Figure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN

Size: px
Start display at page:

Download "Figure 2-1 City Of Boynton Beach, Florida Anionic Exchange Resin Facility and East Water Treatment Plant Improvements EXISTING SITE PLAN"

Transcription

1 Figure 2-1 City Of Boynton Beach, Florida EXISTING SITE PLAN N

2 Figure 2-2 City Of Boynton Beach, Florida PROPOSED SITE HORIZONTAL CONTROL PLAN N

3 Figure 4-1 City of Boynton Beach, Florida EAST WTP EXISTING PROCESS BLOCK FLOW DIAGRAM

4 Figure 4-2 City of Boynton Beach, Florida EAST WTP PROPOSED PROCESS BLOCK FLOW DIAGRAM

5 MIEX CONTRACT BASIN N 30" RW 24" RW 24" D.I. (PROPOSED) 36" D.I. 12" D.I. 30" D.I. NORTH SOFTENER PLAN 2012 Figure 4-3 City Of Boynton Beach, Florida PROPOSED RAW PIPING MODIFICATIONS - EAST

6

7 3 2 1 New 36-inch Water Line with 24-inch Isolation, Pressure Sustaining and Flow Control Valves 2 Proposed Unloading Station Area 3 Existing CIP Waste Solution Pumps pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures 1 Figure 4-5 City of Boynton Beach, Florida Anionic Exchange Resin Facility and West Water Treatment Plant Improvements CONCEPTUAL SITE PLAN MODIFICATIONS WEST WTP JAN 2015

8 WELL 13W WELL 12W 1 TO 36-INCH TRANSMISSION LINE pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures EXISTING WELLFIELD 1 New 36-inch Water Line with 24-inch Isolation, Pressure Sustaining, and Flow Control Valves EXISTING CARTRIDGE FILTERS EXISTING FIRST STAGE FEED PUMPS Figure 4-6 City of Boynton Beach, Florida Anionic Exchange Resin Facility and West Water Treatment Plant Improvements PROPOSED RAW WATER SUPPLY MODIFICATIONS SCHEMATIC WEST WTP JAN 2015

9 FROM CLEANING TANK FROM DUAL ZONE MONITORING WELL BRINE WASTE TO DEEP INJECTION WELL (EXISTING TO REMAIN) (EXISTING TO REMAIN) pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures PROPOSED UNLOADING STATION WITH QUICK CONNECT BRINE WASTE TRANSFER TRUCK FROM EAST WTP (EXISTING TO REMAIN) Figure 4-7 City of Boynton Beach, Florida Anionic Exchange Resin Facility and West Water Treatment Plant Improvements PROPOSED CIP WASTE SOLUTION SYSTEM MODIFICATIONS FLOW SCHEMATIC WEST WTP JAN 2015

10 pw:\fl\boynton Beach\9666B40\Disciplines\Process\BB_West WTP PDR_Figures Figure 4-8 City of Boynton Beach, Florida MIEX SYSTEM PROCESS SCHEMATIC EAST WTP JAN 2015

11 pw://carollo/documents/client/fl/boynton Beach/9666B40/Disciplines/Process/BB_East WTP PDR_Fig 4-2 Figure 4-9 City of Boynton Beach, Florida MIEX CONTACTOR SECTION I JAN 2015

12 pw://carollo/documents/client/fl/boynton Beach/9666B40/Disciplines/Process/BB_East WTP PDR_Fig 4-2 Figure 4-10 City of Boynton Beach, Florida MIEX CONTACTOR SECTION II JAN 2015

13 P-CW-0101 Figure 4-11 City of Boynton Beach, Florida EAST WTP CLEARWELL P&ID

14 N PLAN Figure 4-12 City Of Boynton Beach, Florida CLEARWELL MODIFICATIONS PLAN

15 RVSS-EW-0707 RVSS-EW-0808 VFD-EW-0101 VFD-EW-0202 VFD-EW-0303 RVSS-EW-0505 RVSS-EW-0606 P-EW-0707 P-EW-0808 P-EW-0101 P-EW-0202 P-EW-0303 P-EW-0505 P-EW-0606 Figure 4-13 City of Boynton Beach, Florida EAST WTP HIGH SERVICE PUMP STATION P&ID

16 N PLAN 2012 Figure 4-14 City Of Boynton Beach, Florida EAST WTP REPUMP STATION AND GST - PROPOSED YARD PIPING PLAN

17 RVSS-EH-0101 RVSS-EH-0202 RVSS-EH-0303 P-EH-0101 P-EH-0202 P-EH-0303 T-EH-0404 T-EH-0606 Figure 4-15 City of Boynton Beach, Florida EAST WTP PLANT FINISHED WATER STORAGE AND REPUMP STATION P&ID

18 N PLAN Figure 4-16 City Of Boynton Beach, Florida CONTROL BUILDING FIRST FLOOR CONSTRUCTION PLAN

19 N PLAN Figure 4-17 City Of Boynton Beach, Florida CONTROL BUILDING SECOND FLOOR CONSTRUCTION PLAN

20 SWITCHBOARD-1 NORMAL LOAD SCHEDULE SWITCHBOARD-1 EMERGENCY LOAD SCHEDULE (LEFT SIDE) SINGLE LINE POWER DIAGRAM Figure 4-18 City of Boynton Beach, Florida SWITCHBOARD-1 SINGLE LINE POWER DIAGRAM

21 PLAN Figure 4-19 City of Boynton Beach, Florida CONTROL BUILDING - ELECTRICAL PLAN

22 PLAN Figure 4-20 City of Boynton Beach, Florida REPUMP STATION ELECTRICAL BUILDING PLAN

23 MCC-5 LOAD SCHEDULE SINGLE LINE POWER DIAGRAM Figure 4-21 City of Boynton Beach, Florida REPUMP STATION AND MCC-5 SINGLE LINE POWER DIAGRAM

24 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT EXISTING SITE PLAN C-2 SITE PLAN REVIEW

25 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT EXISTING SITE PLAN C-3 SITE PLAN REVIEW

26 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT DEMOLITION PLAN C-4 SITE PLAN REVIEW

27 SEE SHEET C-6 FOR YARD PIPIPING PLAN - NORTHEAST SEE SHEET C-10 FOR PAVING, GRADING AND DRAINAGE PLAN - NORTHEAST SEE SHEET C-8 FOR YARD PIPIPING PLAN - SOUTHEAST SEE SHEET C-12 FOR PAVING, GRADING AND DRAINAGE PLAN - SOUTHEAST N SEE SHEET C-7 FOR YARD PIPIPING PLAN - NORTHWEST SEE SHEET C-11 FOR PAVING, GRADING AND DRAINAGE PLAN - NORTHWEST SEE SHEET C-9 FOR YARD PIPIPING PLAN -SOUTHEAST SEE SHEET C-13 FOR PAVING, GRADING AND DRAINAGE PLAN - SOUTHEAST Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PROPOSED SITE HORIZONTAL CONTROL PLAN C-5 SITE PLAN REVIEW

28 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - NORTHEAST C-6 SITE PLAN REVIEW

29 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - NORTHWEST C-7 SITE PLAN REVIEW

30 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - NORTHWEST C-8 SITE PLAN REVIEW

31 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT YARD PIPING PLAN - SOUTHWEST C-9 SITE PLAN REVIEW

32 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - NORTHEAST C-10 SITE PLAN REVIEW

33 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - NORTHWEST C-11 SITE PLAN REVIEW

34 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - NORTHEAST C-12 SITE PLAN REVIEW

35 N Belvedere Road, Suite 400 East West Palm Beach, FL Tel: (561) FL COA No. EB CITY OF BOYNTON BEACH UTILITIES DEPARTMENT BOYNTON BEACH EAST WATER TREATMENT PLANT PAVING, GRADING AND DRAINAGE PLAN - SOUTHWEST C-13 SITE PLAN REVIEW

Associated Hazard (outcome) Control Measures. Reduction of water supply

Associated Hazard (outcome) Control Measures. Reduction of water supply Raw water Intake Low lift pumphouse Structural failure of intake Source water Inability to pump-all 4 pumps (loss of power, etc.), structural failure, fire Loss of the 2 larger capacity pumps Structural

More information

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems

Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems Water System Information Water System Name: Simplified Start-Up Checklist For Fully-Pressurized Seasonal Systems Division of Drinking and Ground Waters (Revised 8/17/2017) Date Checklist Completed (mm/dd/yyyy):

More information

current supply and what is needed for future conditions; this is not the total water demand for these utilities.

current supply and what is needed for future conditions; this is not the total water demand for these utilities. Southwest Missouri Water Delivery Systems, Hydraulic Analysis of Alternatives June 28, 2017 Page 2 current supply and what is needed for future conditions; this is not the total water demand for these

More information

WatMan WATER RO SYSTEMS FOR DESALINATION

WatMan WATER RO SYSTEMS FOR DESALINATION WatMan WATER RO SYSTEMS FOR DESALINATION The WatMan reverse osmosis systems produce from 1 to 2000 m 3 per day of high quality water suitable for communities, marine environment, boiler feed and general

More information

Prestige Water Equipment Ltd.

Prestige Water Equipment Ltd. The Prestige range of water softeners complements the range of water pretreatment products and services. Use of water softening minimises the problems caused by hard water scale such as reduced heat transfer

More information

OBG PRESENTS: Proactive Approach to Infrastructure Renewal

OBG PRESENTS: Proactive Approach to Infrastructure Renewal OBG PRESENTS: Proactive Approach to Infrastructure Renewal AGENDA 1. History of Drinking Water and the MCWA 2. The Need for a Water System Renewal Program 3. MCWA s Infrastructure Renewal Evaluation 2

More information

Prestige Water Equipment Ltd.

Prestige Water Equipment Ltd. The Prestige range of water softeners complements the range of water pre-treatment products and services. Use of water softening minimises the problems caused by hard water scale such as reduced heat transfer

More information

Reverse Osmosis System Installation Guide and Operation Manual.

Reverse Osmosis System Installation Guide and Operation Manual. Reverse Osmosis System Installation Guide and Operation Manual. Table of Contents 1 Introduction...2 2 Installation...3 2.1 Feed water connection...3 2.2 Permeate and concentrate plumbing...3 2.3 Electrical

More information

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS Richard A. Sanger, CLIA, CIC, CID ABSTRACT Lawn Bowling Greens and Croquet Courts are unique when it comes to designing an efficient irrigations system.

More information

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017

INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL. Graça Bravo. 26th September 2017 INSPECTIONS OF THE LPG ESTABLISHMENTS IN PORTUGAL Graça Bravo 26th September 2017 SUMMARY 1. IDENTIFICATION OF THE LPG ESTABLISHMENTS 2. GENERAL DESCRIPTION OF THE LPG ESTABLISHMENT 3. INSPECTION SUPPORTING

More information

maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes

maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes Water Technologies & Solutions technical paper maintaining storage tank dissolved oxygen levels utilizing gas transfer membranes Authors: W.E. Haas, SUEZ, J. Helmrich, Florida Power and Light and J.E.

More information

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016

Written Closure Plan. Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016 Written Closure Plan Pawnee Station - North CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Revised: March 27, 2019 Table of Contents 1.0 General Information... 3 2.0 Description

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 WRITTEN CLOSURE PLAN 2 3.1 Narrative 2 3.2 CCR Removal 2 3.3 CCR Left in Place 3 3.4 Maximum CCR Inventory 3 3.5 Maximum

More information

Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground

Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground b R!-2019 www.segaquatics.com Providing quality commercial equipment since 1998 for pool, spa, fountain and spray ground Fountain components, landscape / under water lights and equipment systems jets,

More information

OXYGEN and SYSTEM OXY

OXYGEN and SYSTEM OXY OXYGEN and SYSTEM OXY Used to mix the treated liquid with air allowing a high degree of oxygen exchange Particularly indicated for an efficient oxigenation in waste water treatment plant as well as industrial

More information

Well Disinfection NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM

Well Disinfection NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM Well Disinfection MINNESOTA DEPARTMENT OF HEALTH NONCOMMUNITY PUBLIC WATER SUPPLY PROGRAM When to Disinfect Well disinfection can eliminate or reduce many kinds of harmful bacteria and viruses as well

More information

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300

Exhibit #5. X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300 Exhibit #5 X-670 Recirculated Cooling Water (RCW) Cooling Tower and associated piping to X- 710 and X-300 Recommended System Cleaning and Flushing program Acceptance criteria: Total suspended solids: 0.005%

More information

MSF Distillers Lifetime Kuwait experience

MSF Distillers Lifetime Kuwait experience MSF Distillers Lifetime Kuwait experience Ministry of Energy- Electricity and Water Kuwait March 2006 1. Seawater Desalination Progress In Kuwait: KUWAIT has population of 2.2 M people in 2005. The limited

More information

Windy Ridge Elementary School

Windy Ridge Elementary School Windy Ridge Elementary School SCHOOL ROUTE PLAN For WINDY RIDGE ELEMENTARY SCHOOL LOCATION 54 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016

CLOSURE PLAN. CCR (b) GERS Landfill Area. Welsh Power Plant Pittsburg, Texas. October, 2016 CLOSURE PLAN CCR 257.102(b) Landfill Area Welsh Power Plant Pittsburg, Texas October, 2016 Prepared for : Southwest Electric Power Company Welsh Plant Pittsburg, Texas Prepared by: American Electric Power

More information

Remotely-installed Hydraulic Module

Remotely-installed Hydraulic Module Remotely-installed Hydraulic Module HDM 1.1-2.2 Single or twin pump ACC-PRC001E-GB Table of Contents Application Considerations Unit sizing...4 Unit placement... 4 Minimum water volume... 4 Selection Procedure...5

More information

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop San Antonio, Texas Project No October 17, 2016 Mr. Michael Malone CPS Energy 145 Navarro Street, Mail Drop 100406 San Antonio, Texas 78296 Project No. 0352436 Subject: Compilation of Construction History Calaveras Power Station San

More information

City of Crystal Lake Community Development Department

City of Crystal Lake Community Development Department City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org STORABLE ABOVE

More information

Dynamic Simulation for T-9 Storage Tank (Holding Case)

Dynamic Simulation for T-9 Storage Tank (Holding Case) Dynamic Simulation for T-9 Storage Tank (Holding Case) CASE 1: 19,642 Kg/Hr (Holding: 52 o C), No Liquid Draw Workshop Description Estimation of vapor flow rate coming out from the T-9 tank for holding

More information

The ultimate in water softening

The ultimate in water softening Calming troubled waters Metered Water Softener Specification MODEL: CALSOFT M The ultimate in water softening Due to Calmag s commitment to new product development the photographs contained within these

More information

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM NEW PROGRAM! PROGRAM Mechanical Maintenance MODEL H-IRT-1 Industrial Refrigeration Trainer MODEL H-RIG-1C Rigging Systems Trainer MODEL H-IMTS-1 Industrial Maintenance Training System MODEL H-FP-223-14

More information

DRAFT- LMS Prioritized Project List

DRAFT- LMS Prioritized Project List PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY DRAFT- LMS Prioritized Project List November 14, 2018 2018 ~ :'cniciiiec1/ C ~ IIEOITATION pflogv.p. 20 S O U T H M I L I T A R Y T R A I L, W E S T

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

AN INNOVATIVE APPROACH TO OPTIMIZE REVERSE OSMOSIS MEMBRANE PERFORMANCE

AN INNOVATIVE APPROACH TO OPTIMIZE REVERSE OSMOSIS MEMBRANE PERFORMANCE AN INNOVATIVE APPROACH TO OPTIMIZE REVERSE OSMOSIS MEMBRANE PERFORMANCE Lance R. Littrell, P.E. 1 Glenn W. Dunkelberger, P.E. 1 1 Reiss Environmental, Inc. 12001 Research Parkway Suite 228 Orlando, FL

More information

MANUAL FLOW CONTROL 2-1/2" - 18" QUICKSET FLOW CHART

MANUAL FLOW CONTROL 2-1/2 - 18 QUICKSET FLOW CHART This chart performs two functions: It allows you to calculate the permanent pressure drop for any size Quickset or. This figure is useful mostly in the design process, for system calculations. It allows

More information

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS

CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS CITY OF ROSEVILLE DESIGN AND CONSTRUCTION DETAILS Trench Backfill Utility Trench Paving Backfill and Embedment TB 1 HDPE, SRHDPE & PVC Storm Drain Pipe Only (Nonrigid) Bedding and Backfill TB2 Deep Cut

More information

CONSTRUCTION CONTRACTS

CONSTRUCTION CONTRACTS UPD: 2/26/18 CONSTRUCTION S OUT FOR BID WD-2692 WW-656 WW-673 TITLE 16-Inch and 8-Inch Ductile Iron Water Main Installation, Sewer Replacement, and Pavement Renovation on Geary Boulevard from 32nd to

More information

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street

PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street PEDESTRIAN SAFETY ASSESSMENT SR 934/NORMANDY DRIVE AND 71 Street PRESENTED BY MISLEIDYS LEON TRAFFIC SAFETY PROGRAM ENGINEER FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) BACKGROUND In response to citizen

More information

LP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal Projects, New Zealand

LP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal Projects, New Zealand Proceedings World Geothermal Congress 2010 Bali, Indonesia, 25-29 April 2010 LP Separator Level Control by Variable Speed and Multi Stage Brine Reinjection Pumps at Kawerau and Nga Awa Purua Geothermal

More information

Profile LFR-43 HELENA ITALY. Italian National Agency for New Technologies, Energy and Sustainable Economic Development, C.R. ENEA Brasimone, Italy

Profile LFR-43 HELENA ITALY. Italian National Agency for New Technologies, Energy and Sustainable Economic Development, C.R. ENEA Brasimone, Italy Profile LFR-43 HELENA ITALY GENERAL INFORMATION NAME OF THE FACILITY ACRONYM COOLANT(S) OF THE FACILITY LOCATION (address): OPERATOR CONTACT PERSON (name, address, institute, function, telephone, email):

More information

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT

PROJECT NO. 093 MA 199 H C. FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENIX HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT PROJECT NO. 093 MA 199 H 5807 01C FEDERAL NO. xxxx WIKIEUP-WICKENBURG-PHOENI HIGHWAY TEGNER STREET, ALTERNATIVE 10 PROJECT IMPROVEMENT (INTERSECTION IMPROVEMENT) US 93/US 60 FINAL PROJECT ASSESSMENT April

More information

CONSTRUCTION CONTRACTS

CONSTRUCTION CONTRACTS UPD: 2/12/18 CONSTRUCTION S OUT FOR BID WW-672 TITLE Wastewater Enterprise Elevator Maintenance, Repair and Modernization 2018-2021 BID DUE $1.5M February 15, 2018 IN DEVELOPMENT TITLE Rim Fire Assets

More information

Survey Style - Borders

Survey Style - Borders Style - Borders 0.25 Point 0.50 Point 1.00 Point 1.50 Point 2.00 Point 2.50 Point 3.00 Point 3.50 Point Double Line Located in: ArcGIS\Bin\Styles\.style Version: ArcGIS 9.0 1 Style - Colors Bedrock 1 Elevation

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

Heat Pump Connections and Interior Piping

Heat Pump Connections and Interior Piping Job Sheet 3 Heat Pump Connections and Interior Piping OBJECTIVES In this job sheet, you will observe how the presence of air in the ground loop affects the geothermal heat pump performance. You will also

More information

Village of Lombard. Building Division/Community Development Department 255 E. Wilson Avenue Lombard, IL Tel: Fax:

Village of Lombard. Building Division/Community Development Department 255 E. Wilson Avenue Lombard, IL Tel: Fax: Village of Lombard Building Division/Community Development Department 255 E. Wilson Avenue Lombard, IL 60148 Tel: 630-620-5750 Fax: 630-629-2374 Residential Swimming Pool, Spa and Hot Tub Permit Checklist

More information

Accu-Tab Systems 1000 Series by Axiall Corporation

Accu-Tab Systems 1000 Series by Axiall Corporation Accu-Tab Systems 1000 Series by Axiall Corporation Installation and Operating Instructions Model 1050 DANGER: DO NOT MIX CHEMICALS! The Accu-Tab chlorinator is designed for use with Axiall approved tablets

More information

ETL listed for installations within 5 ft. (1.5M) of outer edge of water

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Fiberstars Light Streams Mini Laminar Installation Manual (LSML) 3072091 ETL listed for installations within 5 ft. (1.5M) of outer edge of water 79-15056-00 Rev. A Page 1 of 6 SAVE THESE INSTRUCTIONS!

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION

IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION IMPORTANT PLEASE READ BEFORE COMMENCING INSTALLATION This Fitting Guide is designed to assist in the Installation of your Reverse Osmosis System. Some of the parts that are supplied with each system may

More information

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET

SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET SWIMMING POOLS/SPAS/HOT TUBS PLAN REVIEW GUIDE SHEET Sect. 106-748, City Code of Ordinances: Regulations are applicable to both above and inground swimming pools, spas and hot tubs. POOL PLACEMENT Measurement

More information

586, ,057 78, N/A $ 781,657 $ 586,243 $ - $ 40 N/A $ 16,307,537 $ 3,261,507 $ - $ 3,261,507

586, ,057 78, N/A $ 781,657 $ 586,243 $ - $ 40 N/A $ 16,307,537 $ 3,261,507 $ - $ 3,261,507 (New) New 50000 Dams Gainer Dam 1927 $ 3,430,846 100 N/A $ 108,374,370 $ 37,931,030 $ - $ 37,931,030 50001 Dams Regulating Dam - Horseshoe Structure 1918 $ 50,591 100 N/A $ 1,811,160 $ 362,232 $ - $ 362,232

More information

P.S. Townson EnergySolutions, Engineering and Technology Division, 2345 Stevens Drive, Richland, WA, 99354

P.S. Townson EnergySolutions, Engineering and Technology Division, 2345 Stevens Drive, Richland, WA, 99354 Crossflow Ultrafilter Module Draining and Flush Testing for the Hanford Tank Waste Treatment and Immobilization Plant - Lessons Learned in Declogging Crossflow Filters 9511 P.S. Townson EnergySolutions,

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

ADAPTABILITY & PRECISION

ADAPTABILITY & PRECISION ADAPTABILITY & PRECISION CALIBRATION GAUGES FOR CHEMICAL INJECTION SYSTEMS by KENCO FEATURING NEW AccuRate PRECISION PUMP SETTING GAUGE visit our online business center at: www.kenco-eng.com 2 AccuRate

More information

Start and stop of the SWRO with isave unit

Start and stop of the SWRO with isave unit MAKING MODERN LIVING POSSIBLE Instruction Start and stop of the SWRO with isave unit isave.danfoss.com Table of Contents Prior to start-up...3 Starting up the system...3 Daily system shutdown...4 2-14

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION

MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION MEMORIAL UNIVERSITY OF NEWFOUNDLAND Faculty of Engineering and Applied Science FLUID MECHANICS LABORATORY PIPE FRICTION Objective To estimate the fluid pressure drops and roughness specifications for copper

More information

Technical Topics. Softener Elution Studies TT

Technical Topics. Softener Elution Studies TT Technical Topics TT-035-1204 Water softeners are critical components in many commercial and industrial water-using systems. By removing calcium and magnesium ions (hardness) from a facility s or system

More information

Wood County Economic Development

Wood County Economic Development Wood County Economic Development Water Source Evaluation Study Phase I and Phase II Study Review NWWSD Public Meeting February 15, 2018 Jack Jones, P.E. Poggemeyer Design Group Purpose Summary Phase I

More information

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail:

Dry Gas Seal Rack CH-3185 Schmitten Tel Mail: Dry Gas Seal Rack CH-3185 Schmitten Tel. +41 26 497 55 66 Mail: info@felcon.ch Usually, compressor modifications are carried out because of adaptations to new operating parameters. However, in cases of

More information

Swimming Pools, Hot Tubs and Spas

Swimming Pools, Hot Tubs and Spas OLATHE FIRE DEPARTMENT BUILDING CODES 1225 S. Hamilton Circle Olathe, KS 66061 / Main: (913) 971-7900 / Fax: (913) 971-9812 Swimming Pools, Hot Tubs and Spas Definitions: Swimming Pool- Any structure intended

More information

INSTRUCTION MANUAL. Demineralizer. 24R Two Stage Deioniser. Brand :

INSTRUCTION MANUAL. Demineralizer. 24R Two Stage Deioniser. Brand : INSTRUCTION MANUAL Demineralizer Model : 24R Two Stage Deioniser Brand : 24R Two Stage Deioniser Operating Instructions 24R Two Stage Deionisers Page 1 IMPORTANT It is most important that this instruction

More information

SNS BL-13B NPDGamma Experiment

SNS BL-13B NPDGamma Experiment SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target, Relief and Vent System Design Review April 7, 2010 C-156 9:00 10:30 PM Hydrogen System Block Diagram Diagram of Major System Components

More information

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435

Installation and operation Manual. Bermad Surge Anticipation Valve. Model No 435 Instruction manual Bermad surge anticipation manual Model No 435 Installation and operation Manual Bermad Surge Anticipation Valve Model No 435 Bermad Water Technologies Rev 0 5/05/2015 7 Inglewood Drive,

More information

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN

APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN CLACKAMAS COUNTY COMMUNITY HEALTH DIVISION ENVIRONMENT & HEALTH SERVICES APPLICATION FOR A PERMIT TO CONSTRUCT OR ALTER A PUBLIC SWIMMING POOL, SPA POOL, WADING POOL OR FOUNTAIN APPLICATION IS HEREBY MADE

More information

WEEKLY CONSTRUCTION REPORT

WEEKLY CONSTRUCTION REPORT WEEKLY CONSTRUCTION REPORT SEVEE & MAHER ENGINEERS, INC. PROJECT: PERIOD ENDING: FRI, 28 April 2017 JOB NO.: 16047.00 CLIENT: TOWN OF CUMBERLAND CONTRACTOR: STOREY BROTHERS, INC. PROJECT MANAGER: DAN DIFFIN

More information

Downum Title Services, Inc. TITLE REPORT Work Order #6581

Downum Title Services, Inc. TITLE REPORT Work Order #6581 17030 Main Street South Blountstown, Florida 32424 Downum Title Services, Inc. JUDY DOWNUM Telephone: (850) 674-3533 Fax: (850) 674-1343 TITLE REPORT Work Order #6581 FOR GULF COUNTY TAX COLLECTOR 1000

More information

PLD 03 T A CASAPPA S.p.A.

PLD 03 T A CASAPPA S.p.A. GEAR FLOW DIVIDERS INDEX Section Page GENERAL FEATURES... 3 GENERAL DATA... 5 FLOW EQUALIZER... 6 FLOW DIVIDERS... 8 TYPICAL CIRCUITS... 10 NOTES ABOUT COMPOSITION... 12 PORTS DIMENSIONS.... 14 GROUP DIMENSIONS...

More information

Accu-Tab Systems 2000 P Series by Axiall Corporation

Accu-Tab Systems 2000 P Series by Axiall Corporation Accu-Tab Systems 2000 P Series by Axiall Corporation Installation and Operating Instructions Models 2075 P 2150 P For NSF/ANSI-Standard 61 NSF STANDARD 61 applications use NSF/ANSI Standard 60 listed Axiall

More information

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014

2014 Street and Utility Improvement Project. Feasibility Report January 28, 2014 2014 Street and Utility Improvement Project Feasibility Report January 28, 2014 Public Informational Meeting 22 residents from 17 properties signed in Questions about construction (FAQs) Eyebrow cul-de-sac

More information

UpFront Chromatography A/S Lersoe Park Allé 42 DK-2100 Copenhagen Denmark

UpFront Chromatography A/S Lersoe Park Allé 42 DK-2100 Copenhagen Denmark The Rhobust Whey Refinery - novel way for separation of α-lactalbumin and β-lactoglobulin in whey The Rhobust Whey Refinery is a new, unique concept which enables the dairy processor to fractionate whey

More information

Cycle Isolation Monitoring

Cycle Isolation Monitoring Cycle Isolation Monitoring True North Consulting Greg Alder Santee Cooper Leif Svensen Scientech Symposium 2009 January 14-15, 15, 2009 Clearwater Beach, Florida Introduction Generating plants often suffer

More information

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4

List of Forms. Form Description Page No. Form Commercial Swimming Pool Discharge Application Form 31-4 City of Columbia Engineering Regulations PART 31: SPECIFICATIONS FOR COMMERCIAL SWIMMING POOL BACKWASH AND DRAINAGE Table of Contents Paragraph Description Page No. 31.1 General 31-1 31.2 Definitions 31-1

More information

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools. Building Information BURNABY PLANNING & BUILDING DEPARTMENT Swimming Pools The purpose of this brochure is to explain to owners and contractors the City of Burnaby s requirements for private swimming pools.

More information

CFI TEAM AVAILABLE PROPERTIES

CFI TEAM AVAILABLE PROPERTIES Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 April 1 Block 28 3 1 Class III Front - $5.75 NNN $1.20 End cap unit;

More information

CRYOGENICS & LNG Application Guide

CRYOGENICS & LNG Application Guide CRYOGENICS & LNG Application Guide www.regoproducts.com/cryoflow W IT W IC K Y W E L D G IN 1 Index Cryogenic and Gas Plant (ASU) Construction... 3 Liquid Cryogenic Bulk Tanks Rego... 4 Liquid Cryogenic

More information

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment)

Overview. OPIPOH10 - SQA Unit Code HG Operate an Oil and Gas Process ( Gas Treatment) OPIPOH10 - SQA Unit Code HG21 04 Overview This process involves the removal of impurities from the gas stream to reach the specified quality. The process boundary is from the inlet such as separator, compressor

More information

I. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose:

I. Subject: Medical Gas Systems Utility Failure Interim Procedure III. Purpose: I. Subject: Medical Gas Systems Utility Failure Interim Procedure II. Purpose: To provide a systematic response to medical gas system failure and restoration of this critical utility. III. Procedure: Systems

More information

CFI TEAM AVAILABLE PROPERTIES

CFI TEAM AVAILABLE PROPERTIES Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Shader Industrial Park 2515 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 Feb 1 Block 28 3 1 Class III

More information

Remeha Quinta Cascade guide

Remeha Quinta Cascade guide Technical information Remeha Quinta Cascade guide Cascade guide Cascade systems 2 Remeha Quinta Cascade guide TABLE OF CONTENTS FOREWORD 4 1 GENERAL DESCRIPTION OF CASCADE SYSTEMS 4 1.1 Optimum number

More information

GAS DEHYDRATION SYSTEM

GAS DEHYDRATION SYSTEM GAS DEHYDRATION SYSTEM High pressure gases from the Gas Compressors (CBA-4070/4020) flow to the Glycol Contactor (MAF-1150). In the Contactor, gas flows through trays, contacting the lean glycol that is

More information

Iron Filter Installation / Operation Manual

Iron Filter Installation / Operation Manual Iron Filter Installation / Operation Manual BrassMaster and BrassMaster Plus Technical Video Library: http://watercontrolinc.com/residential-technical-support/residential-technical-videos BrassMaster technical

More information

photo: deltaport berth 2 project

photo: deltaport berth 2 project photo: deltaport berth 2 project GROUND I MPROVEMENT BOLEO MARINE TERMINAL Vancouver Pile Driving Ltd. (Vanpile) was involved in the development of the The final Stone Column spacing that was accepted

More information

Phuel Portable Control Units

Phuel Portable Control Units Phuel Portable PCE Control Unit Pressure Test Unit c/w Chart Recorder Triple Wireline BOP The Phuel range of Air Driven Portable provide all the control functions required for well intervention operations

More information

Eric Jones Fish Hatchery Manager II Ca. Dept. of Fish & Wildlife

Eric Jones Fish Hatchery Manager II Ca. Dept. of Fish & Wildlife Mount Shasta Hatchery 2014 Photo courtesy of M. Dege Eric Jones Fish Hatchery Manager II Ca. Dept. of Fish & Wildlife McCloud River Redband trout reared at Mt. Shasta Hatchery About MSH Why were the redbands

More information

ProMinent Gas Chlorination

ProMinent Gas Chlorination ProMinent Gas Chlorination ProMinent Australia Head Office - Sydney Unit 4, 4 Narabang Way BELROSE NSW 2085 PO Box 85, BELROSE WEST NSW 2085 Ph: (02) 9450 0995 Fax: (02) 9450 0996 Fax (02) 9450 0994 -

More information

SAFEsystem. Safety Apparatus Filter Enhancement. Filtration Systems. Now you can safely control your filtering process

SAFEsystem. Safety Apparatus Filter Enhancement. Filtration Systems. Now you can safely control your filtering process Now you can safely control your filtering process BROCHURE C1 SAFEsystem TM Safety Apparatus Filter Enhancement Available on Individual, Duplex or Multi-Housing ASME Code filter systems. Filtration Systems

More information

Sterisil Ac+ Installation & Operating Manual

Sterisil Ac+ Installation & Operating Manual Sterisil Ac+ Installation & Operating Manual 719 622 7200 Sterisil.com Arbor Dental Associates 2 Table of Contents Introduction 4 Sterisil Ac + Features 5 Installation Instructions 6 Maintenance 10 Troubleshooting

More information

OPERATION AND MAINTENANCE MANUAL

OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE MANUAL Skum Bladder Tank Type Vertical. Table of Contents Page General Description 2 1. Installation 1.1 Safety 2 1.2 Transporting 2 1.3 Inspection 2 1.4 Filling Instruction 3-7

More information

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10

VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES 10 / ED VPPL VARIABLE DISPLACEMENT AXIAL-PISTON PUMPS FOR INTERMEDIATE PRESSURE SERIES OPERATING PRINCIPLE The VPPL are variable displacement axial-piston pumps with variable swash plate, suitable for applications

More information

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels

Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels (Jan 2017) Periodic Survey of Fuel Installations on Ships other than Liquefied Gas Carriers utilizing gas or other low flash point fuels CONTENTS 1. Application 2. Special Survey 2.1 Schedule 2.2 Scope

More information

Pixel Thermographics Ltd. Compressed Air Leak Detection Survey SAMPLE REPORT. Pixel Thermographics Ltd

Pixel Thermographics Ltd. Compressed Air Leak Detection Survey SAMPLE REPORT. Pixel Thermographics Ltd Compressed Air Leak Detection Survey By Sunrise House Hulley Road Macclesfield Cheshire SK10 2LP Tel: +44 (0)8456 042 703 Web: Email: info@pixelthermographics.co.uk Survey Information This sample report

More information

SECTION PRESSURE TESTING OF PIPING

SECTION PRESSURE TESTING OF PIPING SECTION 15044 PRESSURE TESTING OF PIPING PART 1 - GENERAL 1.01 DESCRIPTION A. Scope of Work: This section specifies the leakage and pressure testing of piping. B. Testing Records: PART 2 - PRODUCTS 2.01

More information

City of Crystal Lake Community Development Department

City of Crystal Lake Community Development Department City of Crystal Lake Community Development Department 100 W. Woodstock Street Crystal Lake, IL 60014 www.crystallake.org Phone (815) 356-3605 Fax (815) 479-1647 building@crystallake.org ABOVE GROUND SWIMMING

More information

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual

TOP VALVE. Pat. #5,857,486 & 5,944,050. Mid-Range Pressure PSIG Back Pressure and Pressure Relief Valves. Instruction Manual TOP VALVE Pat. #5,857,486 & 5,944,050 Mid-Range Pressure 50 232 PSIG Back Pressure and Pressure Relief Valves Instruction Manual Please Note: This instruction manual provides detailed information and instructions

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Instructions for SILEX 1C Mixed bed cartridge filter

Instructions for SILEX 1C Mixed bed cartridge filter D01B-30A-UK1 January 2017 Instructions for SILEX 1C Mixed bed cartridge filter With conductivity sensor Gravity flow or pressure installation SILHORKO-EUROWATER A/S Phone +45 86 57 12 22 DK-8660 Skanderborg

More information

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD

SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD SUNRAY DRIVE/PERRINE RANCH ROAD FROM WEST OF DARLINGTON ROAD TO GRAND BOULEVARD AND PERRINE RANCH ROAD AT SEVEN SPRINGS BOULEVARD FINAL ROUTE AND POND STUDY PROJECT NO. C-9570.10 Prepared for: Pasco County

More information

Access Management Standards

Access Management Standards Access Management Standards Section 1: Application of Access Standards This chapter describes the Department's access management standards for access connections on the county roadway system. The standards

More information

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984.

*A Certificate of Survey for the property may be on file at City Hall if the house was built after 1984. Swimming Pools ** Permits are required for pools having a water surface area exceeding 100 square feet ** Permits are required for pools having a water surface area exceeding 100 square feet (11-3-3/8

More information

Pure Water Power Purification System 4-Stage RODI Operations Manual

Pure Water Power Purification System 4-Stage RODI Operations Manual Pure Water Power Purification System 4-Stage RODI Operations Manual Flush Valve Lever Quick Disconnect for RO Water Testing Water Supply In Drain Hose Pure Water Out to Waterfed Pole New Machine Setup

More information

Gravity Fed System. Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O Connell, Sarah Salmon, James Brinkerhoff Group Number: 13631

Gravity Fed System. Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O Connell, Sarah Salmon, James Brinkerhoff Group Number: 13631 Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O Connell, Sarah Salmon, James Brinkerhoff Group Number: 13631 Table of Contents 1. Project Background 2. Important

More information

MEMORANDUM TABLED DOCUMENT. WACI lb. Tabled at tackvi-oin COMMUNITY AND LEISURE ASSETS GROUP OF ACTIVITIES 2015/16. Feb-16

MEMORANDUM TABLED DOCUMENT. WACI lb. Tabled at tackvi-oin COMMUNITY AND LEISURE ASSETS GROUP OF ACTIVITIES 2015/16. Feb-16 MEMORANDUM TABLED DOCUMENT TO: Marton Community Committee Tabled at tackvi-oin FROM: Samantha Whitcombe DATE: 15 March 2016 On WACI.40-- 20lb SUBJECT: FILE: Current Infrastructure projects/upgrades and

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information