Figure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN
|
|
- Harvey Bridges
- 6 years ago
- Views:
Transcription
1 Figure 2-1 City Of Boynton Beach, Florida EXISTING SITE PLAN N
2 Figure 2-2 City Of Boynton Beach, Florida PROPOSED SITE HORIZONTAL CONTROL PLAN N
3 Figure 4-1 City of Boynton Beach, Florida EAST WTP EXISTING PROCESS BLOCK FLOW DIAGRAM
4 Figure 4-2 City of Boynton Beach, Florida EAST WTP PROPOSED PROCESS BLOCK FLOW DIAGRAM
5 MIEX CONTRACT BASIN N 30" RW 24" RW 24" D.I. (PROPOSED) 36" D.I. 12" D.I. 30" D.I. NORTH SOFTENER PLAN 2012 Figure 4-3 City Of Boynton Beach, Florida PROPOSED RAW PIPING MODIFICATIONS - EAST
6
7 3 2 1 New 36-inch Water Line with 24-inch Isolation, Pressure Sustaining and Flow Control Valves 2 Proposed Unloading Station Area 3 Existing CIP Waste Solution Pumps pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures 1 Figure 4-5 City of Boynton Beach, Florida Anionic Exchange Resin Facility and West Water Treatment Plant Improvements CONCEPTUAL SITE PLAN MODIFICATIONS WEST WTP JAN 2015
8 WELL 13W WELL 12W 1 TO 36-INCH TRANSMISSION LINE pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures EXISTING WELLFIELD 1 New 36-inch Water Line with 24-inch Isolation, Pressure Sustaining, and Flow Control Valves EXISTING CARTRIDGE FILTERS EXISTING FIRST STAGE FEED PUMPS Figure 4-6 City of Boynton Beach, Florida Anionic Exchange Resin Facility and West Water Treatment Plant Improvements PROPOSED RAW WATER SUPPLY MODIFICATIONS SCHEMATIC WEST WTP JAN 2015
9 FROM CLEANING TANK FROM DUAL ZONE MONITORING WELL BRINE WASTE TO DEEP INJECTION WELL (EXISTING TO REMAIN) (EXISTING TO REMAIN) pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures PROPOSED UNLOADING STATION WITH QUICK CONNECT BRINE WASTE TRANSFER TRUCK FROM EAST WTP (EXISTING TO REMAIN) Figure 4-7 City of Boynton Beach, Florida Anionic Exchange Resin Facility and West Water Treatment Plant Improvements PROPOSED CIP WASTE SOLUTION SYSTEM MODIFICATIONS FLOW SCHEMATIC WEST WTP JAN 2015
10 pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures Figure 4-8 City of Boynton Beach, Florida MIEX SYSTEM PROCESS SCHEMATIC EAST WTP JAN 2015
11 pw://carollo/documents/client/fl/boynton Beach/9666B40/Disciplines/Process/BB_East WTP PDR_Fig 4-2 Figure 4-9 City of Boynton Beach, Florida MIEX CONTACTOR SECTION I JAN 2015
12 pw://carollo/documents/client/fl/boynton Beach/9666B40/Disciplines/Process/BB_East WTP PDR_Fig 4-2 Figure 4-10 City of Boynton Beach, Florida MIEX CONTACTOR SECTION II JAN 2015
13 P-CW-0101 Figure 4-11 City of Boynton Beach, Florida EAST WTP CLEARWELL P&ID
14 N PLAN Figure 4-12 City Of Boynton Beach, Florida CLEARWELL MODIFICATIONS PLAN
15 RVSS-EW-0707 RVSS-EW-0808 VFD-EW-0101 VFD-EW-0202 VFD-EW-0303 RVSS-EW-0505 RVSS-EW-0606 P-EW-0707 P-EW-0808 P-EW-0101 P-EW-0202 P-EW-0303 P-EW-0505 P-EW-0606 Figure 4-13 City of Boynton Beach, Florida EAST WTP HIGH SERVICE PUMP STATION P&ID
16 N PLAN 2012 Figure 4-14 City Of Boynton Beach, Florida EAST WTP REPUMP STATION AND GST - PROPOSED YARD PIPING PLAN
17 RVSS-EH-0101 RVSS-EH-0202 RVSS-EH-0303 P-EH-0101 P-EH-0202 P-EH-0303 T-EH-0404 T-EH-0606 Figure 4-15 City of Boynton Beach, Florida EAST WTP PLANT FINISHED WATER STORAGE AND REPUMP STATION P&ID
18 N PLAN Figure 4-16 City Of Boynton Beach, Florida CONTROL BUILDING FIRST FLOOR CONSTRUCTION PLAN
19 N PLAN Figure 4-17 City Of Boynton Beach, Florida CONTROL BUILDING SECOND FLOOR CONSTRUCTION PLAN
20 SWITCHBOARD-1 NORMAL LOAD SCHEDULE SWITCHBOARD-1 EMERGENCY LOAD SCHEDULE (LEFT SIDE) SINGLE LINE POWER DIAGRAM Figure 4-18 City of Boynton Beach, Florida SWITCHBOARD-1 SINGLE LINE POWER DIAGRAM
21 PLAN Figure 4-19 City of Boynton Beach, Florida CONTROL BUILDING - ELECTRICAL PLAN
22 PLAN Figure 4-20 City of Boynton Beach, Florida REPUMP STATION ELECTRICAL BUILDING PLAN
23 MCC-5 LOAD SCHEDULE SINGLE LINE POWER DIAGRAM Figure 4-21 City of Boynton Beach, Florida REPUMP STATION AND MCC-5 SINGLE LINE POWER DIAGRAM
24 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT EXISTING SITE PLAN C-2 SITE PLAN REVIEW
25 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT EXISTING SITE PLAN C-3 SITE PLAN REVIEW
26 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT DEMOLITION PLAN C-4 SITE PLAN REVIEW
27 SEE SHEET C-6 FOR YARD PIPIPING PLAN - NORTHEAST SEE SHEET C-10 FOR PAVING, GRADING AND DRAINAGE PLAN - NORTHEAST SEE SHEET C-8 FOR YARD PIPIPING PLAN - SOUTHEAST SEE SHEET C-12 FOR PAVING, GRADING AND DRAINAGE PLAN - SOUTHEAST N SEE SHEET C-7 FOR YARD PIPIPING PLAN - NORTHWEST SEE SHEET C-11 FOR PAVING, GRADING AND DRAINAGE PLAN - NORTHWEST SEE SHEET C-9 FOR YARD PIPIPING PLAN -SOUTHEAST SEE SHEET C-13 FOR PAVING, GRADING AND DRAINAGE PLAN - SOUTHEAST Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PROPOSED SITE HORIZONTAL CONTROL PLAN C-5 SITE PLAN REVIEW
28 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - NORTHEAST C-6 SITE PLAN REVIEW
29 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - NORTHWEST C-7 SITE PLAN REVIEW
30 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - NORTHWEST C-8 SITE PLAN REVIEW
31 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - SOUTHWEST C-9 SITE PLAN REVIEW
32 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - NORTHEAST C-10 SITE PLAN REVIEW
33 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - NORTHWEST C-11 SITE PLAN REVIEW
34 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - NORTHEAST C-12 SITE PLAN REVIEW
35 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - SOUTHWEST C-13 SITE PLAN REVIEW
Associated Hazard (outcome) Control Measures. Reduction of water supply
Raw water Intake Low lift pumphouse Structural failure of intake Source water Inability to pump-all 4 pumps (loss of power, etc.), structural failure, fire Loss of the 2 larger capacity pumps Structural
More informationSimplified Start-Up Checklist For Fully-Pressurized Seasonal Systems
Water System Information Water System Name: Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems Division of Drinking and Ground Waters (Revised 8/17/2017) Date Checklist Completed (mm/dd/yyyy):
More informationcurrent supply and what is needed for future conditions; this is not the total water demand for these utilities.
Southwest Missouri Water Delivery Systems, Hydraulic Analysis of Alternatives June 28, 2017 Page 2 current supply and what is needed for future conditions; this is not the total water demand for these
More informationWatMan WATER RO SYSTEMS FOR DESALINATION
WatMan WATER RO SYSTEMS FOR DESALINATION The WatMan reverse osmosis systems produce from 1 to 2000 m 3 per day of high quality water suitable for communities, marine environment, boiler feed and general
More informationPrestige Water Equipment Ltd.
The Prestige range of water softeners complements the range of water pretreatment products and services. Use of water softening minimises the problems caused by hard water scale such as reduced heat transfer
More informationOBG PRESENTS: Proactive Approach to Infrastructure Renewal
OBG PRESENTS: Proactive Approach to Infrastructure Renewal AGENDA 1. History of Drinking Water and the MCWA 2. The Need for a Water System Renewal Program 3. MCWA s Infrastructure Renewal Evaluation 2
More informationPrestige Water Equipment Ltd.
The Prestige range of water softeners complements the range of water pre-treatment products and services. Use of water softening minimises the problems caused by hard water scale such as reduced heat transfer
More informationReverse Osmosis System Installation Guide and Operation Manual.
Reverse Osmosis System Installation Guide and Operation Manual. Table of Contents 1 Introduction...2 2 Installation...3 2.1 Feed water connection...3 2.2 Permeate and concentrate plumbing...3 2.3 Electrical
More informationWATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT
WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS Richard A. Sanger, CLIA, CIC, CID ABSTRACT Lawn Bowling Greens and Croquet Courts are unique when it comes to designing an efficient irrigations system.
More informationINSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017
INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL Graça Bravo 26th September 2017 SUMMARY 1. IDENTIFICATION OF THE LPG ESTABLISHMENTS 2. GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 3. INSPECTION SUPPORTING
More informationmaintaining storage tank dissolved oxygen levels utilizing gas transfer membranes
Water Technologies & Solutions technical paper maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes Authors: W.E. Haas, SUEZ, J. Helmrich, Florida Power and Light and J.E.
More informationWritten Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016
Written Closure Plan Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Revised: March 27, 2019 Table of Contents 1.0 General Information... 3 2.0 Description
More informationTABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1
TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum
More informationProviding quality commercial equipment since 1998 for pool, spa, fountain and spray ground
b R!-2019 www.segaquatics.com Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground Fountain components, landscape / under water lights and equipment systems jets,
More informationOXYGEN and SYSTEM OXY
OXYGEN and SYSTEM OXY Used to mix the treated liquid with air allowing a high degree of oxygen exchange Particularly indicated for an efficient oxigenation in waste water treatment plant as well as industrial
More informationWell Disinfection NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM
Well Disinfection MINNESOTA DEPARTMENT OF HEALTH NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM When to Disinfect Well disinfection can eliminate or reduce many kinds of harmful bacteria and viruses as well
More informationExhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300
Exhibit #5 X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300 Recommended System Cleaning and Flushing program Acceptance criteria: Total suspended solids: 0.005%
More informationMSF Distillers Lifetime Kuwait experience
MSF Distillers Lifetime Kuwait experience Ministry of Energy- Electricity and Water Kuwait March 2006 1. Seawater Desalination Progress In Kuwait: KUWAIT has population of 2.2 M people in 2005. The limited
More informationWindy Ridge Elementary School
Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationCLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016
CLOSURE PLAN CCR 257.102(b) Landfill Area Welsh Power Plant Pittsburg, Texas October, 2016 Prepared for : Southwest Electric Power Company Welsh Plant Pittsburg, Texas Prepared by: American Electric Power
More informationRemotely-installed Hydraulic Module
Remotely-installed Hydraulic Module HDM 1.1-2.2 Single or twin pump ACC-PRC001E-GB Table of Contents Application Considerations Unit sizing...4 Unit placement... 4 Minimum water volume... 4 Selection Procedure...5
More informationMr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No
October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San
More informationCity of Crystal Lake Community Development Department
City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org STORABLE ABOVE
More informationDynamic Simulation for T-9 Storage Tank (Holding Case)
Dynamic Simulation for T-9 Storage Tank (Holding Case) CASE 1: 19,642 Kg/Hr (Holding: 52 o C), No Liquid Draw Workshop Description Estimation of vapor flow rate coming out from the T-9 tank for holding
More informationThe ultimate in water softening
Calming troubled waters Metered Water Softener Specification MODEL: CALSOFT M The ultimate in water softening Due to Calmag s commitment to new product development the photographs contained within these
More informationNEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM
NEW PROGRAM! PROGRAM Mechanical Maintenance MODEL H-IRT-1 Industrial Refrigeration Trainer MODEL H-RIG-1C Rigging Systems Trainer MODEL H-IMTS-1 Industrial Maintenance Training System MODEL H-FP-223-14
More informationDRAFT- LMS Prioritized Project List
PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY DRAFT- LMS Prioritized Project List November 14, 2018 2018 ~ :'cniciiiec1/ C ~ IIEOITATION pflogv.p. 20 S O U T H M I L I T A R Y T R A I L, W E S T
More informationDigester Processes. 1. Raw Sludge Pumping System
Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters
More informationAN INNOVATIVE APPROACH TO OPTIMIZE REVERSE OSMOSIS MEMBRANE PERFORMANCE
AN INNOVATIVE APPROACH TO OPTIMIZE REVERSE OSMOSIS MEMBRANE PERFORMANCE Lance R. Littrell, P.E. 1 Glenn W. Dunkelberger, P.E. 1 1 Reiss Environmental, Inc. 12001 Research Parkway Suite 228 Orlando, FL
More informationMANUAL FLOW CONTROL 2-1/2" - 18" QUICKSET FLOW CHART
This chart performs two functions: It allows you to calculate the permanent pressure drop for any size Quickset or. This figure is useful mostly in the design process, for system calculations. It allows
More informationCITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS
CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut
More informationCONSTRUCTION CONTRACTS
UPD: 2/26/18 CONSTRUCTION S OUT FOR BID WD-2692 WW-656 WW-673 TITLE 16-Inch and 8-Inch Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation on Geary Boulevard from 32nd to
More informationPEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street
PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street PRESENTED BY MISLEIDYS LEON TRAFFIC SAFETY PROGRAM ENGINEER FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) BACKGROUND In response to citizen
More informationLP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal Projects, New Zealand
Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010 LP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal
More informationProfile LFR-43 HELENA ITALY. Italian National Agency for New Technologies, Energy and Sustainable Economic Development, C.R. ENEA Brasimone, Italy
Profile LFR-43 HELENA ITALY GENERAL INFORMATION NAME OF THE FACILITY ACRONYM COOLANT(S) OF THE FACILITY LOCATION (address): OPERATOR CONTACT PERSON (name, address, institute, function, telephone, email):
More informationPROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT
PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April
More informationCONSTRUCTION CONTRACTS
UPD: 2/12/18 CONSTRUCTION S OUT FOR BID WW-672 TITLE Wastewater Enterprise Elevator Maintenance, Repair and Modernization 2018-2021 BID DUE $1.5M February 15, 2018 IN DEVELOPMENT TITLE Rim Fire Assets
More informationSurvey Style - Borders
Style - Borders 0.25 Point 0.50 Point 1.00 Point 1.50 Point 2.00 Point 2.50 Point 3.00 Point 3.50 Point Double Line Located in: ArcGIS\Bin\Styles\.style Version: ArcGIS 9.0 1 Style - Colors Bedrock 1 Elevation
More informationURBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2
URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny
More informationHeat Pump Connections and Interior Piping
Job Sheet 3 Heat Pump Connections and Interior Piping OBJECTIVES In this job sheet, you will observe how the presence of air in the ground loop affects the geothermal heat pump performance. You will also
More informationVillage of Lombard. Building Division/Community Development Department 255 E. Wilson Avenue Lombard, IL Tel: Fax:
Village of Lombard Building Division/Community Development Department 255 E. Wilson Avenue Lombard, IL 60148 Tel: 630-620-5750 Fax: 630-629-2374 Residential Swimming Pool, Spa and Hot Tub Permit Checklist
More informationAccu-Tab Systems 1000 Series by Axiall Corporation
Accu-Tab Systems 1000 Series by Axiall Corporation Installation and Operating Instructions Model 1050 DANGER: DO NOT MIX CHEMICALS! The Accu-Tab chlorinator is designed for use with Axiall approved tablets
More informationETL listed for installations within 5 ft. (1.5M) of outer edge of water
Fiberstars Light Streams Mini Laminar Installation Manual (LSML) 3072091 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15056-00 Rev. A Page 1 of 6 SAVE THESE INSTRUCTIONS!
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationIMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION
IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION This Fitting Guide is designed to assist in the Installation of your Reverse Osmosis System. Some of the parts that are supplied with each system may
More informationSWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET
SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET Sect. 106-748, City Code of Ordinances: Regulations are applicable to both above and inground swimming pools, spas and hot tubs. POOL PLACEMENT Measurement
More information586, ,057 78, N/A $ 781,657 $ 586,243 $ - $ 40 N/A $ 16,307,537 $ 3,261,507 $ - $ 3,261,507
(New) New 50000 Dams Gainer Dam 1927 $ 3,430,846 100 N/A $ 108,374,370 $ 37,931,030 $ - $ 37,931,030 50001 Dams Regulating Dam - Horseshoe Structure 1918 $ 50,591 100 N/A $ 1,811,160 $ 362,232 $ - $ 362,232
More informationP.S. Townson EnergySolutions, Engineering and Technology Division, 2345 Stevens Drive, Richland, WA, 99354
Crossflow Ultrafilter Module Draining and Flush Testing for the Hanford Tank Waste Treatment and Immobilization Plant - Lessons Learned in Declogging Crossflow Filters 9511 P.S. Townson EnergySolutions,
More informationHYDROSTATIC LEAK TEST PROCEDURE
This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics
More informationADAPTABILITY & PRECISION
ADAPTABILITY & PRECISION CALIBRATION GAUGES FOR CHEMICAL INJECTION SYSTEMS by KENCO FEATURING NEW AccuRate PRECISION PUMP SETTING GAUGE visit our online business center at: www.kenco-eng.com 2 AccuRate
More informationStart and stop of the SWRO with isave unit
MAKING MODERN LIVING POSSIBLE Instruction Start and stop of the SWRO with isave unit isave.danfoss.com Table of Contents Prior to start-up...3 Starting up the system...3 Daily system shutdown...4 2-14
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More informationMEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION
MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION Objective To estimate the fluid pressure drops and roughness specifications for copper
More informationTechnical Topics. Softener Elution Studies TT
Technical Topics TT-035-1204 Water softeners are critical components in many commercial and industrial water-using systems. By removing calcium and magnesium ions (hardness) from a facility s or system
More informationWood County Economic Development
Wood County Economic Development Water Source Evaluation Study Phase I and Phase II Study Review NWWSD Public Meeting February 15, 2018 Jack Jones, P.E. Poggemeyer Design Group Purpose Summary Phase I
More informationDry Gas Seal Rack CH-3185 Schmitten Tel Mail:
Dry Gas Seal Rack CH-3185 Schmitten Tel. +41 26 497 55 66 Mail: info@felcon.ch Usually, compressor modifications are carried out because of adaptations to new operating parameters. However, in cases of
More informationSwimming Pools, Hot Tubs and Spas
OLATHE FIRE DEPARTMENT BUILDING CODES 1225 S. Hamilton Circle Olathe, KS 66061 / Main: (913) 971-7900 / Fax: (913) 971-9812 Swimming Pools, Hot Tubs and Spas Definitions: Swimming Pool- Any structure intended
More informationINSTRUCTION MANUAL. Demineralizer. 24R Two Stage Deioniser. Brand :
INSTRUCTION MANUAL Demineralizer Model : 24R Two Stage Deioniser Brand : 24R Two Stage Deioniser Operating Instructions 24R Two Stage Deionisers Page 1 IMPORTANT It is most important that this instruction
More informationSNS BL-13B NPDGamma Experiment
SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target, Relief and Vent System Design Review April 7, 2010 C-156 9:00 10:30 PM Hydrogen System Block Diagram Diagram of Major System Components
More informationInstallation and operation Manual. Bermad Surge Anticipation Valve. Model No 435
Instruction manual Bermad surge anticipation manual Model No 435 Installation and operation Manual Bermad Surge Anticipation Valve Model No 435 Bermad Water Technologies Rev 0 5/05/2015 7 Inglewood Drive,
More informationAPPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN
CLACKAMAS COUNTY COMMUNITY HEALTH DIVISION ENVIRONMENT & HEALTH SERVICES APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN APPLICATION IS HEREBY MADE
More informationWEEKLY CONSTRUCTION REPORT
WEEKLY CONSTRUCTION REPORT SEVEE & MAHER ENGINEERS, INC. PROJECT: PERIOD ENDING: FRI, 28 April 2017 JOB NO.: 16047.00 CLIENT: TOWN OF CUMBERLAND CONTRACTOR: STOREY BROTHERS, INC. PROJECT MANAGER: DAN DIFFIN
More informationDownum Title Services, Inc. TITLE REPORT Work Order #6581
17030 Main Street South Blountstown, Florida 32424 Downum Title Services, Inc. JUDY DOWNUM Telephone: (850) 674-3533 Fax: (850) 674-1343 TITLE REPORT Work Order #6581 FOR GULF COUNTY TAX COLLECTOR 1000
More informationPLD 03 T A CASAPPA S.p.A.
GEAR FLOW DIVIDERS INDEX Section Page GENERAL FEATURES... 3 GENERAL DATA... 5 FLOW EQUALIZER... 6 FLOW DIVIDERS... 8 TYPICAL CIRCUITS... 10 NOTES ABOUT COMPOSITION... 12 PORTS DIMENSIONS.... 14 GROUP DIMENSIONS...
More informationAccu-Tab Systems 2000 P Series by Axiall Corporation
Accu-Tab Systems 2000 P Series by Axiall Corporation Installation and Operating Instructions Models 2075 P 2150 P For NSF/ANSI-Standard 61 NSF STANDARD 61 applications use NSF/ANSI Standard 60 listed Axiall
More information2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014
2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac
More informationUpFront Chromatography A/S Lersoe Park Allé 42 DK-2100 Copenhagen Denmark
The Rhobust Whey Refinery - novel way for separation of α-lactalbumin and β-lactoglobulin in whey The Rhobust Whey Refinery is a new, unique concept which enables the dairy processor to fractionate whey
More informationCycle Isolation Monitoring
Cycle Isolation Monitoring True North Consulting Greg Alder Santee Cooper Leif Svensen Scientech Symposium 2009 January 14-15, 15, 2009 Clearwater Beach, Florida Introduction Generating plants often suffer
More informationList of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4
City of Columbia Engineering Regulations PART 31: SPECIFICATIONS FOR COMMERCIAL SWIMMING POOL BACKWASH AND DRAINAGE Table of Contents Paragraph Description Page No. 31.1 General 31-1 31.2 Definitions 31-1
More informationThe purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.
Building Information BURNABY PLANNING & BUILDING DEPARTMENT Swimming Pools The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.
More informationCFI TEAM AVAILABLE PROPERTIES
Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 April 1 Block 28 3 1 Class III Front - $5.75 NNN $1.20 End cap unit;
More informationCRYOGENICS & LNG Application Guide
CRYOGENICS & LNG Application Guide www.regoproducts.com/cryoflow W IT W IC K Y W E L D G IN 1 Index Cryogenic and Gas Plant (ASU) Construction... 3 Liquid Cryogenic Bulk Tanks Rego... 4 Liquid Cryogenic
More informationOverview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)
OPIPOH10 - SQA Unit Code HG21 04 Overview This process involves the removal of impurities from the gas stream to reach the specified quality. The process boundary is from the inlet such as separator, compressor
More informationI. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose:
I. Subject: Medical Gas Systems Utility Failure Interim Procedure II. Purpose: To provide a systematic response to medical gas system failure and restoration of this critical utility. III. Procedure: Systems
More informationCFI TEAM AVAILABLE PROPERTIES
Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Shader Industrial Park 2515 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 Feb 1 Block 28 3 1 Class III
More informationRemeha Quinta Cascade guide
Technical information Remeha Quinta Cascade guide Cascade guide Cascade systems 2 Remeha Quinta Cascade guide TABLE OF CONTENTS FOREWORD 4 1 GENERAL DESCRIPTION OF CASCADE SYSTEMS 4 1.1 Optimum number
More informationGAS DEHYDRATION SYSTEM
GAS DEHYDRATION SYSTEM High pressure gases from the Gas Compressors (CBA-4070/4020) flow to the Glycol Contactor (MAF-1150). In the Contactor, gas flows through trays, contacting the lean glycol that is
More informationIron Filter Installation / Operation Manual
Iron Filter Installation / Operation Manual BrassMaster and BrassMaster Plus Technical Video Library: http://watercontrolinc.com/residential-technical-support/residential-technical-videos BrassMaster technical
More informationphoto: deltaport berth 2 project
photo: deltaport berth 2 project GROUND I MPROVEMENT BOLEO MARINE TERMINAL Vancouver Pile Driving Ltd. (Vanpile) was involved in the development of the The final Stone Column spacing that was accepted
More informationPhuel Portable Control Units
Phuel Portable PCE Control Unit Pressure Test Unit c/w Chart Recorder Triple Wireline BOP The Phuel range of Air Driven Portable provide all the control functions required for well intervention operations
More informationEric Jones Fish Hatchery Manager II Ca. Dept. of Fish & Wildlife
Mount Shasta Hatchery 2014 Photo courtesy of M. Dege Eric Jones Fish Hatchery Manager II Ca. Dept. of Fish & Wildlife McCloud River Redband trout reared at Mt. Shasta Hatchery About MSH Why were the redbands
More informationProMinent Gas Chlorination
ProMinent Gas Chlorination ProMinent Australia Head Office - Sydney Unit 4, 4 Narabang Way BELROSE NSW 2085 PO Box 85, BELROSE WEST NSW 2085 Ph: (02) 9450 0995 Fax: (02) 9450 0996 Fax (02) 9450 0994 -
More informationSAFEsystem. Safety Apparatus Filter Enhancement. Filtration Systems. Now you can safely control your filtering process
Now you can safely control your filtering process BROCHURE C1 SAFEsystem TM Safety Apparatus Filter Enhancement Available on Individual, Duplex or Multi-Housing ASME Code filter systems. Filtration Systems
More informationSterisil Ac+ Installation & Operating Manual
Sterisil Ac+ Installation & Operating Manual 719 622 7200 Sterisil.com Arbor Dental Associates 2 Table of Contents Introduction 4 Sterisil Ac + Features 5 Installation Instructions 6 Maintenance 10 Troubleshooting
More informationOPERATION AND MAINTENANCE MANUAL
OPERATION AND MAINTENANCE MANUAL Skum Bladder Tank Type Vertical. Table of Contents Page General Description 2 1. Installation 1.1 Safety 2 1.2 Transporting 2 1.3 Inspection 2 1.4 Filling Instruction 3-7
More informationVPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10
/ ED VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES OPERATING PRINCIPLE The VPPL are variable displacement axial-piston pumps with variable swash plate, suitable for applications
More informationPeriodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels
(Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope
More informationPixel Thermographics Ltd. Compressed Air Leak Detection Survey SAMPLE REPORT. Pixel Thermographics Ltd
Compressed Air Leak Detection Survey By Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP Tel: +44 (0)8456 042 703 Web: Email: info@pixelthermographics.co.uk Survey Information This sample report
More informationSECTION PRESSURE TESTING OF PIPING
SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01
More informationCity of Crystal Lake Community Development Department
City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org ABOVE GROUND SWIMMING
More informationTOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual
TOP VALVE Pat. #5,857,486 & 5,944,050 Mid-Range Pressure 50 232 PSIG Back Pressure and Pressure Relief Valves Instruction Manual Please Note: This instruction manual provides detailed information and instructions
More informationMeadow Woods Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete
More informationInstructions for SILEX 1C Mixed bed cartridge filter
D01B-30A-UK1 January 2017 Instructions for SILEX 1C Mixed bed cartridge filter With conductivity sensor Gravity flow or pressure installation SILHORKO-EUROWATER A/S Phone +45 86 57 12 22 DK-8660 Skanderborg
More informationSUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD
SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County
More informationAccess Management Standards
Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards
More information*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.
Swimming Pools ** Permits are required for pools having a water surface area exceeding 100 square feet ** Permits are required for pools having a water surface area exceeding 100 square feet (11-3-3/8
More informationPure Water Power Purification System 4-Stage RODI Operations Manual
Pure Water Power Purification System 4-Stage RODI Operations Manual Flush Valve Lever Quick Disconnect for RO Water Testing Water Supply In Drain Hose Pure Water Out to Waterfed Pole New Machine Setup
More informationGravity Fed System. Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O Connell, Sarah Salmon, James Brinkerhoff Group Number: 13631
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O Connell, Sarah Salmon, James Brinkerhoff Group Number: 13631 Table of Contents 1. Project Background 2. Important
More informationMEMORANDUM TABLED DOCUMENT. WACI lb. Tabled at tackvi-oin COMMUNITY AND LEISURE ASSETS GROUP OF ACTIVITIES 2015/16. Feb-16
MEMORANDUM TABLED DOCUMENT TO: Marton Community Committee Tabled at tackvi-oin FROM: Samantha Whitcombe DATE: 15 March 2016 On WACI.40-- 20lb SUBJECT: FILE: Current Infrastructure projects/upgrades and
More informationPEDESTRIAN SAFETY STUDY
PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation
More information