1 Downtown Congestion Reduction Plan Final January 16, 2018 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number Arup North America Ltd 560 Mission Street Suite 700 San Francisco United States of America

2 Contents Executive Summary 1 1 Introduction 2 Page 1.1 Plan Contents Plan Objectives and Strategy Development Recommended Strategies 7 2 Background Conditions Plan Study Area Transportation Context Socioeconomic Factors Transportation Mode Share Lafayette in the Future Measuring and Understanding Traffic Congestion Traffic Congestion Data Sources The Where and When of Traffic Congestion Traffic Congestion Across Downtown Traffic Congestion Trends in Lafayette Transit Parking Traffic Safety Summary of Background Conditions 40 3 Growth Scenarios and Traffic Analysis Development Growth Scenarios Traffic Analysis 45 4 Strategy Development Initial List of Strategies Long List of Strategies Short List of Strategies & Refinement Multi-Criteria Analysis 53 5 Recommended Traffic Congestion Reduction Strategies 54 6 Funding and Implementation 58 Appendix A: Strategy Concepts 60 Page 1

3 Appendix B: Public Surveys 66 B.1 Priorities Survey 66 B.2 Preferences Survey 75 Appendix C: Multi-Criteria Analysis Methodology 79 Multi-Criteria Analysis 81 Table 1: Examples of Congestion Reduction Strategies...4 Table 2: Recommended Strategy Descriptions...9 Table 3: Recommended Strategies by Implementation Timeframe...10 Table 4: City of Lafayette Economic Indicators...42 Table 5: Population and employment forecasts ( )...45 Table 6: LOS Criteria...46 Table 7: Traffic Analysis Results...47 Table 8: Examples of Congestion Reduction Strategies...49 Table 9: Multi-Criteria Analysis Summary...53 Table 10: Recommended Strategies by Implementation Timeframe...57 Table 11: Survey Results...76 Figure 1: Plan Components...3 Figure 2: Plan Timeline...4 Figure 3: Recommended Strategies...8 Figure 4: Previous Lafayette Transportation Studies...11 Figure 5: Project Study Area...13 Figure 6: Lamorinda Study Area...14 Figure 7: Lafayette Population Trends, Source: US Census Bureau...15 Figure 8: Lafayette Employment Data, Source: Longitudinal Employer-Household Dynamics Survey, US Census Bureau...16 Figure 9: Where Lafayette Residents Work (2013), Source: US Census, Longitudinal Employer-Household Dynamics Survey, US Census...17 Figure 10: Commute (Journey-to-Work) Mode Share (2013), Source: US Census American Community Survey...18 Figure 11: Lafayette and Moraga Housing Projections, Source: ABAG...19 Figure 12: Typical Congestion at 8 AM and 5 PM (2015)...22 Figure 13: Hourly traffic volumes on Moraga Rd at School St, Source: Downtown Specific Plan (2012)...23 Figure 14: Hourly intersection volumes at Mount Diablo Blvd/Moraga Rd, Source: MTC PASS Study (2015)...24 Figure 15: Downtown Issues...25 Figure 16: BART Issues...26 Figure 17: SR 24 Issues...27 Figure 18: School Issues...28 Page 2

4 Figure 19: AM Peak Hour Traffic on Mount Diablo Blvd at Moraga Rd and 1 st St...29 Figure 20: PM Peak Hour Traffic on Mount Diablo Blvd at Moraga Rd and 1 st St...29 Figure 21: Average Daily Traffic on SR 24 in Lafayette, Caltrans Count Book...30 Figure 22: Data from BART Ridership Reports for April Figure 23: County Connection Route 6 map, source: countyconnection.com...32 Figure 24: County Connection Route 25 map, source: countyconnection.com...32 Figure 25: County Connection Ridecheck Plus, Ridership by Route and Stop for Routes 6 and 25 provided by County Connection...34 Figure 26: Severity of Collisions, SWITRS...36 Figure 27: Traffic Collisions in Lafayette, (SWITRS)...37 Figure 28: Collisions between Vehicles with Pedestrian/Bicyclists (SWITRS)...38 Figure 29: Collision Violation by Category, SWITRS...39 Figure 30: Collision by Time of Day, SWITRS...39 Figure 31: Pedestrian Location During Collision (SWITRS)...40 Figure 32: Traffic Trends...41 Figure 33: Traffic Growth Scenarios...44 Figure 34: Traffic Analysis Model Extents...46 Figure 35: Long List of Strategies...50 Figure 36: Short List of Strategies...52 Figure 37: Final Recommended Strategies...55 Figure 38: Short and Long-Term Implementation Timing...56 Figure 39: Recommended Strategies...60 Figure 40: Adaptive Signal detection camera and radio on a traffic signal mast arm (Source: FHWA)...60 Figure 41: Southbound left-turn at Moraga Road and Moraga Boulevard...61 Figure 42: Recommended traffic signal locations on Deer Hill Road...61 Figure 43: Additional school pick-up & drop-off zones...62 Figure 44: Student Pedestrian Safe Routes...62 Figure 45: School Street Bike-Ped Pathway...63 Figure 46: Brook Street-School Street Realignment...64 Figure 47: BART Pedestrian Bridge...64 Figure 48: Moraga Road Extension...65 Figure 49: 2nd Northbound Right Turning Lane...65 Figure 50: Transportation Survey from lafayettecongestion.com, active November January Figure 51: Transportation Survey from lafayettecongestion.com, active November January Figure 52: Transportation Survey from lafayettecongestion.com, active November January Page 3

5 Figure 53: Transportation Survey from lafayettecongestion.com, active November January Figure 54: Transportation Survey from lafayettecongestion.com, active November January Figure 55: Collaborative Maps Survey from lafayettecongestion.com, active November January Figure 56: Collaborative Maps Survey from lafayettecongestion.com, active November January Figure 57: Collaborative Maps Survey from lafayettecongestion.com, active November January Figure 58: Inventory of Qualitative Comments from Online Preference Survey..77 Page 4

6 Executive Summary In 2013, shortly after adopting the Lafayette Downtown Specific Plan ( DSP ), the City Council directed the Circulation Commission to conduct study sessions on how to reduce downtown traffic congestion. Between , the Circulation Commission developed an extensive catalog, or universe, of potential solution ideas for further study. This became the basis for a Downtown Congestion Reduction Plan ( Plan ). In 2014, the City secured grant funding from the Contra Costa Transportation Authority ( CCTA ) to study Downtown Lafayette traffic and produce the Plan, which would document study analysis and recommend solution ideas to curtail current and manage future traffic congestion. Subsequently, the City Council authorized formation of the Plan Steering Committee, to oversee staff and consultant s technical analysis and advise the City Council on traffic congestion reduction strategies. The Steering Committee is comprised of members of various stakeholder groups, including the City Council, Circulation Commission, Planning Commission, Design Review Committee, Lafayette School District, Chamber of Commerce, and Homeowners Council. The Steering Committee met publicly 13 times and undertook three major public outreach initiatives in developing the Plan for final adoption by the City Council. Ultimately, alleviating traffic congestion is about enhancing the quality of life. Traffic congestion is a facet of modern life that almost everyone dislikes as it takes longer to travel places, which keeps us away from home, work, and the enjoyable things in life. It is a significant problem that has come with growth and development in Lafayette, the larger Lamorinda area, and the Bay Area overall. This Plan takes a comprehensive look at how to deliver solutions that solve Lafayette s numerous transportation challenges, mainly in the downtown core. Transportation issues in Downtown Lafayette are complex with no quick-fix solutions. Therefore, the background analysis focuses on how the street network performs and the various causes behind what generates traffic to, from, and through the Downtown. Traffic congestion is a multifaceted problem. The nature of this problem, with its many causes and potential solutions, makes it a challenge to capture a single guiding principle or objective for the study. The Steering Committee developed the following statement of purpose for the study: Address critical transportation concerns that affect the quality of life in the community. Page 1

7 Expanding on this statement, the Steering Committee expressed several guiding principles organized around three key themes: 1. Enhance the quality of life 2. Improve existing deficiencies 3. Guide future changes In addition to identifying solution strategies, the Plan also evaluates when various strategies should be implemented to alleviate congestion associated with future land development. While the Plan provides a long-term vision for Downtown transportation planning, the majority of strategies recommended in the Plan are considered achievable within the next ten years, if and when traffic conditions warrant those applicable actions, and adequate funding and community support are also in place. 1 Introduction 1.1 Plan Contents The body of the Plan is comprised of five sections. This introductory section outlines the information included in the Plan. The following sections follow in a sequence that corresponds to the development of the Plan, from gathering and analyzing existing traffic data to providing traffic congestion reduction strategy recommendations. Following the five main body sections, two appendices provide supporting information and data. For further reference, all technical reports reviewed by the Steering Committee are also available at the dedicated Plan website: Figure 1 summarizes the various sources supporting the final recommended strategies and implementation plan. Page 2

8 Figure 1: Plan Components 1.2 Plan Objectives and Strategy Development The following represent the objectives of the recommended strategies in the Plan: Reduce congestion in Downtown Enhance safety for motorists Enhance safety for pedestrians and cyclists Minimize parking impacts Enhance urban design Minimize environmental and utility impacts Be cost effective Be consistent with established City policies These guiding principles informed the strategy development process described in the following sections. The study explored two categories of strategies to address Downtown traffic congestion: 1) strategies that increase capacity or throughput (the number of vehicles that can travel through an intersection), or 2) strategies that reduce vehicle trips (also known as demand management strategies). Table 1 provides some typical strategies for these two categories. Please note that these are not exhaustive lists: Page 3

9 Table 1: Examples of Congestion Reduction Strategies Capacity Enhancing Increase Capacity / Throughput Add new streets Widen existing streets Add left or right-turn lanes Improve signal coordination Vehicle Trip Reduction Promote Walk, Bike, and Transit Modes Add bike lanes Add pedestrian crossings Provide more bus service Improve access to BART Opportunities for adding new streets or widening existing streets are limited in a developed area such as Downtown Lafayette. However, removing on-street parking to provide additional turn lanes, reconfiguring intersections, and improved traffic signal coordination can all increase capacity and help people travel through key congested segments with less delay. The vehicle trip reduction strategies focus on ways to promote alternative modes of transportation by making it easier to walk and bike to Downtown schools and BART, for example, and possibly remove vehicle trips on congested roadways. The strategy development process included several key steps: The Plan is the result of a two-and-a-half-year process, which has incorporated several key analyses. Figure 2 presents the Plan s timeline. Figure 2: Plan Timeline The key milestones in the development of the Plan include: Issue Identification: the key transportation issues in the Downtown were identified and provided in the Background Conditions Report (Arup, February 17, 2016). This report also presents the existing conditions traffic model and analysis. A web-based priorities survey and Collaborative Map were launched in November 2015 and collected over 900 responses. The feedback from this outreach contributed to subsequent strategy development. Additional information and conceptual designs for the strategies are presented in Appendix B. Page 4

10 Initial List of Strategies: the Steering Committee, City staff, and Arup developed an initial list of over 100 strategies from previous Circulation Commission strategy memos, previous studies such as the DSP, results from the first set of surveys (i.e., Collaborative Map and priorities survey, available in Appendix B), as well as analysis and field observations performed early in the Plan process. Long List of Strategies: The Initial List was used to develop a subsequent Long List of 50 strategies. The Long List was presented to the Steering Committee and included a project description, conceptual design options, a qualitative analysis of potential effectiveness, and the projected trade-offs. Long to Short List Strategy Evaluation: the Steering Committee narrowed the Long List to a Short List of strategies using a more detailed analysis, including estimates of vehicle traffic generation, the potential for shifting trips from auto to alternative modes, traffic operations impacts, and other qualitative measures. The strategy development work was an iterative process that included a range of various analyses and engineering studies to refine the strategies to respond to guidance from the Steering Committee, City staff, and public input. The strategy development process is summarized in the technical memorandum Long List to Short List of Strategies and Projects (Arup, June 22, 2016). Detailed Short List Traffic Analysis: a detailed traffic analysis was conducted on the Short List strategies to identify their effectiveness at serving existing and future traffic. These analyses are summarized in several technical memoranda: Preliminary Detailed Network Traffic Analysis Work-in-Progress Findings (Arup, August 26, 2016), Traffic Analysis: Progress Update (Arup, November 10, 2016), and Final Traffic Analysis (January 19, 2017). Refined Short List: the detailed traffic analyses and other engineering design studies provided the Steering Committee and City staff with the necessary information to refine the Short List of strategies and the definition of each strategy. Finalized Short List, Multi-Criteria Assessment, and Costs: Arup developed a multicriteria analysis to finalize the Short List of strategies. The multi-criteria analysis utilizes a diverse array of qualitative and quantitative measures that consider each strategy s impact on congestion and traffic operations, safety, connectivity, quality of the environment, cost, and the potential ease of implementation (e.g., regulatory, environmental, and political considerations). The memorandum Multi-Criteria Analysis Revised Results (Arup, April 24, 2017) presents the full multi-criteria analysis. Additional detail on the multi-criteria analysis is presented in Appendix C. The Short List was presented to a joint City Council / Circulation Commission meeting on April 24, City staff and Arup received feedback and launched the second preference survey. Over 600 respondents participated in the second survey. The results of the second survey are provided in the memorandum Lafayette Downtown Congestion Reduction Plan Public Outreach (Arup, July 5, 2017). Page 5

11 A public workshop was held on May 23, 2017 at the Lafayette Veterans Memorial Center and received in-person feedback and additional comments on the Short List of strategies from over 70 attendees. The final Steering Committee meeting was held on August 15, 2017 to finalize the strategy recommendations to the City Council. The multi-criteria assessment, preference survey, and public feedback from the workshop all contributed to the final deliberation by the Steering Committee. City staff and Arup responded to a range of comments and held follow up meetings with the School District to address circulation issues around the Downtown schools. This draft Plan presents the final set of recommendations and the implementation plan to the City Council. One strategy, the 2nd northbound right-turn (NBR) turning lane at Mt Diablo Boulevard and Moraga Road, requires a City Council determination as the Steering Committee could not reach consensus. Page 6

12 1.3 Recommended Strategies At its August 15, 2017 meeting the Steering Committee finalized traffic congestion reduction strategy recommendations for inclusion in this Plan. Figure 3 presents an aerial view of the numbered locations of recommended strategies. Strategy numbers correspond to strategy details described in the subsequent Table 2. Additional information and conceptual designs for the strategies are presented in Appendix A. One strategy, the 2nd northbound right-turn (NBR) turn lane at Mt Diablo Boulevard and Moraga Road (#12), requires a City Council determination as the Steering Committee could not reach consensus. Two timeframes for implementing the strategies have been identified: Short-Term Strategies (1-10 Years): these strategies are generally lower cost, can be implemented with minimal right-of-way acquisition and coordination with other regional and state agencies, require only minimal environmental analysis under the California Environmental Quality Act (CEQA), and can be designed and constructed in a five-year time period. These strategies have been shown to provide enough capacity to serve an additional 6% additional traffic in Downtown Lafayette. Long-Term Strategies ( Years): these strategies are much higher cost, will require significant coordination with regional agencies such as EBMUD and Caltrans, and will require a full Environmental Impact Report (EIR) under CEQA. However, these strategies are only necessary if traffic and development growth approaches the higher growth scenario. These strategies have been shown to provide enough capacity to serve an additional 20% additional traffic in Downtown Lafayette. Table 3 presents the recommended timing (Short or Long-Term) for each strategy. The cost estimates and reasoning for including each strategy in the Short and Long-Term packages are also provided. It is important to note that these strategies do not represent a strict priority list, but merely represent a way of organizing the strategies according to short and long-term timeframes. The City should remain flexible to implement one or more of the Long-Term strategies if grant funding opportunities arise. The remainder of this Plan document provides supporting detail for the recommended strategies summarized in the figure and two tables below. Page 7

13 Figure 3: Recommended Strategies Page 8

14 Table 2: Recommended Strategy Descriptions Strategy 1. Coordinated traffic signals on Mount Diablo Boulevard and Moraga Road 2. Southbound left-turn lane at Moraga Road and Moraga Boulevard 3. Signalize the intersections of Deer Hill Road and Oak Hill Road and Deer Hill Road and Happy Valley Road Description Provide a series of traffic signal system upgrades along Mount Diablo Boulevard and Moraga Road. These improvements include: 1) install new traffic signal controllers, 2) extend the traffic signal interconnect system on Mount Diablo Boulevard to include Mountain View Drive, Happy Valley Road, and Dewing Avenue, 2 nd Street, and Brown Avenue, 3) incorporate the Moraga Road / St. Mary s Road intersection into the Moraga Road coordinated system, 4) install advanced traffic cameras for video data collection and detection, 5) investigate options for implementing advanced adaptive traffic control systems. Provide a left-turn lane at the southbound approach of the Moraga Road / Moraga Boulevard intersection, while maintaining two southbound and northbound travel lanes. The turn lane would remove 6-7 on-street parking spaces on the west side of Moraga Road. The turn lane will provide an area for vehicles to line up and not block southbound traffic as they wait to make a left-turn. This will increase capacity and improve traffic operations on Moraga Road. Traffic signals at these intersections will improve traffic operations and provide an enhanced environment for pedestrians using the crosswalks. Roundabouts were also evaluated but eliminated from consideration because they would not likely provide sufficient traffic capacity. 4. Additional School Pick-up & Drop-off Zones Introduce two new pick-up and drop-off zones at Golden Gate Way and St Mary s Road. The new zones provide additional options for parents to drop-off children that could divert some vehicle trips from critical segments of Moraga Road. 5. Student-Pedestrian Safe Routes Create a seamless pedestrian network with new paths and enhanced facilities on existing streets. This network would include the School Street Bike-Ped Connection to Trail concept, with enhanced safety measures at other key intersections. These Safe Routes provide a seamless network for children and other pedestrians to travel between the schools and the new pick-up and drop-off zones, the Regional Trail, and Moraga Road. These improvements are necessary to support the pick-up and drop-off zones and promote additional walking and cycling around the schools. 6. School Street Bike-Ped Pathway Connection to Trail The School Street Bike-Ped Pathway Connection to Trail includes a redesign of the street to provide a wide path for pedestrians and cyclists on the north side of the street that connects the Downtown schools and the Lafayette-Moraga Regional Trail. The proposed design would remove some on-street parking. However, parking could be added with a redesign of School Street in front of the Middle School. This proposed design would integrate well with the Brook St-School St Intersection Realignment strategy. 7. Enhanced School Bus Program Expand the school bus program by increasing the contracted service by four buses and extending the service to Lafayette Elementary. 8. Regional Trail Connection to BART/Downtown Improve bicycle and pedestrian facilities and signage between the Lafayette-Moraga Regional Trail and BART and Downtown. This would include the School Street Bike-Ped Connection to Trail, improvements on Brook Street, Hough Avenue, and Lafayette Circle. 9. Brook St-School St intersection realignment Realign Brook and School Streets to create a single intersection at Moraga Road with a southbound left-turn pocket. Consolidating the two intersections at Brook and School Street to one and providing the left-turn pocket improves traffic operations on Moraga Road, Brook Street, and School Street. The Masonic Lodge property would need to be acquired and the building demolished. Also, a few on-street parking spaces on the south side of School Street would need to be removed. 10. BART Pedestrian Bridge over Oak Hill Road Construct a pedestrian bridge over Oak Hill Road connecting the BART parking lots to the station. A connection to the new path and bridge from Oak Hill Road could also be built to provide another access point to the station. This will reduce potential conflicts between drivers and pedestrians at the existing Deer Hill Road/Oak Hill Road crosswalks and provide a more direct connection to BART for patrons parking at lots east of Oak Hill Road. This could also potentially reduce driver delay at the Deer Hill Road/Oak Hill Road intersection. 11. Moraga Rd Extension Behind McCaulou s / Whole Foods To 1st St Requires City Council Decision 12. 2nd NBR turning lane at Mt Diablo Boulevard and Moraga Road (No North-South Crosswalk at the east leg) Extend Moraga Road north of Mount Diablo Boulevard through the shopping center, between Safeway and McCaulou s, to connect with 1st Street opposite the State Route 24 eastbound on-ramp. This connector would operate one-way northbound only. This project would provide a direct connection for traffic heading to the freeway, which redistributes traffic from key segments of Mount Diablo Boulevard and 1st Street. This would improve traffic operations through the Downtown Y. This project is only required in the long-term if population and employment growth exceed certain targets and if the redevelopment of the shopping center presents an opportunity. Provide a second northbound right-turn from the middle lane at the Moraga Road / Mount Diablo Boulevard intersection and remove the north-south crosswalk on the eastern leg of the intersection. These changes would increase capacity for the critical northbound right-turn, which would reduce queuing and improve traffic operations along Moraga Road. The crosswalk needs to be removed to avoid conflicts between turning drivers and pedestrians. Several alternatives that considered other lane configurations, signal phasing, and crossing options were evaluated but eliminated from consideration during Steering Committee review. Page 9

15 Table 3: Recommended Strategies by Implementation Timeframe Strategy Cost Reasoning Short-Term (1-10 years): Relatively Low Cost Investments to Increase Capacity and Reduce Trip Demand Coordinated Traffic Signals Southbound left-turn lane at Moraga Road and Moraga Boulevard Signalize Deer Hill Rd/Oak Hill Rd and Deer Hill Rd/Happy Valley Rd Additional School Pick-up & Drop-off Zones Student Pedestrian Safe Routes / Priority Streets School Street Bike-Ped Pathway Connection to Trail Enhanced School Bus Program Regional Trail Connection to BART/Downtown Long-Term ( Years): Long-Term Projects to Consider if Needed Brook St-School St Intersection Realignment BART Pedestrian Bridge over Oak Hill Rd Moraga Rd Extension to SR 24 and 1st St Behind McCaulou's/Whole Foods For City Council Deliberation Mount Diablo Blvd/Moraga Rd 2nd Northbound Right-Turn $1-1.5M $75-100k $ k $ k $50-100k $500k-1.5M $320k (per year) $50-100k $4-5M $6-8M $20-30M $ k Extending the coordinated traffic control system to additional signals will provide a small increase in capacity with minimal physical or environmental impacts. It also scored first in the preference survey, by a significant margin. However, it scored last on the multi-criteria assessment and it is an expensive strategy to implement. Despite these drawbacks, this project could qualify for regional and/or federal funds, such as MTC s IDEA grant program. Providing a dedicated left-turn pocket is a relatively low-cost measure to increase capacity on Moraga Rd. This strategy also scored reasonably high on the preference survey (#3 or #4). These traffic signals provide additional capacity and pedestrian safety benefits. These signals scored high in the multi-criteria assessment, they have a relatively modest financial cost, and they can be constructed without significant physical impacts. However, they did score low in the survey. These formal zones will help divert some school-related traffic from Moraga Rd. These additional zones scored high in the multi-criteria assessment and in the top third of the preference survey. These Safe Routes are the key connections from the additional pick-up and drop-off zones to the schools. For the zones to be effective and safe, these additional routes are needed. This strategy scored high in the multi-criteria assessment but in the middle to the bottom third of the survey. However, Arup and City staff still consider this is a critical complement to the pick-up/drop-off zones. This project is also a critical complement to the pick-up/drop-off zones and the Student Pedestrian Safe Routes, as it forms a key connection between the two Downtown schools and the Lafayette-Moraga Regional Trail. With the Brook St-School St Realignment project, it also provides a direct and safe pedestrian and bicycle connection to the west side of Moraga Rd. The proposed design removes 9 on-street parking spaces. However, the public spaces are all on the south side of the street and impact spaces only near two houses; there is also excess on-street parking capacity on Avalon Ave. This strategy does score low in both the multi-criteria analysis (last) and in the bottom third of the survey. This strategy will likely take additional design and outreach with the neighbors prior to implementation. Providing additional school buses at Stanley Middle School and new service at Lafayette Elementary will reduce school-related trips during peak times. This strategy scored reasonably high in the multi-criteria assessment and near the top in the preference survey. It is relatively expensive to implement, at approximately $320,000 per year to the current contractor operating the school buses. This program will likely take additional time to identify and acquire funds. This project helps create a cohesive bicycle and pedestrian network across Downtown, to reach key destinations such as BART and nearby commercial establishments. It also helps tie together the Safe Routes and the other school-related projects. It scored high in the multi-criteria analysis and it is relatively low-cost. However, it did score in the bottom third of the survey. This strategy enhances traffic capacity and helps provide a better east-west bicycle connection across Moraga Rd. It scored high in the multi-criteria assessment, but in the middle of the pack in the survey. There are still concerns that this strategy would encourage cut-through traffic on Brook St. However, the congestion relief associated with the Short and Medium-Term strategies should improve conditions along Moraga Road to the point that it would reduce the attractiveness of using Brook St as a cut-through route. But additional traffic calming measures on Brook St could be explored. This strategy will likely take at least five years to implement. This project will provide a more direct connection between the BART parking lots. It will also divert some pedestrians from the Oak Hill Rd/Deer Hill Rd intersection, which will provide a modest operational and safety benefit. However, the project is very expensive and will require a long time to design, fund, and construct. This project is only required if the City experiences traffic growth at the higher 20% growth forecast shown in the earlier section. To achieve this growth, sites such as McCaulou s/whole Foods would need to redevelop. If this redevelopment occurs, the connection from Moraga Rd to SR 24 and 1 st St should be constructed as part of the site plan. This roadway will provide a direct connection and was shown to be the most effective at improving queuing along Moraga Rd. While this strategy scored high in the multi-criteria assessment and the survey, it would require the removal of the north-south crosswalk on the east leg of the intersection. Arup and City staff have considered that this is too significant of an impact on pedestrian circulation. This strategy would also contradict established City policies promoting pedestrian mobility and Complete Streets principles, especially in the downtown core. The strategy provides significant congestion reduction benefits for a modest cost. Page 10

16 2 Background Conditions To prepare for studying ways to reduce current and future traffic congestion, it is necessary to understand historical efforts to date and to validate traffic trends. Since its incorporation in 1968, the City of Lafayette has conducted numerous traffic congestion-related studies, focused primarily in the Downtown core area. These studies have considered ways to alleviate traffic congestion and parking issues, provide better transit service, improve the pedestrian and bicycle network, and enhance safety. Figure 4 presents a timeline and lists some of the key studies. Most of these studies have focused on specific modes, hot spots, or design recommendations. This Plan advances decades of prior study shown below and also leverages more recent industry research and best practices. Figure 4: Previous Lafayette Transportation Studies Each of the studies noted above contribute foundational information for this Plan. Of particular influence are the Downtown Specific Plan (2012) and the corresponding Environmental Impact Report (EIR) (2012). Upon adopting the DSP, the City Council recognized a need to develop a traffic plan that could supplement the DSP. To achieve this, in 2013 the Council directed the Circulation Commission to conduct study sessions on how to reduce downtown traffic congestion. Between , the Circulation Commission developed an extensive catalog, or universe, of potential solution ideas for further study. The Downtown Congestion Reduction Plan is the culmination of the Council-directed traffic study. Page 11

17 The DSP provides comprehensive guidance for land use growth and development in the Downtown. The DSPidentified four downtown districts and defined their unique characteristics. For each district, the plan developed policies on land use, building density and height, parking, the pedestrian experience, and other important elements. In addition to district-specific policies, the DSP developed a range of policies to apply to Downtown as a whole. The circulation policies were organized under these six priorities: Circulation: Balance downtown vehicular circulation with providing a bicycle and pedestrian system; Pedestrians: Ensure a continuous and accessible pedestrian network with appropriate pedestrian infrastructure; Bicycles: Develop a bicycle network and associated facilities to serve the Downtown; Transit: Support a transit network to serve the Downtown; Transportation Demand Management (TDM): Improve downtown circulation through TDM strategies; Parking: Support adequate parking in the Downtown. Some projects have been successfully implemented, which have increased capacity and made bicycling and walking more attractive. The following lists some recently completed transportation projects: Downtown signal timing optimization New third eastbound lane on Mount Diablo Boulevard (Moraga Road to 1 st Street) Reconfigured plaza (Moraga Road to 1 st Street south of Mount Diablo Boulevard) Improved eastbound SR 24 on-ramp at 1 st Street Improved bike and pedestrian facilities in Downtown Wider sidewalks on Mount Diablo Boulevard Multi-use path on Moraga Road (connecting schools) Crossing enhancements Bike sharrows Downtown bike bypass and route signage However, many previously studied projects have not been implemented because of high costs, unattractive trade-offs, and/or a lack of community consensus. Page 12

18 2.1 Plan Study Area The Plan study area mimics the part of the City included in the DSP. Lafayette s downtown has a wide range of land uses including residential, office, shopping, entertainment, recreation, education, and civic buildings such as the Lafayette Library and Learning Center. The Plan also considers regional transportation facilities that extend beyond study area and City boundaries, such Bay Area Rapid Transit (BART) and State Route 24 (SR 24), shown in Figure 5 below. Incorporating these regional transportation facilities during the study phase contributed to the intentional holistic approach to strategy development in this Plan. Figure 5: Project Study Area In the context of this Plan, the term region is interchangeable between the greater San Francisco Bay Area and Contra Costa County. Whereas, as depicted in Figure 6, Lafayette is part of the Lamorinda sub-region, comprised of the three municipalities of Lafayette, Moraga, and Orinda. Providing a unique mix of both rural and urban characteristics, Lamorinda is situated near major urban areas yet is immediately surrounded by miles of open space. San Francisco and Oakland to the west and the Interstate 680 (I-680) corridor to the east provide jobs, housing, shopping, and other destinations to people who live and work in Lamorinda. North and south of the sub-region, regional parks and wilderness areas free of development give the area a semirural environment, despite its relative proximity to urban areas. Page 13

19 Figure 6: Lamorinda Study Area 2.2 Transportation Context The Lamorinda Action Plan (2014), prepared by CCTA, assesses the transportation issues within the Lamorinda area and outlines a package of policies, objectives, and actions to address those issues. The Action Plan also identifies Routes of Regional Significance and Interjurisdictional Routes within Lamorinda that represent the key elements of the transportation system. Especially important to Downtown Lafayette, State Route 24 (SR 24) and a Bay Area Rapid Transit (BART) line together form the only prominent regional connection within Lamorinda to the wider Bay Area. SR 24, which runs through the heart of Lafayette and Orinda, connects to I-680, I-580, and I-880, all three major north-south interstates. SR 24 serves Downtown Lafayette with multiple freeway interchanges, including (from east to west), at Pleasant Hill Road, Laurel Drive ( Central Lafayette exit) and Acalanes Road. BART is the primary regional rail transit operator in the East Bay with a network of stations throughout the Bay Area. Lamorinda has BART stations in Lafayette and Orinda. The Lafayette station has served Lamorinda since Below are sample statistics related to use of the Lafayette BART station: Page 14

20 Average daily passenger exits (at fare gates) in 2015: 3,900 Parking spaces: 1,526 County Connection bus lines servicing station: 6, 25, 250 (late evening service during the school year) In Lamorinda, there are a limited number of roads that access the parallel SR 24 and BART corridors. In Orinda, Moraga Way is the primary arterial providing access the Orinda BART station and SR 24. In Lafayette, Moraga Road is the primary arterial providing access to the Lafayette BART station and SR 24. Most streets in the region funnel traffic to this limited number of north-south roads. For Lafayette, this pattern of traffic funneling to Moraga Road is one of the root causes of congestion in the Downtown. 2.3 Socioeconomic Factors Demographics and social indicators are critical to understanding travel behavior, vehicle trip generation, and traffic trends. The population of Lafayette has remained steady over the years with a small increase since Figure 7 shows the Census population trends from 2000 through The average growth rate over these 15 years is approximately 0.4 percent per year. Figure 7: Lafayette Population Trends, Source: US Census Bureau 30,000 Lafayette Population 25,000 20,000 Population 15,000 10,000 5, Year The population over 65 years of age has grown 32 percent since 2000, while the population under 18 has declined 5 percent. Enrollment in the Lafayette School District, which includes four elementary schools and one middle school, has remained relatively steady over the decade. Overall, the median age has risen slightly from 42 in 2000 to 45 in Page 15

21 Although Lafayette has a high median income, the socioeconomic details of the community are complex. Lafayette s median household income has risen 9 percent since 2009, reaching $136,000 in Already a highly educated population, the percentage of residents with a Bachelor s degree increased to 75 percent of the population, an 8 percent increase from 2007 to The number of jobs in Lafayette has recovered since the latest recession of and has slightly surpassed ten-year totals. Overall, jobs have increased 4% from 9,419 in 2002 to 9,813 in The local labor force declined 22 percent from 10,234 in 2002 to 7,941 in 2013, the last year for which figures were available for this Plan. Figure 8 shows labor employment trends in Lafayette. Figure 8: Lafayette Employment Data, Source: Longitudinal Employer-Household Dynamics Survey, US Census Bureau 12,000 Lafayette Employment Employed Lafayette residents People working in Lafayette 10,000 8,000 6,000 4,000 2, Lafayette residents in the workforce are employed all over the Bay Area, as shown in Figure 9. The most common cities for Lafayette residents to be employed include Oakland, Walnut Creek, San Francisco, Lafayette, Berkeley, and Concord, in that order. Approximately 50 percent of Lafayette residents travel west of Lamorinda for work (e.g., San Francisco and Oakland), 35 percent travel east of Lamorinda (e.g. Walnut Creek and Concord), and 15 percent stay within the Lamorinda area. Page 16

22 Figure 9: Where Lafayette Residents Work (2013), Source: US Census, Longitudinal Employer- Household Dynamics Survey, US Census 2.4 Transportation Mode Share Mode share describes the relative popularity of certain travel methods. These travel methods include driving personal automobiles, riding transit, bicycling, and walking. As is the case for this Plan, mode share is often analyzed in terms of travel method to and from jobs. Populationwide travel to work data is available from the Census Bureau s annual American Community Survey (ACS). Figure 10 shows the most recent 2013 ACS data for how Lafayette residents travel to work. Between 2009 and 2013, commuters who drove alone fell from 70 percent to 66 percent. Simultaneously, transit commuting increased 63 percent, while walking and bicycling remained steady. Across all modes, travel time to work has increased eight percent, from a median 26.5 minutes in 2009 to 28.6 minutes in 2013, and the percentage of people traveling for more than 45 minutes to work has increased 26 percent. Page 17

23 Figure 10: Commute (Journey-to-Work) Mode Share (2013), Source: US Census American Community Survey Commute Mode of Lafayette Residents, % 1% 1% 15% 6% 10% 66% Drove alone Carpooled Took public transportation Walked Bicycled Taxi, motorcycle, other Worked at home 2.5 Lafayette in the Future Both Plan Bay Area (2013) and the City of Lafayette s DSP identify Downtown Lafayette as the center for much of the community s projected population growth. Plan Bay Area 2040, created by the Metropolitan Transportation Commission (MTC), is a state-mandated, integrated longrange transportation, land use, and housing plan to help Bay Area cities and counties plan for transportation needs and preserve the character of its numerous, diverse communities while adapting to the challenges of future population growth. The DSP builds on the Lafayette General Plan and other policy documents to provide a detailed land use and design framework to guide private development and public investment in the downtown. For Lafayette, Plan Bay Area forecasts a 15 percent increase in housing units and households by 2040 with approximately 50 percent of that growth occurring in the Downtown. Figure 11 provides a summary of the projected growth for Lafayette and Moraga. The Plan Bay Area forecasts are included for Moraga for comparative purposes. The DSP and DSP EIR provide detail for local growth in the Plan study area, including: Downtown will increase housing units in addition to office and retail square footage. The EIR traffic study included 1,765 additional housing units and 180,000 square feet of both office and retail space. The EIR estimated an increase of an additional 1,900 peak hour vehicle trips in Downtown by BART will not add more parking spaces to its current 1,526. Page 18

24 Traffic on SR 24 will increase as population and jobs increase in the I-680 corridor and in the San Francisco and Oakland urban areas. Local housing dynamics will impact enrollment in Lafayette schools. The CCTA regional travel demand model estimates similar growth rates of percent for areas in and around the Downtown. Figure 11: Lafayette and Moraga Housing Projections, Source: ABAG 12,000 Projected Growth in Housing Units 10,000 8,000 Units 6,000 4,000 2,000 Lafayette Moraga Year In addition to ongoing demographic changes, future societal trends are likely to also impact travel behavior and auto trip-making. Recent evidence indicates that Boomers (ages 50-65) and Millennials (ages 21-34) prefer more walkable, transit-oriented communities. 1 These preferences are shaping travel behavior in communities around California. Biking, walking, and riding transit continue to rise in popularity, while driving is decreasing. 2 1 American Planning Association, Investing in Place: Two Generations Views on the Future of Communities, May 2014: 2 Brian McKenzie, Modes Less Traveled Bicycling and Walking to Work in the United States: American Community Survey Reports, United States Census Bureau, May 2014: American Public Transportation Association, Public Transportation Use Is Growing Here Are the Facts, March 2014: Page 19

25 Technological trends will also impact Lafayette. Vehicles, and the goods and services that support them, are likely to evolve along with the demand for more energy efficient and selfdriving features. The Internet of Things (IoT) is expanding and producing smarter devices with more complex and real-time data. As data becomes more prevalent and integrated seamlessly into transportation services, travel options will increase and could begin to favor connected and shared mobility services such as those offered by technology network companies like Uber and Lyft. However, the impacts of these technology trends on travel behavior, auto trip-making, and ultimately traffic congestion in Lafayette is uncertain. 2.6 Measuring and Understanding Traffic Congestion Congestion occurs when the traffic demand on a roadway exceeds the available capacity, which results in slower speeds, increased delays, and long queues. There are two types of congestion: Typical (Recurring): this is congestion that occurs on a regular basis when demand exceeds capacity; Incident-based (Non-Recurring): this is when an accident or another incident (e.g., downed power lines) blocks one or more lanes of traffic. Congestion is caused by the popularity of destinations and various activities. The more people want to travel to similar locations at similar times, the more likely the roadway network that connects people with these locations will become congested. Congestion can also result from incidents, such as collisions, inclement weather, special events, and construction or other work zones. Typical congestion is something that transportation planners can address through managing demand and designing solutions that increase capacity. While incidents are impossible to predict, there can be policies in place to clear accidents more efficiently and communicate information to travelers faster if they do occur. 2.7 Traffic Congestion Data Sources To measure travel and congestion for this study, we drew from a variety of traditional count sources as well as new probe data from GPS and navigations systems. These are summarized below: Program for Arterial System Synchronization (PASS): The study utilized peak period vehicle, pedestrian, and bicycle counts collected by TJKM in 2013 for the ongoing Program for Arterial System Synchronization (PASS) traffic signal project in Downtown. These counts included: weekday AM, mid-day, afternoon, PM and weekend mid-day periods for 13 of the highest volume intersections on Mount Diablo Boulevard and Moraga Road. This study also collected hourly traffic counts for seven days using machine tube counters at five locations. Machine counts provided an indication of the daily and hourly traffic variation on local streets. Downtown Specific Plan (2012): The DSP analysis utilized counts collected in 2009 for the DSP EIR. The EIR was also a source of intersection level-of-service (LOS) calculations, which provided an indication of vehicular traffic operations across the City. Page 20

26 New traffic counts: For this study, updated traffic counts were collected in May 2015 for three locations on Mount Diablo Boulevard at the intersections of Moraga Road, 1 st Street, and Oak Hill Road-Lafayette Circle East. These counts were used as a check on the previous data sources. Caltrans PeMS: To understand conditions on SR 24, the study utilized freeway volume and speed data from Caltrans Freeway Performance Management System (PeMS). The data were downloaded for several years to understand the variability in traffic conditions and how long congestion persists on SR 24. The Caltrans Count Book was used to check and supplement the data. Incident data: Traffic incident data was compiled from the California Statewide Integrated Traffic Records System (SWITRS) and accessed through the University of California at Berkeley s Transportation Injury Mapping System (TIMS). Parking data: The City provided parking data from 2011 and 2014 that were analyzed to understand parking utilization and turnover. Field observations: The consultant team collected queuing information, identified pedestrian and bicycle conditions, and reported on the general condition of the transportation system during routine field work. GPS, cell phone, navigation systems data: The consultant team utilized mobility data provided by the data vendors INRIX and StreetLight. This data offers a tremendous opportunity to better understand how people travel through a study area. Traditional traffic data does not provide insight into where trips are coming from and going to. Autonomous GPS and mobile phone data is an emerging data source that can provide this level of detail and help us to identify local travel markets. These data sources were used to understand existing congestion in Downtown and to develop the traffic model, which is described later in the report. 2.8 The Where and When of Traffic Congestion Traffic congestion in the Downtown occurs at various places and throughout the day. Figure 12 presents the location of typical traffic congestion using INRIX GPS/navigation system data during the morning and evening peak periods. The shading of segments indicates the relative level of congestion on that particular link, and is defined as the ratio of actual speed to the typical uncongested or free flow travel speeds. For example, green segments show links where travel speeds are over 85% of what they would be with no other vehicle traffic; whereas dark red segments indicate heavily congested links during gridlock conditions. Sections on Moraga Road, Mount Diablo Boulevard, and SR 24 are the most congested segments, which reflects field observations. The severity and causes of congestion are detailed in the following sections. Page 21

27 Congestion during the AM Commute ^ N SR 24 Congestion during the PM Commute ^ N SR 24 Congestion (% free flow speed) 85%-100% 65%-85% 50%-65% 33%-50% 25%-33% 0%-25% Source: INRIX, 2015 Figure 12: Typical Congestion at 8 AM and 5 PM (2015) For Downtown Lafayette, the temporal distribution of congestion is somewhat unique. Figure 13 presents hourly traffic count data collected over several days on Moraga Road at School Street. Figure 14 shows total intersection traffic volumes at the Mount Diablo Boulevard / Moraga Road intersection for four different hours of the day. These two figures indicate that traffic volumes in Downtown typically begin peaking mid-afternoon around 2:30 to 3:00 PM and volumes remain at a sustained level for a longer period from three to four hours compared to most roadways in the Bay Area; most streets in the Bay Area experience the beginning of an afternoon/evening peak hour between 4:00 and 5:00 PM with a peak period lasting two hours. Thus, in Downtown Lafayette, the earlier mid-afternoon peak leading to a longer evening peak period is a unique phenomenon. This reflects the numerous activities that are focused along the two main Downtown arterials of Mount Diablo Boulevard and Moraga Road, and the strong influence of proximate school and shopping trips, which typically peak at this time of the day. Page 22

28 Figure 13: Hourly traffic volumes on Moraga Rd at School St, Source: Downtown Specific Plan (2012) Page 23

29 Figure 14: Hourly intersection volumes at Mount Diablo Blvd/Moraga Rd, Source: MTC PASS Study (2015) Intersection Veh Volume (veh/h) 3,500 3,000 2,500 2,000 1,500 1, Mount Diablo Blvd / Moraga Rd Hourly Intersection Volumes 2,780 3,070 3,310 3,280 AM Peak Mid-Day Peak Mid-Aft Peak PM Peak 2.9 Traffic Congestion Across Downtown The traffic analysis conducted for this Plan utilized a number of recent studies that evaluated traffic congestion in Downtown Lafayette. The following bullet points summarize these findings by focus area: The DSP EIR reported LOS D conditions at Mount Diablo Boulevard / Moraga Road and Mount Diablo Boulevard / 1 st Street. Localized delay (LOS F conditions) reported in the DSP EIR at the Moraga Road / School Street / Brook Street intersection during the school peak. Downtown has several significant core destinations that are major traffic generators: the Whole Foods and Safeway block between Oak Hill Road and 1 st Street, La Fiesta Square, and the Trader Joes block between Mountain View Drive and Dewing Avenue. The Downtown Y intersection layout, which links Mount Diablo Boulevard, Moraga Road, Oak Hill Road, and First Street, forces traffic from Moraga Road and heading to/from SR 24 or the BART station to use a circuitous path that includes various turning movements on Mount Diablo Boulevard, First Street, and Oak Hill Road to reach the freeway. This causes congestion at multiple intersections. Eight traffic signals in 0.8 miles on Mount Diablo Boulevard between Mountain View Drive and 2 nd Street. This close spacing of signals makes coordination between intersections challenging. Driveways and on-street parking along Mount Diablo Boulevard create additional friction as vehicles decelerate to access these parking lots or to parallel park at on-street spaces. Close signal spacing and lack of dedicated left-turn lanes on Moraga Road contribute to queuing and congestion. Page 24

30 Figure 15 illustrates the major issues around the Downtown. Figure 15: Downtown Issues The BART station is a valuable transportation asset as it provides high-speed commuter rail service across the core of the Bay Area. However, the station precinct has access and parking issues similar to those of the Downtown. Figure 16 illustrates the issues summarized below: A primary route to the BART station, 1 st Street, requires drivers to use segments of the congested Downtown Y. Parking fills up fast in the morning (often before 8 AM), which then results in drivers circulating looking for other options or leaving Lafayette altogether. BART patrons parking west of Oak Hill Road have to cross the Deer Hill Road / Oak Hill Road intersection (all way stop) to access the BART station. Wayfinding does not clearly highlight pedestrian pathways between BART and Mount Diablo Boulevard. Page 25

31 Figure 16: BART Issues Traffic congestion on SR 24 and the access to and from the ramps at Deer Hill Road, 1 st Street, and Oak Hill Road also affect downtown conditions. Figure 17 illustrates these issues, which are summarized below: SR 24 is congested during the AM and PM peak travel periods. The afternoon congestion can sometimes result in traffic exiting the freeway at Acalanes Road to use Mount Diablo Boulevard to bypass the traffic. For downtown traffic, the Y is the primary route to access the SR 24 on- and off-ramps. Page 26

32 Figure 17: SR 24 Issues Traffic congestion around the downtown school locations (Lafayette Elementary and Stanley Middle School) is caused by pick-up and drop-off activities around the schools combined with other traffic using Moraga Road during the mid-afternoon. Figure 18 illustrates the issues around the downtown school locations. These issues are summarized below: Pick-up and drop-off activities around the schools contribute to congestion on Moraga Road and St Mary s Road School Street has issues related to narrow sidewalks, drop-off/pick-up activity, and residential on-street parking There are safety concerns for pedestrians at crossings around the schools, particularly at Moraga Road and St Mary s Road The pedestrian crossing times contribute to traffic delay on Moraga Road Page 27

33 Figure 18: School Issues 2.10 Traffic Congestion Trends in Lafayette It is important to reflect on recent historical trends in traffic volumes to understand how conditions have changed over time. Figure 19 and Figure 20 compare the AM and PM peak hour traffic volumes for the Mount Diablo Boulevard / Moraga Road and Mount Diablo Boulevard / First Street intersections since the year Between 2000 and 2015, traffic volumes decreased at both intersections. Comparing 2015 to 2000, peak hour volumes at Mount Diablo / Moraga Road were 14% lower in the AM and 10% lower in the PM. The 2015 counts were slightly higher than 2013, which reflects the ongoing economic recovery, but in general, traffic volumes appear to have remained largely steady or slightly lower compared with 2007 levels, which represents the data taken just prior to the Great Recession period. Page 28

34 Figure 19: AM Peak Hour Traffic on Mount Diablo Blvd at Moraga Rd and 1 st St AM Peak Hour Intersection Volumes Mt Diablo Blvd / Moraga Rd Intersection Mt Diablo Blvd / 1st St Intersection 4,000 Intersection Veh Volumes (veh/h) 3,500 3,000 2,500 2,000 1,500 1, Year Figure 20: PM Peak Hour Traffic on Mount Diablo Blvd at Moraga Rd and 1 st St PM Peak Hour Intersection Volumes Mt Diablo Blvd / Moraga Rd Intersection Mt Diablo Blvd / 1st St Intersection 4,000 Intersection Veh Volumes (veh/h) 3,500 3,000 2,500 2,000 1,500 1, Year Page 29

35 Traffic on SR 24 has remained consistently congested. In its 2015 report on congestion in the Bay Area, the Metropolitan Transportation Commission listed the evening commute on SR 24 from Oakland to Orinda as the ninth most congested route in the Bay Area. 3 A bit farther east towards Lafayette, total traffic and peak period traffic has remained relatively consistent over the past decade. After a dip in 2008, daily traffic on SR 24 has returned to pre-recession levels with traffic east of Downtown remaining heavier overall than traffic west of Downtown, as shown in Figure 21. An evaluation of peak period traffic volumes on SR 24 show similar patterns. Figure 21: Average Daily Traffic on SR 24 in Lafayette, Caltrans Count Book Daily Traffic on SR 24 West of Downtown East of Downtown 250,000 Daily Volume (veh/day) 200, , ,000 50, Year 3 Metropolitan Transportation Commission, Fresh Data on Bay Area s Vital Signs Include New Top 10 List for Freeway Congestion, Vital Signs, December 17, Page 30

36 2.11 Transit Transit ridership in Lafayette has grown significantly in a relatively short span of time. BART ridership at Lafayette BART Station has increased 37% from 2,900 daily riders in 1999 to 3,900 in 2015, as shown in Figure 22. System-wide growth over this period was 54%. Figure 22: Data from BART Ridership Reports for April ,500 Weekday Average Exits at Lafayette BART Station 4,000 Average weekday station exits 3,500 3,000 2,500 2,000 1,500 1, Year Two County Connection bus routes, the 6 and 25, serve Downtown Lafayette and the BART station. Route 6 (Figure 23) serves both the Lafayette and Orinda BART stations, running along Moraga Road in Lafayette and Moraga Way in Orinda. Route 25 (Figure 24) similarly serves both the Lafayette and Walnut Creek BART stations along Mount Diablo Boulevard and Olympic Boulevard. Page 31

37 Figure 23: County Connection Route 6 map, source: countyconnection.com Figure 24: County Connection Route 25 map, source: countyconnection.com Page 32

38 According to the Central Contra Costa Transit Authority s Mini Short Range Transit Plan (FY through FY ), both of these routes underperform compared to other County Connection routes. Route 6 is 43 rd of 63 of County Connection s routes with 13.7 passengers per revenue hour. Route 25 ranks even lower with 5.3 passengers per revenue hour, putting it at 62 nd of 63 routes. The cost per passenger is high for each route. Route 6 again performs better than Route 25, but worse than most County Connection routes. Route 6 costs $4.65 per passenger, 46 th of the 63 County Connection Routes, while Route 25 is second to last at $12.79 per passenger. Lamorinda is the least densely populated incorporated area in County Connection s service area, according to the Central Contra Costa Transit Authority s Short Range Transit Plan In large part because of this low density pattern, Route 25 does not meet County Connection s performance standards of 15 passengers per revenue hour and $8.50 per passenger. Route 6 is just shy of the passengers per revenue hour standard and surpasses the cost per passenger standard. Figure 25 shows that despite low ridership trends overall, both routes have experienced small ridership increases to downtown destinations in the last five years. In total, both routes have added approximately 130 daily riders. Page 33

39 Figure 25: County Connection Ridecheck Plus, Ridership by Route and Stop for Routes 6 and 25 provided by County Connection 250 County Connection Daily Ridership Downtown Lafayette 200 Daily Passengers Route 25 Route BART Lafayette Downtown 2.12 Parking The parking analysis conducted for this Plan is summarized in the Background Conditions Report (Arup, February 11, 2016), which is available on the Plan website. In , the Lafayette Planning Department completed a Downtown parking inventory and occupancy study on behalf of the City sparking Ordinance Update Committee (POC). Data and findings from this study supersede the previously-available parking data. Key findings from the parking study are summarized below: There are a total of 11,408 on- and off-street spaces in the study area. Private parking represents 96% of the available parking stock, comprising 10,946 spaces while the 462 public spaces comprise 4% of the parking stock. On-street parking is predominantly unmetered, with 79%, or 1,368 spaces unmetered while 21% or 364 spaces are metered. Though certain parcels with off-street parking may consistently achieve or exceed 85% occupancy it is important to view all parcels in conjunction with the surrounding parcels in order to understand data trends and gain a better understanding of how parking is used. In order to better analyze the data staff divided the total study into seven different areas or Blocks. The only block that exceeded 85% was the block on the North side of Page 34

40 Mount Diablo between Oak Hill Road and First Street 4, which reached 86% occupancy on Wednesday at noon. The findings demonstrate that within each area there is consistently available parking. However, within each of those areas there is typically one or two more impacted lots. On-street parking is considered underutilized, particularly on Mt. Diablo Boulevard adjacent to the most impacted off-street parking, like the Trader Joes Parking lot. Some potential reasons for this: o People do not prefer to park on Mt. Diablo Boulevard or Oak Hill Road because of the speed of traffic o People will wait in a parking lot for a free space rather than paying a nominal fee for an available space Public parking is considered underutilized. Some potential causes: o Directing signage is ineffective o Public parking is not immediately next to the busiest destinations o The public is generally unaware of the extent of public parking Private parking is considered underutilized. Some potential causes: o Businesses restrict their parking such that only their patrons can use the lot, even when the business is not open o Businesses have many parking spaces for uses that are not parking intensive o Lots are gated Based on the above summary findings, the following recommendations have been put forth to the POC: 1. Incorporate better signage to direct drivers towards public parking 2. Meter parking and enforce time limits for public and private parking to increase turnover 3. Remove physical barriers between parking lots to improve parking availability as well as ingress and egress from downtown lots 4. Make downtown streets and shortcuts between parking lots and commercial areas more pedestrian friendly in order to encourage parking further from more impacted areas 5. Increase sharing for parking, particularly in underutilized lots and lots where utilization decreases in the evening or on weekends Traffic Safety According to SWITRS data, over a ten-year period from early 2004 to late 2013, 204 traffic injury collisions were reported within Lafayette city boundaries, excluding collisions on SR While most of these injury collisions involved no severe injuries or fatalities, seventeen were severe injury collisions and seven involved traffic fatalities. Figure 26 shows the severity of injury collisions in Lafayette during this ten-year study period. 4 This lot encompasses the Safeway, McCaulous and Wholefoods lots. 5 Collisions involving property damage only and no injuries are not reported in the SWITRS database. Page 35

41 Figure 26: Severity of Collisions, SWITRS Severity of Injury Collisions in Lafayette, % 8% 57% 31% Fatal Injury (Severe) Injury (Other Visible) Injury (Complaint of Pain) All the collisions that involved fatalities or severe injuries in the Downtown area involved a vulnerable road user i.e., a pedestrian or cyclist. Of the seven traffic fatalities in Lafayette during this ten-year period, two were in the Downtown area. The first fatality occurred in 2007 when a speeding driver hit a pedestrian at Brown Street and Hall Lane. In the other traffic fatality, a motorcyclist died just north of the BART station parking lots at the intersection of Deer Hill Road and North Thompson Road. The citation issued for both fatalities was Automobile Right of Way. Four of seventeen collisions that resulted in severe injuries occurred in the Downtown area. Two pedestrians were injured in 2005 due to unsafe backing on 2 nd Street and in 2007 due to improper passing at Mount Diablo Boulevard and Dewing Avenue. The other two severe injuries involved bicyclists. Figure 27 plots the fatal/severe and non-severe accidents across Downtown. Page 36

42 Figure 27: Traffic Collisions in Lafayette, (SWITRS) Vulnerable road users are significantly overrepresented in injury collision statistics. First, SWITRS data show that vulnerable road users involved in an injury collision tend to be located in the Downtown area. Citywide, there were 46 injury collisions involving bicyclists or pedestrians during the ten-year timeframe. Two-thirds, or 29, of these collisions occurred in the Downtown area, as shown in Figure 28. Just over half of the collisions were pedestrians, and the rest were bicyclists. Second, within the Downtown area, vulnerable road users are overrepresented in injury collision data. Of all injury collisions in the ten-year period, 32 percent of all incidents involving bicyclists or pedestrians. By comparison, traffic counts at the Mount Diablo Boulevard and Moraga Road intersection show 89 bicyclists and pedestrians and 3,394 vehicles in the evening peak period. In other words, 97 percent of traffic are vehicles and only 3 percent are bicyclists or pedestrians, yet bicyclists and pedestrians are involved in a large portion of injury collisions. Page 37

43 Figure 28: Collisions between Vehicles with Pedestrian/Bicyclists (SWITRS) In a third of the injury collisions in Lafayette over the ten-year period, a violation for driving at an unsafe speed was issued. Following this violation, three other violations were common. Drivers who violated the right of way were involved in 12 percent of the collisions, drivers who turned improperly made up 10 percent of the collisions, and violations at traffic signals or traffic signs were also 10 percent of the incidents. A more complete list of violation categories in detailed in Figure 29. Page 38

44 Figure 29: Collision Violation by Category, SWITRS Injury Collision Violation Category ( ) Unsafe Speed Automobile Right of Way Other Hazardous Violation Improper Turning Traffic Signals and Signs Unsafe Lane Change Driving or Bicycling Under the Influence of Alcohol or Drug Wrong Side of Road Pedestrian Right of Way Following Too Closely Figure 30 shows injury collisions by time-of-day. The largest share of injury collisions, 27 percent, occurred in the evening peak period. By contrast, relatively few collisions occurred in the morning peak period. Figure 30: Collision by Time of Day, SWITRS Injury Collision Time of Day ( ) 9:00 PM to 11:59 PM 6:00 PM to 8:59 PM 3:00 PM to 5:59 PM Noon - 2:59 PM 9:00 AM - 11:59 AM 6:00 AM - 8:59 AM 3:00 AM - 5:59 AM Midnight to 2:59 AM Citywide, most pedestrians who are involved in a collision were in a crosswalk. Only three of the nineteen collisions involved a pedestrian who was crossing the street not in a crosswalk. Full information is shown in Figure 31. These data show the need for safer conditions for pedestrians. Page 39

45 Figure 31: Pedestrian Location During Collision (SWITRS) 12 Pedestrian location during collision 10 8 Count Crossing in Crosswalk at Intersection Crossing Not in Crosswalk Crossing in Crosswalk Not at Intersection In Road, Including Shoulder Not in Road 2.14 Summary of Background Conditions The background conditions summarized in this chapter provide context for the causes of congestion and how traffic volumes in Downtown Lafayette have changed since the turn of this century. Traffic levels generally trend upwards as population, jobs, and economic growth increases. However, economic downturns, such as those experienced in 2001 and , can often lead to a short-term decrease in traffic growth. In addition, the Bay Area is experiencing a long-term shift to alternative modes such as transit, walking, and biking that can slow the rate of single-occupancy automobile traffic growth. For example, from 2000 to 2014, the share of auto commute trips in the Bay Area has decreased from 81 percent to 76 percent. Traffic trends in the City have fluctuated over the years. Figure 32 presents several datasets: The AM and PM peak hour traffic volumes (left axis) at the Mount Diablo Blvd / Moraga Rd intersection from 2000, 2007, 2009, 2013, and This intersection is featured because it facilitates the highest peak hour traffic volumes among all Downtown Lafayette intersections. AM and PM traffic peaked in 2000 then declined in ensuing years through After 2007, PM peak hour volumes stayed flat and have increased between 2013 and AM peak hour volumes have followed the same general trends, albeit with a slightly steeper decline between While traffic volumes can fluctuate daily and vary by intersection, counts at other Downtown intersections show the same general trends. The drive alone Journey-to-Work Commute Mode Share (right-axis) for the City of Lafayette is from the US Census. This is the share of drive alone commute work trips made by Lafayette residents. This share has decreased from 71 percent to 65 percent since 2000, which is lower than the Bay Area average of 76 percent. This tracks closely with trends across the Bay Area. Page 40

46 Figure 32: Traffic Trends Mount Diablo Blvd / Moraga Rd: Intersection Traffic Volumes Peak Hour Intersection Volumes (All Approaches) 4,000 3,500 3,000 2,500 2,000 1,500 1, % 70% 68% 66% 65% Drive Alone Commute Mode Share (%) AM Peak Hour Traffic PM Peak Hour Traffic 80% 75% 70% 65% 60% 55% 50% Lafayette Drive Alone Commute Mode Share (%) Current traffic volumes are slightly lower than in year 2000; more recent traffic growth since 2010 has stayed relatively flat. One reason for this is that the percentage of drive alone work commute trips has decreased over the same period from 2000 to However, these numbers do not provide a complete picture as the commute mode share focuses on work trips and not on other types of travel. Table 4 provides a summary of key socioeconomic indicators for the City of Lafayette from US Census and other City sources. Many of the indicators decreased between 2000 and 2010, but have increased over the last five years. Population and job growth have increased since 2010, while the labor force (the number of employed residents in Lafayette) has decreased over the same period. These metrics provide evidence of why traffic volumes decreased after 2000 and why traffic growth has been slower over the last few years. Page 41

47 Table 4: City of Lafayette Economic Indicators % Change Economic and Traffic Data (10 Yrs) (5 Yrs) Population 23,908 23,893 25, % 8.2% Labor Force 9,603 8,741 7, % -14.5% Employment 8,560 8,109 9, % 15.5% Housing Units 9,334 9,651 9, % 1.0% Commercial sf n/a 2,126,587 2,170,338 n/a 2.1% School Enrollment (K-5) 2,292 2,138 2, % 10.0% School Enrollment (6-8) 1,214 1,073 1, % 10.1% Drive Alone Mode Share 71% 68% 64% -3% -5.9% % Aged % 17% 18% 3% 5.9% Traffic Volumes: Mount Diablo Blvd/Moraga Rd 3,795 3,327 3, % 2.0% Source: Arup, US Census, City of Lafayette These data indicate that there has been a change in the type of travel and a shift in the composition of traffic. The number of Lafayette residents commuting to work has decreased along with the drive alone commute mode share. However, local employment (workers commuting to Lafayette) and school enrollments have increased over the last five years. Commercial space, which includes office and retail, has increased slightly (2%) in the last five years. Even though traffic volume growth has been flat over the last several years, congestion, especially along Moraga Road, appears to have stayed steady. This is likely due to the concentration of multiple activities and driveways along the segment from St. Mary s Road to Mount Diablo Boulevard. Increased drop-off and pick-up activity at Lafayette Elementary and Stanley Middle School (though enrollments have not changed significantly), retail activity at Fiesta Square, and the Lafayette Library and Learning Center, which are all accessed from Moraga Road. 3 Growth Scenarios and Traffic Analysis This chapter summarizes the development growth scenarios, traffic forecasting assumptions, and the traffic analysis results. 3.1 Development Growth Scenarios The Plan considers two land use / development future growth scenarios. The traffic forecasts and analysis models were used to assess future traffic congestion, develop and refine proposed congestion reduction strategies, and test their effectiveness. Section 3.2 describes the process of generating the future year traffic forecasts and the traffic analysis models based on these development growth scenarios. Page 42

48 Generally, trips are made by residents, workers, shoppers, and school parents to accomplish activities. The number of trips generated within the City of Lafayette and Lamorinda region are a function of the size of the population and labor force, number of jobs, number of housing units, amount of commercial space and school enrollment. For any trip, the decision to use an automobile is determined by economic factors, like the cost and convenience of driving, compared to other options such as walking, cycling, or riding transit. The decision to make an auto trip using a certain route and at a specific time is determined by the type of activity, the perceived level of congestion, and personal preference. These factors all influence why trips occur, where they go, when they occur, and what travel mode is used. This determines the amount of traffic on a road during peak times and the resultant level of congestion. The two land use development scenarios modeled for this Plan assume varying degrees of development growth within Lafayette and Moraga. The two future scenarios are summarized below: Business as Usual: the Business as Usual forecast assumes historical Lafayette development and traffic volume growth consistent with the existing General Plan and the DSP development scenario approved by the City Council. This growth scenario assumes approximately 8 percent higher development and traffic by This represents average annual growth of 0.3 percent. The Business as Usual scenario is shown as it represents historical growth patterns, a relatively lower level of development growth, and reduced trip making. Higher Growth : the Higher Growth or worst case scenario assumes greater relative development and traffic volume growth in Lafayette that would be consistent with projected development totals from ABAG s Plan Bay Area and assumed in CCTA s regional travel demand model. This scenario assumes 20 percent growth in population and jobs by This represents average annual growth of nearly 1 percent. This represents a worst case scenario, which assumes steady population and employment growth and no major changes in travel behavior or transportation technology. It should be noted that this growth scenario exceeds Lafayette s own projections in all of its approved long-range planning documents, including the DSP and General Plan. Figure 33 illustrates how the two development growth forecasts applied to intersection volumes at the Mount Diablo Boulevard / Moraga Road intersection. As alluded in section 2.14, above, this intersection experiences the most peak hour traffic in Downtown Lafayette. Page 43

49 Figure 33: Traffic Growth Scenarios The Higher Growth scenario was used for the traffic analysis presented in the next section and to assess the congestion reduction potential of proposed Short List strategies. The traffic analysis utilized the Higher Growth scenario to develop traffic forecasts for both the near-term (year 2025) and long-term (year 2040) future conditions. The projected development increases in the Higher Growth scenario would translate into a 20 percent increase in traffic across the Downtown study area. This increase is a weighted average and incorporates both residential and commercial growth. For example, in the travel analysis model, zones along Mount Diablo Boulevard would likely generate more traffic because a greater intensity and mix of development is projected along that corridor, while other areas not adjacent to Mount Diablo Boulevard are projected to have less intense development growth. Under long-term conditions in the Higher Growth scenario, zones along Mount Diablo Boulevard could generate traffic growth closer to 30 percent, while residential areas in other parts of the study area generate growth closer to 5 percent. The traffic growth rates were incorporated into the detailed traffic analysis used to evaluate the strategies. The 20 percent traffic growth rate represents an average across the wider Downtown study area. Table 5 below shows the corresponding population and employment growth forecasts from the CCTA Development Forecasts for areas in Downtown Lafayette and for other areas of Lamorinda ( ), along with the combined total growth rate proposed to develop the future baseline volume scenario. Page 44

50 Table 5: Population and employment forecasts ( ) Area Population Growth Employment Growth Total Weighted Growth (Population+Employment) Downtown Lafayette 32% 15% 24% Lamorinda 14% 14% 14% Source: CCTA, City of Lafayette, MTC The increment of new additional PM peak hour traffic in the future scenario is approximately 1,750 vehicle trips within the Downtown area. This is very close to the Cumulative With Specific Plan vehicle trip generation estimate of 1,900 PM peak hour trips presented in the DSP EIR. The next section presents the traffic analysis methodology and results for three distinct scenarios: Existing Condition (year 2015), Near-Term (year 2025) and Long-Term (year 2040). 3.2 Traffic Analysis The traffic analysis methodology for this study incorporates a series of tools to evaluate traffic capacity, intersection performance, travel time, and queuing within Downtown. Arup utilized traffic microscopic simulation ( microsimulation ) models of Downtown for the morning (AM) peak hour and the two-hour afternoon peak periods, which include the mid-day (MD) and evening (PM). Microsimulation software tools such as Synchro/SimTraffic and VISSIM were used to simulate individual vehicle and pedestrian movements on the street network. These models utilize assumptions on how drivers accelerate, change lanes, and interact with pedestrians. These tools generate metrics such as travel time, delay, and queuing. Traffic microsimulation models analyze how individual users (e.g., drivers, pedestrians, and buses) interact on the transportation system. Section 4.4, below, discusses a more qualitative traffic analysis methodology which also contributes to strategy recommendations in this Plan. The DSP EIR conducted a comprehensive traffic analysis that identified the potential impacts of future development in Downtown. The EIR traffic analysis provides a strong basis for understanding existing and future traffic conditions. The traffic analysis presented in this report builds on this earlier work and is largely consistent with the previous findings. The Higher Growth development scenario described in the previous section was used to generate traffic forecasts for the following traffic analysis scenarios: Existing Conditions (2015): the traffic models were developed and calibrated using a combination of 2015 counts and travel time measurements with earlier data. Near-Term Year (2025): this represents an approximate mid-point forecast year for traffic growth and is half of the year 2040 growth. Long-Term Year (2040): this applies the 20% growth rate over existing volumes described above. These three future scenarios were modeled using the calibrated existing conditions model and adding in the future traffic forecasts. Figure 34 presents the extents of the analysis study area. Page 45

51 Figure 34: Traffic Analysis Model Extents SR 24 ^ N The traffic analysis summarizes intersection delay and level of service (LOS) as well as travel time on key corridors. LOS is a qualitative rating describing conditions experienced by drivers at a signalized intersection. Intersection delay was calculated using the traffic simulation model, with LOS determined using criteria from the Highway Capacity Manual (HCM, Transportation Research Board, 2010). Table 6 presents the LOS criteria. Table 6: LOS Criteria LOS A B C Description Delay of 0 to 10 seconds. Most vehicles arrive during the green phase and do not stop at all. Delay of 10 to 20 seconds. More vehicles stop than with LOS A, but many drivers still do not have to stop. D Delay of 20 to 35 seconds. The number of vehicles stopping is significant, although many still pass through without stopping. E Delay of 55 to 80 seconds. Most, if not all, vehicles must stop and drivers consider the delay excessive. F Delay of more than 80 seconds. Vehicles may wait through more than one cycle to clear the intersection. Source: Transportation Research Board LOS and delay is only measured for an individual intersection, and does not fully account for the effects of queuing at upstream and downstream locations. Table 7 presents the traffic analysis results for Existing Conditions and the future year 2025 and 2040 scenarios. Both of the future year scenarios represent baseline conditions i.e., they assume no changes to the roadway network or implementation of strategies. Page 46

52 Table 7: Traffic Analysis Results Study Location Existing (2015) Near-Term (2025) Long-Term (2040) Intersection LOS / Delay (sec) MDB/Oak Hill Rd C / 29 C / 30 C / 31 MDB/1st St C / 29 C / 31 D / 51 MDB/Moraga Rd D / 49 D / 50 F / 94 Moraga Rd/Moraga Blvd C / 34 D / 49 D / 54 Moraga Rd/Brook/School C / 27 F / 94 F / 102 Moraga Rd/St Marys B / 16 E / 60 E / 70 Travel Time (mm:ss) NB Moraga Rd St Mary s to MDB 03:24 04:27 05:41 SB Moraga Rd MDB to St Mary s 01:27 03:12 04:15 Total System Delay (average delay per vehicle, mm:ss) Total System 01:30 02:17 03:19 The future year baseline analysis, which assumes the worst case conditions, indicates the following: The future traffic increases will cause delay and congestion to worsen. In the Long-Term (2040) scenario, the 20 percent increase in traffic projected under the Higher Growth forecast will result in a 36 percent increase in vehicle hours of delay. Moraga Road, including the intersections at Mount Diablo Boulevard, Brook Street, and School Street, remains the most critical segment, followed by First Street between Mount Diablo Boulevard and SR 24. Other intersections of Mount Diablo Boulevard outside of the Y appear to have sufficient capacity and should continue to operate acceptably in the future. However, under the Higher Growth scenario, projected traffic growth of 20 percent on SR 24 could lead to greater diversion to Mount Diablo Boulevard if freeway conditions worsen. 60% of vehicles travelling north on Moraga Road turn right onto Mount Diablo Boulevard. With only one short right turning lane on this approach there is insufficient capacity for these vehicles to queue and the right turning queue spills into the middle lane and into upstream intersections that are located south of this intersection. Vehicles travelling southbound on Moraga Road and turning left into Moraga Boulevard block through traffic on this approach which increases the delay of southbound vehicles. These queues have been observed to extend back to Mount Diablo Boulevard and block east and westbound traffic on Mount Diablo Boulevard. This is expected to worsen in the future. The traffic modeling indicates that significant changes to the roadway network and intersection capacity are needed to support future traffic volumes if the worst-case scenario of 20 percent growth materializes by year These traffic modeling tools were used to help define and Page 47

53 evaluate the strategies described in the next section. The detailed traffic analysis for the complete set of strategies are provided in the technical memorandums referenced at the beginning of the report. 4 Strategy Development Chapters 1 and 2 briefly discuss the process by which congestion reduction strategies have been developed for this Plan. This chapter delves into the details. In the first study phase for this Plan, Arup drew from the following sources to generate the initial list, called the universe, of congestion reduction strategies: 1. Previous City of Lafayette plans and studies, in addition to other public agency and School District documents, that presented a range of proposed transportation projects and programs across the Downtown study area. 2. The web-based survey and Collaborative Map tool conducted in fall 2015, which generated hundreds of responses from local residents representing a broad spectrum of their personal experiences and ideas for transportation-related improvements. 3. Arup s background conditions analysis and numerous site visits. 4. Input from the Steering Committee, Circulation Commission, City Council, School District, and City staff. From these sources, the Initial List of over 100 possible strategies were documented. This was refined to a more manageable Long List of 50 by combining several duplicates or related projects. Arup conducted an initial qualitative assessment of the potential congestion reduction benefits and cost/implementation challenges for each solution idea and then documented this in the Lafayette Downtown Congestion Long List Strategies Matrix (March 22, 2016). The benefit and cost assessment utilized a qualitative scoring of 1 (low) to 5 (high). Arup staff developed these benefit and cost scores using engineering judgment, past experience, and their understanding of the background data and traffic modeling completed to date. While the assessment was qualitative, it was deemed a helpful guide for the Steering Committee to evaluate the relative merits of individual projects. Additional quantitative analysis was then conducted to generate and eventually finalize a refined Short List of eleven strategies recommended in this draft Plan. The study explored two categories of strategies to address Downtown traffic congestion: 1) strategies that increase capacity or throughput (the number of vehicles that can travel through an intersection), or 2) strategies that reduce vehicle trips (also known as demand management strategies). Table 8 provides some typical strategies for these two categories. Please note that these examples are not exhaustive: Page 48

54 Table 8: Examples of Congestion Reduction Strategies Capacity Enhancing Increase Capacity / Throughput Add new streets Widen existing streets Add left or right-turn lanes Improve signal coordination Vehicle Trip Reduction Promote Walk, Bike, and Transit Modes Add bike lanes Add pedestrian crossings Provide more bus service Improve access to BART Opportunities for adding new streets and widening streets are limited in a developed area such as Downtown Lafayette. However, additional turn lanes, reconfiguring intersections, and improved traffic signal coordination can all increase capacity, which would allow for more people to travel through particular intersections and segments within the local transportation network. The vehicle trip reduction strategies focus on ways to promote alternative modes of transportation by making it easier to walk and bike to Downtown schools and BART, and possibly remove vehicle trips on congested roadways. The strategy development process included several steps, which encapsulate input from more than a dozen publicly-noticed meetings, including at the Steering Committee, joint City Council and Circulation Commission, and a public workshop. These steps are described in the following sections. 4.1 Initial List of Strategies The Steering Committee, City staff, and Arup developed an initial list of over 100 strategies from previous Circulation Commission strategy memos, previous studies such as the DSP, results from the first set of surveys (i.e., Collaborative Map and priorities survey), and our own early analysis and field observations. 4.2 Long List of Strategies The Initial List was used to develop a Long List of 50 strategies. Figure 35 presents the Long List plotted on an x-y axis: the y-axis shows the scale of the congestion reduction benefits, while the x-axis shows the scale of the ease of implementation. Arup developed a detailed table for the Steering Committee that included a project description, options, a qualitative analysis of the effectiveness, and the potential trade-offs. The Steering Committee weighed these factors and trimmed the Long List down to an initial Short List of 19 strategies. Page 49

55 Figure 35: Long List of Strategies Page 50

56 4.3 Short List of Strategies & Refinement The 19 strategies on the initial Short List are shown in Figure 36. Arup conducted a more detailed analysis of these strategies, including estimates of vehicle traffic generation, the potential for shifting trips from auto to alternative modes, and traffic operations impacts. Arup developed a series of traffic microsimulation models to test how each strategy would impact traffic level-of-service, travel time, and vehicle queuing under existing conditions and two future analysis scenarios (year 2025 and 2040). The Steering Committee evaluated the detailed traffic analysis and further refined the Short List to 15 recommended strategies. This Short List edition then underwent extensive public review. From April 24 June 1, 2017 over 600 community members submitted feedback on the strategies featured in the Short List. Feedback was submitted via a web-based Preference Survey as well as during a public workshop on May 23 rd at the Lafayette Veterans Memorial Hall. Subsequent to that outreach period, on August 15, 2017, the Steering Committee approved a recommended Short List of 11 strategies and draft Implementation Plan. These recommendations have been incorporated into this draft Plan in Chapter 4. The traffic analyses, combined with a multi-criteria assessment, were used to refine the Short List from 19 to 15 strategies. The multi-criteria assessment considered a broad range of transportation and societal factors, as well as order-of-magnitude cost estimates. Page 51

57 Figure 36: Short List of Strategies Page 52

58 4.4 Multi-Criteria Analysis To further assess the refined Short List of 15 strategies, the Steering Committee guided development of a multi-criteria analysis tool. This method was employed to gauge the qualitative performance measures for each of the Short List strategies, and achieve one of the original study objectives: to apply holistic traffic evaluation of traffic congestion reduction strategies. The multi-criteria analysis considered a range of performance measures, including congestion reduction (weighted 3x the other variables), safety, connectivity, parking, environmental, ease of implementation, cost, and urban design. Table 9 summarizes the results of the multi-criteria assessment and cost estimate. The detailed multi-criteria assessment results are presented in Appendix C. Table 9: Multi-Criteria Analysis Summary Ease of Capacity Enhancing Strategies Composite Score Implementation Cost New Traffic Signals on Deer Hill Rd 29 2 $ k Brook St-School St Intersection Realignment 27 1 $4-5M MDB/Moraga Rd 2nd NBR 26 5 $ k Moraga Rd Extension Behind McCaulou s/whole Foods to First St 26 1 $20-30M School Street One-Way Westbound 26 3 $ k BART Pedestrian Bridge Over Oak Hill Road 26 1 $6-8M Moraga Rd/Moraga Blvd SBL lane 24 5 $75-100k Coordinated Traffic Signals 24 5 $1-1.5M Vehicle Trip Reduction Strategies Ease of Composite Score Implementation Cost Regional Trail Connection to BART/Downtown 27 5 $50-100k Additional School Loading Zones 26 2 $ k Student Pedestrian Safe Routes Priority Streets 26 5 $50-100k Enhance School Bus Program 25 2 $320k (per year) Staggered School Times 25 1 Unknown Mt Diablo Boulevard Bike-Ped Pathway Expansion 22 3 $1-2M School Street Bike-Ped Connection to Trail 21 3 $500k-1.5M The technical studies, multi-criteria analysis, public feedback from the preference survey and public workshop, and direction from the Steering Committee generated critical input for developing a recommended strategy plan and when each strategy should be implemented. Chapter 4 describes the recommended implementation timing for certain strategies. Page 53

59 5 Recommended Traffic Congestion Reduction Strategies The Steering Committee considered a wide range of factors to develop a final list of recommended strategies for inclusion in the Plan, as described in Chapter 3 and 4, above. Figure 37 presents the final recommended traffic congestion reduction strategies. Additional information and conceptual designs for the strategies are presented in Appendix A. The analyses indicate that implementing combinations of the recommended strategies could effectively reduce or alleviate existing and future Downtown traffic congestion under the worstcase Higher Growth development scenario. Modeling the recommended strategies under this scenario allows for better understanding of the estimated effectiveness and potential implementation timing of strategy combinations. Timing is critical because not all strategies can be implemented immediately. Strategies such as the Brook-School Intersection Realignment (#9), would require land acquisition, design and environmental studies, and would require additional funding sources. Other strategies, such as the Enhanced School Bus Program (#7), could be implemented sooner by increasing the number of buses leased from the existing operator. The two growth scenarios described in Chapter 3 provide a useful high and low target to examine when to implement the proposed strategies over the next 15 to 20 years. It is possible that development patterns and travel behavioral trends will result in future growth somewhere between the two forecast lines. Two timeframes for implementing strategies have been identified: Short-Term Strategies (1-10 Years): these strategies generally have lower relative costs, can be implemented with relatively minimal right-of-way acquisition and coordination with other regional and state agencies, likely require only minimal environmental analysis under the California Environmental Quality Act (CEQA), and can probably be designed and constructed in a five-year time period. These strategies have been estimated to provide up to 6% additional roadway capacity. Long-Term Strategies ( Years): these strategies generally have much higher relative costs, will require more significant coordination with regional agencies such as EBMUD and Caltrans, and will likely require a full Environmental Impact Report (EIR) under CEQA. However, these strategies are only necessary if traffic and development growth approaches the Higher Growth scenario. These strategies have been estimated to provide up to 20% additional roadway capacity. Page 54

60 Figure 37: Final Recommended Strategies Page 55

61 The Short and Long-Term Strategy timeframes for strategy implementation are presented in Figure 38 within the context of the two development growth scenarios presented in Chapter 3. The horizontal gray line shows the existing intersection capacity at Mount Diablo Boulevard / Moraga Road. As traffic volumes from the Business as Usual and Higher Growth scenarios begin to exceed the capacity, congestion worsens and LOS E/F conditions are reached. The Short and Long-Term Strategy implementation packages each provide a step increase in capacity over the existing condition. Figure 38: Short and Long-Term Implementation Timing Table 10 presents the recommended strategies that are included in the Short and Long-Term Strategy implementation packages. It is important to note that these recommended strategies do not represent a strict priority list, but merely represent a way of organizing the strategies according to short and long-term timeframes. The City should remain flexible to implement one or more of the Long-Term strategies sooner than estimated if corresponding traffic conditions and grant funding opportunities arise. Page 56

62 Table 10: Recommended Strategies by Implementation Timeframe Strategy Cost Reasoning Short-Term (1-10 years): Relatively Low Cost Investments to Increase Capacity and Reduce Trip Demand Coordinated Traffic Signals Southbound left-turn lane at Moraga Road and Moraga Boulevard Signalize Deer Hill Rd/Oak Hill Rd and Deer Hill Rd/Happy Valley Rd Additional School Pick-up & Drop-off Zones Student Pedestrian Safe Routes / Priority Streets School Street Bike-Ped Pathway Connection to Trail Enhanced School Bus Program Regional Trail Connection to BART/Downtown Long-Term ( Years): Long-Term Projects to Consider if Needed Brook St-School St Intersection Realignment BART Pedestrian Bridge over Oak Hill Rd Moraga Rd Extension to SR 24 and 1st St Behind McCaulou's/Whole Foods For City Council Deliberation Mount Diablo Blvd/Moraga Rd 2nd Northbound Right-Turn $1-1.5M $75-100k $ k $ k $50-100k $500k-1.5M $320k (per year) $50-100k $4-5M $6-8M $20-30M $ k Extending the coordinated traffic control system to additional signals will provide a small increase in capacity with minimal physical or environmental impacts. It also scored first in the preference survey, by a significant margin. However, it scored last on the multi-criteria assessment and it is an expensive strategy to implement. Despite these drawbacks, this project could qualify for regional and/or federal funds, such as MTC s IDEA grant program. Providing a dedicated left-turn pocket is a relatively low-cost measure to increase capacity on Moraga Rd. This strategy also scored reasonably high on the preference survey (#3 or #4). These traffic signals provide additional capacity and pedestrian safety benefits. These signals scored high in the multi-criteria assessment, they have a relatively modest financial cost, and they can be constructed without significant physical impacts. However, they did score low in the survey. These formal zones will help divert some school-related traffic from Moraga Rd. These additional zones scored high in the multi-criteria assessment and in the top third of the preference survey. These Safe Routes are the key connections from the additional pick-up and drop-off zones to the schools. For the zones to be effective and safe, these additional routes are needed. This strategy scored high in the multi-criteria assessment but in the middle to the bottom third of the survey. However, Arup and City staff still consider this is a critical complement to the pick-up/drop-off zones. This project is also a critical complement to the pick-up/drop-off zones and the Student Pedestrian Safe Routes, as it forms a key connection between the two Downtown schools and the Lafayette-Moraga Regional Trail. With the Brook St-School St Realignment project, it also provides a direct and safe pedestrian and bicycle connection to the west side of Moraga Rd. The proposed design removes 9 on-street parking spaces. However, the public spaces are all on the south side of the street and impact spaces only near two houses; there is also excess on-street parking capacity on Avalon Ave. This strategy does score low in both the multi-criteria analysis (last) and in the bottom third of the survey. This strategy will likely take additional design and outreach with the neighbors prior to implementation. Providing additional school buses at Stanley Middle School and new service at Lafayette Elementary will reduce school-related trips during peak times. This strategy scored reasonably high in the multi-criteria assessment and near the top in the preference survey. It is relatively expensive to implement, at approximately $320,000 per year to the current contractor operating the school buses. This program will likely take additional time to identify and acquire funds. This project helps create a cohesive bicycle and pedestrian network across Downtown, to reach key destinations such as BART and nearby commercial establishments. It also helps tie together the Safe Routes and the other school-related projects. It scored high in the multi-criteria analysis and it is relatively low-cost. However, it did score in the bottom third of the survey. This strategy enhances traffic capacity and helps provide a better east-west bicycle connection across Moraga Rd. It scored high in the multi-criteria assessment, but in the middle of the pack in the survey. There are still concerns that this strategy would encourage cut-through traffic on Brook St. However, the congestion relief associated with the Short and Medium-Term strategies should improve conditions along Moraga Road to the point that it would reduce the attractiveness of using Brook St as a cut-through route. But additional traffic calming measures on Brook St could be explored. This strategy will likely take at least five years to implement. This project will provide a more direct connection between the BART parking lots. It will also divert some pedestrians from the Oak Hill Rd/Deer Hill Rd intersection, which will provide a modest operational and safety benefit. However, the project is very expensive and will require a long time to design, fund, and construct. This project is only required if the City experiences traffic growth at the higher 20% growth forecast shown in the earlier section. To achieve this growth, sites such as McCaulou s/whole Foods would need to redevelop. If this redevelopment occurs, the connection from Moraga Rd to SR 24 and 1 st St should be constructed as part of the site plan. This roadway will provide a direct connection and was shown to be the most effective at improving queuing along Moraga Rd. While this strategy scored high in the multi-criteria assessment and the survey, it would require the removal of the north-south crosswalk on the east leg of the intersection. Arup and City staff have considered that this is too significant of an impact on pedestrian circulation. This strategy would also contradict established City policies promoting pedestrian mobility and Complete Streets principles, especially in the downtown core. The strategy provides significant congestion reduction benefits for a modest cost. Page 57

63 Short-Term (1-10 Years) Summary These strategies should be implemented as early as possible to address existing congestion, as funding opportunities arise. The rationale supporting the Short-Term strategies is that these can be implemented relatively quickly and in conjunction with proposed Downtown school campus redesigns funded by the school district bond measure passed in Each of the Short-Term strategies would involve varying degrees of modifications to physical infrastructure. To complement these strategies, it will also be important to continue regular monitoring of traffic conditions on Moraga Road and Mount Diablo Boulevard to track growth trends in traffic volumes, travel times, and even modal shifts. Long-Term ( Years) Summary Depending on the rate of traffic growth, some of the Long-Term strategies may be needed in approximately ten to fifteen years under the Higher Growth scenario. However, these strategies might not be required at all if growth under the Business as Usual scenario occurs or other longterm factors put downward pressure on demand for single-occupancy vehicle use. Drive alone mode share and auto ownership per household continue to trend down locally in Lafayette and the Bay Area overall, while bicycle usage and ridesharing (carpooling and Uber/Lyft) are increasing. In the future, autonomous vehicles could allow for an increase in road capacity and promote low cost shared trips, which could reduce overall congestion. The strategy delivering the most significant capacity increase, the Moraga Road extension (#11), is only required if Downtown traffic volume growth exceeds 20%. This level of traffic growth would likely require that a significant portion of Downtown (e.g., including the Whole Foods site) be redeveloped at an intensity greater than what is permitted under the existing General Plan and DSP. The trip reduction strategies (e.g., school loading zones and the enhanced school bus program), coupled with other land use and development policies, could help slow the rate of traffic growth in Downtown. This would result in future growth closer to the Business as Usual line (shown in blue) depicted in Figure 44. Slower traffic growth would provide the City with greater flexibility in terms of the number and timing of strategies 6. 6 Funding and Implementation Since Lafayette relies primarily on regional, State, and federal grant funds to implement approved transportation programs and projects, implementation timing is often reliant on sufficient funding availability. In many cases, the agency administering grant funds differs from the agency actually sourcing the grant funding. For example, One Bay Area (OBAG) grant funds include federal dollars that are appropriated to states and then regional planning agencies, the 6 Additional detail on the growth assumptions is provided in the memorandum A Framework for a Downtown Congestion Reduction Plan Implementation Strategy Correlations between Estimated Future Development and Traffic Growth (Arup, March 23, 2017). Page 58

64 latter of which administer said funds based on legislative authority. In that case, the Metropolitan Transportation Commission (MTC) maintains authority to allocate federal funds appropriated to the Bay Area region via the State. State-administered grant programs are typically competitive across the state. Regionally-administered grant programs are usually competitive with some exceptions for formula programs - across the Bay Area, within Contra Costa County, or even within the Lamorinda and Tri-Valley sub-regions. Additionally, virtually all grant funding programs require some form of matching or in-kind funding contribution from the project sponsor, i.e., the agency implementing the project or program. There is also variation in the frequency and dollar amounts among transportation grant funding programs. Some programs reliably request calls for projects on an annual basis whereas others become available only if sufficient funds can be derived from their designated sources in order to garner competitive applications. To exemplify this, the Contra Costa Transportation Authority (CCTA) administers the ½-cent countywide transportation sales tax, called Measure J. And, since Measure J took effect in 2009, CCTA has periodically packaged accrued sales tax revenues into defined grant programs, which is then made available for transportation projects through a mix of competitive grant and formula-based programs. Generally, transportation funding availability also assumes relatively consistent legislative support to either continue, expand, or in some cases contract or even eliminate said programs. Several grant funding programs could be considered for future implementation of recommended congestion reduction strategies. However, for reasons described above, the frequency and dollar amount of available grant funding cannot be forecasted with certainty. Only a select few programs have observed consistency in advertising calls for projects on an annual basis. These include the statewide Active Transportation Program (ATP) and the regional Transportation Development Act (TDA) program. Others programs, such as the Statewide Transportation Improvement Program (STIP) and Measure J sales tax programs, typically only become available on a periodic basis. Although, Lafayette may also consider pursuing anticipated new funding programs, like those derived from the recently passed Senate Bill 1 (SB 1), which raised the statewide fuel tax. Page 59

65 Appendix A: Strategy Concepts This appendix provides additional detail on the proposed strategies. Figure 39 presents the recommended strategies. Each strategy is summarized on the following pages. Figure 39: Recommended Strategies 1. Coordinated Traffic Signals on Mount Diablo Boulevard and Moraga Road Figure 40: Adaptive Signal detection camera and radio on a traffic signal mast arm (Source: Provide a series of traffic signal system upgrades along Mount Diablo Boulevard and Moraga Road. These improvements include: 1) install new traffic signal controllers, 2) extend the traffic signal interconnect system on Mount Diablo Boulevard to include Mountain View Drive, Happy Valley Road, and Dewing Avenue, 2nd Street, and Brown Avenue, 3) incorporate the Moraga Road / St. Mary s Road intersection into the Moraga Road coordinated system, 4) install advanced traffic cameras for video data collection and detection, 5) investigate options for implementing advanced adaptive traffic control systems. Figure 40 shows an example of advanced adaptive signal hardware used for vehicle detection and coordination. Page 60

66 2. Southbound Left-Turn lane at Moraga Road and Moraga Boulevard Provide a left-turn lane at the southbound approach of the Moraga Road / Moraga Boulevard intersection, while maintaining two southbound and northbound travel lanes. The turn lane would remove 6-7 on-street parking spaces on the west side of Moraga Road. The turn lane will provide an area for vehicles to line up and not block southbound traffic as they wait to make a left-turn. This will increase capacity and improve traffic operations on Moraga Road. Figure 41 shows the proposed left-turn lane to Moraga Boulevard. Figure 41: Southbound left-turn at Moraga Road and Moraga 3. Signalize the Intersections of Deer Hill Road and Oak Hill Road and Deer Hill Road and Happy Valley Road Figure 42: Recommended traffic signal locations Install new traffic signals at the Deer Hill on Deer Hill Road Road / Oak Hill Road and Deer Hill Road / Happy Valley Road intersection. Traffic signals at these intersections will improve traffic operations and provide an enhanced environment for pedestrians using the crosswalks. Roundabouts were also evaluated but eliminated from consideration because they would not likely provide sufficient traffic capacity. Figure 42 shows the location of the proposed traffic signals. Page 61

67 4. Additional School Pick-up & Drop-off Zones Introduce two new pick-up and drop-off zones at Golden Gate Way and St Mary s Road. The new zones provide additional options for parents to drop-off children that could divert some vehicle trips from critical segments of Moraga Road. Figure 43 shows the location of the two additional loading zones. Figure 43: Additional school pick-up & drop-off zones 5. Student-Pedestrian Safe Routes Figure 44: Student Pedestrian Safe Routes Create a seamless pedestrian network with new paths and enhanced facilities on existing streets. This network would include the School Street Bike-Ped Connection to Trail concept, with enhanced safety measures at other key intersections. These Safe Routes provide a seamless network for children and other pedestrians to travel between the schools and the new pick-up and drop-off zones, the Regional Trail, and Moraga Road. These improvements are necessary to support the pick-up and drop-off zones and promote additional walking and cycling around the schools. Figure 44 shows the location of the Safe Routes providing access to the schools. Page 62

68 6. School Street Bike-Pedestrian Pathway Connection to Trail The School Street Bike-Ped Pathway Connection to Trail includes a redesign of the street to provide a wide path for pedestrians and cyclists on the north side of the street that connects the Downtown schools and the Lafayette-Moraga Regional Trail. The proposed design would remove some on-street parking. However, parking could be added with a redesign of School Street in front of the Middle School. This proposed design would integrate well with the Brook St-School St Intersection Realignment and the School Street One-Way Westbound strategy. Figure 45 shows the proposed design from Moraga Road to the Regional Trail. Figure 45: School Street Bike-Ped Pathway 7. Enhanced School Bus Program Expand the school bus program by increasing the contracted service by four buses and extending the service to Lafayette Elementary. 8. Regional Trail Connection to BART/Downtown Improve bicycle and pedestrian facilities and signage between the Lafayette-Moraga Regional Trail and BART and Downtown. This would include the School Street Bike-Ped Connection to Trail, improvements on Brook Street, Hough Avenue, and Lafayette Circle. Page 63

69 9. Brook Street-School Street Intersection Realignment Figure 46: Brook Street-School Street Realignment Realign Brook and School Streets to create a single intersection at Moraga Road with a southbound left-turn pocket. Consolidating the two intersections at Brook and School Street to one and providing the left-turn pocket improves traffic operations on Moraga Road, Brook Street, and School Street. The Masonic Lodge property would need to be acquired and the building demolished. Also, a few on-street parking spaces on the south side of School Street would need to be removed. Figure 46 shows the proposed realignment. 10. BART Pedestrian Bridge over Oak Hill Road Figure 47: BART Pedestrian Bridge Construct a pedestrian bridge over Oak Hill Road connecting the BART parking lots to the station. A connection to the new path and bridge from Oak Hill Road could also be built to provide another access point to the station. This will reduce potential conflicts between drivers and pedestrians at the existing Deer Hill Road / Oak Hill Road crosswalks and provide a more direct connection to BART for patrons parking at lots east of Oak Hill Road. This could also potentially reduce driver delay at the Deer Hill Road/Oak Hill Road intersection. Figure 47 shows the location of the proposed pedestrian bridge. Page 64

70 11. Moraga Road Extension Behind McCaulou s / Whole Foods To 1st Street Figure 48: Moraga Road Extension Extend Moraga Road north of Mount Diablo Boulevard through the shopping center, between Safeway and McCaulou s, to connect with 1st Street opposite the State Route 24 eastbound onramp. This connector would operate one-way northbound only. This project would provide a direct connection for traffic heading to the freeway, which redistributes traffic from key segments of Mount Diablo Boulevard and 1st Street. This would improve traffic operations through the Downtown Y. This project is only required in the long-term if population and employment growth exceed certain targets and if the redevelopment of the shopping center presents an opportunity. Figure 48 shows one potential alignment for the Moraga Road extension with the redevelopment of the Whole Foods site nd NBR turning lane at Mt Diablo Boulevard and Moraga Road (No North-South Figure 49: 2nd Northbound Right Turning Lane Crosswalk at the east leg) Provide a second northbound right-turn from the middle lane at the Moraga Road / Mount Diablo Boulevard intersection and remove the north-south crosswalk on the eastern leg of the intersection. These changes would increase capacity for the critical northbound right-turn, which would reduce queuing and improve traffic operations along Moraga Road. The crosswalk needs to be removed to avoid conflicts between turning drivers and pedestrians. Several alternatives that considered other lane configurations, signal phasing, and crossing options were evaluated but eliminated from consideration during Steering Committee review. This strategy requires approval by the City Council. Figure 49 shows the location of the proposed second northbound right-turn lane at the Mount Diablo Boulevard / Moraga Road intersection. Page 65

71 Appendix B: Public Surveys The scope of work for the called for two public outreach periods. This Appendix describes the purpose, methodologies, and outcomes for each period. The first outreach period occurred during the first phase of study, from mid-november through December This outreach commenced after the first joint City Council and Circulation Commission meeting to review Plan progress. For this outreach period, Arup designed a Priorities Survey, which featured a dynamic Collaborative Map on which participants could mark specific locations and insert comments regarding their concerns and ideas to address Downtown traffic congestion. The second outreach period occurred from late April through May This outreach also commenced after the second joint City Council and Circulation Commission meeting. For this latter outreach, Arup designed a Preference Survey, in which participants could opine on the preliminary Short List of strategies recommended by the Steering Committee. Arup also hosted a public workshop at the Veterans Memorial Building, to gain inperson feedback on the preliminary strategy recommendations. B.1 Priorities Survey To augment data based analysis and assessment, feedback was sought from local residents through a range of survey tools aimed at gathering community input on transportation issues and to identify priorities for the study. Two survey tools were developed and have been made available along with a project website ( 1. Transportation Survey of issues and priorities (857 responses) 2. Collaborative Map of specific transportation issues (420 responses) The primary findings from these survey tools are summarized below: Congestion is felt to be a major problem in Lafayette with downtown, highway, and school congestion among the most pressing transportation issues. The availability and price of parking in Downtown and at the BART station are major concerns. Bicycle and pedestrian safety conditions are an impediment to access for non-driving travelers, especially school children. Frustrations about growth in the downtown and from Moraga infuse concerns about current and future traffic conditions. Transportation Survey The Transportation Survey was open for two months from November 2015 to January In total, 961 participants took the survey. Access to the survey was not restricted by , IP address, or other mechanism, but when the survey was closed, the data was culled to ensure unique responses from duplicate IP addresses. After removing duplicate and unfinished surveys, the responses totaled 857. Page 66

72 The survey was generally representative of Lafayette residents and other groups interested in Lafayette transportation. The majority (82%) of respondents were Lafayette residents, followed by Moraga residents at 9 percent of respondents, Orinda residents at 1 percent, and 8 percent of respondents were from other Bay Area locations. Employment status and percentage of respondents with children in school was generally comparable to the American Community Survey (ACS) numbers for Lafayette. Commuting modal share was also comparable to ACS percentages. The share of school children who walked or biked to school was lower for this survey than the rates for Lafayette Elementary School listed in the Safe Routes to School Report (2013), which may suggest lower walking and biking rates for other schools in Lafayette since this survey was not restricted to Lafayette Elementary families. While respondents indicated that they use a range of modes for commuting purposes, they rely almost exclusively on driving to get to downtown destinations for non-work trips. Most survey respondents (91%) visit Downtown Lafayette frequently (at least a few times per week) for nonwork purposes. For such trips, 89 percent of respondents drive alone or with others. No respondents listed County Connection buses as a mode for downtown trips. The remaining travelers visited Downtown by walking (6%) or bicycling (3%). While an overwhelming 98 percent of respondents rated the quality of life in Lafayette as excellent or good (Figure 50), over half of residents rated congestion as severe or worse (Figure 51). Page 67

73 Percentage of Respondents 70% 60% 50% 40% 30% 20% 10% 0% How would you rate the quality of life in Lafayette or the larger Lamorinda area? 61% 37% Excellent Good Fair Poor 2% 0% Figure 50: Transportation Survey from lafayettecongestion.com, active November January Percentage of Respondents 60% 50% 40% 30% 20% 10% 0% How would you rate the level of congestion in Lafayette or the larger Lamorinda area? 3% Not a problem 32% Moderate Figure 51: Transportation Survey from lafayettecongestion.com, active November January For the final multiple choice questions, respondents were asked to choose their highest and lowest three priorities from a list of fourteen options. Respondents did not have the ability to rank among their priorities. Reducing downtown congestion was the clear top priority. Downtown parking, highway ramp access, and school congestion were fairly even second priorities. See Figure 52 below for a full list. 50% Severe 15% Carmageddon Page 68

74 Downtown congestion Downtown parking School congestion SR 24 ramp access BART parking Downtown character Bike/ped downtown access School safety Downtown safety Transit to BART Other option Lamorinda School Bus Service Bike/ped BART access What are your HIGHEST three priorities for improving transportation in the downtown? BART safety Percentage of Respondents 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Figure 52: Transportation Survey from lafayettecongestion.com, active November January While most issues selected as low priorities were not selected as high priorities, school safety was twice as likely to be selected as a high priority than as a low priority (Figure 53). Page 69

75 BART safety Lamorinda School Bus Service Transit to BART Bike/ped BART access Downtown character BART parking Bike/ped downtown access Downtown safety SR 24 ramp access Downtown parking School congestion School safety Downtown congestion What are your LOWEST three priorities for improving transportation in the downtown? Other Option Percentage of Respondents 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% Figure 53: Transportation Survey from lafayettecongestion.com, active November January Of the 857 survey participants, 45 percent responded to the open-ended question. The responses were coded the responses into eight general categories: parking, growth, biking, safety, walking, transit, school options, and intersections (Figure 54). Page 70

76 120 Survey Comments Themes 100 Responses Figure 54: Transportation Survey from lafayettecongestion.com, active November January Under these themes, these discussions were most common: 1. Parking was the most commonly discussed item. Respondents had negative opinions regarding downtown parking meters and discussed availability problems in specific parking lots. Calls for parking garages were common. 2. Growth was discussed almost as much as parking. Commenters expressed fear that growth will transform Lafayette in part by exacerbating existing traffic issues. 3. Respondents expressed a desire to bicycle, but safety was a prominent concern. There were calls for more bike parking and more direct connections between BART and the Lafayette/Moraga Regional Trail. 4. Safety was a concern in general, especially regarding speeding drivers. Respondents highlighted the area around the schools for needing more safety measures. 5. Respondents expressed an interest in walking, but in safer conditions. 6. The idea of a downtown circulator was frequently mentioned, as was improving County Connection headways. 7. Parents mentioned safer walking and biking routes for their children, and respondents generally mentioned improving bus service. 8. Some respondents commented on intersections, either general operations (such as signal timing) or the design of specific intersections (such as lane striping). Page 71

77 Collaborative Map Survey As of January 11, 2016, 131 people provided 420 comments to the Collaborative Maps survey. 7 Most people contributed a few comments, but sixteen people contributed more than five comments each, with one person providing 41 comments and three people providing 25 to 29 comments each. There was no maximum contribution per unique address set. See Figure 55 below Collaborative Maps Comments per Uunique addresses Comments per unique addresses Figure 55: Collaborative Maps Survey from lafayettecongestion.com, active November January About half of the comments focused on general traffic conditions with pedestrian and bicycling comments falling into second and third, respectively (Figure 56). Comments spanned the spectrum of ideas and observations from the specific ( Need a pedestrian overcrossing here. ) to the general ( Put up signage to remind drivers that texting while operating a vehicle is illegal and causes traffic. ). Traffic comments focused on Mount Diablo Boulevard and especially Moraga Road. Given that Mount Diablo Boulevard has a higher average daily traffic volume than Moraga Road, the greater density of comments along Moraga Road shows the intensity of the conflicts along that roadway. Emphasizing the importance of Moraga Road, bicycling comments also converged on the stretch of Moraga Road from School Street to Mount Diablo Boulevard. Pedestrian comments, however, spanned the Downtown, showing the need for better walking conditions throughout the study area. The Collaborative Map comments will be utilized in Phase 2 of the study as the long list of projects is screened down to a short list. The comments will help in this screening process. 7 A unique person is actually a unique address. While one person could use different addresses to submit repeating comments, the incentive for doing this was low, since we did not limit the number of comments per address. Page 72

78 Comments by Mode Vehicle Traffic Pedestrian Bicycling Other Transit Figure 56: Collaborative Maps Survey from lafayettecongestion.com, active November January In addition to creating their own comments, participants could engage with other commenters through agree and disagree buttons. Of the 420 comments submitted to the Collaborative Map, 306 or 73% received agree or disagree votes. With many of these comments receiving multiple or even dozens of votes, the total vote tally came to 1,421. While most comments had only a small handful of votes, some comments received a large number. The density of votes per comment is shown in Figure 57. More information on the surveys can be found in the Appendix of this report. Page 73

79 Votes per Comment Figure 57: Collaborative Maps Survey from lafayettecongestion.com, active November January Page 74

80 B.2 Preferences Survey The second round of outreach included an online preference survey that was launched at the City Council meeting on April 24, 2017 and a public workshop held at the Lafayette Veterans Memorial Center on May 23, This second outreach effort was intended to gauge public opinion on the refined Short List of strategies generated by the Steering Committee and analyzed by Arup. The outreach was launched at the joint City Council / Circulation Commission meeting on April 24 th with the online Preference Survey ( The public workshop, which was held on May 23 rd, included a presentation by Arup and City staff and a workshop that allowed residents to provide strategy input in person. Arup closed the preference survey on June 1, The survey was completed by 619 participants. The survey consistent of two questions plus a third question that asked for additional qualitative comments regarding the strategies. Survey results are shown below 8. Table 12 below summarizes the two survey questions: Q1: Select up to five (5) strategies that you feel will reduce congestion. The 619 participants submitted 2,718 responses. Q2: Given the pros and cons described for each strategy, select up to five (5) projects that you would support the City investing in. The 619 participants submitted 2,597 responses. The percentages in Table 11 represent the number of respondents that included the strategy as one of their top five responses to the question. 8 The results reported from the survey tool calculate the response percentages in a different way than reported in this memo. The percentages in the survey output are calculated by dividing the number of votes for each strategy by the total votes submitted by all participants, not by the number of participants that included the strategy in their top 5. Over 3,000 total votes were submitted for all strategies by the 619 respondents. The survey tool generates lower percentages because it divides the number of votes for each strategy by the 3,000 total votes, as opposed to the number participants. Page 75

81 Table 11: Survey Results Question 1 Question 2 Select up to five (5) strategies that you feel will reduce congestion. Count % Given the pros and cons described for each strategy, select up to 5 projects that you would support the City investing in. Count % 1. Coordinated Traffic Signals % 1. Coordinated Traffic Signals % 3. Mount Diablo Blvd/Moraga Rd 2nd Northbound Right-Turn % 3. Mount Diablo Blvd/Moraga Rd 2nd Northbound Right-Turn % 4. Moraga Rd/Moraga Blvd Southbound Left- Turn Lane % 14. Enhanced School Bus Program % 14. Enhanced School Bus Program % 4. Moraga Rd/Moraga Blvd Southbound Left- Turn Lane % 8. Additional School Pick-up & Drop-off Zones % 8. Additional School Pick-up & Drop-off Zones % 12. BART Pedestrian Bridge over Oak Hill Rd % 12. BART Pedestrian Bridge over Oak Hill Rd % 5. Brook St-School St Intersection 5. Brook St-School St Intersection Realignment % Realignment % 7. Moraga Rd Extension to SR 24 and 1st St Behind McCaulou's/Whole Foods % 13. Student Pedestrian Safe Routes % 15. Staggered School Times % 6. Signalize Deer Hill Rd/Oak Hill Rd and Deer Hill Rd/Happy Valley Rd % 6. Signalize Deer Hill Rd/Oak Hill Rd and Deer Hill Rd/Happy Valley Rd % 15. Staggered School Times % 13. Student Pedestrian Safe Routes % 11. Regional Trail Connection to BART/Downtown % 9. School Street Bike-Ped Pathway Connection to Trail % 2. School St One-Way Westbound (1st St to Moraga Rd) 79 13% 10. Mount Diablo Blvd Bike-Ped Pathway Expansion 62 10% 7. Moraga Rd Extension to SR 24 and 1st St Behind McCaulou's/Whole Foods % 11. Regional Trail Connection to BART/Downtown % 9. School Street Bike-Ped Pathway Connection to Trail % 10. Mount Diablo Blvd Bike-Ped Pathway Expansion 72 12% 2. School St One-Way Westbound (1st St to Moraga Rd) 67 11% Some key observations include: Coordinated traffic signals scored the highest on both questions, with over 70% expressing support. However, the strong response could reflect a lack of understanding of the project definition and the relatively limited congestion benefits identified by our analysis. The 2 nd Northbound Right-Turn lane at Mount Diablo Blvd / Moraga Rd scored second in both questions, with 44-49% support. The School St One-Way Westbound (First St to Moraga Rd) and the Mount Diablo Blvd Bike-Ped Pathway Expansion scored the lowest on both questions, with support in the 10-13% range. The school-related strategies, including the Enhanced School Bus Program and the Additional Pick-Up & Drop-Off Zones, received support from over a third (33-37%) of respondents. The remainder of the strategies showed support ranging from 20 to 25%. Page 76

82 The high number of strategies (15) presented in this survey resulted in votes being spread across many selections. This results in only one strategy, Coordinated Traffic Signals, earning greater than a 50% share of the votes. This could indicate that there is a lack of consensus on which strategies to implement. City staff analyzed the text comments (Q3) from 314 responses to identify if the comments generally supported or were concerned/opposed to each strategy. Figure 58 presents this analysis. and the full text responses are attached to this memo. The strategies are ranked by the number of total comments received. Three additional strategies have showed up in the comments, including reducing/stopping Downtown development, constructing a pedestrian bridge over Moraga Road, and providing Downtown/BART shuttles. The qualitative responses show a wide range of opinions, similar to what we heard at the public workshop. Figure 58: Inventory of Qualitative Comments from Online Preference Survey The qualitative comments generally follow the results of the first two survey questions. There is strong and nearly unanimous opposition for two strategies: the MDB Pathway Expansion and School St One-Way Westbound. However, there are only a few strategies that received a high number of supportive votes. The pedestrian bridge over Moraga Road (not in our strategy package) and the Enhanced School Bus Program received the most supportive votes (15 and 14 votes, respectively), but these totals were half of the opposition votes for the MDB Pathway Expansion (40 votes) and School Street One-Way (36 votes) strategies. The Brook Street-School Street Realignment strategy had almost equal votes in support and opposition (11 support votes to 9 opposed). The key findings from the qualitative responses include: There is a broad range of opinions regarding the strategies. Page 77

Memorandum. 1 Introduction. James Hinkamp Tony Coe. Michael Iswalt Vanessa Peers

Memorandum. 1 Introduction. James Hinkamp Tony Coe. Michael Iswalt Vanessa Peers To Copies James Hinkamp Tony Coe Date March 23, 2017 Reference number 243381/VP From Michael Iswalt Vanessa Peers File reference Subject Lafayette Downtown Congestion Study: Multi-Criteria Analysis Revised

More information

Reference number /VP. Lafayette Downtown Congestion Study: Multi-Criteria Analysis Revised Results

Reference number /VP. Lafayette Downtown Congestion Study: Multi-Criteria Analysis Revised Results Memorandum To Copies James Hinkamp Tony Coe Date April 24, 2017 Reference number 243381/VP From Michael Iswalt Vanessa Peers File reference Subject Lafayette Downtown Congestion Study: Multi-Criteria Analysis

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

I-105 Corridor Sustainability Study (CSS)

I-105 Corridor Sustainability Study (CSS) I-105 Corridor Sustainability Study (CSS) Metro Streets and Freeways Subcommittee March 21, 2019 Gary Hamrick Cambridge Systematics, Inc. I-105 CSS Project History & Background Funded by Caltrans Sustainable

More information

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need

Purpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description

University of Victoria Campus Cycling Plan Terms of Reference. 1.0 Project Description University of Victoria Campus Cycling Plan Terms of Reference 1.0 Project Description The Campus Cycling Plan, a first for the University, will provide a comprehensive and coordinated approach to support

More information

Preliminary Transportation Analysis

Preliminary Transportation Analysis Preliminary Transportation Analysis Goals of a Robust, Multimodal Transportation Network Safe Accessible/Connected Efficient Comfortable Context-Sensitive Motor Vehicle: Continue to analyze the data to

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Arterial Transitway Corridors Study. Ave

Arterial Transitway Corridors Study. Ave Arterial Transitway Corridors Study Ave January 2012 Arterial Transitway Corridors Study Overview Corridor Features and Demographics 11 study corridors, 95 route miles 86,000 daily rides and half of existing

More information

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service

Planning Committee STAFF REPORT March 7, 2018 Page 2 of 4 The following MTSOs are being used across the five subregions: Intersection Level of Service Planning Committee STAFF REPORT Meeting Date: March 7, 2018 Subject Summary of Issues Recommendations Financial Implications Options Attachments Changes from Committee Review Draft 2017 Multimodal Transportation

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Washington DC Section of ITE Project Briefing

Washington DC Section of ITE Project Briefing Washington DC Section of ITE Project Briefing November 5, 2015 Renée Hamilton, VDOT, Deputy District Administrator I-66 Outside the Beltway Improvement Area Project Location Virginia 2 Purpose and Need

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

Santa Clara I-280 CORRIDOR STUDY

Santa Clara I-280 CORRIDOR STUDY Santa Clara I-280 CORRIDOR STUDY OCTOBER 2017 PREPARED BY: 1.1 Background The I-280 Corridor Study within Santa Clara County is a high-level highway planning study led by the Santa Clara VTA, in partnership

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

SANTA MONICA BOULEVARD CORRIDOR

SANTA MONICA BOULEVARD CORRIDOR CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY

EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing

More information

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION

CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION June 2015 CITY OF ALPHARETTA DOWNTOWN MASTER PLAN TRAFFIC EVALUATION Introduction The Alpharetta Downtown Master Plan was developed in the fall

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Welcome! San Jose Avenue Open House August 25, 2015

Welcome! San Jose Avenue Open House August 25, 2015 Welcome! San Jose Avenue Open House August 25, 2015 Vision Zero The City and County of San Francisco adopted Vision Zero San Francisco Vision Zero High Injury Network as a policy in 2014, committing an

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Central Freeway and Octavia Circulation Study

Central Freeway and Octavia Circulation Study Central Freeway and Octavia Circulation Study Final Report Plans and Programs Committee San Francisco County Transportation Authority September 18, 2012 Presentation Outline Background and Study Purpose

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

5.0 Roadway System Plan

5.0 Roadway System Plan Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,

More information

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand). EXECUTIVE SUMMARY A. Introduction The San Francisco Congestion Management Program (CMP) is a biennial program conducted in accordance with state law to monitor congestion and adopt plans for mitigating

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

Welcome. Background. Goals. Vision

Welcome. Background. Goals. Vision Welcome The formal Public Information Centre (PIC) for the Transportation Master Plan How We GO will be held in early 2017. At that time we will present the recommended transportation system for Niagara

More information

Develop a Multi-Modal Transportation Strategy (Theme 6)

Develop a Multi-Modal Transportation Strategy (Theme 6) DEVELOP A MULTI-MODAL TRANSPORTATION STRATEGY (THEME 6) WHY IS THIS THEME ADDRESSED? Develop a Multi-Modal Transportation Strategy (Theme 6) Statement of Ideal Reduce resident and visitor reliance on single

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand).

modes, the increased roadway capacity is the implied solution, which, in turn, has been shown to lead to more driving (induced demand). CONGESTION MANAGEMEN T PROGRAM DECEMBER, 201 7 EXECUTIVE SUMMARY A. Introduction Every two years, the San Francisco County Transportation Authority (SFCTA) prepares the San Francisco Congestion Management

More information

Public Event 1 Community Workshops

Public Event 1 Community Workshops Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016 Welcome Workshop Purpose We re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn

More information

City of Homewood Transportation Plan

City of Homewood Transportation Plan City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION

More information

North Shore Transportation Improvement Strategy

North Shore Transportation Improvement Strategy North Shore Transportation Improvement Strategy Preliminary, Near-term Recommendation 2016 April Transportation Improvement Strategy (TIS) Comprehensive and Analytical A multi-modal transportation strategy

More information

Community Task Force March 14, 2018

Community Task Force March 14, 2018 Community Task Force March 14, 2018 Welcome and Introductions Project Partners Regional Transportation District (RTD) City of Aurora Colorado Department of Transportation (CDOT) Denver Regional Council

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS

Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS Welcome and Introductions Overview of the Study to Date Community Involvement Intersection Improvement Concepts Bike-Ped Recommendations ITS Recommendations Transit Recommendations Next Steps Inventoried

More information

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014 MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

180 Grand Avenue, Suite x117 Dowling Associates, Inc.

180 Grand Avenue, Suite x117 Dowling Associates, Inc. 180 Grand Avenue, Suite 250 510.839.1742 x117 Oakland, CA 94612 510.839.0871 fax www.dowlinginc.com mbowman@dowlinginc.com Dowling Associates, Inc. Date: Memorandum To: CC: From: Ms. Leah Greenblat City

More information

Berkeley Strategic Transportation Plan A-76

Berkeley Strategic Transportation Plan A-76 Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served

More information

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM.

Moving Cambridge. City of Cambridge Transportation Master Plan Public Consultation Centre. March 7, :00 8:00 PM. City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018 5:00 8:00 PM Region of Waterloo City of Cambridge Transportation Master Plan Public Consultation Centre March 7, 2018

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

CHIEF PEGUIS TRAIL EXTENSION WEST

CHIEF PEGUIS TRAIL EXTENSION WEST 1 PRELIMINARY DESIGN OF THE CHIEF PEGUIS TRAIL EXTENSION WEST Public Information Session June 6, 2017 Welcome 1 Thank you for attending today s public information session. The following boards provide

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Key objectives of the survey were to gain a better understanding of:

Key objectives of the survey were to gain a better understanding of: 3 COMMUNITY INPUT Community input is an essential part of corridor studies. For the SR 87 corridor study, VTA staff conducted an extensive online survey of people living and commuting along the corridor.

More information

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)

Chapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014) Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY

REVIEW OF LOCAL TRAFFIC FLOW / LONG RANGE PLANNING SOLUTIONS STUDY ITEM Town of Atherton TRANSPORTATION COMMITTEE STAFF REPORT TO: FROM: MEMBERS OF THE COMMITTEE ROBERT OVADIA, PUBLIC WORKS DIRECTOR DATE: FEBRUARY 12, 2019 SUBJECT: REVIEW OF LOCAL TRAFFIC FLOW / LONG

More information

Eastern PA Trail Summit October 1, 2018

Eastern PA Trail Summit October 1, 2018 Eastern PA Trail Summit October 1, 2018 WHO WE ARE + WHY + WE RE * HERE * * * * * * Session Goals: Discuss how to coordinate planning and design in small, urbanized towns Consider how to develop alternative

More information

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St)

PROJECT OVERVIEW. 20th Avenue Project Limits (Lincoln Way to Wawona St) PROJECT OVERVIEW In 2014, San Francisco adopted Vision Zero as City policy, with a commitment to eliminate all traffic deaths in the City by 2024. nue Project Limits (Lincoln Way to St) Collision data

More information

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS

WEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd

More information

Clay Street Bridge Replacement Project

Clay Street Bridge Replacement Project Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Speed Limits Study and Proposal. Public Input Session: 8/14/13 Speed Limits Study and Proposal Public Input Session: 8/14/13 Why is Decatur a unique place for this project? First Community Transportation Plan in the nation with a Health Impact Assessment. Strong sense

More information

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT

Update June 2018 OUR 2017 PUBLIC ENGAGEMENT Update June 2018 Hi, Let s Get Wellington Moving (LGWM) is developing a Recommended Programme of Investment (RPI) that meets our programme objectives and supports the city s and region s growth. As part

More information

Typical Rush Hour Commute. PennyforTransportation.com

Typical Rush Hour Commute. PennyforTransportation.com Typical Rush Hour Commute In the News Overview of the Plan Collaborative plan with projects in every community Prioritizing connectivity and congestion relief Dedicated transportation-specific funding;

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

WELCOME TO OPEN HOUSE # 1 June 14, 2017

WELCOME TO OPEN HOUSE # 1 June 14, 2017 Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

92% COMMUTING IN THE METRO. Congested Roadways Mode Share. Roadway Congestion & Mode Share

92% COMMUTING IN THE METRO. Congested Roadways Mode Share. Roadway Congestion & Mode Share COMMUTING IN THE METRO Roadway Congestion & Mode Share The majority of major roadways in Greater Des Moines are without congestion and have underutilized capacity. This surplus capacity could be used for

More information

Access BART: TOD and Improved Connections. October 29, 2008

Access BART: TOD and Improved Connections. October 29, 2008 Access BART: TOD and Improved Connections October 29, 2008 1 Access BART Study Goals Evaluate at the system-level land use and access scenarios to optimize ridership Identify station clusters that provide

More information

CHAPTER 7.0 IMPLEMENTATION

CHAPTER 7.0 IMPLEMENTATION CHAPTER 7.0 IMPLEMENTATION Achieving the vision of the Better Streets Plan will rely on the ability to effectively fund, build and maintain improvements, and to sustain improvements over time. CHAPTER

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Appendix 1 Transit Network Analysis

Appendix 1 Transit Network Analysis Appendix 1 Transit Network Analysis APPENDIX 1 TRANSIT NETWORK ANALYSIS The purpose of this appendix is to provide an update on the transit network analysis as it pertains to: i. SmartTrack ii. Scarborough

More information

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns.

Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Welcome! Thank you for participating in today s Valencia Bikeway Improvements workshop. Data Analysis February to March Identified safety needs from reported collisions and existing travel patterns. Initial

More information

1999 On-Board Sacramento Regional Transit District Survey

1999 On-Board Sacramento Regional Transit District Survey SACOG-00-009 1999 On-Board Sacramento Regional Transit District Survey June 2000 Sacramento Area Council of Governments 1999 On-Board Sacramento Regional Transit District Survey June 2000 Table of Contents

More information

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015

HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 HIGHBURY AVENUE/HAMILTON ROAD INTERSECTION IMPROVEMENTS Municipal Class Environmental Assessment PUBLIC INFORMATION CENTRE 1 MAY 14, 2015 ACCESSIBILITY Under the Accessibility Standards 2015 for Customer

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map INTRODUCTION The I-280 Corridor Study is a highway planning study led by Santa Clara VTA, in partnership with the City of Cupertino and in coordination with other stakeholders in the study area. The study

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017 TRANSPORTATION & MOBILITY VISIONING MEETING August 23 24, 2017 Project Team 1999 South Lakefront Framework Plan In 1999, the Chicago Park District authorized framework plans for three historic parks: Jackson,

More information

Transportation Assessment

Transportation Assessment Transportation Assessment Midtown Open House February 10, 2018 Overview Midtown in Focus Overview & Purpose of Today Transportation Assessment overview Summary of Transportation work to date Review & Analysis

More information

Better Market Street Project Update. Urban Forestry Council September 17, 2014

Better Market Street Project Update. Urban Forestry Council September 17, 2014 Better Market Street Project Update Urban Forestry Council September 17, 2014 Project Area Limits Better Market Street Schedule Market Street City s busiest transit corridor Over 85 buses per hour 14 surface

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Appendix A-K Public Information Centre 2 Materials

Appendix A-K Public Information Centre 2 Materials Appendix A-K Public Information Centre 2 Materials Our Rapid Transit Initiative Make an impact on the future of transit Join the discussion on Rapid Transit in London You re invited to a Public Information

More information