1 COMPAISONS OF WAVE OVETOPPING DISCAGES AND DAMAGES OF TE NTOU VETICAL SEAWALL DUE TO TWO SIMILA SUPE TYPOONS ON KEELUNG COAST OF TAIWAN Da-Wei Chen 1 Shiaw-Yih Tzang Shan-wei Ou In thi tudy, SWAN model wa firt applied to obtain wave condition during Typhoon erb (1996) and Kroa (7). Then the reult were ued for etimating the wave overtopping dicharge with exiting empirical formulae elected from EurOtop manual. In the EurOtop formulae, calculation of overtopping dicharge can be improved by adapting average wave period (T m-1,) for well condition. The reult how that the peak overtopping dicharge during Typhoon erb (1996) are larger than thoe during Typhoon Kroa (7) at the two elected ite. In addition, the water depth at toe of eatern NTOU eawall (NTOU ) are hallower than that at northern NTOU eawall (NTOU 1) o that the dicharge at NTOU 1 are larger than thoe at NTOU. The calculation how that the peak wave overtopping dicharge during both typhoon are greater than the criteria for damage on back lope of eawall, which agree with the NTOU eawall failure event during Typhoon erb. The predicted failure doe not again happen to NTOU eawall during Typhoon Kroa implying the effective reduction in overtopping dicharge by lifting up 1m of the cret after rebuilding the previouly damaged eawall. Keyword: wave overtopping; vertical eawall; tructure damage; typhoon INTODUCTION Taiwan i located on the edge of wetern Pacific Ocean o that it coatal area are uually threatened by violent wave during typhoon period. In recent year, the eawall of National Taiwan Ocean Univerity (NTOU) in Keelung of northeatern Taiwan have freuently uffered conecutive damage due to typhoon wave. In 1996, a uper Typhoon erb truck the vertical NTOU eawall of the reclaimed campu cauing partial damage on the parapet, a hown in Fig. 1 (a). According to Tai et al. (6), the damage were primarily caued by ignificant wave overtopping due to extreme high water level coniting of high pring tide and torm urge and aociated large wave. Tzang et al. (9) have further calculated the overtopping dicharge with exiting empirical formulae and hown that during certain period the dicharge could be greater than the deign criteria according to Coatal Engineering Manual (CEM, ). Later, the NTOU eawall had been conecutively damaged by typhoon in the ame and the following year, i.e. Typhoon Zane(1996), Typhoon Winnie(1997) (Tzang and iao, 1999). The eawall were then rebuilt in 199 by mainly lifting up 1m of the cret height. owever, in 7, another uper Typhoon Kroa with imilar path of Typhoon erb (ee Fig. ) truck the rebuilt eawall but caued only damage on the concrete covering of the drainage ditche right behind the parapet. From a imilar previou cae, Tzang et al. () reported that typhoon wave might reult in intene water hammer drainage in the channel by breaking on the drainage outlet on vertical face of the eawall. The trong upward jet could ubeuently break the covering and puh away broken piece. Then the following overtopping water could have pounded on and diplace thoe broken concrete piece further, a hown in Fig. 1 (b). In order to undertand the different effect of wave overtopping dicharge over the lifted-up cret elevation of the rebuilt eawall during Typhoon Kroa, it i aimed in thi tudy at carrying out calculation and comparion with exiting empirical formulae and thoe of EurOtop Manual. 1 Department of arbor and iver Engineering, National Taiwan Ocean Univerity, Pei-Ning oad, Keelung, Taiwan,,.O.C. Department of arbor and iver Engineering, National Taiwan Ocean Univerity, Pei-Ning oad, Keelung, Taiwan,,.O.C. Department of Environmental eource Management, Tajen Univerity, Weiin oad, Sin-er Village, Yanpu Townhip, Pingtung, Taiwan, 97,.O.C. 1
2 COASTAL ENGINEEING 1 (a) Typhoon erb (1996) (b) Typhoon Kroa (7) Figure 1. The damage on NTOU eawall. OVETOPPING FOMULAE In recent year, many finding have been obtained from invetigation on overtopping flow over coatal tructure in everal large program project of European Union. A ummarized in Coatal Engineering Manual, mean overtopping dicharge are more widely adopted, though the local overtopping dicharge (in m //m) from a ingle wave can ometime be 1 time larger during the torm peak (CEM, ). Empirical Formulae The mean overtopping dicharge are defined a the average over 5 or 1 random wave from the model tet (Bruce et al., 1). For uite a longtime, Goda formulae (Goda, 195) have been the commonly adopted method, and calculation can be directly obtained from deign diagram for cae of vertical wall and block mound eawall. But a diadvantage of thi method i that interpolation of the diagram by the uer i reuired. To overcome the diadvantage, ome reearcher had further extended the work of Goda to take into account of bottom lope, wave teepne and loping breakwater, e.g. erbert (199); Jenen and Sorenen (1979). Franco et al (199) tudied wave overtopping over variou caion breakwater, epecially in deep water by unbroken wave. Their model i repreented by dimenionle parameter Q * for dicharge and * for freeboard from pecific tructure geometry. Baed on additional model tet, Allop et al. (1995) found that formulae of Fanco et al. (199) would underetimate for larger
3 Latitude (deg.) COASTAL ENGINEEING 1 value of c /, where c i the freeboard height and the ignificant wave height. They propoed that thi parameter can be ued in deep and hallow water. Later, Beley et al. (199) extended formulae by Allop et al. (1995) with another parameter d * to deal with influence of a berm in front of a vertical wall. Franco et al. (1999) had alo revied their previou verion by taking in new parameter from the reanalyi of the data ued by Franco et al. (199), and with additional reult from D model tet. 6 1/7 1: 1/7 : /1 : 7/1 : /1 : 1/6 : 1/6 16: 1/6 1: 7/1 1: 7/1 : 1/6 : 1996 Typhoon erb 7 Typhoon Kroa Longitude (deg.) Figure. The path of typhoon erb(1996) & Kroa(7). EurOtop According to EurOtop (7), the manual i developed from three manual: the Environment Agency Manual on Overtopping (U.K.), the TAW Technical eport on Wave run-up and wave overtopping at dike (Netherland), and the German Die Küte EAK (). The new combined manual ha extended and developed the part of thoe manual to dicu wave run-up and overtopping for coatal tructure of variou type, including eawall, flood embankment, breakwater, and horeline tructure. In EurOtop (7), the predicting formulae are typically applicable for three type of eawall: plain vertical eawall, vertical compoite wall, and vertical battered wall. For afety aement, the predicted dicharge are baed on either determinitic deign or probabilitic deign. The probabilitic deign take into account the effect of uncertaintie from all parameter including wind, wave and urge tatitic. It i noted that the pectral period (T m-1, = m -1 /m ) i adopted a the parameter of wave period. In general, the relationhip between the pectral period (T m-1, ) and the commonly adopted peak period (T p ) are T p = 1.1 T m-1,. Since plain vertical eawall formulae of EurOtop (7) are better formulated, the overtopping dicharge are imulated by plain vertical formulae in thi paper. WAVE SIMULATION To imulate the typhoon wave, the work preented herein adopt primarily the SWAN model of verion.7. The far-field computational domain of the neted grid, a hown in Fig. (a), cover the range from 1to N and 11to 1E. The area i elected to include the affecting procee of a typhoon. The near-field computation domain cover the area in northeatern Taiwan including Keelung, which are alo detailed in Fig. (b). It i een in Table that for far-field wave imulation the grid pacing i km and the computational time tep i 15
4 COASTAL ENGINEEING 1 min. In the near-field neted domain grid ize of 5 km, m and m are for layer, and, repectively. In thi tudy, the SWAN model ha been driven by 1m wind field above ea water level obtained from the Cro-Calibrated Multi-Platform (CCMP). They are the obervational data per 6 hr with grid accuracy of.5 by NASA. In addition, in order to improve high-reolution in 1 hr for computational domain when typhoon approach to Taiwan, the wind field model of CCMP wa coupled with VM (ankin-vortex Model) by interpolation on each computational grid. Table 1. Empirical formulae and thoe hydraulic condition. Formulae Allop et al. (1995) Type / wave Vertical (unbroken) Vertical (broken) ydraulic condition. < c / <., ignore water depth. (including unbroken & broken wave ) h *., for impacting wave h * >., for reflecting wave model Q g 1 Q * gh h Dimenionle Freeboard Dimenionle dicharge Q c Q aexp b c * h Q a b Allop et al. (1995) & Beley et al. (199) Compoite (unbroken) d * >. or c / <1.5, for unbroken wave Compoite (broken) Compoite (broken) d *. or c / >1.5, for broken wave d<, tructure with emergent mound. Q Q g 1 * g d 1 Q * gh d c Q aexp b c * d Q aexp b c d d * Q a b g g m, deep m, deep h h h h g g m m * Table. EurOtop formulae and thoe hydraulic condition. Formulae Type / wave ydraulic condition c.exp.6 Probabilitic m (unbroken) h*., c.1 c/ m.5.exp 1. Determinitic m (unbroken).6.6 g gh gh * gh * gh * m c 1.51 h* m c.1 h* m c.71 h* m c.1 h* m mm. c.exp.16m m1, 1, m, deep mm. c.exp 1.95m m1, 1, m, deep Zero Freeboard h*., c/ m (unbroken) Probabilitic h*., (broken, non-impulive) c Determinitic. h* 1. (broken, non-impulive) m Probabilitic (broken, impulive, ubmerged toe) Determinitic (broken, impulive, ubmerged toe) Probabilitic (broken, impulive, emergent toe) Determinitic (broken, impulive, emergent toe) h*., c h. * m h*., m 1,.5. c. mm 1, 5. m, deep.55 c 1.6 m, deep Table. Information of computational domain. neted Geographic Data ource Filename eolution grid reolution Layer 1 National Oceanographic Data Center ETOPO1 x=y=. ~ km Layer National Center of Ocean eearch TaiDBMV6 x=y=. ~ 5 km Layer Electronic Chart Sytem x=y=. ~ m Layer Meaurement x=y=.5 ~ m
5 Latitude (deg.) Latitude (deg.) COASTAL ENGINEEING 1 5 Layer Longitude (deg.) (a) Far-field computational domain Layer Layer Suao ualien Longitude (deg.) (b) near-field computation domain Figure. Coatal topography of the neted domain. Model Validation Comparion of the predicted wave height and period with field data meaured at ualien and Suao tation on the eat coatal water of Taiwan during Typhoon erb (1996) and Kroa (7) are hown in Fig. (a) and (b). The circle repreent the meaured data and the curve repreent the predicted reult. It can be een from Fig. (a), the meaured maximum ignificant wave height ( ) of 7.6 m (T m = 1. ) occurred at 6: on July 1 during Typhoon erb, while the imulated ignificant wave height of. m (T m = 1. ) occurred at 17: on July 1. In addition, in Fig. (b), the meaured maximum of 11.7 m (T m = 1.6 ) occurred at 1: on Oct. 6 during Typhoon Kroa, while the imulated maximum of.5 m (T m = 1. ) occurred at 1: on Oct. 6. ence, the comparion how that the imulated value of Typhoon Kroa agreed better with meaured data on magnitude and occurrence time than the imulation of Typhoon
6 mean wave period (ec) ignificant wave height (m) mean wave period (ec) ignificant wave height (m) 6 COASTAL ENGINEEING 1 erb did. But agreement between the imulation and meaured data through the whole time erie for both typhoon are imilar. 1 Meaurement SWAN ualien : : 11: : 11: : 11: : 1996/7/9 1996/7/ 1996/7/1 1996//1 date/time (a) Typhoon erb 1 Meaurement SWAN Suao : : 11: : 11: : 11: : 7/1/ 7/1/5 7/1/6 7/1/7 date/time (b) Typhoon Kroa (7) Figure. Comparion of ignificant wave height and period predicted by the SWAN wave model with meaurement during the paage of Typhoon erb & Kroa.
7 COASTAL ENGINEEING 1 7 Wave condition The NTOU eawall have uffered damage due to typhoon-induced wave for many time in the pat, epecially in eatern wall (NTOU ) and northern wall (NTOU 1), a hown in Fig. 5. The tatic water depth at the two location are m (NTOU 1) and m (NTOU ), repectively. The imulation by SWAN model how that at the two ite of NTOU 1 and NTOU, maximum are.5 m (1. ) and. m (1. ) at : on July 1 during Typhoon erb. The firt peak are.6 m (1.6 ) and.6 m (1. ) at 16: on Oct. 6 while the econd peak are. m (9.1 ) and. m (9. ) at : on Oct. 6 during Typhoon Kroa, a hown in Fig. 7 and. owever, comparion of the occurring time of maximum along typhoon path, the imulation of two location during Typhoon Kroa how that the firt peak value of were primarily due to nearly tationary typhoon move offhore the eatern Taiwan (ee Fig. ).The econd peak value of were induced by typhoon low preure center a it continued to pa over Keelung. Typhoon Winnie (1997) Sinlaku () NTOU_1 Typhoon Zane (1996) Typhoon erb (1996) Typhoon erb (1996) Sinlaku () NTOU_ Typhoon erb (1996) Typhoon Kroa (7) ( 柯羅莎 ) N Typhoon Sinlaku () Figure 5. The ite of conecutive damage and predicted wave condition by SWAN model. WAVE OVETOPPING DISCAGES Parameter etting The NTOU eawall tood on rocky bottom with an offhore lope of about 1:1. The eawall wa originally deigned a a vertical compoite tructure with a berm of -ton tetrapod. But the foundation uarry tone were only placed at ite with elevation under E.L. -. m. The elevation of crown wall were E.L. +6 m for original wall during Typhoon erb and E.L. +7 m for rebuilt wall during Typhoon Kroa, a hown in Fig. 6 (a) and 6 (b). In particular before the attack of Typhoon erb in 1996, the eawall had uffered from everal typhoon attack o that many of the berm tetrapod might have been dilocated to be more like a vertical wall tructure. Thu, the overtopping flow dicharge hall be calculated by elected empirical formulae for both cae. For the imulation, the water depth including typhoon urge were elected from the nearby tidal tation in Port of Keelung. To predict mean overtopping flow rate, mot of the empirical formulae reuire wave condition at toe and configuration parameter of coatal tructure. For Goda formulae, the euivalent deep-water wave height and deep-water wave length are reuired to obtain overtopping dicharge within certain water depth. In particular, ome of the calculation need to
8 COASTAL ENGINEEING 1 be derived by interpolation from the diagram. The hydraulic coefficient and aociated parameter of the applied formulae are repectively lited in Table 1 and Table. Analyi Deign of cret level for coatal tructure generally take into account allowable overtopping dicharge. For embankment eawall, the critical value of mean overtopping dicharge are marked together with the predicted value. It can be een in Fig. 7 and Fig. that the prediction had one peak value during Typhoon erb and two peak value during Typhoon Kroa. In addition, the overtopping dicharge predicted by determinitic and probabilitic method from EurOtop manual are alo diplayed in thee two figure. Moreover, all the prediction by EurOtop manual have adopted average wave period (T m-1, ) for well condition. Comparion of the ea water level at two ite in two typhoon have hown that the peak value of. m during Typhoon erb i larger than the peak value of 1.71 m during Typhoon Kroa. During Typhoon erb, the peak water level occurred at : on July 1 while peak ignificant wave height occurred about 1 hour later a the typhoon approached, a hown in Fig. 7(a). On the contrary, the occurrence time during Typhoon Kroa for maximum value of important parameter are different from each other, a hown in Fig. (a)..5 m (a) Old wall E.L. +7. E.L. +5. EL. +. EL depth M.W.L L.L.W.L (b) New wall Figure 6. NTOU eawall originally deigned for new and old.
9 mean overtopping dicharge (m /ec/m) ignificant wave heoght (m) mean overtopping dicharge (m /ec/m) ignificant wave heoght (m) period (ec) ea water level (m) period (ec) ea water level (m) COASTAL ENGINEEING 1 9 Ditance from typhoon center to Keelung ignificant wave height (m) 1996 Typhoon erb mean period (ec) NTOU_ average wave period (m -1 /m ) EMBANKMENT SEAWALLS Damage even if fully protected Damage even if back lope not protected Allop et al.(1995)-vertical Allop et al.(1995)-compoite Beley et al.(199)-compoite EurOtop()-Determinitic EurOtop()-Probabilitic 1996/7/9 : Damage even if cret not protected.1 No damage 1 11: : 11: : 11: : 11: : 1996/7/9 1996/7/ 1996/7/1 date/time 1996//1 (a) NTOU 1 Ditance from typhoon center to Keelung Typhoon erb NTOU_ 16 ignificant wave height (m) mean period (ec) average wave period (m -1 /m ) EMBANKMENT SEAWALLS Damage even if fully protected Damage even if back lope not protected Allop et al.(1995)-vertical Allop et al.(1995)-compoite Beley et al.(199)-compoite EurOtop()-Determinitic EurOtop()-Probabilitic 1996/7/9 : Damage even if cret not protected.1 No damage 11: : 11: : 11: : 11: : 1996/7/9 1996/7/ 1996/7/1 date/time 1996//1 (b) NTOU Figure 7. The calculated overtopping dicharge at two ite during Typhoon erb (1996).
10 mean overtopping dicharge (m /ec/m) ignificant wave heoght (m) mean overtopping dicharge (m /ec/m) ignificant wave heoght (m) period (ec) ea water level (m) period (ec) ea water level (m) 1 COASTAL ENGINEEING Ditance from typhoon center to Keelung Typhoon Kroa NTOU_1 16 ignificant wave height (m) mean period (ec) average wave period (m -1 /m ) EMBANKMENT SEAWALLS Damage even if fully protected Damage even if back lope not protected Allop et al.(1995)-vertical Allop et al.(1995)-compoite Beley et al.(199)-compoite EurOtop()-Determinitic EurOtop()-Probabilitic 7/1/6 : Damage even if cret not protected.1 No damage 1 11: : 11: : 11: : 11: : 7/1/ 7/1/5 7/1/6 date/time 7/1/7 (a) NTOU Ditance from typhoon center to Keelung Typhoon Kroa NTOU_ 16 ignificant wave height (m) mean period (ec) average wave period (m -1 /m ) EMBANKMENT SEAWALLS Damage even if fully protected Damage even if back lope not protected Allop et al.(1995)-vertical Allop et al.(1995)-compoite Beley et al.(199)-compoite EurOtop()-Determinitic EurOtop()-Probabilitic 7/1/6 : Damage even if cret not protected.1 No damage 11: : 11: : 11: : 11: : 7/1/ 7/1/5 7/1/6 date/time 7/1/7 (b) NTOU Figure. The calculated overtopping dicharge at two ite during Typhoon Kroa (7).
11 COASTAL ENGINEEING 1 11 The peak value of predicted overtopping dicharge at two ite are. (NTOU 1) and.71 m //m (NTOU ) during Typhoon erb, and they have occurred at almot the ame time a typhoon center cloed. But the peak prediction during Typhoon Kroa are.9 (NTOU 1) and.6 m //m (NTOU ) when the typhoon tationed offhore eatern Taiwan. Later, the econd peak value are.11 (NTOU 1) and.1 m //m (NTOU ) when the typhoon continued and approached Keelung. The reult how that the water depth of NTOU are hallower than that of NTOU 1 while the dicharge at NTOU 1 are larger than thoe at NTOU. The reult in different ite how that the calculation with Allop (1995) and Beley (199) at NTOU 1 are larger than thoe at NTOU, the calculation with probabilitic method are lowet during Typhoon Kroa. Moreover, the reult in different formulae how that the calculation by Allop vertical formula are larger than other in addition to the reult with determinitic method. The calculation with Allop compoite formula at NTOU 1 are larger than thoe with Beley, but the calculation at NTOU with Beley are larger than thoe with Allop. According to Tai et al. (6), the old eawall had uffered rupture of parapet and loing of backfill oil and the reulting flooding on campu due to Typhoon erb. Thu by comparing with the lowet criteria for damage on unprotected lope, i.e.. m //m, it i confirmed that all maximum prediction during Typhoon erb have exceeded the criterion for both tructure type at both ite. On the other hand, mot of the prediction during Typhoon Kroa are een to be lower than the criterion In fact, only the old eawall ha uffered upertructure damage but they were not een to happen again on the rebuilt eawall during Typhoon Kroa. Thi imply implie that the rebuilt eawall could effectively defend wave impact on the parapet of eawall. Table. The overtopping dicharge at rebuilt eawall by reducing 1m during Typhoon Kroa. B (E.L. +7m) A (E.L +6m) (A-B)/A Allop et al. vertical Allop et al. compoite Beley et al. compoite EurOtop Determinitic EurOtop Probabilitic Allop et al. vertical 17 Allop et al. compoite 1 Beley et al. compoite 19 EurOtop Determinitic 16 EurOtop Probabilitic 16 It i particularly illutrated In Table that a the cret level of the rebuilt eawall decreae by 1m, mot of the calculated average dicharge have increaed 9~7%. ence, the rebuilt eawall ha played an effective role on reducing the overtopping dicharge by lifting up the cret by only 1m during Typhoon Kroa. By comparing the maximum dicharge with the determinitic method of EurOtop manual during Typhoon Kroa with the ame cret level of E.L. +6 m, the peak overtopping dicharge increae to be.5 (NTOU 1) and.5 (NTOU ) m //m, repectively. The maximum dicharge at NTOU during Typhoon Kroa i even larger than that during Typhoon erb. Thi further confirm the effect of higher cret elevation on reducing wave overtopping. CONCLUDING EMAKS In thi tudy, the overtopping dicharge at NTOU eawall by the two typhoon with imilar path, trength, and wave condition but cauing different eawall damage are etimated with exiting empirical formulae including thoe of EurOtop manual. On aplying the EurOtop formulae, calculation of overtopping dicharge adopt the average wave period (T m-1, ). The reult how that the peak overtopping dicharge during Typhoon erb (1996) are larger than thoe during Typhoon Kroa (7) at the two elected ite. In addition, the water depth at toe of eatern NTOU eawall (NTOU ) are hallower than that at northern NTOU eawall (NTOU 1) reulting in larger dicharge at NTOU 1 than thoe at NTOU. The calculation how that the peak wave
12 1 COASTAL ENGINEEING 1 overtopping dicharge during Typhoon erb are all greater than the criteria for damage on back lope of eawall. Thi agree well with the NTOU eawall failure event during Typhoon erb. The predicted failure doe not again happen to NTOU eawall during Typhoon Kroa implying the effective reduction in overtopping dicharge by lifting up 1m of the cret through rebuilding the previouly damaged eawall. So far, the complex phyical mechanim due to interaction of fluid-tructure i yet to be explored with further tudie. EFEENCES Allop, N.W.., Beley, P. and Madurini, L., Overtopping performance of vertical and compoite breakwater, eawall and low reflection alternative, Final Proceeding MCS Project Workhop, Alderney, United Kingdom. Beley, P., Stewart, T. and Allop, N.W.., 199. Overtopping of vertical tructure: new prediction method to account for hallow water condition, Proc. Conf. Coatline, Structure and Breakwater, Intitution of Civil Engineer, Thoma Telford, London, Bruce, T., Allop, N.W.. and Pearon, J., 1. Violent overtopping of eawall- extended prediction method, Proc Conf Coatline, Structure and Breakwater, Intitution of Civil Engineer, Thoma Telford, London, Engineering, A.C.o.,. Coatal Engineering Manual. Department of the Army, Waterway Experiment Station, Army Corp of Engineer, Vickburg, Miiippi. EurOtop 7. EurOtop Wave Overtopping of Sea Defence and elated Structure: Aement Manual, Environment Agency (UK), Expertie Netwerk Waterkeren (NL), Kuratorium fr Forchung im Kteningenieurween (DE), Pullen, T., Allop, N.W.., Bruce, T., Kortenhau, A., Schüttrumpf,. and van der Meer, J.W.; Franco, C. and Franco, L., Overtopping formula for caion breakwater with nonbreaking D wave. Journal of Waterway Port Coatal and Ocean Engineering-Ace, 15,, 9-1. Franco, L., de Gerloni, M. and van der Meer, J.W., Wave overtopping on vertical and compoite breakwater. Proceeding of the Coatal Engineering Conference. ASCE, Kobe, Jpn, pp Goda, Y., 195. andom Sea and Deign of Maritime Structure. Univerity of Tokyo Pre, Tokyo. Tai, C.., S.Y. Tzang, S.S. iao, C.C. Cheng and.w. Li, 6. Coatal tructure failure and coatal wave on the north coat of Taiwan due to typhoon erb, Journal of Coatal eearch,,, 9-5. Tzang, S. Y. and S. S. iao, A cae tudy on typhoon-induced conecutive damage on coatal tructure at Keelung Coat. Coatal Structure 99, ASCE, Santander, Spain, Tzang, S. Y., Lin, J.G., iao, S.S.,. Comparion of Coatal Structure Failure Due to Typhoon Kroa and erb in Coatal Water nearby NTOU. Proceeding of th Conference on Ocean Engineering, pp.6-6. (in Chinee) Tzang, S.Y., Ou, S.., Chen, D.W. and o, C.C., 9. Invetigation of Wave Overtopping over Vertical Seawall by Typhoon erb (1996) on Northeatern Coat of Taiwan, Proceeding of 5th International Conference on Aian and Pacific Coat (APAC9), Singapore,, -5.
A Study of Ocean Waves at Fisherman s Wharf, Victoria Harbour
A Study of Ocean Wave at Fiherman Wharf, Victoria Harbour David B. Fiel, Jianhua Jiang and Dave Billenne ASL Environmental Science Inc., 1986 Mill Rd., Sidney, BC, V8L 5Y3, Canada, Phone Number (250) 656-0177
More informationCREST LEVEL OPTIMIZATION OF THE MULTI LEVEL OVERTOPPING BASED WAVE ENERGY CONVERTER SEAWAVE SLOT-CONE GENERATOR. J. P. Kofoed 1 and E.
6 th European Wave and Tidal Energy Conference Glagow, UK Augut 29 th - September 2 nd 2005 CREST LEVEL OPTIMIZATION OF THE MULTI LEVEL OVERTOPPING BASED WAVE ENERGY CONVERTER SEAWAVE SLOT-CONE GENERATOR
More informationCHANGE OF NEARSHORE SIGNIFICANT WAVES IN RESPONSE TO SEA LEVEL RISE. Se-Hyeon Cheon 1 and Kyung-Duck Suh 1
CHANGE OF NEARSHORE SIGNIFICANT WAVES IN RESPONSE TO SEA EVE RISE Se-Hyeon Cheon 1 and Kyung-Duck Suh 1 In thi paper, a method ha been developed for etimating the change of nearhore ignificant wave in
More informationOPTIMISING A BREAKWATER LAYOUT USING AN ITERATIVE ALGORITHM
OPTIMISING A BREAKWATER LAYOUT USING AN ITERATIVE ALGORITM Michael Rutell R Wallingford / Univerity of Surrey Due to the remote and expoed coatal location of mot liquefied natural ga (LNG) exportation
More informationVALIDATION OF THE ASAR WAVE MODE LEVEL 2 PRODUCT USING WAM AND BUOY SPECTRA
VALIDATION OF THE ASAR WAVE MODE LEVEL 2 PRODUCT USING WAM AND BUOY SPECTRA Harald Johnen (1), Geir Engen (1), Bertrand Chapron (2) (1) Norut Informajonteknologi AS, PP 6463 Forkningparken, N-9294 Tromø,
More informationFluid-structure interaction between trains and noise-reduction barriers: numerical and experimental analysis
Fluid Structure Interaction V 49 Fluid-tructure interaction between train and noie-reduction barrier: numerical and experimental analyi M. Belloli, B. Pizzigoni, F. Ripamonti & D. Rocchi Mechanical Engineering
More informationMEASUREMENT OF DYNAMIC STRESSES ON CARRIERS WITH DETACHABLE GRIP AT STATION ENTRANCE: LA.T.I.F. EXPERIENCES AND FUTURE PROSPECTS
MEASUREMENT OF DYNAMIC STRESSES ON CARRIERS WITH DETACHABLE GRIP AT STATION ENTRANCE: LA.T.I.F. EXPERIENCES AND FUTURE PROSPECTS dott.ing. Fabio Degaperi Introduction The importance of dynamic tre effect
More informationLABORATORY EXPERIMENTS FOR WAVE RUN-UP ON THE TETRAPOD ARMOURED RUBBLE MOUND STRUCTURE WITH A STEEP FRONT SLOPE
Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons
More informationMEMORANDUM. TNC Fisher Slough Final Design and Permitting Subject: Large Wood Debris Design. Jenny Baker (TNC) Dave Olson (DD3)
MEMORANDUM TNC Fiher Slough Final Deign and Permitting Subject: Large Wood Debri Deign To: From: Jenny aker (TNC) Dave Olon (DD3) David Cline (Tetra Tech) Jon Olmted (Tetra Tech) Jay lair (Tetra Tech)
More informationPHYSICAL MODEL TESTS ON WAVE OVERTOPPING AND FLOW PROCESSES ON DIKE CRESTS INFLUENCED BY WAVE-CURRENT INTERACTION
PHYSICAL MODEL TESTS ON WAVE OVERTOPPING AND FLOW PROCESSES ON DIKE CRESTS INFLUENCED BY WAVE-CURRENT INTERACTION Stefanie Lorke 1, Babette Scere 1, Holger Scüttrumpf 1, Antje Borncein 2, Reinard Pol 2
More informationEssential Ingredients for Heavy Orographic Rainfall and their Potential Application for Prediction
7.6 Eential Ingredient for eavy Orographic Rainfall and their Potential Application for Prediction Yuh-Lang Lin, Sen Chiao, Jame A. Thurman and Michael L. Kaplan North Carolina State Univerity, Raleigh,
More informationHydraulic jump in stilling basin with vertical end sill
International Journal of Phical Science Vol. (), pp. -9, Januar, Available online at http://www.academicjournal.org/ijps ISSN 99-9 Academic Journal Full Length Reearch Paper Hdraulic jump in tilling bain
More informationSEISMIC RESPONSE ANALYSIS OF LONG-SPAN CONTINUOUS RIGID-FRAMED BRIDG
SEISMIC RESPONSE ANALYSIS OF LONG-SPAN CONTINUOUS RIGID-FRAMED BRIDG Song Wa-li 1, Liu Gao-jun 2, Song Wen-chao 3 and Ren Wen-jie 4 1 Profeor, School of Civil Engineering, Hebei Univerity of Technology,
More informationExperimental Investigation of Pressure Flushing Technique in Reservoir Storages
Experimental Invetigation of Preure Fluhing Technique in Reervoir Storage M. E. MESKATI SAMIRZADI 1, A. A. DEGANI 1, T. SUMI, A. MOSAEDI 1 and M. MEFTA. 1 1 Dept. of Water Engineering, Gorgan Univerity
More informationWAVE OVERTOPPING AND RUBBLE MOUND STABILITY UNDER COMBINED LOADING OF WAVES AND CURRENT
WAVE OVERTOPPING AND RUBBLE MOUND STABILITY UNDER COMBINED LOADING OF WAVES AND CURRENT Sepehr Eslami A. and Marcel R.A. van Gent Coastal structures such as breakwaters are usually studied under wave loading
More informationUPDATE OF THE EUROTOP MANUAL: NEW INSIGHTS ON WAVE OVERTOPPING
UPDATE OF THE EUROTOP MANUAL: NEW INSIGHTS ON WAVE OVERTOPPING Jentsje van der Meer 1 William Allsop 2, Tom Bruce 3, Julien De Rouck 4, Tim Pullen 5, Holger Schüttrumpf 6, Peter Troch 7 and Barbara Zanuttigh
More informationWave Crest Distributions: Observations and Second-Order Theory
1AUGUST 000 FORRISTALL 1931 Wave Cret Ditribution: Obervation and Second-Order Theory GEORGE Z. FORRISTALL Shell E&P Technology, Houton, Texa (Manucript received February 1999, in final form 14 September
More informationSimulation of morphological changes induced by large-scale coastal engineering using a 3D wave current interaction model
Indian Journal of Geo-Marine Science Vol. 45(2), February 2016, pp. 215-223 Simulation of morphological change induced by large-cale coatal engineering uing a 3D wave current interaction model Ting Xu
More informationINTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 3, 2012
INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 3, 2012 Copyright 2010 All right reerved Integrated Publihing ervice Reearch article ISSN 09 4399 Invetigation on fly ah concrete
More informationWave and overtopping predictions on reservoirs and inland waterways
Wave and overtopping predictions on reservoirs and inland waterways Tim Pullen 1, William Allsop 1, Eunice Silva 1, Craig Goff 1 and Tracey Williamson 2, 1 HR Wallingford, Howbery Park, Wallingford, Oxfordshire
More informationOptimization for Bus Stop Design Based on Cellular Automaton Traffic Model
Modern Tranportation Volume 6, 2017, PP.1-7 Optimization for Bu Stop Deign Baed on Cellular Automaton Traffic Model Liankui Zhang 1, Chengyou Cui 1 1. Department of Technology Economic and Management,
More informationRevisions to the EurOtop manual version 2. Writing EurOtop 2 why?
Revisions to the EurOtop manual version 2 Life at the seaside: the sunny view Contents 1. Admissible 2. Summary of the changes 3. Calculation tools 4. Smooth slopes: dikes to vertical walls; zero freeboard,
More information2. Water levels and wave conditions. 2.1 Introduction
18 2. Water levels and wave conditions 2.1 Introduction This Overtopping Manual has a focus on the aspects of wave run-up and wave overtopping only. It is not a design manual, giving the whole design process
More informationSynthesis of a multivariate extreme sea climate
Application of Statitic and Probability in Civil Engineering, Der Kiureghian, Madanat & Petana (ed) 3 Millpre, Rotterdam, ISBN 9 5966 4 8 Synthei of a multivariate extreme ea climate P.B. Webber Minitry
More informationTurbulence and waves in numerically simulated slope flows
9 ème Congrè Françai de Mécanique Mareille, 4-8 août 9 Turbulence and wave in numerically imulated lope flow E. FEDOROVICH, A. SHAPIRO School of Meteorology, Univertiy of Oklahoma, David L. Boren Blvd.,
More information08 Rubble Mound Structure Design
08 Rubble Mound Structure Deign Ref: Shore Protection Manual, USACE, 1984 Baic Coatal Engineering, R.M. Sorenen, 1997 Coatal Engineering andbook, J.B. erbich, 1991 EM 1110-2-2904, Deign of Breakwater and
More informationA New Strategy for Harbor Planning and Design
A New Strategy for Harbor Planning and Design Xiuying Xing, Ph.D Research Associate Sonny Astani Department of Civil and Environmental Engineering University of Southern California Los Angeles, CA 90089-2531
More informationCORPS OF ENGINEERS, U. S. ARMY PLANS FOR IMPROVEMENT OF NAVIGATION CONDITIONS GREENVILLE BRIDGE, MISSISSIPPI RIVER MODEL INVESTIGATION
TA7,vJ31 (\0 2..-.:;b c CORPS OF ENGINEERS, U. S. ARMY PLANS FOR IMPROVEMENT OF NAVIGATION CONDITIONS AT GREENVILLE BRIDGE, MISSISSIPPI RIVER MODEL INVESTIGATION TECHNICAL MEMORANDUM NO. 2 366 CONDUCTED
More informationLABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS
Asian and Pacific Coasts 23 LABORATORY EXPERIMENTS ON WAVE OVERTOPPING OVER SMOOTH AND STEPPED GENTLE SLOPE SEAWALLS Takayuki Suzuki 1, Masashi Tanaka 2 and Akio Okayasu 3 Wave overtopping on gentle slope
More informationVEHICLE NO X AND PM10 EMISSION FACTORS FROM SYDNEY S M5-EAST TUNNEL
VEHICLE NO X AND PM1 EMISSION FACTORS FROM SYDNEY S M5-EAST TUNNEL Mark F. Hibberd 1 1 CSIRO Atmopheric Reearch, PB 1, Apendale, Vic 3195, Autralia Abtract Reult are preented on the vehicle emiion factor
More informationScientia Iranica, Vol. 14, No. 4, pp 358{368 c Sharif University of Technology, August 2007 Research Note Evaluation of Empirically Derived PVT Proper
Scientia Iranica Vol. 14 No. 4 pp 358{368 c Sharif Univerity of Technoloy Auut 2007 Reearch Note Evaluation of Empirically Derived PVT Propertie for Middle Eat Crude Oil M.N. Hemmati and R. Kharrat 1 PVT
More informationreviewed paper Public transport travel time simulation Tomáš CHLEBNICAN, Jiří CTYROKY, Marek ZDERADICKA
reviewed paper Public tranport travel time imulation Tomáš CHLEBNICAN, Jiří CTYROKY, Marek ZDERADICKA (Mgr. Jiří ČTYROKÝ, Útvar rozvoje hl. m. Prahy, Vyšehradká 57, Prague, 18 00, ctyroky@urm.mepnet.cz)
More informationINFLUENCE OF THE EXHAUST GAS RECIRCULATION ON THE OXYGEN CONTENTS AND ITS EXCESS RATIO IN THE ENGINE COMBUSTION CHAMBER
Journal of KONES Powertrain and Tranport Vol. 0 No. 3 013 INFLUENCE OF THE EXHAUST GAS ECICULATION ON THE OXYGEN CONTENTS AND ITS EXCESS ATIO IN THE ENGINE COMBUSTION CHAMBE Stan Potrzednik Zbigniew mudka
More informationMODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR RE-DESIGN
Proceedings of the 14 th International Conference on Environmental Science and Technology Rhodes, Greece, 3-5 September 2015 MODELING OF CLIMATE CHANGE IMPACTS ON COASTAL STRUCTURES - CONTRIBUTION TO THEIR
More informationPHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA)
PHYSICAL AND NUMERICAL MODELLING OF WAVE FIELD IN FRONT OF THE CONTAINER TERMINAL PEAR - PORT OF RIJEKA (ADRIATIC SEA) DALIBOR CAREVIĆ (1), GORAN LONČAR (1), VLADIMIR ANDROČEC (1) & MARIN PALADIN (1) 1.
More informationTHE REDUCTION OF WAVE OVERTOPPING BY MEANS OF A STORM WALL
THE REDUCTION OF WAVE OVERTOPPING BY MEANS OF A STORM WALL Koen Van Doorslaer 1,2, Julien De Rouck 1, Jentsje van der Meer 3,4 A second edition of the EurOtop manual, a manual on wave overtopping of sea
More informationThe Feature of Weak Shock Wave Propagated in a Overlong Tunnel
Open Journal of Fluid Dynamic 0 85-89 http://d.doi.org/0.436/ojfd.0.4a034 Publihed Online December 0 (http://www.scirp.org/journal/ojfd) The Feature of Weak Shock Wave Propagated in a Overlong Tunnel Xiao
More informationCalculation of Actual Concrete Shrinkage Magnitude
Calculation of Actual Magnitude By: Emilio M. Morale, MSCE - Mater of Science in Civil Engineering major in Geotechnic and Structure, Carnegie Mellon Univerity, Pittburgh Pa. Chairman PICE Geotechnical
More informationWAVE OVERTOPPING OF RUBBLE MOUND BREAKWATERS
WAVE OVERTOPPING OF RUBBLE MOUND BREAKWATERS Mogens Hebsgaard 1, Peter Sloth 1, and tegen Juhl 2 Abstract A general expression for the overtopping discharge of a rubble mound breakwater has been derived
More informationMEMORANDUM: INTERIM CONCEPTS
roject 73845 I 15/Tropicana Interchange Feaibility Study MEMORANDUM: INTERIM CONCETS INTRODUCTION During the initial project creening and throughout the development of project concept, alternative concept
More informationOriginal Article. Effectiveness of a specialized climbing method for beginners on the physical and technical fitness of 8-10 year old children
Journal of Phyical Education and Sport (JPES), 18 Supplement iue 5, Art 308, pp. 2065-2069, 2018 online ISSN: 2247-806X; p-issn: 2247 8051; ISSN - L = 2247-8051 JPES Original Article Effectivene of a pecialized
More informationREBUILDING COMPOSITE BREAKWATERS FOLLOWING THE 2011 TOHOKU TSUNAMI: LESSONS LEARNT AND DOES IT MAKE SENSE TO REINFORCE?
Proceedings of Coastal Engineering, JCE, Vol.3, 212, November REBUILDING COMPOITE BREAKWATER FOLLOWING THE 211 TOHOKU TUNAMI: LEON LEARNT AND DOE IT MAKE ENE TO REINFORCE? Miguel Esteban1, Rafael Aranguiz
More informationRegional Analysis of Extremal Wave Height Variability Oregon Coast, USA. Heidi P. Moritz and Hans R. Moritz
Regional Analysis of Extremal Wave Height Variability Oregon Coast, USA Heidi P. Moritz and Hans R. Moritz U. S. Army Corps of Engineers, Portland District Portland, Oregon, USA 1. INTRODUCTION This extremal
More informationMechanical Waves: Applications in Medicine. How Elastography is Helping Doctors Avoid the Biopsy Needle
Mechanical Wave: Application in Medicine How Elatography i Helping Doctor Avoid the Biopy Needle Purpoe Thi leon i meant to increae tudent undertanding of mechanical wave and provide them with example
More information2011 SEG SEG San Antonio 2011 Annual Meeting 3377
Source-receiver pretack depth migration uing dreamlet Bangyu Wu *, Ru-han Wu and Jinghuai Gao Modeling and Imaging Laboratory, IGPP, Univerity of California, Santa Cruz Summary The dreamlet method add
More informationApplication of single-step genomic evaluation for crossbred performance in pig 1
Application of ingle-tep genomic evaluation for crobred performance in pig 1 T. Xiang* B. Nielen G. Su* A. Legarra and O. F. Chritenen* *Center for Quantitative Genetic and Genomic Department of Molecular
More informationAustralian Journal of Basic and Applied Sciences
AENSI Journals Australian Journal of Basic and Applied Sciences ISSN:1991-8178 Journal home page: www.ajbasweb.com Developing a Stability Formula for Breakwater-An Overview 1,2 Nur Aini Mohd Arish, 2 Othman
More informationABSTRACT: Ocean wave energy contains the largest energy density
Deign and Modelling of Wave Energy Converter and Power Take-Off Sytem DESIGN AND MODELLING OF WAVE ENERGY CONVERTER AND POWER TAKE-OFF SYSTEM E. Chuah 1, K. Magawaran and M.Z. Haan 3 1 School of Engineering,
More informationSTUDY ON TSUNAMI PROPAGATION INTO RIVERS
ABSTRACT STUDY ON TSUNAMI PROPAGATION INTO RIVERS Min Roh 1, Xuan Tinh Nguyen 2, Hitoshi Tanaka 3 When tsunami wave propagation from the narrow river mouth, water surface is raised and fluctuated by long
More informationREVETMENTS. Purposes and Operational Constraints. Purposes Erosion control o o. Revetment Design 4/5/2016. CE A676 Coastal Engineering
REVETMENTS Ijsseldam, the Netherlands Orson P. Smith, PE, Ph.D. Instructor Purposes and Operational Constraints Purposes Erosion control o o Embankment Toe protection for a seawall, retaining wall or other
More informationA Graphic Method to Estimate the Wind Speed under Urban Canopy Layer
Civil Engineering and Architecture 3(6): 172-188, 2015 DOI: 10.13189/cea.2015.030602 http://www.hrpub.org A raphic Method to Etimate the Wind Speed under Urban Canopy Layer Manoureh Tahba School of Architecture
More informationCalorimetric Validation of the Caltrac Accelerometer During Level Walking
Calorimetric Validation of the Caltrac Accelerometer During Level Walking The primary purpoe of thi tudy wa to compare the Caltrac accelerometer output with meaured energy expenditure (Ee). Twenty-five
More informationCAL. V657, VD57 CHRONOGRAPH
CL. V657, VD57 TIME/CLENDR l Hour, minute and econd hand l Date diplayed in numeral ENGLISH l Meaure up to 60 minute in 1/10 econd increment l Split time meaurement DISPLY ND /UTTONS SCREW DOWN [for model
More informationHeat Transfer Effect of Inert Gas on Multi-Tubular Reactor for Partial Oxidation Reaction
Korean J. Chem. Eng., 18(2), 184-189 (2001) Heat Tranfer Effect of Inert Ga on Multi-Tubular Reactor for Partial Oxidation Reaction Kwang Ho Song, Sang Eon Han and Kwang-Ho Park LG Chem Reearch Park, LG
More informationReducing Public Safety Risk at a NSW Breakwater
Reducing Public Safety Risk at a NSW Breakwater E Watterson 1, S Driscoll 2 1 SMEC Ports and Marine, Newcastle, NSW 2 NSW Crown Lands Minor Ports Unit, Newcastle, NSW Observations, photographs, physical
More informationSemi-Quantitative Freshwater Mussel Survey Date Prepared: 11/20/2017
PARTNERSHIP FOR THE DELAWARE ESTUARY Science Group Semi-Quantitative Frehwater Muel Survey Date Prepared: 11/20/2017 Prepared By: Kurt Cheng Suggeted Citation: Cheng, K. 2017. Semi-Quantitative Frehwater
More informationThe Failure of the Kamaishi Tsunami Protection Breakwater
PT-13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada March, 2013 Paper Code. (PT-13 - Tucker)
More informationConvective entrainment and large-scale organization of tropical precipitation: sensitivity of the CNRM-CM5 hierarchy of models
Convective entrainment and large-cale organization of tropical precipitation: it ti enitivity of the CNRM-CM5 hierarchy of model Boutheina Ouelati & Gille Bellon CNRM, CNRS/Météo-France, Touloue, France
More informationCOST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION
COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates
More informationDevice-Free Passive Identity Identification via WiFi Signals
enor Article Device-Free Paive Identity Identification via WiFi Signal Jiguang Lv ID, Wu Yang * and Dapeng Man Information Security Reearch Center, Harbin Engineering Univerity, Harbin 5, China; lvjiguang@hrbeu.edu.cn
More informationOvertopping Breakwater for Wave Energy Conversion at the Port of Naples: Status and Perspectives
Overtopping Breakwater for Wave Energy Conversion at the Port of Naples: Status and Perspectives Diego Vicinanza, Pasquale Contestabile, Enrico Di Lauro 1. INTRODUCTION Nowadays over 1500 Wave Energy Converter
More informationMACHINE MILKING AND DAILY CHANGES OF COW S TEAT CONDITION
20 th Int. Symp. Animal Science Day, Kranjka gora, Slovenia, Sept. 19 th 21 t, 2012. COBISS: 1.08 Agri category code: L01 ACHINE ILKING AND DAILY CHANGES OF COW S TEAT CONDITION iomir STOJNOVIĆ 1, Damir
More informationCHAPTER 135. Influence of the core configuration on the stability of berm breakwaters. Nikolay Lissev 1 AlfT0rum 2
CHAPTER 135 Influence of the core configuration on the stability of berm breakwaters Nikolay Lissev 1 AlfT0rum 2 Abstract An experimental study has been carried out to investigate the concept of extending
More informationWIND WAVES REFLECTIONS - A CASE STUDY
WIND WAVES REFLECTIONS - A CASE STUDY J. Rytktinen Rak enteiden Mekaniikka, Vol 1 No 1 1988, s. 55... 65 This study describes s ome o f t h e wa v e r eflection measur ements conducted at the Hydraulic
More informationWAVE OVERTOPPING AT BERM BREAKWATERS IN LINE WITH EUROTOP
WAVE OVERTOPPING AT BERM BREAKWATERS IN LINE WITH EUROTOP Sigurdur Sigurdarson 1 and Jentsje W. van der Meer 2 The paper presents the development of a new overtopping formula for berm breakwaters. Overtopping
More informationWave Runup and Overtopping at Seawalls Built on Land and in Very Shallow Water
Wave Runup and Overtopping at Seawalls Built on Land and in Very Shallow Water Hajime Mase, M.ASCE 1 ; Takashi Tamada 2 ; Tomohiro Yasuda 3 ; Terence S. Hedges 4 ; and Maria T. Reis 5 Downloaded from ascelibrary.org
More informationEffect of Altering Handle Position of a Rolling Walker on Gait in Children with Cerebral Palsy
Effect of Altering Handle Poition of a Rolling Walker on Gait in Children with Cerebral Paly The purpoe of thi tudy wa to determine whether altering the handle poition on a rolling walker would affect
More informationTHE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE
THE WAVE CLIMATE IN THE BELGIAN COASTAL ZONE Toon Verwaest, Flanders Hydraulics Research, toon.verwaest@mow.vlaanderen.be Sarah Doorme, IMDC, sarah.doorme@imdc.be Kristof Verelst, Flanders Hydraulics Research,
More informationBRRAKING WAVE FORCES ON WALLS
CETN-III-38 3/88 BRRAKING WAVE FORCES ON WALLS PURPOSE: To introduce the Goda method as an alternative to the Minikin method for the determination of breaking wave forces on semirigid wall structures.
More informationPARAMETRIZATION OF WAVE TRANSFORMATION ABOVE SUBMERGED BAR BASED ON PHYSICAL AND NUMERICAL TESTS
Proceedings of the 6 th International Conference on the Application of Physical Modelling in Coastal and Port Engineering and Science (Coastlab16) Ottawa, Canada, May 10-13, 2016 Copyright : Creative Commons
More information6. Wave Overtopping at Seawalls: Measurements at Small and Large Scale
6-1 6. Wave Overtoppg at Seawalls: Measurements at Small and Large Scale Tom Bruce 1, William Allsop 2, Jonathan Pearson 1 & Xavier Gironella 3 1 School of Engeerg and Electronics, University of Edburgh,
More informationRedirection of center-of-mass velocity during the step-to-step transition of human walking
2668 The Journal of Experimental Biology 212, 2668-2678 Publihed by The Company of Biologit 29 doi:1.1242/jeb.27581 Redirection of center-of-ma elocity during the tep-to-tep tranition of human walking
More informationCoordination in CPG and its Application on Bipedal Walking
Coordination in CPG and it Application on Bipedal Walking Weiwei Huang Department of Mechanical Engineering National Univerity of Singapore Singapore 96 huangweiwei@nu.edu.g Chee-Meng Chew Department of
More informationSteven A. Hughes. Ph.D., P.E. David R. Basco. Ph.D., P.E.
Steven A. Hughes. Ph.D., P.E. Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center David R. Basco. Ph.D., P.E. Coastal Engineering Center Old Dominion University Overview
More informationDie Küste. EurOtop Die Küste. EurOtop. Wave Overtopping of Sea Defences and Related Structures: Assessment Manual.
Heft 73 Jahr 2007 EurOtop Die Küste Die Küste ARCHIV FÜR FORSCHUNG UND TECHNIK AN DER NORD- UND OSTSEE ARCHIVE FOR RESEARCH AND TECHNOLOGY ON THE NORTH SEA AND BALTIC COAST EurOtop Wave Overtopping of
More informationTHE WAVE OVERTOPPING SIMULATOR IN ACTION
THE WAVE OVERTOPPING SIMULATOR IN ACTION Jentsje W. van der Meer 1, Patrizia Bernardini 2, Gosse Jan Steendam 3, Gert Jan Akkerman 4 and Gijs Hoffmans 5 The wave overtopping simulator is a device which
More informationTechnical Brief - Wave Uprush Analysis 129 South Street, Gananoque
Technical Brief - Wave Uprush Analysis 129 South Street, Gananoque RIGGS ENGINEERING LTD. 1240 Commissioners Road West Suite 205 London, Ontario N6K 1C7 June 12, 2013 Table of Contents Section Page Table
More informationCold Formed Steel Tension Members with Two and Three Staggered Bolts
Miouri Univerity of Science and Technoloy Scholar' Mine International Specialty Conference on Cold- Formed Steel Structure (2010) - 20th International Specialty Conference on Cold-Formed Steel Structure
More informationINTRODUCTION TO COASTAL ENGINEERING
The University of the West Indies Organization of American States PROFESSIONAL DEVELOPMENT PROGRAMME: COASTAL INFRASTRUCTURE DESIGN, CONSTRUCTION AND MAINTENANCE A COURSE IN COASTAL DEFENSE SYSTEMS I CHAPTER
More informationInternational Journal of Innovative Research in Advanced Engineering (IJIRAE) ISSN:
RANSMISSION COEFFICIEN (K) AND REFLECION COEFFICIEN () ON BREAKWAER YPE CUBE Setiyawan Department of Civil Engineering, adulako University, Palu, Central Sulawesi, Indonesia setiyawanvip@yahoo.co.id; Manuscript
More informationReliability based design method for coastal structures in shallow seas
Indian Journal of Geo-Marine Sciences Vol. 39(4), December 2010, pp. 605-615 Reliability based design method for coastal structures in shallow seas B Prasad Kumar Department of Ocean Engineering & Naval
More informationCenter for By-Products Utilization
Center for By-Product Utilization MECHANICAL PROPERTIES AND DURABILITY OF CONCRETE MADE WITH CLASS C BLY ASH FROM DIFFERENT SOURCES OF WISCONSIN By Tarun R. Naik, Shiw S. Singh, and Mohammad M. Hoain Report
More informationWave Overtopping of Seawalls. Design and Assessment Manual. HR Wallingford Ltd. February R&D Technical Report W178. R&D Technical Report W178
Wave Overtopping of Seawalls Design and Assessment Manual HR Wallingford Ltd February 1999 R&D Technical Report W178 R&D Technical Report W178 Commissioning Organisation Environment Agency Rio House Waterside
More informationWAVE REFLECTION AND WAVE RUN-UP AT RUBBLE MOUND BREAKWATERS
WAVE REFLECTION AND WAVE RUN-UP AT RUBBLE MOUND BREAKWATERS Markus Muttray, ocine Oumeraci, Erik ten Oever Wave reflection and wave run-up at rubble mound breakwaters with steep front slope were investigated
More informationStructure Failure Modes
US Army Corps Monitoring and Maintenance of Coastal Infrastructure Structure Failure Modes Steven A. Hughes, PhD, PE Coastal and Hydraulics Laboratory US Army Engineer Research and Development Center Waterways
More informationWAVE OVERTOPPING SIMULATOR TESTS IN VIET NAM
WAVE OVERTOPPING SIMULATOR TESTS IN VIET NAM Le Hai Trung 1, Jentsje van der Meer 2, Gerrit Jan Schiereck 3, Vu Minh Cat 4, Gerben van der Meer 5. Sea dikes in Viet Nam have been built up during a long
More informationNearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA
1 Nearshore Dredged Material Placement Pilot Study at Noyo Harbor, CA Noyo Cove N 2011 National Conference on Beach Preservation Technology 9-11, February 2011 Lihwa Lin, Honghai Li, Mitchell Brown US
More informationKeywords: dikes, levees, overtopping, flow depth, flow velocity, wave overtopping simulator, erosional index
FLOW DEPTHS AND VELOCITIES AT CREST AND LANDWARD SLOPE OF A DIKE, IN THEORY AND WITH THE WAVE OVERTOPPING SIMULATOR Jentsje W. van der Meer, Bianca Hardeman, Gosse-Jan Steendam, Holger Schüttrumpf and
More informationA Review on Experimental Analysis for Rectangular Perforated Fin Array
A Review on Experimental Analyi for Rectangular Perforated Fin Array I.N. Wankhede 1, N. P. Salunke 2 1 PG Student, Mechanical Department, RCPIT Shirpur, Maharahtra, India 2 H. O. D., Mechanical Department,RCPIT
More informationHURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING
HURRICANE SANDY LIMITED REEVALUATION REPORT UNION BEACH, NEW JERSEY DRAFT ENGINEERING APPENDIX SUB APPENDIX D SBEACH MODELING Rev. 18 Feb 2015 1 SBEACH Modeling 1.0 Introduction Following the methodology
More informationOECS Regional Engineering Workshop September 29 October 3, 2014
B E A C H E S. M A R I N A S. D E S I G N. C O N S T R U C T I O N. OECS Regional Engineering Workshop September 29 October 3, 2014 Coastal Erosion and Sea Defense: Introduction to Coastal/Marine Structures
More informationEFFECTS OF WAVE, TIDAL CURRENT AND OCEAN CURRENT COEXISTENCE ON THE WAVE AND CURRENT PREDICTIONS IN THE TSUGARU STRAIT
EFFECTS OF WAVE, TIDAL CURRENT AND OCEAN CURRENT COEXISTENCE ON THE WAVE AND CURRENT PREDICTIONS IN THE TSUGARU STRAIT Ayumi Saruwatari 1, Yoshihiro Yoneko 2 and Yu Tajima 3 The Tsugaru Strait between
More informationDirectional Wave Spectra from Video Images Data and SWAN Model. Keywords: Directional wave spectra; SWAN; video images; pixels
Jurnal Teknologi Full paper Directional Wave Spectra from Video Images Data and SWAN Model Muhammad Zikra a*, Noriaki Hashimoto b, Masaru Yamashiro b, Kojiro Suzuki c a Department of Ocean Engineering,
More informationLOCALLY CONCENTRATED SEVERE BEACH EROSION ON SEISHO COAST CAUSED BY TYPHOON T0709
F-4 Fourth International Conference on Scour and Erosion 2008 LOCALLY CONCENTRATED SEVERE BEACH EROSION ON SEISHO COAST CAUSED BY TYPHOON T0709 Yoshimitsu TAJIMA 1 and Shinji SATO 2 1 Member of JSCE, Associate
More informationStudy of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1
Study of Passing Ship Effects along a Bank by Delft3D-FLOW and XBeach1 Minggui Zhou 1, Dano Roelvink 2,4, Henk Verheij 3,4 and Han Ligteringen 2,3 1 School of Naval Architecture, Ocean and Civil Engineering,
More informationACCOUNTING FOR LEVEE OVERTOPPING DURATION: A TEST WITH HURRICANE KATRINA CONDITIONS Robert G. Dean 1 and Mathijs van Ledden 2
ACCOUNTING FOR LEVEE OVERTOPPING DURATION: A TEST WITH HURRICANE KATRINA CONDITIONS Robert G. Dean 1 and Mathijs van Ledden Overtopping of earthen levees can result in lee side erosion, levee failure and
More informationINTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT
Advanced Series on Ocean Engineering Volume 16 INTRODUCTION TO COASTAL ENGINEERING AND MANAGEMENT J. William Kamphuis Queen's University, Canada World Scientific Singapore New Jersey London Hong Kong Contents
More informationScour Analysis at Seawall in Salurang, Sangihe Islands Regency, North Sulawesi
PROCEEDING OF 3 RD INTERNATIONAL CONFERENCE ON RESEARCH, IMPLEMENTATION AND EDUCATION OF MATHEMATICS AND SCIENCE YOGYAKARTA, 16 17 MAY 2016 M 04 Scour Analysis at Seawall in Salurang, Sangihe Islands Regency,
More informationCAL. VD50 1/10 SECOND RETROGRADE CHRONOGRAPH
CL. VD50 1/10 SECOND RETROGRDE CHRONOGRPH TIME/CLENDR l Hour, minute and econd hand l Date diplayed in numeral STOPWTCH l Meaure up to 60 minute in 1/10 econd increment. ENGLISH DISPLY ND /UTTONS SCREW
More informationVertical Distribution of Wave Overtopping for Design of Multi Level Overtopping Based Wave Energy Converters Kofoed, Jens Peter
Aalborg Universitet Vertical Distribution of Wave Overtopping for Design of Multi Level Overtopping Based Wave Energy Converters Kofoed, Jens Peter Published in: Proceedings of the 30th International Conference
More information