n/a n/a $2,000,000 n/a n/a $1,018,000 n/a n/a $1,000,000 $50,000,00 $18,500,00 n/a n/a $1,600,000 $15,000,00 $84,263,46 7 n/a n/a $2,000,000

Size: px
Start display at page:

Download "n/a n/a $2,000,000 n/a n/a $1,018,000 n/a n/a $1,000,000 $50,000,00 $18,500,00 n/a n/a $1,600,000 $15,000,00 $84,263,46 7 n/a n/a $2,000,000"

Transcription

1 x Advanced Systems Incident Inclement Weather Equipment and Supply Shortage Integrated Corridor Local Match for Future Federal/State/Other Funding and (only funding category divided equally by District) Continue to expand and upgrade the ATMS to include upgrading the Center (TMC) control room infrastructure, expansion of the fiber optic cable network and travel time monitoring system, IP/Ethernet network conversion and add vehicle infrastructure integration. Expand coverage and upgrade CCTV cameras and dynamic message boards $2,5, Salt storage barns, street sweeper, sprayer, storage tanks, tailgate spreaders, plow attachments, spreader, spreader hoppers, chippers, and other related equipment Provide cross network travel management for parallel corridors to include I-75, Cobb, I-575,, Canton, and Powers Ferry Required local match for Federal/State Grants and other funding sources Construction of sidewalks, trails, and other pedestrian and bike path improvements along roadways in the vicinity of schools, activity centers, multi-modal facilities (transit stops/ shelters, etc.) and other congested areas; includes pedestrian bridges where needed Construction of sidewalks and other pedestrian improvements along roadways in the vicinity of schools, activity centers, multi modal facilities (transit stops/shelters, etc.) and other congested areas; includes pedestrian bridges where needed Construction of sidewalks and other pedestrian improvements along roadways in the vicinity of schools, activity centers, multi modal facilities (transit stops/shelters, etc.) and other congested areas; includes pedestrian bridges where needed $1,18, $1,, $5,, $18,5, $1,6, Planning Studies Long and short term multimodal transportation studies $1,, - ainage - Traffic Signal Timing Traffic Signals Technology Various School Zone Throughout the County - (Tier (Tier - ainage (Tier Advanced Systems (Tier Incident (Tier Integrated Corridor (Tier Traffic Signal Timing (Tier Traffic Signals (Tier Technology (Tier (Tier (Tier $15,, Typical safety and operational intersection improvements or roundabout construction - Specific locations to be determined from future analysis Corridor safety and operational improvements - Specific locations to be determined from future analysis $6,, Repair and replacement of roadway drainage systems throughout the County $8,9, Milling, patching, leveling, resurfacing, and re-striping of various roadways throughout the County Upgrade or replace timing software, retime traffic signal corridors, optimize SCATS timing, implement County regional traffic operations program (RTOP), and upgrade and transfer operations of GDTO traffic signals Upgrade traffic signal infrastructure to include adding and upgrading uninterruptible power supply (UPS), adding flashing arrow LT displays, and rebuilding traffic signal supports Upgrade information systems to include Geographic Information Systems (GIS), Program/Project/Contract management system (ProjectView), and transportation management system (Cartegraph) $84,263,46 7 $1,5, $1,, Additional turn lane and school entrance improvements $4,, Milling, patching, leveling, resurfacing, and re-striping of various roadways throughout the County Construction of sidewalks and other pedestrian improvements along roadways in the vicinity of schools, activity centers, multi modal facilities (transit stops/shelters, etc.) and other congested areas; includes pedestrian bridges where needed $5,, $36,, Repair and replacement of roadway drainage systems throughout the City $4,, Continue to expand and upgrade the ATMS to include upgrading the Center (TMC) control room infrastructure, expansion of the fiber optic cable network and travel time monitoring system, IP/Ethernet network conversion and add vehicle Expand coverage and upgrade CCTV cameras and dynamic message boards $2,5, Provide cross network travel management for parallel corridors to include I-75, Cobb, I-575,, Canton, and Powers Ferry Upgrade or replace timing software, retime traffic signal corridors, optimize SCATS timing, implement County regional traffic operations program (RTOP), and upgrade and transfer operations of GDTO traffic signals Upgrade traffic signal infrastructure to include adding and upgrading uninterruptible power supply (UPS), adding flashing arrow LT displays, and rebuilding traffic signal supports Upgrade information systems to include Geographic Information Systems (GIS), Program/Project/Contract management system (ProjectView), and transportation management system (Cartegraph) $1,, $1,5, Typical safety and operational intersection improvements or roundabout construction - Specific locations to be determined from future analysis $4,, Corridor safety and operational improvements - Specific locations to be determined from future analysis $4,, Mobility Manager A consistent mobility manager Online Database Medicaid Paratransit Services Regional and Statewide HST Coordination Efforts Planning Studies (Tier Evaluate Sidewalk Network for ADA Compliance Modify Sidewalk Maintenance Plan to Recognize the Shorter Timeframe to Functional Obsolescence under ADA Online transportation options database Coordinate with Southeastrans to provide Medicaid paratransit services Remain up to date on regional and statewide HST coordination efforts Long and short term multimodal transportation studies $1,, Policy Recommendations Evaluate the sidewalk network for ADA compliance so that a detailed plan can be developed for balancing the expenditure of financial resources for maintenance, rehabilitation, and new facilities. Identify items such as broken sidewalk/ramps and uneven surface/joints which are the cause of functional obsolescence. CO-458 R-1 R-4 Conduct Study to Identify and Prioritize Sidewalk Projects Related to Transit-Oriented Development Implement Asset System to Track Condition of the Network Preliminary Safety Audit Create and fill the position of Complete Streets Coordinator with the County DOT Complete and adopt the Complete Streets Implementation Guidebook Modify development regulations to incorporate bike facilities Modify development regulations to include an in-lieu fee program Update County Design Standards for Biking Enact a program to use collected data on cyclist recreational/commut er routes to identify frequented shared roadways for improvement Detailed Safety Audit, Design, and of the Top Three to Five Focus Areas Study to identify 2-4 new Family Friendly Routes Complete East Marietta Family Friendly Route Complete South Mableton Family Friendly Route Study Feasibility of BRT Complete Corridor Update Complete Streets Policy Update the Bike and Plan Interstate North Realignment at Interstate North Cir Acworth Due West at Jim Owens/ Mars Hill Church s Roundabout Blackwell at Autumn Ridge R-5 Buckner R-6 Bullard R-7 R-8 R-1 Canton at Shallowford / Highland Terrace (southern intersection) Canton Corridor Concord at South Hurt / Windsor R-11 Cooper Lake R-14 R-17 R-18 R-2 R-22 Dallas Hwy (SR 12) at Lost Mountain /Mars Hill (SR 176) Gilmore at Atlanta /Cumberland Hicks at Concord Lost Mountain (SR 176) at Midway / Mirror Lake Campus Loop /Big Shanty / Bike & Bike & Bike & Bike & Bike & Bike & Bike & Bike & Bike & Conduct studies of transit corridors for the purposes of identifying gaps in sidewalk, safety deficiencies, lack of proper crossing elements, etc. to develop prioritized project list to be funded through local dollars Implementation of a GIS based asset management system is recommended to track and monitor sidewalks, ramps, crosswalks, pedestrian signal heads, push buttons, and signs, so that ongoing maintenance activity can be tracked on a system wide and facility specific basis. Perform a high level pedestrian safety audit of all transit corridors and high pedestrian use areas to Identify and assess areas of high pedestrian activity and/or pedestrian crash experience. This preliminary audit will identify basic needs and prioritize corridors for more detailed study/improvement. Create a county position to oversee design and implementation of complete streets and to encourage public participation in safe bike riding to build support for future projects Update the Trail in the Guidebook with the new trail map from this CTP; elevate the priority given to the trail map to the highest level which will make construction of trails on the map required as part of roadway reconstruction; the three Complete Street Focus Areas of KSU campus, SPSU campus/marietta, and Cumberland Mall/Braves complex should be added as prioritization criteria that would require any construction project within these areas to consider complete street facilities Modify regulations to include bicycle lockers, racks and showers with all new office development over 1, square feet. Also, modify regulations to include bicycle racks at all commercial retail over 5, square feet. Modify development regulations to implement a "fee in-lieu" policy that will require developments on parcels adjacent to proposed trails on the Cobb County Bike and Trail to include those sections of trail. The developer, architect and civil engineer would be responsible for the design and construction of the trail section. Alternatively, a fee may be paid by the developer in-lieu of construction. This fee is to be used on the design and construction of trails as needed. Modify Cobb County design guidelines to reference details in the Bike and Plan, and AASHTO, and NACTO guidelines for the design of bike and trail facilities; consider creating a minimum bike lane width of 5' for county roads instead of the generally accepted 4' for greater safety and rider comfort; encourage cities to adopt similar design guidelines Consider purchasing data from a third-party vendor to use in identifying recreational/commuter cycling routes; investigate these high traffic routes for deficiencies that are leading to unsafe conditions for bikers and motorists and enact a program to improve these shared roadways Provide a detailed safety study, conceptual and detailed design, and implementation of improvements for the top three to five focus areas identified in the preliminary pedestrian safety audit. Use guidelines in 21 and Plan to identify 2-4 new areas of high demand for bike and pedestrian traffic. Study alternatives for Family Friendly Routes using the 21 Plan's guidelines on LOS and signage and marking treatments. Complete the East Marietta Family Friendly Route described in the 21 and Plan. Complete the South Mableton Friendly Route described in the 21 and Plan. Conduct a feasibility study to determine costs and optimal routes for linear bike and ped system along Cobb Parkway, and for radial bike and ped system around BRT stations. Update Complete Streets Policy to give weight to Cobb County documents such as the Bike and Plan and the Complete Streets Implementation Guidebook Update the Cobb County Bike and Plan to survey the effectiveness of the current approach by reviewing the performance measures set forth in the original document and to develop new goals and projects Realign Interstate North and Cumberland (at Interstate North Cir) to connect Cumberland Blvd directly with Windy Ridge Parkway (via interstate North Circle). Includes improvements to Interstate North Circle between Cumberland Blvd and Windy Ridge. Allows for creation of a pedestrian corridor along Interstate North south of Windy Ridge. SB LT signal phasing to be adjusted at Interstate North and Windy Ridge to permissive-only. $4,, Construct roundabout to replace existing 4-legged all-way stop intersection, improve school entrance $2,3, Replace existing 4-legged all-way stop intersection, improve school entrance $65, including turn lanes at key intersections and sidewalks; possible roundabout at Pebblebrook. including turn lanes at key intersections and sidewalks Veterans Hwy Lost Mountain (SR 176) Oakdale $9,2, Villa Rica $2,5, Add NB RT lane to Canton $8, including turn lanes at key intersections and sidewalks Canton Conn Cherokee Co $5,, Realign South Hurt and Windsor to create 2 "T" intersections $75, including sidewalks Veterans Hwy Nickajack $3,6, Lengthen EB & WB LT lanes, reassign lanes on north leg, widen south leg and reassign lanes $5,8, improvements, turn lanes, and sidewalks $85, Construction of roundabout in lieu of adding turn lanes $1,2, Realign Midway to align with Mirror Lake, add LT and RT lanes $1,7, Improve connection to on Campus Loop to Big Shanty, possible connection under $2,5,

2 R-23 R-26 Old Canton at Holly Springs Hiram Lithia Springs at Hill R-28 Hurt R-29 R-3 Jim Owens (Lewis Elementary School) John Ward at Irwin (Cheatham Hill Elementary) R-34 New R-37 Old Hamilton /Casteel R-42 Shallowford R-43 Shiloh at Royal /Apartment R-45 Stilesboro R-119 R-121 R-128 R-227 R-228 R-273 Paces Ferry at Woodland Brook Six Flags at Hillcrest Macedonia at Hopkins Austell (SR 5) at Mulkey Austell at Hospital South Clay at Ewing /Sweetwater R-464 Walker, Phase 2 R-467 Dallas Hwy (SR 12) R-514 Factory Shoals at Six Flags R-518 Cumberland Blvd R-519 New Macland R-521 R-522 R-523 R-531 R-532 R-533 R-534 Circle 75 Realignment I-2 WB Exit at Six Flags I-2 WB Exit at Riverside Liberty Hill /Westerly at Canton Hartman at Factory Shoals Hartman at Riverside Troon Cir (All Entrance/Exit) at Riverside R-535 Factory Shoals R-537 R-538 R-539 R-3 R-486 R-516 R-536 ASP-CO-175B Riverside /Six Flags Six Flags at Riverside White at Factory Shoals Beech /West Side S Cobb (SR 28) at Fairground St (Air Force Plan 6/Lockheed) Post Oak Tritt at Hembree Phillips at Factory Shoals S Cobb (SR 28) CO-451 Spring Capacity CO-456 CO-297B Cumberland Blvd Big Shanty Phase IV Construct roundabout with bypass lane to replace existing 3-legged intersection $2,2, improvement; possible roundabout $1,5, including turn lanes at key intersections and sidewalks Springs Austell (SR 5) $9,5, Additional turn lane and school driveway improvements $1,, Construct a roundabout to replace existing 3-legged intersection. $1,, Corridor safety improvement in reverse curves near Corner $8,, including turn lanes at Oregon Park and key intersections, and sidewalks from Due West to Casteel Park $5,9, including turn lanes at key intersections and sidewalks Canton Blackwell $6,6, Signalize intersection, reassign lanes $4, including turn lanes at key intersections, sight distance enhancements and sidewalks Rosehedge Stilesboro Ln $6,, Construct roundabout to replace existing signalized 3-legged road $2,1, Roundabout. Existing traffic movements indicate possible need for traditional improvements or a roundabout. $1,, Construct roundabout to replace existing 4-legged all-way stop intersection $2,5, $75, at Austell (SR 5) and Hospital South consist of the addition of a RT lane and extension of the LT lane for Austell southbound. $75, Construct roundabout to replace existing signalized intersection $1,5, Corridor operational improvement, pedestrian safety improvements, and construction of second Mableton Town Square improvements including adding lanes, reassigning lanes, channelizing RT lanes, etc. John Ward Paulding Co $1,, $1,, improvements (new signal/upgrade pedestrian signals; add RT lane) $1,, operational improvements, turn lanes, sidewalks, turn lanes, sidewalks Akers Mill Macland (SR 36) Spring $5,5, Arapaho $2,5, improvements including adding lanes, reassigning lanes, channelizing RT lanes, etc. $4,, Signal upgrade and crosswalks or possible roundabout $5, Signal upgrade and crosswalks $5, Realign intersection for safety and operational improvements $3,, improvement $5, improvements. Increase turning radius. $5, improvements. Increase turning radius. $5, Improve so this road is suitable for truck traffic. Possible widen. Review vertical alignment for proper intersection sight distance and stopping sight distance Improve so this road is suitable for truck traffic. Widen to 5 lanes to match roadway east of start location. Six Flags Troon Cir/Phillip Douglas Co Douglas Co $6,, $5,, improvements $5, improvements. sight distance needs to be improved. and pedestrian improvements to Beech and West Side for improved access at Chattahoochee Tech. Sandtown S Cobb (SR 28) $3,, improvement $4,, improvements near Pope High School $2,2, improvements. Increase turning radius. $1,, Capacity Projects Capacity This project involves adding one general purpose lane in each direction along S Cobb (SR 28) Capacity Capacity Addition of an additional westbound through lane on Spring Road to accommodate need for an additional northbound LT lane on Cobb (US 41/SR at Spring Addition of an additional westbound through lane on Cumberland Blvd. This new lane further improves intersection operation and traffic signal efficiency. Restriping and elimination of existing split-phase traffic signal at Cumberland and Akers Mill /Stillhouse. This project involves adding one general purpose lane in each direction along Big Shanty CO-426 SR 12 (Roswell ) Capacity This project will widen Roswell (SR 12) from 4 to 6 lanes R-15 East-West Connector Capacity Widen to 6 lane divided; intersection improvement R-36 Old 41 Hwy Capacity Convert existing intersections to roundabouts or relocate White to align with Ave R-74 R-88 C.H. James (SR 6) Lake Acworth (SR 92) (CO- 31) Capacity Capacity Widen to 6 lane divided (truck friendly lanes) and safety and operational improvements; includes bridge replacements Cobb Cobb Akers Mill Meadows East Piedmont Camp Highland Ave Luke Glenn Garrett Jr. Hwy Cobb Atlanta (SR 5) $28,, Bell $3,, Cumberlan d Fulton Co $6,, $5,4, $63,, Fontaine $9,5, Stilesboro Douglas Co Cherokee St $4,3, $26,5, $3,, R-92 R-493 R-525 CO-367 R-9 R-229 ASP-CO-411 CO-457 related to managed lanes project Hickory Grove related to managed lanes project I-285 EB/WB Auxiliary Lanes Macland (SR 36) Windy Hill /Terrell Mill Connector South Barrett Reliever Phase 3 I-75 North at Third Army (Includes Connector from Cobb to I-75 North) I-285 at Cobb R-91 Circle 75 R-15 R-466 R-485 R-52 CO-459 PT-28 R-468 R-469 R-47 R-471 R-472 R-473 R-474 R-55 R-56 R-57 R-58 R-59 R-51 R-511 R-512 R-513 R-53 R-557 R-558 Cobb at Windy Hill I-75 Managed Lanes Exit Ramp at Akers Mill at I-2 EB and Riverside I-285 at Cobb I-285 and Transit Bridge Austell Transfer Center - Multi modal Macedonia at Noses Casteel at Sewell Little Willeo at Willeo Mars Hill (SR 176) at Allatoona Woodland Brook. at Vinings Branch Brookwood at Clay Branch Powers Ferry at Rottenwood Trib Camp Highland over Silver Comet Trail Candy Ln over Olley Elliott over Springs Flint Hill over Noses Tributary Greenfield over Sope Hurt over Nickajack James over Pine Little John Trl over Powers Lower Roswell over Sope Willeo over Willeo (Joint project with City of Roswell Piedmont over Little Noonday Wright over Mill Two Steel Bridges on Silver Comet Trail County Bridges/Box Culverts Capacity and capacity improvements (widening) related to managed lanes traffic Cobb Capacity Widen to 4 lanes Baker Capacity Capacity Additional lanes Widen from 2 to 4 lanes New 4-lane roadway parallel to I-75 New connection crossing I-75 and and and and and and and and Projects Cobb SR 12 (Marietta Hwy) in Paulding Co Windy Hill Greers Chapel New interchange on I-75 in the general vicinity of Third Army with a multi-lane connector to North Cobb at Dabbs Bridge Construction of an additional WB RT lane on the ramp and an additional NB receiving lane on Cobb to allow free-flow rightturns from this ramp to Circle 75. This new lane will be channelized to separate it from other NB lanes on Cobb. Includes overhead lane designation guide signs on the ramp to guide motorists onto the appropriate lanes on Cobb. I-575 Wade Green Paces Ferry SR 176 (New Macland /Lost Mtn ) in Cobb Co Terrell Mill Roberts Ct I-75 exit ramp improvements Grade separated interchange; or Reliever s; or typical intersection improvements Managed lane ramps to/from north on I-75 at Akers Mill $12,, $1,, $5,, $41,84,75 $2,, $18,, $6,, $3,, $12,5, $6,, $15,, Add RT lane, signal upgrade and crosswalks improvements Transit Projects $3,, Transit Addition of pedestrian/transit bridge over I-285 $9,, Transit Transit infrastructure to include transfer center in the vicinity of Austell (SR 5) and East-West Conn $8,, Bridge Projects Bridge Replace deficient bridge $1,5, Bridge Replace deficient bridge $1,5, Bridge Replace deficient bridge $1,3, Bridge Replace deficient bridge $1,7, Bridge Bridge replacement that can be culvert $5, Bridge Bridge replacement that can be culvert $55, Bridge Bridge replacement $1,3, Bridge Repair/rehabilitate deficient bridge $1, Bridge Repair/rehabilitate deficient bridge $15, Bridge Repair/rehabilitate deficient bridge $15, Bridge Repair/rehabilitate deficient bridge $5, Bridge Repair/rehabilitate deficient bridge $1, Bridge Repair/rehabilitate deficient bridge $15, Bridge Repair/rehabilitate deficient bridge $5, Bridge Repair/rehabilitate deficient bridge $5, Bridge Repair/rehabilitate deficient bridge $1, Bridge Replace deficient bridge $1,5, Bridge Repair/rehabilitate deficient bridge $1, Bridge Repair/rehabilitate deficient bridge $5, Bridge Paint removal and repainting with some structural steel replacements $2,7, Bridge Repair/rehabilitate deficient bridges and box culverts - Specific locations to be determined from future GDOT and County inspections $3,5, Multi-use Trail Project

3 M-71 Cheatham Hill Multiuse Trail ( Mountain National Battlefield Park Connector) Enhancements R-415 Six Flags Gateway Gateway Multi-use Trail Enhancement Enhancement Multi-use trail along Cheatham Hill Road providing access to Cheatham Hill and Kolb Farm battle sites, interpretive facilities and trailheads from Springs and SR 12/Dallas Highway $12,, Enhancements in the Six Flags Parkway Corridor with hardscaping, landscaping, monuments, and signage $1, Enhancements of Gateway Corridors at various locations with hardscaping, landscaping, monuments, and signage Table 2: Acworth Short-term Recommendations Misc. - Misc. Storm water - Misc. Paving - Local Match for Future Federal/State/Ot her Funding Downtown Parking & Misc. Paving - (Tier Misc. Storm water - (Tier Main St (Joint project with R-416 Lemon St R-417 Taylor Conn R-418 Academy St R-419 Dallas St R-42 Northside R-422 Winn St R-426 Main St R-54 Mitchell Hill R-541 Hillview R-542 Overlook R-543 Wexford Downs R-544 Kildare Ct R-545 Ridgecrest Ct R-546 Hickory Grove R-547 New McEver R-548 New McEver $75, $1,8, $3,38,827 Required local match for Federal/State Grants and other funding sources $1,, $1,5, $5,, $4,, operational roadway improvements Nance Nowlin $3,, Main St $1,, Taylor St Mitchell Hill $1,, Dixie Ave Dead End $1,, Dixie Ave (McCall Primary School) Old Cherokee Beach St $1,, McLain Cir N $1,225, Main St S Dead End $1,3, Enclave N City Limits $1,, $2,5, $1,75, $1,, $75, $5, $4, Old Cowan Baker Grove $1,, Main St Cantrell $2,5, Table 3: Austell Short-term Recommendations Cantrell Huddlestone Bridge Maintenance Equipment Public Works Facility Public Works Facility Information Technology Upgrades ainage System Striping Purchase of backhoe, grapple bucket truck $81,922 Roof repair/replacement $84,413 Upgrades to internal computer systems for financial management, budgeting, project tracking, asset management $168,826 Repair and replacement of roadway drainage systems throughout the City $193,39 $2,5, Milling, patching, leveling, resurfacing, and re-striping of various roadways throughout the city $1,113,486 Stripe (traffic and thermoplastic) striping of roadways through the City $211,32 Construction of sidewalks along roadways throughout the City $844,128 R-236 R-237 R-244 R-251 R-252 R-461 R-515 R-239 R-238 R-177 R-318 R-32 R-321 R-322 Table 3: Austell Short-term Recommendations Sign Replacement and Upgrades Replace and upgrade road signs throughout the City $126,619 Table 4: Short-term Recommendations Preservation and Stormwater infrastructure upgrades city wide $3,, of various streets and sidewalk repairs $698,867 Zoning Multiuse trails $2,49,6 Dallas/Watts Ben King Ellis Safety Project (Joint project with Cobb County) Mack Dobbs (Joint project with Cobb (US 41/SR at Ben King (Joint project with Sardis St Overpass Sardis St Extension Project Downtown Capacity New Connection Enhancement Project includes road improvements from Main St along Dallas and Watts to Cobb. Includes a roundabout at the intersection of Watts & Dallas St, street parking, and drainage improvements. This project would be a gate way to downtown. The project also consists of streetscape center median islands, landscaping and street light improvements. focus on reducing congestion and safety considerations Realign road curvature and intersection at Confederate Trl to provide better site distance. Add sidewalk along the west side of Ellis from Arlington Pointe to Nottinghill (King Row Subdivision) for a total distance of approximately 1,7-linear feet. Main St Cobb (US 41/SR $2,619,72 $3,133,431 $563,975 Extend RT lane Jiles I-75 $4,84,254 including turn lanes and sidewalks operational improvements Cobb Old 41 Hwy City Limit Jim Owens/Blue Springs $3,284,394 $6,5, improvement Capacity Projects The project consists of constructing a new overpass over the CSX Railroad, realigning Whitfield Place from Main St to Moon Station and connecting to the Sardis St Extension project. Right-of-way purchase and coordination with CSX Rail Road will be required. The total project length would be approximately 1,658 feet. Project further encompasses closing the rail road crossing at Main and reets. It also conforms to the City s Downtown/Depot Master Plan which involved transforming this area into a pedestrian friendly zone with access to the Southern Museum and other community events held in the Depot area. This project is in conformity with the Cobb County Comprehensive Plan, and the Major Thoroughfare Plan. Project will maximize transportation system performance, improve traffic congestion and compliment redevelopment of the downtown area. Construct new road from Main St that intersects with reet, Summer St and overpass to Moon Station. A bypass will also be built between the extension at Summer St to N. just south of Ben King will allow a portion of to remain "historical'. Enhancement Projects Moon Station Main St Sardis St Extension Moon Station $6,, $2,5, Replace brick roads, install landscaped median and upgrade streetlights. $556,179 Table 5: Marietta Short-term Recommendations Bridge Rehabilitation Gateway (General Project) Street Marking Reflectivity Annual Street ATM/ITS (General Project) General Streets and ainage Bridge rehabilitation $9, Gateway and key corridor enhancement $1,5, Replacement of street markings that do not meet new FHWA Standards $6, Annual street resurfacing $12,469,797 Traffic system infrastructure $3,6, Street and drainage rehabilitation and construction $4,41,6 ATM/ITS (Tier Traffic system infrastructure Sidewalk and Multi-use Trails (Tier 2) Annual Street (Tier General Streets and ainage (Tier Cobb (US 41/SR at Allgood Merritt at Barnes Mill Springs St at Laurel Springs Lane Sawyer at Canton South Marietta at Lower Roswell R-342 Springs St R-344 Roswell St Sidewalk and multi-use trail rehabilitation and construction $3,, Street resurfacing and rehabilitation $2,5,23 Street and drainage rehabilitation and construction $3,775, and pedestrian improvements $2, improvements to remove hump in roadway at the request of MFD $425, improvement $3, improvement $3, improvement $4, 2-11' travel lanes/ protective LT lanes/ improvements/ 14' planted area in medians/ 6' sidewalk upgrades/ decorative lighting/ landscaping. 2-11' travel lanes/ protective LT lanes/ improvements/ 14' planted area in medians/ 6' sidewalk upgrades/ decorative lighting/ landscaping. South Loop Sandtown $2,575, Barnes St Dodd St $4,5,

4 R-348 R-463 R-465 R-526 R-527 R-528 R-529 R-549 R-551 R-13 P-61 P-68 Table 5: Marietta Short-term Recommendations Sandtown Allgood at Scufflegritt Sandtown Allgood Road at Merritt Allgood Road at Sawyer Church St and Manget St at Lakewood Church St and Polk St at Mountain View Roundabout Safety improvements along roadway to Westside including Westside. realignment. Westside Springs St improvement and gateway enhancements $25, operational improvements, turn lanes, sidewalks Springs St Austell (SR 5) improvement and gateway enhancements $25, improvement and gateway enhancements $25, Traffic calming and pedestrian improvements from Northloop to Chicopee Northloop Chicopee $2, improvements and sight distance improvements approaching the intersection $25, Traffic calming and pedestrian improvements from Northloop to Chicopee Northloop Chicopee $5, Additional funding to complete the 211 SPLOST project $75, Sign Reflectivity Replacement of signage throughout the City that does not meet new FHWA standards $36, Old 41 Bridge Replacement Crossing - South Marietta near Crescent Cr. Bridge Projects Bridge Bridge replacement for Bridge over CSX RR CSX RR Projects Church St Extension $2,375, $2,825, $8,, Sidewalk pedestrian improvements and drainage improvements Margaret St Fryer $65, bridge access to the east $75, P-97 Ave and streetscapes along Ave within the city limits $1,, P-98 P-99 P-12 M-9 R-35 R-297 R-298 R-3 R-31 R-33 R-32 North Loop Renaissance District Roswell and Multi-use Trails Burnt Hickory Road Trail Campbell Hill, Sessions, Radium, St Joseph CBD Brick and streetscape improvements along the North Loop from Fairground St to and additional sidewalks along Cole St 5' minimum sidewalks along Frasier from Lakewood to Alexander, along Waterman from Lakewood to Alexander, and along Alexander from Frasier to Water. Street lighting also included. Sidewalk and or multi-use trail improvements on South side of Roswell from South Loop to Lower Roswell and Powers Ferry to US 41 Fairground St $65, Lakewood Alexander $4, $25, Sidewalk and multi-use trail rehabilitation and construction $3,6, Multi-Use Trail Multi-use Trail Projects Multi-use trail proposed to run national park. Utilize parks as trailhead facility. Enhancement Projects Old Mountain Whitlock Ave $1,25, Enhancement, streetscape and intersection improvements $5, Enhancement Continuation of plan for conversion to brick sidewalks within the CBD $95, Table 6: Springs Short-term Recommendations Misc. General Streets Storm drainage, curb and gutter, sidewalks, striping and marking and intersection improvements $84,12 Asphalt resurfacing and pavement markings $6,, Projects General Street (Tier Springs at Forest Hill /Sailors Florence at C.H James New Macland at Macedonia Sailors at C.H. James Springs Dallas at Florence Brownsville, pedestrian facilities, pedestrian lighting $1,327,6 Storm drainage, curb and gutter, sidewalks, striping and marking and intersection improvements $5, modifications for pedestrian access, turning lanes, restriping and signal upgrade $5, modifications for pedestrian access, turning lanes, restriping and signal upgrade $6, access, medians, restriping and signal upgrade $5, Additional LT capacity on Sailors turning onto C.H. James $5, improvements $25, Capacity Capacity Projects Hiram Lithia CH James $1,, R-275 R-276 R-277 R-279 R-281 R-282 R-283 R-284 R-29 R-17 Table 7: Smyrna Short-term Recommendations Access crossing improvements at the Spring St and Hawthorne Ave railroad crossings; Multi-use trail on Windy Hill from Atlanta to Village ; crossing improvements along S Cobb (SR 28) $2,5, Traffic Calming Install traffic calming devices at various locations throughout the city $2, Studies Various engineering and land planning studies to evaluate the Smyrna transportation system $25, Various streets will be resurfaced as needed $4,,23 Pavement marking and striping Various streets will be restriped as needed $25, Curb and gutter Curb and gutter will be installed or replaced as needed $5, Street signage and signal pole upgrades Stormwater drainage rehabilitation Replace and rehabilitate existing street signage, signal poles and mast arms $3, General stormwater drainage rehabilitation $3, Congestion Relief Various improvements to relieve traffic $2,273, Traffic and pedestrian crossing signal upgrades Install LED filaments in traffic signals and pedestrian crossing signals $15, Paths/ Various paths and sidewalks, including new sidewalks and upgrades to existing sidewalks $1,, Congestion Relief (Tier (Tier Church St Pat Mell Spring and Cumberland Blvd at Roswell St / Hawthorne St / N. Matthews St Concord at S Cobb (SR 28) Oakdale Dickerson Riverview at S Cobb (SR 28) Gann Culvert Replacement Railroad Quiet Zone Windy Hill Various improvements to relieve traffic $1,, Various streets will be resurfaced as needed $1,, Curb and gutter, storm drainage, sidewalks and resurfacing $9, Curb and gutter, storm drainage, sidewalks and resurfacing from S Cobb (SR 28) to Atlanta S Cobb (SR 28) Atlanta $9, improvements, median and electronic message signs $4,, Improve the safety and function of the intersection $1,, RT lane on Concord Road onto South Cobb southbound; Dual LT lanes on Concord onto South Cobb northbound (including ROW acquisition) Road improvements from Buckner to Veterans, congestion relief study Buckner $3,, Veterans $1,5, Road improvements Riverview Oakdale $1,, Dual LT lanes on Riverview onto South Cobb northbound $15, Culvert replacement on Gann at the creek crossing $6, Railroad quiet zone installation at a crossing to be determined $4, Capacity Capacity Projects Blvd concept that includes widening, addition of medians, intersection and pedestrian improvements S Cobb (SR 28) Atlanta $38,,

5 Table 8: Cobb County Mid-range Recommendations CO ainage Systems Bridges and Culverts - s - s - School Zones Congestion Relief and Mobility - Traffic, Traffic Signals, and Planning Regional and Statewide HST Coordination Efforts Create HST Partnerships Metro Arterial Connector - Dallas Acworth Hwy (SR 92) Provide funding for the resurfacing of a portion of the Cobb County roadway network. $66,941,111 Provide pedestrian facilities that are safe transportation alternatives to the automobile. $36,562,5 Provide for the repair and replacement of existing drainage facilities $9,27,833 Provide for the repair and replacement of existing bridges and culverts to ensure structural integrity and operational safety $2,416,667 $23,125, $32,57,833 $6,25, $12,5, Remain up to date on regional and statewide HST coordination efforts Partner with county agencies and organizations Capacity Projects Capacity to at least 4 lanes from Paulding County to US 41 (North Cobb ) US 41 INV-R-1 S Cobb (SR 28) Capacity Widen from 4 to 6 lanes East West Conn Paulding Co $15,625,424 I-285 $14,1, R-35 Oakdale Capacity Widen to 5 lanes; create dual LT lanes on Buckner at Oakdale. Buckner Oak $1,5, R-224 Barrett Capacity Barrett wideningcontinuing the widening and trail project that was started in the 25 SPLOST before the scope was reduced) R-496 Oglesby Capacity Widen to 4 lanes from Brownsville to CH James CO-384B INV-R-4 R-495 INV-R-2 INV-R-3 INV-R-5 INV-R-6 Mulkey Extension - East to Due West Clay /Oglesby Connector S Cobb (SR 28) at East West Conn US 41 (Cobb ) at Cobb (US 41/SR Cobb (US 41/SR INV-R-7 Dallas Hwy (SR 12) INV-R-8 R-261 East West Conn Grade Separated ramps on Barrett at Cobb R-489 Barrett INV-T-1 INV-T-2 Cumberland Transfer Center Relocation Marietta Transfer Center Relocation and and and and and and and and New roadway New connection connecting to Due West over RR tracks Connector (2 lanes) from Eastern terminus of Oglesby to Clay at Austell Springs and Projects Burnt Hickory Brownsville Brookwod Eastern Terminus of Oglesby Dallas Hwy (SR 12) CH James $13,6, $2,, Floyd $7, Due West $6,1, Clay $2,, Grade separation at S Cobb (SR 28) and East West Conn $13,6, Grade separation at Cobb and $13,6, Grade separation at Cobb and Lake Acworth (SR 92) $13,6, Grade separation at Cobb and Hiram Acworth Hwy (SR 92) $13,6, Grade separation at Dallas Hwy (SR 12) and Mars Hill (SR 176) $13,6, Grade separation at East West Conn and Austell (SR 5) $13,6, Construct grade separation ramps on Barrett at Cobb $55,, Grade separation at Dallas Hwy (SR 12) $4,5, Transit Projects Transit Relocate Cumberland Transfer Center to US 41 at Akers Mill $15,, Transit Relocated Marietta Transfer Center to US 41 at South Marietta $15,, INV-T-6 Local Bus Service Transit Redirect local bus service to relocated transfer centers INV-T-7 INV-T-8 INV-T-1 Bus Service Frequency Connect Cobb Local Bus Service Austell Transfer Center Expansion Transit Increase service frequency for key local bus routes with purchase of 1 new local buses $4,2, Transit Provide local bus service to compliment Connect Cobb BRT $1,1, Transit Expand upon the Austell Transfer Center to accommodate more buses and a potential BRT $1,, INV-T-13 CCT Local Bus Route Transit New local route INV-T-14 PT-7 Austell Transit Corridor Connect Cobb High Capacity Transit (ART) Phase 1 Transit New skip stop express service to Austell along Austell (SR 5) Cumberland Transfer Center Austell Transfer Center HE Holmes MARTA Station Marietta Transfer Center $1,1, $1,1, Transit From to Cumberland - New Starts fixed guide way Cumberland $494,, Table 9: Acworth Mid-range Recommendations Trail System $5,, Miscellaneous ROW Maintenance Equipment /Tr affic Light $1,, $8,, Table 1: Austell Mid-range Recommendations Public Works Vehicle Shelter Upgrade Enclosure to include front metal panel and roll up doors $126,619 Table 11: Mid-range Recommendations R-246 Cobb International Extend Cobb International to new roundabout at Stanley & Collins Roads $7,846,44 Extension Bridge Projects R-241 Main St Bridge at Summer St Bridge The Main Street/Old Hwy 41 Bridge passes over the CSX rail road and is located between Summer St and Sardis St. The bridge expansion is approximately 1. This road is a truck route that feeds into an industrial area south of the downtown area. Project consists of adding a new third lane to the existing bridge that will improve traffic flow, enable pedestrian access to the downtown and regional bike trail system. will include adding a third lane that will become a turning lane, sidewalks and a bicycle lane. The total project length would be approximately 8 feet. This project is in conformity with the Cobb County Comprehensive Plan, and the Major Thoroughfare Plan. $1,899,383 Table 12: Marietta Mid-range Recommendations R-329 R-33 University North, Phase 1 University North, Phase 2 New complete street with two lanes, with 12 ft. travel lanes, a 8 ft planted median, 4 ft. bike lanes in both directions, 5 ft. landscape strip and 5 ft sidewalks on both sides with lighting. New complete street with two lanes with 12 ft travel lanes, a 8 ft. planted median, 4 ft. bike lanes in both directions, 5 ft landscape strip, and 5 ft sidewalks on both sides with lighting Cobb Wylie $2,368,186 Wylie Franklin $6,872,798

6 Table 13: County Long-range Recommendations ASP-CO-428A ASP-CO-428B CO-26D CO ainage Systems Bridges and Culverts - s - s - School Zones Congestion Relief and Mobility - Traffic, Traffic Signals, and Planning Combine CCT and CSS Services into One Contract for a Private Vendor Windy Hill Road Windy Hill Stilesboro Due West at Dallas Hwy (SR 12) Provide funding for the resurfacing of a portion of the Cobb County roadway network. $12,494,1 Provide pedestrian facilities that are safe transportation alternatives to the automobile. $65,812,5 Provide for the repair and replacement of existing drainage facilities $16,687,5 Provide for the repair and replacement of existing bridges and culverts to ensure structural integrity and operational safety $36,75, $41,625, $58,627,5 $11,25, $22,5, Capacity Combine these services into one contract to save money and provide a more efficient operation, with comingling of the paratransit and senior clients. Capacity Projects Widen from 4 to 6 lanes Austell (SR 5) Capacity Widen from 4 to 6 lanes Atlanta Capacity This project involves adding one general purpose lane in each direction along Stilesboro between Rosehedge and Due West (4.3 miles). Capacity Widen from 2 to 4 lanes from Paulding Co line to US 41 INV-R-11 Piedmont Capacity Widen to 6 lanes R-13 Shallowford Capacity Additional right lane added WB onto Shallowford Road. R-29 R-225 Springs from Cedar to Hurt East-West Connector Rosehedge Due West Blackwell S Cobb (SR 28) Cobb Due West Dallas Hwy (SR 12) $2,63,4 $9,888, $28,, $8,7, Canton $12,6, Trickum $1,42, Capacity Widen from 4 to 6 lanes Cedar Hurt $3,296, Capacity Widen from 4 to 6 lanes Hicks R-333 Delk Capacity Widen Delk on south side to continue 3 lanes of travel Bentley R-487 Floyd Capacity Widen to 4 lanes R-497 R-499 CO-384A INV-R-1 R-256 R-26 AR-959 AR-96 CO-AR-238 INV-R-9 CO-41 Piedmont/East Piedmont Barrett Mulkey Extension - West South Barrett Reliever Phase 5 South Barrett Reliever Phase 4 along Wilson to Big Shanty Revive I-75 North/I-285 Revive I-75 North/I-285 I-75 North From I- 285 North to Delk East West Conn North Cobb Park and Ride Lot Capacity Capacity Widen to 6 lanes Widen to 6 lanes Austell (SR 5) (SR 5 Meadows New roadway Cliff Place New roadway Roberts Ct and Grade and Grade and Grade and Grade Transit Extend the Reliever eastward over I-575 northward to tie into Barrett across from Meadows. New roadway built with context-sensitive design. Design preferences include four lanes divided with median, sidewalks, and bicycle lanes Build new connection to Big Shanty Road and to Town Center Mall along Wilson Road. New roadway built with context-sensitive design. Design preferences include two lanes divided with median and pedestrian/bicycle facilities. and Projects Meadows Wilson Springs Powers Ferry $2,, $1,, Hicks $9,554, Sewell Mill Piedmont /Bells Ferry East-West Conn $29,14, $28,, $4,4, $12,, Barrett $22,, Town Center $6,8, Flyover ramp from I-75 NB to I-285 WB $1,9, Flyover ramp from I-75 SB to I-285 WB $28,1, This project is part of reconstruction of the interchange at I-75 North and Windy Hill. It will be a ten lane collector distributor system along I-75 from I-285 North to Delk. In addition, the project will reconfigure the Delk exit at I-75 North and provide HOV in the corridor. $147,, Grade separation at East West Conn and Springs $13,6, Transit Projects Multi-level park and ride facility in northern Cobb County to accommodate transit, carpools and vanpools. $15,, Table 13: County Long-range Recommendations INV-T-9 PT-22 AR-ML-2 Acworth to KSU Local Service Route Bus Route Development - Connection to Perimeter Market I-285 North Managed Lanes and CD From I-75 North to I-85 North Transit Provide local bus service from Acworth to KSU $1,1, Transit New route along Roswell and Johnson Ferry $6,, Managed Lanes Projects Managed Lanes Revive 285 is the name given to the improvement project on I-285 North from I-75 to I-85. $2,178,,

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Cobb County Government Facilities Schedule

Cobb County Government Facilities Schedule Administrative Building 0 East Park Square 8 5 M,T,W,H,F 0 0 0 0 Adult Detention Center 825 County Services Parkway 30090 Adult Detention Center 2 825 County Services Parkway Adult Detention Center Intake

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Omaha s Complete Streets Policy

Omaha s Complete Streets Policy Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

Austell Road Access Management Plan Public Meeting February 17, 2009

Austell Road Access Management Plan Public Meeting February 17, 2009 Austell Road Access Management Plan Public Meeting February 17, 2009 Laraine Vance: Dan Cohen: Cobb DOT Project Manager Pond & Company Planning Director 1 Access Management What is Access Management? The

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA

A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA Overview The Atlanta Braves strategically selected the location for SunTrust Park to provide an environment rich in transportation

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

SRTS IMPLEMENTATION COSTS

SRTS IMPLEMENTATION COSTS SRTS IMPLEMENTATION COSTS What Is a Estimate? A cost estimate establishes the anticipated budget required to implement the actions (the improvement projects and programs) identified in your School Travel

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

CUMBERLAND AREA PEDESTRIAN PLAN

CUMBERLAND AREA PEDESTRIAN PLAN CUMBERLAND AREA PEDESTRIAN PLAN Prepared for Cobb County Board of Commissioners Prepared by Gresham, Smith and Partners In collaboration with Alta Planning + Design JULY 2016 Please note that the content

More information

4. Action Plan & Projects

4. Action Plan & Projects 4. Action Plan & Projects 45 46 ACTION PLAN AND PROJECTS The Action Plan organizes the list of transportation projects described in the Mobility Framework Plan section into short-term (0-5 years) and long-term

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

STATE OF GEORGIA OFFICE OF THE GOVERNOR

STATE OF GEORGIA OFFICE OF THE GOVERNOR STATE OF GEORGIA OFFICE OF THE GOVERNOR Nathan Deal GOVERNOR For Immediate Release May 28, 2014 Deal announces $33 million in transportation infrastructure project awards 18 governments and CIDs to receive

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

The Bike Buzz in Richland. November 2017 Carl Berkowitz

The Bike Buzz in Richland. November 2017 Carl Berkowitz The Bike Buzz in Richland November 2017 Carl Berkowitz Richland has been growing by leaps and bounds with lots of new homes and roads throughout the community. Recognizing all the growth in the Queensgate

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm

Summary of Comments Public Meeting: Marietta Street Resurfacing Project Atlanta Contemporary August 29, 2017 / 6:00 pm to 8:00 pm Renew Atlanta hosted a public meeting to discuss the Marietta Street Resurfacing project at. Councilmember Cleta Winslow attended the public meeting, where over seventy (70) citizens to include representatives

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017

Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road. October 3, 2017 Feasibility Study of Pedestrian Crossings Along Route 7, East of Cascades Parkway and West of Dranesville Road October 3, 2017 Study Area (area within a ¼-mile radius of the study intersections) Route

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Lincoln Highway Streetscape Plan Concept Plan

Lincoln Highway Streetscape Plan Concept Plan Lincoln Highway Streetscape Plan Concept Plan November 14, 2014 Introduction This report provides a summary of conceptual transportation, land use, and design recommendations in the Lincoln Highway Streetscape

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

Reams Road RCA Study. Board of County Commissioners Public Hearing

Reams Road RCA Study. Board of County Commissioners Public Hearing Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement

More information

S T A T I O N A R E A P L A N

S T A T I O N A R E A P L A N The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information