1 EASTERN AVE ELLINGHAM ST WILLOW ST CENTRAL AVE MARGINAL ST CR AVE HIGHLAND ST HIGHLAND ST GERRISH AVE CONGRESS AVE SHAWMUT ST MARGINAL ST MYSTIC RIVER WASHINGTON AVE SPRUCE ST 5TH ST 4TH ST DIVISION ST 3RD ST PARK ST VALE ST EVERETT AVE CHELSEA TOWN LINE EVERETT TOWN LINE 3RD ST SPRUCE ST 2ND ST CHESTNUT ST AUURN ST EACHAM ST PROP TRANSMISSION LINE (TYP) EVERETT MTA COMMUTER RAIL CHELSEA PROP WORKZONE (TYP) OSTON SHURTLEFF ST HAWTHORN ST ARLINGTON ST MAPLE ST SCALE: 1" = 300' MARKET ST EHEN ST COMMERCIAL ST NOTE: 1. ASELINE STATIONING SHOWN FOR INFORMATIONAL PURPOSES ONLY. REFER TO APPROVED PLAN AND PROFILE DRAWINGS FOR ACTUAL TRANSMISSION LINE LOCATION INFORMATION. TT

2 TEMPORARY TRAFFIC CONTROL GENERAL NOTES 1. ALL CONSTRUCTION SIGNING, TEMPORARY TRAFFIC CONTROL DEVICES, AND ROADSIDE ELEMENTS SHALL CONFORM WITH THE 2009 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AS AMENDED, THE MASSDOT STANDARD DETAILS AND DRAWINGS FOR THE DEVELOPMENT OF TEMPORARY TRAFFIC CONTROL PLANS, THE LATEST REVISIONS OF THE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, (AASHTO) ROADSIDE DESIGN GUIDE, AASHTO POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS, AND NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM (NCHRP) REPORT 350 OR THE AASHTO MANUAL FOR ASSESSING SAFETY HARDWIRE (MASH). 2. ALL TEMPORARY PEDESTRIAN PATHWAYS SHALL COMPLY FULLY WITH ALL REQUIREMENTS OF THE MUTCD AND ALL APPLICALE MASSACHUSETTS ARCHITECTURAL ACCESS OARD (MAA) AND AMERICANS WITH DISAILITIES ACT ACCESSIILITY GUIDELINES (ADAAG) REQUIREMENTS AND PULIC RIGHTS-OF WAY ACCESSIILITY GUIDELINES (PROWAG). 3. WORK HOURS SHALL E AS FOLLOWS UNLESS OTHERWISE DIRECTED Y THE CITY OF CHELSEA: EACHAM STREET (CITY LIMITS) TO REET (AT SPRUCE STREET): 6:00 PM TO 2:00 AM REET (AT SPRUCE STREET) TO MARGINAL STREET (AT SHAWMUT STREET): 7:00 AM TO 3:00 PM MARGINAL STREET (AT SHAWMUT STREET) TO WILLOW ST: 6:00 PM TO 2:00 AM WILLOW ST TO PROJECT LIMITS: 6:00 PM TO 2:00 AM 4. NO WORK SHALL OCCUR WITHIN THE PULIC WAY ON STATE RECOGNIZED HOLIDAYS UNLESS OTHERWISE APPROVED Y THE AGENCY AND MUNICIPALITY WITH JURISDICTION OVER THE ROADWAY. 5. ALL DRUMS OUTSIDE TAPERS SHALL E SET AT 20' ON CENTER MAX. UNLESS OTHERWISE NOTED OR ADJUSTED Y THE ENGINEER. 6. REFLECTORIZED CONES SHALL E A MINIMUM OF 36 INCHES IN HEIGHT. 7. CONES MAY E USED IN LIEU OF DRUMS OUTSIDE OF TAPER AREAS. 8. ALL DRUMS SHALL E APPROXIMATELY PLACED AND MOVED AS NECESSARY TO MAINTAIN SAFE AND REASONALE AUTTER ACCESS. WORK MAY REQUIRE ADDITIONAL SIGNS, DRUMS AND OTHER TRAFFIC CONTROL DEVICES, GRADING AND TEMPORARY PAVEMENT FOR PASSAGE OF PEDESTRIAN, VEHICULAR AND EMERGENCY TRAFFIC THROUGH THE WORK AREAS, OTH DURING AND AFTER WORKING HOURS, TO MAINTAIN SUCH ACCESS. 9. THE CONTRACTOR SHALL NOTIFY EACH AUTTER AT LEAST 24 HOURS IN ADVANCE OF THE START OF ANY WORK THAT WILL REQUIRE THE TEMPORARY CLOSURE OR RESTRICTION OF ACCESS. 10. FOR DROP-OFFS 4" OR LESS WITHIN THE CLEAR ZONE, CONDITION MAY E MITIGATED WITH W8-9 (LOW SHOULDER) SIGN OR TEMPORARY CHANNELIZATION DEVICES. FOR DROP-OFFS GREATER THAN 4" UT NO MORE THAN 12", DETERMINE WHETHER IT IS MORE COST EFFECTIVE TO INSTALL OTH TEMPORARY CHANNELIZATION DEVICES AND A 1V:4H (MIN) TO 1V:6H (DESIRED) WEDGE OR REMOVE THE HAZARD. 11. CONTRACTOR SHALL STAGE WORK SUCH THAT A DROP-OFF OF NO MORE THAN 12" AT THE END OF EACH WORK DAY EXISTS WITHIN THE CLEAR ZONE AT ANY TIME AND ENSURE DROP-FF IS MITIGATED PER NOTE CONSTRUCTION CLEAR ZONE SHALL E IN ACCORDANCE WITH MASSDOT OSTON TRAFFIC GUIDELINES AS FOLLOWS: 4' IF POSTED SPEED IS LESS THAN 35 MPH 8' IF POSTED SPEED IS 35 MPH 15' IF POSTED SPEED IS 40 MPH 20' IF POSTED SPEED IS 45 MPH ' MINIMUM LANE WIDTHS SHALL E MAINTAINED UNLESS OTHERWISE NOTED. 14. NON-ESSENTIAL TRAFFIC CONTROL DEVICES AND SIGNS SHALL E COVERED OR REMOVED DURING NON-WORKING HOURS WHEN NOT IN USE. 15. SIGNS INSTALLED ON PORTALE STANDS REQUIRE 12 INCH MINIMUM MOUNTING HEIGHT FROM THE ROADWAY SURFACE TO THE OTTOM OF THE SIGN. 16. SIGNS INSTALLED ON PORTALE STANDS PLACED AMONG CHANNELIZATION DEVICES REQUIRE A 36 INCH MINIMUM MOUNTING HEIGHT FROM THE ROADWAY SURFACE TO THE OTTOM OF THE SIGN. 17. SIGNS MOUNTED ON P5 POSTS REQUIRE A MINIMUM 84 INCH MOUNTING HEIGHT FROM THE ROADWAY OR SIDEWALK SURFACE TO THE OTTOM OF THE SIGN. 18. ALL SIGNS SHALL E MOUNTED ON THEIR OWN NCHRP 350 AND/OR MASH CRASH TESTED SIGN SUPPORTS AND INSTALLED IN ACCORDANCE WITH THE MUTCD. 19. CONTRACTOR SHALL SECURE WORK AREAS TO PREVENT UNAUTHORIZED ACCESS AT ALL TIMES. 20. CONTRACTOR SHALL COORDINATE WITH CITY OF CHELSEA 48 HOURS PRIOR TO RESTRICTING ANY PARKING ON CITY ROADWAYS DURING CONSTRUCTION. SUGGESTED TEMPORARY TRAFFIC CONTROL SETUP APPLICATION ROADWAY STATION TEMPORARY TRAFFIC CONTROL SETUPS SHEET NUMER EACHAM STREET TO TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 EACHAM STREET TO TYPICAL TWO-WAY STREET LANE SHIFT SHEET 3 EACHAM STREET TO (MANHOLE) SITE SPECIFIC - EACHAM STREET AT MARKET STREET SHEETS 5 & 6 EACHAM STREET TO TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 EACHAM/ REET TO SITE SPECIFIC - EACHAM STREET AT REET SHEETS 7 & 8 REET TO TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 TYPICAL LOCAL ROAD CLOSURE SHEET 4 REET TO (MANHOLE) TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS SHEET 4 DETOUR PLAN - REET AT SPRUCE STREET SHEET 18 REET TO SITE SPECIFIC - REET AT SPRUCE STREET/COMMANDANTS WAY SHEETS 9 & 10 REET TO REET TO REET TO (MANHOLE) TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 TYPICAL ONE LANE I-DIRECTIONAL TRAFFIC AT INTERSECTION - NEAR SIDE SHEET 3 TYPICAL ONE LANE I-DIRECTIONAL TRAFFIC AT INTERSECTION - FAR SIDE SHEET 3 PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 TYPICAL LOCAL ROAD CLOSURE SHEET 4 TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS SHEET 4 DETOUR PLAN - REET AT CHESTNUT STREET SHEET 19 TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 REET TO PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 REET TO SITE SPECIFIC - REET AT /TREMONT STREET SHEETS REET TO REET TO TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 TYPICAL ONE LANE I-DIRECTIONAL TRAFFIC AT INTERSECTION - NEAR SIDE SHEET 3 TYPICAL ONE LANE I-DIRECTIONAL TRAFFIC AT INTERSECTION - FAR SIDE SHEET 3 PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 REET TO PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 REET TO SITE SPECIFIC - AT SHEETS 14 & 15 MARGINAL STREET TO (MANHOLE) MARGINAL STREET TO MARGINAL STREET TO (MANHOLE) TYPICAL LOCAL ROAD CLOSURE SHEET 4 TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS SHEET 4 DETOUR PLAN - MARGINAL STREET AT REET SHEET 20 TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 TYPICAL LOCAL ROAD CLOSURE SHEET 4 TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS SHEET 4 DETOUR PLAN - MARGINAL STREET AT SHAWMUT STREET SHEET 21 TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 MARGINAL STREET TO PEDESTRIAN YPASS TYPE II DETAIL SHEET 4 MARGINAL STREET TO SITE SPECIFIC - MARGINAL ST AT CHARLES ST SHEETS 16 & 17 MARGINAL STREET TO TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 MARGINAL STREET TO PEDESTRIAN YPASS TYPE I DETAIL SHEET 4 WILLOW STREET TO TYPICAL TWO-WAY STREET LANE CLOSURE - ALTERNATING TRAFFIC SHEET 3 ADVANCE SIGN SPACING LEGEND POLICE OFFICER TRAFFIC SIGNAL REFLECTORIZED DRUM TEMPORARY CONSTRUCTION SIGN TRAFFIC CONE TYPE III ARRICADE ARROW OARD (A) (RIGHT OR LEFT) ARROW OARD (A) (DOULE) ARROW OARD (A) (CAUTION) WORK AREA (PULIC ACCESS RESTRICTED) TRANSITION/UFFER AREAS TRAFFIC FLOW PEDESTRIAN ROUTE NTS NOT TO SCALE TYP TYPICAL DYL DOULE YELLOW LINE MIN. MINIMUM O.C. ON CENTER DISTANCE ETWEEN SIGNS (FEET) LANE TAPER LENGTH FORMULAS UFFER SPACING ROADWAY ALL ROADWAYS A C D L= TAPER LENGTH IN FEET WIDTH OF ROADWAY TO E W= SHIFTED OR REDIRECTED IN FEET SPEED (MPH) 15 DISTANCE (FEET) 80 S= POSTED SPEED LIMIT IN MPH 40 MPH OR LESS 2 WS L= 60 POSTED SPEED GREATER THAN 40 MPH L= WS

3 OPERATIONAL SIGNING LANE CLOSURES SHOWN ARE FOR TEMPORARY CONSTRUCTION. ALL DRUMS AND SIGNS ARE SHOWN AS THEY SHOULD APPEAR DURING THE WORKING DAY, OR WHILE OPERATING IN THE WORK ZONE. REFER TO GENERAL NOTES FOR FURTHER DETAILS. MAJOR STREET D C A MINOR STREET MAX 11' TYP D C A PROP TYPE III ARRICADE (TYP) REFLECTORIZED 10' O.C. IN TAPER AREAS REFLECTORIZED 20' O.C. (SEE GENERAL NOTE 7) D C A A C D 11' TYP MAX REFLECTORIZED 10' O.C. (SEE GENERAL NOTE 7) WORK AREA DYL 11' MIN DYL REFLECTORIZED 10' O.C. MAX D NOTES: 1. REFER TO ADVANCE SIGN SPACING TALE ON SHEET 2. TYPICAL TWO-WAY STREET LANE CLOSURE ALTERNATING TRAFFIC SCALE: NTS A C D MAX UFFER -1 WORK AREA MAX D REFLECTORIZED 20' O.C. (SEE GENERAL NOTE 7) NOTE: 1. ADVANCE WARNING SIGN PLACEMENT TO E ADJUSTED AS NECESSARY. 2. REFER TO ADVANCE SIGN SPACING TALE ON SHEET 2. ONE LANE I-DIRECTIONAL TRAFFIC AT INTERSECTIONS - FAR SIDE SCALE: NTS REFLECTORIZED 10' O.C. D C A 11' TYP MINOR STREET C A D C A MAJOR STREET W5-1 A DYL W1-4R TRAFFIC 10' O.C. C L/2 NOTES: 1. SEE TAPER LENGTH FORMULA ON SHEET SEE UFFER SPACING CHART ON SHEET REFER TO ADVANCE SIGN SPACING TALE ON SHEET 2. D W REFLECTORIZED 10' O.C. IN TAPER AREAS W1-4R WORK AREA 11' 11' W1-4L UFFER (SEE NOTE 2) REFLECTORIZED 10' O.C. W5-1 W1-4L W L/2 D C A DYL A C WORK AREA REFLECTORIZED 10' O.C. (SEE GENERAL NOTE 7) D MAX MAX 11' TYP MAX NOTE: 1. ADVANCE WARNING SIGN PLACEMENT TO E ADJUSTED AS NECESSARY. 2. REFER TO ADVANCE SIGN SPACING TALE ON SHEET 2. ONE LANE I-DIRECTIONAL TRAFFIC AT INTERSECTIONS - NEAR SIDE SCALE: NTS D C A TYPICAL TWO-WAY STREET LANE SHIFT SCALE: NTS

4 PEDESTRIAN YPASS TYPE I NOTES: 1. ADDITIONAL ADVANCE WARNING SIGNS MAY E NECESSARY AS DETERMINED Y THE ENGINEER. 2. CONTROLS FOR PEDESTRIAN TRAFFIC ONLY, ARE SHOWN. VEHICULAR TRAFFIC SHALL E MAINTAINED AS SHOWN ELSEWHERE. 3. STREET LIGHTING SHOULD E CONSIDERED WHEN LOCATING CONTROL DEVICES. 4. INDICATES DIRECTION OF PEDESTRIAN TRAVEL. 5. IF THE WORK ZONE DOES NOT PERMIT PEDESTRIANS TO TRAVEL ADJACENT TO IT AS SHOWN IN PEDESTRIAN YPASS TYPE I, THE APPROPRIATE SIGNS SHALL E INSTALLED TO CROSS PEDESTRIANS TO THE OPPOSITE SIDE OF THE STREET AT EXISTING OR TEMPORARY CROSSWALKS AS SHOWN IN PEDESTRIAN YPASS TYPE II, AND AS DIRECTED Y THE ENGINEER. 6. ALL TEMPORARY PEDESTRIAN PATHWAYS SHALL COMPLY FULLY WITH ALL REQUIREMENTS OF THE MUTCD AND ALL APPLICALE MAA AND ADAAG REQUIREMENTS AND INCLUDE THE USE OF A COMPLIANT TEMPORARY PEDESTRIAN MANAGEMENT GUIDANCE SYSTEM AT ALL TIMES. 7. CONTRACTOR SHALL MAINTAIN AS WIDE OF A PEDESTRIAN ACCESS AS POSSILE AT ALL TIMES. EXCEPT WHERE NECESSARY, THE CONTRACTOR MAY TEMPORARILY REDUCE PEDESTRIAN PATHWAYS TO 4 FEET IN WIDTH (EXCLUDING CUR) FOR NO MORE THAN 200 LINEAR FEET AT A TIME IN ACCORDANCE WITH ALL STANDARDS. A 5' x 5' PASSING AREA SHALL E PROVIDED IN INTERVALS NOT EXCEEDING 200 FEET. 8. TEMPORARY WHEELCHAIR RAMPS SHALL E CONSTRUCTED IN ACCORDANCE WITH MASSDOT, MAA, AND ADAAG REQUIREMENTS. TYPE III ARRICADE (TYP) R9-9, M4-9bSR EXISTING SIDEWALK TEMP CUR RAMP - PARALLEL TO THE CUR (SEE DETAIL) R9-11aR MTD ON TYPE III ARRICADE TRAVEL LANE PEDESTRIAN YPASS TYPE II WORK AREA ENCLOSED W/CONSTRUCTION FENCING TRAVEL LANE EXIST CROSSWALKS TRAVEL LANE EXISTING SIDEWALK R9-11aL MTD ON TYPE III ARRICADE R9-9, M4-9bSL EXISTING SIDEWALK PEDESTRIAN PATH (5' MIN WIDTH) PEDESTRIAN CHANNELIZATION DEVICE (TYP) SEE TYPICAL TWO-WAY STREET LANE SHIFT DETAIL ON SHEET 3 EXISTING SIDEWALK PEDESTRIAN CHANNELIZATION DEVICE (TYP) EXIST WCR (TYP) 2-4" WIDE CONTRAST EDGE MARKING YELLOW NON-SLIP PROTECTION (TYP) GRANITE CUR 6" REVEAL (TYP) CLEAR SPACE GRANITE CUR 6" REVEAL (TYP) TEMPORARY CUR RAMP-PARALLEL TO CUR 2" MIN. PROTECTIVE EDGING 2" MIN HEIGHT 12" MIN 12" MIN 1" 1" TEMPORARY CUR RAMP-PERPENDICULAR TO CUR TEMPORARY CUR RAMPS SCALE: NTS JOINT/GAP TREATMENT DETECTALE WARNING PANEL JOINT/GAP TREATMENT YELLOW NON-SLIP PROTECTION (TYP) 60"x60" MIN TURNING AREA PROTECTIVE EDGING 2" MIN HEIGHT 2.0% SLOPE MAX DETECTALE EDGING 6" MIN HEIGHT DETECTALE WARNING PANEL 2-4" WIDE CONTRAST EDGE MARKING NOTES: 1. CUR RAMPS SHALL E 60" MINIMUM WIDTH WITH A FIRM, STALE AND NON-SLIP SURFACE. 2. PROTECTIVE EDGING WITH A 2" MINIMUM HEIGHT SHALL E INSTALLED WHEN THE CUR RAMP OR LANDING PLATFORM HAS A VERTICAL DROP OF 6" OR GREATER OR HAS A SIDE APRON SLOPE STEEPER THAN 1:3 (33%). PROTECTIVE EDGING SHOULD E CONSIDERED WHEN THE CUR RAMPS OR LANDING PLATFORMS HAVE A VERTICAL DROP OF 3" OR MORE. 3. DETECTALE EDGING WITH 6" MINIMUM HEIGHT AND CONTRASTING COLOR SHALL E INSTALLED ON ALL CUR RAMP LANDINGS WHERE THE WALKWAY CHANGES DIRECTION (TURNS). 4. THE CUR RAMP WALKWAY AND LANDING AREA SURFACE SHALL E OF A SOLID CONTINUOUS CONTRASTING COLOR AUTTING UP TO THE EXISTING SIDEWALK. 5. CUR RAMPS AND LANDINGS SHOULD HAVE A 1:50 (2%) MAX CROSS-SLOPE. 6. CLEAR SPACE OF 48"x48" MINIMUM SHALL E PROVIDED AOVE AND ELOW THE CUR RAMP. 7. WATER FLOW IN THE GUTTER SYSTEM SHALL HAVE MINIMAL RESTRICTION. 8. LATERAL JOINTS OR GAPS ETWEEN SURFACES SHALL E LESS THAN 0.5" WIDTH. 9. CHANGES ETWEEN SURFACE HEIGHTS SHOULD NOT EXCEED 0.5" LATERAL EDGES SHOULD E VERTICAL UP TO 0.25" HIGH, AND EVELED AT 1:2 ETWEEN 0.25" AND 0.5" HEIGHT. 10. IF A TEMPORARY PEDESTRIAN RAMP LEADS TO A CROSSWALK, THEN A DETECTALE WARNING PAD MUST E ADHERED TO THE ASE OF THE RAMP. IF IT LEADS TO A PROTECTED PEDESTRIAN YPASS THAT DOES NOT CONFLICT WITH VEHICULAR TRAFFIC, THEN A PAD SHALL NOT E INSTALLED ON THE RAMP. 11. TEMPORARY CUR RAMP SHALL E PAID FOR UNDER ITEM TEMPORARY PEDESTRIAN MANAGEMENT GUIDANCE SYSTEM. PEDESTRIAN YPASS DETAIL SCALE: NTS REFLECTORIZED 5' O.C. TYPE III ARRICADE W/ R11-2 SIGN (TYP) TYPE III ARRICADE W/ R11-2 & M4-10R/L SIGNS (TYP) R3-1 D C A W20-2c VARIES R3-1 TYPE III ARRICADE W/ R11-3a & M4-10R/L SIGNS (TYP) D C A W20-2c REFLECTORIZED 5' O.C. W20-3c REFLECTORIZED 5' O.C. W20-3c W20-3c W20-3c A W20-2c C R3-2 D W20-2c W20-3c D C A W20-2c C R3-2 D W20-2c W20-3c D C A A NOTE: 1. REFER TO ADVANCE SIGN SPACING TALE ON SHEET 2. TYPICAL LOCAL ROAD CLOSURE SCALE: NTS NOTE: 1. REFER TO ADVANCE SIGN SPACING TALE ON SHEET 2. TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS SCALE: NTS

5 EACHAM ST W TAPER CALCULATIONS EACHAM ST E MARKET ST S W = 22' TAPER CALCULATIONS S = 30 MPH S = 30 MPH 2 L = L/2 = 55' MIN TAPER CALCULATIONS L/2 = 158' MIN L/2 = 165' MIN MARKET ST EACHAM ST EACHAM ST MA-W24-2(MOD) R4-7b W1-4R R4-7b 60' TAPER FOR LANE SHIFT L = WS 60 = 330' MARKET ST W = 21' S = 30 MPH MA-W24-2(MOD) W = 7' WS 60 = 105' 2 165' TAPER FOR LANE SHIFT W1-4L 160' TAPER FOR LANE SHIFT WS = 315' L = 60 2 MA-W24-2(MOD) W1-4L R4-7b R4-7b PROP CONES TRAFFIC FLOW ARROW (TYP) PROP REFLECTROIZED DRUMS PROP CONES 10' MIN PROP REFLECTORIZED CONES PROP WORKZONE (TYP) R4-7b 10' MIN 10' MIN 10' MIN 10' MIN SCALE: 1" = 30'

6 MAX MARKET 10' O.C (TYP) PROP WORKZONE (TYP) MAX EACHAM ST TRAFFIC FLOW ARROW (TYP) EACHAM 10' O.C (TYP) MARKET ST SCALE: 1" = 30'

7 MAPLE ST PROP WORKZONE (TYP) TRAFFIC FLOW ARROW (TYP) EACHAM ST R4-8b MAX TAPER ' SCALE: 1" = 20' W20 1

8 MAPLE ST TRAFFIC FLOW ARROW (TYP) PROP REFLECTORIZED CONES R4-7b PROP REFLECTORIZED DRUMS R4-7b 10' MIN EACHAM ST PROP TYPE III ARRICADE W/ W1-6L SIGN (TYP) PROP WORKZONE (TYP) SCALE: 1" = 20'

9 SEE INSET A W4-2R TRAFFIC FLOW ARROW (TYP) W4-2R W20-5cR PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) 165' TAPER FOR LANE CLOSURE SPRUCE ST SPRUCE ST S TAPER CALCULATIONS AUURN ST A (LT) W = 11' S = 30 MPH MAX 2 WS L = = 165' 60 PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) 2ND ST MAINTAIN EXIST CROSSWALK AT ALL TIMES NOTES: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. 2. CONTRACTOR TO COORDINATE WITH MTA REGARDING TEMPORARY RELOCATION OF EXIST US STOPS ON SPRUCE STREET AND COMMANDMANTS WAY DURING CONSTRUCTION. SUPP() FROM W4-2R W20-5cR SPRUCE ST SUPP() MAX COMMANDMENTS WAY SEE NOTE SCALE: 1" = 30' PROP PEDESTRIAN DETOUR ROUTE (TYP) INSET A SCALE: 1"=30'

10 ET SEE INSET A W4-2R W4-2R REET W20-5cR 165' TAPER FOR LANE CLOSURE SPRUCE STREET SPRUCE ST REET A (LT) PROP PEDESTRIAN DETOUR ROUTE (TYP) PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) 2ND ST SPRUCE STREET PROP REFLECTORIZED DRUMS MAX NOTES: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. 2. CONTRACTOR TO COORDINATE WITH MTA REGARDING TEMPORARY RELOCATION OF EXIST US STOPS ON SPRUCE STREET AND COMMANDMANTS WAY DURING CONSTRUCTION. SUPP() SECOND STREET FROM W4-2R W20-5cR SPRUCE STR INSET A SCALE: 1"=30' SPRUCE ST SUPP() COMMANDANTS WAY MAX COMMANDMENTS WAY SEE NOTE 2 PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) SCALE: 1" = 30' TRAFFIC FLOW ARROW (TYP) REET

11 (ONE-WAY) SCHOOL ST SEE INSET A TO W4-2R S TAPER CALCULATIONS W = 10' S = 30 MPH 2 WS L = = 1 MIN 60 R7-1L SUPP(C) CHESTNUT ST CHESTNUT ST SUPP(A) SUPP(A) CHERRY ST (ONE-WAY) PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) MAX A (LEFT) RESTRICT PARKING R7-1R PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) MAINTAIN EXIST CROSSWALK AT ALL TIMES 1 TAPER FOR LANE CLOSURE PARK ST 11' MIN MAX PEDESTRIAN DETOUR ROUTE (TYP) PEMROKE ST (ONE-WAY) SUPP(C) FROM W20-5cR W4-2R INSET A SCALE: 1"=30' 2ND ST SUPP(C) EACON ST SUPP(C) SUPP(C) SUPP(C) TREMONT ST NOTE: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. INSET SCALE: 1"=40' SEE INSET SCALE: 1" = 30'

12 SEE INSET A TO W4-2R S TAPER CALCULATIONS W = 10' S = 30 MPH 2 WS L = = 1 MIN 60 R7-1L SUPP(C) CHESTNUT ST CHERRY ST (ONE-WAY) A (LEFT) 1 TAPER FOR LANE CLOSURE RESTRICT PARKING R7-1R PARK ST PEDESTRIAN DETOUR ROUTE (TYP) PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) SCHOOL ST (ONE-WAY) WINNISIMMET ST SUPP(C) FROM W20-5cR W4-2R 2ND ST 11' MIN MAX PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) MAX MAINTAIN EXIST CROSSWALK AT ALL TIMES PEMROKE ST (ONE-WAY) INSET A SCALE: 1"=30' CHESTNUT ST PROP TYPE III ARRICADE W/ R9-9(MOD) SIGN NOTE: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. TREMONT ST SCALE: 1" = 30'

13 MAX WINNISIMMET ST PROP REFLECTORIZED DRUMS PEMROKE ST (ONE-WAY) SCHOOL ST (ONE-WAY) PARK ST MAX TREMONT ST CHESTNUT ST CHERRY ST (ONE-WAY) MAINTAIN EXIST CW AT ALL TIMES SCALE: 1" = 30' NOTE: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. CHESTNUT ST

14 HAWTHORNE ST 60' MARGINAL ST PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) PROP WORKZONE (TYP) PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) PROP PEDESTRIAN DETOUR ROUTE (TYP) MAX TAPER WINNISIMMET ST DIVISION ST ONE-WAY TRAFFIC FLOW ARROW (TYP) 80' TAPER SCALE: 1" = 30' NOTE: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. WINNISIMMET ST 110' 40' SCHOOL ST PEMROKE ST

15 HAWTHORNE ST MAX TAPER PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) DIVISION ST MARGINAL ST ONE-WAY PROP WORKZONE (TYP) PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) MAX TAPER PROP PEDESTRIAN DETOUR ROUTE (TYP) TRAFFIC FLOW ARROW (TYP) SCALE: 1" = 30' NOTE: 1. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. WINNISIMMET ST WINNISIMMET ST PEMROKE ST T

16 SUFFOLK ST CHARLES ST HIGHLAND ST MARGINAL ST TRAFFIC FLOW ARROW (TYP) MAINTAIN ACCESS AT ALL TIMES PROP REFLECTORIZED DRUMS 60' TAPER PROP WORKZONE (TYP) MAX TAPER (LOCATED FROM MARGINAL ST) (LOCATED FROM CHARLES ST) SCALE: 1" = 30'

17 SUFFOLK ST CHARLES ST HIGHLAND ST MARGINAL ST TRAFFIC FLOW ARROW (TYP) MAINTAIN ACCESS AT ALL TIMES PROP REFLECTORIZED DRUMS PROP WORKZONE (TYP) MAX TAPER 15' TAPER (LOCATED FROM CHARLES ST) MAINTAIN ACCESS AT ALL TIMES MAINTAIN ACCESS AT ALL TIMES SCALE: 1" = 30'

18 MTA COMMUTER RAIL M4-9AL CARTER ST SUPP(A) M3-4 SUPP(A) M3-4 SUPP(A) M3-2 E LOCUST ST 2ND ST M4-9AR SPRUCE ST 2ND ST AUURN ST RILEY WAY MAPLE ST SEE NOTE 2 M4-8a MARKET ST PROP WORKZONE SEE NOTE 3 CLOSE AND DETOUR REET (SEE NOTE 2) EACHAM ST M4-8a CLOSE AND DETOUR REET JUSTIN DR LEGEND REET EASTOUND DETOUR FLOW ARROW REET WESTOUND DETOUR FLOW ARROW WORK AREA (PULIC ACCESS RESTRICTED) COMMANDMENTS WAY NOTES: 1. REFER TO TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 2. REFER TO TYPICAL LOCAL ROAD CLOSURE DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 3. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. CAPTAINS ROW LOCAL ACCESS ONLY

19 WALNUT ST SUPP(A) M3-2 SUPP(A) M3-2 M4-8a SPRUCE ST M4-9AR CLOSE AND DETOUR REET M4-9AL 2ND ST AUURN ST 4TH ST EVERETT AVE MULERRY ST ARLINGTON ST TRAFFIC FLOW ARROW (TYP) ARLINGTON ST NORTHEAST EXPY (ROUTE 1) [AOVE] M4-9AR CHESTNUT ST 3RD ST EVERETT AVE PARK ST SEE NOTE 2 SEE NOTE 3 SEE NOTE 3 PINE ST PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) CHESTNUT ST CHERRY ST PROP PEDESTRIAN DETOUR ROUTE (TYP) 4TH ST M4-8a SEE NOTE 2 PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) SUPP(A) M3-4 SCHOOL ST TREMONT ST HAWTHORNE ST WINNISIMMET ST PARK ST DIVISION ST PEMROKE ST SHURTLEFF ST SUPP(A) M3-4 M4-9SR SEE NOTE 3 CLOSE AND DETOUR WILLIAMS STREET HAWTHORNE ST CENTRAL AVE CONGRESS AVE SHURTLEFF ST ESSEX ST MAVERICK ST SHAWMUT ST NOTES: 1. REFER TO TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 2. REFER TO TYPICAL LOCAL ROAD CLOSURE DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 3. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. LEGEND MARGINAL ST REET EASTOUND DETOUR FLOW ARROW REET WESTOUND DETOUR FLOW ARROW WORK AREA (PULIC ACCESS RESTRICTED) LOCAL ACCESS ONLY

20 EVERETT AVE WALNUT ST CHESTNUT ST CHERRY ST DIVISION ST M4-9SR PARK ST CENTRAL AVE SHURTLEFF ST CONGRESS AVE ESSEX ST LYNN ST SUFFOLK ST 2ND ST NORTHEAST EXPY (ROUTE 1) 3RD ST 2ND ST CONGRESS AVE M4-9SR HAWTHORNE ST ESSEX ST M4-9AL SHURTLEFF ST M4-8a SUFFOLK ST M4-9bV MARGINAL ST SHAWMUT ST PROP PEDESTRIAN DETOUR ROUTE (TYP) PROP TYPE III ARRICADE W/ R9-11R SIGN (TYP) LEGEND ARLINGTON ST CHESTNUT ST CHERRY ST M4-8a PARK ST SCHOOL ST WINNISIMMET ST DIVISION ST SEE NOTE 2 SEE NOTE 3 SEE NOTE 2 PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) CLOSE AND DETOUR REET PROP TYPE III ARRICADE W/ R9-9 SIGN (TYP) NOTES: 1. REFER TO TYPICAL LOCAL ROAD CLOSURE WITH LOCAL ACCESS DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 2. REFER TO TYPICAL LOCAL ROAD CLOSURE DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 3. EXIST TRAFFIC SIGNAL TO OPERATE IN FLASHING MODE UNDER POLICE CONTROL FOR THE DURATION OF THIS SETUP. REET EASTOUND DETOUR FLOW ARROW REET WESTOUND DETOUR FLOW ARROW WORK AREA (PULIC ACCESS RESTRICTED) LOCAL ACCESS ONLY CLOSE AND DETOUR REET

21 HIGHLAND ST M4-8a NOTE: CONGRESS AVE M4-9SR M4-8a CLOSE AND DETOUR MARGINAL STREET CLOSE AND DETOUR MARGINAL STREET CENTRAL AVE MAVERICK ST ESSEX ST LYNN ST SUFFOLK ST SHAWMUT ST CHARLES ST DIVISION ST M4-9SR PARK ST ACCESS DETAIL ON SHEET 4 FOR ADDITIONAL INFORMATION. 1. REFER TO TYPICAL LOCAL ROAD CLOSURE WITH LOCAL 2. REFER TO TYPICAL LOCAL ROAD CLOSURE DETAIL ON SHEET 4. CONGRESS AVE ESSEX ST HAWTHORNE ST SUFFOLK ST SHURTLEFF ST MARGINAL ST PROP TYPE III ARRICADE W/ R9-11aL SIGN (TYP) PROP PEDESTRIAN DETOUR ROUTE (TYP) SEE NOTE 2 SEE NOTE 2 PROP TYPE III ARRICADE W/ R9-11aR SIGN (TYP) M4-9AL M4-9AR WINNISIMMET ST DIVISION ST LEGEND MARGINAL STREET EASTOUND DETOUR FLOW ARROW MARGINAL STREET WESTOUND DETOUR FLOW ARROW WORK AREA (PULIC ACCESS RESTRICTED) LOCAL ACCESS ONLY

22 TEMPORARY TRAFFIC CONTROL SIGN SUMMARY TEMPORARY TRAFFIC CONTROL SIGN SUMMARY 48" 36" 36" 48" WORK ZONE SPEEDING FINES DOULED END ROAD WORK DOULE FINES END AS PER MASSDOT STANDARD --- WHITE --- WHITE LACK LACK LACK LACK W4-2R 36" 36" W5-1 36" 36" SEE FHWA "STANDARD HIGHWAY SIGNS, 2004 EDITION"; AS AMENDED LACK LACK LACK LACK SEE FHWA "STANDARD R3-1 30" 30" HIGHWAY SIGNS, WHITE RED/ LACK 2004 EDITION"; AS AMENDED LACK 36" 36" LACK LACK R3-2 30" 30" WHITE RED/ LACK LACK W20-2c 36" 36" LACK LACK R4-7b 24" 30" WHITE LACK LACK W20-3c 36" 36" LACK LACK R4-8b 24" 30" WHITE LACK LACK 36" 36" LACK LACK R7-1L 12" 18" WHITE RED RED W20-5cR 36" 36" LACK LACK R7-1R 12" 18" WHITE RED RED 36" 36" AS PER MASSDOT STANDARD LACK LACK SIDEWALK R9-9 30" 18" WHITE LACK LACK CLOSED 36" 36" LACK LACK CROSSWALK R9-9(MOD) 30" 18" WHITE LACK LACK CLOSED SEE FHWA "STANDARD M3-2 24" 12" HIGHWAY SIGNS, WHITE LACK LACK 2004 EDITION"; AS AMENDED R9-11aL 24" 12" WHITE LACK LACK M3-4 24" 12" WHITE LACK LACK R9-11aR 24" 12" WHITE LACK LACK M4-8a 24" 18" LACK LACK R9-11R 24" 12" WHITE LACK LACK M4-9AL 30" 24" LACK LACK R " 30" WHITE LACK LACK M4-9AR 30" 24" LACK LACK R11-3a 60" 30" WHITE LACK LACK 30" 24" LACK LACK W1-4L 36" 36" LACK LACK 30" 24" LACK LACK W1-4R 36" 36" LACK LACK M4-9SR 30" 24" LACK LACK W1-6L 48" 24" LACK LACK NOTES: 1. HIGH INTENSITY REFLECTIVE SHEETING SHALL E USED FOR ALL SIGNS. SEE FHWA "STANDARD HIGHWAY SIGNS, 2004 EDITION" FOR TEXT DIMENSIONS, AS AMENDED; THE 1977 MASSHIGHWAY DEPARTMENT CONSTRUCTION AND TRAFFIC STANDARD DETAILS, AS AMENDED, FOR SIGNS AND SUPPORTS; THE MASSHIGHWAY DEPARTMENT SIGN LISTINGS 1993 EDITION, AS AMENDED; AND THE 2017 MASSDOT STANDARD SIGNS OOK, AS AMENDED. 2. ALL SIGNS SHOWN GRAPHICALLY FOR INFORMATION ONLY. SIGN VENDOR SHALL FARICATE ALL SIGNS IN ACCORDANCE WITH THE APPLICALE STANDARDS.

23 TEMPORARY TRAFFIC CONTROL SIGN SUMMARY (CONTINUED) 30" 24" SEE FHWA "STANDARD HIGHWAY SIGNS, 2004 EDITION"; AS AMENDED LACK LACK 30" 24" LACK LACK 30" 24" LACK LACK M4-9bSL 30" 24" LACK LACK M4-9bSR 30" 24" LACK LACK M4-9bV 30" 24" LACK LACK M4-10L 48" 18" LACK M4-10R 48" 18" LACK SUPP(A) VARIES 12" LACK LACK SUPP() VARIES 12" SPRUCE ST LACK LACK SUPP(C) VARIES 12" LACK LACK NOTES: 1. HIGH INTENSITY REFLECTIVE SHEETING SHALL E USED FOR ALL SIGNS. SEE FHWA "STANDARD HIGHWAY SIGNS, 2004 EDITION" FOR TEXT DIMENSIONS, AS AMENDED; THE 1977 MASSHIGHWAY DEPARTMENT CONSTRUCTION AND TRAFFIC STANDARD DETAILS, AS AMENDED, FOR SIGNS AND SUPPORTS; THE MASSHIGHWAY DEPARTMENT SIGN LISTINGS 1993 EDITION, AS AMENDED; AND THE 2017 MASSDOT STANDARD SIGNS OOK, AS AMENDED. 2. ALL SIGNS SHOWN GRAPHICALLY FOR INFORMATION ONLY. SIGN VENDOR SHALL FARICATE ALL SIGNS IN ACCORDANCE WITH THE APPLICALE STANDARDS.

SOUTH MAIN STREET ROUTE 28

SOUTH MAIN STREET ROUTE 28 PLOTTED 10/0/016 10:4:46 AM \\vhb\proj\worcester\1148.00\cad\ts\planmisc\aerial Crossing\Aerial Crossing Plan View.dwg 1 0 NO REVISIONS AND RECORD OF ISSUE HORIZ. SCALE VERT. SCALE ROUTE 8 ENGINEER CHECKED

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS

MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS MANUAL OF TEMPORARY TRAFFIC CONTROL ON CITY STREETS PUBLIC WORKS DEPARTMENT 2015 REVISION 1-2016 REVISION SUMMARY - MARCH 2016 Introduction 1.05 - Specifications for Traffic Control Devices Temporary Traffic

More information

TRAFFIC CONTROL DEVICES

TRAFFIC CONTROL DEVICES TRAFFIC CONTROL DEVICES SIGNS Temporary traffic control work zone signs include regulatory, warning and guide signs utilized to provide regulations, warnings and guidance information to road users impacted

More information

Including Revision 1 dated May 2012 and Revision 2 dated May 2012

Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Including Revision 1 dated May 2012 and Revision 2 dated May 2012 Page 634 2009 Edition Notes for Figure 6H-1 Typical pplication 1 Work eyond the Shoulder 1. If the work space is in the median of a divided

More information

Temporary Traffic Control for Highway Work Zones

Temporary Traffic Control for Highway Work Zones Temporary Traffic Control for Highway Work Zones MONTHLY DELMARVA MISS UTILITY MEMBER MEETING MARCH 20, 2014 PRESENTED BY: Adam Weiser, P.E. PTOE Safety Programs Manager Delaware Department of Transportation

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS 2006 Edition Page 6H-1 CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: Whenever the acronym TTC is used in this Chapter, it refers to temporary traffic control. Standard: The

More information

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE

REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Development Engineering 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 Engineering Services Division REVOCABLE PERMIT FOR STREET BANNER APPLICATION PACKAGE Phone: 916-808-8300 Fax: 916-808-1984 Preparation

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

Field guide for Accessible Public Rights-of-Way Edition

Field guide for Accessible Public Rights-of-Way Edition Field guide for Accessible Public Rights-of-Way 2017 Edition CONTENTS PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY Pedestrian access routes 3 Components 3 Continuous width 3 Median and pedestrian refuge

More information

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG

NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS CURB DETAILS DATE: MARCH 2013 FILE NAME: CURB.DWG NOT TO SCALE PUBLIC WORKS STANDARD DETAILS SIDEWALK RAMPS DATE: MARCH 2013 FILE NAME: SIDEWALK RAMPS.DWG NOT

More information

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS 'HYHORSPHQW (QJLQHHULQJ 5LFKDUGV %OYG UG )ORRU 6DFUDPHQWR &$ Phone: 916-808-8300 Fax: 916-808-1984 (QJLQHHULQJ 6HUYLFHV 'LYLVLRQ CONSTRUCTION ENCROACHMENT PERMIT APPLICATION AND PROCESSING INSTRUCTIONS

More information

ROUNDABOUTS/TRAFFIC CIRCLES

ROUNDABOUTS/TRAFFIC CIRCLES GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal

More information

Appendix Work Zone Traffic Control

Appendix Work Zone Traffic Control ppendix Work Zone Traffic Control The purpose of this appendix is to present basic guidelines for work zone traffic control and to supplement the Highway Work Zone Safety Checklist. This appendix presents

More information

Driveway Design Criteria

Driveway Design Criteria Design Manual Chapter 5 - Roadway Design 5L - Access Management 5L-4 Driveway Design Criteria A. General For efficient and safe operations, access drives and minor public street intersections can be improved

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG)

Standards vs. Guidelines. Public Right-of Way Accessibility Guidelines (PROWAG) www.access-board.gov Public Right-of Way Accessibility Guidelines (PROWAG) Juliet Shoultz, P.E Transportation Systems Engineer US Access Board Standards vs. Guidelines Guidelines are developed by the Access

More information

CHAPTER 6H. TYPICAL APPLICATIONS

CHAPTER 6H. TYPICAL APPLICATIONS Section 6H.01 Typical Applications Support: CHAPTER 6H. TYPICAL APPLICATIONS Chapter 6G contains discussions of typical temporary traffic control activities. Chapter 6H presents typical applications for

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES

WORK ZONE TRAFFIC CONTROL PROCEDURES WORK ZONE SETUP / REMOVAL WORK ZONE TRAFFIC CONTROL PROCEDURES When installing a work zone, install the advance warning signs on all approaches prior to installing the traffic control devices. Perform

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

CHAPTER 1 STANDARD PRACTICES

CHAPTER 1 STANDARD PRACTICES CHAPTER 1 STANDARD PRACTICES OBJECTIVES 1) Functions and Limitations 2) Standardization of Application 3) Materials 4) Colors 5) Widths and Patterns of Longitudinal Pavement Marking Lines 6) General Principles

More information

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope

Design Overview. Section 4 Standard Plans for Design. Pedestrian Access Routes. Pedestrian Access Routes. Overview. Cross Slope Design Overview Section 4 Standard Plans for Design Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Design Basics Recommendations: The Zone System Driveway Crossings Pedestrian

More information

Edison Electric Institute. Work Zone Safety October 4-7, 2009

Edison Electric Institute. Work Zone Safety October 4-7, 2009 Edison Electric Institute Work Zone Safety October 4-7, 2009 1 Your Presenter Mike Kelly Fire Department Battalion Chief (Retired 7/05) Member NCUTCD (Chapter 6) Director/Owner of START Group Consultant

More information

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE

Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE ADA Ramp Construction Department of Public Works Office of Disability Affairs February 23, 2017 Presented by Mark Zwoyer, PE Agenda Opening Statements/Welcome PROWAG, ADAAG, INDOT and DPW Standards Inspector

More information

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview

ADA Design Overview. Section 2. ADA Design Overview. Pedestrian Access Routes. Pedestrian Access Routes. Overview ADA Design Overview Section 2 ADA Design Overview Overview Accessible Pedestrian Signals Alternate Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group 2 Pedestrian Access Route (PAR)

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices

Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 Proposed Language as approved by the NCUTCD on June 23, 2011, for new section on Pedestrian Channelizing

More information

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE A.1 STANDARD Measures shall be taken to accommodate pedestrian traffic through and/or around Work Zones for Construction

More information

Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance

Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance Virginia Department of Transporta on Work Zone Pedestrian and Bicycle Guidance May 1, 2016 Table of Contents Page Preface...ii 1. Introduction...1 ADA Requirements...1 Special Pedestrian Populations...2

More information

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE

STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE STREET and UTILITY REPAIRS WORK AREA PROTECTION GUIDE May 2006 Street and Utility Repairs Work Area Protection Guide TABLE OF CONTENTS 1. Introduction... 1 2. Typical Applications... 11 2.1 Use of Hand-Signaling

More information

California Manual on Uniform Traffic Control Devices

California Manual on Uniform Traffic Control Devices California Manual on Uniform Traffic Control Devices FHWA s MUTCD 2009 Edition as amended for use in California 2012 Edition State of California Business, Transportation and Housing Agency Department of

More information

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS

City of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable

More information

Americans with Disabilities Act and Curb Ramps

Americans with Disabilities Act and Curb Ramps Americans with Disabilities Act and Curb Ramps Katherine Smutzer Standards Engineer, INDOT Purdue Road School Wednesday March 9, 2016 Two Items to Remember All curb ramps, sidewalks and sidewalk driveway

More information

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space

DEFINITIONS Activity Area - Advance Warning Area Advance Warning Sign Spacing Advisory Speed Approach Sight Distance Attended Work Space DEFINITIONS Activity Area - that part of a TTC zone activity area where the work actually takes place. It consists of the work space, traffic space and one or more buffer spaces. Advance Warning Area -

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

TRAFFIC CONTROL HANDBOOK

TRAFFIC CONTROL HANDBOOK TRAFFIC CONTROL HANDBOOK MUST MAINTAIN PEDESTRIAN AND DISABILITY ACCESS AT ALL TIMES City of Tacoma Department of Public Works Last updated: 10/21/09 TABLE OF CONTENTS INTRODUCTION (READ FIRST) Traffic

More information

Chapter 17. Work Zone Management. 17 Work Zone Management

Chapter 17. Work Zone Management. 17 Work Zone Management Chapter 17 Work Zone Management 17 Work Zone Management Chapter 17 Work Zone Management 17.1 Introduction Construction always has some impact on the users of the facility. The various activities required

More information

Appendix C. Bicycle Route Signage

Appendix C. Bicycle Route Signage Appendix C Bicycle Route Signage This page intentionally left blank. APPENDIX C - BICYCLE ROUTE AND WAYFINDING SIGNAGE Bicycle route signs are wayfinding signs that guide bicyclists along preferred, designated

More information

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices

PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices INTRODUCTION: PROWAG/ADAAG Standards Guidance For Temporary Pedestrian Access Route (TPAR) Facilities and Devices Minnesota Department of Transportation DRAFT Document DRAFT This document was developed

More information

12A Accessible Sidewalk Requirements

12A Accessible Sidewalk Requirements TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT

CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT CROSSING GUARD PLACEMENT CONSIDERATIONS AND GAP ASSESSMENT Many factors contribute to the need for a Crossing Guard. General federal guidance, provided by the FHWA MUTCD, states that adult crossing guards

More information

Fundamentals of Traffic Control Devices

Fundamentals of Traffic Control Devices Fundamentals of Traffic Control Devices Traffic Engineering & Operations October 8, 2014 Raj Ponnaluri, Angela Wilhelm, and Christopher Lewis Agenda Agenda Signs Pavement Markings Signals Traffic Operations

More information

FREEWAY AND SERVICE ROAD CONNECTIONS

FREEWAY AND SERVICE ROAD CONNECTIONS EDGE LINE WHITE STOP BAR SERVICE ROAD EDGE LINE DOTTED LINE (5 MARK, 20 GAP) EDGE LINE 4" WHITE BROKEN LINE 12" WHITE DOTTED LINE (5 MARK, 20 GAP) LINE LINE EDGE LINE 300 SERVICE ROAD 1/2 X (500 MAX) CHANNELIZING

More information

Field guide for Accessible Public Rights-of-Way Edition

Field guide for Accessible Public Rights-of-Way Edition Field guide for Accessible Public Rights-of-Way 2015 Edition BRIEFING MEMO SUBJECT: Department of Justice/Department of Transportation Joint Technical Assistance on Title II of the Americans with Disabilities

More information

Traffic Control Inspection Checklist Segment:

Traffic Control Inspection Checklist Segment: Traffic Control Inspection Checklist Segment: Simon Contractors Simon Contractors Originator: Description Reviewed by: Initials Date Distribution: Traffic Quality Manager, Site Assistant Traffic Manager

More information

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park

Updated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

CONSTRUCTION SPECIFICATION

CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES CONTROL OF TRAFFIC C201 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C201 ISSUE: NO:1 October 2007 TABLE OF CONTENTS CLAUSE CONTENTS

More information

0 CITY OF SANTA ANA 0

0 CITY OF SANTA ANA 0 : A traffic control plan (Plan) is required whenever work is to be performed within the public right-of-way and is deemed necessary by the City of Santa Ana's (City) Traffic Engineer. Work cannot start

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Work Zone Safety A Look At Best Practices. AASHTO SCOTE June 6, 2016

Work Zone Safety A Look At Best Practices. AASHTO SCOTE June 6, 2016 Work Zone Safety A Look At Best Practices AASHTO SCOTE June 6, 2016 1 Work Zone Safety Innovations 2 Positive Protection Measures Pedestrian Accommodations Temporary Bicycle Facilities Work Area Lighting

More information

2018 AASHTO BIKE GUIDE

2018 AASHTO BIKE GUIDE 2018 AASHTO BIKE GUIDE Your presenters Jessica Fields, PE Denver Office Director Sagar Onta, PE, PTOE Denver Engineering Director 35 years of combined experience street design, transportation planning,

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD

Appendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that

More information

NO LATER THAN ONE WEEK BEFORE YOUR PROPOSED CLOSURE START DATE

NO LATER THAN ONE WEEK BEFORE YOUR PROPOSED CLOSURE START DATE Application for Temporary Street/Sidewalk Closure Permit Please submit approimately one week before proposed closure. Please Return To: City of Charlottesville Department of Neighborhood Development Services

More information

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION

MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION 2011 Edition Page I-1 MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES INTRODUCTION 01 Traffic control devices shall be defined as all signs, signals, markings, and other devices used to regulate, warn, or guide

More information

Pedestrian Accommodation in Work Zones:

Pedestrian Accommodation in Work Zones: Pedestrian Accommodation in Work Zones: A Field Guide February 2018 Work Zone Safety Consortium This material is based upon work supported by the Federal Highway Administration Grant Agreement DTFH61-13-H-00025

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

ADA & Public Rights of Way

ADA & Public Rights of Way ADA & Public Rights of Way Overview of Current and Up-coming Requirements FDOT Design Training Expo 2012 Orlando, FL Dean Perkins, RA - ADA Coordinator Florida Department of Transportation Office of Design,

More information

Who is Toole Design Group?

Who is Toole Design Group? 2018 AASHTO Bike Guide Status Update NCHRP 15 60 Amalia Leighton Cody, PE, AICP & Kenneth Loen, PE Washington APWA October 4, 2018 Who is Toole Design Group? TDG is a full service engineering, planning

More information

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices

NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 NCUTCD Proposal for Changes to the Manual on Uniform Traffic Control Devices Attachment No. 2 Item No.: 15A.EC.01

More information

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS

TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS 1.0 INTRODUCTION 1.1 Purpose The Southern California Regional Rail Authority (SCRRA) is the designated track owner of the Metrolink

More information

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION

ATTACHMENT NO. 11. RRLRT No. 2. Railroad / Light Rail Transit Technical Committee TECHNICAL COMMITTEE: Busway Grade Crossings STATUS/DATE OF ACTION ATTACHMENT NO. 11 RRLRT No. 2 TECHNICAL COMMITTEE: TOPIC: Railroad / Light Rail Transit Technical Committee Busway Grade Crossings STATUS/DATE OF ACTION RRLRT TC Draft: 06/23/2011 RRLRT TC Approval: 06/27/2014

More information

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook?

2014 FHWA Aging Road User Handbook. Recommendations to Accommodate Aging Pedestrians. Lifesaver National Conference. What is the Handbook? 2014 FHWA Aging Road User Handbook Recommendations to Accommodate Aging Pedestrians Lifesaver National Conference March 17, 2015 Revised June 2014 1 What is the Handbook? 1998 1st Edition 2001 2nd Edition

More information

2009 Manual on Uniform Traffic Control Devices

2009 Manual on Uniform Traffic Control Devices 2009 Manual on Uniform Traffic Control Devices Tori Brinkly, PE Highway Safety Engineer WFL-FHWA April 20, 2010 Paragraphs are numbered. Standard Statements are bolded. Guidance statements are italicized.

More information

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018

REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL. Ginger Quinn & Paul Kelley April 11, 2018 REVISION 2 VIRGINIA WORK AREA PROTECTION MANUAL Ginger Quinn & Paul Kelley April 11, 2018 ADA & District Traffic Engineer Added in various sections Work Zone Pedestrian and Bicycle Guidance document VDOT

More information

SCOPE Application, Design, Operations,

SCOPE Application, Design, Operations, SCOPE Application, Design, Operations, Maintenance, etc.: Typical Traffic Control Signals Pedestrian Hybrid Beacons Emergency Vehicle One-Lane/Two-Way Facilities, Freeway Entrance Ramps, and Movable Bridges

More information

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL

GUIDELINES FOR EMERGENCY TRAFFIC CONTROL GUIDELINES FOR EMERGENCY TRAFFIC CONTROL TABLE OF Contents Page Introduction...1 Chapter 6I of the 2009 MUTCD...2 Reason for Control...6 Components of Incident Management Area...7 Traffic Control Devices

More information

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions

Designing Pedestrian Facilities for Accessibility. Module 3 Curb Ramps & Blended Transitions Module 3 & Other Purpose: Allow pedestrians to transition between the street and sidewalks, islands, etc. Typically installed at: Intersections (1 ramp at each end of each crosswalk) Mid-block crossings

More information

PART 6. TEMPORARY TRAFFIC CONTROL CHAPTER 6A. GENERAL

PART 6. TEMPORARY TRAFFIC CONTROL CHAPTER 6A. GENERAL 2012 Edition Page 623 Section 6A.01 General PART 6. TEMPORARY TRAFFIC CONTROL CHAPTER 6A. GENERAL 01 Whenever the acronym TTC is used in Part 6, it refers to temporary traffic control. 02 The needs and

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition- Revision 2 Page 813 CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS

PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS 2006 Edition Page TC9-1 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS SECTIONS CHAPTER 9A. Section 9A.01 Section 9A.02 Section 9A.03 Section 9A.04 Section 9A.05 Section 9A.06 Section

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

Section 9A.07 Meaning of Standard, Guidance, Option, and Support

Section 9A.07 Meaning of Standard, Guidance, Option, and Support 2012 Edition Page 895 PART 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES CHAPTER 9A. GENERAL Section 9A.01 Requirements for Bicyclist Traffic Control Devices 01 General information and definitions concerning

More information

12A Accessible Sidewalk Requirements. 12A Protruding Objects

12A Accessible Sidewalk Requirements. 12A Protruding Objects TOC Design Manual Chapter 12 - Sidewalks and Bicycle Facilities Table of Contents Table of Contents Chapter 12 - Sidewalks and Bicycle Facilities 12A Sidewalks 12A-1---------------------------------General

More information

TRAFFIC CONTROLS FOR BICYCLE FACILITIES

TRAFFIC CONTROLS FOR BICYCLE FACILITIES Part 9. TRAFFIC CONTROLS FOR BICYCLE FACILITIES TABLE OF CONTENTS Chapter 9A. GENERAL Page Section 9A.1 Requirements for Bicyclist Traffic Control Devices............................. 9A-1 9A.2 Scope.................................................................

More information

Application for Temporary Street/Sidewalk Closure Permit

Application for Temporary Street/Sidewalk Closure Permit Application for Temporary Street/Sidewalk Closure Permit Please Return To: City of Charlottesville Department of Neighborhood Development Services P.O. Bo 911, City Hall Charlottesville, VA 22902 Telephone

More information

CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations

CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations April 2015 Page 6D-1 CHAPTER 6D. PEDESTRIAN AND WORKER SAFETY Section 6D.01 Pedestrian Considerations 01 A wide range of pedestrians might be affected by TTC zones, including the young, elderly, and people

More information

Attachment No. 4 Approved by National Committee Council

Attachment No. 4 Approved by National Committee Council Attachment No. 4 Approved by National Committee Council The Signals Technical Committee distributed a technical committee recommendation to sponsors concerning pedestrian hybrid beacons following the January

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5081 Page 1 of 13 General Notes 5/15/2018 Page 1 of 1 Project No. 82 183-82 KA D 5081-01 0309-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way for

More information

General Notes. Project No /15/2018 Page 1 of 1

General Notes. Project No /15/2018 Page 1 of 1 5025 Page 1 of 10 General Notes 5/15/2018 Page 1 of 1 Project No. 82 18-18- 82 KA D 5025-01 0307-19 1 2 Note The contractor is responsible for establishing and maintaining centerline of the traveled way

More information

ADA PRESENTATION (CURB RAMPS)

ADA PRESENTATION (CURB RAMPS) ADA PRESENTATION (CURB RAMPS) ACECNJ/NJDOT/FHWA DESIGN SUMMIT Warren Howard New Jersey Department of Transportation May 21, 2013 ADA Curb Ramps NJDOT wants curb ramps to be designed & constructed properly

More information

Temporary Traffic Control Handbook

Temporary Traffic Control Handbook InTrans Project Reports Institute for Transportation 3-2016 Temporary Traffic Control Handbook Paul Wiegand Iowa State University, pwiegand@iastate.edu Beth Richards Iowa State University, brich@iastate.edu

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL SECTION 900 TRAFFIC CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 900 TRAFFIC CONTROL Section Number Title 901 GENERAL 902 MATERIALS, EQUIPMENT, AND

More information

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA

New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA New Trends In Temporary Traffic Control (TTC) Spring Occupational Safety & Health Committee Conference Philadelphia, PA Michael Kelly Work history - Fire service member of 30 years (retired at the rank

More information

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements

Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements 1836 Blake Street Denver, CO 80202 720.524.7831 ww.altaplanning.com MEMO 3 Task 4 Wayfinding Elements, Placement and Technical Guidance 4.1 Wayfinding Elements Based on field reconnaissance, best practices

More information

SECTION TRAFFIC REGULATIONS

SECTION TRAFFIC REGULATIONS SECTION 01550 TRAFFIC REGULATIONS PART 1 - GENERAL 1.01 OBJECTIVES A. The Contractor shall provide for safe movement of vehicular, bicycle and pedestrian traffic, including persons with disabilities in

More information

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise

Updated There is no park access roadway to be constructed points beyond the limit of along full limits of the park's the phase I work. Phase 1. Revise The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need

More information

Oregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR

Oregon Supplement to the Manual on Uniform Traffic Control Devices. Adopted July 2005 by OAR Oregon Supplement to the Manual on Uniform Traffic Control Devices Adopted July 2005 by OAR 734-020-0005 2003 Edition Oregon Supplement to the MUTCD Page 2 INTRODUCTION Traffic control devices installed

More information

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones

Designing Pedestrian Facilities for Accessibility. Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in Work Zones Designing Pedestrian Facilities for Accessibility Module 8 Maintenance of Pedestrian Facilities and Alternate Pedestrian Access Routes in s Maintenance of Accessible Features Title II (28 CFR 35.133(a))

More information

2018 AASHTO BIKE GUIDE

2018 AASHTO BIKE GUIDE 2018 AASHTO BIKE GUIDE Your presenter Rob Burchfield, PE NW Regional Engineering Director 35 years of experience in traffic engineering and bicycle facility design Toole Design Group Toole Design Group

More information

Work Area Traffic Control Policies and Procedures

Work Area Traffic Control Policies and Procedures Work Area Traffic Control Policies and Procedures August 2016 Traffic Operations 626 Linden Street P.O. Box 580 TABLE OF CONTENTS Introduction... 1 Applicability... 1 Goals... 1 Authority... 2 Planning...

More information

Accessible Sidewalk Requirements

Accessible Sidewalk Requirements Accessible Sidewalk Requirements A. Introduction 12A-2 Design Manual Chapter 12 - Sidewalks and Bicycle Facilities 12A - Sidewalks SUDAS and Iowa DOT jointly developed this section based on the July 26,

More information

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS

SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS SECTION 48 - TRAFFIC STRIPES AND PAVEMENT MARKINGS TABLE OF CONTENTS Section Page 48-1 GENERAL... 48.1 48-2 THERMOPLASTIC TRAFFIC STRIPES AND PAVEMENT MARKINGS... 48.1 48-3 PAINTED TRAFFIC STRIPES AND

More information

Designing Accessible Traffic Signals

Designing Accessible Traffic Signals Designing Accessible Traffic Signals Adam Allen, P.E., TSOS ADA Compliance Crackdown Draft Public Rights of Way Accessibility Guidelines (PROWAG) 2009 Manual on Uniform Traffic Control Devices (MUTCD)

More information

(This page left intentionally blank)

(This page left intentionally blank) (This page left intentionally blank) 2011 Edition - Revision 2 Page 569 Section 6A.01 General PART 6 TEMPORARY TRAFFIC CONTROL CHAPTER 6A. GENERAL 01 Whenever the acronym TTC is used in Part 6, it refers

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS

ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS DEPARTMENT OF ENVIRONMENTAL SERVICES ARLINGTON COUNTY PAVEMENT MARKING SPECIFICATIONS MAY 2017 Table of Contents 1. General... 2 2. Design Criteria... 3 3. Marking Plan Preparation... 4 Exhibits... 5 MK

More information