1 T-PROP RISK ASSESSMENT 13/02/2012 ELBROC RA T-PROP

2 CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 3 4. Objectives 4 5. Hazard Classification 4 Risk matrix 5 FACTOR/INDEX TABLE 5 6. Conclusion 6 Appendix 1 T-Prop performance graphs 7-18 Appendix 2 Tabulated Hazards and Control Measures INSTALLATION AND REMOVAL PROCEDURE 22 13/02/2012 ELBROC RA T-PROP

3 Introduction This document has been compiled as a risk assessment for the T-Prop mechanical prop designed and manufactured by ELBROC MINING PRODUCTS (PTY) LTD. This assessment preempts any potential application and trials that will be conducted underground. A comprehensive assessment will be carried out in accordance with the guidelines (QSP 111 Issue 1) The aim of this assessment is to identify the potential hazards associated with the use of these temporary support units in underground stoping operations and to list control measures to eliminate or reduce that potential. 1. Product Description The manufacturers of the T-Prop mechanical prop have developed the unit to perform in accordance with the COMRO guidelines for rock-burst and rock-fall conditions. The T-Prop can be re-used several times provided the prop is inspected for damage after each use. The primary purpose of the T-Prop is to be used as a temporary active support in an underground environment where such needs are identified by the mine and is not a blast on prop. 2. Design Criteria The T-Prop is a mechanical prop designed as a temporary support that can be reused 1. Installed at a load of 30kN 2. Safely operates at 50kN 3. Covers stopping width of 0.9m to 4.8m 4. Modular design Jack unit can be separated from extensions 5. Remote release mechanism 3. Risk Assessment Team The team that compiled this provisional assessment consisted of: Trevor Clements Director Operations Groundwork Consulting (Pty) Ltd 13/02/2012 ELBROC RA T-PROP

4 4. Objectives In order to effectively identify the hazards associated with this product, a process as set out below facilitates a logical approach to formulating the risk indices. 1. Utilize a task procedure for installing and transporting the prop to identify probable hazards. 2. Apply a risk rating for each hazard. 3. List preventative measures. All the above are tabulated in Appendix Hazard Classification The following definitions are appropriate to this risk assessment and will be referred to in this document: HAZARD RISK SEVERITY PROBABILITY CONSEQUENCE -something that has potential to cause harm. -the likelihood that harm from a particular hazard will occur. -extent of the risk associated with the harm that a person might suffer as well as the number of persons likely to be harmed. -the chance that a person or persons will be harmed during the exposure period. -the degree of harm; the potential severity of injuries. The matrix below has been adopted from the Anglogold policy and procedure (QSP 111 Issue 1 dated ) and appropriately incorporated into the risk rating of this product. Allocating a value for the consequence and probability from the index column and row does the process of attaching the risk. 13/02/2012 ELBROC RA T-PROP

5 Probability Expected result Quite possible Unusual but possible Remotely possible Very unlikely Practically impossible Consequence Index Catastrophic 1 Disaster (few 2 fatalities) Very serious 3 (single fatal) Serious (serious 4 injury) Important 5 (temporary disability) Of concern (minor 6 injury) No incident 7 Near miss Consequences FACTOR INDEX 1. Catastrophic (many fatalities) 2. Disaster (a few fatalities). 3. Very serious (one fatality). 4. Serious (serious injury). 5. Important (temporary disability). 6. Of concern (minor injury). 7. No incident 8. Near miss Probability Is the most likely and expected result if event occurs. 2. Quite possible (50/50). 3. Unusual but possible. 4. Only remotely possible (has happened somewhere). 5. Conceivable but very unlikely (hasn t happened yet). 6. Practically impossible (one in a million) /02/2012 ELBROC RA T-PROP

6 6. Conclusion Primary hazards associated with the direct use of these products within the designed specifications and controls will be minimized if the correct installation and transport procedures are applied. This provisional risk assessment is restricted to the application of these products for underground permanent stope support only. 13/02/2012 ELBROC RA T-PROP

7 APPENDIX 1

8

9

10

11

12

13

14

15

16

17

18

19 APPENDIX 2

20 ELBROC T-Prop PROCESS ACTIVITY HAZARD CONS PROB RISK PREVENTATIVE MEASURES Installation Making work and support Falls of ground resulting in injuries Employ mine standard / procedure for barring down the area safe to persons hanging wall and creating a stable footwall Determining and installing the temporary prop in accordance to the mine standard Decrease in areal coverage - increased area of possible instability (FOG) Demarcation of installation pattern Prop support to be positioned at right angles to the dip of the strata Uneven load distribution - uneven load distribution on temporary prop support and increased risk of being dislodged by mining operations Training on installation of support Correct sizing of the unit for the applicable stope width Undersized units would lead to ineffective support resistance and possible dislodging resulting in hanging wall collapses and injuries to persons Order the correct size of the unit for the relevant working place. Positioning the sized prop support in place Injury to extended bodily limbs and toppling of the prop before pre-stressing has taken place Wear protective clothing and ensure that hands are not sited between the temporary prop and hanging- or footwall Removing Removing of temporary support at end of shift Falls of ground resulting in injuries to persons Use of remote release mechanism to remove temporary support Positioned at 45 degrees above temporary support next to last permanent support 3 5 meters from temporary support 13/02/2012 ELBROC RA T-PROP

21 ELBROC T-Prop PROCESS ACTIVITY HAZARD CONS PROB RISK PREVENTATIVE MEASURES Loading - Stacking of props in Surface store Toppling of bundles thereby creating obstructions and injuries to passers by. Do not stack more than two bundles on top of one another Ensure correct placement in store to prevent obstructions Off loading from transport vehicle Bundles falling off and injuring persons Make use of hyster and /or crane operations Ensure correct procedural training for operators. Stacking in material car If not stacked properly, the units may dislodge and disrupt rolling stock Pack units flat in material cars Transport In Stope To be secured on both ends to the mono winch rope Physical transport Prevent damage of props by dragging Bodily injuries due to weight of the unit Apply mine standard for mono rope procedures for securing objects Ensure that two persons carry the unit simultaneously Make use of two carrying straps where provided on the unit. 13/02/2012 ELBROC RA T-PROP

22

23 TOPIC Entry examination Make safe of stope face according to entry examination standard procedure Ensure all required PPE are used: Overall Gumboots Hard hat Gloves Goggles Ear plugs Temporary support Install temporary support as per mine standard procedure Installation procedure Ensure footwall is clean and solid Select most suitable spot on the hanging and footwall, place the prop in position Install prop at right angles to the dip Headboard towards the face Hold the prop in position and pre-load with loading handle Start new installation Make use of the of the remote release tool Attach remote release tool Clear all workers from face Stand in safe position under last permanent support Pull remote release tool and remove prop To remove T - Prop OCCUPATION Miner and Team Leader Stope Team Stope Team Miner 13/02/2012 ELBROC RA T-PROP

OMNI 89 PROP RISK ASSESSMENT

OMNI 89 PROP RISK ASSESSMENT OMNI 89 PROP RISK ASSESSMENT 13/08/2012 ELBROC RA OMNI 89 PROP Page 1 of 10 CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 3 4. Objectives 4 5. Hazard Classification

More information

RB 80 HYDRAULIC PROP RISK ASSESSMENT

RB 80 HYDRAULIC PROP RISK ASSESSMENT RB 80 HYDRAULIC PROP RISK ASSESSMENT 1 CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 4 4. Objectives 4 5. Hazard Classification 4-5 Risk matrix 6 FACTOR/INDEX

More information

PACKSETTER HAND PUMP

PACKSETTER HAND PUMP PACKSETTER HAND PUMP 1 CONTENTS Introduction...3 1. Product Description 3 2. Design Criteria.. 3 3. Risk Assessment Team.. 3 4. Objectives... 4 5. Hazard Classification...4+5 Risk matrix..6 FACTOR/INDEX

More information

HS329 Risk Management Procedure

HS329 Risk Management Procedure HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and

More information

HAZARD MANAGEMENT PROCEDURE

HAZARD MANAGEMENT PROCEDURE TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk

More information

OPERATIONL RISK ASSESSMENTS

OPERATIONL RISK ASSESSMENTS OPERATIONL RISK ASSESSMENTS Table of Contents SUBJECT Introduction... 3 Formal Risk Assessment Rating... 6 Action Criteria Framework... 7 Summary - Overall Highest To Lowest Risk... 8 DEPARTMENT Operation

More information

-JHA- Job. For Science and Engineering. Hazard Assessment

-JHA- Job. For Science and Engineering. Hazard Assessment -JHA- For Science and Engineering Job Hazard Assessment Is a Job Hazard Assessment Necessary? The Occupational Safety and Health Administration regulations confirm a JHA is needed. OSHA 1910.132(d)(2)

More information

SAFE WORK METHOD STATEMENT Part 1

SAFE WORK METHOD STATEMENT Part 1 SAFE WORK METHOD STATEMENT Part 1 Company Details: Aztech Integrated Systems Pty Ltd ABN: 50 142 740 172 Director : Aaron Caruana +61 418 178 719 7/227A Brisbane Road, Labrador, QLD, 4215. Project Details:

More information

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George

More information

Safe Work Method Statements (SWMS)

Safe Work Method Statements (SWMS) Safe Work Method Statements (SWMS) The purpose of a SWMS is to list the steps of a particular task in your workplace, identify the hazards and associated risks in each step and recommend key safety controls

More information

Bhadwasi Gypsum Mine, Rajasthan State Mines & Minerals Limited CHAPTER VII Additional studies

Bhadwasi Gypsum Mine, Rajasthan State Mines & Minerals Limited CHAPTER VII Additional studies Bhadwasi Gypsum Mine, Rajasthan State & Minerals Limited 7.0.0 CHAPTER VII Additional studies 7.3.0 Risk assessment and safety management Plan: 7.3.1 Risk assessment has been done covering following aspects:

More information

WORK METHOD STATEMENT CARPET LAYING

WORK METHOD STATEMENT CARPET LAYING ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

WORK METHOD STATEMENT STRUCTURAL STEEL

WORK METHOD STATEMENT STRUCTURAL STEEL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Hazard Assessment & Control. Faculty of Veterinary Medicine

Hazard Assessment & Control. Faculty of Veterinary Medicine Hazard Assessment & Control Faculty of Veterinary Medicine Emergency Evacuation In the event of an emergency Primary exit is to the. Secondary exit is to the. Assembly point is at. Campus Security Emergency

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

Hazard Management Making your workplace safer

Hazard Management Making your workplace safer Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,

More information

Safety in Precast Erection

Safety in Precast Erection Safety in Precast Erection C. Kirubakaran R Star Consultants Pte Ltd, Singapore Abstract: Construction industry is known to be one of the most hazardous among different industries all over the world. The

More information

RISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY

RISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY RISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY A) RISK Risk concerns the deviation of one or more results of one or more future events from their expected value. Risk related to

More information

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS

CIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS Title: Circuit Breaker Testing Purpose and Scope: Provide guidelines for testing of Circuit Breakers. Staffing Resources: Staff will have the minimum requirement of an Electrical Fitter/Mechanic Licence

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

Vector to ZERO: HAZARD HUNT. 2. Mission/Task: 3. Begin Date: 4. End Date: 5. Date Prepared: 10. Develop Controls 11. Residual Risk Level

Vector to ZERO: HAZARD HUNT. 2. Mission/Task: 3. Begin Date: 4. End Date: 5. Date Prepared: 10. Develop Controls 11. Residual Risk Level RISK ASSESSMENT 1. Organization and Unit Location: Vector to ZERO: HAZARD HUNT Sheet 1 of 5 See Appendix A for Risk Assessment Matrix 2. Mission/Task: 3. Begin Date: 4. End Date: 5. Date Prepared: 6. Operational

More information

Responsibility. Qualitative measures of Likelihood. A Almost certain Daily Occurrence: Common or frequent. Qualitative Measures of Consequence

Responsibility. Qualitative measures of Likelihood. A Almost certain Daily Occurrence: Common or frequent. Qualitative Measures of Consequence Authorised by: Purpose Scope Responsibility This procedure defines the processes to be followed in order to identify health and safety hazards, assess the risks associated with hazards relating to use

More information

Employ The Risk Management Process During Mission Planning

Employ The Risk Management Process During Mission Planning Employ The Risk Management Process During Mission Planning TSG 154-6465 Task(s) TASK NUMBER TASK TITLE Taught or 154-385-6465 Employ The Risk Management Process During Mission Planning Supported Task(s)

More information

RISK ASSESSMENT FORM Project / Work Description: Handling of furniture.

RISK ASSESSMENT FORM Project / Work Description: Handling of furniture. Department & Exact Location Of The Work Performed: RISK ASSESSMENT FORM Project / Work Description: Handling of furniture. Risk Assessment Team (Name/s): Date Conducted: Approved By Supervisor / Reporting

More information

Klondex Midas Operations, Inc. Midas Mine Elko County, NV

Klondex Midas Operations, Inc. Midas Mine Elko County, NV Klondex Midas Operations, Inc. Midas Mine Elko County, NV April 28, 2014 Machinery 2 Overview Underground gold mine (2014: approximately 258,021 h worked and 159 employees) 53-year-old miner Victim was

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

WORK METHOD STATEMENT TERMITE PROTECTION

WORK METHOD STATEMENT TERMITE PROTECTION ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Procedure: Work health and safety hazard management

Procedure: Work health and safety hazard management Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation

More information

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS

COMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS COMMISSIONING TESTS FOR NEW HV CABES (UP TO 33 KV) JOB SAFETY ANAYSIS Title: Carry Out Field Testing Purpose and Scope: To identify the hazards and control measures associated with testing and commissioning

More information

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS

WORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Age Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT

Age Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT Age Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT This checklist is to be used as a preliminary assessment of the work area. If the answer is yes or possibly, then

More information

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS) WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL

More information

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING

Activity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING Activity Hazard Analysis (AHA) EM 385 2008 01.A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING Activity Hazard Analysis (AHA) AHAs: Risk Assessment Tool Defines the Activity or Work to be Performed Identifies

More information

This guidance note gives simple, practical advice on what can be done to eliminate or reduce the risks.

This guidance note gives simple, practical advice on what can be done to eliminate or reduce the risks. Health and Safety Guidance Note MANUAL HANDLING A guide for Managers, Heads of Departments Introduction Manual handling operations currently account for approximately 35% percent of all reported industrial

More information

EMERGING TRENDS IN OCCUPATIONAL SAFETY AND HEALTH IN MINES : SOME ISSUES AND CONCERN

EMERGING TRENDS IN OCCUPATIONAL SAFETY AND HEALTH IN MINES : SOME ISSUES AND CONCERN EMERGING TRENDS IN OCCUPATIONAL SAFETY AND HEALTH IN MINES : SOME ISSUES AND CONCERN PROFESSOR ASHIS BHATTACHERJEE DEPARTMENT OF MINING ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR INTRODUCTION

More information

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations

WH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations Workplace Address: Page 1 of PART 1: TASK DETAILS Client: JOB/TASK: Using Water blaster PART 2: RESOURCES Relevant Legislation/Codes Practice: Training Required: Equipment Used: Materials Used: Substances

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3018 HAZARD IDENTIFICATION AND RISK ASSESSMENT Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager

More information

Manual Handling Risk Assessment In accordance with the Manual Handling Operations Regulations 1992

Manual Handling Risk Assessment In accordance with the Manual Handling Operations Regulations 1992 Ref o MHRA 3.1 Task Carrying Bin Bags Location Bath Area ame of Assessor Simon Foley Job Title Quality Health and Environmental Manager Signature 28 th ovember 2014 Review Details (Reviewed following change

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Risk Management Guide

Risk Management Guide What is health and safety risk management? Risk Management Guide Risk Management is a proactive, logical and systematic approach of managing the uncertainty relating to potential risk, rather than responding

More information

TLILIC2001 Licence to Operate a Forklift Truck

TLILIC2001 Licence to Operate a Forklift Truck Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SWMS No. 09 SEED COECTION Barung andcare Assoc Inc 38A Coral St, Maleny Qld, 4552 Tel: 07 5494 3151 Email: info@barunglandcare.org.au ABN: 48 562 796 065 VERSION CONTRO Original version Date of this version

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019

SH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019 OHS-FRM-103 Rev11 (07/18) SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG ABN 45 081 359 613 Phone: 07 3889 8827 Mobile: 0411 756 719 Page 1 SH&EWMS No.:

More information

WORK METHOD STATEMENT ELECTRICAL

WORK METHOD STATEMENT ELECTRICAL ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

RISK ASSESSMENT. White Paper.

RISK ASSESSMENT. White Paper. RISK ASSESSMENT White Paper www.leuze.com White Paper RISK ASSESSMENT IN HARMONY The European Machinery Directive as well as its implementations on a national level (in Germany ProdSG and 9 ProdSV) require

More information

Accident/Incident Reporting and Investigation Procedures

Accident/Incident Reporting and Investigation Procedures Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative

More information

ERI Safety Videos Videos for Safety Meetings POWER SAW SAFETY. Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS

ERI Safety Videos Videos for Safety Meetings POWER SAW SAFETY. Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS ERI Safety Videos Videos for Safety Meetings 2111 POWER SAW SAFETY Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS POWER SAW SAFETY This easy-to-use Leader s Guide is provided to assist in conducting a

More information

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE

FLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs Personnel Involved Manager Project Operators Assistant Notes re Operator/Off-Sider Training Allan McConnell In situ testing is a niche business with very few rigs in Australia. There are no specific training

More information

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1

EVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1 EVENT SAFETY RISK ASSESSMENT (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) EVENT SAFETY MANAGEMENT INFORMATION SHEET September 2010 #3 RISK ASSESSMENT IT S A MUST The success of your event is measured in many

More information

Accident Investigation and Hazard Analysis

Accident Investigation and Hazard Analysis Accident Investigation and Hazard Analysis June 18, 2015 Objectives: Accident Investigation Define accidents Review why accident investigations are important Review the purpose of accident investigations

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Hazard and Risk Assessment Guide

Hazard and Risk Assessment Guide Page 1 Safety legislation in Canada (Occupational Health & Safety Act, Sec. 25) entails employers to do everything that is reasonable to ensure their workers have a healthy and safe workplace. The first

More information

Monitoring excavation in the highway

Monitoring excavation in the highway This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you

More information

Advice On Risk Control Measures For Working In Hazy Conditions

Advice On Risk Control Measures For Working In Hazy Conditions Advice On Risk Control Measures For Working In Hazy Conditions Thursday, 20 June 2013 The haze levels in Singapore have reached a record high of PSI level 371 (1:00pm Thursday) and are now at levels which

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Entanglement Hired From All Master Hire Stores Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157 1 of 6 1.0 PURPOSE To establish minimum requirements and guidelines for controlling hazardous exposure of personnel to falls from working elevations in conformance with Federal and State OSHA rules and

More information

Prevention of Falls and Working at Heights

Prevention of Falls and Working at Heights Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,

More information

LEADER NOTES FOR MAY 2012 STAND-DOWN

LEADER NOTES FOR MAY 2012 STAND-DOWN LEADER NOTES FOR MAY 2012 STAND-DOWN BEST PRACTICES PHILOSOPHY Properly executed Insulate and Isolate ( I&I ) techniques allow line workers to safely work on and/or around energized parts. The Best Practices

More information

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING

SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING Personal Protective Equipment Foot Hearing High Visibility Head Eye Face Hand Protective Clothing Breathing Normal Requirements: Safety footwear, hearing

More information

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Steve Smallman Position Safety & Systems Manager Date 21/6/13 Phone 0249649991 Signature

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN: SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph 07 3265 6537 ABN: 45 081 359 613 OHS-FRM-100 Rev 6 (07/14) Page 1 SH&EWMS No.: F-C-QLD-01

More information

University of Vermont Department of Physical Plant Personal Protective Equipment Program

University of Vermont Department of Physical Plant Personal Protective Equipment Program University of Vermont Department of Physical Plant Personal Protective Equipment Program REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING AND COMPLIANCE OFFICE

More information

Worksite Analysis Techniques & Tools. Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC. Why Analyze The Workplace?

Worksite Analysis Techniques & Tools. Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC. Why Analyze The Workplace? Worksite Analysis Techniques & Tools Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC 1 Why Analyze The Workplace? 1 Worksite Analysis is a combination of systematic actions to provide

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

FALL PROTECTION (SAF-SPI-06)

FALL PROTECTION (SAF-SPI-06) 1. PURPOSE To describe the Ontario Operations standard methods for preventing serious injury resulting from fall from heights and to provide a Standard for Fall Protection to safeguard employees who work

More information

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. August 8, 2017

RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. August 8, 2017 Attachment A Draft Resolution Page 1 of 2 RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA August 8, 2017 WHEREAS, Government Code Section 26614 was enacted in 1965 to provide that the

More information

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).

Specific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable). OCCUPATIONAL HEALTH & SAFETY MANUAL Section OHS-005, Job Safety Analysis SCORESBY, VIC 3179 GEELONG, VIC 3218 MALAGA, WA 6090 DUDLEY PARK, SA 5008 MANSFIELD, QLD 4122 NORTH ROCKS, NSW, 2641 ACT 2609 LAVINGTON,

More information

Purpose. Scope. Responsibility. Qualitative measures of Likelihood

Purpose. Scope. Responsibility. Qualitative measures of Likelihood Authorised by: MTi GROUP Rev Date: 30.03.15 Purpose Scope Responsibility This procedure defines the processes to be followed in order to identify health and safety hazards, assess the risks associated

More information

Biomedical Laboratory: Its Safety and Risk Management

Biomedical Laboratory: Its Safety and Risk Management Biomedical Science Letters 2017, 23(3): 155~160 https://doi.org/10.15616/bsl.2017.23.3.155 eissn : 2288-7415 Review Biomedical Laboratory: Its Safety and Risk Management Tin Tun Singapore Association for

More information

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.

THE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE. TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the

More information

Important Safety Information Enclosed

Important Safety Information Enclosed Important Safety Information Enclosed ShedBoss Safety Pack NOTE: ENSURE YOUR CONSTRUCTION CREW RECEIVES THIS PACK TO COMPLY WITH SAFE WORK AUSTRALIA CODE OF PRACTICE www.shedboss.com.au Important Safety

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT 13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or

More information

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT

SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT Personal Protective Equipment Foot Hearing High Visibility Head Eye Day Operations Normal Requirements: Safety footwear, hearing protection,

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information

SAFETY MANAGEMENT SYSTEM

SAFETY MANAGEMENT SYSTEM Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving

More information

Staff Contractors. Public. Staff Contractors

Staff Contractors. Public. Staff Contractors 1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances

More information

DRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES

DRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES DRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES NOVEMBER 216 CONTENTS 1INTRODUCTION 2THE STATE OF OUR CURRENT KNOWLEDGE OF MARKING, DRILLING, CHARGING AND BLASTING 3OPPORTUNITIES FOR THE INDUSTRY

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

Work Health and Safety Risk Management Procedures

Work Health and Safety Risk Management Procedures Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard

More information

MODULAR ALUMINUM PANEL SHIELDS MAPS

MODULAR ALUMINUM PANEL SHIELDS MAPS MODULAR ALUMINUM PANEL SHIELDS MAPS 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Phone: 713.943.0750 Toll Free: 800.231.6662 Fax: 713. 943.8483 April 16, 2009 MODULAR ALUMINUM PANEL SHIELDS Page 2

More information

Aquatic Guidelines Safe Water Entry Information and Risk Assessments

Aquatic Guidelines Safe Water Entry Information and Risk Assessments Aquatic Guidelines Safe Water Entry Information and Risk Assessments This risk assessment and guidelines package was developed in accordance with the Royal Lifesaving Societies Implementation Guide for

More information

IPLOCA. Novel Construction Spring Plenary Session Amsterdam 5-6 April 2017

IPLOCA. Novel Construction Spring Plenary Session Amsterdam 5-6 April 2017 IPLOCA Novel Construction Spring Plenary Session Amsterdam 5-6 April 2017 Delta Machinery Macarten McGroder (Mac) C.Eng,MIQ.FIMQS Machinery Solutions Moerdijk Netherlands Deurne Netherlands Mombasa Kenya

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

RulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1

RulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1 RulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1 CALIFORNIA Proposition 65 Warning Diesel engine exhaust and some of its constituents are known to the State of California to cause cancer, birth

More information

TRAM Conference Keynote Quarterly Training Summit. October 2016 U.S. Department of Labor U.S.

TRAM Conference Keynote Quarterly Training Summit. October 2016 U.S. Department of Labor U.S. TRAM Conference Keynote Quarterly Training Summit October 10, 2018 October 2016 U.S. Department of Labor U.S. David G. Zatezalo Assistant Secretary of Labor Mine Safety and Health Administration 1 The

More information

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation

Guidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation 1.0 Objective This Work Instruction is designed to assist in the assessment of health and safety and wellbeing (HSW) risk and suggested controls associated with hazards identified while working throughout

More information

SITE SPECIFIC SAFETY PLAN (SSSP)

SITE SPECIFIC SAFETY PLAN (SSSP) SITE SPECIFIC SAFETY PLAN (SSSP) This plan shall be completed and reviewed with the Corporate Safety Department before work commences. Completed plans shall be maintained and kept on site with the project

More information

Hazard Identification and Control

Hazard Identification and Control Hazard Identification and Control Steve Wallace steve@hcsas.sk.ca (306)729-4863 How our mind works Unintentional Blindness It s not what you look at it s what you see Brain is wired for biological movement

More information

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)

1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*) National Unit specification: general information Unit title: Excavation in the Road/Highway Unit code: F933 04 Superclass: TL Publication date: October 2014 Source: Version: Scottish Qualifications Authority

More information

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324

Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Albie Wheeler Position Managing Director Date 1/7/12 Signature Phone 0249649991 Mobile

More information

HAZARD IDENTIFICATION & RISK ASSESSMENT

HAZARD IDENTIFICATION & RISK ASSESSMENT Clearheart Construction Co., Inc. Hazard Identification & Risk Assessment HAZARD IDENTIFICATION & RISK ASSESSMENT If all employees and subcontractors followed established OSHA compliant procedures to accomplish

More information

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)

JOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible) Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative

More information

Hazard & Risk Management

Hazard & Risk Management Hazard & Risk Management Introduction The Church recognises WHS hazards and risks must be appropriate managed to ensure, so far as reasonably practicable, the health and safety of all workers at Church

More information

Proposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT

Proposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT RISK ASSESSMENT Mining and allied activities are associated with several potential hazards to both the employees and the public at large. A worker in a mine should be able to work under conditions, which

More information

Codex Seven HACCP Principles. (Hazard Identification, Risk Assessment & Management)

Codex Seven HACCP Principles. (Hazard Identification, Risk Assessment & Management) Codex Seven HACCP Principles (Hazard Identification, Risk Assessment & Management) Logic sequence for application of HACCP Assemble the HACCP team Describe product Identify intended use Construct a flow

More information

The Best Use of Lockout/Tagout and Control Reliable Circuits

The Best Use of Lockout/Tagout and Control Reliable Circuits Session No. 565 The Best Use of Lockout/Tagout and Control Reliable Circuits Introduction L. Tyson Ross, P.E., C.S.P. Principal LJB Inc. Dayton, Ohio Anyone involved in the design, installation, operation,

More information