T-PROP RISK ASSESSMENT
|
|
- Ezra Powell
- 5 years ago
- Views:
Transcription
1 T-PROP RISK ASSESSMENT 13/02/2012 ELBROC RA T-PROP
2 CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 3 4. Objectives 4 5. Hazard Classification 4 Risk matrix 5 FACTOR/INDEX TABLE 5 6. Conclusion 6 Appendix 1 T-Prop performance graphs 7-18 Appendix 2 Tabulated Hazards and Control Measures INSTALLATION AND REMOVAL PROCEDURE 22 13/02/2012 ELBROC RA T-PROP
3 Introduction This document has been compiled as a risk assessment for the T-Prop mechanical prop designed and manufactured by ELBROC MINING PRODUCTS (PTY) LTD. This assessment preempts any potential application and trials that will be conducted underground. A comprehensive assessment will be carried out in accordance with the guidelines (QSP 111 Issue 1) The aim of this assessment is to identify the potential hazards associated with the use of these temporary support units in underground stoping operations and to list control measures to eliminate or reduce that potential. 1. Product Description The manufacturers of the T-Prop mechanical prop have developed the unit to perform in accordance with the COMRO guidelines for rock-burst and rock-fall conditions. The T-Prop can be re-used several times provided the prop is inspected for damage after each use. The primary purpose of the T-Prop is to be used as a temporary active support in an underground environment where such needs are identified by the mine and is not a blast on prop. 2. Design Criteria The T-Prop is a mechanical prop designed as a temporary support that can be reused 1. Installed at a load of 30kN 2. Safely operates at 50kN 3. Covers stopping width of 0.9m to 4.8m 4. Modular design Jack unit can be separated from extensions 5. Remote release mechanism 3. Risk Assessment Team The team that compiled this provisional assessment consisted of: Trevor Clements Director Operations Groundwork Consulting (Pty) Ltd 13/02/2012 ELBROC RA T-PROP
4 4. Objectives In order to effectively identify the hazards associated with this product, a process as set out below facilitates a logical approach to formulating the risk indices. 1. Utilize a task procedure for installing and transporting the prop to identify probable hazards. 2. Apply a risk rating for each hazard. 3. List preventative measures. All the above are tabulated in Appendix Hazard Classification The following definitions are appropriate to this risk assessment and will be referred to in this document: HAZARD RISK SEVERITY PROBABILITY CONSEQUENCE -something that has potential to cause harm. -the likelihood that harm from a particular hazard will occur. -extent of the risk associated with the harm that a person might suffer as well as the number of persons likely to be harmed. -the chance that a person or persons will be harmed during the exposure period. -the degree of harm; the potential severity of injuries. The matrix below has been adopted from the Anglogold policy and procedure (QSP 111 Issue 1 dated ) and appropriately incorporated into the risk rating of this product. Allocating a value for the consequence and probability from the index column and row does the process of attaching the risk. 13/02/2012 ELBROC RA T-PROP
5 Probability Expected result Quite possible Unusual but possible Remotely possible Very unlikely Practically impossible Consequence Index Catastrophic 1 Disaster (few 2 fatalities) Very serious 3 (single fatal) Serious (serious 4 injury) Important 5 (temporary disability) Of concern (minor 6 injury) No incident 7 Near miss Consequences FACTOR INDEX 1. Catastrophic (many fatalities) 2. Disaster (a few fatalities). 3. Very serious (one fatality). 4. Serious (serious injury). 5. Important (temporary disability). 6. Of concern (minor injury). 7. No incident 8. Near miss Probability Is the most likely and expected result if event occurs. 2. Quite possible (50/50). 3. Unusual but possible. 4. Only remotely possible (has happened somewhere). 5. Conceivable but very unlikely (hasn t happened yet). 6. Practically impossible (one in a million) /02/2012 ELBROC RA T-PROP
6 6. Conclusion Primary hazards associated with the direct use of these products within the designed specifications and controls will be minimized if the correct installation and transport procedures are applied. This provisional risk assessment is restricted to the application of these products for underground permanent stope support only. 13/02/2012 ELBROC RA T-PROP
7 APPENDIX 1
8
9
10
11
12
13
14
15
16
17
18
19 APPENDIX 2
20 ELBROC T-Prop PROCESS ACTIVITY HAZARD CONS PROB RISK PREVENTATIVE MEASURES Installation Making work and support Falls of ground resulting in injuries Employ mine standard / procedure for barring down the area safe to persons hanging wall and creating a stable footwall Determining and installing the temporary prop in accordance to the mine standard Decrease in areal coverage - increased area of possible instability (FOG) Demarcation of installation pattern Prop support to be positioned at right angles to the dip of the strata Uneven load distribution - uneven load distribution on temporary prop support and increased risk of being dislodged by mining operations Training on installation of support Correct sizing of the unit for the applicable stope width Undersized units would lead to ineffective support resistance and possible dislodging resulting in hanging wall collapses and injuries to persons Order the correct size of the unit for the relevant working place. Positioning the sized prop support in place Injury to extended bodily limbs and toppling of the prop before pre-stressing has taken place Wear protective clothing and ensure that hands are not sited between the temporary prop and hanging- or footwall Removing Removing of temporary support at end of shift Falls of ground resulting in injuries to persons Use of remote release mechanism to remove temporary support Positioned at 45 degrees above temporary support next to last permanent support 3 5 meters from temporary support 13/02/2012 ELBROC RA T-PROP
21 ELBROC T-Prop PROCESS ACTIVITY HAZARD CONS PROB RISK PREVENTATIVE MEASURES Loading - Stacking of props in Surface store Toppling of bundles thereby creating obstructions and injuries to passers by. Do not stack more than two bundles on top of one another Ensure correct placement in store to prevent obstructions Off loading from transport vehicle Bundles falling off and injuring persons Make use of hyster and /or crane operations Ensure correct procedural training for operators. Stacking in material car If not stacked properly, the units may dislodge and disrupt rolling stock Pack units flat in material cars Transport In Stope To be secured on both ends to the mono winch rope Physical transport Prevent damage of props by dragging Bodily injuries due to weight of the unit Apply mine standard for mono rope procedures for securing objects Ensure that two persons carry the unit simultaneously Make use of two carrying straps where provided on the unit. 13/02/2012 ELBROC RA T-PROP
22
23 TOPIC Entry examination Make safe of stope face according to entry examination standard procedure Ensure all required PPE are used: Overall Gumboots Hard hat Gloves Goggles Ear plugs Temporary support Install temporary support as per mine standard procedure Installation procedure Ensure footwall is clean and solid Select most suitable spot on the hanging and footwall, place the prop in position Install prop at right angles to the dip Headboard towards the face Hold the prop in position and pre-load with loading handle Start new installation Make use of the of the remote release tool Attach remote release tool Clear all workers from face Stand in safe position under last permanent support Pull remote release tool and remove prop To remove T - Prop OCCUPATION Miner and Team Leader Stope Team Stope Team Miner 13/02/2012 ELBROC RA T-PROP
OMNI 89 PROP RISK ASSESSMENT
OMNI 89 PROP RISK ASSESSMENT 13/08/2012 ELBROC RA OMNI 89 PROP Page 1 of 10 CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 3 4. Objectives 4 5. Hazard Classification
More informationRB 80 HYDRAULIC PROP RISK ASSESSMENT
RB 80 HYDRAULIC PROP RISK ASSESSMENT 1 CONTENTS Introduction 3 1. Product Description 3 2. Design Criteria 3 3. Risk Assessment Team 4 4. Objectives 4 5. Hazard Classification 4-5 Risk matrix 6 FACTOR/INDEX
More informationPACKSETTER HAND PUMP
PACKSETTER HAND PUMP 1 CONTENTS Introduction...3 1. Product Description 3 2. Design Criteria.. 3 3. Risk Assessment Team.. 3 4. Objectives... 4 5. Hazard Classification...4+5 Risk matrix..6 FACTOR/INDEX
More informationHS329 Risk Management Procedure
HS329 Risk Management Procedure Work Health and Safety Act 2011 Policy hierarchy link Work Health and Safety Regulation 2011 Work Health and Safety Policy Code of Practice How to Manage Work Health and
More informationHAZARD MANAGEMENT PROCEDURE
TABLE OF CONTENTS 1. OBJECTIVE... 2 2. SCOPE... 2 3. DEFINITIONS... 2 4. RESPONSIBILITIES... 2 5. HAZARD IDENTIFICATION... 3 5.1 HAZARD AND RISK IDENTIFICATION TOOLS AND METHODS... 3 5.1.1 Take 5 Risk
More informationOPERATIONL RISK ASSESSMENTS
OPERATIONL RISK ASSESSMENTS Table of Contents SUBJECT Introduction... 3 Formal Risk Assessment Rating... 6 Action Criteria Framework... 7 Summary - Overall Highest To Lowest Risk... 8 DEPARTMENT Operation
More information-JHA- Job. For Science and Engineering. Hazard Assessment
-JHA- For Science and Engineering Job Hazard Assessment Is a Job Hazard Assessment Necessary? The Occupational Safety and Health Administration regulations confirm a JHA is needed. OSHA 1910.132(d)(2)
More informationSAFE WORK METHOD STATEMENT Part 1
SAFE WORK METHOD STATEMENT Part 1 Company Details: Aztech Integrated Systems Pty Ltd ABN: 50 142 740 172 Director : Aaron Caruana +61 418 178 719 7/227A Brisbane Road, Labrador, QLD, 4215. Project Details:
More informationSAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030
SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George
More informationSafe Work Method Statements (SWMS)
Safe Work Method Statements (SWMS) The purpose of a SWMS is to list the steps of a particular task in your workplace, identify the hazards and associated risks in each step and recommend key safety controls
More informationBhadwasi Gypsum Mine, Rajasthan State Mines & Minerals Limited CHAPTER VII Additional studies
Bhadwasi Gypsum Mine, Rajasthan State & Minerals Limited 7.0.0 CHAPTER VII Additional studies 7.3.0 Risk assessment and safety management Plan: 7.3.1 Risk assessment has been done covering following aspects:
More informationWORK METHOD STATEMENT CARPET LAYING
ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone
More informationWORK METHOD STATEMENT STRUCTURAL STEEL
ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone
More informationHazard Assessment & Control. Faculty of Veterinary Medicine
Hazard Assessment & Control Faculty of Veterinary Medicine Emergency Evacuation In the event of an emergency Primary exit is to the. Secondary exit is to the. Assembly point is at. Campus Security Emergency
More informationSafe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN
JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS
More informationHazard Management Making your workplace safer
Hazard Management Making your workplace safer A Guide to Hazard Identification, Risk Assessment, Control and Reviewing 1 What is a hazard? A hazard is something which has the potential to harm the health,
More informationSafety in Precast Erection
Safety in Precast Erection C. Kirubakaran R Star Consultants Pte Ltd, Singapore Abstract: Construction industry is known to be one of the most hazardous among different industries all over the world. The
More informationRISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY
RISK ASSESSMENT HAZARD IDENTIFICATION AND RISK ASSESSMENT METHODOLOGY A) RISK Risk concerns the deviation of one or more results of one or more future events from their expected value. Risk related to
More informationCIRCUIT BREAKER TESTING - JOB SAFETY ANALYSIS
Title: Circuit Breaker Testing Purpose and Scope: Provide guidelines for testing of Circuit Breakers. Staffing Resources: Staff will have the minimum requirement of an Electrical Fitter/Mechanic Licence
More informationSH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN
SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30
More informationVector to ZERO: HAZARD HUNT. 2. Mission/Task: 3. Begin Date: 4. End Date: 5. Date Prepared: 10. Develop Controls 11. Residual Risk Level
RISK ASSESSMENT 1. Organization and Unit Location: Vector to ZERO: HAZARD HUNT Sheet 1 of 5 See Appendix A for Risk Assessment Matrix 2. Mission/Task: 3. Begin Date: 4. End Date: 5. Date Prepared: 6. Operational
More informationResponsibility. Qualitative measures of Likelihood. A Almost certain Daily Occurrence: Common or frequent. Qualitative Measures of Consequence
Authorised by: Purpose Scope Responsibility This procedure defines the processes to be followed in order to identify health and safety hazards, assess the risks associated with hazards relating to use
More informationEmploy The Risk Management Process During Mission Planning
Employ The Risk Management Process During Mission Planning TSG 154-6465 Task(s) TASK NUMBER TASK TITLE Taught or 154-385-6465 Employ The Risk Management Process During Mission Planning Supported Task(s)
More informationRISK ASSESSMENT FORM Project / Work Description: Handling of furniture.
Department & Exact Location Of The Work Performed: RISK ASSESSMENT FORM Project / Work Description: Handling of furniture. Risk Assessment Team (Name/s): Date Conducted: Approved By Supervisor / Reporting
More informationKlondex Midas Operations, Inc. Midas Mine Elko County, NV
Klondex Midas Operations, Inc. Midas Mine Elko County, NV April 28, 2014 Machinery 2 Overview Underground gold mine (2014: approximately 258,021 h worked and 159 employees) 53-year-old miner Victim was
More information??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.
Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work
More informationWORK METHOD STATEMENT TERMITE PROTECTION
ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone
More informationProcedure: Work health and safety hazard management
Procedure: Work health and safety hazard management Purpose This procedure describes how the Australian National University (ANU) manages Work Health Safety hazards for the health, safety, rehabilitation
More informationCOMMISSIONING TESTS FOR NEW HV CABLES (UP TO 33 KV) JOB SAFETY ANALYSIS
COMMISSIONING TESTS FOR NEW HV CABES (UP TO 33 KV) JOB SAFETY ANAYSIS Title: Carry Out Field Testing Purpose and Scope: To identify the hazards and control measures associated with testing and commissioning
More informationWORK METHOD STATEMENT ALUMINIUM WINDOWS AND DOORS
ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone
More informationAge Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT
Age Concern Hounslow Manual Handling Risk Assessment PART ONE PRELIMINARY RISK ASSESSMENT This checklist is to be used as a preliminary assessment of the work area. If the answer is yes or possibly, then
More informationWHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)
WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL
More informationActivity Hazard Analysis (AHA) EM A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING
Activity Hazard Analysis (AHA) EM 385 2008 01.A.13 FIGURE 1-2 CONTRACTOR REQUIRED AHA TRAINING Activity Hazard Analysis (AHA) AHAs: Risk Assessment Tool Defines the Activity or Work to be Performed Identifies
More informationThis guidance note gives simple, practical advice on what can be done to eliminate or reduce the risks.
Health and Safety Guidance Note MANUAL HANDLING A guide for Managers, Heads of Departments Introduction Manual handling operations currently account for approximately 35% percent of all reported industrial
More informationEMERGING TRENDS IN OCCUPATIONAL SAFETY AND HEALTH IN MINES : SOME ISSUES AND CONCERN
EMERGING TRENDS IN OCCUPATIONAL SAFETY AND HEALTH IN MINES : SOME ISSUES AND CONCERN PROFESSOR ASHIS BHATTACHERJEE DEPARTMENT OF MINING ENGINEERING INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR INTRODUCTION
More informationWH&S Act 2011 & Regulations 2011, Environmental Protection Act and Regulations
Workplace Address: Page 1 of PART 1: TASK DETAILS Client: JOB/TASK: Using Water blaster PART 2: RESOURCES Relevant Legislation/Codes Practice: Training Required: Equipment Used: Materials Used: Substances
More informationSAFETY MANAGEMENT SYSTEM
Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving
More informationESSENTIAL SAFETY RESOURCES
ESSENTIAL SAFETY RESOURCES GS-3018 HAZARD IDENTIFICATION AND RISK ASSESSMENT Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager
More informationManual Handling Risk Assessment In accordance with the Manual Handling Operations Regulations 1992
Ref o MHRA 3.1 Task Carrying Bin Bags Location Bath Area ame of Assessor Simon Foley Job Title Quality Health and Environmental Manager Signature 28 th ovember 2014 Review Details (Reviewed following change
More informationHow severely could the risk hurt someone?
Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised
More informationRisk Management Guide
What is health and safety risk management? Risk Management Guide Risk Management is a proactive, logical and systematic approach of managing the uncertainty relating to potential risk, rather than responding
More informationTLILIC2001 Licence to Operate a Forklift Truck
Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed
More informationSAFE WORK METHOD STATEMENT
SWMS No. 09 SEED COECTION Barung andcare Assoc Inc 38A Coral St, Maleny Qld, 4552 Tel: 07 5494 3151 Email: info@barunglandcare.org.au ABN: 48 562 796 065 VERSION CONTRO Original version Date of this version
More informationSAFETY MANAGEMENT SYSTEM
Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving
More informationSH&EWMS No.: F-C-QLD-10 Revision Date: July 2018 Revision Due: July 2019
OHS-FRM-103 Rev11 (07/18) SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG ABN 45 081 359 613 Phone: 07 3889 8827 Mobile: 0411 756 719 Page 1 SH&EWMS No.:
More informationWORK METHOD STATEMENT ELECTRICAL
ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone
More informationRISK ASSESSMENT. White Paper.
RISK ASSESSMENT White Paper www.leuze.com White Paper RISK ASSESSMENT IN HARMONY The European Machinery Directive as well as its implementations on a national level (in Germany ProdSG and 9 ProdSV) require
More informationAccident/Incident Reporting and Investigation Procedures
Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative
More informationERI Safety Videos Videos for Safety Meetings POWER SAW SAFETY. Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS
ERI Safety Videos Videos for Safety Meetings 2111 POWER SAW SAFETY Leader s Guide 2001, SAFETY SOURCE PRODUCTIONS POWER SAW SAFETY This easy-to-use Leader s Guide is provided to assist in conducting a
More informationFLYING OBJECTS MANUAL HANDLING EXCESSIVE NOISE
JOB NO: PROJECT: DATE: SWMS NO: SWMS 002 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: STUMP REMOVAL SUPERVISED BY: REVISION DATE: April 2016 MINIMUM PERSONAL PROTECTIVE EQUIPMENT
More informationJOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs
Personnel Involved Manager Project Operators Assistant Notes re Operator/Off-Sider Training Allan McConnell In situ testing is a niche business with very few rigs in Australia. There are no specific training
More informationEVENT SAFETY RISK ASSESSMENT - (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) 1
EVENT SAFETY RISK ASSESSMENT (SMALL TO MEDIUM SIZED COMMUNITY EVENTS) EVENT SAFETY MANAGEMENT INFORMATION SHEET September 2010 #3 RISK ASSESSMENT IT S A MUST The success of your event is measured in many
More informationAccident Investigation and Hazard Analysis
Accident Investigation and Hazard Analysis June 18, 2015 Objectives: Accident Investigation Define accidents Review why accident investigations are important Review the purpose of accident investigations
More informationHow severely could the risk hurt someone? Low/Insignificant First aid
Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised
More informationHazard and Risk Assessment Guide
Page 1 Safety legislation in Canada (Occupational Health & Safety Act, Sec. 25) entails employers to do everything that is reasonable to ensure their workers have a healthy and safe workplace. The first
More informationMonitoring excavation in the highway
This unit covers the requirements that you must meet when monitoring excavation work in the highway. You must ensure that you act in accordance with all current specifications and procedures and that you
More informationAdvice On Risk Control Measures For Working In Hazy Conditions
Advice On Risk Control Measures For Working In Hazy Conditions Thursday, 20 June 2013 The haze levels in Singapore have reached a record high of PSI level 371 (1:00pm Thursday) and are now at levels which
More informationSAFETY MANAGEMENT SYSTEM
Equipment Location: Hazard Entanglement Hired From All Master Hire Stores Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving
More informationMANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY FALL HAZARD CONTROL REQUIREMENTS SERIES & NO. SMI - 157
1 of 6 1.0 PURPOSE To establish minimum requirements and guidelines for controlling hazardous exposure of personnel to falls from working elevations in conformance with Federal and State OSHA rules and
More informationPrevention of Falls and Working at Heights
Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,
More informationLEADER NOTES FOR MAY 2012 STAND-DOWN
LEADER NOTES FOR MAY 2012 STAND-DOWN BEST PRACTICES PHILOSOPHY Properly executed Insulate and Isolate ( I&I ) techniques allow line workers to safely work on and/or around energized parts. The Best Practices
More informationSAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING
SAFE WORK METHOD STATEMENT Part 1 CONCRETE SAWING Personal Protective Equipment Foot Hearing High Visibility Head Eye Face Hand Protective Clothing Breathing Normal Requirements: Safety footwear, hearing
More informationWheeler Cranes 6 McIntyre Rd Tomago NSW 2324
Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Steve Smallman Position Safety & Systems Manager Date 21/6/13 Phone 0249649991 Signature
More informationSH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph ABN:
SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt St, GEEBUNG QLD 4031 ph 07 3265 6537 ABN: 45 081 359 613 OHS-FRM-100 Rev 6 (07/14) Page 1 SH&EWMS No.: F-C-QLD-01
More informationUniversity of Vermont Department of Physical Plant Personal Protective Equipment Program
University of Vermont Department of Physical Plant Personal Protective Equipment Program REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING AND COMPLIANCE OFFICE
More informationWorksite Analysis Techniques & Tools. Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC. Why Analyze The Workplace?
Worksite Analysis Techniques & Tools Bobbi K. Samples Owner/Principal Consultant The Safety Firm, LLC 1 Why Analyze The Workplace? 1 Worksite Analysis is a combination of systematic actions to provide
More informationSAFETY MANAGEMENT SYSTEM
Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving
More informationInstructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading
Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of
More informationFALL PROTECTION (SAF-SPI-06)
1. PURPOSE To describe the Ontario Operations standard methods for preventing serious injury resulting from fall from heights and to provide a Standard for Fall Protection to safeguard employees who work
More informationRESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA. August 8, 2017
Attachment A Draft Resolution Page 1 of 2 RESOLUTION OF THE BOARD OF SUPERVISORS OF ORANGE COUNTY, CALIFORNIA August 8, 2017 WHEREAS, Government Code Section 26614 was enacted in 1965 to provide that the
More informationSpecific Safety Legislation/Codes of Practice/Australian Standards applicable to this JSA (Tick those applicable).
OCCUPATIONAL HEALTH & SAFETY MANUAL Section OHS-005, Job Safety Analysis SCORESBY, VIC 3179 GEELONG, VIC 3218 MALAGA, WA 6090 DUDLEY PARK, SA 5008 MANSFIELD, QLD 4122 NORTH ROCKS, NSW, 2641 ACT 2609 LAVINGTON,
More informationPurpose. Scope. Responsibility. Qualitative measures of Likelihood
Authorised by: MTi GROUP Rev Date: 30.03.15 Purpose Scope Responsibility This procedure defines the processes to be followed in order to identify health and safety hazards, assess the risks associated
More informationBiomedical Laboratory: Its Safety and Risk Management
Biomedical Science Letters 2017, 23(3): 155~160 https://doi.org/10.15616/bsl.2017.23.3.155 eissn : 2288-7415 Review Biomedical Laboratory: Its Safety and Risk Management Tin Tun Singapore Association for
More informationTHE CONTROLLED COPY OF THIS DOCUMENT IS ON THE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR THE DATE AT THE BOTTOM OF THE PAGE.
TE CONTROLLED COPY OF TIS DOCUMENT IS ON TE COMPUTER NETWORK PRINTED COPIES ARE ONLY CURRENT FOR TE DATE AT TE BOTTOM OF TE PAGE. Title Using Angle Grinders SWMS No. 8 Authorized and email Signed by the
More informationImportant Safety Information Enclosed
Important Safety Information Enclosed ShedBoss Safety Pack NOTE: ENSURE YOUR CONSTRUCTION CREW RECEIVES THIS PACK TO COMPLY WITH SAFE WORK AUSTRALIA CODE OF PRACTICE www.shedboss.com.au Important Safety
More informationPERSONAL PROTECTIVE EQUIPMENT
13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or
More informationSAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT
SAFE WORK METHOD STATEMENT Part 1 EXCAVATOR AUGER ATTACHMENT Personal Protective Equipment Foot Hearing High Visibility Head Eye Day Operations Normal Requirements: Safety footwear, hearing protection,
More informationFIRE HYDRANT TESTING METHOD STATEMENT.
SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....
More informationSAFETY MANAGEMENT SYSTEM
Equipment Location: Hazard Hired From All Master Hire Stores Entanglement Can anyone s hair, clothing, gloves, necktie, jewellery, cleaning brushes, rags or other materials become entangled with moving
More informationStaff Contractors. Public. Staff Contractors
1. Vehicle movements In conjunction with the vehicle driver, venue management and the client, our staff should ensure the safe parking of vehicles for loading and unloading purposes. Depending upon circumstances
More informationDRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES
DRILLING AND BLASTING IN HARD ROCK NARROW TABULAR MINES NOVEMBER 216 CONTENTS 1INTRODUCTION 2THE STATE OF OUR CURRENT KNOWLEDGE OF MARKING, DRILLING, CHARGING AND BLASTING 3OPPORTUNITIES FOR THE INDUSTRY
More informationSafety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1
Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2
More informationWork Health and Safety Risk Management Procedures
Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard
More informationMODULAR ALUMINUM PANEL SHIELDS MAPS
MODULAR ALUMINUM PANEL SHIELDS MAPS 3330 S. SAM HOUSTON PKWY E. HOUSTON, TEXAS 77047 Phone: 713.943.0750 Toll Free: 800.231.6662 Fax: 713. 943.8483 April 16, 2009 MODULAR ALUMINUM PANEL SHIELDS Page 2
More informationAquatic Guidelines Safe Water Entry Information and Risk Assessments
Aquatic Guidelines Safe Water Entry Information and Risk Assessments This risk assessment and guidelines package was developed in accordance with the Royal Lifesaving Societies Implementation Guide for
More informationIPLOCA. Novel Construction Spring Plenary Session Amsterdam 5-6 April 2017
IPLOCA Novel Construction Spring Plenary Session Amsterdam 5-6 April 2017 Delta Machinery Macarten McGroder (Mac) C.Eng,MIQ.FIMQS Machinery Solutions Moerdijk Netherlands Deurne Netherlands Mombasa Kenya
More informationMUTCD Part 6G: Type of Temporary Traffic Control Zone Activities
MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,
More informationRulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1
RulesforLaborers,Oilers, andtheplacingcrew VERSION7.0.1 CALIFORNIA Proposition 65 Warning Diesel engine exhaust and some of its constituents are known to the State of California to cause cancer, birth
More informationTRAM Conference Keynote Quarterly Training Summit. October 2016 U.S. Department of Labor U.S.
TRAM Conference Keynote Quarterly Training Summit October 10, 2018 October 2016 U.S. Department of Labor U.S. David G. Zatezalo Assistant Secretary of Labor Mine Safety and Health Administration 1 The
More informationGuidance: HSW Risk Assessment Methodology HSW-PR09-WI01. Objective. Implementation
1.0 Objective This Work Instruction is designed to assist in the assessment of health and safety and wellbeing (HSW) risk and suggested controls associated with hazards identified while working throughout
More informationSITE SPECIFIC SAFETY PLAN (SSSP)
SITE SPECIFIC SAFETY PLAN (SSSP) This plan shall be completed and reviewed with the Corporate Safety Department before work commences. Completed plans shall be maintained and kept on site with the project
More informationHazard Identification and Control
Hazard Identification and Control Steve Wallace steve@hcsas.sk.ca (306)729-4863 How our mind works Unintentional Blindness It s not what you look at it s what you see Brain is wired for biological movement
More information1 National Unit credit(s) at SCQF level 5: (1 SCQF credit points at SCQF level 5*)
National Unit specification: general information Unit title: Excavation in the Road/Highway Unit code: F933 04 Superclass: TL Publication date: October 2014 Source: Version: Scottish Qualifications Authority
More informationWheeler Cranes 6 McIntyre Rd Tomago NSW 2324
Wheeler Cranes 6 McIntyre Rd Tomago NSW 2324 ABN: 34 088 229 190 This SWMS has been developed and authorised by: Name Albie Wheeler Position Managing Director Date 1/7/12 Signature Phone 0249649991 Mobile
More informationHAZARD IDENTIFICATION & RISK ASSESSMENT
Clearheart Construction Co., Inc. Hazard Identification & Risk Assessment HAZARD IDENTIFICATION & RISK ASSESSMENT If all employees and subcontractors followed established OSHA compliant procedures to accomplish
More informationJOB SAFETY ANALYSIS. How to use the Risk Assessment Charts. Likelihood A (Almost Certain) B (Likely) C (Possible)
Page 1 of 6 How to use the Assessment Charts 1. Determine the Likelihood on the Qualitative Assessment Process Chart (pick a letter applicable to the task). 2. Determine the Consequence on the Qualitative
More informationHazard & Risk Management
Hazard & Risk Management Introduction The Church recognises WHS hazards and risks must be appropriate managed to ensure, so far as reasonably practicable, the health and safety of all workers at Church
More informationProposed Sand/ Moram Mining Project at Gata No.- 17/1 Village- Sehjana, Tehsil & District- Hamirpur, U.P. RISK ASSESMENT RISK ASSESSMENT
RISK ASSESSMENT Mining and allied activities are associated with several potential hazards to both the employees and the public at large. A worker in a mine should be able to work under conditions, which
More informationCodex Seven HACCP Principles. (Hazard Identification, Risk Assessment & Management)
Codex Seven HACCP Principles (Hazard Identification, Risk Assessment & Management) Logic sequence for application of HACCP Assemble the HACCP team Describe product Identify intended use Construct a flow
More informationThe Best Use of Lockout/Tagout and Control Reliable Circuits
Session No. 565 The Best Use of Lockout/Tagout and Control Reliable Circuits Introduction L. Tyson Ross, P.E., C.S.P. Principal LJB Inc. Dayton, Ohio Anyone involved in the design, installation, operation,
More information