1 8/1/2017 City of San Juan Capistrano Agenda Report E8 TO: FROM: Honorab.le Mayor and Members. of the City Council ;i1'en Siegel, City Manager SUBMITTED BY: Steve May, Public Works and Utilities Director 4 PREPARED BY: George Alvarez, City Engineer DATE: August 1, 2017 SUBJECT: Consideration of the Bikeway Detour Plan During the San Juan Creek Bridge Replacement Construction Project RECOMMENDATION: Approve the Del Obispo Street Option for the Bikeway Detour Plan during the San Juan Creek Bridge Replacement Construction Project. DISCUSSION/ANALYSIS: The Southern California Regional Rail Authority (SCRRA), in partnership with Orange County Transportation Authority (OCTA}, is planning to replace the existing 100 year old single track railroad bridge over San Juan Creek near the southeast corner of the City's Groundwater Recovery Plant and to the east of Descanso Park. The location is shown on Attachment 1. The current bridge is in need of replacement due to its age and condition. The existing bridge will remain in place until a new bridge just to the west is constructed. During construction of the new bridge, it will be necessary to close the existing bikeway that extends east of the 1-5 freeway to the trail along San Juan Creek. To provide a continuous bikeway during construction, two detour options have been proposed. The first option, Del Obispo Street, is shown on Attachment 1. This detour would begin on Avenida Padre, continue on Camino Capistrano, turn left on Del Obispo Street, enter the Trabuco Creek trail levee, and then continue south. Currently, Camino Capistrano between Avenida Padre and Del Obispo Street is designated as a Class II Bikeway that is striped for a bike lane. Del Obispo Street has no bike lanes between Camino Capistrano and Paseo Adelanto. The sidewalk width is wide enough to accommodate cyclists.
2 City Council Agenda Report August 1, 2017 Page 2 of 2 The second option, River Street, is shown on Attachment 2. This detour is similar to the Del Obispo Street Option with the exception that instead of using the segment on Del Obispo Street between Los Rios and Paseo Adelanto, cyclists would be diverted to Los Rios Street up to Ramos Street and would continue west to Paseo Adelanto to enter the San Juan Creek Trail. Staff has reviewed the two detour options and recommends that the City Council approve the Del Obispo Street Option, since it is the most direct route to and from the San Juan Creek trail. Pending Council approval, signage would. be posted directing cyclists along the detour route. Construction is expected to commence in 2019 and the estimated duration is 30 months for completion. FISCAL IMPACT: There is no fiscal impact to the City for the Bikeway Detour. All construction related costs will be funded by the Orange County Transportation Authority. ENVIRONMENTAL IMPACT: OCTA and SCRRA are the lead agencies for this project and have determined that this project is statutorily exempt under provisions of the CEQA Guidelines. CITY COUNCIL REVIEW: There has been no prior City Council review of this item. COMMISSION/COMMITTEE/BOARD REVIEW AND RECOMMENDATIONS: At the June 19, 2017, meeting of the Parks, Recreation, Youth, Senior Services, Trails and Equestrian Commission, the Commission recommended that the City Council approve the Del Obispo Street option for the bikeway detour plan. The Commission further requested that staff look into the possibility of including an equestrian crossing. An equestrian crossing under the railroad bridge is beyond the scope of the bridge project, although a future equestrian crossing would not be precluded by the current project. Commission Chairman Muir and Commissioner Perrin plan to attend the City Council meeting to respond to any questions. NOTIFICATIONS: Southern California Regional Rail Authority Orange County Transportation Authority ATTACHMENTS: Attachment 1: Attachment 2: Attachment 3: Location Map Del Obispo Street Detour Option River Street Detour Option
3 Bridge Replacement Location Map ATTACHMENT 1, Page 1 of 1
4 _ MILES OF DETOUR, :. SHORTEST DETOUR, MOST LIKELY USED BY LOCALS - MAJORITY OF DETOUR ROUTE IS ON DESIGNATED BIKEWAYS i (CLASS I AND II) _ If! :t DEL OBISPO IS TRAFFIC.. SENSITIVE AND PHYSICALLY RESTRICTIVE. RECENT TRAFFIC ;, dmprovement WAS DONE BY OCTA. I ;- - MOST DEL OBISPO SIDEWALKS, :"'ARE NARROW FOR MIXED USE j; EXCEPT SIDEWALK ON THE NE ISIDEOFRR.. EX SIDEWALK WIDTH (NW) 5.5' (2.5'@ SIGNAL) {SW) 5.5' TREE) EX LANE WIDTH -TEMP. LOW IMPACT SIDEWALK EXTENSION IS NOT FEASIBLE DUE TO UTILITIES & TREES. TEMP. MODIFICATION OF LANES MAY BE POSSIBLE BUT POSSIBLY 'COMPLICATED DUE TO TRAFFIC hr\... AND DRAINAGE IMPACT. ' y... "'"' 0 "'"' 5). :;, a. C\1 c CD E.c (,) cv c:t
5 - 1.5 MILES OF DETOUR, SECOND SHORTEST, MOST FEASIBLE CONSIDERING SHORT DETOUR LENGTH, GOOD BIKE SAFETY, MIN. IMPACT ON CAR TRAFFIC, AND POSSIBLY NO IMPACT ON EX UTIL & DRAINAGE ""'... 0 ""' Q) c:n ftl a. - C")... c Q) E.c u ftl... c:r - MAJORITY OF DETOUR ROUTE IS ON DESIGNATED BIKEWAYS (CLASS land II) -LOS RIOS, RIVER ST, PASEO ADELANTO ARE PRACTICALLY CLASS Ill BIKEWAYS (LITTLE CAR TRAFFIC) - ON DEL OBISPO, BOTH DIRECTION TRAFFIC TO USE NE SIDEWALK (DUE TO MEDIAN AT LOS RIOS & DEL OBISPO) WHICH HAS 8.5' WIDTH - CONNECTS BIKE TRAFFIC TO SJC STATION AND LOS RIOS HISTORIC DISTRICT ;.&.c::s;.:.ar.-z...o..::::e -.r=.. -..:
Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012
Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More information5.16 Transportation/Traffic
5.16 Transportation/Traffic The analysis of traffic and circulation presented in this section is based on the traffic study completed by Transtech, Inc., specifically, the Historic Town Center Master Plan
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install
More informationAGENDA ITEM G-2 Public Works
AGENDA ITEM G-2 Public Works STAFF REPORT City Council Meeting Date: 12/6/2016 Staff Report Number: 16-214-CC Regular Business: Approve the Oak Grove University Crane Bike Improvement Concept Plan, authorize
More informationBICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes
Minutes Approved as Submitted Date: 8/10/17 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes June 8, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationStaff Report City of Manhattan Beach
Agenda Item #: Staff Report City of Manhattan Beach TO: Honorable Mayor Ward and Members of the City Council THROUGH: Geoff Dolan, City Manager FROM: Richard Gill, Director of Parks and Recreation Richard
More informationDISTRICT BICYCLE PROGRAM
DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationPRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationThe procedures to be followed in undertaking Non-Emergency work depend on the degree of traffic disruption caused by the work.
APPENDIX G TRAFFIC CONTROL GUIDELINES FOR UTILITY WORK WITHIN ROADWAY RIGHTS- OF-WAY JUNE 2001 Scope of Guidelines These traffic control guidelines cover work performed by utility companies and/or their
More informationCITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES
CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new
More informationAMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities
I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;
More informationCITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA
CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET
More informationCity of Roseville Section 13 Design Standards. _Bikeways January 2016 SECTION 13 BIKEWAYS
SECTION 13 BIKEWAYS 13-1 GENERAL The City of Roseville bikeway standards are designed to insure that transportation and recreational bikeways are constructed in a manner that would provide a safe and comfortable
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationIntroduction. North 12 th Complete Street Project Overview
Introduction On Wednesday, March 1, 2017, the City of Sacramento, in partnership with Sacramento Regional Transit District and the Sacramento Housing and Redevelopment Agency, hosted a community outreach
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationSUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing
REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION
More informationModest Improvements for More Bicycle-Friendly Road Projects
Modest Improvements for More Bicycle-Friendly Road Projects Ed Barsotti Ride Illinois 630-978-0583 ed@rideillinois.org About Ride Illinois Bicycle advocacy (501c3) organization Roads, trails, education,
More informationCITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT
Meeting Date: May 10, 2016 Department: Submitted By: Prepared By: Agenda Title: Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY
More informationOmaha s Complete Streets Policy
Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More informationGeneral Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701
General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationSAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY
THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications
More informationCRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN
CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,
More informationItem No. 14 Town of Atherton
Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationTable 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line
Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3
More informationTransportation Development Act Grant Radar Check Speed Signs
City Council Agenda January 18, 2017 To: From: Subject: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Radar Check Speed Signs Date: January 10, 2017 Recommendation
More informationENERGY SECTOR COORDINATION
ENERGY SECTOR COORDINATION Darin Kosmak, Deputy Director TxDOT Rail Division November 4, 2013 Energy Sector Considerations Existing FM roads not built to handle truck traffic resulting from: Oil & natural
More informationCITY OF BLOOMINGTON COMPLETE STREETS POLICY
CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,
More informationChapter 3: Multi-Modal Circulation and Streetscapes
CHAPTER 3: MULTI-MODAL CIRCULATION AND STREETSCAPES Chapter 3: Multi-Modal Circulation and Streetscapes Overview Streetscape improvements have already been completed for Depot Street between Main Avenue
More informationWest End Connectivity Master Plan
West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity
More informationThis chapter describes the proposed circulation system and transportation alternatives associated with
5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing
More informationTransportation Development Act Grant Center Avenue Pedestrian Signal Project
CITY OF MARTINEZ CITY COUNCIL AGENDA April 15, 2015 TO: FROM: SUBJECT: DATE: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Center Avenue Pedestrian Signal Project
More informationCITY OF ALBANY TRAFFIC AND SAFETY COMMISSION
CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION City Hall - Council Chambers 1000 San Pablo Avenue, Albany, CA 94706 Wednesday, November 30, 2016, 7:00 PM 1. CALL TO ORDER The meeting was called to order
More informationAtwood Avenue Fair Oaks Avenue Cottage Grove Road
Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House
More informationPrince George s County plans, policies, and projects
Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationBEVERLY HILLS STAFF REPORT. To: From: Subject: INTRODUCTION DISCUSSION. Meeting Date: August 7, 2018
BEVERLY HILLS 9.4 STAFF REPORT Meeting Date: August 7, 218 To: From: Subject: Honorable Mayor & City Council Ryan Gohlich, AICP, City Planner / Assistant Director of Community Development Commemorative
More informationActive Transportation Rail to River Corridor. Community Meeting - Segment A
Active Transportation Rail to River Corridor Community Meeting - Segment A June 29, 2017 Tonight s Agenda > Open House (30 min) > Welcome / Project Overview > Presentation of 30% Design Refinements > Next
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationAct 47 Exception Application Process (Permitting Bicycle Travel on Freeways)
Act 47 Exception Application Process (Permitting Bicycle Travel on Freeways) Attached is a revised application process to permit Pedalcycle travel on the shoulders of freeways within the Commonwealth.
More informationTEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS
TEMPORARY TRAFFIC CONTROL GUIDELINES FOR HIGHWAY-RAIL GRADE CROSSINGS 1.0 INTRODUCTION 1.1 Purpose The Southern California Regional Rail Authority (SCRRA) is the designated track owner of the Metrolink
More informationReams Road RCA Study. Board of County Commissioners Public Hearing
Reams Road RCA Study Board of County Commissioners Public Hearing April 24, 2018 Presentation Overview Study Overview Existing Conditions Development of Alternatives Preferred Alternative Public Involvement
More informationRochester Downtown Bicycle Study 2009
Rochester Downtown Bicycle Study 2009 Relationship of ROCOG Long Range Transportation Plan to Rochester Comprehensive Plan Regional Long Range Transportation Plan (LRTP) is prepared under the auspices
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationComplete Streets Workshop Follow-up. April 27, 2011 Rockledge City Hall
Complete Streets Workshop Follow-up April 27, 2011 Rockledge City Hall Agenda Complete Streets draft briefing presentation and sample policy language Share your Complete Streets projects and post workshop
More informationComplete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER
Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:
More informationMobility and Complete Streets
9:35, Cotton s Point by Rick Delanty Mobility and Complete Streets The Mobility and Complete Streets Element focuses on moving people by multiple transportation modes, including both human powered and
More informationCirculation and Mobility
SECTION 4 Circulation and Mobility OVERVIEW The first phase of the circulation analysis is to address specific concerns regarding the circulation system in the vicinity of the Gateway Specific Plan area
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationAGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive
AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell
More informationPCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING
PCH/DEL PRADO STREET IMPROVEMENTS PUBLIC OUTREACH MEETING JANUARY 22, 2014 MEETING AGENDA 1. INTRODUCTION OF STAFF 2. PROJECT SCHEDULE 3. PROJECT SCOPE 4. GENERAL CONCERNS 5. COMMUNICATIONS 6. ODDS AND
More informationORANGE COUNTY GRAND JURY
ORANGE COUNTY RAIL CROSSING SAFETY: SNAPSHOT OF A PROCESS SUMMARY Metrolink operates the commuter rail system that serves the Southern California region. It was established in 1991 as the Southern California
More informationSUBJECT: AUTHORIZE BID ADVERTISEMENT FOR OLIVE AVENUE CLASS 2 BIKE LANES HSIP, CIP PROJECT NO
STAFF REPORT MEETING DATE: May 3, 2016 TO: FROM: City Council Russell Thompson, Public Works Director Gosia Woodfin, Assistant Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationMontclair s Complete Streets Experience
Presented by: Hon. Jerry Fried, Mayor Montclair Township About Montclair Six square miles Six commuter rail stations Four local bus routes (NJ Transit) Two private commuter bus routes Five business districts
More informationMASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018
MASSACHUSETTS AVENUE BRIDGE REPLACEMENT PROJECT APRIL 25, 2018 AGENDA Introductions Project Benefits Progress to Date Schedule for Remaining Work Phase 3 Activities, Impacts & Traffic Detours Phase 4 Activities
More informationPURPOSE AND POLICY GUIDANCE
1 PURPOSE AND POLICY GUIDANCE The VTA Bicycle Technical Guidelines (BTG) present standards and guidance for planning, designing, operating, retrofitting and maintaining roadways and bikeways. They are
More informationSaskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening
Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening We are here today to present the draft plan for the Saskatchewan Drive Roadway Rehabilitation and Shared-Use Path Widening project
More informationSouthbend to Prima Vista. October 30, Floresta Corridor Master Plan
Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels
More informationTOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019
TOWN OF MORAGA MORAGA WAY AND CAMINO PABLO/CANYON ROAD IMPROVEMENTS Town Council Meeting March 13, 2019 1 Edric Kwan, Public Works Director Josh Peterman, Principal, Fehr and Peers Shawn Knapp, Senior
More informationNapa County Planning Commission Board Agenda Letter
Agenda Date: 8/17/2016 Agenda Placement: 9D Napa County Planning Commission Board Agenda Letter TO: FROM: Napa County Planning Commission John McDowell for David Morrison - Director Planning, Building
More informationINTRODUCTION. General Plan 1 June 21, 1994 (rev. July 1, 2008)
is well served by a diverse circulation system. While the San Diego Freeway has served the area for many years, the Foothill Transportation Corridor is now in operation and provides additional highway
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationCITY OF VANCOUVER ADMINISTRATIVE REPORT
CITY OF VANCOUVER ADMINISTRATIVE REPORT Report Date: May 31, 2007 Author: Paul Storer Phone No.: 604.873.7693 RTS No.: 06348 VanRIMS No.: 13-5000-20 Meeting Date: June 12, 2007 TO: FROM: SUBJECT: Standing
More informationTO: Karen P. Brust, City n r - ~~
2/4/2014 012 TO: Karen P. Brust, City n r - ~~ FROM: Keith Vaner Maaten, P.., Public Works and Utilities irectorca ~ f Prepared by: George(},Aivarez, P.E, T.E., City EngineerrrtJfic Engineer.J;I-Q/ ATE:
More informationBICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes
BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes February 9, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m. by Chair Hasser in the City Hall Committee Room, located
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationI-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT
I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate
More informationTOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY
TOWN OF PORTLAND, CONNECTICUT COMPLETE STREETS POLICY I. VISION, GOALS & PRINCIPLES VISION To improve the streets of Portland making them safer and more accessible for all users including pedestrians,
More informationSection 3.14 Transportation and Traffic
Section 3.14 Transportation and Traffic 3.14.1 Introduction The analysis contained in this section is based on the results of the TIA prepared by Fehr and Peers, dated March 2017, and included in Appendix
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationMake Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.
Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings
More informationOrinda Bicycle, Trails and Walkways Master Plan
Orinda Bicycle, Trails and Walkways Master Plan Public Meeting October 15, 2008 Presented by: Ian Moore, Alta Lauren Ledbetter, Alta Bruce Wolff, Alta Introductions City of Orinda Monica Pacheco, Assistant
More informationCITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016
CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CALL TO ORDER: 9:30 a.m. ROLL CALL: PLEDGE OF ALLEGIANCE: Vice Mayor Diane Glasser
More informationBicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda
CITY OF ROHNERT PARK Development Services Bicycle and Pedestrian Advisory Committee (BPAC) Meeting Agenda 5:30 PM, Monday, December 18, 2017 Rohnert Park City Hall, Conference Room 2A 130 Avram Avenue,
More informationRESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 6123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY WHEREAS, the term Complete Streets describes a comprehensive, integrated transportation
More information10.0 CURB EXTENSIONS GUIDELINE
10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services
More informationRESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY
RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune
More informationDRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA
DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346
More informationState Road (S.R.) 61 (U.S. 319) FPID s and
State Road (S.R.) 61 (U.S. 319) FPID s 220496 2 22 01 and 219747 2 22 01 Crawfordville Highway Conceptual Design and Environmental Reevaluation May 6, 2014 END PROJECT PROJECT LOCATION/LIMITS Project Limits:
More informationCITY OF ELK GROVE CITY COUNCIL STAFF REPORT
CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 10.3 AGENDA TITLE: Bike Lane Installation Project Update MEETING DATE: April 26, 2017 PREPARED BY: Ryan D. Chapman P.E., Traffic Engineer DEPARTMENT
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationHennepin Avenue Reconstruction Washington Avenue to 12 th Street
CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat
More informationDEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee
DEPARTMENT OF COMMUNITY PLANNING, HOUSING AND DEVELOPMENT Planning Division/Site Plan Review Committee 2100 Clarendon Boulevard, Suite 700, Arlington, VA 22201 TEL 703-228-3525 FAX 703-228-3543 www.arlingtonva.us
More informationLessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice
Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS
More information