July 2016 Agenda Understanding the hazards. Containment principles. Primary and secondary containment. Facility features: Layout & Air locks. Pressurisation.

More information

The CompacSas BAH airlock is the ideal solution for transforming an existing door into an airlock

The CompacSas BAH airlock is the ideal solution for transforming an existing door into an airlock CompacSas BAH Improved filtering for existing accesses Manual Attack Resistance Ballistic Resistance Access Flow Recyclable product Energy savings Models: CompacSas BAH IMPROVED FILTERING The CompacSas

More information

Price Guide

Price Guide Guide 2013 PARTITIONING EASYFIT FRAMES DOORS && IRONMONGERY MOVABLE WALLS CLICWALL STORAGE WALL SHELVING WASHROOMS 1 The price guide to our range of flexible interior solutions Flexible interiors for beautiful

More information

EasySas. The most advanced airlock electronics on the market. Recyclable product. Eco-design. Energy savings

EasySas. The most advanced airlock electronics on the market. Recyclable product. Eco-design. Energy savings EasySas The most advanced airlock electronics on the market Eco-design Energy savings Recyclable product ELECTRONIC AIRLOCK MANAGEMENT SkySas range UniSas range CompacSas range An electronic management

More information

ASSESSMENT OF BIOAEROSOL REDUCTION METHODS IN STEM CELL TRANSPLANT UNITS AT A UNIVERSITY HOSPITAL

ASSESSMENT OF BIOAEROSOL REDUCTION METHODS IN STEM CELL TRANSPLANT UNITS AT A UNIVERSITY HOSPITAL ASSESSMENT OF BIOAEROSOL REDUCTION METHODS IN STEM CELL TRANSPLANT UNITS AT A UNIVERSITY HOSPITAL T. S. Alderman, MS, W.R. Thomann, Dr.P.H., D.L. Hunt, Dr.P.H. Duke University Medical Center INTRODUCTION

More information

Vermin, Insects and Scavenging Birds Management Plan

Vermin, Insects and Scavenging Birds Management Plan VIRIDOR WASTE MANAGEMENT LIMITED Lostock Waste Treatment Plant Vermin, Insects and Scavenging Birds Management Plan CONTENTS 1 Introduction... 2 2 Sources, Releases and Impacts... 3 3 Vermin, Insects and

More information

Laboratory and Satellite Rodent Housing

Laboratory and Satellite Rodent Housing University of Louisville Institutional Animal Care and Use Committee Policies and Procedures Laboratory and Satellite Rodent Housing Policy: Although strongly discouraged, the IACUC acknowledges that there

More information

Press Release. Friction Stir Welding: Grenzebach extends its portfolio

Press Release. Friction Stir Welding: Grenzebach extends its portfolio Friction Stir Welding: Grenzebach extends its portfolio Higher dynamics, higher welding speeds, lower process forces and even higher quality welding seams and welding surfaces: at the Düsseldorf Schweissen

More information

CLARKES ERO FEEDER MANUAL

CLARKES ERO FEEDER MANUAL CLARKES ERO FEEDER MANUAL It is the sole responsibility of the Owner and/or the Responsible Supervising Operators of this equipment to properly instruct their employees, either direct or contact, in the

More information

490 Micro GC Site Preparation Checklist

490 Micro GC Site Preparation Checklist Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

Installations & Equipment

Installations & Equipment Installations & Equipment www.uk.airliquide.com Installations & Equipment Air Liquide is the world leader in gases for industry, health and the environment. Our dedicated supply offer to the Laboratory

More information

AREA VALVE SERVICE UNITS

AREA VALVE SERVICE UNITS AREA VALVE SERVICE UNITS. Unit 8, McKenzie Industrial Park, Tel No.: 44 (0) 161 428 7200 Bird Hall Lane, Fax No.: 44 (0) 161 428 7010 Stockport, Email: info@p3-phoenix.com U.K., SK3 0SB www.p3-phoenix.com

More information

Assembly Instructions for STS-110 payload

Assembly Instructions for STS-110 payload 2008 Assembly Instructions for STS-110 payload IMPORTANT NOTE TO MODELERS The making of this model requires the use of the X-acto knife (craft knife) and tweezers, besides a simple scissor. Also important,

More information

PART III SECTION 5C OLYMPIC GAMES STATEMENT OF BADMINTON S REQUIREMENT

PART III SECTION 5C OLYMPIC GAMES STATEMENT OF BADMINTON S REQUIREMENT PART III SECTION 5C OLYMPIC GAMES STATEMENT OF BADMINTON S REQUIREMENT The purpose of this Statement is to act as: an aid to bidding cities a reference against which the plans of cities hosting the will

More information

DK46 - DK800 Supplementary instructions

DK46 - DK800 Supplementary instructions DK46 - DK800 Supplementary instructions Variable area flowmeter Device category II2G with electrical internals Additional Ex manual KROHNE CONTENTS DK46 - DK800 1 Safety instructions 3 1.1 General... 3

More information

Laboratory Self Inspection Checklist LAB01

Laboratory Self Inspection Checklist LAB01 Laboratory Self Inspection Checklist LAB01 General Chemical/Biological Laboratories Location Assessor Date This core checklist is provided by the Health and Safety Department as a template, which provides

More information

M18W49_MME75_F_EN MANUAL

M18W49_MME75_F_EN MANUAL M18W49_MME75_F_EN MANUAL Contents Important information 3 Applications 3 Technical data 3 Installation and use 4-6 Cleaning 7 Service and repairs 7 Spare parts and accessories 8-9 Testing and troubleshooting

More information

DOUBLE MASK REV: /BS

DOUBLE MASK REV: /BS DOUBLE MASK Before the Double mask may be taken into use, this manual must be studied carefully. Only, by MEDICVENT, authorized personnel are allowed to perform adjustments or repairs on this equipment.

More information

Insulated Door Components. Tension Spring System. High performance hardware door system for residential applications

Insulated Door Components. Tension Spring System. High performance hardware door system for residential applications Insulated Door Components Tension Spring System High performance hardware door system for residential applications Tension Spring System Simple and quick suitable for door dimensions of 3500 mm x 2250

More information

Dräger ERS-Chamber Refuge Chambers

Dräger ERS-Chamber Refuge Chambers Dräger ERS-Chamber Refuge Chambers Dräger Engineered Refuge Solutions (ERS) provide a safe haven for miners in emergency situations. The engineered chamber solution is fully customized to the individual

More information

M18W49_MME100_MUS_EN MANUAL

M18W49_MME100_MUS_EN MANUAL M18W49_MME100_MUS_EN MANUAL Contents Important information 3 Applications 3 Technical data 3 Installation and use 4-6 Cleaning 7 Service and repairs 7 Spare parts and accessories 8-9 Testing and troubleshooting

More information

A tool for controlling risks in ropeway operation: the safety management system

A tool for controlling risks in ropeway operation: the safety management system A tool for controlling risks in ropeway operation: the safety management system Gaëtan RIOULT Head of ropeways department French ministry of transport Ropeways as urban public transport systems : a safe

More information

ANTI-EXPLOSION PANELS

ANTI-EXPLOSION PANELS ANTI-EXPLOSION PANELS ATEX TO AVOID THE FIRE AND EXPLOSION OF THE FILTERS AND SILOS WITH AIRCOM S FIREBREAK SASH SHUTTER AND ANTI-EXPLOSION PANELS CERTIFIED WITH THE NORM UNI EN14797 CERTIFIED 2049 DNV-MUNO

More information

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7

CONTENTS 1. INTRODUCTION DESCRIPTION OF TEST SAMPLE TEST RIG GENERAL ARRANGEMENT TEST SEQUENCE...7 Page 2 of 22 CONTENTS 1. INTRODUCTION...3 2. DESCRIPTION OF TEST SAMPLE...4 3. TEST RIG GENERAL ARRANGEMENT...6 4. TEST SEQUENCE...7 5. SUMMARY AND CLASSIFICATION OF TEST RESULTS...8 6. WATERTIGHTNESS

More information

Assembling and testing fluid power systems

Assembling and testing fluid power systems Unit 020 Assembling and testing fluid power systems Level: 2 Credit value: 14 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover

More information

Adams McGillan. Craig Cottage 451 Seacoast Road Magilligan BT49 0LL. Offers Around 149,950. Telephone

Adams McGillan. Craig Cottage 451 Seacoast Road Magilligan BT49 0LL. Offers Around 149,950. Telephone Adams McGillan RESIDENTIAL & COMMERCIAL Craig Cottage 451 Seacoast Road Magilligan BT49 0LL Offers Around 149,950 Telephone 028 7035 7777 www.adamsmcgillan.com SUMMARY: Occupying a generous sized site

More information

Work Method Statement. Prepared for: The Bolton NHS Foundation Trust Prepared by: Mark Fentiman Date:

Work Method Statement. Prepared for: The Bolton NHS Foundation Trust Prepared by: Mark Fentiman Date: Work Method Statement Prepared for: The Bolton NHS Foundation Trust Prepared by: Mark Fentiman Date: 06.03.2014 Detailed Work Plan The Bolton NHS Foundation Trust Date: 06.03.2014 1 Contents: 1. The Deprox

More information

New AQF Filter Polymer Filtration System

New AQF Filter Polymer Filtration System New AQF Filter Polymer Filtration System Operator Manual Covering Serial Number 20002001 onwards February 2011 Index Disclaimer notice...3 Introduction...4 Important safety notices...5 Getting started...6

More information

Air Handling Unit (AHU) Air handling unit which serves to condition the air and provide the required air movement within a facility.

Air Handling Unit (AHU) Air handling unit which serves to condition the air and provide the required air movement within a facility. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 13, Issue 5 Ver. I (Sep. - Oct. 2016), PP 28-35 www.iosrjournals.org. Heating, Ventilation and Air

More information

Asbestos Regulation and Compliance

Asbestos Regulation and Compliance Asbestos Regulation and Compliance Asbestos workshop for the elevator industry Yvonne Nann Occupational Hygiene Officer WorkSafeBC Yvonne.Nann@worksafebc.com November 25, 2015 Definition of Asbestos-containing

More information

CUNY ASRC Photonics Spectroscopy Facility User Policies

CUNY ASRC Photonics Spectroscopy Facility User Policies CUNY ASRC Photonics Spectroscopy Facility User Policies The Photonics Spectroscopy Facility (PSF) of CUNY Advanced Science Research Center is a multi-user facility and it is imperative that all users are

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge]

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS. A high-capacity EBA system [CSVS] [main purge] PAGE : 1 / 9 5. CONTAINMENT PURGE (EBA [CSVS]) The Reactor Building purge system comprises the following: A high-capacity EBA system [CSVS] [main purge] A low-capacity EBA system [CSVS] [mini-purge] 5.1.

More information

SUPERIOR PERFORMANCE

SUPERIOR PERFORMANCE LAB-1 ABR BLASTROOM & PNEUMATIC RECOVERY SYSTEM OPERATION & MAINTENANCE MANUAL BLAST ROOM SUPERIOR PERFORMANCE And Quality In Blast Cleaning Equipment! WARNING Read Manual Failure to read, understand &

More information

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation

ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6. Fume Cupboards, Ventilated Cabinets, Local Exhaust Ventilation ESTATES OFFICE OPERATIONS WORKS INSTRUCTIONS WI 6 ISSUE RECORD Revision Description Updated Date Compiled by Review date 01 Modified Mar 2010 J Cummins Mar 2011 02 Reviewed Aug 2011 J Cummins Aug 2012

More information

Semi-annual BRD Checklist. Inspection Location(s) P.I. Name. Office Telephone : Contact Telephone : Department. Survey Date : Reviewed Date :

Semi-annual BRD Checklist. Inspection Location(s) P.I. Name. Office Telephone : Contact Telephone : Department. Survey Date : Reviewed Date : Semi-annual BRD Checklist P.I. Name Survey Date : Reviewed Date : Survey By : Reviewed By : Inspection Location(s) Building Name Building Code Lab/Room # 1. Documentation and Training Personnel have documented

More information

PURDUE UNIVERSITY TEFLON CORE PCB THRU-HOLE PREPARATION FOR BLACK HOLE APPLICATION RF LAB. Professor in charge: William Chappell MSEE 289

PURDUE UNIVERSITY TEFLON CORE PCB THRU-HOLE PREPARATION FOR BLACK HOLE APPLICATION RF LAB. Professor in charge: William Chappell MSEE 289 RF LAB Professor in charge: William Chappell MSEE 289 AUTHOR: BOB SALISBURY DATE: 12/5/2007 12/6/2007 page 1 of 7 TABLE OF CONTENTS 1 SCOPE... 3 2 PURPOSE... 3 3 REFERENCE DOCUMENTS... 3 4 MATERIALS...

More information

Installation of Your SprayMaster System

Installation of Your SprayMaster System Installation of Your SprayMaster System 1. At the installation site, remove all equipment from the corrugated box and the polyethylene drum and replace the drum lid. Check the picture to identify each

More information

OS2 F R A M E S E R I E S

OS2 F R A M E S E R I E S P E R F O R M A N C E S P E C I F I C A T I O N S. F R A M E S E R I E S Window - Single OR Double Sash (Inswing Casement) Assessment of ification 4 Joint Permeability 0.75 m³/hm Overall Area Permeability

More information

01 18/11/2013 correction of the reference of the product 1 4 5

01 18/11/2013 correction of the reference of the product 1 4 5 The signed original report cancels all results and draft documents previously submitted. Each updated version of the report supersedes all previous ones. All void copies must be returned to CETIAT or destroyed.

More information

M18W49_MME100EX_F_EN MANUAL

M18W49_MME100EX_F_EN MANUAL M18W49_MME100EX_F_EN MANUAL Contents Important information 3 Applications 3 Technical data 3 Installation and use 4-6 Cleaning 7 Service and repairs 7 Spare parts and accessories 8-9 Testing and troubleshooting

More information

Toolkit for safe Use of Microbiological Safety Cabinets(MSC s)

Toolkit for safe Use of Microbiological Safety Cabinets(MSC s) Toolkit for safe Use of Microbiological Safety Cabinets(MSC s) What Do I Need To Do? How Do I Manage the Use of MSC s Recommendations 1 What Do I Need To Do Head of Department? Information, induction,

More information

THE UNIVERSITY OF WESTERN ONTARIO OCCUPATIONAL HEATH & SAFETY

THE UNIVERSITY OF WESTERN ONTARIO OCCUPATIONAL HEATH & SAFETY THE UNIVERSITY OF WESTERN ONTARIO OCCUPATIONAL HEATH & SAFETY UWO West Valley Sheep Unit Inspection Checklist Approved by Biohazards Subcomittee: March 27, 2009 The following inspection items have been

More information

AES 28/50/75/110/150 RFG Sterilization Autoclaves with counter pressure and fast cooling

AES 28/50/75/110/150 RFG Sterilization Autoclaves with counter pressure and fast cooling AES 75 RFG Advantages: Total flexibility adjusting the pressures on each cycle phases. Three settable pressures: on heating phase, on sterilizing phase and on cooling phase. Reduces the total cycle time

More information

INDUSTRY AND TECHNOLOGY Institutional (ILO), Program (PLO), and Course (SLO) Alignment

INDUSTRY AND TECHNOLOGY Institutional (ILO), Program (PLO), and Course (SLO) Alignment INDUSTRY AND TECHNOLOGY Institutional (ILO), Program (PLO), and Course (SLO) Program: Construction Technology Number of Courses: 22 Date Updated: 09.18.2014 Submitted by: SueEllen Warren, ext. 4519 Renee

More information

AUTOMOTIVE SYSTEMS LABORATORY SAFETY GUIDE (V1-8/30/17)

AUTOMOTIVE SYSTEMS LABORATORY SAFETY GUIDE (V1-8/30/17) COLLEGE OF ENGINEERING & APPLIED SCIENCES FLOYD HALL AUTOMOTIVE SYSTEMS LABORATORY SAFETY GUIDE (V1-8/30/17) ROOM G-114 1 P a g e General Lab Safety Rules 1. Safety glasses, or appropriate goggles/face

More information

Events At Ovolo Southside

Events At Ovolo Southside Events At Ovolo Southside Features State-of-the-art AV System with 7.1 Surround Sound Stunning 18 meter video projection wall Industry, Artistry, Creativity, Interactivity, Let's GIG it ON!! 360 Turntable

More information

ARCA Guidance Note. Guidance on Air Management in Asbestos Enclosures

ARCA Guidance Note. Guidance on Air Management in Asbestos Enclosures Guidance on Air Management in Asbestos Enclosures 1 GUIDANCE ON AIR MANAGEMENT IN ASBESTOS ENCLOSURES 1. BACKGROUND 1.1 This guidance note is intended to clarify expectations with regard to air management,

More information

Managed by. In partnership with

Managed by. In partnership with Managed by In partnership with From top player to top leader What next? This is a crucial question all footballers must ask themselves at some stage. Ideally, after hanging up their boots, ex-players are

More information

Electrical Machines & Drives Group Safety Policy 2018/2019

Electrical Machines & Drives Group Safety Policy 2018/2019 Electronic & Electrical Engineering. Electrical Machines & Drives Group Safety Policy 2018/2019 1 Introduction This Safety Policy provides the safety information and procedures that must be followed to

More information