1 REPORT TO FRESNO COUNCIL OF GOVERNMENTS DATE: APRIL 2012 TO: FROM: FRESNO COG POLICY BOARD STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER SUBJECT: GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT INFRASTRUCTURE IMPROVEMENTS: PLANNING ENGINEERING AND ENVIRONMENTAL STUDY In October 2009 Fresno COG began the process of preparing plans for the revitalization of the Golden State Corridor. This work was to be the second of several steps in the process that began in 2003 with the visioning document prepared by Fresno COG and Chabin Concepts entitled Community Vision for the Golden State Corridor. This second step was funded by Measure C allocations. The project consists of the revitalization of the Golden State Corridor to make it an inviting, enjoyable, and dynamic economic engine for the surrounding communities. The project area is Golden State Boulevard (Whitson Street in Selma and Simpson Street in Kingsburg) from just south of American Avenue north of Fowler to Mission Street in Kingsburg. Improvements along the Corridor include infrastructure improvements, pavement rehabilitation, new traffic signals, a continuous bikeway, landscaping, and signage. Fresno COG requested proposals for the work, and the team led by Quad Knopf, with VRPA Technologies, Planning Design Consultants, and Chabin Associates (writers of the 2003 Visioning Plan) was selected in March The project deliverables are intended to bring the design to a 30% completion level and provide the environmental review documentation. Specifically, the project consists of: Design Guidelines Manual Topographic Survey of the 14.2-mile long Corridor 30% Construction Plans for the length of the Corridor and its intersections Utility/Railroad/CPUC Report Water Conservation Study
2 Existing Pavement Assessment Study Engineer s Cost Estimate Grant Opportunities Report CEQA Document (Mitigated Negative Declaration) CEQA Technical Studies NEPA Technical Studies These deliverables are now complete and have been delivered to Fresno COG. In addition, the CEQA process has been completed, with the exception of adoption by the COG Policy Board. Together, they represent significant progress in the goal of revitalizing this important regional transportation asset. Throughout this planning and design process, the three cities, Fowler, Selma, and Kingsburg, along with Fresno County, were heavily involved in providing key information and in determining the design and outcome of the project. A Golden State Advisory Committee was formed consisting of staff members from the four jurisdictions, as well as representatives from Caltrans, FAX, the CPUC, and the Fresno Bicycle Coalition. This group met six times to review, discuss, and determine the details of the project. In addition, Quad Knopf presented a progress report to each City Council mid-way through the process, and held three public meetings, one in each city, to give the general public a say in the project. During the 45-day public review period, copies of the plans and documents were made available to the public for review at the Fresno COG office, Fresno County Public Works and Planning Department, each of the three city halls, the downtown Fresno library, and branch libraries in Fowler, Selma, and Kingsburg. The proposed Initial Study/Mitigated Negative Declaration was completed in accordance with CEQA and is ready to be adopted by the Policy Board. The attached seven sheets provide details of the improvements that are planned, including additional lanes at intersections, location of the bicycle path planned for connecting the three cities, and new signal locations. RECOMMENDATION: Fresno COG staff is requesting that the TTC and the PAC recommend adoption of the CEQA environmental document and acceptance of the project and that the Fresno COG Policy Board adopt the CEQA/MND document and accept the project studies. Attachments: Figure 1- Project Vicinity Figure 2 Project site (five pages) Project Summary Sheets (seven pages) 2
3 PROJECT VICINITY Figure 1 3
4 PROJECT SITE Figure 2a 4
5 PROJECT SITE Figure 2b 5
6 PROJECT SITE Figure 2c 6
7 PROJECT SITE Figure 2d 7
8 PROJECT SITE Figure 2e 8
9 Golden State Corridor North Fowler LOCATION EXISTING CONDITION PROPOSED MODIFICATIONS American Avenue/ 4-way intersection with RR Xing, 2-way stop. Intersection modifications to American Avenue by separate County project. Fowler Sphere of Influence Golden State Corridor project begins approximately 200 feet south of the intersection. Start Class I Bike Path on west side of Golden State Blvd. Start Class II bike lanes in each direction adjacent to curb. Jefferson Avenue 3-way intersection (west), 1-way stop. Private 1-way stop to remain. New NB and SB left and right turn lanes. Bike Path Xing. RR Xing. Lincoln Avenue 3-way intersection with RR Xing, 1-way stop. 1-way stop to remain. New SB U-turn lane. New NB left turn lane. New SB acceleration lane. Clovis Avenue Frontage Rd. 3-way signalized intersection. Signal to remain. Lengthen existing NB and SB left turn lanes. Bike Path Xing. Clovis Avenue overcrossing Grade separated overcrossing over GS Blvd. SB lanes shifted into median to allow room for Class 1 Bike Path under and RR tracks. the overcrossing. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
10 Golden State Corridor - Central Fowler ITEM II C LOCATION EXISTING CONDITION PROPOSED MODIFICATIONS Clayton Avenue 4-way intersection with RR Xing, 2-way stop. 2-way stop to remain. New NB right and left turn lanes. New SB right and left turn lanes. Bike Path Xing. Fowler City limits "Welcome to Fowler" sign (SB). Bonita Avenue 3-way intersection (west) to access 8 th Street, 1-way stop to remain. New NB left turn lane and SB right turn lane. Bike Path Xing. 1-way stop. Abandon portion of 8 th Street between Bonita Avenue and Adams Avenue. Adams Avenue 4-way signalized intersection with RR Xing. Signal to be modified. New SB right turn lane. Access from 8 th Street to Adams Avenue closed. NEW ROAD SHIFT None currently. Transition SB GS Blvd. to 8th Street and NB GS to SB GS Blvd. Class I Bike Path ends with ped/bike Xing at Mariposa Street for access to Class II lanes. Mariposa Street 3-way intersection (east) with RR Xing, 1-way stop. 1-way stop to remain. New WB drive approach for access to future development site. New NB right and left turn lanes. New SB left turn lane. Tuolumne Street 3-way intersection with 8 th Street, 1-way stop. 1-way stop to remain with new access to GS Blvd. New NB and SB No access to GS Blvd. left turn lanes. New EB drive approach for access to future development site. Merced Street 4-way signalized intersection with RR Xing. Focal point of Fowler, transit stop site, signage. Signal to be modified. New EB right turn lane. Main Street 3-way intersection with 8 th Street, 1-way stop. 1-way stop to remain with new access to Golden State Blvd. New NB and SB No access to Golden State Blvd. left turn lanes. New EB drive approach for access to future development site. Fresno Street 3-way intersection with 8 th Street, 1-way stop. 1-way stop to remain with new access to Golden State Blvd. New NB and SB No access to Golden State Blvd. left turn lanes. New EB drive approach for access to future development site. NEW ROAD SHIFT None currently. Transition back to existing alignment between Fresno Street and Tulare Street. Class I Bike Path begins again south of Fresno Street with ped/bike Xing at Fresno Street. Vine Street 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB and SB right and left turn lanes. New WB left turn lane. Bike Path Xing. Peach Street 3-way intersection (west), 1-way stop 1-way stop to remain with new NB access to Golden State Blvd. New NB and SB No access to NB Golden State Blvd. left turn lanes. New SB acceleration lane. Bike Path Xing. South Avenue 4-way intersection with RR Xing, 2-way stop 2-way stop to remain. New NB right turn lane. New SB left turn lane. New EB right turn lane. "Welcome to Fowler" sign (NB). Bike Path Xing. Temperance Avenue 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB right turn lane. New SB right turn. Realign EB approach lanes to intersect at 90 degrees. Bike Path Xing. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
11 Golden State Corridor - South Fowler ITEM II C LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Parlier Avenue 3-way intersection (west), 1-way stop. 1-way stop to remain. Add median break with NB left turn lane. Bike Path Xing. No median break. East Valley Drive 3-way intersection (west), 1-way stop. 1-way stop to remain. Add SB left turn lane for U-turns. Bike Path Xing. Manning Avenue Signalized intersection with RR Xing. Signal modifications. Add 2 nd NB left turn lane. Add 3 rd WB through lane and WB right turn lane. Bike Path Xing. San Antonio Drive 3-way signalized intersection. Signal and all existing turn lanes remain. Bike Path Xing. Fowler City limits DeWolf Ave./ 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB and SB left turn lanes. New NB right turn lane. Springfield Ave./ Bike Path Xing. Fowler and Selma Sphere of Influence Selma City limits SB lanes only are inside city limits. Pull-off location Chicago Canal (circa 1885). Add pull-off location on west side with historical marker. Incorporate bike rest stop. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
12 Golden State Corridor North Selma LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Dinuba Avenue 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB right turn lane. New SB right turn lane. "Welcome to Selma" sign (SB). Bike Path Xing. Selma City limits NB lanes now also inside city limits. Highland Avenue 4-way signalized intersection. Signal modifications. New WB left turn lane. Bike Path Xing. EXISTING ROAD Existing shift to Whitson Street. Realign W. Front Street into a T intersection (1-way stop) with Whitson SHIFT Street. Class 1 Bike Path crosses to east side of Whitson Street and then merges into new Class II bike lanes on W. Front Street. Class II bike lanes end on GS Blvd. (Whitson Street) at new W. Front Street intersection. Floral Avenue 4-way signalized intersection. Directional signage, terminated vista 1,000 ft north, looking NB. New EB right turn lane (Floral Ave) Gaither Street 3-way intersection (west), 1-way stop. 1-way stop to remain. Stillman Street 4-way intersection (west), 1-way stop. No changes with this project. City of Selma plans to close Stillman between Stillman Street between Whitson and Thompson Whitson Street and Thompson Avenue via a separate project. is one-way east only. Thompson Avenue 4-way signalized intersection. Signal to remain. New NB left turn lane. New SB left turn lane. Branch Street 4-way intersection, 2-way stop. 2-way stop to remain. New NB left turn lane. New SB left turn lane. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
13 Golden State Corridor South Selma ITEM II C LOCATION EXISTING CONDITION PROPOSED MODIFICATIONS Sherman Street 3-way intersection (west), 1-way stop. 1-way stop to remain. North Street 4-way intersection, 2-way stop. 2-way stop to remain. New NB left turn lane. New SB left turn lane. First Street 4-way intersection, 2-way stop. 2-way stop to remain. Second Street 4-way signalized intersection. Singal to remain. Focal point of Selma, transit stop site, directional signage. Third Street 4-way intersection, 2-way stop. No changes to Third Street/Whitson Street intersection. New intersection modifications at Third/Front/McCall intersection for bike lanes and better turning movements. McCall Avenue 4-way intersection, 4-way stop. No changes. EXISTING ROAD Existing shift from Whitson Street to GS Blvd. SHIFT Todd Street 3-way intersection (west), 1-way stop Realign W. Front Street into a 4-way intersection with Todd Street with 2-way stop. End W. Front Street Class II bike lanes. New bike lane Xings. Begin Class II bike lanes on GS Blvd. south of Todd Street. Begin Class I Bike Path on west side of GS Blvd. south of Todd Street. Nebraska Ave/ 4-way intersection with RR Xing, 2-way stop 2-way stop to remain. New NB right and left turn lanes. New SB left turn lane. Bike Park Street Path Xing. Dockery Avenue 3-way intersection (west), 1-way stop 1-way stop to remain. New NB left turn lane. New SB left turn lane. Bike Path Xing. Saginaw Avenue/ 3-way intersection (east) with RR Xing, 1-way stop. 1-way stop to remain. New NB right turn lane. New SB left turn lane. Selma City limits "Welcome to Selma" sign (NB). Bike Path Xing. Van Horn Avenue 3-way intersection (west), 1-way stop. 1-way stop to remain. New NB left turn lane. Bike Path Xing. Mountain View Ave./ 4-way signalized intersection with RR Xing. Modify RR crossing. New NB right turn lane. Bike Path connects to existing Class Selma and Kingsburg I Bike Path south of Mt. View Avenue.* Sphere of Influence * The City of Kingsburg is on schedule to complete a Class 1 bike path on west side of GS Blvd from Kingsburg to Mountain View Ave. ahead of GS project. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
14 Golden State Corridor North Kingsburg ITEM II C LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Amber Avenue 3-way intersection (west), 1-way stop. 1-way stop to remain. Close median, eliminating NB left turns onto Amber Avenue. "Welcome to Kingsburg" sign (SB). Kingsburg City limits Kamm Avenue/ 4-way intersection with RR Xing, 4-way stop. New traffic signal. New NB right and left turn lanes. New SB left turn lanes. Bethel Avenue Revise intersection grades to reduce vertical differences. Design to accommodate future overcrossing over GS Blvd. and RR tracks. Consider widening RR Xing at 100% plan stage. Bike Path Xing by others.* * The City of Kingsburg is on schedule to complete a Class 1 bike path on west side of GS Blvd from Kingsburg to Mountain View Ave. ahead of GS project. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
15 Golden State Corridor South Kingsburg ITEM II C LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Stroud Avenue 4-way intersection with RR Xing, 2-way stop. Realign intersection with new RR Xing to connect to new industrial driveway on Bike Path Xing. west side of GS. 2-way stop to remain. New NB right and left turn lanes. Existing EB Stroud Avenue to become a 3-way intersection with 1-way stop. Between Stroud Narrow right of way. No median island. Add curb and gutter on west side of GS Blvd. with defined drive approaches. Avenue and Sierra Transition from 4-lane to 2-lane, with continuous Modify parking lots and buildings that encroach into GS Blvd. right of way. Avenue left turn lane. Existing Class I Bike Path ends. Continue shared use bike/pedestrian path on west side of GS Blvd. to Sierra Street. Sierra Street/ 4-way signalized intersection with RR Xing. Signal to remain. End shared bike/pedestrian path. State Hwy 201 Median island begins south of intersection. Ellis Street 3-way intersection (west), 1-way stop. 1-way stop to remain. Draper Street 4-way signalized intersection with RR Xing. Signal to remain. New NB right turn lane. Focal point of Kingsburg. Transit stop site, possibly at train station. Class II bike lanes end. Class III bike routes begin south of intersection. Lewis Street 3-way intersection (west), 1-way stop. 1-way stop to remain. New NB left turn lane. Earl Street 4-way signalized intersection with RR Xing. Signal to remain. New NB left turn lane. New SB left turn lane. Mission Street 3-way intersection (west), 1-way stop. 1-way stop to remain. No changes. Class III bike route ends. End of Golden State Corridor improvements. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing
16 BEFORE THE FRESNO COUNCIL OF GOVERNMENTS RESOLUTION NO In the Matter of: ) RESOLUTION ADOPTION OF THE MITIGATED ) NEGATIVE DECLARATION (SCH# ) AND GOLDEN STATE CORRIDOR - ECONOMIC ) ACCEPTANCE OF THE GOLDEN STATE CORRIDOR - DEVELOPMENT INFRASTRUCTURE IMPROVEMENTS: ) ECONOMIC DEVELOPMENT INFRASTRUCTURE PLANNING ENGINEERING AND ) IMPROVEMENTS: PLANNING, ENGINEERING ENVIRONMENTAL STUDY ) AND ENVIRONMENTAL STUDY ) WHEREAS, the Fresno Council of Governments (Fresno COG) has previously authorized the preparation of the Golden State Corridor-Economic Development Infrastructure Improvements: Planning Engineering and Environmental Study; and WHEREAS, documents have been prepared consisting of a Topographic Survey, 30% Design Plans, a Design Guidelines Manual, a Utility/Railroad CPUC Report, an Engineer s Cost Estimate, a Water Conservation Study, an Existing Pavement Assessment Report, a Grant Opportunities Report, and an Initial Study/Negative Declaration with background technical studies; and WHEREAS, the cities of Fowler, Selma, and Kingsburg, and the County of Fresno participated heavily in the design of these project deliverables; and WHEREAS, public meetings were held in each of the three cities in June and July of 2011 to gather public input on the project; and WHEREAS, a Initial Study/Negative Declaration was prepared and circulated for a 45-day public review in accordance with the California Environmental Quality Act. WHEREAS, Fresno COG has independently reviewed the contents of the Mitigated Negative Declaration and agrees with the findings therein; and NOW, THEREFORE, BE IT RESOLVED, that the Fresno COG, acting at Lead Agency, adopts the Initial Study Mitigated Negative Declaration, in accordance with the California Environmental Quality Act. BE IT FURTHER RESOLVED, that the Fresno COG, acting at Lead Agency, adopts Mitigation and Monitoring Program (Section 5 of the Final Mitigated Negative Declaration), in accordance with the California Environmental Quality Act. BE IT FURTHER RESOLVED, that the Fresno COG accepts the Golden State Corridor-Economic Development Infrastructure Improvements: Planning Engineering and Environmental Study project as complete. THE FOREGOING RESOLUTION was passed and adopted by the Fresno Council of Governments this 26th day of April, AYES: NOES: ABSTAIN: ABSENT: ATTEST: Signed: Amarpreet Dhaliwal, Chair I hereby certify that the foregoing is a true copy of a resolution of the Fresno Council of Governments duly adopted at a regular meeting thereof held on the 26th day of April, Signed: Tony Boren, Executive Director
3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationMEMORANDUM. David Mohlenbrok, Environmental Services Manager
MEMORANDUM DATE: August 10, 2017 TO: FROM: RE: Planning Commission Members David Mohlenbrok, Environmental Services Manager Blue Memo # 1 for Rocklin Station Project Comments Received on Initial Study/Mitigated
More informationStaff Report City of Manhattan Beach
Agenda Item #: Staff Report City of Manhattan Beach TO: THROUGH: FROM: Honorable Mayor Wilson and Members of the City Council Geoff Dolan, City Manager Richard Thompson, Director of Community Development
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:
More informationTable 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line
Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install
More informationAPPENDIX E GRADE CROSSING LOCATIONS
APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing
More informationAPPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY
STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationToronto and East York Community Council. Director, Transportation Services, Toronto and East York District
No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationStation 1: Street & Sidewalk Upgrades
Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY SUMMARY: The South Van Ness and Mission Intersection Improvements
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationTransportation Development Act Grant Center Avenue Pedestrian Signal Project
CITY OF MARTINEZ CITY COUNCIL AGENDA April 15, 2015 TO: FROM: SUBJECT: DATE: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Center Avenue Pedestrian Signal Project
More informationUPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS
UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications on Herbst Road
More informationBD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1
BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner
More informationPlanned Date of Obligation for 4/1/15 and beyond (please enter as MM/DD/YY)
for 4/1/15 City of Clovis 5208-149 LSTMP454 Pedestrian Bridge / SR 168 NI Master Plan 4/30/2015 $168,000 $168,000 City of Clovis 5208-139 FRE130005 Shaw, Clovis-Sunnyside Street Maintenance 5/1/2015 CON
More informationNOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA
NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927
More informationBICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes
Minutes Approved as Submitted Date: 8/10/17 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes June 8, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.
More informationImproving Cyclist Safety at the Dundas Street West and Sterling Road Intersection
STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various traffic and parking modifications on Bay Street
More informationTRANSPORTATION COMMISSION Agenda Staff Report
TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationRESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 6123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY WHEREAS, the term Complete Streets describes a comprehensive, integrated transportation
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More informationDonahue Drive Corridor Traffic Operational Evaluation
Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationCaltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns
Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationPISMO BEACH COUNCIL AGENDA REPORT
PISMO BEACH COUNCIL AGENDA REPORT Agenda Item 8.E SUBJECT/TITLE: TRAFFIC SAFETY COMMITTEE RECOMMENDATIONS TO CITY COUNCIL RECOMMENDATION: Adopt a Resolution approving the Traffic Safety Committee s recommendation
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationAbrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677
Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,
More informationAddendum to Mitigated Negative Declaration
Addendum Date: Case No.: 2014.1499E Project Title: (MDSP) - Mission Valencia Green Gateway Streetscape Project Original: 2008.1075, MDSP Mitigated Negative Declaration Project Sponsor: Charlie Ream, San
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications
More informationJanuary 31, Woodrow Wilson Small Area Study
Woodrow Wilson Small Area Study Overview Woodrow Wilson Complex Consists of: Wilson Elementary School Valley Career and Technical Center Wilson Middle School Wilson High School Wilson Workforce and Rehabilitation
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationTransportation Development Act Grant Radar Check Speed Signs
City Council Agenda January 18, 2017 To: From: Subject: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Radar Check Speed Signs Date: January 10, 2017 Recommendation
More informationBoston Post Road Design Feasibility Study
Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationSupervisor Cook Announces Final Plans for Braddock Road Improvement Project
Supervisor Cook Announces Final Plans for Braddock Road Improvement Project After more than two years of study and significant community input, I am pleased to announce the final plans for the Braddock
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationEast 12 th Street Bikeway Feasibility Study
Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)
More informationMINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY
MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study
More informationCDOT s Transportation Plan for the Obama Presidential Center in Jackson Park
CDOT s Transportation lan for the Obama residential Center in Jackson ark May 10, 2018 repared for Jackson ark Watch JacksonarkWatch.org repared by at Hawley,.E. TOE rasmith 16745 West Bluemound Road Brookfield,
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationGlenn Avenue Corridor Traffic Operational Evaluation
Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Sustainable Streets Transportation Engineering BRIEF DESCRIPTION: Requesting that the San Francisco Municipal
More informationItem 08M 1 of 9
MEETING DATE: December 20, 2017 PREPARED BY: Christopher L. Magdosku, City Engineer DEPT DIRECTOR: Brenda Wisneski DEPARTMENT: Development Services CITY MANAGER: Karen P. Brust SUBJECT: Interim North Coast
More informationJanuary 2018 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN
FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN January 2018 i Acknowledgements: The Fresno Council of Governments thanks the jurisdiction staff members and community members who contributed to the creation
More informationDavid DiPierro, John Amberson. Steering Committee Meeting #4 Overview
IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project
More information4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project
City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Sustainable Streets BRIEF DESCRIPTION: Approving various routine parking and traffic modifications. SUMMARY:
More informationChapter 13 ORANGE COVE
Chapter 13 ORANGE COVE This chapter describes the current status and future plans for biking and walking in the City of Orange Cove. RELATIONSHIP TO CITY PLANS AND POLICIES The Orange Cove General Plan
More informationNOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAFAYETTE RESOLVES AS FOLLOWS:
BEFORE THE CITY COUNCU. OF THE CITY OF LAFAYETTE IN THE MATTER OF: A Resolution of the City Council of the City ) of Lafayette Authorizing Closure of Certain ) Streets and Establishing No Parking Zones
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationFreeway ramp intersection study
Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate
More informationChapter 11 KINGSBURG RELATIONSHIP TO CITY PLANS AND POLICIES. City of Kingsburg Bicycle Transportation Plan (2017) City of Kingsburg General Plan
Chapter 11 KINGSBURG This chapter describes the current status and future plans for biking and walking in the City of Kingsburg. RELATIONSHIP TO CITY PLANS AND POLICIES The Kingsburg General Plan is the
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationWEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069
MINUTES Meeting of the San Marcos Traffic Commission WEDNESDAY, SEPTEMBER 6, 2017 6:00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069 CALL TO ORDER: Vice Chairman Rico called the
More informationCity of Palo Alto (ID # 7812) City Council Staff Report
City of Palo Alto (ID # 7812) City Council Staff Report Report Type: Consent Calendar Meeting Date: 3/20/2017 Summary Title: 101 Auxiliary Project Parcels Relinquishments Acceptance and Release of Parcels
More informationSANTA MONICA BOULEVARD CORRIDOR
CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More information4. Mobility and Transportation Element. Page Bikes and Pedestrians
Below are the specific General Plan text changes proposed for A-16-015 and the proposed changes to Figure MT-2 Paths and Trails. In general changes consist of removing references to the Bicycle, Pedestrian
More informationMineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st
Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24
More informationMarina Loft (DRC 51-R-12)
Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,
More informationC C C
C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationReference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis
To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion
More information5858 N COLLEGE, LLC N College Avenue Traffic Impact Study
5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...
More informationPre-Construction Meeting
Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope
More informationRESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune
More informationStakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville
PRESENT Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PROJECT TEAM REPRESENTATIVES Name Organization Celia McAdam Luke McNeel Caird Leo Heuston Judy Matsui
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationAMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities
I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;
More information4.12 TRANSPORTATION Executive Summary. Setting
4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions
More informationCity of Davis East Covell Corridor Plan
Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationINDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:
INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.
More informationHARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN
HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,
More informationCOMMUNITY PARTICIPATION CHAPTER 8
COMMUNITY PARTICIPATION CHAPTER 8 8.1 ROLE OF THE CITY S BICYCLE ADVISORY COMMISION 8.2 BICYCLE TRANSPORTATION PLAN STAKEHOLDERS 8.2.1 Stakeholders 8.2.2 Stakeholders Letters of Recommendations 8.3 CITY
More informationHOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING
4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown
More informationLyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study
Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301
More informationAbout the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability
About the study Key goals of this study are to: North Milwaukee Avenue is a local and regional street for multiple modes of transportation. It is officially zoned and functions as a pedestrian street southeast
More informationTABLE OF CONTENTS. Executive Summary
Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting
More informationCITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT
City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE
More information3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM
3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,
More informationCo-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department
28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator
More informationMEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:
MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.
More informationREGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More information