Table 1: Original and adjusted slope gradients for each difficulty rating Traditional Ranges Adjusted Ranges

Size: px
Start display at page:

Download "Table 1: Original and adjusted slope gradients for each difficulty rating Traditional Ranges Adjusted Ranges"

Transcription

1 1 Summary Nothing beats a day spent skiing. Except, of course, a day spent designing slopes for skiing. As winter looms closer, some wealthy investors are considering purchasing Wasatch Ranch in Utah. The investors would like to transform the mountain into one of the top ski resorts in North America to be used every winter. The investors have expressed interest in making Wasatch Ranch a location for a future Winter Olympics. Their representative, Ms. Mogul, has asked us to create a preliminary model of a ski resort. The model would include potential slopes and trails to fulfill the guidelines of a ski resort and possible Winter Olympics location. She has recommended plenty of slopes of varying lengths, totaling at least 160 kilometers. The distribution of trails should be about 20% green circles, 40% blue squares, and 40% black diamonds. We were asked by Ms. Mogul to plan the development of a ski resort on the property of the Wasatch ranch that could serve as a location for a future Winter Olympics. Our conceptual resort will be split into four main areas: a main area in the western region of the property, two smaller sister areas to the south, and a family-friendly area to the north. (See Appendix, Figure 9.) In designing this possible resort, we took a variety of factors into account. First, we assumed that rivers could not be crossed anywhere on the mountain except at locations with base lodges. We intentionally placed these lodges near both rivers and primary roads, which could be developed to support an influx of traffic. One of the guidelines was a wide variety of lengths of slopes. We achieved this guideline by placing the tops of our ski lifts at peaks of varying distances from the base lodges. Our resort will require the construction of 9 lodges and 24 lifts. (See Appendix, Figure 1, 4, 6.) The lodges and the lifts eventually became the central factor of each of the sections of the resort. The trails were ultimately designed around the placement of the lifts and the lodges so that the trails did not pass over any of the rivers. At each of the peaks accessed by the chairlifts were one or more main slopes. These slopes typically went from a peak to a base lodge. Off of these main slopes, a plethora of other trails could be traced. We then determined the difficulty ratings of each of the trails and the slopes on the mountain. We did this by measuring, on a topographical map, the shortest horizontal range per 40 vertical feet. We then took the vertical rise over the horizontal run and multiplied by 100% to get the percent gradient of the steepest part of each slope. Because our terrain was steeper in general, we adjusted the ranges for the slope gradients so that they more accurately reflect each trail s difficulty relative to other trails in the park. After this adjustment, 15% of the total length of trails is rated as green circles, 39% is rated as blue squares, and 45% is rated as black diamonds. In this proposed resort, there will be a total of 151 slopes and trails that span approximately 164 kilometers. This ensures that there are plenty of trails to choose from because the number of trails is close to the average trails of the North American ski resorts. The lengths of the main slopes also vary widely and interestingly, with a range of about 1.4 kilometers. When we compared the North American resorts with the resort of Wasatch that we designed Wasatch placed third.

2 2 Memo Dear Ms. Mogul, We have surveyed the terrain in the Wasatch ranch and have created a preliminary model of a ski resort. We think there is a lot of potential in this region, and we would highly recommend that you buy this ranch. The recommendations for the paths of the slopes and trails are included at the end of this document. While deciding upon the specific trails and slopes, we kept your guidelines in mind. Our main resort, which hosts the most trails, will be located mostly on the west side of the property. In addition to this main resort, we suggest three sister zones at nearby peaks. There are two to the south of a similar difficulty as the main area. Because these two and the main ski areas are both challenging, we suggest a fourth sister zone (affectionately called Kiddie Land by members of our team). This one, north of the main area, will be more family-friendly, with easier and safer trails. As we were dividing up the land for the slopes we quickly realized that a good portion of the mountain has a steep slope. To fulfill your requested percentage of each difficulty level more trails had to be added in the north where there was less of an incline. Generally, the terrain becomes more difficult as one moves west. While this terrain could be daunting to some beginners, it may also attract seasoned experts, lending the resort more attention and prestige, which will be helpful for its prospects as a Winter Olympics venue. Even with Kiddie Land, much of the park s terrain is very difficult. We thus adjusted our difficulty rating system 2 percentage points above the traditional slope gradients. Table 1: Original and adjusted slope gradients for each difficulty rating Rating Traditional Ranges Adjusted Ranges Green Circle 6% to 25% 8%-27% Blue Square 25% to 40% 27%-42% Black Diamond 40% or more 42% or more With the current adjustments, about ~15% of the total length of the slopes are rated as green circles, ~40% are rated as blue squares, and ~45% are rated as black diamonds. If desired, the values could be adjusted to better fit your desired percentages of 20% greens, 40% blues, and 40% blacks. In ranking our proposed ski resort against others in North America, we gathered data about the number of trails in each of the other resorts. Unfortunately, no data could be found from the Canadian ski resorts, but perhaps with more time, this could be investigated further. Thus, our ski resort was ranked against the other resorts in the U.S. only. We ranked based on a point system with 2 criteria. The first was a ratio of lifts to trails. (Having a high ratio indicates more ski lifts and less queuing time.) The second was average trail length. (Having a low average length means the trails are kept interesting.) Each of the ski resorts were ranked in these two areas, with the resort in first place receiving 12 points, the second receiving 11, and so on. We

3 3 scored first in the ski lift competition and 6th in terms of average trail length. This gave us 19 points overall, putting us in 3rd place out of all the American ski resorts given. While this ranking is not all-encompassing, it indicates that this resort is good for guest satisfaction. In conclusion, we would fervently suggest that you purchase this ranch and construct a ski resort according to this model. It will be an amazing long-term investment! Here is a map of the middle slope for your reference. If you have anymore questions about the designs of the other slopes then feel free to contact us for a follow up or more information. Sincerely, team 7408

4 4 Given Variables Wasatch Ranch 13,000 total acres on Wasatch Mountain property 5,500 skiable acres on Wasatch Mountain property 11 mile ridgeline 4750 foot drop top to bottom 24 peaks 15 bowls North American and Olympic Ski Areas (Refer to Appendix Table 1) Base elevation Peak elevation Skiable acres Slopes total The distribution of green, blue, and black trails Number of lifts Olympic Ski Areas (Refer to Appendix Table 2) Base elevation Peak elevation Slopes Total The distributions of green, blue, and black trails Number of lifts Trail Classifications Green Circle: 6%-25% slope gradient Blue Square: 25%-40% slope gradient Black Diamond: 40%+ slope gradient

5 5 Assumptions Because the prospective buyers of the property are wealthy and have expressed interest in making this a possible Olympic venue, money will not be much of a constraint. Trees can be chopped down anywhere to make the trails. On the mountains, it is not feasible to make a ski trail cross streams and rivers. However, it is assumed that at the base lodge location, rivers can be diverted underground. It was observed that the primary roads entered in yellow on the map, provided on mapright.com, were undeveloped dirt roads (Mirr). It is assumed that some of these roads could be developed as a way to get to the ski area, but they cannot be crossed. The other roads can be abandoned and covered with snow, allowing trails to cross over them. It can be assumed that snow will cover the roads completely because the mountain receives over 400 inches of snow (Wasatch Peaks Ranch, 2017). It is assumed that main slopes typically span from the top of a ski lift to the bottom. Ski trails will branch off of the main slopes. Ski slope should be viable for non-olympic as well as Olympic use. When calculating our data and using the given data, main slopes were included in the total number of trails. Hypothesis The trials that are created will not perfectly fit the difficulty ratio on the first iteration; through the implementation of multiple iterations the trail variation will get closer to the desired ratio. Analysis and Model Development Brainstorm To design a mountain with the optimal variation of trails we determined the usable area. To gain a better understanding of the skiable area we found a map of Wasatch Mountain (Mirr). When we analyzed the map we discovered that rivers and roads covered many parts of the mountain. In fact, the yellow roads depicted on the map appeared to cover the whole span of the mountain. Based on the assumption that roads could be either developed or overridden, we created trails over some of the yellow roads. Next, we determined the process of drawing and calculating the slopes of different ski trails. The problem stated that the percent slope of a ski trail determined the difficulty rank of that trail. On the topographic map each line or loop goes by 40 feet. Using the virtual map a line could be drawn and the distance could be determined. However, to calculate the steepest part of the trail only one vertical drop of 40 feet was needed. The percent slope of the line could be

6 6 determined by dividing the rise (the vertical drop) by the run (the horizontal difference between the 40 foot vertical difference). First Model To start planning out possible locations for ski trails we split the topographic map into sections for each person. We began collecting data separately in the various locations and recording the slopes as each trail was added. The data would be used at the end to determine the rank of each of the trails. The separation of the area proved to be an inefficient way of collecting data. The plan was not successful because the methods varied greatly. We determined that we needed to develop a better way to keep each section of the mountain together as a whole. Second Model From the first attempt we determined that the area of the topographic map should not have been handled separately. A new strategy was attempted by creating trails in each of the labeled quadrants. The trails were added down the diagram for each section. However, there was still a flaw in this system; the trails were still scattered all around the quadrants and did not make any logical sense with the data. The data from this trial was also more difficult to keep track of because we did not put a system in place to keep track of any of the lengths of the lines. Final Model From the previous two attempts of creating the slopes we concluded that we needed a system to keep track of the data as the lines were being configured. To keep track of the data we created an excel that kept the running total of the kilometers of trails because it was given that we needed to include a total of at least 160 kilometers of trails. The trails also had to be made more consistent and connected with each other. To ensure that the slopes were connected the lodges and possible chair lifts were placed first for each of the sections that the total area was divided into. After the chair lifts and the lodges were determined the main slopes for each section were then connected from the lodges to the ski lifts. As the slopes were drawn using the interactive map the lengths of each ski trail and the horizontal length between the steepest vertical drop were recorded on the excel. These steps were repeated for four sections of the map to create slopes over the entire ranch. As the slopes were recorded and the percent of the data were calculated the excel was programed to highlight percent higher than six and less than 25 in green, the percent higher than 25 but lower than or equal to 40 in blue, and the percent higher than 40 in black. The highlights signified, based on the givens, the difficulty level of each of the trails.

7 7 One weakness of our model was our failure to consider specific elements of each trail in their difficulty ratings. We simply used the ranges of slope gradients provided for each rating as hard cutoffs. In the future, some of the trail ratings could be revised to fit a wider variety of criteria. (Refer to appendix for visual a model) Analysis One of the guidelines the team was given was that the main slopes should have great variance in length. In order to find this we did a few tests to measure variance in our data. First, we took the range of lengths of our main slopes. The longest slope was feet and the shortest main slope was This range came out to 4,488 feet, but the other data we were using was given in kilometers, so we converted this to km and it came out to be km. To further show the variance, we found the standard deviation of all of the trails. We know that the guideline was focused on main slopes, but we thought that the variance of the trails is also an important factor. The standard deviation came out to be.604 km. Using these two measures of variance together, but focusing mainly on the main slopes value as that is what was asked, we decided that the variance in main slope length was great enough to pass this checkpoint. Another guideline that was important to Ms. Mogul, so it was important to our team, and that was that there are plenty of trails. First we had to define what plenty of trails actually means. We decided to base it off of the given data for North American resorts. At first we were considering using the mean of the data, but due to a few resorts who had too many trails comparatively and became outliers, we decided that a median value might be more accurate. The median for the North American data set was trails in each resort. Our resort came out to have 151 trails. To determine if our resort could be considered to have enough trails, we first found the standard deviation of the number of trails for the North American resorts, which came out to be Our value is within one standard deviation of the median, so we decided that Wasatch fits the guideline, Plenty of Trails There were multiple comparisons to be made between our model of Wasatch Ranch and other potential guidelines. The first comparison to be made was with the original guidelines, provided by Ms. Mogul, referred to as target in table 1. The original guidelines suggested that 20% of the trails should be green, another 40% blue trails, and the final 40% black trails. To determine the percent of leveled trails in our model, we divided the total kilometers of each level by the total kilometers of all the trails combined. (refer to figure #). This comparison showed that our model did not completely match the guidelines given. Our percent of green trails, 13.49%, and blues trails, 33.72%, were both less than the target percentages of green and blue. However, our percent of black trails, 52.80%, exceeded the target percentage. In order to get more of an understanding of what our data actually means, more comparisons were made. We compared our data to the North America data and found the following. We decided that the most efficient way to compare our data to the North American ski resorts was to compare the average percentages for each difficulty level. This was calculated by taking the average number of kilometers for each difficulty level across the North American

8 8 resorts provided, then we divided that by the average total number of kilometers. Our percentage of green trails and blue trails were both less than the green and blue trails for the North American data set, which were 19.25% and 43.88% respectively, while our percentages of black trails was larger than the North American percentage which came out to 36.87%. Due to the somewhat concerning differences between our model values and the target values, we decided to look into where we could rearrange the difficulties. We decided that the most accurate representation of the distribution of the difficulties in our resort was to shift the percentage boundaries up by 2 %. This means that trails with slopes of 27% and under would now fall into the green circle category, slopes between 28% and 42% are now considered blue squares, and any slope that is steeper than 42% is a black diamond. Before the shift, our distribution of levels was off which meant that the rankings were not doing a good job of discerning which trails were actually hard compared to others. The shift resulted in 7 of the easiest black diamonds falling into the blue category which greatly helped our ratio. In addition to these changes, 4 blues were now considered to be greens. This means that following the shift, the percentages reflected the relative difficulty level of the trails more accurately. The percentage for the green trials rose to 15.08%, the percentage of the blue trails sky rocketed to 39.76%, and the blacks fell to 45.16%. % Trail Types Iteration 1 Boundary Shift 100% 100% 80% 80% 60% 60% 40% 40% 20% 20% 0% Wasatch North American Resorts Olympic Target 0% Wasatch North American Resorts Olympic Target Green Blue Black Green Blue Black The important thing to look for in these graphs is the improvement in similarity from the left graph to the right graph. After the shift, there is a substantial improvement in the ratios for Wasatch. We were also asked to rank our proposed ski resort amongst other existing North American ski resorts, specifically the ones we were given. We decided that an important part of a ski resort is the guest experience, and decided to weigh aspects of that heavily. An important part of the guest experience that we could quantify with the data we were given and the data we found was the number of ski lifts to the number of trails. If there is a high ratio of ski lifts to trails that means that it is less likely that a guest will have to wait in line to get to their

9 9 destination. We found this for our proposed resort by dividing the total number of lifts by the total number of trails. We decided that the higher the resultant value is, the lower the congestion of riders making the guest experience a more positive one. We found that for the Wasatch Ski Resort, this ratio came out to be approximately 0.16 ski lifts per each. We then researched the number of trails for each of the resorts we were comparing to (Mountain Info). However, it proved to be rather difficult to find information regarding the number of trails in the Canada based ski resorts. We compared our ratio and found that we surpassed all of the other resorts in this aspect of the guest experience (Table 4). Another aspect of the guest experience that we thought was important was how enjoyable the trails are. While some people will certainly disagree, we made the assumption that most guests will not enjoy staying on one trail for long periods of time. Thus, we decided that it is more interesting and therefore should help a ski resort in rank, if the resort has a relatively low average length for its trails. We found the value for our proposed resort by dividing the total amount of kilometers by the total number of trails. We found that our trails on average were approximately 1.09 kilometers long. When comparing this value to the other resorts, we found that Vail, Whistler Blackomb, and a few other resorts were better in this regard judging by our standards. We found that we placed sixth in this part of the competition. Using these aspects of guest experience, we tried to rank which resorts were the best in the areas we tested. Out of the North American groups we were given, only 13 had enough information about their ski areas for us to rank them. Based off of that, we gave the team that did the best in each of the heats 12 points, second place received 11 points, so on and so forth until last place received 0 points. Wasatch came in first in the ski lift ranking and sixth in the optimal trail length ranking, meaning the ski resort received 12 points and then 7 points, adding up to 19 points. Only Vail and Whistler Blackomb received more points than that, so for this ranking system, Wasatch would place in third out of the existing ski resorts in North America that were compared. Solution and Extensions The suggested slopes and trails are able to fulfill the requirements of plenty of slopes, varying length of main slopes, difficulty distribution, and the 160 plus kilometers. An extension would be to consider the Olympic data more significantly. There was a small amount of Olympic data therefore most of the calculations determined provided skewed results. If more data was found about other Olympic locations then Wasatch could have been compared with them. However, the fact that Wasatch ranked third of the North American results might play a part in the ability of the resort to host the Olympics. References

10 10 Mirr, K(n.d.). Retrieved November 09, 2017, from (n.d.). Retrieved November 09, 2017, from ABOUT PARK CITY MOUNTAIN. (n.d.). Retrieved November 09, 2017, from info.aspx Cowan, J. (2001, December 16). How Steep Is Steep? Retrieved November 09, 2017, from Lifts & Trails. (n.d.). Retrieved November 09, 2017, from mountain/current-conditions/lifts-and-trails#sm.00b8vyn81cl0eae11cb11lsh0ulrw Mountain Info. (n.d.). Retrieved November 09, 2017, from mountain/about-the-mountain/mountain-info.aspx Mountain Info. (n.d.). Retrieved November 09, 2017, from mountain/about-the-mountain/mountain-info.aspx Mountain Info. (n.d.). Retrieved November 09, 2017, from mountain/about-the-mountain/mountain-info.aspx Mountain Stats. (2017, October 19). Retrieved November 09, 2017, from Piste. (2017, August 30). Retrieved November 09, 2017, from Trail Map Winter Jackson Hole Resort. (n.d.). Retrieved November 09, 2017, from Wasatch Peaks Ranch. (2017, November 09). Retrieved November 09, 2017, from

11 11

12 12 Appendix Table 1: The table below shows the given data for the North American ski resorts. Table 2: The table below shows the given data for the Olympic ski resorts.

13 13 Table 3.0: The table below shows the data for the proposed Wasatch Ranch. Each length that was recorded was found and the percent slope was calculated. The column of length is color coded for the green, blue, and black trails. Table 3.1: Continuation of the Wasatch data

14 14 Table 3.2: Continuation of the Wasatch data Table 3.3: Continuation of the Wasatch data

15 15 Table 3.4: Continuation of the Wasatch data Table 3.5: Continuation of Wasatch data

16 16 Table 3.6: Continuation of Wasatch data Table 3.7: Continuation of Wasatch data Table 3.8: Continuation of Wasatch data

17 17 Table 4: The table below shows the number of lifts per a trail for each of the mountains in North America. Figure 1: The figure above shows the northern area of trails that were designed. The lifts are not shown because only one lift was used. This area is known as the children s area.

18 18 Figure 2: The figure above shows the lifts and the base lodges for the middle section of the area. The base lodges are squares and the triangles are the lifts. Figure 3: The figure above displays the main slopes of the middle section of the area. All the main slopes meet at the ski lift or the base lodge.

19 19 Figure 4: The figure above displays all the trails in the middle section of the total area. Figure 5: The figure above shows the lifts and the base lodges for the third section of the total area.

20 20 Figure 6: The figure above displays all the trails that connect the lifts and the lodges from figure 5. Figure 7: The figure above displays the lifts and the lodges for the southern section of the mountain.

21 21 Figure 8: The figure above displays all the trails in the southern section of the data.

22 22 Figure 9: The figure above demonstrates the overview of all the trails throughout the mountain.

23 23

Team 7414 HiMCM /12

Team 7414 HiMCM /12 Team 7414 HiMCM 2017 1/12 Ski Slope Problem Wasatch Peaks Ranch in Peterson, Utah is for sale, and a group of wealthy winter sport fans and their agent, Ms. Mogul, are looking for a new mountain to develop

More information

Winter is fast approaching and it is finally time to hit the slopes! With the upcoming 2018 Winter Olympics in

Winter is fast approaching and it is finally time to hit the slopes! With the upcoming 2018 Winter Olympics in Team 7410 HiMCM Page 1 of 17 Summary: Winter is fast approaching and it is finally time to hit the slopes! With the upcoming 2018 Winter Olympics in mind, investors are looking to develop a new high-end

More information

Team 7416 HiMCM 2017 Page 1 of 24. Olympic ski slopes are difficult to plan, and a ranch in Utah is being evaluated to

Team 7416 HiMCM 2017 Page 1 of 24. Olympic ski slopes are difficult to plan, and a ranch in Utah is being evaluated to Team 7416 HiMCM 2017 Page 1 of 24 Summary Olympic ski slopes are difficult to plan, and a ranch in Utah is being evaluated to determine whether or not it should host an event. The measurements and difficulty

More information

Briefing Paper: ONE Wasatch Ski Interconnect Concept

Briefing Paper: ONE Wasatch Ski Interconnect Concept Briefing Paper: ONE Wasatch Ski Interconnect Concept Purpose and Audience The purpose of this briefing paper is to provide information on the ONE Wasatch proposal for discussion purposes. The intent is

More information

BEGINNER TIPS. Where to Start

BEGINNER TIPS. Where to Start BEGINNER TIPS Snow sports are fun and challenging. The freedom experienced with motion and gravity is exhilarating and exciting. As with all gravity sports, the potential for injury is present. As a new

More information

TIMBERLINE MOUNTAIN SPECIFICATIONS SUMMARY

TIMBERLINE MOUNTAIN SPECIFICATIONS SUMMARY DESIGN CRITERIA TIMBERLINE MOUNTAIN SPECIFICATIONS SUMMARY The upgrading and expansion of a ski area is influenced by a variety of ski facility design criteria that help to create a quality ski experience.

More information

Prepared for: August 4 th, Presented by: Eric Callender Ecosign VP Adam Schroyen Resort Planner

Prepared for: August 4 th, Presented by: Eric Callender Ecosign VP Adam Schroyen Resort Planner TAHOE DONNER PHASE 1 & 2 INVENTORY AND TECHNICAL ASSESSMENT Prepared for: August 4 th, 2017 Presented by: Eric Callender Ecosign VP Adam Schroyen Resort Planner ECOSIGN RESORT PLANNERS (2016) LTD. Whistler,

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Turbo Roundabout Design? Redesign of Park City s 14 Year Old Deer Valley Roundabout Bill Baranowski, P.E. RoundaboutsUSA

Turbo Roundabout Design? Redesign of Park City s 14 Year Old Deer Valley Roundabout Bill Baranowski, P.E. RoundaboutsUSA TRB 4 th International Conference on Roundabouts Seattle, WA April 2014 Turbo Roundabout Design? Redesign of Park City s 14 Year Old Deer Valley Roundabout Bill Baranowski, P.E. RoundaboutsUSA Abstract:

More information

Spatial Methods for Road Course Measurement

Spatial Methods for Road Course Measurement Page 1 of 10 CurtinSearch Curtin Site Index Contact Details Links LASCAN Spatial Sciences WA Centre for Geodesy COURSE MEASUREMENT This page is a summary of results of some of the research we have recently

More information

THE SUSAN JANE AVALANCHE PATH: A CASE STUDY IN SKI AREA PLANNING AND AVALANCHE PATH IDENTIFICATION. Chester Marler I Ann Fink II ABSTRACT

THE SUSAN JANE AVALANCHE PATH: A CASE STUDY IN SKI AREA PLANNING AND AVALANCHE PATH IDENTIFICATION. Chester Marler I Ann Fink II ABSTRACT THE SUSAN JANE AVALANCHE PATH: A CASE STUDY IN SKI AREA PLANNING AND AVALANCHE PATH IDENTIFICATION Chester Marler I Ann Fink II ABSTRACT Some of the planning efforts for a ski area expansion project are

More information

Opleiding Informatica

Opleiding Informatica Opleiding Informatica Determining Good Tactics for a Football Game using Raw Positional Data Davey Verhoef Supervisors: Arno Knobbe Rens Meerhoff BACHELOR THESIS Leiden Institute of Advanced Computer Science

More information

A statistical model of Boy Scout disc golf skills by Steve West December 17, 2006

A statistical model of Boy Scout disc golf skills by Steve West December 17, 2006 A statistical model of Boy Scout disc golf skills by Steve West December 17, 2006 Abstract: In an attempt to produce the best designs for the courses I am designing for Boy Scout Camps, I collected data

More information

SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL

SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL SOLITUDE MOUNTAIN RESORT MASTER DEVELOPMENT PLAN AMENDMENT PROPOSAL 6/02/14 INTRODUCTION Solitude Mountain Resort s (Solitude) current Master Development Plan (MDP) was accepted by the Wasatch-Cache National

More information

CHAPTER 1 PURPOSE OF AND NEED FOR ACTION

CHAPTER 1 PURPOSE OF AND NEED FOR ACTION CHAPTER 1 PURPOSE OF AND NEED FOR ACTION This chapter describes the current and proposed project area and summarizes the Proposed Action, the Purpose of and Need for the action, the decisions to be made,

More information

4-3 Rate of Change and Slope. Warm Up. 1. Find the x- and y-intercepts of 2x 5y = 20. Describe the correlation shown by the scatter plot. 2.

4-3 Rate of Change and Slope. Warm Up. 1. Find the x- and y-intercepts of 2x 5y = 20. Describe the correlation shown by the scatter plot. 2. Warm Up 1. Find the x- and y-intercepts of 2x 5y = 20. Describe the correlation shown by the scatter plot. 2. Objectives Find rates of change and slopes. Relate a constant rate of change to the slope of

More information

File Code: 1950:2720 Date: March 21, Dear Interested Party,

File Code: 1950:2720 Date: March 21, Dear Interested Party, United States Department of Agriculture Forest Service White River National Forest 900 Grand Ave Glenwood Springs, CO 81601-3602 File Code: 1950:2720 Date: March 21, 2017 Dear Interested Party, The White

More information

MATH GRADE 6 UNIT 6 RATE ANSWERS FOR EXERCISES

MATH GRADE 6 UNIT 6 RATE ANSWERS FOR EXERCISES MATH GRADE 6 UNIT 6 RATE FOR EXERCISES LESSON 2: PRICE AS A RATE 1. $6.25 2. $.625, or $.63 3. $5.25 4. $.3125, or $.31 5. a. $2.5 b. $13.75 6. a. Amount (pt) 1 2 3 4 5 6 Cost non-organic ($) $.75 $1.5

More information

VAIL HOMEOWNERS ASSOCIATION, INC. VHA Action Notice: Update on Golden Peak Proposal April 10, 2017

VAIL HOMEOWNERS ASSOCIATION, INC. VHA Action Notice: Update on Golden Peak Proposal April 10, 2017 Existing view of Golden Peak - note cut to the summit, made in the 1960 s, for a lift that was never built Approximate view of Golden Peak once construction of proposed race course and lift to the summit

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

CITY OF SAINT JOHN TRAFFIC CALMING POLICY

CITY OF SAINT JOHN TRAFFIC CALMING POLICY CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING

More information

AN EXPERIENCE YOU WILL REMEMBER FOREVER

AN EXPERIENCE YOU WILL REMEMBER FOREVER AN EXPERIENCE YOU WILL REMEMBER FOREVER RATES & SCHEDULE 2018 SCHEDULE & RATES 02 2018 CPG SCHEDULE & RATES CPG CAN DELIVER THE SKIING OR RIDING EXPERIENCE OF YOUR LIFE Chugach Powder Guides has delivered

More information

PROPOSAL TO IGC PLENARY 2017 Year 1. From USA. PROPOSAL to change the calculation of speed points and distance points.

PROPOSAL TO IGC PLENARY 2017 Year 1. From USA. PROPOSAL to change the calculation of speed points and distance points. PROPOSAL TO IGC PLENARY 2017 Year 1 From USA PROPOSAL to change the calculation of speed points and distance points. SUMMARY This proposal affects Annex A. The proposal argues that the current scoring

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL

Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Chapter Twenty-eight SIGHT DISTANCE BUREAU OF LOCAL ROADS AND STREETS MANUAL Jan 2006 SIGHT DISTANCE 28(i) Chapter Twenty-eight SIGHT DISTANCE Table of Contents Section Page 28-1 STOPPING SIGHT DISTANCE

More information

C.A.R.S. Project Design Report.

C.A.R.S. Project Design Report. C.A.R.S. Project Design Report. PRODUCED BY: Browne, A. Kennedy, M. Dolan, N. Selman, C. STUDENT NO: DATE DUE: COURSE: LECTURER: C09365788-C09686908-D11125480-C08868352 20-April-2012 Dt004/3 Civil Engineering

More information

IPC Nordic Skiing Homologation Guide Version 2015

IPC Nordic Skiing Homologation Guide Version 2015 IPC Nordic Skiing Homologation Guide Version 205 Homologation of courses for IPC Nordic Skiing (Cross Country Skiing and Biathlon for skiers with impairments) General In general, the philosophy for FIS

More information

SQUAW VALLEY FUNITEL

SQUAW VALLEY FUNITEL SQUAW VALLEY FUNITEL AN INSTALLATION FOR THE THIRD MILLENNIUM Co presentation: Ernst Egli, PE Hans Burkhart Director for Marketing and Sales Gen. Manager Garaventa AG Squaw Valley Ski Corp. Switzerland

More information

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant

Pre Feasibility Study Report Citiwater Cleveland Bay Purification Plant SOLAR POWER SPECIALISTS.Pure Power ACN 074 127 718 ABN 85 074 127 718 POWER MAGIC PTY LTD 245 INGHAM RD GARBUTT QLD 4814 Phone: 1800 068 977 Fax: 07 4725 2479 Email: FNQSOLAR@bigpond.com Pre Feasibility

More information

Second Generation Bicycle Charging Station. Engineering Analysis

Second Generation Bicycle Charging Station. Engineering Analysis Second Generation Bicycle Charging Station By Jonathan Jerome, Michael Klinefelter, Connor Kroneberger, Kori Molever, and Robert Rosenberg Team 22B Engineering Analysis Document Submitted towards partial

More information

AN EXPERIENCE YOU WILL REMEMBER FOREVER

AN EXPERIENCE YOU WILL REMEMBER FOREVER AN EXPERIENCE YOU WILL REMEMBER FOREVER 02 2019 CPG SCHEDULE & RATES CPG CAN DELIVER THE SKIING OR RIDING Chugach Powder Guides has delivered some of the best powder and most exhilarating terrain that

More information

Revision 7/2/02 MEASURING WRAVMA DRAWING DESIGNS WITH SCORING TEMPLATES

Revision 7/2/02 MEASURING WRAVMA DRAWING DESIGNS WITH SCORING TEMPLATES Revision 7/2/02 MEASURING WRAVMA DRAWING DESIGNS WITH SCORING TEMPLATES -these suggested criteria supplement the criteria in the WRAVMA manual *Note item designs depicted here are representational and

More information

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0

Chapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0 Chapter 3.6 Elementary School Z DeLand, FL Volusia County MPO March 2008 Page 13.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Elementary School Z is a planned elementary

More information

Paper Report for Possible Road Locations within Saint Edwards State Park

Paper Report for Possible Road Locations within Saint Edwards State Park Paper Report for Possible Road Locations within Saint Edwards State Park Jedediah Bryce Troy Lane Kim Littke Douglas Marconi Project #1 Submitted to: Professor Peter Schiess on April 4 th, 2009 ESRM 468

More information

Calculation of Trail Usage from Counter Data

Calculation of Trail Usage from Counter Data 1. Introduction 1 Calculation of Trail Usage from Counter Data 1/17/17 Stephen Martin, Ph.D. Automatic counters are used on trails to measure how many people are using the trail. A fundamental question

More information

Atmospheric Waves James Cayer, Wesley Rondinelli, Kayla Schuster. Abstract

Atmospheric Waves James Cayer, Wesley Rondinelli, Kayla Schuster. Abstract Atmospheric Waves James Cayer, Wesley Rondinelli, Kayla Schuster Abstract It is important for meteorologists to have an understanding of the synoptic scale waves that propagate thorough the atmosphere

More information

NEIGHBORHOOD TRAFFIC CALMING POLICY

NEIGHBORHOOD TRAFFIC CALMING POLICY NEIGHBORHOOD TRAFFIC CALMING POLICY I. PURPOSE The City of Kent continually strives to strengthen and protect its neighborhoods by improving the quality of life in residential areas. Traffic conditions

More information

AS91430: Cycleways Waiopehu College Year 13 Geography Matt Reeves

AS91430: Cycleways Waiopehu College Year 13 Geography Matt Reeves AS91430: Cycleways Waiopehu College Year 13 Geography Matt Reeves December 2017 AS91430: Cycleways Cycling is an activity that a large proportion of our national population decides to enjoy and participate

More information

3.6 Magnetic surveys. Sampling Time variations Gradiometers Processing. Sampling

3.6 Magnetic surveys. Sampling Time variations Gradiometers Processing. Sampling 3.6 Magnetic surveys Sampling Time variations Gradiometers Processing Sampling Magnetic surveys can be taken along profiles or, more often, on a grid. The data for a grid is usually taken with fairly frequent

More information

Computing the Probability of Scoring a 2 in Disc Golf Revised November 20, 2014 Steve West Disc Golf, LLC

Computing the Probability of Scoring a 2 in Disc Golf Revised November 20, 2014 Steve West Disc Golf, LLC Computing the Probability of Scoring a 2 in Disc Golf Revised November 20, 2014 Steve West Disc Golf, LLC Data: Scores from 2014 Am Worlds and related tournaments. The number of player-rounds contributing

More information

Gas Gathering System Modeling The Pipeline Pressure Loss Match

Gas Gathering System Modeling The Pipeline Pressure Loss Match PETROLEUM SOCIETY CANADIAN INSTITUTE OF MINING, METALLURGY & PETROLEUM PAPER 2005-230 Gas Gathering System Modeling The Pipeline Pressure Loss Match R.G. MCNEIL, P.ENG. Fekete Associates Inc. D.R. LILLICO,

More information

Near Miss Avalanche Incident Jan 3 rd, 2014

Near Miss Avalanche Incident Jan 3 rd, 2014 Near Miss Avalanche Incident Jan 3 rd, 2014 Location: Turnagain Pass Tincan mountain - Lower CFR, West aspect Summary Tincan avalanche, dog fully buried, presumed dead January 3rd, 2014 2:50pm HS-AO-D2.5-R2.5-O/G

More information

Race Organizer Guide Integrating Adaptive Skiers into Your Race

Race Organizer Guide Integrating Adaptive Skiers into Your Race As a race organizer you play an important role in the development of adaptive Nordic skiing in the U.S. Thank you for challenging yourself and your organizing committee to open your event to more members

More information

LUTSEN RESORT ON LAKE SUPERIOR

LUTSEN RESORT ON LAKE SUPERIOR FOR SALE HOSPITALITY LUTSEN RESORT ON LAKE SUPERIOR 5700 W Highway 61 Lutsen, MN 55612 PRESENTED BY: Frank Jermusek, JD President / Managing Director 952.820.1615 frank.jermusek@svn.com Cameron Peterson

More information

How can I use the graph to figure out which racer is faster? How can we find the unit rate for each racer?

How can I use the graph to figure out which racer is faster? How can we find the unit rate for each racer? Common Core Standard: 8.EE.6 How can I use the graph to figure out which racer is faster? How can we find the unit rate for each racer? What if the line does not pass through (0, 0)? CPM Materials modified

More information

KICKING HORSE MOUNTAIN RESORT APPLICATION TO AMEND THE EXISTING CONTROLLED RECREATION AREA

KICKING HORSE MOUNTAIN RESORT APPLICATION TO AMEND THE EXISTING CONTROLLED RECREATION AREA KICKING HORSE MOUNTAIN RESORT APPLICATION TO AMEND THE EXISTING CONTROLLED RECREATION AREA September 19, 2017 File: 4403694 Reg Nolander Sr. Manager, Major Projects Mountain Resorts Branch Ministry of

More information

Running head: DATA ANALYSIS AND INTERPRETATION 1

Running head: DATA ANALYSIS AND INTERPRETATION 1 Running head: DATA ANALYSIS AND INTERPRETATION 1 Data Analysis and Interpretation Final Project Vernon Tilly Jr. University of Central Oklahoma DATA ANALYSIS AND INTERPRETATION 2 Owners of the various

More information

9. APPENDICES Disciplines of Mountain Biking

9. APPENDICES Disciplines of Mountain Biking 9. APPENDICES 9.1. Disciplines of Mountain Biking Cross-country Cross-country mountain biking is the oldest discipline within the sport and is analogous to cross-country running or skiing. It involves

More information

Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)]

Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)] 14 August 2008 MAR 110 HW-2a: ex1bathymetric Charts 1 2-1. BATHYMETRIC CHARTS Homework 2a Bathymetric Charts [based on the Chauffe & Jefferies (2007)] Nautical charts are maps of a region of the ocean

More information

2017/2018 WINTER GROUPS BOOKING PACKAGE

2017/2018 WINTER GROUPS BOOKING PACKAGE 2017/2018 WINTER GROUPS BOOKING PACKAGE Thanks for choosing The Lake Louise Ski Resort for your winter adventure! We can create memorable experiences for groups of all sizes. We offer packages that include

More information

PREDICTING the outcomes of sporting events

PREDICTING the outcomes of sporting events CS 229 FINAL PROJECT, AUTUMN 2014 1 Predicting National Basketball Association Winners Jasper Lin, Logan Short, and Vishnu Sundaresan Abstract We used National Basketball Associations box scores from 1991-1998

More information

Pocatello Regional Transit Master Transit Plan Draft Recommendations

Pocatello Regional Transit Master Transit Plan Draft Recommendations Pocatello Regional Transit Master Transit Plan Draft Recommendations Presentation Outline 1. 2. 3. 4. What is the Master Transit Plan? An overview of the study Where Are We Today? Key take-aways from existing

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

A New Approach in the GIS Bikeshed Analysis Considering of Topography, Street Connectivity, and Energy Consumption

A New Approach in the GIS Bikeshed Analysis Considering of Topography, Street Connectivity, and Energy Consumption A New Approach in the GIS Bikeshed Analysis Considering of Topography, Street Connectivity, and Energy Consumption ACSP Conference, Cincinnati, OH November 1, 2012 Hiroyuki Iseki, Ph.D. & Matthew Tingstrom

More information

STANDARD SCORES AND THE NORMAL DISTRIBUTION

STANDARD SCORES AND THE NORMAL DISTRIBUTION STANDARD SCORES AND THE NORMAL DISTRIBUTION REVIEW 1.MEASURES OF CENTRAL TENDENCY A.MEAN B.MEDIAN C.MODE 2.MEASURES OF DISPERSIONS OR VARIABILITY A.RANGE B.DEVIATION FROM THE MEAN C.VARIANCE D.STANDARD

More information

77.1 Apply the Pythagorean Theorem

77.1 Apply the Pythagorean Theorem Right Triangles and Trigonometry 77.1 Apply the Pythagorean Theorem 7.2 Use the Converse of the Pythagorean Theorem 7.3 Use Similar Right Triangles 7.4 Special Right Triangles 7.5 Apply the Tangent Ratio

More information

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009

LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 LIVERPOOL TRANSPORTATION MODELING TECHNICAL MEMO MAY 2009 Syracuse Metropolitan Transportation Council 100 Clinton Square 126 N. Salina Street, Suite 100 Syracuse, NY 13202 Telephone (315) 422-5716; Fax

More information

Taos Ski Valley s 2010 Master Development Plan Phase 1 Proposed Projects

Taos Ski Valley s 2010 Master Development Plan Phase 1 Proposed Projects Taos Ski Valley s 2010 Master Development Plan Phase 1 Proposed Projects Background The majority of Taos Ski Valley s (TSV) lift and trail network is located on National Forest System (NFS) lands administered

More information

Week 7 One-way ANOVA

Week 7 One-way ANOVA Week 7 One-way ANOVA Objectives By the end of this lecture, you should be able to: Understand the shortcomings of comparing multiple means as pairs of hypotheses. Understand the steps of the ANOVA method

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

APPENDIX 3: EAGLECREST MASTER PLAN PUBLIC OPINION SURVEYS

APPENDIX 3: EAGLECREST MASTER PLAN PUBLIC OPINION SURVEYS APPENDIX 3: EAGLECREST MASTER PLAN PUBLIC OPINION SURVEYS Eaglecrest Master Plan Public Opinion Surveys Prepared for Eaglecrest Ski Area Board of Directors Prepared by McDowell Group Inc. Eaglecrest Master

More information

New Seward and 36 th Avenue Intersection Conceptual Design

New Seward and 36 th Avenue Intersection Conceptual Design University of Alaska Anchorage New Seward and 36 th Avenue Intersection Conceptual Design Prepared By: Zaid S. Hussein Dana Menendez Galen Jones Civil Engineering Department Prof. Osama Abaza CE A404 Highway

More information

Optimal Weather Routing Using Ensemble Weather Forecasts

Optimal Weather Routing Using Ensemble Weather Forecasts Optimal Weather Routing Using Ensemble Weather Forecasts Asher Treby Department of Engineering Science University of Auckland New Zealand Abstract In the United States and the United Kingdom it is commonplace

More information

Advanced Terrain. Powder / Snow Alpine Terrain Tree Skiing Strong. Intermediate. Terrain

Advanced Terrain. Powder / Snow Alpine Terrain Tree Skiing Strong. Intermediate. Terrain Avalanche Mitigation Safety Briefing Alpine Strong Intermediate Advanced Expert and extreme terrain Overall Big Red Cats Cat Canada 5 5 3 4 4.5 4 5 4.5 4 4 3.5 4 * 4 4.5 Revelstoke Cat Skiing Cat Canada

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

Sandwich Pedestrian/Bicycle Planning

Sandwich Pedestrian/Bicycle Planning Sandwich Pedestrian/Bicycle Planning Improved Pedestrian and Bicycle Connections with the Cape Cod Canal Multi-use Path February 2014 Table of Contents Introduction... 1 Background... 1 Study Goals...

More information

CROSS COURSE INSTRUCTION DOCUMENT

CROSS COURSE INSTRUCTION DOCUMENT CROSS COURSE INSTRUCTION DOCUMENT Table of Contents CROSS COURSE DESCRIPTION... 3! CRITERIA FOR SBX/SX RUN SELECTION... 4! Gradients / Slope inclinations... 4! Run Width... 4! Level of Courses... 8! Beginner

More information

An opportunity for summer revenue at the Camden Snow Bowl. Summer Snow Bowl Lift Serve Mountain Biking, Version 2

An opportunity for summer revenue at the Camden Snow Bowl. Summer Snow Bowl Lift Serve Mountain Biking, Version 2 An opportunity for summer revenue at the Camden Snow Bowl By: The Mountain Bike Subgroup of the Snow Bowl Four Season Committee Summer Snow Bowl Lift Serve Mountain Biking, Version 2 Summer Snow Bowl Lift

More information

Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed

Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed Pedestrian traffic flow operations on a platform: observations and comparison with simulation tool SimPed W. Daamen & S. P. Hoogendoorn Department Transport & Planning, Delft University of Technology,

More information

A STUDY OF SIMULATION MODEL FOR PEDESTRIAN MOVEMENT WITH EVACUATION AND QUEUING

A STUDY OF SIMULATION MODEL FOR PEDESTRIAN MOVEMENT WITH EVACUATION AND QUEUING A STUDY OF SIMULATION MODEL FOR PEDESTRIAN MOVEMENT WITH EVACUATION AND QUEUING Shigeyuki Okazaki a and Satoshi Matsushita a a Department of Architecture and Civil Engineering, Faculty of Engineering,

More information

Riverton Roundabout Design Project

Riverton Roundabout Design Project Riverton Roundabout Design Project Tuckett & Ferguson Consulting Prepared for: Trace Robinson Director of Public Works Riverton City Prepared by: Tuckett & Ferguson Consulting Firm Brigham Young University

More information

4-3 Rate of Change and Slope. Warm Up Lesson Presentation. Lesson Quiz

4-3 Rate of Change and Slope. Warm Up Lesson Presentation. Lesson Quiz 4-3 Rate of Change and Slope Warm Up Lesson Presentation Lesson Quiz Holt Algebra McDougal 1 Algebra 1 Warm Up 1. Find the x- and y-intercepts of 2x 5y = 20. x-int.: 10; y-int.: 4 Describe the correlation

More information

RENOVATION MASTER PLAN

RENOVATION MASTER PLAN RENOVATION MASTER PLAN For: Field Club of Omaha Omaha, Nebraska DATE: JUNE 20,, 2018 P r e p a r e d b y : 3250 BRINKERHOFF ROAD KANSAS CITY, KANSAS 66115 PHONE: 913.621.5214 FAX: 913.621.0760 EXECUTIVE

More information

Motion. 1 Describing Motion CHAPTER 2

Motion. 1 Describing Motion CHAPTER 2 CHAPTER 2 Motion What You ll Learn the difference between displacement and distance how to calculate an object s speed how to graph motion 1 Describing Motion 2(D), 4(A), 4(B) Before You Read Have you

More information

BRUNDAGE MOUNTAIN ROAD

BRUNDAGE MOUNTAIN ROAD DESTINATION RESORT DEVELOPMENT LAND 336.64 ACRES AVAILABLE express or implied, is made as to the accuracy of the information contained herein, and same is submitted subject to errors, omissions, change

More information

AN EXCLUSIVE HELI SKI MEMBERSHIP CLUB IN SALT LAKE CITY

AN EXCLUSIVE HELI SKI MEMBERSHIP CLUB IN SALT LAKE CITY AN EXCLUSIVE HELI SKI MEMBERSHIP CLUB IN SALT LAKE CITY We are excited to announce a new and amazing helicopter skiing and riding experience for our member groups. A UNIQUE AND WORLD CLASS SKIING EXPERIENCE

More information

T R A N S P O R T A T I O N M E M O R A N D U M

T R A N S P O R T A T I O N M E M O R A N D U M WILKINSON LLC t raffic engineering and t ransportation p lanning 3405 Harbor Way Fort Collins, CO 80524 phone: 970-988-0143 fax: 970-472-0223 martinawilkinson@msn.com T R A N S P O R T A T I O N M E M

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Exemplar for Internal Achievement Standard. Mathematics and Statistics Level 1

Exemplar for Internal Achievement Standard. Mathematics and Statistics Level 1 Exemplar for Internal Achievement Standard Mathematics and Statistics Level 1 This exemplar supports assessment against: Achievement Standard Investigate a given multivariate data set using the statistical

More information

A SUMMARY OF RULES AND GUIDELINES FOR WAVES

A SUMMARY OF RULES AND GUIDELINES FOR WAVES July 2005 issue July 15, 2005 (data through July 15) Excerpted from the July 2005 Elliott Wave Theorist A SUMMARY OF RULES AND GUIDELINES FOR WAVES I have spent some time collecting and formulating all

More information

Average Runs per inning,

Average Runs per inning, Home Team Scoring Advantage in the First Inning Largely Due to Time By David W. Smith Presented June 26, 2015 SABR45, Chicago, Illinois Throughout baseball history, the home team has scored significantly

More information

Applying Hooke s Law to Multiple Bungee Cords. Introduction

Applying Hooke s Law to Multiple Bungee Cords. Introduction Applying Hooke s Law to Multiple Bungee Cords Introduction Hooke s Law declares that the force exerted on a spring is proportional to the amount of stretch or compression on the spring, is always directed

More information

RULES FOR MOUNTAIN BIKE ORIENTEERING

RULES FOR MOUNTAIN BIKE ORIENTEERING RULES FOR MOUNTAIN BIKE ORIENTEERING Version 2012b April 2012 This second version of MTBO Rules for New Zealand has been developed by the NZOF MTBO Committee and updated twice after the 2012 Otago Carnival

More information

ACRES FOR SALE Destination Resort Development Land Brundage Mountain Road, McCall, Idaho 83638

ACRES FOR SALE Destination Resort Development Land Brundage Mountain Road, McCall, Idaho 83638 LeAnn Hume, CCIM, CLS Senior Director Retail / Investment Specialist +1 208 287 8436 leann.hume@paccra.com 398 South 9th Street, Ste 260 Boise, Idaho 83702 Main +1 208 287 9500 Fax +1 208 287 9501 paccra.com

More information

Special edition paper

Special edition paper Development of a Track Management Method for Shinkansen Speed Increases Shigeaki Ono** Takehiko Ukai* We have examined the indicators of appropriate track management that represent the ride comfort when

More information

Exploring the relationship between the pressure of the ball and coefficient of restitution.

Exploring the relationship between the pressure of the ball and coefficient of restitution. Exploring the relationship between the pressure of the ball and coefficient of restitution. When I started thinking about possible investigations I knew I wanted to create a lab that was related to sports.

More information

(Lab Interface BLM) Acceleration

(Lab Interface BLM) Acceleration Purpose In this activity, you will study the concepts of acceleration and velocity. To carry out this investigation, you will use a motion sensor and a cart on a track (or a ball on a track, if a cart

More information

CONSUMER AGENCY S GUIDELINES FOR THE PROMOTION OF SAFETY ON SKI SLOPES. Publication series 2/2002 Finnish Consumer Agency & Ombudsman

CONSUMER AGENCY S GUIDELINES FOR THE PROMOTION OF SAFETY ON SKI SLOPES. Publication series 2/2002 Finnish Consumer Agency & Ombudsman CONSUMER AGENCY S GUIDELINES FOR THE PROMOTION OF SAFETY ON SKI SLOPES Publication series 2/2002 Finnish Consumer Agency & Ombudsman ISSN 0788-544X ISBN 951-681-024-1 (paperback) ISBN 951-681-025-X (PDF)

More information

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer 5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

MOUNTAIN BIKE ORIENTEERING RULES

MOUNTAIN BIKE ORIENTEERING RULES MOUNTAIN BIKE ORIENTEERING RULES This third version of MTBO Rules for New Zealand has been developed by the Orienteering NZ MTBO Committee and revised after the Otago and Woodhill2Whaka Carnivals. These

More information

GARIBALDI AT SQUAMISH PROJECT CASP Master Plan EAO Additional Information Requirements Mountain Master Plan DRAFT

GARIBALDI AT SQUAMISH PROJECT CASP Master Plan EAO Additional Information Requirements Mountain Master Plan DRAFT GARIBALDI AT SQUAMISH PROJECT CASP Master Plan EAO Additional Information Requirements Mountain Master Plan DRAFT Prepared for: Land and Water British Columbia Inc. 200 10428 153rd Street Surrey, B.C.

More information

KOPAONIK SKI RESORT 2008 PROJECT RECOMMENDATIONS MARCH 28, 2008

KOPAONIK SKI RESORT 2008 PROJECT RECOMMENDATIONS MARCH 28, 2008 KOPAONIK SKI RESORT 28 PROJECT RECOMMENDATIONS MARCH 28, 28 Prepared for: Ministry of the Economy and Regional Development of Republic of Serbia Bulevar Kralja Aleksandra 15 11 Beograd, Serbia Prepared

More information

Solutionbank S1 Edexcel AS and A Level Modular Mathematics

Solutionbank S1 Edexcel AS and A Level Modular Mathematics Page 1 of 1 Exercise A, Question 1 A group of thirty college students was asked how many DVDs they had in their collection. The results are as follows. 12 25 34 17 12 18 29 34 45 6 15 9 25 23 29 22 20

More information

2008 Excellence in Mathematics Contest Team Project B. School Name: Group Members:

2008 Excellence in Mathematics Contest Team Project B. School Name: Group Members: 2008 Excellence in Mathematics Contest Team Project B School Name: Group Members: Lassie - TEAM PROJECT B 2008 Excellence in Mathematics Contest The Team Project is a group activity in which the students

More information

MOUNTED LAND NAVIGATION

MOUNTED LAND NAVIGATION CHAPTER 12 MOUNTED LAND NAVIGATION A vehicle commander should be able to navigate from one point on the ground to another with or without a compass. If separated from his unit and given an azimuth and

More information

Memorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes.

Memorandum. Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey. From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes. Memorandum To: Dr. Wilbert Odem, Dr. Paul Trotta, and Mr. Justin Ramsey From: Timothy Mahon, Patrick Belsheim, and Ali Alrayyes Date: 10/17/2013 Re: Routes Decision Matrix Decision Matrix Methodology The

More information

Palythoa Abundance and Coverage in Relation to Depth

Palythoa Abundance and Coverage in Relation to Depth Palythoa Abundance and Coverage in Relation to Depth Foisy, Mia 02//208 Foisy, Mia Masternaut Project 02//208 Palythoa Abundance and Coverage in Relation to Depth Abstract: Palythoa abundance and coverage

More information

LABORATORY EXERCISE 1 CONTROL VALVE CHARACTERISTICS

LABORATORY EXERCISE 1 CONTROL VALVE CHARACTERISTICS Date: Name: LABORATORY EXERCISE 1 CONTROL VALVE CHARACTERISTICS OBJECTIVE: To demonstrate the relation between valve stem position and the fluid flow through a control valve, for both linear and equal

More information