West Ealing Centre Neighbourhood Forum Interim Movement Group Report 19 Nov 2012

Size: px
Start display at page:

Download "West Ealing Centre Neighbourhood Forum Interim Movement Group Report 19 Nov 2012"

Transcription

1 West Ealing Centre Neighbourhood Forum Interim Movement Group Report 19 Nov 2012 BACKGROUND In the short time this Movement Work Group has been set up we have gathered evidence from three walkabouts, a number of small meetings and one paper. This was an attempt to understand the geography of the area and take into account current problems and future developments. Details of the Ealing Council Local Implementation Plan (Transport) called LIP with its funding have recently been revealed. A meeting with the Council will be arranged at short notice to discuss these plans (1c Corridor Plans) and the monies that accompany them this week. This has meant that this report has been assembled rapidly and without proper and complete debate. WALKING Introduction This has been our first priority. More people will occupy new homes in this area with the changes being made to two estates. Some of this housing will be deemed car free. The loss of the multi-storey car parks and two surface car parks will mean more walking and more shopping trolleys. An aing and a poorer population will mean more walking. Existing and new CPZs will reduce the ability to park freely in this area. A major mosque is planned attracting Friday worshippers from a large area. More people living in the area or coming to the area to shop/eat/pray will walk. WALKING Problems/proposals The new West Ealing Crossrail Station proposed on the north side of the tracks while new housing and Uxbridge Road destination to the south. No up to date details have been released. We have considered ideas for this new station. Waitrose is a forum member and discussions will continue. Jacobs Ladder is a busy, insecure and steep stepped approach foot bridge over the railway line. It is the poor but only connection between the expanding Drayton Green Primary Cchool, expanding IPC church and open space to the north to the growing population to the south. Similarly it is the connection between the business customer hinterland to the north to the shops and facilities to the south. It is such a poor facility that it would be difficult to negotiate it with pram, bicycle or shopping trolley. The step risers are high. Movement through the area to the north of the Uxbridge Road from the south feels insecure, unplanned and convoluted. Ealing Council s Conceptual Ideas 03 (Green Man Passage) proposals are ill-advised and don t go far enough as they only deal with the southern half of this route. Routes (this is a misnomer) from Jacob s Ladder southwards ought to be reordered in the estate redevelopment both in plans and planning gain monies. Pavement congestion problems occur in three places.

2 a) outside Nos Uxbridge Rd when the mass of passengers and those with shopping trolleys and buggies waiting for the E3 and E8 buses blocks the pavement b) outside No 47(? ) Uxbridge Road where customers and stock block the footway c) bus stop opposite Lido House and adjacent to Dean Gardens, where any waiting passengers block pedestrian movement. These may have simple solutions like double bus shelters, enforcement or setting back the Dean Gardens fence. Ealing Council Conceptual Ideas 01 Leeland Terrace to address narrow and cramped pavements was rejected by a large majority at the 10 May 2012 Walpole Ward Forum. Melbourne Avenue suffers from appearing to be for pedestrians only but has vehicles including lorries passing across it with some damage to the drainage slot. A shortage of amenity space and the rather dead nature of St James Avenue could be improved by redesigning the access to Sainsbury s car park to enter directly from Leeland Terrace. The resulting car free road could contain a play area. Money now allocated to Ealing Council s Conceptual Idea 02 St James Ave could go further and provide more for Pedestrians. The area covered by concept design should be designed to be adaptable. This would make it possible to clear it for events /articulated lorries for Blood Donation/Screening/other health services etc. Trees and seating could be palletised to make space adaptable. This is the major failing of Melbourne Avenue design. All the street furniture was/is fixed. Walking routes from the Sheltered accommodation in Tawny Close and from the Dean Gardens/Sherwood Close Estate south of Dean Gardens needs review as they are currently blocked. Raising road tarmac to curb top height at crossings and at junctions of minor roads to the Uxbridge road in the Ealing Council Corridor 1c proposals has implications. It isn t allocated but this and the Hanwell modifications are rated at a 450,000 spend. As a group we will ask what benefits will this raising of tarmac produce when other items need urgent attention. More research is to be undertaken but there are implications for the partially sited and confusion for Guide Dogs who are able to detect curbs but have more difficulty with change of surface delimiting roads from footways. Further work to be discussed. CYCLING We have received an excellent document on an east-west cycle route from a community leader and founder member of WECNF. The Ealing Council LIP document proposes few changes to the cycle routes which are in effect just labels.

3 His report is published at Appendix A. Our view is that a properly engineered route in West Ealing is a priority and that the Ealing Council LIP proposals come later. Our criticism of the Corridor 1c proposal is that it doesn t address changing the experience of young people. In the WEN-led 2 October 2009 Lido Junction Report produced by the community we advocated the provision of facilities to dissuade cyclists from using the Lido Junction. Officers are aware of the contents of this report and the diversion of southbound cyclists along Hastings south down Broughton Road and across a modified dual use crossing into Broomfield Road. Expensive modifications to the Uxbridge Road may be misjudged when this could be spent on the east west cycle route proposal above. We suggest this proposal is so important that we will actively encourage the community to reject all the 1c proposals if it is not made the priority. We are looking to the future not just to the present. The Council has this money with for example 700,000 for towpath cycling improvements between Southall and Greenford Green alone. Proposals to remove barriers between pavements and roads should be avoided as they are dual use and provide safe, visible and space efficient places to which to lock cycles. BUSES To be completed. Bus route No E1 to be modified to include Manor Road to service the future new Crossrail Station. New bus route required north-south down Drayton Green Road and Northfield Avenue to join say Northwick Park Hospital to West Middlesex Hospital when Ealing Hospital closes. E7 and E11 bus pull-ins to Waitrose? Bus stop rationalisation and adequate shelter and countdown provision to be surveyed. 1c proposals to raise tarmac tables along this section of the Uxbridge Road makes riding and descending stairs dangerous and unpleasant for bus passengers. This has to be balanced against slowing traffic. Modifications were carried out along Northfield Avenue and we are still waiting to see the comparison (speed and accident rates) before and after these modifications. HEAVY GOODS VEHICLES We have still to survey loading options. There has been a trend to supply relatively small shops with very big vehicles and multiples of big vehicles. This causes problems in Northfield Avenue and also in the Uxbridge Road. Our Lido Junction experience indicated many breaches of loading regulations with little if any enforcement. Sorting this out with traders could produce significant gains to freeing the Uxbridge Road at peak times. A planned regime where everyone gains.

4 There are concerns to be researched about how lorries from the A40 access West Ealing shops. Ecclestone, Felix and Alexandra Roads not a suitable route to West Ealing for lorries. At night HGVs especially vehicles like skip lorries make a loud bang every time they pass over a raised table. There is a concentration of flats now and more to come (rubberstamped by Ealing s LDF now Local Plan). Raised tables and residential units don t sit well together. CARS AND PARKING Work to be completed. The connection between car parking and shop viability is well known. While we are rich enough the car will be part of our lives and must be embraced and sensibly controlled. The elderly and disabled may find this the only way to access their facilities and services. John Cowing and Arthur Breens to complete survey of new places for stop and shop bays to compensate for loss of multi-storey car park and two surface car parks to the north of Uxbridge Road. Duration of these bays and turn over and phone extension of 30 minutes proposed by Council to be reviewed. Council reluctant to explain rational of such conversion. The provision of a few bays in the 1c Corridor proposals appears expensive compared with the many new bays that could be installed in the area with just Traffic Orders and lines. The workings of the the 3 CPZs and the anomalies and displacement between them and their affects on trade is to be investigated. The very expensive discretionary operation vehicle permits for CPZs may have to be reviewed to ensure shop viability when the whole area has CPZs. For the Council the whole mix of various departments and their vested interests need careful review. Things must work for the community not only to satisfy income streams or dogma. Clamping to the north of Uxbridge Road on roads which were publicly owned to be investigated. Manor Road and Drayton Green are now a commuter car park in a CPZ. This is a U turn and need s some explanation. Access and drop-off facilities must be provided at the new West Ealing Crossrail Station. CONCLUSION This is a work in progress and the group who gathered this information are very open to discussion and debate. The Council were unable to tell me more than the name of one person in West Ealing with whom they consulted at the formative stage before they produced their 1c plans. This in part invalidates their 1c Corridor designs soon to be up for consultation.

5 We would hope to have a wider and therefore more valid discussion before very large monies are spent. Eric Leach and Arthur Breens have after some arguments been asked to arrange a meeting with Council Officer Poalo Paternostro the week of 26 November to discuss our concerns about the 1c proposals. Many apologies to anyone I may have offended by misrepresenting their views and that includes Council Officers and forum members. Please send me your feedback. Arthur Breens breens01@btinternet.com

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

ACV Community Engagement Feb/Mar 2015: Summary (Infrastructure issues highlighted in red)

ACV Community Engagement Feb/Mar 2015: Summary (Infrastructure issues highlighted in red) Ashtead Choral Society Best answer: Nothing (a follow up spoken comment was that it s just right Transport A solution to end the on street parking in Craddocks Parade area and surrounding roads. Traffic

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites

Mumford Terminal Replacement Opportunities Neighbourhood Open House. we are here. PHASE 2 Identifying and Evaluating Candidate Sites Welcome Replacement Opportunities Neighbourhood Open House. AGENDA PURPOSE 1. REVIEW the information boards 2. DISCUSS aspects of the project with the project team 3. SHARE your thoughts on replacement

More information

SHOTLEY BRIDGE VILLAGE TRUST

SHOTLEY BRIDGE VILLAGE TRUST SHOTLEY BRIDGE VILLAGE TRUST Traffic & Parking Study - 2009 The Parking Lot, a focus group of the Shotley Bridge Village Trust, has undertaken this study. Evidence was gathered, through surveys during

More information

Terwillegar Drive Expressway Draft Concept Plan

Terwillegar Drive Expressway Draft Concept Plan Terwillegar Drive Expressway Draft Concept Plan Anthony Henday Drive to Whitemud Drive November 28 5:00-8:00 p.m. December 1 10:00 a.m. - 3:00 p.m. Let s Talk Today you can: Learn about the new direction

More information

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS. CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

9. Parking Supporting Statement

9. Parking Supporting Statement 9. Parking Supporting Statement Content 1. Setting the Scene 2. Vision 3. Parking and the Shared Priorities 4. Issues 5. Delivery Programme in the first Plan Period 2001/02 2005/06 6. Good Practice 7.

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.

A CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City. A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment

More information

Local Highway Panels Members Guide. 5 Crossing Facilities

Local Highway Panels Members Guide. 5 Crossing Facilities Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities

Active Travel Towns Funding Scheme Project Proposal. Sligo. Sligo Local Authorities Active Travel Towns Funding Scheme 2014-2016 Project Proposal for Sligo by Sligo Local Authorities Introduction Over the last two years, Sligo Local Authorities have implemented years 1 & 2 of their 5

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1

TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL. Page 1 TS 109 DURHAM ROAD QTC PHASE 4 PROJECT PROPOSAL Page 1 Table of Contents 1.0 Introduction... 3 2.0 Project Overview... 3 3.0 Project Proposals... 4 3.1 Enfield Road / Durham Road Junction... 3 5 3.2 Summerfield

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas

GLEN EIRA CITY COUNCIL. MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas GLEN EIRA CITY COUNCIL MURRUMBEENA Transforming our neighbourhood together our concepts based on your ideas 1 WHAT HAVE WE HEARD? WHAT NOW? Stage one Tell us what you love about your shopping strip November

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Appendix 12 Parking on footways and verges

Appendix 12 Parking on footways and verges Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

BYRES ROAD: PUBLIC REALM Public Consultation

BYRES ROAD: PUBLIC REALM Public Consultation Public Consultation Introduction As a vibrant commercial, shopping and residential location within the heart of the West End Byres Road is an important destination. Its proximity to the University of Glasgow

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

Background. Caversham a vision for the future. Joint public meeting arranged by:

Background. Caversham a vision for the future. Joint public meeting arranged by: Joint public meeting arranged by: Sharing our Streets Caversham a vision for the future and Caversham Traders Association This presentation followed a presentation by Simon Beasley, Network Manager for

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Roadways. Roadways III.

Roadways. Roadways III. Introduction 97 Roadway Design Principles 98 Safe Speeds 99 Optimizing of Street Space 00 Minimum Lane Widths in the City of Boston 02 Design Features that Reduce Operating Speeds 05 Travel Lanes Transit

More information

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL Clerk to the Council: Mrs M Rousseau, West View, West Bagborough, TA4 3EG Phone: 01823 432 658 Email: clerk@bishopslydeard.org http://www.bishopslydeard.org.uk/

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

Oxford Street West. 21 December https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street

Oxford Street West. 21 December https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street Oxford Street West 21 December 2017 https://consultations.tfl.gov.uk/roads/oxford-street/?cid=oxford-street This consultation response is on behalf of the London Cycling Campaign (LCC), the capital s leading

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

South Park Street Bicycle Lane Improvements. Public Engagement. November 2017

South Park Street Bicycle Lane Improvements. Public Engagement. November 2017 South Park Street Bicycle Lane Improvements Public Engagement November 2017 South Park Street Bicycle Lane Improvements WHAT WE HEARD REPORT Introduction To improve safety and bicycle route continuity

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey:

CLOSED. The draft concept design has been broken down into 5 categories for the purpose of this survey: Old Strathcona s neighbourhood renewal process is now at the draft concept design phase. Over the last several months, the city has been gathering local knowledge and resident input that has been used

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

WELLINGTON CITY COUNCIL CYCLING NETWORK DRAFT FRAMEWORK

WELLINGTON CITY COUNCIL CYCLING NETWORK DRAFT FRAMEWORK PO BOX 7316, Newtown, Wellington, 6242 newtownwellington@gmail.com WELLINGTON CITY COUNCIL CYCLING NETWORK DRAFT FRAMEWORK Introduction The Newtown Residents' Association is the Incorporated Society representing

More information

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use

Footpath design. A guide to creating footpaths that are safe, comfortable, and easy to use Footpath design A guide to creating footpaths that are safe, comfortable, and easy to use November 2013 Contents Introduction / 1 Zoning system / 2 Width / 4 Height / 5 Surface / 5 Footpath elements /

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Maynooth Cycling Submission on North South Corridor

Maynooth Cycling Submission on North South Corridor Maynooth Cycling Submission on North South Corridor Maynooth Cycling welcomes the intention to improve facilities and quality of service for pedestrians and cyclists in Maynooth. In particular, we strongly

More information

Have your say on the transformation of Oxford Street West

Have your say on the transformation of Oxford Street West Have your say on the transformation of Oxford Street West About Living Streets We are Living Streets, the UK charity for everyday walking. We want to create a walking nation, free from congested roads

More information

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE

21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07 TRANSPORT CONNECTIVITY AND INFRASTRUCTURE 21.07-1 Connectivity and Choice Transport connectivity and mode choice are critical to achieving productive, sustainable and socially just cities. Travel

More information

Cycle Track Design Best Practices Cycle Track Sections

Cycle Track Design Best Practices Cycle Track Sections Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide

More information

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit

-Current Get On Board initiative: Existing LTC program to help make LTC accessible, informative, and encourage use of public transit 2.1.1 Encourage community partners to engage London Transit Commission through the Get On Board program to educate Londoners on how to use the bus system (current initiative)(year 1 to 3) -Current Get

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

North West Non-Technical Summary of the Transport Assessment September 2011

North West Non-Technical Summary of the Transport Assessment September 2011 North West Non-Technical Summary of the Transport Assessment September 2011 Introduction This is a Non-Technical Summary of the findings of the Transport assessment work undertaken for the proposed North

More information

Signage and condition of road and pavements on both sides of Chesil Street

Signage and condition of road and pavements on both sides of Chesil Street Signage and condition of road and pavements on both sides of Chesil Street Tuesday 26 July and Tuesday 2nd August 2016, both at 6 p.m. Audited by: Janet Berry, Angela Stevenson, Mike Slinn, Phil Gagg,

More information

What is the status of the CPR Yards Crossing Study?

What is the status of the CPR Yards Crossing Study? September 2015 Project Advisory Committee (PAC) Sectors RESIDENTS Centennial Community Improvement Association Dufferin Residents Association of Winnipeg William Whyte Residents Association LOCAL BUSINESS

More information

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people

Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people Submission on Clontarf to City Centre Cycle Route with signatures of 1,493 people Route should use a fully segregated two-way cycle path Contact details Cian Ginty - editor, IrishCycle.com - cian.ginty@gmail.com

More information

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES

REF. PE01595: MORATORIUM ON SHARED SPACE SCHEMES PE1595/RRR Sustrans submission of 17 March 2017 Following the Public Petitions Committee meeting on 9 th February 2017 you wrote to Sustrans Scotland requesting a clarification on our position on the use

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback. City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for

More information

Summary of Feedback Received during Speak Up Broward s 22 Speakers Bureau Engagements from December 10, 2013 through April 2, 2014

Summary of Feedback Received during Speak Up Broward s 22 Speakers Bureau Engagements from December 10, 2013 through April 2, 2014 Summary of Feedback Received during Speak Up Broward s 22 Speakers Bureau Engagements from December 10, 2013 through April 2, 2014 Broward County Transit (BCT): Concerns for the safety of children particularly

More information

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary

Memo. Ocean Avenue Corridor Design Project Public Workshop #2 Summary Ocean Avenue Corridor Design Project Public Workshop #2 Summary The second public workshop for the Ocean Avenue Corridor Design Project was held on Wednesday, May 14, 2014 from, 6 to 8 pm at Lick Wilmerding

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas:

Cycle network linking Wolverhampton city centre and Bilston town centre with employment sites and residential areas: Context and Problems Corridor length 12.3 km; Population within 800m 59,922; Jobs within 800m 59,100; Unemployment 11%; Average Index of Multiple Deprivation 46; Households with no car 45%; Proportion

More information

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines

Contents. Champaign-Urbana Mass Transit District Stop Placement Guidelines Contents Champaign-Urbana Mass Transit District Introduction... 1 Stop Spacing... 2 Rural... 2 Low Density Suburban... 2 General Urban... 2 Urban Core... 2 Operational Safety... 3 Stop Placement... 4 Nearside

More information

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses

Wyldewood Estates. Pre-Application Public Engagement Summary of Issues and Responses Wyldewood Estates Pre-Application Public Engagement Summary of Issues and Responses March 2016 Executive Summary Morguard Residential Properties has been thoughtfully planning the redevelopment of Wyldewood

More information

BEST PRACTICES FOR ACCESSIBLE TRANSPORT. C G B (Kit) Mitchell

BEST PRACTICES FOR ACCESSIBLE TRANSPORT. C G B (Kit) Mitchell BEST PRACTICES FOR ACCESSIBLE TRANSPORT by C G B (Kit) Mitchell Independent mobility is necessary for independent living Many people with disabilities use cars, either as driver or passenger Those who

More information

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES

EXECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES EECUTIVE SUMMARY: TRANSIT-ORIENTED DEVELOPMENT IN SMITHS FALLS, ONTARIO; A COMPARISON BETWEEN TWO SITES Topic and Purpose In 2007, the Mayor of Ottawa s Task Force on Transportation suggested adding a

More information

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments

More information

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998

Corporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998 R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

London Cycle Network Annual Report 2000

London Cycle Network Annual Report 2000 London Cycle Network Annual Report 2000 A cycle network for London by 2005 A cycle network for London by 2005 The London Cycle Network will: provide local links between residential neighbourhoods, railway

More information

WELCOME Mission-Geneva Transportation Study

WELCOME Mission-Geneva Transportation Study WELCOME Mission-Geneva Transportation Study Study Process and Schedule 2005 2006 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sept Oct Task 2 Develop Outreach Plan Task 3 Document Existing Conditions/ Prioritize

More information

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING

IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING IMPACT OF THE BERMUDA CONNECTIVITY PROJECT ON CYCLING BBAG BRIEFING NOTE EMAIL: BERMUDABRIDGEAGP@BTINTERNET.COM WWW.FACEBOOK.COM/GROUPS/BERMUDABRIDGEAG TWITTER @BERMUDABRIDGEAG CYCLING BBAG BRIEFING NOTE

More information

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London

Chapter 4 Route Window C3 Hyde Park and Park Lane shafts. Transport for London Chapter 4 Route Window C3 Hyde Park and Park Lane shafts Transport for London HYDE PARK AND PARK LANE SHAFTS 4 Route Window C3 Hyde Park and Park Lane shafts Introduction 4.1 In this route window, which

More information

5 Transit & Traffic. Overview

5 Transit & Traffic. Overview 5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Milton Road Project Update. Paul van de Bulk 30 January 2018

Milton Road Project Update. Paul van de Bulk 30 January 2018 Milton Road Project Update Paul van de Bulk 30 January 2018 Milton Road Project Objectives Comprehensive priority for buses in both directions wherever practicable; Safer and more convenient routes for

More information

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods

Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods N D. Focus Area II Vision: Traditional hamlet with an attractive business/pedestrian friendly main street connected to adjacent walkable neighborhoods Transit Road Focus Area II is located in the Hamlet

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

Easton Safer Streets - Final Project Report BRISTOL

Easton Safer Streets - Final Project Report BRISTOL - Final Project Report BRISTOL A Sustrans Community Street Design Project in partnership with Bristol City Council February 07 About Sustrans Sustrans makes smarter travel choices possible, desirable and

More information

How do we design for pedestrians? Case study: transforming the Walworth Road

How do we design for pedestrians? Case study: transforming the Walworth Road How do we design for pedestrians? Case study: transforming the Walworth Road David Moores, Director of Public Realm Institution of Highways and Transportation, November 2009 Presentation overview Design

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

The Ramsey Market Town Transport Strategy 26 th April 2010

The Ramsey Market Town Transport Strategy 26 th April 2010 The Ramsey Market Town Transport Strategy 26 th April 2010 Contents INTRODUCTION 2 BACKGROUND 3 Strategy Area 4 Travel to, from and within Ramsey 5 Transport problems in the town 6 Links with other policies

More information

Nottingham Cycle City Frequently Asked Questions

Nottingham Cycle City Frequently Asked Questions Nottingham Cycle City Frequently Asked Questions About the scheme How much money is to be spent on cycling? And where is the money from? We have 6.1 million in Growth Fund which we will be investing directly

More information

Enhancing Downtown

Enhancing Downtown Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses

More information

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs.

Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Traffic signs Traffic signs used, including signs giving orders, warning signs, direction signs, information signs and road works signs. Although The Highway Code shows many of the signs commonly in use,

More information

Monroe Street Reconstruction

Monroe Street Reconstruction Total participants: 45+ Monroe Street Reconstruction Cross Section Workshop Notes September 29, 2016, Wingra School Workshop Orientation, Technical and Functional Considerations: The workshop began with

More information

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

sessions. The opinions of local people will help decide which of these two options is taken forward to be built. A4018 FAQs Why are no bus lanes proposed north of Crow Lane? Inbound and outbound bus lanes were considered north of the Crow Lane junction, but they took away capacity from other traffic on the approach

More information

College Green Submission May 2016 Executive Summary

College Green Submission May 2016 Executive Summary College Green Submission May 2016 Executive Summary The advent of the Luas Cross City in 2017 will bring major changes to Dublin city. The city s central spine which will now be used by Luas, has for many

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Glebe Neighbourhood Cycling Plan

Glebe Neighbourhood Cycling Plan Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling

More information

Board of Supervisors February 27, 2017

Board of Supervisors February 27, 2017 : Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis

More information

EVAN GLASS. Montgomery County Council District 5

EVAN GLASS. Montgomery County Council District 5 EVAN GLASS 1. Do you support funding and advancing the Purple Line to groundbreaking as described in the Locally Yes. As a member of the recently convened Purple Line Implementation Advisory Group, I will

More information

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council

Developing a Birmingham Transport Space Allocation policy. David Harris Transport Policy Manager Economy Directorate Birmingham City Council Developing a Birmingham Transport Space Allocation policy David Harris Transport Policy Manager Economy Directorate Birmingham City Council Birmingham s Sustainable Urban Mobility Plan Birmingham Connected

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan

Ormond & McKinnon Walks Response to Draft Glen Eira Community Plan Response to Draft Glen Eira Community Plan We would like to take this opportunity to thank Glen Eira City Council for the opportunity to comment on the Glen Eira Draft Community Plan. Below is an outline

More information

FUTUREDMS 2018 CONSULTATION REPORT

FUTUREDMS 2018 CONSULTATION REPORT FUTUREDMS 2018 CONSULTATION REPORT Rev 1 17/08/2018 Sharing ideas of how to make amazing spaces and facilities better through the passion of talented people working together This document presents the

More information