Transportation Impact Study. Eagle, Colorado. Frost Creek. Revised March 25, November 30, for PREPARED FOR: PREPARED BY:

Size: px
Start display at page:

Download "Transportation Impact Study. Eagle, Colorado. Frost Creek. Revised March 25, November 30, for PREPARED FOR: PREPARED BY:"

Transcription

1 Transportation Impact Study for Frost Creek Eagle, Colorado November, 5 Revised March 5, 6 PREPARED FOR: BCP ARR, LLC c/o Meriwether Companies 9 Valmont Road, Suite Boulder, CO 8 Contact: Garrett Simon PREPARED BY: McDowell Engineering, LLC PO Box 59 Eagle, CO Contact: Kari J. McDowell Schroeder, PE, PTOE Project Number: M8

2 Statement of Engineering Qualifications Kari J. McDowell Schroeder, PE, PTOE is a Transportation and Traffic Engineer for McDowell Engineering, LLC. Ms. McDowell Schroeder has over nineteen years of extensive traffic and transportation engineering experience. She has completed numerous transportation studies and roadway design projects throughout the State of Colorado. Ms. McDowell Schroeder is a licensed Professional Engineer in the State of Colorado and has her certification as a Professional Traffic Operations Engineer from the Institute of Transportation Engineers. Frost Creek Eagle, CO Revised March 5, 6 Page

3 Traffic Impact Study for Frost Creek Table of Contents. PROJECT DESCRIPTION PROJECT ACCESS TRAFFIC STUDY SCOPE EXISTING CONDITIONS DESCRIPTION OF EXISTING TRANSPORTATION SYSTEM TRAFFIC DATA COLLECTION FUTURE TRAFFIC PROJECTIONS.... BACKGROUND INFRASTRUCTURE ASSUMPTIONS.... BACKGROUND TRAFFIC GROWTH.... PROJECT TRAFFIC.... TRIP GENERATION FOR PROPOSED LAND USE.... TRIP GENERATION FOR PROPOSED LAND USE.... DIRECTIONAL DISTRIBUTION.... TRAFFIC ASSIGNMENT AND TOTAL TRAFFIC....5 OPERATIONS AND HCM ANALYSIS....6 STATE HIGHWAY ACCESS PERMITS....7 PERCENTAGE OF IMPACT OF GREATER ROADWAY NETWORK....8 BRUSH CREEK ROAD TURN LANE ANALYSIS....9 ACCESS DESIGN CRITERIA.... SIGHT DISTANCE.... INTERNAL CIRCULATION AND TRAVEL SPEEDS RECOMMENDATIONS AND CONCLUSIONS APPENDIX... Frost Creek Eagle, CO Revised March 5, 6 Page

4 Tables and Figures FIGURE : AREA MAP... 5 FIGURE : SITE PLAN... 7 FIGURE : HAYMEADOW DEVELOPMENT S PROPOSED BRUSH CREEK ROAD/SYLVAN LAKE ROAD... FIGURE : HAYMEADOW DEVELOPMENT S PROPOSED BRUSH CREEK ROAD/SYLVAN LAKE ROAD... FIGURE 5: YEAR 5 EXISTING TRAFFIC... FIGURE 6: YEAR 6 BACKGROUND TRAFFIC... 6 FIGURE 7: YEAR 5 BACKGROUND TRAFFIC... 8 GRAPH : HISTORIC SECOND HOME RATES IN EAGLE COUNTY... TABLE : PROJECT TRIP GENERATION... FIGURE 8: YEAR 6 DIRECTIONAL DISTRIBUTION... 6 FIGURE 9: YEAR 5 DIRECTIONAL DISTRIBUTION... 8 FIGURE : YEAR 6 PROJECT GENERATED TRAFFIC ASSIGNMENT... FIGURE : YEAR 5 PROJECT GENERATED TRAFFIC ASSIGNMENT... FIGURE : YEAR 6 TOTAL TRAFFIC... 6 FIGURE : YEAR 5 TOTAL TRAFFIC... 8 TABLE : US 6 PERCENTAGE OF IMPACT... TABLE A: HCM LEVEL OF SERVICE CRITERIA... 9 Frost Creek Eagle, CO Revised March 5, 6 Page

5 . Project Description McDowell Engineering has prepared this Transportation Impact Study for the proposed resubdivision of the Frost Creek development. The purpose of this study is to forecast and analyze the impacts of the additional traffic volumes associated with the proposed increase in the number of residential units. Recommendations to mitigate any traffic impacts are also included. The analysis complies with Eagle County and Town of Eagle standards. The Frost Creek project was originally approved in 5 under the name of Adam s Rib. This approval included 97 single family homes, 5 accessory dwelling units, a private 8 hole golf course, and private, square foot recreation center. The original traffic analysis was covered in LSC s Adam s Rib Traffic Study. Membership rates and housing construction remained low through Year. The property was sold to a new ownership group in. As such, Frost Creek is looking to resubdivide in order to meet current market conditions. Frost Creek is proposing additional single family homes and 5 cabins. Frost Creek is located within unincorporated Eagle County. It is three miles south of the Town of Eagle on Brush Creek Road. Refer to the Area Map in Figure. Figure : Area Map Frost Creek Eagle, CO Revised March 5, 6 Page 5

6 . Project Access Both accesses to Frost Creek have been constructed and are currently in operation. The primary Frost Creek access to Brush Creek Road is located on the northeastern side of the property. Frost Creek Drive is located,8 feet south of the Bruce Creek/Salt Creek access to Brush Creek Road. There is a guard station at the Frost Creek Drive entrance. A secondary access at the southeastern end of the site connects with the golf maintenance facility and southern home sites to Brush Creek Road. The internal roadway network connects the two Brush Creek Road accesses. In the event of an emergency, there is a secondary egress from the site available. The access locations are depicted in the site plan Figure.. Traffic Study Scope This traffic study evaluates peak hour traffic operations at the following intersections: US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road Brush Creek Road & Sylvan Lake Road Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street US 6 & Sylvan Lake Road / Violet Lane US 6 & Future Brush Creek Road Extension Brush Creek Road & Frost Creek Drive Brush Creek Road & South Site Access The traffic study scope was reviewed with both Eagle County and Town of Eagle staff prior to the completion of this study. The Traffic Study Scoping Form can be found in the Appendix. Frost Creek Eagle, CO Revised March 5, 6 Page 6

7 Figure : Site Plan Frost Creek Eagle, CO November, 5 Page 7

8 . Existing Conditions. Description of Existing Transportation System Brush Creek Road is the primary roadway serving the site. The roadway is currently a paved, two lane major collector with a posted speed limit of 5mph in the vicinity of the site. Brush Creek Road is the equivalent to the Colorado Department of Transportation (CDOT) access category, R B, rural highway. There are plans for a Brush Creek Road extension that will extend Brush Creek Road west of the Capitol Street intersection. This extension will connect through to US 6 (Grand Avenue.) It is proposed to be a paved, two lane road. The intersection with Capitol Street is currently controlled by an all way ( way) stop. Sylvan Lake Road extends through the Eagle Ranch commercial area, connecting US 6 (Grand Avenue) to Brush Creek Road. In the vicinity of Brush Creek Road, it is a two lane, paved collector street. The roadway section is wider in the Eagle Ranch commercial area to accommodate on street parking. The intersection of US 6 is controlled by a roundabout. Capitol Street extends south from US 6 (Grand Avenue) and downtown Eagle to Sylvan Lake Road. It is a two lane, paved roadway with on street parking in the developed areas at both ends. In downtown there are drainage dips that cross the roadway and regulate traffic speed. The intersections at both ends are controlled by stop signs on Capitol Street. Northbound traffic approaching US 6 is limited to a right out only movement. Signage restricts trucks from using Capitol Street and directs them to use alternate routes. US 6 (Grand Avenue) is a two lane, paved highway though Eagle. It connects to the communities of Gypsum/Dotsero to the west and Edwards/Avon to the east. US 6 is currently a State Highway. It is classified as a NR B highway, non rural arterial and access to the roadway is controlled by an Access Management Plan. However, CDOT and the Town of Eagle are currently in the devolution process for US 6. The roadway is anticipated to be turned over to the Town in July 6. Frost Creek Eagle, CO Revised March 5, 6 Page 8

9 . Traffic Data Collection Traffic data was collected at the following intersections in late September and early October of 5. US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road Brush Creek Road & Sylvan Lake Road Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street US 6 & Sylvan Lake Road / Violet Lane Brush Creek Road & Frost Creek Drive Brush Creek Road & South Site Access Turning movement counts were collected from 7: 9:am and : 6:pm on a weekday and from :am :pm on a Saturday. School was in session. There was construction activity on the Brush Creek Bridge, west of the US 6/Sylvan Lake Road roundabout throughout the count period. However, a fully functioning and traffic controlled temporary bridge was in place. Therefore, the traffic data collected is considered accurate. There were mountain bike events in the Town of Eagle on two of the Saturdays that were counted. However, similar sporting events occur frequently in the Town, and are considered typical weekend traffic. It was noted that there were several illegal northbound left turn movements observed at the intersection of US 6 and Capitol Street. This movement was as high as 6vph during the Saturday peak hour. The movement is restricted by a small median island on Capitol Street. However, it is physically possible to make an illegal left turn onto US 6 from this location. Frost Creek Eagle, CO Revised March 5, 6 Page 9

10 . Future Traffic Projections. Background Infrastructure Assumptions Brush Creek Road Extension: The Town of Eagle has plans to construct the Brush Creek Road extension from Capitol Street to US 6 in the future. This will not be completed by Year 6, but is anticipated prior to the long range planning Year 5. An excerpt from the Town of Eagle s West Eagle Sub Area Plan is shown in Figure. Per the Haymeadow Traffic Study, the intersections on either end of the Brush Creek Road extension will require a roundabout. Figure : Haymeadow Development s Proposed Brush Creek Road/Sylvan Lake Road Brush Creek Road and Sylvan Lake Road Improvements: The Haymeadow Development, located on the northeast corner of Brush Creek Road and Sylvan Lake Road is proposing improvements to this intersection as part of their development. The improvements will shift the Brush Creek Road alignment from the current configuration to a north/south orientation. Figure is an excerpt from the Haymeadow Traffic Study that depicts the proposed intersection alignment. Frost Creek Eagle, CO Revised March 5, 6 Page

11 Figure : Haymeadow Development s Proposed Brush Creek Road/Sylvan Lake Road Grand Avenue Capacity Improvements: Similar to the Haymeadow Traffic Study, it has been assumed that Grand Avenue between Eby Creek Road and Sylvan Lake Road will have been widened to two through lanes in each direction by Year to accommodate regional traffic. Per the Haymeadow Traffic Study, the widening will likely be phased over time as auxiliary right turn lanes become continuous through lanes. Sylvan Lake Road Improvements: Again per the Haymeadow Traffic Study, it is anticipated that Sylvan Lake Road will function adequately as a two lane roadway in areas without intersections. However, the area around Capitol Street and Eagle Ranch Road will likely need to be widened to accommodate two through lanes in each direction and/or auxiliary turn lanes. The paved width is already available, but may require the removal of existing on street parking in some spots. It is understood that this was planned when the roadway was originally designed and constructed. A traffic signal or roundabout may be required at the Capitol Street and Sylvan Lake Road intersection.. Background Traffic Growth The Year 5 has been selected as the long term planning horizon for this study. Estimates of daily and peak background traffic conditions have been made for the study area. These background traffic estimates do not include any Frost Creek traffic. Frost Creek Eagle, CO Revised March 5, 6 Page

12 Study Comparisons: It was noted that several of the current Year 5 traffic volumes at the US 6 and Eby Creek roundabout were higher than the Interchange Feasibility Study s projections for Year 5. Therefore, CDOT s current year growth factor 5 of.57 west of the Eby Creek roundabout and.8 east of the roundabout were used to determine appropriate forecasting for this intersection. A.% growth rate was used on the local movements. A similar scenario occurred on the Sylvan Lake Roundabout projections from the Haymeadow Traffic Study. Therefore, CDOT s year growth factor 5 of.57 west of the Eby Creek roundabout was used to determine appropriate forecasting for this intersection. A.% growth rate was used on the local movements. On other occasions where a singular movement s existing traffic exceeded the Haymeadow Traffic Study, a.% growth rate was used on the local movements. Traffic Forecasting: The Town of Eagle has a well developed traffic forecasting matrix for the Brush Creek Valley. The Projected Brush Creek Growth Model 6 was updated by the Town in November of 5 to reflect the anticipated future growth and buildout rates along Brush Creek Road. Details on the model updates are included in the Appendix. The Town s updated model was used to analyze the Year 5 long term impacts on the roadway network. Year 6 background forecasting was determined by interpolating between the existing 5 data and Year 5 projections. The background traffic projections have been modified to exclude the Frost Creek traffic. (Frost Creek traffic is added back in for the total traffic calculations described in Section..) It should be noted that the Year 5 projections are lower than the Haymeadow Development Traffic Study. The Haymeadow study assumed that all future buildout on Brush Creek Road had occurred by Year 5. However, the Town s traffic model predicts that the growth will reach buildout at Year 55. The resulting Year 5 existing traffic volumes can be found in Figure 5. Year 6 and Year 5 background traffic volumes can be found in Figure 6 and Figure 7, respectively. A.% growth rate was used for Brush Creek Road traffic south of Frost Creek and Bruce Creek to accommodate future traffic increase for Sylvan Lake State Park, White River National Forest, and Holy Cross Wilderness areas. Traffic Operations Evaluation: Year 6 and Year 5 background traffic were evaluated at all study intersections using the projection information and Highway Capacity Manual 7 (HCM) analysis procedures. This is described in Section.5 of this report. Frost Creek Eagle, CO Revised March 5, 6 Page

13 This page is intentionally blank. Frost Creek Eagle, CO Revised March 5, 6 Page

14 Figure 5: Year 5 Existing Traffic Intersection Key: (Direction of for Analysis) US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E) Brush Creek Road (N/E) & Sylvan Lake Road (S)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road/Violet Lane (S/N) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Project Number: M58 Turning Movements Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

15 Figure 5: Year 5 ExistingTraffic 5 / 96 / 6 7 / 8 / 68 6 / 9 / / 6 / 6 95 / 66 / 6 / 7 / 6 / 66 / 5 58 / 56 / 66 / 9 / 7 / / 9 5 / / 98 / 6 / 5 7 / 5 / / 6 / 6 5 / / / / 6 / / 9 7 / / 6 US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road / 7 / 5 / 5 / 58 6 / 6 / 5 8 / 9 / 5 5 / / 7 5 / / / / / / 6 / 9 / 8 9 / / / 6 / 8 7 / / 5 95 / 78 / 5 / / 8 / / / 8 / / 8 / 85 5 / 7 / 8 58 / / 7 / / 7 / / 5 9 / 5 / 7 Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street 7 9 / / 7 / 9 / / 6 / / 8 / 7 / 5 / 5 7 / 7 / 5 / / 6 8 / / / / 56 / / 9 / 97 / 69 9 / 8 / 9 / / / / 5 / / 5 / / / / 5 / / 6 US 6 & Sylvan Lake Road Brush Creek Road & Frost Creek Drive / / 6 / 9 / 696 / 68 / 7 / 6 / 6 58 / 75 / 5 / / 8 8 / 75 / / 77 / 57 / 7 / 8 / / / / 5 / / 7 Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

16 west leg / wleg / west leg / Figure 6: Year 6 Background Traffic Intersection Key: (Direction of for Analysis) US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E) Brush Creek Road (N/E) & Sylvan Lake Road (S)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road/Violet Lane (S/N) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

17 Figure 6: Year 6 Background Traffic 9 / 96 / 6 7 / 8 / 69 7 / / / 6 / / 68 / 7 / 8 / 6 / 68 / 5 59 / 6 / 67 / 9 / 7 7 / / 89 6 / 6 / 6 / / / / 7 6 / / 9 6 / / 6 US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road 5 / 7 / 5 7 / 5 / 5 6 / 5 / 8 9 / 8 / 5 6 / / 9 6 / 5 / / / / / / / 9 / / / 7 / 7 / 5 / 55 7 / 78 / 58 / 9 / 5 6 / / 8 7 / 8 / 5 / 9 / 7 / 6 / / 8 / 86 6 / 9 / 5 8 / / 8 / / 6 / 8 / Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street 7 9 / 5 / 8 / / / 7 / / 9 / 5 8 / 559 / 5 7 / 75 / 8 8 / / 5 / / 56 / 6 / 9 / 99 / 66 / 5 / 9 / / 7 / 7 / 8 / / / / 5 / / 7 US 6 & Sylvan Lake Road Brush Creek Road & Frost Creek Drive 5 / / 8 6 / 9 / / / 9 56 / / 5 / 6 / 5 76 / 86 / 88 / 7 / 7 65 / 77 / 67 / 5 / 79 9 / 79 / 7 / 5 / Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

18 Figure 7: Year 5 Background Traffic 8 Intersection Key: US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E/W) Brush Creek Road (N/S) & Sylvan Lake Road (E/W)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road /Violet Lane (S/N) 8 US 6 (E/W) & Future Brush Creek Road Extension (S) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) *The Brush Creek Road and Sylvan Lake Road intersection will be reconfigured with the Haymeadow development. Brush Creek Road changes to a (N/S) alignment, while Sylvan Lake Road is extended into the development in an (E/W) direction. 9 South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

19 Figure 7: Year 5 Background Traffic 56 / 85 / 95 8 / 67 / 7 / 7 / / 959 / 8 9 / / 5 / 55 / 8 8 / 9 / 9 / 8 / 9 8 / / / / 5 / 75 / 7 / 9 / 8 5 / 5 / 6 5 / 6 / 5 / / 85 / 8 / 5 / / 88 7 / / 5 / / 5 / 75 / 5 5 / 8 / 9 US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road 5 / 5 / 5 / 5 / 9 9 / / 56 / / 8 / 7 / 8 5 / 5 / 5 / 5 / / / 5 / 5 / 5 95 / 8 / 5 5 / / / 5 / 65 9 / 8 / 86 6 / 65 / 7 / 5 / 6 / / 95 / 95 / 69 / 9 / 9 8 / 9 / 8 5 / 5 / 5 / 7 / 9 75 / / 9 7 / 5 / 85 / / 5 / / 5 / 58 / Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street / 6 / / / / 9 / / / 6 / 85 / 56 / 68 / 8 6 / / 77 / 6 / 55 / 6 / 65 / / 857 / 68 / 56 7 / 9 / 9 / / 7 / / / / 7 / 65 / / 5 / 5 / 9 / 8 / / 7 7 / 8 / 9 US 6 & Sylvan Lake Road US 6 & Future Brush Creek Road Extension Brush Creek Road & Frost Creek Drive / 8 / 9 / / 6 / 9 / 7 / 66 / 6 5 / / 7 95 / 8 / 8 / / 85 / 9 / 77 8 / 6 / 5 75 / 6 / 7 85 / 95 / 7 8 / 5 / 5 Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

20 . Project Traffic. Trip Generation For Proposed Land Use Existing Project Operations Description: The previously approved use for Frost Creek is only partially built out. At the time of the traffic data collection for this project, there were six single family homes, one single family home under construction, 5 cabins, and 6 Frost Creek facility members. The clubhouse restaurant was open to the public during the Saturday peak hour counts. It should be noted that clubhouse, pro shop, and restaurant are all ancillary uses under the golf course trip generation rates. Therefore, the restaurant traffic does not need to be added singularly to the overall trip generation calculations. This fact is supported by the Observed Trip Comparison in Section.. Future Project Operations Description: In total, the project is anticipated to have single family homes, 5 accessory dwelling units (modelled as units to be consistent with the Prior traffic study ), cabins, the golf course and community recreation center. The applicant is projecting a total of 5 Frost Creek members. This may consist of approximately 5 resident members, and 75 non resident members. The property is anticipating the employment of full time staff and up to an additional seasonal staff and 6 part time staff.. Trip Generation For Proposed Land Use Observed Trip Comparison: The current Frost Creek traffic counts were compared to the anticipated traffic for the existing membership. Using a proportional share of the membership traffic for the golf course and recreation center, the site should expect a Saturday peak of vehicles per hour (vph.) However, the observed traffic was lower than anticipated for the current level of development. Only 8vph at both site accesses were observed. At the current time, the % difference is insignificant. However, with buildout of the project, this could equate to a significant reduction in actual traffic vs. the projected traffic. Therefore, trip generation calculations could be considered conservative analysis for a number of reasons. Although the clubhouse restaurant is open to the public, the golf course and recreational facility are private and restricted to members and their guests only. The ITE data does not specify public vs. private golf courses and community recreation facilities. Members and guests are utilizing on site facilities (internal trip reduction) and not leaving the site frequently. Frost Creek Eagle, CO Revised March 5, 6 Page

21 Trip Generation Analysis: A trip generation analysis was prepared based upon the 9th Edition of ITE s Trip Generation Manual 9. The Frost Creek analysis assumes no transit, ridesharing, bicycle commuting, or telecommuting mode split adjustment. In addition, no adjustments were taken for internal trip reductions between the residences and golf course or recreation facility. As such, it is a conservative estimate for vehicular trip generation. The applicant is anticipating that % of the proposed additional dwelling units will be occupied by full time residents and 8% will be recreational second homes. This is consistent with the Northwest Colorado Council of Governments The Social and Economic Effect of Second Homes 8 reporting that 78% of Eagle County homes in the $8, + price range were second homes. Refer to Graph. Both Eagle County and the Town of Eagle participated in this study and publication. The published historic rate of 78% recreational second home was used for the trip generation calculations. Eagle County and Town of Eagle staff were both active in this discussion. Graph : Historic Second Home Rates in Eagle County The applicant is also proposing the addition of 5 cabins that are made available for members to rent. These homes were also analyzed using the recreational home trip generation rates. The trip generation analysis results can be found in Table Project Trip Generation. This table adds the previously approved land uses to the proposed additional homes and 5 cabins to arrive at a total traffic projection for the entire site. Frost Creek Eagle, CO Revised March 5, 6 Page

22 As presented in Table, the additional residential lots and cabins created by the proposed resubdivision will create an additional vehicle trips per day. The peak hour traffic could anticipate an additional trips during the morning peak hour, 5 trips during the evening peak hour, and 6 trips during the Saturday peak hour. The Year 6 analysis assumes that the entire Frost Creek development has reached % of the residential buildout and 5% of the total membership. As described in the remainder of the report, the buildout timeframe will not change the recommendations for the proposed resubdivision. Frost Creek Eagle, CO Revised March 5, 6 Page

23 PROJECT NUMBER: M8 PREPARED BY: KJS DATE: REVISED: 9//5 //5 Table Project Trip Generation Frost Creek, Eagle, Colorado Estimated Project Generated Traffic Average Average Weekday Saturday Morning Peak Hour Evening Peak Hour Inbound Outbound Inbound Outbound Saturday Peak Hour Inbound Outbound ITE Code Units AM Peak PM Peak Hour Rate Hour Rate Saturday Peak Hour Rate Avg. Weekday Rate Avg. Saturday Rate Trips (vpd) Trips (vpd) % Trips Trips % Trips Trips % Trips Trips % Trips Trips % Trips Trips % Trips Trips Currently Approved Use: # Single Family Home 97 # Multi Family Residential (Accessory Dwelling Units) dwelling units % 9 6% dwelling units % 8 6% 6 Clubhouse #95 Community Recreation Center. ksf % 6% Private Golf Course # Golf Course 8 holes % 5% 7 dwelling units,57, Proposed Additional Use: % Primary Residences # Single Family Home 9 78% Recreational Second Homes #6 Recreational Homes 5 Rental Cabins #6 Recreational Homes 5 dwelling units % 7% 5 6% 6 6% 5% 5 6% dwelling units % 5 5% 5 % 5 56% 6 8% 6 5% 7 dwelling units % 5% % 56% 8% 5% 59 dwelling units 9 Frost Creek Total 86 dwelling units,, Proposed Percentage (%) Increase 6% % % 7% 7% % 7% % % Year 6 % Residential Buildout & 5% Membership Rate Values obtained from Trip Generation, 9th Edition, Institute of Transportation Engineers,. Based upon ITE's Trip Generation Rates for Peak Hour of Generator. Based upon LSC Transportation Consultants' September, Adam's Rib Ranch Traffic Study. Included for informational purposes only. '*' denotes data that was not provided in the original report. This information was not provided in LSC's Traffic Study. Therefore, ITE's Trip Generation Rates were applied. 5 ksf =, square feet

24 . Directional Distribution Directional trip distribution estimates are used to assign the new site traffic to the existing roadway network. For this study, a detailed estimate of the trip distribution pattern for the Frost Creek development has been prepared as illustrated in Figure 8 for Year 6 and Figure 9 for Year 5. The Year 5 scenario assumes that the Brush Creek Road extension has been constructed from Capitol Street to US 6, as described in Section.. All trip distribution estimates were reviewed with County and Town staff in the Traffic Study Scoping. The project trip distribution generally follows the same distribution patterns as the Haymeadow Development through the Town of Eagle. The directional distribution has been applied to all of the Frost Creek traffic. At the time of the original study, the Brush Creek Road Extension was not analyzed. This study updates the site traffic to use the foreseen roadway network. Frost Creek Eagle, CO Revised March 5, 6 Page

25 This page is intentionally blank. Frost Creek Eagle, CO Revised March 5, 6 Page 5

26 Figure 8: Year 6 Directional Distribution % Intersection Key: (Direction of for Analysis) US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E) Brush Creek Road (N/E) & Sylvan Lake Road (S)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road/Violet Lane (S/N) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) % 9 South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

27 9% Figure 8: Year 6 Directional Distribution 9% 5% 5% 5% 5% 5% 5% US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road 5 6 5% 5% 9% 9% 9% 9% 9% 9% Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street 7 9 9% 89% % % 9% 89% % % % % US 6 & Sylvan Lake Road Brush Creek Road & Frost Creek Drive % % 5% 5% % % Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

28 Figure 9: Year 5 Directional Distribution 8 % Intersection Key: US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E/W) Brush Creek Road (N/S) & Sylvan Lake Road (E/W)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road /Violet Lane (S/N) 8 US 6 (E/W) & Future Brush Creek Road Extension (S) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) % *The Brush Creek Road and Sylvan Lake Road intersection will be reconfigured with the Haymeadow development. Brush Creek Road changes to a (N/S) alignment, while Sylvan Lake Road is extended into the development in an (E/W) direction. 9 South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

29 9% Figure 9: Year 5 Directional Distribution 9% 5% 5% % 5% % 5% 5% 5% US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road 5 6 6% 9% 9% 9% 6% 9% 9% 9% Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street % % % 89% % % 8% % % % 89% % % 8% % % US 6 & Sylvan Lake Road US 6 & Future Brush Creek Road Extension Brush Creek Road & Frost Creek Drive % % % % % % Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

30 . Traffic Assignment and Total Traffic When the trip generation expected for this site is applied to the estimated trip distribution, the result is the anticipated assignment of trips on the roadway system. Figure depicts the Year 6 vehicle trips on the greater roadway network that are anticipated from the entire Frost Creek development. Figure shows the total Frost Creek traffic assignment for Year 5. The Year 6 total traffic is the sum of Year 6 background traffic (Figure 6) with the project generated traffic (Figure ) and can be seen in Figure. Similarly, Year 5 total traffic is the sum of Year 5 existing traffic (Figure 7) with the project generated traffic (Figure ) and can be seen in Figure. Frost Creek Eagle, CO Revised March 5, 6 Page

31 This page is intentionally blank. Frost Creek Eagle, CO Revised March 5, 6 Page

32 Figure : Year 6 Project Generated Traffic Assignment Intersection Key: (Direction of for Analysis) US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E) Brush Creek Road (N/E) & Sylvan Lake Road (S)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road/Violet Lane (S/N) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

33 7 / / Figure : Year 6 Project Generated Traffic Assignment 9 / / / / 9 / / / / / / / / US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road / / / / / / / / / / 9 / / 9 / / 9 / / Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street 7 9 / / 7 / / 5 / / 6 / 7 / 8 7 / 8 / 9 / / 9 / / 5 / / US 6 & Sylvan Lake Road Brush Creek Road & Frost Creek Drive / / / / 7 / 9 / 8 / 9 / / / Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

34 Figure : Year 5 Project Generated Traffic Assignment 8 Intersection Key: US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E/W) Brush Creek Road (N/S) & Sylvan Lake Road (E/W)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road /Violet Lane (S/N) 8 US 6 (E/W) & Future Brush Creek Road Extension (S) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) *The Brush Creek Road and Sylvan Lake Road intersection will be reconfigured with the Haymeadow development. Brush Creek Road changes to a (N/S) alignment, while Sylvan Lake Road is extended into the development in an (E/W) direction. 9 South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

35 5 / / Figure : Year 5 Project Generated Traffic Assignment / / / / 5 / 5 / 6 / / / 8 / 9 7 / 7 / / 9 / 7 / / 5 / 5 / 6 US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road / 65 / 67 / / / / 5 / / / / 5 / 5 / 6 5 / / 5 / / Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street / / 7 / / / 9 / 56 / 97 / 99 6 / / 8 / / / / 6 / 5 / 9 / 9 / 8 / / / / / 9 / 77 / 75 / 9 / / / / 9 / 8 / US 6 & Sylvan Lake Road US 6 & Future Brush Creek Road Extension Brush Creek Road & Frost Creek Drive 6 / / / / 6 / / 9 / 8 / 9 / 8 / / / Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

36 Figure : Year 6 Total Traffic Intersection Key: (Direction of for Analysis) US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E) Brush Creek Road (N/E) & Sylvan Lake Road (S)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road/Violet Lane (S/N) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

37 Figure : Year 6 Total Traffic 88 / 6 / / 69 / 8 / 8 / 6 / 68 / 5 6 / 6 / 68 / 9 / 7 7 / / 89 7 / 7 / 7 5 / 5 / 7 57 / / 8 6 / / 9 7 / / 7 US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road 5 / 7 / 5 6 / 57 / 65 7 / 8 / 6 / / / / 9 6 / 5 / / / / / / 5 / 5 / / / 7 / 7 / 5 / 55 7 / 78 / 58 / 5 / 67 6 / / 8 6 / / 9 / 9 / 56 / 8 / 57 / 8 / 86 6 / 9 / 5 8 / / 8 / / 6 / 5 / / / Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street 7 9 / 5 / 8 / / / 7 / / 9 / 5 8 / 559 / 5 76 / 77 / 7 / / 5 / / 8 / / 56 / 6 / 9 8 / 6 / 7 / 59 / / / 9 / 9 / / / 5 / / 7 / 5 / US 6 & Sylvan Lake Road Brush Creek Road & Frost Creek Drive / / 6 / 9 / 6 / 97 / 6 7 / 8 / 69 7 / / 58 / / 9 56 / / 5 / 6 / 5 76 / 86 / 88 / 7 / 7 65 / 77 / 67 7 / / 89 / 88 / 7 / / 5 / / 8 Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

38 Figure : Year 5 Total Traffic 8 Intersection Key: US 6 (E/W) & Eby Creek Road (N/S) US 6 (E/W) & Capitol Street (S) Capitol Street (N/S) & Brush Creek Road (E/W) Brush Creek Road (N/S) & Sylvan Lake Road (E/W)* 5 Sylvan Lake Road (E/W) & Eagle Ranch Road (N/S) 6 Sylvan Lake Road (E/W) & Capitol Street (N) 7 US 6 (E/W) & Sylvan Lake Road /Violet Lane (S/N) 8 US 6 (E/W) & Future Brush Creek Road Extension (S) 9 Brush Creek Road (N/S) & Frost Creek Drive (W) Brush Creek Road (N/S) & South Site Access (W) *The Brush Creek Road and Sylvan Lake Road intersection will be reconfigured with the Haymeadow development. Brush Creek Road changes to a (N/S) alignment, while Sylvan Lake Road is extended into the development in an (E/W) direction. 9 South Maryland Creek Ranch Ranch Road (Game Trail Road) N LEGEND : AM/PM/SAT Volumes = XX / XX / XX Turning Movements Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado November, 5

39 Figure : Year 5 Total Traffic 75 / 99 / 9 5 / 8 / 6 5 / 55 / 8 8 / 9 / 9 7 / 86 / 5 8 / / / / 5 / 75 / 7 / / 5 5 / 5 / 6 7 / 98 / 7 5 / / / 98 / 5 8 / 69 / 5 7 / / / / 5 / 75 / 5 8 / 5 / 5 US 6 & Eby Creek Road US 6 & Capitol Street Capitol Street & Brush Creek Road 5 / 5 / / 8 / 57 9 / / 56 / / 8 / 7 / 8 5 / 5 / 5 / 5 / / / 5 / 5 / 5 9 / / 9 5 / / / 5 / 65 9 / 8 / / 95 / 7 66 / 98 / 5 / 5 / 6 / / / 7 / 77 / / 5 / / 5 5 / 5 / / / 5 75 / / 9 7 / 5 / 85 / / 5 / / 8 / 5 / 5 7 / 6 / 75 Brush Creek Road & Sylvan Lake Road* Sylvan Lake Road & Eagle Ranch Road Sylvan Lake Road & Capitol Street / 6 / / / / 9 / / / 6 / 86 / 59 / 8 / 9 6 / / 77 / 79 / / 97 / 99 8 / 7 / 76 / / 865 / 69 / / 9 / 8 8 / 5 / 56 / / 5 / / 8 / 65 / 99 9 / 8 / 6 / / 6 / 9 / / 75 / 9 / / / / 6 / 6 / 9 US 6 & Sylvan Lake Road US 6 & Future Brush Creek Road Extension Brush Creek Road & Frost Creek Drive 6 / / / / / 57 / / 67 / 7 / 7 / / 9 / 7 / 66 / 6 5 / / 7 95 / 8 / 8 / / 85 / 9 / / 7 / 6 8 / 68 / 7 9 / 8 / 8 / 9 / Project Number: M58 Prepared By: KJS Frost Creek, Eagle, Colorado Brush Creek Road & Frost Creek Drive November, 5

40 .5 Operations and HCM Analysis Intersection Level of Service: Using Highway Capacity Manual 7 (HCM) methodology, Synchro Version 8 software was used to determine the delay and Level of Service (LOS) at the stop controlled intersections. Similarly, Rodel Roundabout Analysis Software was used to model the HCM roundabout capacity. A table summarizing the Total Traffic Level of Service for each intersection analyzed can be found in the Appendix. US 6 & Eby Creek Road: The intersection is currently operating at an acceptable LOS. Peak commuter traffic volumes in the morning and evening peak hours will deteriorate to unacceptable levels of service with the anticipated background traffic growth. It is recommended that the Town continues to monitor this roundabout as growth occurs. US 6 & Capitol Street: The intersection will see the northbound right and westbound left movements continue to deteriorate as traffic increases on US 6. It is recommended that the Town monitors this intersection for possible future access restrictions. Capitol Street & Brush Creek Road: The intersection is anticipated to be reconstructed as a roundabout with the Brush Creek Road Extension. With these improvements, this intersection is anticipated to operate at a Level of Service A/C through Year 5. Brush Creek Road & Sylvan Lake Road: The intersection is anticipated to be realigned and constructed as a roundabout with the Haymeadow Development. With these improvements, this intersection is anticipated to operate at a Level of Service A through Year 5. Sylvan Lake Road & Eagle Ranch Road: The intersection will continue to deteriorate as traffic increases on Sylvan Lake Road. It is recommended that the Town continues to monitor this intersection for the possible construction of a traffic signal or roundabout. In the past, the Town has assisted peak school traffic by placing an officer at this intersection. As an interim solution, the officer placement may become necessary again as traffic on Sylvan Lake Road increases. Sylvan Lake Road & Capitol Street: The intersection will see the southbound stopcontrolled movements continue to deteriorate as traffic increases on Sylvan Lake Road, with or without the project generated traffic. It is recommended that the Town monitors this intersection for the possible construction of a traffic signal or roundabout. US 6 & Sylvan Lake Road / Violet Lane: The intersection is currently operating at an acceptable LOS. It is expected to continue to operate at an acceptable Level of Service B/C through Year 5 once the Brush Creek Road extension is completed. Frost Creek Eagle, CO Revised March 5, 6 Page

41 US 6 & Brush Creek Road Extension: The intersection is anticipated to be constructed in the future by the Town of Eagle. It is recommended that the intersection of US 6 and the Brush Creek Road extension is constructed as a roundabout at the time of construction. With this implementation, the intersection is anticipated to operate at acceptable Levels of Service through Year 5. Brush Creek Road & Frost Creek Drive: The intersection is currently operating at an acceptable LOS A. It is expected to continue to operate at an acceptable Level of Service through Year 5. The 95 th percentile queue is not anticipated to exceed one vehicle at the site egress through Year 5. Brush Creek Road & South Site Access: The intersection is currently operating at an acceptable LOS A. It is expected to continue to operate at an acceptable Level of Service through Year 5. The 95 th percentile queue is not anticipated to exceed one vehicle at the site egress through Year 5..6 State Highway Access Permits Section.6() of the State Highway Access Code (Access Code) requires a new access permit when there is a land use change and/or the driveway volume is anticipated to increase by more than twenty percent. The addition of 6 trips per hour to the greater roadway network does not trigger the need for a State Highway Access Permit. Table : US 6 Percentage of Impact Intersection Frost Creek Peak Hour Traffic Assignment to Intersection Year 5 Background Traffic Volume or State Highway Access Permit Volume* Percentage Impact to US 6 & Eby Creek Road (South ) vph vph % US 6 & Capitol Street (South ) vph 66vph.8% US 6 & Sylvan Lake Road /Violet Lane (South ) 6vph 5vph,vph*.%.%* US 6 & Future Brush Creek Road Extension (South ) vph 7vph.% Frost Creek Eagle, CO Revised March 5, 6 Page

42 .7 Percentage of Impact of Greater Roadway Network Using the Town s Brush Creek traffic model, Frost Creek s additional resubdivision traffic is less than a % impact at the Brush Creek Road and Sylvan Lake Road intersection in Year 5. This is considered a nominal increase. The impact percentage continues to dissipate as traffic reaches Sylvan Lake Road and Capitol Street..8 Brush Creek Road Turn Lane Analysis Eagle County refers to the State Highway Access Code to provide regulation for auxiliary lanes. Brush Creek Road has an equivalent CDOT classification of an R B, rural highway. With a posted speed limit of 5mph, right turn deceleration lanes are required when the peak hour turning volume exceeds 5vph. A left turn deceleration lane is required when the peak hour turning volume exceeds vph. The project has previously constructed a southbound right deceleration lane for Frost Creek Drive. The turn lane totals feet in length. At a posted 5mph, the existing lane can accommodate up to 9vph making the southbound right turning movement into Frost Creek Drive. At buildout, the project is anticipated to have 99vph during the Saturday peak hour making this turn. Therefore, no modifications to the existing southbound right turn lane are required. No other access turning volumes meet the requirements for constructing turn lanes at the site accesses..9 Access Design Criteria The existing access points appear to have been constructed per Eagle County s Eagle County Land Use Regulations (ECLUR) Section 6.j Geometric Standards.. Sight Distance The proposed primary Frost Creek site access locations have adequate sight distance in both directions that well exceed the 595 requirement in Table of the Access Code.. Internal Circulation and Travel Speeds The 95 th percentile queue at the site egress is not expected to exceed one vehicle (5 feet) through the project buildout. The internal Frost Creek roadway system is narrow at to feet. There are sufficient horizontal and vertical curves in the roadway system that will require drivers to maintain 5mph residential speeds. Frost Creek Eagle, CO Revised March 5, 6 Page

43 5. Recommendations and Conclusions McDowell Engineering has prepared this Transportation Impact Study for the proposed resubdivision of the Frost Creek development. The purpose of this study is to forecast and analyze the impacts of the additional traffic volumes associated with the proposed increase in the number of residential units. The Frost Creek project was originally approved in 5 under the name of Adam s Rib. This approval included 97 single family homes, 5 accessory dwelling units, a private 8 hole golf course, and private, recreation center. The original traffic analysis was covered in LSC s Adam s Rib Traffic Study. Trip Generation: With the proposed resubdivision, the applicant is proposing additional single family homes and 5 cabins. The cabins will be available for members or their guests to rent. The additional residential lots and cabins created by the proposed resubdivision will create an additional vehicle trips per day and 6 trips during the Saturday peak hour. Data Collection: Traffic data was collected in late September and early October of 5. The observed traffic at the Frost Creek site accesses was lower than anticipated for the current level of development. Background Traffic Projections: The Town of Eagle has a well developed traffic forecasting matrix for the Brush Creek Valley. The Projected Brush Creek Growth Model 6 was updated by the Town in November of 5 to reflect the anticipated future growth and buildout rates along Brush Creek Road. The study s background traffic projections comply with the Town s update model. Background Infrastructure Improvements: The Town of Eagle has plans to construct the Brush Creek Road extension from Capitol Street to US 6 in the future. In addition, the Haymeadow Development is proposing improvements to this intersection as part of their development. The improvements will shift the Brush Creek Road alignment from the current configuration to a north/south orientation. These infrastructure improvements have been modelled in the Year 5 analysis. Necessary Infrastructure Improvements: The existing Frost Creek Drive access has a southbound right turn deceleration lane that is feet in length. This turn lane is adequate to accommodate the full buildout of the proposed Frost Creek development. No additional off site roadway improvements are required. The timing of Frost Creek s final buildout does not affect these recommendations. Percentage Impact: The additional traffic is less than a % impact at the Brush Creek Road and Sylvan Lake Road intersection in Year 5. Summary: The proposed Frost Creek development is anticipated to be successfully accommodated into the greater Eagle County and Town of Eagle roadway network with the above recommendations. Frost Creek Eagle, CO Revised March 5, 6 Page

44 6. Appendix Reference Documents. Adam s Rib Traffic Study. LSC Transportation Consultants, September.. West Eagle Sub Area Plan. Town of Eagle, September.. Haymeadow Traffic Impact Study. Fox Tuttle Transportation Group, August.. I 7 Eagle Interchange Upgrade Feasibility Study. PBS&J, April OTIS Traffic Data. Colorado Department of Transportation Projected Brush Creek Growth Model. Town of Eagle, Updated November Highway Capacity Manual. Transportation Research Board,. 8. The Social and Economic Effect of Second Homes. Northwest Colorado Council of Governments, June. 9. Trip Generation, 9 th Edition. Institute of Transportation Engineers,.. State Highway Access Code. State of Colorado,.. Eagle County Land Use Regulations. Eagle County,. Included Documents. Traffic Study Scoping Correspondence with Eagle County and the Town of Eagle. Brush Creek Road Traffic Forecasting Model. Traffic Counts. CDOT OTIS Traffic Data 5. HCM Reports a. US 6 & Eby Creek Road b. US 6 & Capitol Street c. Capitol Street & Brush Creek Road d. Brush Creek Road & Sylvan Lake Road e. Sylvan Lake Road & Eagle Ranch Road f. Sylvan Lake Road & Capitol Street g. US 6 & Sylvan Lake Road /Violet Lane h. US 6 & Brush Creek Road Extension i. Brush Creek Road & Frost Creek Drive j. Brush Creek Road & South Site Access Frost Creek Eagle, CO Revised March 5, 6 Page

45 Traffic Study Scoping Correspondence with Eagle County and the Town of Eagle: Frost Creek Eagle, CO Revised March 5, 6 Page 5

46 Revised per our 8//5 meeting with: Ty Ryan - Eagle County Tom G - Town of Eagle Kevin Sharkey - Town of Eagle Kari McDowell Schroeder - McDowell Engineering McDowell Engineering; Kari McDowell Schroeder, PE, PTOE kari@mcdowelleng.com Frost Creek, BCP-ARR, LLC c/o Meriwether Companies Frost Creek Brush Creek Road, Eagle Addition of 56 home sites and cabins. 8% Second Homes, % Primary Residences. See Attached. 5 5 US 6 (Grand Ave.) Site Access US 6 / Sylvan Lake Rd. US 6 / Future Brush Creek Rd. Extension Brush Creek Rd. / Sylvan Lake Rd. Brush Creek Rd. / Capitol St. Capitol St / US 6 US 6 / Eby Creek Road Sylvan Lake Rd. / Eagle Ranch Rd. Sylvan Lake Rd. / Capitol St. Nominal % to Sylvan Lake, 99% towards Eagle. Match Haymeadow project's directional distribution in the Town of Eagle.

47 Negligible Impact, therefore, not used. Per Town of Eagle's background traffic projections for the Haymeadow TIS. Town to make BG buildout revisions. No seasonal adjustment factor is required. x x x x x 9//5 (draft copy)

48 PROJECT NUMBER: PREPARED BY: DATE: REVISED: M8 KJS 9//5 Table Project Trip Generation (8% Second Homes, % Full Time Residents) Frost Creek, Eagle, Colorado Estimated Project Generated Traffic DRAFT Total # of units is still being verified and may decrease. Average Weekday Average Saturday Morning Peak Hour Evening Peak Hour Inbound Outbound Inbound Outbound Saturday Peak Hour Inbound Outbound ITE Code Units AM Peak Hour Rate PM Peak Hour Rate Saturday Peak Hour Rate Avg. Weekday Rate Avg. Saturday Rate Trips (vpd) Trips (vpd) % Trips Trips % Trips Trips % Trips Trips % Trips Trips % Trips Trips % Trips Trips Currently Approved Use: # Single Family Home 97 # Multi Family Residential (Residential Condominium/Townhome) dwelling units dwelling units 76 5 #95 Community Recreation Center. ksf 5 # Golf Course 8 holes 6 8 8, Proposed Additional Use: # Single Family Home dwelling units % 7% 6 6% 7 6% 5% 6 6% 5 #6 Recreational Homes 5 #6 Recreational Homes dwelling units % 7 5% 7 % 6 56% 8 8% 8 5% 8 dwelling units % 5% % 56% 8% 5% 66 dwelling units Proposed Percentage (%) Increase % 9% % 5% 9% Values obtained from Trip Generation, 9th Edition, Institute of Transportation Engineers,. Based upon ITE's Trip Generation Rates for Peak Hour of Generator. Based upon LSC Transportation Consultants' September, Traffic Study. Included for informational purposes only. ' ' denotes data that was not provided in the report. ksf =, square feet

49 Brush Creek Road Traffic Forecasting Model Frost Creek Eagle, CO Revised March 5, 6 Page 6

50 Corky Hillside, JHY, and Ewing Parcels Future 69 Total Existing, Future, Total Trips from Residential Units ~8 acres Existing 69 Residential Units Future 59 ~, acres Eagle Ranch Existing,886 Future Total,59 Existing,6 Future 6,8 Total,5 Total Trips from Residential Units Total 7,65 598,57 Total Trips,55 Residential Units Existing ,56 Future Other Trip Generators* 6,957 Existing * Other Traffic Generators Medical Center Village Center Golf Course Future Future ~ acres Terrace Total,68 Existing Future,68 Total Trips from Residential Units Future Residential Units Existing Future 9 Existing 79 Future Total 9 55 Total 6 8 Existing 95 Future 998 Total Existing 95 Future,6 Total ~ acres 9 Total 7 Existing 87 Future, Total Trips from Residential Units 9 Future Residential Units 9 98 ~66 acres Total Existing 8,5 Future 77 8,5 Total Trips from Residential Units Future,8 787 Existing Existing 8 Future Existing 6 Future Future 77 ~55 acres Total 9 Existing 76 Future Total Trips from Residential Units 8 5 Total 9 Existing 6 Future 7 55 Total Trips from Residential Units ~ acres 8 5 ~5 acres Total Existing 9 Future 9 Total Trips from Residential Units Salt Creek Future Residential Units Existing Total Existing Future Total Total Trips Future Other Trip Generators* Existing Future Total,76 5 Other Traffic Generators Equestrian Center Shooting Range Recreation Center * Existing 77 Trips from Residential Units Total Residential Units Bruce Creek and Other Development along Brush Creek ~, acres Residential Units Charlie Ridgeway Residential Units Adams Rib Upper Ranch,8 Residential Units Existing Haymeadow Existing Total 69 Total Trips from Residential Units Total Future Brush Creek Meadows Existing Total Trips from Residential Units 5 Existing Trips from Residential Units ~8 acres Moser Lane Total 5 7 Total Trips from Residential Units ~, acres Frost Creek 8 Future Residential Units 7 ~ acres Adams Rib Lower Ranch Future Residential Units Existing ~ acres Adams Rib Ridgeway Existing 5 Residential Units Existing Residential Units 7 5 Existing 8 Future 6 Total Trips Existing Golf Course Trip Generators 6 6 Values in red represent /5 background model revisions per the Town of Eagle

51 From Town of Eagle: Projected Units in Upper Brush Creek Valley, High Growth Scenario Bruce Creek Adams Adams Adam's and Other Rib Lower Rib Upper Charlie Rib Moser Brush Creek Eagle Ranch Haymeadow Ranch Ranch Ridgeway Ridgeway Salt Creek Lane Frost Creek Development Total Buildout Nov 5

52 McDowell Engineering Calculations: //5 5 Background Traffic Calculations Total Residential Description /5 A / B /5 Ratio of 5 vs C Buildout % 66% % % 9% 67% % 96% % 7% 5/ Yr. 55 Buildout D AADT,5 8, ,76,698 Yr. 5 E AADT,598 5, ,7,6,67 Commercial / Other 5/ Yr. 55 Buildout F AADT 6,8,6 8,9 Percentag e of Buildout for Year G 5 % % % H Yr. 5 AADT 6,8,6 8,9 Year 5 Background Traffic on Brush Creek Road, South of Ouzel Lane Yr. 5 I AADT 7,66 5, ,668,6 8,78 J Minus Frost Creek,668 K Minus Haymead ow 5,588 L Minus Eagle Ranch 7,66 M Year 5 BG Traffic south of Ouzel Lane ,6,89 Year 5 TotalTraffic on Brush Creek Road, South of Ouzel Lane N O P Year 5 BG Traffic south of Ouzel Lane ,6,89 Frost Creek Project Generate d Traffic,6 Total Year 5 Traffic ,6,6 5,7 A Year 5 projected number of units per development area. B Buildout number of units per Town's 5/ Map. Buildout AADT per Town Spreadsheet and Map. Uses trip generation rate of 9.57 for single family, 5.86 for multifamily, and 6.7 for ADUs. C Percentage of the new (/5) number of 5 units vs. previous (5/) buildout units D Year 55 AADT for the new (/5) number of units at buildout. Based up on the assumption that the growth rate is applicable to the entire site. E Year 5 AADT for the new (/5) number of 5 units. Based up a ratio of the total residential site traffic that will exist in Year 5. F Buildout commercial per Town's 5/ Map. G Percentage of comercial to be builtout in Year 5. H Year 5 commercial AADT. I Total Year 5 AADT = residential (E) + commercial (I) J Subtract out Frost Creek traffic to obtain background traffic volume K Subtract out Haymeadow traffic to get AADT south of Ouzel Lane L Subtract out Eagle Ranch traffic to get AADT south of Ouzel Lane M Total Year 5 Background traffic on Brush Creek Road, south of Ouzel Lane N Copy from Line M. Year 5 Background traffic on Brush Creek Road, south of Ouzel Lane. O Add total traffic for Frost Creek based upon current trip generation calcualtions for entire site. (/5 traffic Study) P Total Year 5 traffic (Background + Frost Creek) on Brush Creek Road, south of Ouzel Lane.

53 Traffic Counts Frost Creek Eagle, CO Revised March 5, 6 Page 7

54 Eby Cr Rd/Church at Hwy 6, NB & EB legs Eagle, Colorado Data Collection Date: Tuesday, September, 5 Weather: Partly Cloudy Weekday Traffic Counts Hwy 6 Hwy 6 Eby Cr Rd/Church Eby Cr Rd/Church Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM :5 AM : AM :5 AM : AM :5 AM : AM :5 AM Total Peak Hour Total Peak Hour Total

55 Eby Creek Road at Hwy 6 Eagle, Colorado Data Collection Date: Tuesday, September, 5 Weather: Weekday Traffic Counts Hwy 6 Hwy 6 Eby Cr Rd Eby Cr Rd Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM : PM :5 PM : PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

56 Eby Creek RD at Hwy 6 Eagle, Colorado Data Collection Date: Saturday September 6, 5 Weather: Sunny Weekday Traffic Counts Hwy 6 Hwy 6 Church Street Eby Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM :5 AM : AM :5 AM : PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

57 Capitol Street at Hwy 6/Grand Ave Eagle, Colorado Data Collection Date: Thursday, September, 5 Weather: Sunny Weekday Traffic Counts Hwy 6/Grand Ave Hwy 6/Grand Ave Capitol St Capitol St Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM :5 AM : AM :5 AM : AM :5 AM : AM :5 AM Total Peak Hour Total Peak Hour Total

58 Capitol Street at Hwy 6/Grand Ave Eagle, Colorado Data Collection Date: Thursday, September, 5 Weather: Sunny Weekday Traffic Counts Hwy 6/Grand Ave Hwy 6/Grand Ave Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM 87 5 :5 PM : PM :5 PM : PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

59 Capitol Street at Hwy 6/Grand Ave Eagle, Colorado Data Collection Date: Saturday, September 6, 5 Weather: Sunny Saturday Traffic Counts Hwy 6/Grand Ave Hwy 6/Grand Ave Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM :5 AM : AM :5 AM : PM :5 PM 8 55 : PM :5 PM Total Peak Hour Total Peak Hour Total

60 Capitol Street and Brush Creek Road Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Sunny Weekday Traffic Counts Brush Creek Road Brush Creek Road Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left N/A Thru Right Peds/ Bikes N/A N/A N/A Peds/ Bikes Left Thru N/A Right Peds/ Bikes N/A Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM :5 AM : AM :5 AM : AM :5 AM : AM :5 AM Total Peak Hour Total Peak Hour Total

61 Capitol Street and Brush Creek Road Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Sunny Weekday Traffic Counts Brush Creek Road Brush Creek Road Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left N/A Thru Right Peds/ Bikes N/A Left N/A Thru N/A Right Peds/ Bikes Left Thru N/A Right Peds/ Bikes N/A Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM 5 7 : PM 7 :5 PM : PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total 9 6 5

62 Capitol Street At Brush Creek Road Eagle, Colorado Data Collection Date: Saturday, September 6, 5 Weather: Sunny Saturday Traffic Counts N/A Brush Creek Road Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM 6 :5 AM : AM :5 AM : PM 7 :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

63 Sylvan Lake Road At Brush Creek Road Eagle, Colorado Data Collection Date: Thursday, August 7, 5 Weather: Drizzle Weekday Traffic Counts N/A Brush Creek Road Sylvan Lake Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM 6 7:5 AM 5 7: AM 6 7:5 AM 6 7 8: AM :5 AM 6 7 8: AM 6 5 8:5 AM 8 8 Total Peak Hour Total Peak Hour Total

64 Sylvan Lake Road At Brush Creek Road Eagle, Colorado Data Collection Date: Tuesday August 5, 5 Weather: Sunny Weekday Traffic Counts N/A Brush Creek Road Sylvan Lake Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM 6 : PM 8 5 :5 PM 6 5: PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

65 Sylvan Lake Road At Brush Creek Road Eagle, Colorado Data Collection Date: Saturday, September 6, 5 Weather: Sunny Weekday Traffic Counts N/A Brush Creek Road Sylvan Lake Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM :5 AM : AM :5 AM 8 : PM :5 PM : PM :5 PM 8 5 Total Peak Hour Total Peak Hour Total

66 Sylvan Lake Road at Eagle Ranch Road Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Partly Cloudy Weekday Traffic Counts Sylvan Lake Road Sylvan Lake Road Eagle Ranch Rd Eagle Ranch Rd Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM :5 AM 9 9 7: AM :5 AM : AM :5 AM 6 8: AM 9 8:5 AM 5 Total Peak Hour Total Peak Hour Total

67 Sylvan Lake Road at Eagle Ranch Road Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Sunny Weekday Traffic Counts Sylvan Lake Road Sylvan Lake Road Eagle Ranch Rd Eagle Ranch Rd Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM : PM :5 PM : PM 7 5:5 PM 6 5: PM :5 PM Total Peak Hour Total Peak Hour Total

68 Sylvan Lake Road at Eagle Ranch Road Eagle, Colorado Data Collection Date: Saturday October, 5 Weather: Saturday Traffic Counts Sylvan Lake Road Sylvan Lake Road Eagle Ranch Rd Eagle Ranch Rd Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM :5 AM : AM 5 :5 AM 7 : PM :5 PM 9 7 : PM 6 9 :5 PM 6 Total Peak Hour Total Peak Hour Total

69 Capitol Street At Sylvan Lake Road Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Cloudy Weekday Traffic Counts Sylvan Lake Road Sylvan Lake Road Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM 6 8 7:5 AM : AM :5 AM : AM :5 AM : AM :5 AM Total Peak Hour Total Peak Hour Total

70 Capitol Street At Sylvan Lake Road Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Cloudy Weekday Traffic Counts Sylvan Lake Road Sylvan Lake Road Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM 6 5 : PM :5 PM 5 5: PM :5 PM : PM :5 PM 6 Total Peak Hour Total Peak Hour Total

71 Sylvan Lake Road at Capitol Street Eagle, Colorado Data Collection Date: Saturday, October, 5 Weather: Sunny Saturday Traffic Counts Sylvan Lake Road Sylvan Lake Road Capitol Street Capitol Street Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM 8 :5 AM : AM 8 :5 AM : PM :5 PM : PM 7 :5 PM Total Peak Hour Total Peak Hour Total

72 Sylvan Lake Rd at Hwy 6, EB & NB legs Eagle, Colorado Data Collection Date: Wednesday, September, 5 Weather: Partly Cloudy Weekday Traffic Counts Hwy 6 Hwy 6 Sylvan Lake Rd Sylvan Lake Rd Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM :5 AM : AM :5 AM : AM :5 AM : AM :5 AM Total Peak Hour Total Peak Hour Total

73 Sylvan Lake Rd Roundabout at HWY 6 Eagle, Colorado Data Collection Date: Wednesday September, 5 Weather: Weekday Traffic Counts Hwy 6 Hwy 6 Sylvan Lake Road Sylvan Lake Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM : PM :5 PM : PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

74 Sylvan Lake Rd at Hwy 6 Eagle, Colorado Data Collection Date: Saturday, October, 5 Weather: Saturday Traffic Counts Hwy 6 Hwy 6 Sylvan Lake Rd Eagle Ranch Rd Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM :5 AM : AM :5 AM : PM :5 PM : PM :5 PM Total Peak Hour Total Peak Hour Total

75 Frost Creek Drive at Brush Creek Road Eagle, Colorado Data Collection Date: Thursday, August 7, 5 Weather: Partly Cloudy Weekday Traffic Counts Frost Creek Drive N/A Brush Creek Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM 7:5 AM 7: AM 7:5 AM 8: AM 8:5 AM 8: AM 8:5 AM Total 9 6 Peak Hour Total 7 Peak Hour Total 5 8

76 Frost Creek Drive at Brush Creek Road Eagle, Colorado Data Collection Date: Thursday, August 7, 5 Weather: Partly Cloudy Weekday Traffic Counts Frost Creek Drive N/A Brush Creek Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM : PM :5 PM 5: PM 5:5 PM 5: PM 5:5 PM Total 9 7 Peak Hour Total 9 Peak Hour Total

77 Frost Creek Drive at Brush Creek Road Eagle, Colorado Data Collection Date: Saturday, August 9, 5 Weather: Sunny Weekday Traffic Counts Frost Creek Drive N/A Brush Creek Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM 7 :5 AM 5 8 : AM 5 5 :5 AM 6 6 : PM 5 8 :5 PM 7 9 : PM 6 :5 PM Total Peak Hour Total Peak Hour Total 5 6 6

78 South Frost Creek Access at Brush Creek Road Eagle, Colorado Data Collection Date: Thursday, August 7, 5 Weather: Partly Cloudy Weekday Traffic Counts Frost Creek Drive N/A Brush Creek Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks 7: AM 7:5 AM 7: AM 7:5 AM 8: AM 8:5 AM 8: AM 8:5 AM Total 9 Peak Hour Total 5 Peak Hour Total 5 6

79 South Frost Creek Access at Brush Creek Road Eagle, Colorado Data Collection Date: Thursday, August 7, 5 Weather: Partly Cloudy Weekday Traffic Counts Frost Creek Drive N/A Brush Creek Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : PM :5 PM : PM :5 PM 5: PM 5 5:5 PM 5: PM 5:5 PM Total Peak Hour Total 8 Peak Hour Total

80 South Frost Creek Access at Brush Creek Road Eagle, Colorado Data Collection Date: Saturday, August 9, 5 Weather: Sunny Weekday Traffic Counts Frost Creek Drive N/A Brush Creek Road Brush Creek Road Eastbound Westbound Northbound Southbound Start Time Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Left Thru Right Peds/ Bikes Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks Cars Trucks : AM 7 :5 AM 5 8 : AM 5 5 :5 AM 6 6 : PM 6 8 :5 PM 6 7 : PM 7 :5 PM 6 7 Total 6 7 Peak Hour Total 5 9 Peak Hour Total 7

81 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Vehicle Volume Report Study Date: Unit ID: Location: Thursday, 8/7/5 / Friday, 8/8/5 Frost Creek Drive Eastbound Volume Westbound Volume Total Volume 7: - 7: : - 8:59 9: - 9:59 : - :59 : - :59 5 : - : : - :59 6 : - :59 9 5: - 5:59 6: - 6: : - 7:59 8: - 8:59 9 9: - 9:59 : - :59 9 : - :59 : - :59 : - :59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 Totals 9 5 AM Peak Time :59 - :58 9:57 - :56 9:57 - :56 AM Peak Volume 7 7 PM Peak Time 9:59 - :58 7:5-8:5 7:5-8:5 PM Peak Volume D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

82 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Vehicle Volume Report Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road Southbound Northbound Volume Volume Total Volume : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 6 7: - 7: : - 8: : - 9:59 7 : - :59 9 : - :59 8 : - :59 7 : - :59 8 : - : : - 5: : - 6:59 7: - 7: : - 8: : - 9: : - : : - :59 : - :59 : - :59 Totals 5 5 AM Peak Time 6: - 7: 9:5 - : 9:5 - : AM Peak Volume 6 5 PM Peak Time :9 - :8 :5-5:5 :57-5:56 PM Peak Volume 7 9 D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

83 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Southbound Classes Report Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: 8 % Trucks: 8. AM % Trucks:. PM % Trucks:. Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

84 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Northbound Classes Report Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: % Trucks:. AM % Trucks:. PM % Trucks:. Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

85 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Total Classes Report Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: 6 % Trucks: 9.7 AM % Trucks:. PM % Trucks:. Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

86 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Southbound Speeds (MPH) Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: 5 to MPH 85th Percentile: 9. MPH. MPH Percent in Ten Mile Pace: 56.5%. MPH 5th Percentile: 5.7 MPH.5 MPH 9th Percentile: 5.5 MPH 95th Percentile: 5.7 MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

87 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Northbound Speeds (MPH) Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: 5 to MPH 85th Percentile: 8.7 MPH. MPH Percent in Ten Mile Pace: 56.%. MPH 5th Percentile: 5.6 MPH.5 MPH 9th Percentile: 9.8 MPH 95th Percentile: 5.7 MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

88 Printed: 9//5 at :9 TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Total Speeds (MPH) Study Date: Unit ID: Location: Wednesday, 8/6/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: 5 to MPH 85th Percentile: 8.9 MPH. MPH Percent in Ten Mile Pace: 56.%. MPH 5th Percentile: 5.6 MPH.5 MPH 9th Percentile: 5. MPH 95th Percentile: 5. MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

89 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Vehicle Volume Report Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road Southbound Northbound Volume Volume Total Volume : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5: : - 6:59 7: - 7: : - 8:59 9: - 9: : - : : - :59 5 : - : : - : : - : : - 5: : - 6: : - 7: : - 8:59 8 9: - 9: : - :59 7 : - :59 9 : - :59 8 : - :59 Totals AM Peak Time 9:9 - :8 : - : : - : AM Peak Volume 9 68 PM Peak Time : - :59 : - : : - : PM Peak Volume 79 D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

90 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Vehicle Volume Report Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road Southbound Northbound Volume Volume Total Volume : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7: : - 8: : - 9:59 6 : - : : - :59 7 : - : : - :59 7 : - : : - 5: : - 6: : - 7:59 7 8: - 8: : - 9: : - : : - :59 5 : - :59 : - :59 Totals AM Peak Time : - : 9: - :9 :5 - :5 AM Peak Volume 7 PM Peak Time :7 - :6 : - :59 : - : PM Peak Volume 5 8 D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

91 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Southbound Classes Report Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: 55 % Trucks:.7 AM % Trucks: 5. PM % Trucks:. Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

92 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Southbound Classes Report Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: 8 % Trucks:. AM % Trucks: 5. PM % Trucks:.9 Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

93 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Northbound Classes Report Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: 6 % Trucks: 5. AM % Trucks: 5. PM % Trucks: 5. Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

94 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Northbound Classes Report Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: 8 % Trucks: 8.5 AM % Trucks:. PM % Trucks: 6.6 Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page 5

95 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Total Classes Report Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: % Trucks:.9 AM % Trucks: 5. PM % Trucks:.8 Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page 7

96 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Total Classes Report Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Truck Summary: # # # # #5 #6 #7 #8 #9 # # # # Total Total Trucks: % Trucks: 6.9 AM % Trucks: 9.6 PM % Trucks: 5.7 Classification Scheme: FHWA (ID: ) # # # # #5 Motorcycles - Axles Passenger Cars - Axles Pickup Trucks, Vans - Axles Buses Single Unit - Axles, 6 Tires #6 #7 #8 #9 # Single Unit Truck - Axles Single Unit - Axles Single Unit - Axles or Less Double Unit - 5 Axles Double Unit - 6 Axles or More # # # Multi-Unit - 5 Axles or Less Multi-Unit - 6 Axles Multi-Unit - 7 Axles or More D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page 8

97 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Southbound Speeds (MPH) Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: to 9 MPH 85th Percentile: 9. MPH. MPH Percent in Ten Mile Pace: 65.%. MPH 5th Percentile: 7. MPH.5 MPH 9th Percentile: 5. MPH 95th Percentile: 5. MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

98 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Southbound Speeds (MPH) Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: to 9 MPH 85th Percentile: 9. MPH. MPH Percent in Ten Mile Pace: 6.8%. MPH 5th Percentile: 5.9 MPH 7.5 MPH 9th Percentile: 9.8 MPH 95th Percentile: 5.7 MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

99 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Northbound Speeds (MPH) Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: to 9 MPH 85th Percentile: 8.6 MPH.8 MPH Percent in Ten Mile Pace: 66.6%. MPH 5th Percentile: 6.7 MPH.5 MPH 9th Percentile: 9.5 MPH 95th Percentile: 5. MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page

100 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Northbound Speeds (MPH) Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: 5 to MPH 85th Percentile: 8. MPH. MPH Percent in Ten Mile Pace: 6.%. MPH 5th Percentile: 6. MPH.5 MPH 9th Percentile: 9.5 MPH 95th Percentile: 5. MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page 5

101 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Total Speeds (MPH) Study Date: Unit ID: Location: Saturday, 8/9/5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: to 9 MPH 85th Percentile: 8.9 MPH. MPH Percent in Ten Mile Pace: 65.7%. MPH 5th Percentile: 7. MPH.5 MPH 9th Percentile: 9.8 MPH 95th Percentile: 5.8 MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page 7

102 Printed: 9//5 at : TrafficViewer Pro v.6.. PicoCount 5 V. (s/n# 57) Daily Total Speeds (MPH) Study Date: Unit ID: Location: Sunday, 8//5 Brush Creek Road : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 : - :59 5: - 5:59 6: - 6:59 7: - 7:59 8: - 8:59 9: - 9:59 : - :59 : - :59 : - :59 : - :59 Totals Percent of Total Percent of AM Percent of PM Standard Deviation: Mean Speed: Median Speed: Modal Speed: Total MPH Ten Mile Pace: to 9 MPH 85th Percentile: 8.6 MPH. MPH Percent in Ten Mile Pace: 59.%.5 MPH 5th Percentile: 6. MPH.5 MPH 9th Percentile: 9.7 MPH 95th Percentile: 5. MPH D:\MTEC\Software Info\PicoCounter\Data\5-8-6 Brush Creek Road S of Frost Creek.tvp Page 8

103 CDOT OTIS Traffic Data Frost Creek Eagle, CO Revised March 5, 6 Page 8

104 CDOT OTIS Online Transportation Information System (/otis/) Highway Data (/otis/highwaydata) Traffic Data (/otis/trafficdata) Data Catalog (/otis/catalog) Reports (/otis/statistics) Map View (/otis/flex/mapview) Help (/otis/trafficdata/help?actionname=index) Traffic Data Explorer (/otis/highwaydata#/ui///criteria/6e/8/5) (/otis/flex/mapview? hwy=6e&begrefpt=8&endrefpt=5)

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Bridge Street Corridor Study Report

Bridge Street Corridor Study Report Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

4.0 TRAFFIC IMPACT STUDIES

4.0 TRAFFIC IMPACT STUDIES SECTION 4 4.0 TRAFFIC IMPACT STUDIES 4.1 TRAFFIC IMPACT STUDY REQUIREMENTS The City has established Traffic Impact Study (TIS) requirements for the purpose of ensuring that both the quantitative and qualitative

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Chapter 4 Traffic Analysis

Chapter 4 Traffic Analysis Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719)

LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO (719) FAX (719) LSC TRANSPORTATION CONSULTANTS, INC. 516 North Tejon Street Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsccs.com May 15, 2009 Mr. Davis Farrar Western Slope Consulting, LLC

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

6060 North Central Expressway Mixed-Use Site Dallas, Texas

6060 North Central Expressway Mixed-Use Site Dallas, Texas Volume 1 Traffic Impact Analysis 6060 North Central Expressway Mixed-Use Site Dallas, Texas April 30, 2018 Kimley-Horn and Associates, Inc. Dallas, Texas Project #063238300 Registered Firm F-928 Traffic

More information

FINAL Albertville Business Park AUAR Update Traffic Study

FINAL Albertville Business Park AUAR Update Traffic Study FINAL Albertville Business Park AUAR Update Traffic Study Prepared for City of Albertville, MN July 20, 2017 SRF No. 10060.00 Table of Contents Introduction... 1 Existing Conditions... 1 Data Collection...

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

Include autoturn exhibits of WB-67 trucks at each roundabout.

Include autoturn exhibits of WB-67 trucks at each roundabout. 1 Along the through path, the desired relationship is R1>R2

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams.

Technical Memorandum TRAFFIC IMPACT STUDY. RIDLEY ROAD CONVENIENCE STORE Southampton County, VA. Prepared for: Mr. David Williams. Technical Memorandum TRFFIC IMPCT STUDY RIDLEY ROD CONVENIENCE STORE Southampton County, V Prepared for: Mr. David Williams By: Charles Smith, P.E., PTOE EPR Charlottesville, V July 2014 1 TBLE OF CONTENTS

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

King Soopers #116 Thornton, Colorado

King Soopers #116 Thornton, Colorado Traffic Impact Study King Soopers #116 Thornton, Colorado Prepared for: Galloway & Company, Inc. 1.0 EXECUTIVE SUMMARY King Soopers #116, a grocery marketplace anchored commercial development, is proposed

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:

TRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for: TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:

More information

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS

CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS CHAPTER 4 TRANSPORTATION IMPACT STUDY TABLE OF CONTENTS Section Title Page 4.1 Introduction... 4-1 4.1.1 General... 4-1 4.1.2 Applicant Responsibility... 4-1 4.1.3 Capacity and Safety Issues... 4-1 A.

More information

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts

Appendix B. Environmental Resource Technical Memorandum. Assessment on Travel Pattern and Access Impacts Appendix B Environmental Resource Technical Memorandum Assessment on Travel Pattern and Access Impacts TECHNICAL MEMORANDUM ENVIRONMENTAL RE-EVALUATION FOR UNION STATION TO OAK CLIFF DALLAS STREETCAR To:

More information

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California

CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California CarMax Auto Superstore/ Reconditioning Center #6002 Murrieta, California TUSTIN 17782 17th Street Suite 200 Tustin, CA 92780-1947 714.665.4500 Fax: 714.665.4501 LOS ANGELES 145 S. Spring Street Suite 120

More information

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748

Bistro 6. City of Barrie. Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report. Project Number: JDE 1748 City of Barrie Traffic Impact Study for Pratt Hansen Group Inc. Type of Document: Final Report Project Number: JDE 1748 Date Submitted: June 12 th, 2017 06/12/17 John Northcote, P.Eng. Professional License

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007

University Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007 Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-

More information

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017

Traffic Impact Analysis (TIA) Process and Procedures Manual. September 2017 Traffic Impact Analysis (TIA) Process and Procedures Manual Post Office Box 664 101 Huntersville-Concord Road Huntersville, NC 28070 Phone 704-766-2220 Fax 704-992-5528 www.huntersville.org (c) 2017, Town

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger

MEMORANDUM. Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT. Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger To: From: Matt Folden, AICP, MNCPPC Rebecca Torma, MCDOT Nancy Randall, AICP, PTP Barbara Mosier, P.E., PTOE Kevin Berger 1110 Bonifant Street Suite 210, Silver Spring, MD 20910 301-448-1333 WellsandAssociates.com

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION

TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION TRAFFIC IMPACT STUDY COMPREHENSIVE UPDATE TOWN OF THOMPSON S STATION, TENNESSEE PREPARED FOR: THE TOWN OF THOMPSON S STATION Transportation Consultants, LLC 1101 17 TH AVENUE SOUTH NASHVILLE, TN 37212

More information

T R A N S P O R T A T I O N M E M O R A N D U M

T R A N S P O R T A T I O N M E M O R A N D U M WILKINSON LLC t raffic engineering and t ransportation p lanning 3405 Harbor Way Fort Collins, CO 80524 phone: 970-988-0143 fax: 970-472-0223 martinawilkinson@msn.com T R A N S P O R T A T I O N M E M

More information

REDEVELOPMENT TRAFFIC IMPACT STUDY

REDEVELOPMENT TRAFFIC IMPACT STUDY REDEVELOPMENT TRAFFIC IMPACT STUDY For Wendy s Parker, Colorado January 215 Prepared for: Sterling Design Associates, LLC 29 W. Littleton Boulevard #3 Littleton, Colorado 812 Prepared by: 1233 Airport

More information

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives

South Albion-Bolton Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Community Plan North Hill Supermarket Transportation Study Part B: Evaluation of Alternatives Prepared for: The Town of Caledon August 9 Transportation Solutions Ltd. 43 Forest Road Cambridge, ON N1S 3B4

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com Traffic

More information

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning

Traffic Impact Study. Roderick Place Columbia Pike Thompson s Station, TN. Transportation Group, LLC Traffic Engineering and Planning F i s c h b a c h Transportation Group, LLC Traffic Engineering and Planning Traffic Impact Study Roderick Place Columbia Pike Thompson s Station, TN Prepared March 2016 Ms. Gillian L. Fischbach, P.E.,

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS...

TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... TABLE OF CONTENTS TABLE OF CONTENTS... I APPENDICES... III LIST OF EXHIBITS... V LIST OF TABLES... VII LIST OF ABBREVIATED TERMS... IX 1 INTRODUCTION... 1 1.1 Project Overview... 1 1.2 Analysis Scenarios...

More information

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for:

NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY. Prepared for: NEW YORK CENTRAL PARK SUBDIVISION BLAIS STREET/ST-PIERRE STREET EMBRUN, ONTARIO TRAFFIC IMPACT STUDY Prepared for: Solidex Holdings Limited & Investissement Maurice Lemieux Investments Attn: Mr. Anthony

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

APPENDIX D Traffic Impact Study (Draft Report)

APPENDIX D Traffic Impact Study (Draft Report) ENVIRONMENTAL IMPACT ASSESSMENT (EIA) REGISTRATION, TRAFFIC IMPACT STUDY (DRAFT REPORT), AND WATER SUPPLY SOURCE ASSESSMENT (WSSA): CAMPING PLAGE ABOITEAU BEACH, CAP-PELÉ, NB APPENDIX D (Draft Report)

More information

EXECUTIVE SUMMARY. Page 1 of 6

EXECUTIVE SUMMARY. Page 1 of 6 EXECUTIVE SUMMARY The purpose of this report is to identify conformance with the original traffic impact study for the proposed retail development on Lot 5 of Riverdale Retail Filing No. 1 located on the

More information

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.

9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd. 9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major

More information

Troutbeck Farm Development

Troutbeck Farm Development Troutbeck Farm Development Willistown Township, Chester County PA For Submission To: Willistown Township Last Revised: October, 4 TPD# INLM.A. 5 E. High Street Suite 65 Pottstown, PA 9464 6.36.3 TPD@TrafficPD.com

More information

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for:

HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: HOLIDAY INN HOTEL 235 KING EDWARD AVENUE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Momentum Planning & Communications 1165 Greenlawn Crescent Ottawa, ON K1L 6C2 June 29, 2015 115-618 Brief_1.doc

More information

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2

URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 URBAN QUARRY HEADQUARTERS 2717 STEVENAGE DRIVE CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Urban Quarry 4123 Belgreen Drive, Ottawa K1G 3N2 February 27, 2014 113-584 Overview_1.doc D. J. Halpenny

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

3.2.2 Proposed Road Network within Phase 1B Lands

3.2.2 Proposed Road Network within Phase 1B Lands 3.2.2 Proposed Road Network within Phase 1B Lands Figure 3.1 also shows the proposed road network within the Premier Gateway Phase 1B Employment Area lands, which features two collector roads providing

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

TABLE TRAFFIC ANALYSIS SCENARIOS

TABLE TRAFFIC ANALYSIS SCENARIOS 4.11 TRANSPORTATION The potential traffic impacts of the proposed project are evaluated in the Buena Park Beach/Orangethorpe Mixed Use Project Traffic Analysis (Traffic Analysis) by Austin-Foust Associates

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

Traffic Impact Statement

Traffic Impact Statement Traffic Impact Statement Mixed Use Development, US 41 and Old Trail Drive aka Tide-Starbucks 4900 9 th Street North General Development Site Plan (GDSP) Collier County, FL 10/6/2015 Prepared for: Prepared

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Gene Dillon Elementary School Traffic Study Division Street Site

Gene Dillon Elementary School Traffic Study Division Street Site To: From: Dr. James Hess, Superintendent Jordan Schwarze, PE, Senior Engineer Matt Pacyna, PE, Senior Associate Date: March 30, 2016 Subject: Gene Dillon Elementary School Traffic Study reet Site Memorandum

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

Mr. Randy Kowalchuk, President

Mr. Randy Kowalchuk, President October 20, 2017 #201, 8506-200th Street, Langley, BC V2Y 0M1 T: 604.371.0091 F: 604.371.0098 Our Reference: 31931 Naramata Benchland Properties 176 Fraser Court, Penticton, BC V2A 8B4 Attention: Mr. Randy

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for:

FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF. Prepared for: FAIRFIELD INN & SUITES HOTEL 135 THAD JOHNSON PRIVATE OTTAWA TRANSPORTATION BRIEF Prepared for: Bona Building & Management Co. Ltd. Place Vanier, 333 North River Road Vanier, Ontario K1L 8B9 August 12,

More information

NORTHSIDE TRANSPORTATION PLAN LIVINGSTON, MONTANA. Prepared for CITY OF LIVINGSTON. Prepared by

NORTHSIDE TRANSPORTATION PLAN LIVINGSTON, MONTANA. Prepared for CITY OF LIVINGSTON. Prepared by NORTHSIDE TRANSPORTATION PLAN LIVINGSTON, MONTANA Prepared for CITY OF LIVINGSTON Prepared by MARVIN & ASSOCIATES 1 North Transtech Way Billings, MT 591 August 14, 18 P.T.O.E. # 59 NORTHSIDE LIVINGSTON

More information

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for

Draft Report. Traffic Impact Study. Superstore, Wal-Mart, and Kent Development. Yarmouth, Nova Scotia. Prepared for oad & Traffic Management Road & Traffic Management R Atlantic Traffic Engineering Specialists Draft Report Traffic Impact Study Superstore, Wal-Mart, and Kent Development Yarmouth, Nova Scotia Prepared

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning

AMEC Earth and Environmental. Bovaird Drive Environmental Assessment. Traffic Study Final Report. August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Environmental Assessment Traffic Study Final Report August Excellence in Transportation Planning AMEC Earth and Environmental Bovaird Drive Class EA Traffic

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information