*Recommended for Award

Size: px
Start display at page:

Download "*Recommended for Award"

Transcription

1 1 1A Edging & Litter Control on Medians and Parkways, Per specifications as described in Attachment A, on an estimated acres. Maintenance cycles to be every fourteen (14) days, for an estimated twenty (20) mowing cycles annually. Edging & Litter Control on Medians and Parkways, Per specifications, as described in Attachment A-BN on an estimated acres. Special Byron Nelson Classic mowing cycle. Addendum 1: "The Byron Nelson Cycle is a single (one each)maintenance cycle. The inventory listing in Attachment A-BN is intended to identify the properties and acreages to be maintained for this cycle. The single (1) cycle shown on Item 1A of the Pricing Page shall prevail." SECTION - I (Items 1-9) This section in its entirety will be awarded to one vendor. $ $48, $ $60, $ $56, $ $1, $ $1, $ $1, B 2 Per acre cost for mowing, string trimming, curb edging & litter control. Additions and/or deletions to the contract. Per maintenance cycle cost for Non-Park Grounds Maintenance, per specifications, on approximately acres, at twelve (12) public buildings as described in Attachment A. Maintenance cycles to be every seven days, for an estimated thirty-eight $ N/A N/A $ N/A N/A $ N/A N/A $ $30, $ $36, $ $24, A 3 Per acre cost for Grounds Maintenance at public buildings. Additions and/or deletions to the contract. Edging, Litter Control & Bed Maintenance on SH 183/Beltline Rd. Interchange, Per specifications, as described in Attachment A, on an estimated acres. Maintenance cycles to be every fourteen (14) days, for an estimated Twenty (20) mowing $ N/A N/A $ N/A N/A $ N/A N/A $ $20, $ $25, $ $27, Page 1 of 7

2 3A Edging & Litter Control on SH 183/Beltline Rd. Interchange, Per specifications, as described in Attachment A-BN on an estimated acres. Special Byron Nelson Classic mowing cycle. $ $1, $ $1, $ $1, Per acre cost for Grounds Maintenance, including mowing, edging, trimming, litter control, bed maintenance & tree & shrub maintenance, per specifications, on approximately acres of Medians, Beautification Areas, Parks, & Streetscape Properties as described in Attachment A. Maintenance cycles to be every seven days, for an estimated thirty-eight (38) $ $45, $ $65, $ $75, A 5 Per acre cost for Grounds Maintenance of Streetscape properties, per specifications. Additions and/or deletions to the contract. Per maintenance cycle cost for Mowing, trimming, and litter control on Drainage Area on N. side of Irving Blvd., between MacArthur Blvd. & Story Ln., Per specifications, as described in Attachment A Maintenance cycle to be every thirty (30) days, for an estimated nine (9) cycles annually. $ N/A N/A $ N/A N/A $ N/A N/A $ N/A 9 $2, $ N/A 9 $2, $ N/A 9 $1, Trimming of groundcover at the Criminal Justice Center, Per specifications, as described in Attachment A Maintenance cycle to be every sixty (60) days, for an estimated five (5) cycles annually. Trimming of hedges and ornamental trees at the Family Advocacy Center, Per specifications, as described in Attachment A Maintenance cycle to be every sixty (60) days, for an estimated five (5) $ N/A 5 $ $65.00 N/A 5 $ $ N/A 5 $ $ N/A 5 $1, $65.00 N/A 5 $ $ N/A 5 $1, Trimming of shrubs and ornamental trees at the Las Colinas Police Station, Per specifications, as described in Attachment A Maintenance cycle to be every sixty (60) days, for an estimated five (5) $ N/A 5 $ $65.00 N/A 5 $ $ N/A 5 $1, Page 2 of 7

3 9 Trimming of beds. Shrubs, ground covers, and ornamental trees at the Valley Branch Library, Per specifications, as described in Attachment A $ N/A 5 $1, $65.00 N/A 5 $ $ N/A 5 $1, SECTION I Total (Items 1-9) $152, $194, $192, SECTION - II (Items 10 & 10A) Optional Bid Items 1 (Depending on funding availability and the discretion of the City, this section may be awarded as individual items or in total. All items selected for award will be awarded to the successful bidder in Section I Base Bid) 10 Optional Bid Item #1 - Lump Sum Bid per Maintenance per specifications for the West Library, 4444 W. Rochelle Blvd. Maintenance cycles to be every seven days, for an estimated thirty-eight $ N/A 38 $7, $ N/A 38 $9, $ N/A 38 $17, A ornamental trees at the West Library $0.00 N/A 5 $0.00 $ N/A 5 $ $ N/A 5 $1, SECTION II Total Optional Bid Items 1 $7, $10, $18, SECTION - II (Items & Items 11A 21A) Optional Bid Items 2 (Depending on funding availability and at the discretion of the City, this section may be awarded as individual items or in total. Items selected for award may be awarded to the successful bidder INDEPENDENTLY from Section I) 11 #1, 925 Chamberlain. Maintenance cycles to be $45.00 N/A 38 $1, $32.00 N/A 38 $1, $99.50 N/A 38 $3, A ornamental trees at Fire Station #1 Maintenance cycle to be every sixty (60) days, for an estimated five (5) Page 3 of 7

4 12 #2, 1306 N. Story. Maintenance cycles to be $45.00 N/A 38 $1, $19.00 N/A 38 $ $99.50 N/A 38 $3, A ornamental trees at Fire Station #2. 13 #3, 1825 E. Grauwyler. Maintenance cycles to be $30.00 N/A 38 $1, $18.00 N/A 38 $ $99.50 N/A 38 $3, A 14 14A ornamental trees at Fire Station #3. #4, 3303 N. MacArthur. Maintenance cycles to be every seven days, for an estimated thirtyeight ornamental trees at Fire Station #4. $15.00 N/A 5 $75.00 $65.00 N/A 5 $ N/A 5 $ $25.00 $30.00 N/A 38 $1, $14.00 N/A 38 $ N/A 38 $3, $ #5, 2925 W. Shady Grove Rd. Maintenance cycles to be every seven days, for an estimated thirty-eight $45.00 N/A 38 $1, $19.00 N/A 38 $ $99.50 N/A 38 $3, Page 4 of 7

5 15A ornamental trees at Fire Station #5. 16 #6, 2801 Esters. Maintenance cycles to be every seven days, for an estimated thirty-eight (38) $90.00 N/A 38 $3, $91.00 N/A 38 $3, $99.50 N/A 38 $3, A ornamental trees at Fire Station #6. 17 #7, 3303 Walnut Hill. Maintenance cycles to be $45.00 N/A 38 $1, $22.00 N/A 38 $ $99.50 N/A 38 $3, A ornamental trees at Fire Station #7. 18 #8, 650 E. Las Colinas Blvd.. Maintenance cycles to be every seven days, for an estimated thirty-eight $45.00 N/A 38 $1, $34.00 N/A 38 $1, $99.50 N/A 38 $3, A ornamental trees at Fire Station #8. Page 5 of 7

6 19 #9, 8101 Jetstar. Maintenance cycles to be every seven days, for an estimated thirty-eight (38) $30.00 N/A 38 $1, $17.00 N/A 38 $ $99.50 N/A 38 $3, A ornamental trees at Fire Station #9. $15.00 N/A 5 $75.00 $65.00 N/A 5 $ $25.00 N/A 5 $ #10, 415 Cimarron Trail. Maintenance cycles to be every seven days, for an estimated thirtyeight $45.00 N/A 38 $1, $23.00 N/A 38 $ $99.50 N/A 38 $3, A ornamental trees at Fire Station # #11, 6200 Love Dr. Maintenance cycles to be $60.00 N/A 38 $2, $53.00 N/A 38 $2, $99.50 N/A 38 $3, A ornamental trees at Fire Station #11. SECTION II Total Optional Bid Items 2 $20, $16, $42, SECTION - II (Item 22) Optional Bid Item 3 (Depending on funding availability and the discretion of the City, this section may be awarded. All items selected for award will be awarded to the successful bidder in Section I Base Bid) Optional Bid Item #3 - Cost per hour for blowing grass clippings and/or leaves off of streets after mowing cycles, per specifications. Service would be ordered as needed. $35.00 N/A N/A N/A $86.00 N/A N/A N/A $ N/A N/A N/A Page 6 of 7

7 TOTAL BID SECTION I (Items 1-9) $152, $194, $192, TOTAL BID SECTION II Optional Bid Item 1 - (Items 10 & 10A) $7, $10, $18, TOTAL BID SECTION II Optional Bid Item 2 - (Items & Items 11A 21A) $20, $16, $42, TOTAL BID SECTION II Optional Bid Item 3 $35.00 $86.00 $ GRAND TOTAL ALL BID ITEMS $181, $221, $253, This response summary is a listing of those who responded and their pricing. However, the responses have not been evaluated and the bidders have not been determined to be responsive at this time. After a complete review of the bids, a recommendation for award will be made and posted online. Unless stated otherwise in the solicitation documents, award will be made to the lowest, responsive responsible bidder who is deemed able to meet the requirements and qualifications of the specifications. This Bid Response is only a portion of the evaluation criteria for this bid. Page 7 of 7

Section 2: Importance-Satisfaction Analysis

Section 2: Importance-Satisfaction Analysis Section 2: Importance- Analysis ETC Institute (2009) 35 Overview Importance- Analysis Blue Springs, MO Today, city officials have limited resources which need to be targeted to activities that are of the

More information

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management

SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 2004 Specifications CSJ 6216-60-001 SPECIAL SPECIFICATION 7581 Performance Based Vegetation Management 1. Description. This item will govern for complete vegetation management of highway rightof-way, including

More information

4.7 Landscape Provisions.

4.7 Landscape Provisions. 4.7. A. Intent. Landscaping of required Yards and required Bufferyards is an essential element of the design of a site with respect to promoting the public health, safety, comfort, convenience and general

More information

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED)

CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No (WED) CITY OF WESTERVILLE STREET LIGHTING POLE AND TRAFFIC SIGNAL POLE PAINTING PROJECT Project No. 2016 003 (WED) Sealed bids for the construction of the Street Lighting Pole and Traffic Signal Pole Painting

More information

City of Memphis. To: John E. Cameron, PE City Engineer. From: Kyle Wagenschutz. Cc: Manny Belen, Randall Tatum. Date: November 5, 2015

City of Memphis. To: John E. Cameron, PE City Engineer. From: Kyle Wagenschutz. Cc: Manny Belen, Randall Tatum. Date: November 5, 2015 City of Memphis Tennessee A C Wharton, Jr. Mayor Jack Sammons Chief Administrative Officer Division of Engineering John E. Cameron, P.E. City Engineer Memo To: John E. Cameron, PE City Engineer From: Kyle

More information

QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, APRIL 27, Central Library Merrick Blvd., Jamaica, NY AGENDA

QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, APRIL 27, Central Library Merrick Blvd., Jamaica, NY AGENDA QUEENS LIBRARY BUILDINGS AND GROUNDS COMMITTEE THURSDAY, APRIL 27, 2017 Central Library 89-11 Merrick Blvd., Jamaica, NY 11432 AGENDA 6:00 PM BUILDINGS AND GROUNDS COMMITTEE REGULAR MEETING I. Call to

More information

SPECIFICATIONS OPTION # 4 GROUNDS MAINTENANCE: Right-of-Ways Various Locations

SPECIFICATIONS OPTION # 4 GROUNDS MAINTENANCE: Right-of-Ways Various Locations SPECIFICATIONS OPTION # 4 GROUNDS MAINTENANCE: Right-of-Ways Various Locations Vendor shall provide pricing for landscape management services to be provided in the Right-of- Way areas of the City of Watauga

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

a contract for Zone A Roadside Landscape Maintenance Services and Resolution No awarding

a contract for Zone A Roadside Landscape Maintenance Services and Resolution No awarding ADMINISTRATIVE STAFF REPORT V 1 TO Mayor and Town Council June 16 2015 SUBJECT Resolution No 50 2015 awarding a contract for Zone A Roadside Landscape Maintenance Services and Resolution No 54 2015 awarding

More information

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council

Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: UPC Presentation to Town Council Route 7 (East Market Street) Interchange at Battlefield Parkway Town of Leesburg Project No: 0007-253-109 UPC 106573 Presentation to Town Council June 26, 2017 Council Decisions East Market Street / Battlefield

More information

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS?

2016 FACT SHEET ENGINEERING STREET OPERATIONS. Engineering Street Operations net 2016 budget is $5,199,900 WHAT IS ENGINEERING STREET OPERATIONS? WHAT IS STREET OPERATIONS? This section maintains approximately 570 km of major, collector and residential roads throughout Saanich. Some of the major programs include road surface treatments (pothole

More information

VILLAGE OF DOWNERS GROVE Report for the Village Council Meeting

VILLAGE OF DOWNERS GROVE Report for the Village Council Meeting MOT 2015-6508 Page 1 of 47 VILLAGE OF DOWNERS GROVE Report for the Village Council Meeting 11/17/2015 SUBJECT: Bid - Mowing Services Three Year Contract SUBMITTED BY: Nan Newlon Director of Public Works

More information

Director, Purchasing and Materials Management

Director, Purchasing and Materials Management BID COMMITTEE CONTRACT AWARD BD40.9 Award of Request for Quotation No. 4001-15-7149 to Watermark Solutions Limited for Provision of Non- Exclusive Leak Detection and Correlation Services on an as Needed

More information

Director, Purchasing and Materials Management

Director, Purchasing and Materials Management BD44.14 BID COMMITTEE CONTRACT AWARD Award of Request for Quotation No. 1101-15-5017 to Inter-Provincial Painting Limited for Painting Services at various City of Toronto's Children s Services locations

More information

Construction Specifications Manual

Construction Specifications Manual Isle of Wight County Pedestrian and Bicycle Master Plan Construction Specifications Manual Adopted August 20, 2009 Introduction The Isle of Wight County Pedestrian and Bicycle Facilities Master Plan was

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Ruth Heggen. Florida Fish and Wildlife Conservation Commission DATE: MARCH 21, 2017 ADDENDUM NO.: 1 BID NO.: FWC 16/17-96

Ruth Heggen. Florida Fish and Wildlife Conservation Commission DATE: MARCH 21, 2017 ADDENDUM NO.: 1 BID NO.: FWC 16/17-96 DATE: MARCH 21, 2017 Florida Fish and Wildlife Conservation Commission Commissioners Brian Yablonski Chairman Tallahassee Aliese P. Liesa Priddy Vice Chairman Immokalee Ronald M. Bergeron Fort Lauderdale

More information

REQUEST FOR PROPOSAL # Pest Control Services

REQUEST FOR PROPOSAL # Pest Control Services REQUEST FOR PROPOSAL # 2018-005 Pest Control Services ADDENDUM No. 1 ISSUE DATE: July 24, 2017 **************************************************************************************************** Responding

More information

DEPARTMENT OF WILDLIFE Operations Division 6980 Sierra Center Parkway, Ste. 120 Reno, Nevada (775) Fax (775)

DEPARTMENT OF WILDLIFE Operations Division 6980 Sierra Center Parkway, Ste. 120 Reno, Nevada (775) Fax (775) STATE OF NEVADA # DEPARTMENT OF WILDLIFE Operations Division 6980 Sierra Center Parkway, Ste. 10 Reno, Nevada 89511 (775) 688-1500 Fax (775) 688-1987 MEMORANDUM Date: June 4, 016 To: From: Nevada Board

More information

4.0 STREETSCAPE ELEMENTS

4.0 STREETSCAPE ELEMENTS .0 Table 3 lists streetscape elements and their maintenance requirements. The figures that follow the table illustrate the streetscape elements. With respect to maintenance, if an element is required as

More information

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads

Congupna Community Plan Steering Committee (CCPSC) Greater Shepparton City Council (GSCC) CCPSC GSCC VicRoads CCPSC GSCC. CCPSC GSCC VicRoads CONGUPNA Action Plan Goal Actions Partnerships Timeframes / 1. Advocate for services - natural gas, sewerage Identify a range of advocacy measures to lobby with relevant government departments and utility

More information

WALKABILITY CHECKLIST How walkable is your community?

WALKABILITY CHECKLIST How walkable is your community? WALKABILITY CHECKLIST How walkable is your community? Everyone benefits from walking and other forms of active transportation. These benefits include: improved fitness, cleaner air, reduced risks of certain

More information

AFL Goulburn Murray. Community Club Sustainability - Guidelines for Player Payment Rules. November 2016

AFL Goulburn Murray. Community Club Sustainability - Guidelines for Player Payment Rules. November 2016 AFL Goulburn Murray Community Club Sustainability - Guidelines for Player Payment Rules November 2016 The following guidelines (Guidelines) are issued by the AFL Goulburn Murray to assist Clubs, Club Officials

More information

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014

Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio. Traffic Engineering Workshop June 4, 2014 Complete Streets Process and Case Study: Taft / McMillian Two-Way Street Conversion Cincinnati, Ohio Traffic Engineering Workshop June 4, 2014 Complete Streets Streets that enable safe access for users

More information

Ocean Park Boulevard Green Street Project Community Workshop

Ocean Park Boulevard Green Street Project Community Workshop Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,

More information

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY

HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY HELM RANCH ROUND 2 - COMMUNITY WORKSHOP AND OPEN HOUSE SUMMARY Tarpey Elementary School, Clovis, CA October 15, 2014 6:30pm-8:30pm OVERVIEW On Wednesday, October 15, 2014, staff from the City of Clovis

More information

South Portland City Council Position Paper of the City Manager

South Portland City Council Position Paper of the City Manager Agenda Item #19 Meeting of May 16, 2016 South Portland City Council Position Paper of the City Manager Subject: ORDER #153-15/16 Appropriating $24,985 from the Sewer User Reserve Account and award of Bid

More information

SAN ANTONIO WATER SYSTEM I.H. 10 Ground Storage Tank Rehabilitation and Painting Project SAWS Job No Solicitation No.

SAN ANTONIO WATER SYSTEM I.H. 10 Ground Storage Tank Rehabilitation and Painting Project SAWS Job No Solicitation No. SAN ANTONIO WATER SYSTEM I.H. 10 Ground Storage Tank Rehabilitation and Painting Project SAWS Job No. 13-0118 Solicitation No. B-16-014-GC September 1, 2016 TO BIDDER OF RECORD: The following changes,

More information

T E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT

T E N D E R Tender # T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT T E N D E R Tender # 2011-424002T SCOTT SCBA AIR PACKS AND ACCESSORIES SAINT JOHN FIRE DEPARTMENT Sealed tenders addressed to the Purchasing Agent, c/o Materials and Fleet Management, 2 nd Floor, 175 Rothesay

More information

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability.

Fill in the rating for each section. Total up the ratings to see how your neighbourhood scores overall for walkability. WALKABILITY CHECKLIST How walkable is your community? Everyone benefits from walking and other forms of active transportation. These benefits include: improved fitness, cleaner air, reduced risks of certain

More information

Tellico Reservoir Land Management Plan - Summary of Allocation Changes

Tellico Reservoir Land Management Plan - Summary of Allocation Changes Tellico Reservoir Land Management Plan - Summary of Allocation Changes Land use allocation changes on Tellico Reservoir that have occurred since the 2000 Tellico Reservoir Land Management Plan (RLMP) was

More information

Clip it and Chip it. Vermont Agency of Transportation

Clip it and Chip it. Vermont Agency of Transportation Clip it and Chip it Vermont Agency of Transportation Agenda Introduction Specific Things to Check Keeping Traffic Control Devices Visible Stopping Sight Distance Intersection Sight Distance Mowing for

More information

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT

BID SUMMARY SHEET. S. Brothers Inc. CONTRACTOR'S NAME CONTRACT QUANTITY & UNIT UNIT PRICE AMOUNT CONTRACT. 13-31-01 : TALMADGE ROAD RESURFACING Fischer Contracting Inc. Z Brothers Concrete Contractors Inc. S. Brothers Inc. 10 Short Hills Ln 304 Jernee Mill Rd P.O. Box 317 Scotch Plains, NJ 07076 Sayreville,

More information

DEPARTMENT OF WILDLIFE Operations Division 6980 Sierra Center Parkway, Ste. 120 Reno, Nevada (775) Fax (775)

DEPARTMENT OF WILDLIFE Operations Division 6980 Sierra Center Parkway, Ste. 120 Reno, Nevada (775) Fax (775) #9 STATE OF NEVADA DEPARTMENT OF WILDLIFE Operations Division 6980 Sierra Center Parkway, Ste. 0 895 (775) 688-500 Fax (775) 688-987 MEMORANDUM Date: June 3, 07 To: From: Nevada Board of Wildlife Commissioners,

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018

Strategies for Maintaining & Renewing Innovative Street Projects. Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 Strategies for Maintaining & Renewing Innovative Street Projects Elyse Parker, Director of Policy & Innovation, City of Toronto NACTO, LA, 2018 1 OUR ASSETS $12B in Assets $20B Replacement Cost $372M Capital

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

MEMBERSHIP RULES. Each Club shall on or before 31 May in each year shall be affiliated to the Association, providing such information as required.

MEMBERSHIP RULES. Each Club shall on or before 31 May in each year shall be affiliated to the Association, providing such information as required. MEMBERSHIP RULES Rule One These rules are made pursuant to the Articles of Association of Bedfordshire Football Association Limited. Where there is any inconsistency between these Rules and the Articles

More information

Accuplacer Arithmetic Study Guide

Accuplacer Arithmetic Study Guide Accuplacer Arithmetic Study Guide Section One: Terms Numerator: The number on top of a fraction which tells how many parts you have. Denominator: The number on the bottom of a fraction which tells how

More information

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT

ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but

More information

COMMUNITY MEETING #1 Summary

COMMUNITY MEETING #1 Summary COMMUNITY MEETING #1 Summary October 26, 2016 LOCATION: TIME: ATTENDEES: Dr. Phillips High School Cafeteria 6500 Turkey Lake Road, Orlando, FL 32819 6:00 pm to 8:00 pm 79 citizens Commissioner Scott Boyd,

More information

Road and Street Naming Policy

Road and Street Naming Policy Road and Street Naming Policy 13 December 2017 CONTENTS Purpose...1 Scope...1 Road and Street Naming...1 Road and Street Naming Criteria...1 Style Guide for Road and Street Names...1 Approval Delegation...2

More information

CITY OF LOS ALAMITOS Recreation and Community Services Department

CITY OF LOS ALAMITOS Recreation and Community Services Department CITY OF LOS ALAMITOS Recreation and Community Services Department NOTICE TO BIDDERS Sealed proposals will be received at the office of the City Clerk of the City of Los Alamitos, 3191 Katella Avenue, Los

More information

Planned Procurement Opportunities Report. June 2018

Planned Procurement Opportunities Report. June 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

POINTS BASED SYSTEM. Application for a Governing Body Endorsement for a Player

POINTS BASED SYSTEM. Application for a Governing Body Endorsement for a Player 1. Contact details of Club (employer) Name (Club Secretary): POINTS BASED SYSTEM Application for a Governing Body Endorsement for a Player Telephone: Mobile: E-mail: 2. Player details Title: Surname/Family

More information

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs

Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Planning Commission March 4, 2009 Ocean Park Boulevard Green Street Project Alternatives & Trade Offs Purpose of Tonight s Meeting Review concept plans and options Provide input on alternatives and trade-offs

More information

REQUEST FOR BIDS For Intake Tunnel Project Bid Notice

REQUEST FOR BIDS For Intake Tunnel Project Bid Notice REQUEST FOR BIDS For Intake Tunnel Project 2018 Bid Notice Bell County Water Control & Improvement District No. 1 (District) is soliciting Request for Bids for the videoing and cleaning, replacing trash

More information

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT

WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS. Richard A. Sanger, CLIA, CIC, CID ABSTRACT WATER AUDITS of LAWN BOWLING GREENS and CROQUET COURTS Richard A. Sanger, CLIA, CIC, CID ABSTRACT Lawn Bowling Greens and Croquet Courts are unique when it comes to designing an efficient irrigations system.

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m.

Welcome to the Public Meeting. Red Hill Business Park South Transportation Master Plan Addendum. December 4, :00 p.m. to 8:00 p.m. Welcome Welcome to the Transportation Master Plan Addendum December 4, 2012 6:00 p.m. to 8:00 p.m. Please sign-in Background PIC#1 Public Information Centre #1 (PIC#1) was held on June 25, 2012. Feedback

More information

City of Turlock Traffic Calming Program

City of Turlock Traffic Calming Program Table of Contents Introduction... 3 Definitions... 3 Purpose... 3 Goals and Objectives... 3 Policy Statements... 4 Minimum Qualifying Criteria... 6 Traffic Calming Request Process... 7 Step No. 1: Complete

More information

OTO BIKE/PED PLAN REPORT

OTO BIKE/PED PLAN REPORT OTO BIKE/PED PLAN REPORT 6/30/2012 Implementation in FY2012 This report outlines the bike/ped accomplishments related to the OTO Bike/Ped Plan. Activities occurring during the 2012 Fiscal Year, July 1,

More information

Clifton Early Childhood Pleasant Run

Clifton Early Childhood Pleasant Run 7033 /D1060 BLUE BUS Clifton Early Childhood - 3950 Pleasant Run AM PM 3701 N O'CONNOR RD ( CHAPARRAL APTS) 6:35 3:45 CHEMSEARCH BLVD &E NORTHGATE (TOWN VILLAGE APTS) 6:44 3:42 2405 WINGREN RD (WINGREN

More information

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112)

Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Project Area Map 6 COUNTY 112 COUNTY Preliminary Design of Wayzata Boulevard Improvements(CSAH 112) Public Open House Open House To Do List: Sign in Visit with Hennepin County staff and design team Learn

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST Contractor: WorleyParsons Canada Services Ltd. Project: Hebron Topsides Project Package: SC-64 GBS Caisson Field Welding Services Category: XXXXX-XXXXX Closing Date: 19 June 2013

More information

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007 Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines

More information

Grayslake Fire Protection District Request for Self-Contained Breathing Apparatus (SCBA) Bid

Grayslake Fire Protection District Request for Self-Contained Breathing Apparatus (SCBA) Bid Grayslake Fire Protection District Request for Self-Contained Breathing Apparatus (SCBA) Bid The Grayslake Fire Protection District invites interested and qualified parties to submit a bid for a Self-Contained

More information

ADDENDUM NO. 1 INVITATION FOR BIDS MAINTENANCE UNIFORM RENTAL SERVICES. IFB NO.: 2016-SP-15 Date Issued: October 6, 2016

ADDENDUM NO. 1 INVITATION FOR BIDS MAINTENANCE UNIFORM RENTAL SERVICES. IFB NO.: 2016-SP-15 Date Issued: October 6, 2016 602 N. Staples, Corpus Christi, Texas 78401 p. 361-289-2712 f. 361-903-3578 www.ccrta.org ADDENDUM NO. 1 INVITATION FOR BIDS MAINTENANCE UNIFORM RENTAL SERVICES IFB NO.: 2016-SP-15 Date Issued: October

More information

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6

Operating Plan 8a Bruce County Rail Trail Section 8 Saugeen Rail Trail to Saugeen Concession 6 Operating Plan 8a Bruce County Rail Trail Section 8 to Saugeen Concession 6 To develop and open the section of Non-Motorized trail (Part of Section 8) which runs from the South boundary of the (west side

More information

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase

UPC Design / CN Locally Administered PE Phase VDOT Administered CN Phase Presentation for County Board, February 27, 2018 Regular Hearing N. Lynn Street Esplanade and Custis Trail Improvements Funding Request for VDOT Construction Bid Award UPC Design 70762 / CN 109813 Locally

More information

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM

Journey to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM MAIN STREET MARKHAM HIGHWAY 407 TO HIGHWAY 7 1 MARCH 24, 2015 2 DISCUSSION Update Committee on Project Schedule Reversible Lanes Recommendations Next Steps 3 COMPLETED WORK 4 PROJECT UPDATE Enbridge is

More information

Cross Country NWT 2018 Arctic Winter Games Athlete and Coach Selection Policy FINAL

Cross Country NWT 2018 Arctic Winter Games Athlete and Coach Selection Policy FINAL Cross Country NWT 2018 Arctic Winter Games Athlete and Coach Selection Policy FINAL This policy sets out the process used by Cross Country NWT to select athletes and coaches for Team NWT at the 2018 Arctic

More information

City Council Report December 2010

City Council Report December 2010 Page 1 of 6 Parks and Recreation Department City Council Report Aquatic and Fitness Center Membership The membership statistics for the Aquatic and Fitness Center as of December 31, 2010 show 2000 membership

More information

Victoria Park Master Plan

Victoria Park Master Plan Victoria Park Master Plan Phase I Presented By: ARCHITECTURAL ALLIANCE & HUGHES HUGHES INC. History of Victoria Park Phase I Purpose Inventory of Existing Conditions Identification of Options by Type (for

More information

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY

TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY CITY OF TULSA BICYCLE & PEDESTRIAN INFRASTRUCTURE TULSA CITY COUNCIL CAPITAL IMPROVEMENT PROGRAM TASK FORCE MEETING JANUARY 31, 2013 CITY OF TULSA ENGINEERING SERVICES DEPARTMENT CITY OF TULSA ADA TRANSITION

More information

Taylor Road Resurfacing Project

Taylor Road Resurfacing Project Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

CITY OF ELK GROVE TRAILS COMMITTEE

CITY OF ELK GROVE TRAILS COMMITTEE CITY OF ELK GROVE TRAILS COMMITTEE Committee Members: Mark Doty, Chair Mark Mendenhall, Vice Chair Erika Smith Sharon Anderson Aaron Silva Regular Meeting of the Trails Committee Monday, October 19, 2015

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Report on Walkability Survey and Workshop for ZIP Code Hosted by the Oklahoma City-County Health Department April 13, 2013

Report on Walkability Survey and Workshop for ZIP Code Hosted by the Oklahoma City-County Health Department April 13, 2013 Report on Walkability Survey and Workshop for ZIP Code 73111 Hosted by the Oklahoma City-County Health Department April 13, 2013 On April 13th, the Oklahoma City-County Health Department hosted a community

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

Entry fees are $15.00 per athlete and must be paid online through the Coach O web site.

Entry fees are $15.00 per athlete and must be paid online through the Coach O web site. USATF REGION 14 JUNIOR OLYMPIC CROSS COUNTRY CHAMPIONSHIPS Sunday, November 30, 2014 Willow Hills Cross Country Course Folsom High School Folsom, California Welcome to the 2012 USATF Region 14 Junior Olympic

More information

Owner s Manual. for. NaturCut. Model CLASSIC HD

Owner s Manual. for. NaturCut. Model CLASSIC HD Owner s Manual for NaturCut Model CLASSIC HD Table of Contents Welcome... 1 Warranty... 1 Use of This Product... 1 Assembly... 2 Assembly Parts... 2 Assemble Handle Section... 2 Adjust Cutting Height...

More information

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents Keep Placer Moving Placer is Growing Keep Placer Moving POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents 30% of the total housing market growth in the Sacramento region.

More information

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY

City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX (956) SPEED HUMPS INSTALLATION POLICY City of Edinburg Department of Public Works 415 W. University Dr. Edinburg, TX 78541 (956) 388-8210 SPEED HUMPS INSTALLATION POLICY A. GENERAL Speed humps are an effective and appropriate device for safely

More information

45 Grandview Trail. Big Timber, Montana $449,000.

45 Grandview Trail. Big Timber, Montana $449,000. 45 Grandview Trail Big Timber, Montana $449,000. Offered Exclusively By: Sonny Todd Real Estate 301 W First, PO Box 788 Big Timber, MT 59011 Office: (406) 932-6668 (406) 932-LAND Toll Free: 1-866-932-1031

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

Brenda Patterson, General Manager, Parks, Forestry and Recreation. P:\2011\Cluster A\PFR\PE AFS#13791

Brenda Patterson, General Manager, Parks, Forestry and Recreation. P:\2011\Cluster A\PFR\PE AFS#13791 Regulating of Kite Flying in City Parks STAFF REPORT ACTION REQUIRED Date: May 11, 2011 To: From: Wards: Reference Number: Parks and Environment Committee Brenda Patterson, General Manager, Parks, Forestry

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 18-072 Subject: Authorizing the City Manager to Negotiate and Enter into a Contract with Bering Marine Corporation for the Purchase and Delivery of 100 Tons of Road

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

3.1 TRAFFIC CALMING PROCESS SUMMARY

3.1 TRAFFIC CALMING PROCESS SUMMARY SECTION 3 3.0 TRAFFIC CALMING 3.1 TRAFFIC CALMING PROCESS SUMMARY Traffic calming is a means in which to reduce speeds and minimize vehicular traffic on local neighborhood streets. Citizen involvement

More information

Epping Forest Council Playing Pitch Strategy. PROJECT DETAILS Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES

Epping Forest Council Playing Pitch Strategy. PROJECT DETAILS Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES PROJECT DETAILS CLIENT NAME ASSIGNMENT TITLE PURPOSE OF REPORT Epping Forest District Council ENGLAND AND WALES CRICKET BOARD DATA APPENDICES Summary update: All cricket sites assessed Received responses

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

RECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS.

RECOMMENDED MOTION: I MOVE TO PASS SECOND READING AND ADOPT ORDINANCE 556, TO REMOVE NE 173RD STREET FROM THE DESIGNATED PEDESTRIAN-ORIENTED STREETS. CITY OF WOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rd Avenue NE, Woodinville, WA 98072 wvvw.ci.woodinville.wa.us To: Honorable City Council Date: 02/05/2013 From: Richard A. Leahy, City Manager

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

UCI CYCLO-CROSS WORLD CUP SELECTION CRITERIA

UCI CYCLO-CROSS WORLD CUP SELECTION CRITERIA 2017-2018 UCI CYCLO-CROSS WORLD CUP SELECTION CRITERIA September 17, 2017 Iowa City, USA September 24, 2017 Waterloo, USA October 22, 2017 Koksijde, Belgium November 20, 2017 Bogense, Denmark November

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

HAYDEN IDAHO. Memo CITY OF

HAYDEN IDAHO. Memo CITY OF Memo CITY OF HAYDEN IDAHO Reviewed By: DH ATTY To: Mayor Griffitts and City Council From: Robert B. Wright, P.E., City Engineer Date: 3-21-2019 Re: Maintenance MOU Between City and ITD; Cooperative Agreement

More information

Project Update May 2018

Project Update May 2018 Project Update May 2018 Dakota County, in cooperation with the City of Lakeville, is planning to reconstruct 202 nd Street West (County Road 50) from Holyoke Avenue to Cedar Avenue (County Road 23). 202

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE

PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE PROCEDURE FOR ACCOMMODATING PEDESTRIANS IN WORK ZONES FOR CONSTRUCTION AND MAINTENANCE A.1 STANDARD Measures shall be taken to accommodate pedestrian traffic through and/or around Work Zones for Construction

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

UCI CYCLO-CROSS WORLD CUP SELECTION CRITERIA

UCI CYCLO-CROSS WORLD CUP SELECTION CRITERIA 2016-2017 UCI CYCLO-CROSS WORLD CUP SELECTION CRITERIA September 21, 2016 Las Vegas, USA September 24, 2016 Iowa City, USA October 23, 2016 Valkenburg, Netherlands November 20, 2016 Koksijde, Belgium November

More information

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS

ORDINANCE NO AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS ORDINANCE NO. 1267 AN ORDINANCE OF THE CITY OF FOLSOM AMENDING CHAPTER 14.28 OF THE FOLSOM MUNICIPAL CODE CONCERNING SWIMMING POOLS, SPAS AND HOT TUBS THE CITY COUNCIL OF THE CITY OF FOLSOM HEREBY DOES

More information

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT TRANSPORTATION

More information

WELCOME. City of Eden Prairie West 70 th Street

WELCOME. City of Eden Prairie West 70 th Street WELCOME City of Eden Prairie West 70 th Street Project Schedule Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug >>> May WEST SEGMENT Concept Plan Fall 2014 Plan Development Winter 2014 Summer 2015 Construction

More information

POST Project Review. Improvements that were made: Cross Country Ski Area o Scope; Tree limbing, brush and rock removal

POST Project Review. Improvements that were made: Cross Country Ski Area o Scope; Tree limbing, brush and rock removal POST Project Review July 14, 2017 Background: During low snow conditions, ski trails open earlier, and remain open longer, with regular summer grooming and removal of underbrush and obstacles, improving

More information

Guthriesville Village Manual of Written & Graphic Design Guidelines

Guthriesville Village Manual of Written & Graphic Design Guidelines Exhibit B Revisions: May 23, June 21, July 20, September 20, & October 9, 2012 Updated: December 13, 2012; June 27, 2013; February 7, 2014 Outline of Contents: 1. Purpose and Applicability 2. Overall Form

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information