STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 De MINIMIS WRITE-UP FOR PM For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3

Size: px
Start display at page:

Download "STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 De MINIMIS WRITE-UP FOR PM For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3"

Transcription

1 SECTION 4(f) STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3 The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) amendment to the Section 4(f) requirements allows the U.S. DOT Federal Highway Administration (FHWA) to determine that certain uses of Section 4(f) land are de minimis. An impact may be determined to be de minimis if the transportation use of the Section 4(f) resource, including consideration of impact avoidance, minimization, and mitigation or enhancement measures, is so minor in nature that it does not adversely affect the activities, features, and attributes that qualify the resource for protection under Section 4(f). Such a finding will be conditioned upon: the official(s) with jurisdiction over the resource indicating, in writing, that the proposed action, including consideration of the mitigation, will not adversely affect the activities, features and attributes that are important to the resource, and the public has been afforded an opportunity (by public notice) to review and comment on the effects of the project on the protected activities, features, and attributes of the Section 4(f) resource, and implementation of the mitigation measures. When this is the case, an analysis of avoidance alternatives is not required and the Section 4(f) evaluation process is complete. The official(s) with jurisdiction over the resource will be informed of FHWA s intent to make the de minimis impact finding. These conditions appear to be met in the case of the Centennial Athletic Complex. Following public and agency review of this report, it is anticipated that the City of Moorhead will request the FHWA to determine the proposed action at Centennial Athletic Complex is a Section 4(f) de minimis action in accordance with Section 6009(a) of SAFETEA-LU. 1. Description of The Section 4(f) Property. Name: Centennial Athletic Complex Size (acre): 59.8 acres Location: th Ave N, Moorhead, MN Ownership: City of Moorhead Type of Section 4(f) Property: Recreation area Function of or Available Activities on the Property: Baseball, softball, football, playground, dog park Description and Location of Existing and Planned Facilities: The property includes four baseball and eight softball fields (with lighting, dugouts and seating), six football fields, three concessions and restroom facilities, two locker rooms, a dog park, two playgrounds and three parking areas. The facilities are located west of 28th St N on either side of 15th Ave N. There are no planned facilities.

2 STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 2 of 3 Access: Vehicles can access parking areas in eight locations. Pedestrian access is limited by existing fragmented pedestrian facility network (i.e., the existing shared-use path adjacent to the property extends along the north side of 15th Avenue North from the dog park parking entrance to the parking access near the intersection of 28th St N and 15th Ave N). Bicycles can access the property from existing roadways. Usage: The Centennial Athletic Complex 2017 reservation schedule indicates that the football fields are utilized by two events/groups from August 15 through October 31, whereby a total of 2,400 people participate. The reservation schedule indicates that the baseball/softball fields are utilized for two leagues and two tournaments. The leagues utilized the fields Monday through Thursday from April 15 through August 28, whereby a total of 40 teams participate (15 people per team). The tournaments utilize the fields Friday or Saturday through Sunday for a total of 12 times annually, whereby 16 to 32 teams participate (15 people per team). In addition to participants, parents and or spectators may be present during any of these events. Approximately 15 to 25 people utilize the dog park per day. Relationship to Other Similarly Used Lands in the Vicinity: Centennial Athletic Complex is one of four public baseball/softball facilities and one of ten playground facilities in north Moorhead. There are several other public baseball/softball and playground facilities in south Moorhead and in Fargo. Centennial Athletic Complex is the only public football facility in Moorhead. There are two football fields associated with schools in Moorhead, and several in Fargo. Centennial Athletic Complex is the only dog park facility in Moorhead. There are four dog park facilities in Fargo. Applicable Clauses Affecting Ownership: None Unusual Characteristics Reducing or Enhancing the Value of the Property: None LAWCON Section 6(f) Impacts: None; however, the property has received state grant funds. The Minnesota Department of Natural Resources indicated that the proposed impacts would not violate the agreement. 2. Impacts to the Section 4(f) Property. Amount of land impacted: 0.6 acres Permanent R/W Acquisition/Easements: No permanent right of way/easements would be acquired, as the City of Moorhead owns both the existing roadway right of way and Section 4(f) property. Temporary Easements: No temporary easements would be acquired, as the City of Moorhead owns both the existing roadway right of way and Section 4(f) property. Functions Affected: No functions would be affected. Facilities Affected: Construction activities would result in temporary impacts on access to the property. Portions of the existing shared-use path would be closed while the alignment is shifted. Access to parking areas would be disrupted during modification of existing shareduse paths, construction of new shared-use paths and while the roadway is resurfaced; however, access to the parking areas would be maintained.

3 STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 3 of 3 3. Coordination with Responsible Official with Jurisdiction Over the Section 4(f) Property: Please refer to the attached letter. 4. Considerations. Impact Avoidance: Access to the property would be maintained; therefore, impacts on functions of the property would not occur. Due to the nature of the transportation improvement project, temporary disruption of access to the property cannot be avoided. Planning to minimize harm: Access to the property would be maintained during construction. Mitigation: Mitigation measures are not proposed. Enhancement: Upon completion of the project, access to the property would be improved. Additional shared-use paths would be constructed, existing shared-use paths would be modified, and 15th Ave N and 28th St N would be resurfaced, resulting in an improved transportation network for all users. 5. Public Notice: Public notice of the availability of this write-up and opportunity for comment on were published in The Extra Newspaper on September 14, Conclusion: The proposed action includes all possible planning to minimize harm to the resource, and is not anticipated to adversely affect the activities, features and attributes of Centennial Athletic Complex.

4 28th St N Section 4(f) Property & Impacts - Centennial Athletic Complex Roadway Resurfacing & Pedestrian Facilities 15th Ave N & 28th St N - Moorhead, MN SP , SP , SP S & SAP Parking and Shared-use Path Access Impact Parking and Shared-use Path Access Impact 15th Ave N Parking Access Impact Shared-use Path Access Impact Parking Access Impact Roadway Access Impact Parking Access Impact Parking Access Impact Roadway Access Impact Impacted Area Centennial Athletic Complex Feet /

5 P St SECTION 4(f) STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3 The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) amendment to the Section 4(f) requirements allows the U.S. DOT Federal Highway Administration (FHWA) to determine that certain uses of Section 4(f) land are de minimis. An impact may be determined to be de minimis if the transportation use of the Section 4(f) resource, including consideration of impact avoidance, minimization, and mitigation or enhancement measures, is so minor in nature that it does not adversely affect the activities, features, and attributes that qualify the resource for protection under Section 4(f). Such a finding will be conditioned upon: the official(s) with jurisdiction over the resource indicating, in writing, that the proposed action, including consideration of the mitigation, will not adversely affect the activities, features and attributes that are important to the resource, and the public has been afforded an opportunity (by public notice) to review and comment on the effects of the project on the protected activities, features, and attributes of the Section 4(f) resource, and implementation of the mitigation measures. When this is the case, an analysis of avoidance alternatives is not required and the Section 4(f) evaluation process is complete. The official(s) with jurisdiction over the resource will be informed of FHWA s intent to make the de minimis impact finding. These conditions appear to be met in the case of the Centennial Athletic Complex. Following public and agency review of this report, it is anticipated that the City of Moorhead will request the FHWA to determine the proposed action at Centennial Athletic Complex is a Section 4(f) de minimis action in accordance with Section 6009(a) of SAFETEA-LU. 1. Description of The Section 4(f) Property. Name: Matson Memorial Field Size (acre): 6.7 acres Location: th Ave N, Moorhead, MN Ownership: City of Moorhead Type of Section 4(f) Property: Recreation area Function of or Available Activities on the Property: Baseball/softball, playground Description and Location of Existing and Planned Facilities: The property includes one baseball/softball field (with lighting, dugouts and seating), concessions stand, restrooms, clubhouse/locker room, press box, a playground and a parking area. The facilities are located west of 11th St N and south of 15th Ave N. There are no planned facilities. Access: Vehicles can access the parking area in four locations. Pedestrians can access the property from the sidewalks along the south side of 15th Ave N and along the east side of th 11P N. Bicycles can access the property from existing roadways and sidewalks.

6 STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 2 of 3 Usage: The Matson Memorial Field 2017 reservation schedule indicates that the baseball/softball field is utilized by four events/groups. From April 1 to June 1, the field is used daily by one group, and from April 15 to August 1, the field is used 4 days per week by a second group. For both groups, 20 to 300 people attend each day. A third group utilizes the field for two games per week, four weeks of the year, whereby 60 to 300 people attend. The fourth group utilizes the field for five games per year, whereby 60 people attend. Relationship to Other Similarly Used Lands in the Vicinity: Matson Memorial Field is one of four public baseball/softball facilities and one of ten playground facilities in north Moorhead. There are several other public baseball/softball and playground facilities in south Moorhead and in Fargo. Applicable Clauses Affecting Ownership: None Unusual Characteristics Reducing or Enhancing the Value of the Property: None LAWCON Section 6(f) Impacts: None 2. Impacts to the Section 4(f) Property. Amount of land impacted: 0.07 acres Permanent R/W Acquisition/Easements: No permanent right of way/easements would be acquired, as the City of Moorhead owns both the existing roadway right of way and Section 4(f) property. Temporary Easements: No temporary easements would be acquired, as the City of Moorhead owns both the existing roadway right of way and Section 4(f) property. Functions Affected: No functions would be affected. Facilities Affected: Construction activities would result in temporary impacts on access to the property and would permanently shift the perimeter fence. A portion of the existing sidewalk along 15th Ave N would be closed while the alignment is shifted to accommodate turn lane construction at the intersection of 15th Ave N and 11th St N. The alignment shift would require approximately 125 linear feet of the existing perimeter fence to be shifted approximately 10 feet south. Access to the parking area from 15th Ave N would be disrupted while the roadway is resurfaced; however, access to the parking area from 13th Ave N would be maintained. 3. Coordination with Responsible Official with Jurisdiction Over the Section 4(f) Property: Please refer to the attached letter. 4. Considerations. Impact Avoidance: Access to the property would be maintained and the fencing shift would not impact the existing dimensions of the playing field; therefore, impacts on functions of the property would not occur. Due to the nature of the transportation improvement project, temporary disruption of access to the property and permanent shifting of the perimeter fencing cannot be avoided. Planning to minimize harm: Access to the property would be maintained during construction.

7 STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 3 of 3 Mitigation: Mitigation measures are not proposed. Enhancement: Upon completion of the project, access to the property would be improved. Additional shared-use paths would be constructed, existing shared-use paths would be modified, and 15th Ave N and 28th St N would be resurfaced, and the intersection of 15th Ave N and 11th St N would receive a permanent signal and added turn lanes, resulting in an improved transportation network for all users. 5. Public Notice: Public notice of the availability of this write-up and opportunity for comment on were published in The Extra Newspaper on September 14, Conclusion: The proposed action includes all possible planning to minimize harm to the resource, and is not anticipated to adversely affect the activities, features and attributes of Matson Memorial Field.

8 10th St N 10th St N 10 1/2 St N 10 1/2 St N Section 4(f) Property & Impacts - Matson Memorial Field Roadway Resurfacing & Pedestrian Facilities 15th Ave N & 28th St N - Moorhead, MN SP , SP , SP S & SAP Roadway Access Impact Parking Access Impact Parking Access Impact 15th Ave N Sidewalk Access and Fencing Impact 11th St N Impacted Area Matson Memorial Field Feet / 13th Ave N

9 SECTION 4(f) STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 1 of 3 The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) amendment to the Section 4(f) requirements allows the U.S. DOT Federal Highway Administration (FHWA) to determine that certain uses of Section 4(f) land are de minimis. An impact may be determined to be de minimis if the transportation use of the Section 4(f) resource, including consideration of impact avoidance, minimization, and mitigation or enhancement measures, is so minor in nature that it does not adversely affect the activities, features, and attributes that qualify the resource for protection under Section 4(f). Such a finding will be conditioned upon: the official(s) with jurisdiction over the resource indicating, in writing, that the proposed action, including consideration of the mitigation, will not adversely affect the activities, features and attributes that are important to the resource, and the public has been afforded an opportunity (by public notice) to review and comment on the effects of the project on the protected activities, features, and attributes of the Section 4(f) resource, and implementation of the mitigation measures. When this is the case, an analysis of avoidance alternatives is not required and the Section 4(f) evaluation process is complete. The official(s) with jurisdiction over the resource will be informed of FHWA s intent to make the de minimis impact finding. These conditions appear to be met in the case of the Centennial Athletic Complex. Following public and agency review of this report, it is anticipated that the City of Moorhead will request the FHWA to determine the proposed action at Centennial Athletic Complex is a Section 4(f) de minimis action in accordance with Section 6009(a) of SAFETEA-LU. 1. Description of The Section 4(f) Property. Name: Shared-use paths Size (acre): Approximately 4,030 feet Location: Approximately 1,550 feet along 15th Ave N east of the Red River bridge, approximately 1,675 feet along 15th Ave N west of 28th St N, and approximately 805 feet along 28th St N from 6th Ave N to 8th Ave N, in Moorhead, MN Ownership: City of Moorhead Type of Section 4(f) Property: Recreation area Function of or Available Activities on the Property: Biking, walking, running Description and Location of Existing and Planned Facilities: The existing shared-use paths along the project corridor consist of paved surfaces adjacent to roadways. Along 15th Ave N, the paths are 8 feet wide, while the path along 28th St N is 10 feet wide. The path along 28th St S currently includes a roadway sign(s) installed within the paved surface. Planned shared-use path facilities along the project corridor consist of the proposed improvements

10 STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 2 of 3 described above (i.e., shifting existing path alignments, ramp improvement, addition of paths, and removal of signage within path). Access: Pedestrians and bicyclists can access existing shared-use paths from adjacent roadways, sidewalks, shared-use path and properties. Usage: Usage rates for the shared-use paths is not available. Relationship to Other Similarly Used Lands in the Vicinity: The shared-use path extending from the Red River bridge along 15th Ave N connects to shared-use paths and on-road bike facilities in Fargo. The shared-use path extending from 28th St N along 15th Ave N has no shared-use path connections, but connects to on-road bike facilities along 15th Ave N and 28th St N. The shared-use path along 28th St N connects to a shared-use path along 8th Ave N and connects to on-road bike facilities along 28th St N. Applicable Clauses Affecting Ownership: None Unusual Characteristics Reducing or Enhancing the Value of the Property: None LAWCON Section 6(f) Impacts: None 2. Impacts to the Section 4(f) Property. Amount of land impacted: Approximately 465 feet Permanent R/W Acquisition/Easements: No permanent right of way/easements would be acquired for impacts to existing shared-use paths, as the City of Moorhead owns both the existing roadway right of way and Section 4(f) property. Temporary Easements: No temporary easements would be acquired for impacts to existing shared-use paths, as the City of Moorhead owns both the existing roadway right of way and Section 4(f) property. Functions Affected: During construction, the impacted portions of shared-use paths would not be available for pedestrian or bicyclists use. Facilities Affected: During construction, portions of the existing shared-use path would be closed while alignments are shifted, the ramp is improved and signage is removed. 3. Coordination with Responsible Official with Jurisdiction Over the Section 4(f) Property: Please refer to the attached letter. 4. Considerations. Impact Avoidance: Due to the nature of the transportation improvement project, temporary partial closures of the shared-use paths cannot be avoided. Planning to minimize harm: Closures would be limited to the time required to make improvements to the shared-use paths and would not be closed for the duration of the proposed project. Mitigation: Mitigation measures are not proposed.

11 STATE AID FOR LOCAL TRANSPORTATION Rev. July 2010 For parks, recreation areas, wildlife or waterfowl refuges Page 3 of 3 Enhancement: Upon completion of the project, the pedestrian and bicyclist network would be improved. Additional shared-use paths would be constructed and existing shared-use paths would be modified to improve safety. 5. Public Notice: Public notice of the availability of this write-up and opportunity for comment on were published in The Extra Newspaper on September 14, Conclusion: The proposed action includes all possible planning to minimize harm to the resource, and is not anticipated to adversely affect the activities, features and attributes of the shared-use paths.

12 Pvt St E 17 St N 26th St N Prince St 13 1/2 St N 24th St N 7th St N King St 9th St N 10th St N 12th St N 13th St N 14th St N 15 1/2 St N 16th St N 18th St N 11th St N 15th St N 17th St N 18 1/2 St N 19th St N 20th St N US Hwy St N 29th St N N 18th Ave 18th Avenue Cir N Section 4(f) Property & Impacts - Shared-use Paths Roadway Resurfacing & Pedestrian Facilities 15th Ave N & 28th St N - Moorhead, MN SP , SP , SP S & SAP /2 St N 17th Ave N Pistol Range Rd 24 St S Shared-use Path Alignment Shift Pvt St A Pvt St B 15th Ave N Co Rd 83 12Th-15th Ave Toll Brg Bridgeview St 13th Ave N 8th St N 12th Ave N 11th Ave N 28th St N 10th Ave N 14 St N 9th Ave N 8 1/2 Ave N 8 Ave N 8th Ave N Lancaster Dr Shared-use Path Sign Relocation 7th Ave N Shared-use Path Ramp Improvement 24 St N Somerset Ln 6th Ave N Queen St 5th Ave N Mayfair Dr Impacted Area Shared-use Path Along Project Corridor Other Shared-use Paths 4th Ave N 4 Ave N 21st St N Sunset Cir Sunrise Cir ,400 Feet Riverfront Park Rd / 3rd Ave N 3rd Ave 2nd Ave N

13 August 8, 2017 To: From: Subject: Project File City of Moorhead Moorhead City Hall 500 Center Avenue Moorhead, MN Section 4(f) De Minimis Agreement th 15P P Ave th N/28P P St N Roadway Rehabilitation and Pedestrian Facilities SP , SP , SP S & SAP The purpose of this letter is to facilitate the Federal Highway Administration s (FHWA) compliance with Section 4(f) of the Department of Transportation Act of 1966 as it pertains to Matson Memorial Field, Centennial Athletic Complex and existing shared-use paths in relation to the proposed 15th Ave N/28th St N Roadway Rehabilitation and Pedestrian Facilities project in Moorhead, Minnesota. The City of Moorhead understands that the proposed project would impact Section 4(f) properties as follows: Impacts to Matson Memorial Field would consist of shifting the existing perimeter fence near the intersection of th 15P P Ave N with th 11P P St S. The project would not impact operation of the Field. Impacts to Centennial Athletic Complex would consist of construction disturbance of access points related to modifying an existing shared-use path and constructing a new shared-use path. Access to the Complex would be maintained during construction. Impacts to existing shared-use paths would consist of minor alignment shifts of existing paths, relocation of signage outside of exiting paths. During construction, portions of the paths would be closed. The City of Moorhead, as the official with jurisdiction over Matson Memorial Field, Centennial Athletic Complex and existing shared-use paths for Section 4(f) purposes, hereby agrees, pending public review, that the proposed project, including mitigation measures, will not adversely affect the activities, features, or attributes that make these properties eligible for Section 4(f) protection. Sincerely, Holly Heitkamp Director of Moorhead Parks and Recreation

Evolving Roadway Design Policies for Walking and Bicycling

Evolving Roadway Design Policies for Walking and Bicycling Evolving Roadway Design Policies for Walking and Bicycling The 2016 Michigan Transportation Planning Conference Kalamazoo, MI July 13, 2016 Title 23 of the Code of Federal Regulations Title 23 was originally

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

Programmatic Categorical Exclusion Update Question & Answers

Programmatic Categorical Exclusion Update Question & Answers Office of Environmental Stewardship 395 John Ireland Blvd St. Paul, MN 55155 Programmatic Categorical Exclusion Update Question & Answers Date: October 2017 OPTIONAL District/Division Nam This FAQ document

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT

MONTGOMERY COUNTY PLANNING DEPARTMENT MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No Date: 6-07-2018 MD355 Over Little Bennett Creek Bridge Replacement (SHA Project No. MO4275180),

More information

3.9 Recreational Trails and Natural Areas

3.9 Recreational Trails and Natural Areas 3.9 Recreational Trails and Natural Areas 3.9.1 Introduction Parks and other recreational facilities such as trails, bicycle routes, and open space are important community resources. This section discusses

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017

Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017 EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL

CITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Potential Bicycle Facility on Bayou Street Mobile, Alabama

Potential Bicycle Facility on Bayou Street Mobile, Alabama Potential Bicycle Facility on Bayou Street Mobile, Alabama By Richard A. Hall, P.E. Prepared For Mobile Downtown Alliance Hall Planning & Engineering, Inc. March 28, 2018 Introduction Review of the February

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

Bicycle and Pedestrian Plans and Improvements

Bicycle and Pedestrian Plans and Improvements Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review

More information

Mark Malone, P.E. SD DOT

Mark Malone, P.E. SD DOT Mark Malone, P.E. SD DOT SD10 Grading & Surfacing From 8 th Ave W to 8 th Ave E 1 mile plus transition lengths Complete Urban Reconstruction Grading, C&G, Storm Sewer, Sidewalk, Concrete Surfacing Railroad

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

INDOT Complete Streets Guideline & Policy

INDOT Complete Streets Guideline & Policy INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL

4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL 4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of

More information

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District.

Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. September 7 th, 2007 Application to AASHTO to recognize six suggested relocations of U.S. Bicycle Route 1 in the Northern Virginia District. Acting District Administrator Mr. Morteza Salehi has endorsed

More information

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015

Outer Cape Bicycle & Pedestrian Master Plan. PUBLIC WORKSHOP #2 March 26, 2015 Outer Cape Bicycle & Pedestrian Master Plan PUBLIC WORKSHOP #2 March 26, 2015 Introductions TODAY S DISCUSSION PRESENTATION: Project Background : Where have we been? Where are we now? Steering Committee

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Traffic Circulation & Pedestrian Safety Study

Traffic Circulation & Pedestrian Safety Study Lyons Township High School North Campus La Grange, Illinois Parking Lot Vaughan Building N Main Building Prepared for: Prepared by: July 23, 2015 Contents List of Figures, iii 1. Introduction...1 2. Existing

More information

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region

2014 Wisconsin Tribal Transportation Conference. Matt Halada Transportation Planner NE Region 2014 Wisconsin Tribal Transportation Conference Matt Halada Transportation Planner NE Region Implementing Wisconsin s Pedestrian and Bicycle Accommodations Law (Complete Streets) Tools and methods for

More information

August 3, Bay Trail Connection With The Community

August 3, Bay Trail Connection With The Community Ms. Lina Velasco, Senior Planner City of Richmond Planning Division P.O. Box 4046 Richmond, CA 94804 Dear Ms. Velasco: August 3, 2009 73 Belvedere Ave. Richmond, CA 94801 Phone/Fax: 510-235-2835 Email:tracbaytrail@earthlink.net

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Small Town & Rural Multimodal Networks

Small Town & Rural Multimodal Networks Small Town & Rural Multimodal Networks Fred Young, PLA Andrea Clinkscales, AICP, PMP Alta Planning + Design Funding Partners Project Team Existing Design Guidance AASHTO Flexibility Guide 2004 AASHTO Bike

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer

10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer 10A DATE: October 5, 2016 TO: PREPARED BY: SUBJECT: Pedestrian and Bicycle Advisory Committee Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer Discussion and Provide Comments, Associated

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Chapter 2: Standards for Access, Non-Motorized, and Transit

Chapter 2: Standards for Access, Non-Motorized, and Transit Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing

More information

CTDOT Pedestrian and Bicycle Safety Initiatives

CTDOT Pedestrian and Bicycle Safety Initiatives CTDOT Pedestrian and Bicycle Safety Initiatives 2017 Northeast Transportation Safety Conference Mark F. Carlino, P.E. Traffic Engineering Division Chief Bureau of Engineering and Construction Connecticut

More information

Route 47 (North Main Street) Reconstruction

Route 47 (North Main Street) Reconstruction TOWN OF SUNDERLAND Route 47 (North Main Street) Reconstruction Presented by Lou Rabito, P.E. Presented to Town of Sunderland June 11, 2018 Project Overview MassDOT Project No. 607245 Resurfacing and Related

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions

U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions U.S. Route 45 (IL 132 to IL 173 and Millburn Bypass) Frequently Asked Questions This document provides responses to the frequently asked questions pertaining to the U.S. Route 45; IL Route 132 to IL Route

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Beyond the Highway. Tale of the Trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation Beyond the Highway Tale of the Trails Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation Beyond the Highway October 11, 2016 Stevens Point, WI Wisconsin DOT and Trails TOPICS

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Emergency Response Support Signage on Multi-Use Trails Plan

Emergency Response Support Signage on Multi-Use Trails Plan DRAFT ( ) Emergency Response Support Signage on Multi-Use Trails Plan Prepared for: SATS Multi-Use Trails Jurisdictions Committee Table of Contents Introduction... 3 Mileage Markers... 4 Rest Stop Identifiers...

More information

TRANSPORTATION NEEDS ASSESSMENT

TRANSPORTATION NEEDS ASSESSMENT TRANSPORTATION NEEDS ASSESSMENT A travel demand analysis was carried out to determine the operational issues and the potential benefit that adding traffic capacity would have on the road network. All the

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install

More information

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.

SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc. SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery

More information

Iowa Highway 58 Corridor Improvement Study

Iowa Highway 58 Corridor Improvement Study 1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Traffic Calming Policy

Traffic Calming Policy Article I. Purpose and Goal. The purpose of this policy is to establish criteria and procedures the City will use to evaluate requests for, and if appropriate, implement traffic calming measures. Neighborhood

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

Administrative Action. Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c)))

Administrative Action. Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c))) Administrative Action Programmatic Categorical Exclusion (Pursuant to the National Environmental Policy Act (42 USC 4332(2)(c))) and Documentation of Compliance with other Federal Environmental Laws For

More information

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004

Roadway Classification Design Standards and Policies. Pueblo, Colorado November, 2004 Roadway Classification Design Standards and Policies Pueblo, Colorado November, 2004 Table of Contents Page Chapter 1. General Provisions 1.1 Jurisdiction 3 1.2 Purpose and Intent 3 1.3 Modification 3

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

Fargo Moorhead Metropolitan Area Complete Streets Policy Statement

Fargo Moorhead Metropolitan Area Complete Streets Policy Statement Fargo Moorhead Metropolitan Area Complete Streets Policy Statement Approved by the Fargo Moorhead Metropolitan Council of Governments Policy Board on November 18, 2010 1. Purpose The term Complete Streets

More information

Beyond the Highway. Trails and trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation

Beyond the Highway. Trails and trails. Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation Beyond the Highway Trails and trails Tom Beekman, P.E. Northwest Regional Planning Chief Department of Transportation Beyond the Highway December 01, 2015 Trego, WI Gary Brunner, P.E. Northwest Regional

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan 5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components

More information

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening

Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

Developing an Effective Safe Routes to School Funding Program for Hawai i

Developing an Effective Safe Routes to School Funding Program for Hawai i Developing an Effective Safe Routes to School Funding Program for Hawai i The Safe Routes to School Program 1 is a Federal Aid program of the U.S. Department of Transportation's Federal Highway Administration

More information

F L E T C H E R A V E N U E

F L E T C H E R A V E N U E Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are

More information

Town of Siler City - Unified Development Ordinance ARTICLE XIV - Streets and Sidewalks

Town of Siler City - Unified Development Ordinance ARTICLE XIV - Streets and Sidewalks ARTICLE XIV - Streets and Sidewalks 193 Street Classification (a) In all new subdivisions, streets that are dedicated to public use shall be classified as provided in 193(b) (1) The classification shall

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road

West Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,

More information

Pennsylvania Avenue (CR 484) Design Alternatives Study

Pennsylvania Avenue (CR 484) Design Alternatives Study MEMORANDUM Pennsylvania Avenue (CR 484) Design Alternatives Study Prepared for: APRIL 2016 Prepared By TABLE OF CONTENTS Project Background... 2 Previous Concept... 2 Existing Conditions... 4 New Alternatives...

More information

WHEREAS, the New Jersey Department of Transportation' s Complete Streets

WHEREAS, the New Jersey Department of Transportation' s Complete Streets WHEREAS, the State Department of Transportation adopted a Complete Streets Policy ( Policy No. 703), effective December 3, 2009, for all projects funded through the Department' s Capital Program and strongly

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 7, 2016 SUBJECT: Adoption of amendments to the Master Transportation Plan (MTP) to create a new Pedestrian

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

City of Memphis On-Street Parking Modification Guidelines

City of Memphis On-Street Parking Modification Guidelines City of Memphis Effective Date: December 1, 2013 Bicycle/Pedestrian Program 125 N. Main Street Memphis, TN 38103 (901) 576-6710 www.bikepedmemphis.com City of Memphis Executive Summary It is current practice

More information

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND:

ITEM # 29 DATE: COUNCIL ACTION FORM ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND: ITEM # 29 DATE: 05-08-18 COUNCIL ACTION FORM SUBJECT: ROAD CLOSURES FOR RAGBRAI ROUTE BACKGROUND: Ames will be an overnight stop for RAGBRAI XLVI from Tuesday, July 24 th, through Wednesday, July 25 th.

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

NEWMARKET UPHAM S CORNER

NEWMARKET UPHAM S CORNER SOUTH STATION Planning Initiative NEWMARKET UPHAM S CORNER COLUMBIA ROAD (P) FOUR CORNERS/GENEVA Working Advisory Group (WAG) Meeting #5 TALBOT AVENUE MORTON STREET BLUE HILL AVE/CUMMINS HWY (P) RIVER

More information

Exhibit 1 PLANNING COMMISSION AGENDA ITEM

Exhibit 1 PLANNING COMMISSION AGENDA ITEM Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:

More information

2.0 Existing Conditions

2.0 Existing Conditions 20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY

TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,

More information

List of Display Boards

List of Display Boards List of Display Boards Welcome Introduction Municipal Class Environmental Assessment (EA) Process Need and Justification for an Interchange Alternatives for Evaluation Vertical and Horizontal Alignments

More information

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application Route 28 Widening (PW County Line to Old Centreville Road) Scored HB 2 Application Project Application ID: 432 General Project Information Project Title Route 28 Widening (PW County Line to Old Centreville

More information

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY

City of Albert Lea Policy and Procedure Manual 4.10 ALBERT LEA CROSSWALK POLICY 4.10 ALBERT LEA CROSSWALK POLICY PURPOSE: Pedestrian crosswalks are an integral part of our transportation infrastructure. To be effective and promote safety, marked crosswalks must be installed after

More information

Bike Planning: A New Day

Bike Planning: A New Day Bike Planning: A New Day Josh Sikich, AICP, LEED AP Chicago Office Director Alta Planning + Design 312-265-0628 joshuasikich@altaplanning.com cities of all sizes are changing Illinois Bike Summit October

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Public Information Meeting #1. Pā ia Community Center 5:30 PM 8:00 PM

Public Information Meeting #1. Pā ia Community Center 5:30 PM 8:00 PM Public Information Meeting #1 Pā ia Community Center 5:30 PM 8:00 PM October 22, 2008 Overview of Tonight s Meeting Pā ia Mini Bypass Pā ia Relief Route Project Description and Study Area Context t Sensitive

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

PURPOSE AND POLICY GUIDANCE

PURPOSE AND POLICY GUIDANCE 1 PURPOSE AND POLICY GUIDANCE The VTA Bicycle Technical Guidelines (BTG) present standards and guidance for planning, designing, operating, retrofitting and maintaining roadways and bikeways. They are

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information