1 Vieques Munitions Response: Current Issues NAOC General Membership Meeting December 7, 2016 Agenda Project Overview Surface Clearance Subsurface Clearance Remote Controlled Equipment Underwater MEC Open Detonation Risk Management
2 Strategic Approach Environmental Restoration Program at Vieques Top priorities safety, risk reduction, efficiency, cost effectiveness Munitions Clearance Land first (hazard higher on land than underwater) Ecological resources Protect endangered species, sensitive habitat Consultation with natural resources agencies (FWS, NMFS, NOAA, Puerto Rico DNER) Optimized Approaches Metal Mapper Underwater technologies Remote controlled equipment Digging and sifting Removal by magnet 2
3 Trespassing / Security Trespassing Summary Many observed trespassing incidents Navy has no jurisdiction for enforcement Navy Security Measures Boat support to enforce EZs during demo events Installation of waterway barrier, 2013 Coordination with Coast Guard, FWS, DNER, and PR law enforcement agencies South Channel Barrier 3
4 Munitions Clearance Progress to Date Surface clearance 3,700 acres cleared of munitions 96,500 MEC items removed Sub-surface clearance 9.5 miles of roads, 10.7 miles of beaches 7.3 million pieces of MPPEH picked up and processed Scrap metal 18.3 million lbs processed, 14.4 million lbs recycled 4
5 MPPEH Density
6 Path Forward Short term Continue to clear high risk areas on land Focus on beaches and other priority areas Remove underwater munitions in high risk areas Long term Complete work on land in 10 years Complete underwater work in 15 to 20 years Provide long term management 6
7 Surface Clearance Goal: support future land use, rather than clear every acre Fish and Wildlife Service has an official land use plan Strategic Approach Transects are investigated and cleared across the entire 15,000 acre area Surface clearance not performed in some areas due to Steep slopes (greater than 30 degrees) Endangered species / critical habitat Cultural / archaeological sites No future land use (or compatible land use) anticipated Example: Former OB/OD area in west Vieques MEC clearance around OB/OD pits and future public areas Picnic areas, hiking trails, observation tower, parking lot, beaches Dense vegetation limits access to uncleared areas Land Use Controls Permitted hunters and crabbers will receive UXO awareness training Information kiosks and signs 7
8 Subsurface Clearance Strategic Approach Clear roads to a depth of 2 feet, beaches to a depth of 4 feet Clear other areas only if needed to support FWS planned land use Estimate 1000 additional acres Methods Mag and dig when trees must be left in place DGM, Advanced Geophysical Classification (AGC) Hand dig or remote controlled excavator Excavator is cost effective in high density areas AGC advantages Less digging per anomaly Locate MEC for MC sampling Long term management (maybe) Reduced number of digs Pending regulator buy-in Even a small reduction could save significant cost 8
9 Remote Controlled Equipment On Vieques, bigger is better Xbox controller Attachments Mower, magnet, sifter, bucket, rake, etc. Uses Cut and rake vegetation So far only in submunitions area Pick up everything but submunitions with magnet Excavate and sift MEC from water holes on beaches May also work in surf zone Dig high density roads Sift debris Sift gravel 50% cost avoidance 9
10 Underwater Sites Near term strategy Wide Area Assessment in progress across 12,000 underwater acres Results will be used to prioritize underwater areas Removal actions for high visibility munitions items Long term strategy to be determined No method for evaluating explosive hazard of underwater munitions So far, regulators are willing to consider only presence of MEC and presence of receptors Uncertainty about appropriate remedial actions Blow in place currently not an option Encapsulation is difficult Water jet messy and uncertain Move to shore if possible Leave in place (are new technologies needed?) Ecological preservation vs. explosive hazard Safety for workers (divers) Sand movement to/from beaches Currently being studied to help determine cleanup strategy 10
11 Open Detonation MEC destroyed by open detonation Safest method for the site workers Conducted in a manner that is protective of human health and the environment 8 years of air monitoring show no effect on populated areas of Vieques Public concerns Pressure from local groups and media to use Controlled Detonation Chamber (CDC) Regulatory support Based on research and site specific data EPA, DOD, and agencies overseas have studied open detonations Air monitoring on Vieques is conclusive Detonations are miles from residential areas Most munitions on Vieques are too big or too dangerous to move to a CDC Difference between UXO and DMM 11
12 MEC Risk Management on Vieques Based on professional judgment Historical accidents Knowledge of past accidents can help prevent future accidents Comprehensive, up-to-date database of accident information is needed Types of encounters with MEC Not just exposure, but how people encounter munitions Prevent Picking It Up Approaches for risk reduction Clear surface MEC and perform LTM Construction support for subsurface MEC Dig for a reason Awareness / Education 3 R s and 1 D (Don t Pick It Up) MEC that has already left the site Minimize risk of working underwater Regulatory oversight by video rather than diving (NAVFAC policy) 12
13 MEC Risk Depends on the number of encounters and the likelihood of detonation Number of Encounters May be large (driving over subsurface MEC in a road) Encounter Types Drive over Step on, kick Hit (tent stake, shovel, heavy equipment, anchor) Heat (blowtorch, campfire, brush fire) Pick up (drop, throw, hit, take apart, heat) Probability of Detonation Can only estimate Depends on fuse type Some fuses are so sensitive they always pose unacceptable risk Depends on encounter type Pick up and heat vs. step on 13
14 Historical Accidents in the US 208 MEC incidents involving death or injury in US since 1910* Mostly men and boys (only one adult female) Mostly surface MEC Mostly on land Need to balance underwater MEC risk against risk of working underwater Mostly grenades, bazooka rockets, mortars, bombs, practice rounds Over half occurred off site (home, school, recycling facility, etc.) MDAS certification is critical 31 incidents involved clearance work by EOD, contractors, or soldiers By far, most encounters with MEC occur during cleanup operations Encounter type By far, most incidents occurred after MEC was picked up Heating was next *A Study of MEC-Related Civilian Incidents Associated with FUD Sites (ACOE, 2011) UXO Incident Report (EPA 2001), DPRA Inc. with data from DDESB and ATF 14
15 Questions? 15
2012 INDUSTRY DAY Society of American Military Engineers - Omaha Post
2012 INDUSTRY DAY Society of American Military Engineers - Omaha Post Omaha District Corps of Engineers Military Munitions Design Center (MMDC) Glenn Marks MMDC Manager May 8, 2012 US Army Corps of Engineers
More informationExhibit 2 Preliminary Conceptual Site Model
MEC/MD Land Use and MRS 1 GA S CHAMBERS 23.8 Training using CS smoke pots/grenades. Assume disposal of canisters in pits or tossed away from the gas chamber (gas chamber #1) in the same general area. Training
More informationRISK METHODOLOGY FOR FUDS
RISK METHODOLOGY FOR FUDS 1 (AKA RAO SPEEDWAGON) 237 217 200 80 252 Assessing Risk and Defining the Remedial Objectives for 237 217 200 119 174 Munitions 237 Response 217 Sites 200 27.59 255 255 255 0
More information3Rs Explosives Safety Guide. Outdoor Recreation. Retreat Report. Recognize
3s Explosives Safety Guide Outdr ecreation ecognize etreat eport Hiking, hunting, fishing, camping, sightseeing, gardening and scuba diving are some of the ways that people enjoy the outdrs. Outdr recreation,
More informationVieques Underwater Demonstration Project
Vieques Underwater Demonstration Project NOAA Office of Response and Restoration National Ocean Service 2006-2007 2007 University of New Hampshire Joint Hydrographic Center 2006 Science Application International
More informationNOAA s Underwater UXO Demonstration Projects Vieques Island, Puerto Rico
NOAA s Underwater UXO Demonstration Projects Vieques Island, Puerto Rico Vieques Restoration Advisory Board Meeting May 7, 2008 Jason Rolfe NOAA s Office of Response & Restoration NOAA s Underwater UXO
More informationPrepared for: U.S. Army Corps of Engineers U.S. Army Engineering and Support Center, Huntsville
FINAL FEASIBILITY STUDY RANGE COMPLEX 1, RANGE COMPLEX 2, ARMY NATIONAL GUARD AND FLAME THROWER RANGE MUNITIONS RESPONSE SITES FORMER CAMP BUTNER GRANVILLE, PERSON, AND DURHAM COUNTIES, NORTH CAROLINA
More informationFeasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA.
Feasibility Report and Environmental Impact Statement on Coastal Storm Damage Reduction SURF CITY AND NORTH TOPSAIL BEACH, NORTH CAROLINA Appendix H Correspondence Appendix H Correspondence This appendix
More informationUXO Below: Mitigating Marine UXO Risk
RPS Energy Ltd Explosives Engineering Services UXO Below: Mitigating Marine UXO Risk Presented by Victoria Phillips 1 Aim To deliver an overview of Unexploded Ordnance (UXO) in the marine environment,
More informationBenefit of ESTCP/SERDP Research Program on Underwater Explosive Safety
Benefit of ESTCP/SERDP Research Program on Underwater Explosive Safety Timothy W. Shelton, PE Supervisory Research Hydraulic Engineer ERDC CHL Oct 2017 DoD has very few options for disposing UXO recovered
More informationExplosives Safety Submissions for Removal of Ordnance and Explosives (OE) from Real Property
Explosives Safety Submissions for Removal of Ordnance and Explosives (OE) from Real Property 1. Reason for OE. Provide a brief description of why OE exists in the specific area(s) covered by the submission.
More informationAdmiralty Inlet Pilot Tidal Project FERC No Appendix C. Derelict Gear Monitoring Plan
Appendix C Derelict Gear Monitoring Plan ADMIRALTY INLET PILOT TIDAL PROJECT FERC PROJECT NO. 12690 DERELICT GEAR MONITORING PLAN (submitted with the Final Application for a New Pilot Project License)
More informationDelineation of the Asian Clam (Corbicula fluminea) Population at Sand Harbor State Park, Nevada
Delineation of the Asian Clam (Corbicula fluminea) Population at Sand Harbor State Park, Nevada Report to the Nevada Division of State Lands and the Tahoe Regional Planning Agency Final Draft Brant Allen,
More informationEelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA Eelgrass (Zostera marina) Survey
Eelgrass Survey Reporting Form 2222 Channel Road Newport Beach, CA 92660 Eelgrass (Zostera marina) Survey Survey Date: July 19th, 2013 Report Date: July 26 th, 2013 Prepared by: Coastal Resources Management,
More informationINADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)
INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents
More informationDive Operations Plan for Personal Submersibles. Revision
Dive Operations Plan for Personal Submersibles Revision 2011.1 1 Table of Contents 1 EVENT...3 1.1 Summary of planned dive...3 1.1.1 PSUBS Guidelines...3 1.1.2 Maximum dive depth planned...3 1.1.3 Number
More informationCHALLENGES IN UXO-DETECTION: COMBINING DIFFERENT GEOPHYSICAL TECHNIQUES WITHIN UXO INVESTIGATION & CLEARANCE
PRESENTATION HYDRO 17 15/11/2017 CHALLENGES IN UXO-DETECTION: COMBINING DIFFERENT GEOPHYSICAL TECHNIQUES WITHIN UXO INVESTIGATION & CLEARANCE Jana De Cuyper - MSc Geology Conor Davidge - BSc Ocean Exploration
More informationENGINEERING EVALUATION and COST ANALYSIS
FINAL ENGINEERING EVALUATION and COST ANALYSIS Public Beaches Surf City and Ship Bottom New Jersey Prepared by: U. S. Army Corps of Engineers Baltimore District 5 December 2007 ENGINEERING EVALUATION /
More informationIn-Situ Response Safety
UNCLAS U.S. Coast Guard National Strike Force In-Situ Response Safety Kenneth KP Pounds Disclosure The presentation to follow is not intended to endorse, represent, nor establish policy for any specific
More informationUnexploded Ordnance Guide for the Marine Antiquities Scheme (MAS)
6 Alpha Associates Limited Quatro House, Frimley Road Camberley, Surrey GU16 7ER Tel: +44(0) 203 371 3900 Web: www.6alpha.com Unexploded Ordnance Guide for the Marine Antiquities Scheme (MAS) 1 Introduction
More informationFACT SHEET NAVY CORAL REEF PROTECTION
FACT SHEET NAVY CORAL REEF PROTECTION 1. MAPPING ASSESSING AND MONITORING OF CORAL REEFS DoD Coral Reef Assessment. DoD Legacy Resource Management Program funding was received in FY-01 to support an overall
More informationHunters Point Naval Shipyard Environmental Remediation Program Overview
NAVFAC Southwest Hunters Point Naval Shipyard Environmental Remediation Program Overview Bayview Hunters Point Mr. Derek Robinson, BRAC Environmental Coordinator Introductions and Overview Derek Robinson
More informationNOAA Marine Debris Program
NOAA Marine Debris Program Nancy Wallace National Oceanic and Atmospheric Administration Marine Debris Program Spill Control Association of America Annual Meeting March 2019 1 NOAA Marine Debris Program
More informationGLOSSARY. Contaminated Debris Disposal - the ability to directly dispose of contaminated material and/or contract for its disposal
GLOSSARY Note: This Glossary is to be used in conjunction with the Response Functions Matrix. Except for marked items, "ability to provide" includes providing by contract. Air Modeling - provide computer
More informationUXO Safety Training Agenda. UXO Safety
Appendix E UXO Safety Training Agenda Identify UXO Hazard By Type and Subgroup Determine the Hazards Marking a UXO Evacuation for a UXO UXO Safety NEVER approach a suspected UXO DO NOT use a radio within
More informationEM385 Construction Safety and Health Certification Course Section 33 Munitions and Explosives of Concern Encountered During USACE Activities
EM385 Construction Safety and Health Certification Course Section 33 Munitions and Explosives of Concern Encountered During USACE Activities OSHAcademy Course 504 Study Guide EM 385 SAFETY AND HEALTH CERTIFICATION
More informationVERTICAL CONCEPTUAL SITE MODELS FOR MUNITIONS RESPONSE SITES
VERTICAL CONCEPTUAL SITE MODELS FOR MUNITIONS RESPONSE SITES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102
More informationUnalaska Navigation Channel Improvements
1 237 237 237 255 255 255 0 0 0 Unalaska Navigation Channel Improvements 217 217 217 200 200 200 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62 102 130 102 56 48 130 120
More informationEnvironmental. Effects of Dredging
Envi~onmental Effects of Dredging Technical Notes THE VALUE OF GRAVEL DISPOSAL MOUNDS IN RIVER SIDE CHANNELS FOR FRESHWATER MUSSELS PURPOSE: This note provides information on the value of gravel disposal
More informationNemo Link s puxo campaign
BLOCK 3 BLOCK 2 U e c n France 400000 570000 KP 0 KP 10 KP 20 KP 30 a r F 565000 BLOCK 1 450000 Belgique 0 5 ONGOING 10 15 20 km N 565000 t i n g n i K Nearshore BE Fra m o d ed KP 50 KP 60 KP 70 KP 80
More informationNatural Shoreline Restoration for High Energy Shorelines. Brian Majka Restoration Ecologist 3/7/2019
Natural Shoreline Restoration for High Energy Shorelines Brian Majka Restoration Ecologist 3/7/2019 Today we ll discuss: High energy shorelines Restoration techniques for high energy shorelines Project
More informationA Survey of Biodegradable and Non Biodegradable Debris on. Dominica s Coastal Zones
A Survey of Biodegradable and Non Biodegradable Debris on Dominica s Coastal Zones Heather edina, Heather Woods, ichele Horner, Patricia Jimenez, Zac Zemanek Dominica 2011 Abstract: This report is a summary
More informationLiving Beaches: Integrating The Ecological Function Of Beaches Into Coastal Engineering Projects and Beach Management
Living Beaches: Integrating The Ecological Function Of Beaches Into Coastal Engineering Projects and Beach Management Melissa Bimbi USFWS SC Field Office Kathy Matthews USFWS Raleigh Field Office January
More informationROCK CLIMBING STRATEGY
Stawamus Chief, Shannon Falls & Murrin Provincial Parks ROCK CLIMBING STRATEGY Prepared by: Ministry of Environment, Lands and Parks BC Parks, Garibaldi/Sunshine Coast District Brackendale, BC and Volunteer
More informationPatrick A. Simmsgeiger, President Diversified Waterscapes Inc. Laguna Niguel, CA. Quagga Mussels (Dressina bugensis)
Patrick A. Simmsgeiger, President Diversified Waterscapes Inc. Laguna Niguel, CA Quagga Mussels (Dressina bugensis) Introduction Patrick Simmsgeiger President, Diversified Waterscapes Nationally Certified
More informationTrout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9
October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement
More informationMANUAL MINE CLEARANCE
1. INTRODUCTION MANUAL MINE CLEARANCE 1.1 Humanitarian demining techniques used during each project may differ according to equipment, the terrain, type of mines / UXO, etc. All procedures used in clearance
More informationSECTION 2 HAZARD ASSESMENT
SECTION 2 HAZARD ASSESMENT CONTENTS Hazard Assessment Policy 2 Hazard Assessment Defined 3 Project Pre-Job Hazard Assessment Form 6 Start card front and back 8 Hazard Assessment Checklist 10 Section 2
More informationNINGALOO MARINE DEBRIS REPORT
NINGALOO MARINE DEBRIS REPORT A Summary Report by Salty Times covering 30 Marine Debris Surveys of the Ningaloo Coastline. Report Contents What: Marine Debris surveys have been conducted along the Ningaloo
More informationProduct Name: Universal Guardrail Post
Dist. by: BEST MATERIALS Ph: 800-474-7570 www.bestmaterials.com Email: Sales@BestMaterials.com Product Name: Universal Guardrail Post Part #: 61133; 61135; 61136 Instruction Manual Do not throw away these
More informationFisheries of the Caribbean, Gulf of Mexico, and South Atlantic; Reef Fish Fishery of Puerto Rico and the U.S. Virgin Islands;
This document is scheduled to be published in the Federal Register on 06/11/2018 and available online at https://federalregister.gov/d/2018-12420, and on FDsys.gov BILLING CODE: 3510-22-P DEPARTMENT OF
More informationFISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum
FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is
More informationManta Tour Operator Standards Kona, Hawaii Drafted by Manta Tour Operators as a Voluntary Standards Finalized March 2013
Manta Tour Operator Standards Kona, Hawaii Drafted by Manta Tour Operators as a Voluntary Standards Finalized March 2013 The purpose of the Manta Tour Operator Standards is to increase the safety of manta
More informationBy Michael Hurley Specialized Safety Products
PRESSURE INCREASES TO IMPLEMENT SAFE ALTERNATIVES TO COMPRESSED AIR Growing awareness of the dangers and potential liabilities of compressed air has industries and institutions exploring new options By
More informationDoD Coral Reef Protection and Management Program
DoD Coral Reef Protection and Management Program PROJECT TEAM U.S. NAVY TOM EGELAND (ASN(I&E)) LORRI SCHWARTZ (NAVFAC) ALEX VIANA (NFESC) STEVE SMITH (NFESC) BOSTON UNIV. MARINE PRG. PHILLIP LOBEL MINDY
More informationOrange County MPA Watch Program Quarterly Report (Jan 1 March 31, 2012)
Orange County MPA Watch Program Quarterly Report (Jan 1 March 31, 2012) What is the OC MPA Watch Program? The Orange County Marine Protected Area (OC MPA) Watch Program enlists volunteers, community groups
More informationOil Spill Incident Annex. Introduction [Link to the Oil and Hazardous Materials Incident Annex in the NRP]
Introduction [Link to the Oil and Hazardous Materials Incident Annex in the NRP] Response to oil spills can vary greatly, involving only a few people or thousands. The initial action taken by responders
More informationPuget Sound Nearshore Ecosystem Restoration Project Restore America s Estuaries Conference 2012 Tampa, FL
Restore America s Estuaries Conference 2012 Tampa, FL presented by: Theresa Mitchell, WA Dept. of Fish & Wildlife Nearshore General Investigation Change Analysis: Comparison of historical and current
More informationUnion Pacific Railroad
Input Questions: 404/401 Pre Application Meeting, December 18, 2013, Portland, Oregon 1. What is the project purpose and need? The purpose of the project is to improve the efficiency and average velocity
More informationAgenda Item 7.1 For Information. Council CNL(10)24. Annual Report on Actions Taken Under Implementation Plans USA
Agenda Item 7.1 For Information Council CNL(10)24 Annual Report on Actions Taken Under Implementation Plans USA Annual Report on actions taken under the US Implementation Plan for the Calendar Year 2009
More informationLand Release. and Cluster Munitions
Land Release and Cluster Munitions The Geneva International Centre for Humanitarian Demining (GICHD) works for the elimination of antipersonnel mines, cluster munitions and explosive remnants of war. The
More information1.0 PURPOSE 2.0 REFERENCES
Page 1 1.0 PURPOSE 1.1 This Advisory Circular provides Aerodrome Operators with guidance for the development of corrective action plans to be implemented in order to address findings generated during safety
More informationSouthampton. Our cottage/retirement home: The pre-build phase
Southampton Our cottage/retirement home: The pre-build phase 2001-2004 Here s an aerial view of Southampton, ON taken from a post card. Southampton, part of the larger municipality of Saugeen Shores, has
More informationScottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement
SHEPD Section ID 154 Scottish Hydro Electric Power Distribution Operation, Inspection, Maintenance and Decommissioning Strategy Bute Cumbrae Cable Replacement Contents Definitions and Abbreviations...
More informationAn Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience
An Example of a Unique Partnership for Contaminated Sediment Management The Port Hueneme Experience AAPA/USACE Quality Partnership Initiative 4 th Annual Project Managers Workshop Port of Ponce, Puerto
More informationJANUARY 2017 STUDY UPDATE. Logan City, Cache Co., CMPO
JANUARY 2017 STUDY UPDATE Logan City, Cache Co., CMPO Purpose of the presentation To provide an update on the status of the Study To present the Study Purpose and Need To present the results of Level 1
More informationUniversity System of Maryland (USM) Dive Plan Approval Form To be submitted to the USM Scientific Diving Safety Officer
University System of Maryland (USM) Dive Plan Approval Form To be submitted to the USM Scientific Diving Safety Officer Date Submitted: Proposed Expedition Dates: Dive Plan through Dive Platform Name:
More informationWork Sample. Terry INTRODUCTION
INTRODUCTION As an environmental consultant, I will be conducting an investigation into the effectiveness of the coastal management strategies currently being undertaken at XXX beach. Here I will be looking
More informationChincoteague National Wildlife Refuge and Wallops Island National Wildlife
This document is scheduled to be published in the Federal Register on 09/11/2015 and available online at http://federalregister.gov/a/2015-21925, and on FDsys.gov Billing Code 4310-55 DEPARTMENT OF THE
More informationDive Fatality Equipment Investigation. Jeffrey Bozanic, PhD David M. Carver
Dive Fatality Equipment Investigation Jeffrey Bozanic, PhD David M. Carver 1 Why is testing dive fatality equipment important? The answer might appear straight forward, but the answer might depend on why
More informationThe Blue Heron Slough Conservation Bank
1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River
More informationClosure Plan for CCR Surface Impoundments
Closure Plan for CCR Surface Impoundments B.L. England Generating Station Beesley s Point, New Jersey April 17, 2018 Prepared For RC Cape May Holdings, LLC 900 North Shore Road Beesley s Point, New Jersey
More informationGeographic Response Plan Map: VI-7 Inset Map A567 TRUNK AND HAWKSNEST BAYS XXX. St. John. qxxxa551 - V.I. WAPA WATERINTAKE, Acropora Priority Sites
Geographic Response Plan Map: VI-7 Inset Map Whistling Cay Virgin Islands National Park j St. John qa551 - V.I. WAPA WATERINTAKE, Great Cruz FRANK BAY # St. St. n Jo h s a om Th A554 CHOCOLATE HOLE FISH
More informationESTCP Cost and Performance Report
ESTCP Cost and Performance Report (MM-0606) EFFICIENT SHALLOW UNDERWATER UXO RETRIEVAL October 2009 ENVIRONMENTAL SECURITY TECHNOLOGY CERTIFICATION PROGRAM U.S. Department of Defense Report Documentation
More informationInterim Guidance Fish Presence Absence
Interim Guidance Fish Presence Absence Source: Forest Practices Act Guidance for Division 635 of the forest practices act dealing with stream classification when no fish surveys have been done (referenced
More informationPart #: 15158; 15159; 15188; 61027; 61029; 61140; 61141
Product Name: Guardrail Receivers Part #: 15158; 15159; 15188; 61027; 61029; 61140; 61141 Instruction Manual Do not throw away these instructions! Read and understand these instructions before using equipment!
More informationCounty of Orange Resources and Development Management Department Harbors, Beaches and Parks. Strategic Plan. HBP Strategic Plan Workshop 1.
County of Orange Resources and Development Management Department Harbors, Beaches and Parks Strategic Plan HBP Strategic Plan Workshop 1 v18 PRESENTATION OUTLINE Harbors, Beaches & Parks (HBP) History
More informationFOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC
Page 1 of 14 FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC FSH 7709.55 - TRAVEL PLANNING HANDBOOK Amendment No.: 7709.55-2009-3 Effective Date: January 8, 2009 Duration: This amendment
More informationRESPONSE TO A SUICIDE/HOMICIDE BOMBING SCENE
Information Bulletin Governor s Office of Emergency Services Law Enforcement Branch Michael Guerin, Chief RESPONSE TO A SUICIDE/HOMICIDE BOMBING SCENE PREFACE Corrected Edition This is the first in a series
More informationNechako White Sturgeon; SARA listing experience for Carrier Sekani First Nations. June 4, 2018 Christina Ciesielski Carrier Sekani Tribal Council
Nechako White Sturgeon; SARA listing experience for Carrier Sekani First Nations June 4, 2018 Christina Ciesielski Carrier Sekani Tribal Council Overview Overview of Nechako White Sturgeon species Recruitment
More informationGoal 3: Foster an environment of partnerships and collaboration to connect our communities and regions to one another.
Non-Motorized Transportation Plan (NMTP) Draft Vision, Goal and,, Tri-County Regional Planning Commission (TCRPC) Purpose The purpose of the Tri-County Regional Planning Commission (TCRPC) Non-Motorized
More informationOctober 5, Pillsbury Winthrop Shaw Pittman LLP
Ecosystem Services Concepts at Work: Overlapping Regimes of Endangered Species Act, Migratory Bird Act, National Environmental Policy Act and Natural Resource Damages Protections Pillsbury Winthrop Shaw
More informationMarine Towed Array Surveys of Ostrich Bay, Lake Erie and Puerto Rico.
Marine Towed Array Surveys of Ostrich Bay, Lake Erie and Puerto Rico. Chet Bassani, Nagi Khadr, Chris Gibson and Jim McDonald Advanced Sensors and Analysis Div., SAIC Cary, NC Marine Towed Array (MTA)
More informationCHAPTER 7.0 IMPLEMENTATION
CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER
More informationPoint LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018
Point LaBarbe/McGulpin Point Response April 2 May 8, 2018 Regional Response Team 3 Meeting November, 2018 TJ Mangoni District Response Advisory Team Supervisor Ninth Coast Guard District 216-214-4285 Summary
More informationThe Isar -Plan Project in Munich Great (Un) expectations.
The Isar -Plan Project in Great (Un) expectations. European River Restoration Conference Session 5- Enhancement of Multi-Use Landscapes 11-13 September 2013 The Isar-Plan Project: Basic Facts Approximate
More information2016 International Perforating Symposium May Galveston, Texas
IMESAFR - QRA Tool Perforating Gun Safety Analysis 2016 International Perforating Symposium May 9-11 - Galveston, Texas Who is the Institute of Makers of Explosives? Safety and Security Association for
More informationLESS LETHAL, FLASH SOUND DIVERSIONARY DEVICE, CHEMICAL AGENTS INSTRUCTOR CERTIFICATION COURSE OVERVIEW AND INSTRUCTIONAL GOALS COURSE OVERVIEW
LESS LETHAL, FLASH SOUND DIVERSIONARY DEVICE, CHEMICAL AGENTS INSTRUCTOR CERTIFICATION COURSE OVERVIEW AND INSTRUCTIONAL GOALS COURSE LENGTH: 40 Hours 5 Days 29 Hours Classroom 11 Hours Practical COURSE
More informationObjectives of our Emergency Plan
Purpose of Training The purpose of this training is to educate the campus community to respond to an emergency situation on the St. Bonaventure University campus. Objectives of our Emergency Plan Minimize
More informationCalifornia Steelhead: Management, Monitoring and Recovery Efforts
California Steelhead: Management, Monitoring and Recovery Efforts Jonathan Nelson Steelhead Restoration & Management Program Oncorhynchus mykiss irideus California Steelhead Distinct Population Segments
More informationTRCP National Sportsmen s Survey Online/phone survey of 1,000 hunters and anglers throughout the United States
#17144 TRCP National Sportsmen s Survey Online/phone survey of 1,000 hunters and anglers throughout the United States Methodology Public Opinion Strategies conducted a national survey of N =1,000 voters
More informationConcept for a Whale Protection Zone for the Endangered Southern Resident Killer Whale
Concept for a Whale Protection Zone for the Endangered Southern Resident Killer Whale Supported (in part) by the Charlotte Martin Foundation and the Norcliffe Foundation The concept described in this document
More informationTownship of Plainsboro Ordinance No County of Middlesex AN ORDINANCE ESTABLISHING A DEER MANAGEMENT PLAN ON CERTAIN PUBLIC PROPERTY
Township of Plainsboro Ordinance No. 18-10 County of Middlesex AN ORDINANCE ESTABLISHING A DEER MANAGEMENT PLAN ON CERTAIN PUBLIC PROPERTY WHEREAS, White-tailed deer populations have been increasing and
More informationMcKenzie Interchange Project Spring 2016 Comment Period. Appendix 1: Display Boards and Feedback Form
McKenzie Interchange Project Spring 2016 Comment Period Appendix 1: Display Boards and Feedback Form August 2016 Welcome to the McKenzie Interchange Project Information Session! Purpose of this Information
More informationCatalogue of Mines, Munitions and Explosives Training Aids
Catalogue of Mines, Munitions and Explosives Training Aids www.explosiveriskmanagement.com enquiries@explosiveriskmanagement.com Company Number: 06798226 VAT Registration Number: GB 985 1072 06 Pictures
More informationManned Underwater Operations (MUO) in a holistic safety perspective. Olav Hauso. Special Adviser. Petroleum Safety Authority, Norway (PSA)
Olav Hauso Special Adviser Petroleum Safety Authority, Norway (PSA) Holism (from Greek: "all, whole, entire"): Is the idea that systems and their properties should be viewed as a whole, not as a collection
More information1.0 PURPOSE AND NEED
1.0 PURPOSE AND NEED 1.0 PURPOSE OF AND NEED FOR THE PROPOSED ACTION 1.1 INTRODUCTION The National Environmental Policy Act (NEPA) of 1969, as amended (42 United States Code Section 4321 et seq.); the
More informationOverview of Recreational Pond Management
Overview of Recreational Pond Management extension November 13 th 2013 Forrest Wynne State Extension Specialist for Aquaculture Kentucky State University Ponds are built for some of the following purposes:
More informationAPPLICANT: Pacific Northwest National Laboratory Attention: Mr. Charles Brandt 1529 West Sequim Bay Road Sequim, Washington 98382
US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationKnow Your River - River Ogmore Salmon and Sea Trout Catchment Summary
Know Your River - River Ogmore Salmon and Sea Trout Catchment Summary Introduction This report describes the status of the salmon and sea trout populations in the Ogmore catchments. Bringing together data
More informationDecember 6, Via fedex
December 6, 2016 Via fedex U.S. Fish & Wildlife Service Pennsylvania Field Office Endangered Species Section 110 Radnor Road, Suite 101 State College, PA 16801 Re: Rover Pipeline LLC, Rover Pipeline Project
More informationU.S. Fish and Wildlife Service Native American Crosscut Funding
U.S. Fish and Wildlife Service Native American Crosscut Funding Tribal / Interior Budget Council National Budget Meeting L Enfant Plaza Hotel Washington, DC November 8, 2013 U.S. Fish and Wildlife Service
More informationThe Value of Springs to The Petersen Ranch
The Value of Springs to The Petersen Ranch Location 60 miles SW of Austin 50 miles North of San Antonio 12 miles West of Blanco 18 miles SE of Fredericksburg 8 miles SW of Luchenbach Ranch Overview 800
More informationGood Mooring to You! Jensen Beach Mooring Field. Kathy Fitzpatrick, P.E. Coastal Engineer, Martin County
Good Mooring to You! Kathy Fitzpatrick, P.E. Coastal Engineer, Martin County Penny Cutt Regional Manager, Coastal Systems International Mooring Field Advantages Provide a safe and secure anchorage at a
More informationCollaboration: Sea-level Marin Adaptation Response Team (C-SMART)
Collaboration: Sea-level Marin Adaptation Response Team (C-SMART) Photo Credit : Lighthawk Aerial Community Development Agency 3501 Civic Center Drive, Rm. 308 San Rafael, CA 94903 415 4736269 T www.marinslr.org
More informationCitizen Advisory Committee Meeting. November 15, 2011 MPRB Headquarters- 6:30-8:30 p.m.
Citizen Advisory Committee Meeting November 15, 2011 MPRB Headquarters- 6:30-8:30 p.m. Charge for Wirth Lake Area Citizen Advisory Committee: Prepare recommendations for the Board of Commissioners on the
More informationNew Jersey Coastal Zone Overview. The New Jersey Beach Profile Network (NJBPN) 3 Dimensional Assessments. Quantifying Shoreline Migration
New Jersey Coastal Zone Overview The New Jersey Beach Profile Network (NJBPN) Objectives Profile Locations Data Collection Analyzing NJBPN Data Examples 3 Dimensional Assessments Methodology Examples Quantifying
More informationOrange County MARINE PROTECTED AREAS 3 rd Quarter 2015 Report
Orange County MARINE PROTECTED AREAS 3 rd Quarter 2015 Report Page 1 of 7 WHAT IS THE OC MPA WATCH PROGRAM? The Orange County Marine Protected Area (OC MPA) Watch Program enlists volunteers, community
More informationScuba diving in the Oosterschelde: Combining travel cost estimates with stated choice experiments
Scuba diving in the Oosterschelde: Combining travel cost estimates with stated choice experiments Sandra Rousseau and Anthony Tejerizo Fuertes CEDON Faculty of Business and Economics ENVECON, London, 9
More informationOrange County MARINE PROTECTED AREAS 2 nd Quarter 2016 Report
Orange County MARINE PROTECTED AREAS 2 nd Quarter 2016 Report Page 1 of 7 WHAT IS THE OC MPA WATCH PROGRAM? The Orange County Marine Protected Area (OC MPA) Watch Program enlists volunteers, community
More information