Mayor Claudia Balducci, Chair, Transportation Policy Board
|
|
- Paulina Webster
- 5 years ago
- Views:
Transcription
1 ACTION ITEM June 18, 2015 To: From: Subject: Executive Board Mayor Claudia Balducci, Chair, Transportation Policy Board Adopt 2015 Transportation 2040 Minor Amendment IN BRIEF At times it may be necessary to amend the region s long-range transportation plan between the regularly scheduled four-year updates. The most recent update to Transportation 2040 was adopted in 2014, and some changes have occurred to projects throughout the region that require an amendment to the plan. To accommodate these changes, the region has adopted procedures to allow for minor amendments that may be approved by the Executive Board on an ad hoc basis. A minor amendment is consistent with the plan s air quality conformity determination, environmental analysis under the State Environmental Policy Act (SEPA), and adopted financial strategy. PSRC released a limited call for project updates in March The results of these changes are described in this memo, for approval by the Executive Board. In addition, in April 2015, PSRC produced a status report on the region s transportation system. This review is required under state law every two years, and in the past has resulted in an Action Strategy adopted as an appendix to the plan. PSRC proposes that the more dynamic status report on the implementation of the system serves to meet the state law requirement, as a replacement to the adopted Action Strategy. At its meeting on June 11, the Transportation Policy Board made the following recommendation. RECOMMENDED ACTION The Executive Board should adopt a minor amendment to Transportation 2040 to reflect revisions to the Regional Capacity Project list as identified in Attachment A, including an updated positive finding of air quality conformity as illustrated in Attachment B. In addition, the Executive Board should approve the deletion of the adopted 2014 Action Strategy included as Appendix A of Transportation 2040, and direct staff to proceed in the future with completion of a status report to meet the state s biennial requirement. DISCUSSION Transportation 2040, the region s long-range transportation plan, was first adopted in May 2010 and updated in May While PSRC is required by federal law to review and update the plan at least every four years, it is recognized that projects in the plan evolve and change over time. Doc ID 1389
2 Opportunities are provided monthly for sponsors of Regional Capacity Projects 1 to request a change in project status to the Transportation Policy and Executive Boards, and minor administrative updates may be made as needed as long as they are consistent with the plan s air quality conformity finding. More substantive project revisions require either a minor or a major amendment to the plan. A minor plan amendment will have no negative impact on the regional air quality conformity determination, will not require additional plan-level environmental review under SEPA, and will be consistent with the plan s financial strategy. Minor plan amendments may be adopted by action of the Executive Board and are generally scheduled on an annual basis or as needed. A major plan amendment requires additional environmental review and requires action by the General Assembly; as such, they are conducted less frequently. To reflect updated project information and current activities, PSRC provided an opportunity for sponsors to submit project revisions and status changes in March This opportunity limited revisions to changes in projects within the currently adopted plan, and no new projects were entertained at this time. Further, since the next required four-year update of the plan is scheduled for adoption in 2018, the opportunity was limited to projects that needed to begin work prior to that time, or were correcting out of date information. Revisions could include changes in cost, scope, or completion date, as well as a request to move projects from the Unprogrammed portion of the plan to Constrained. As a reminder, the air quality conformity determination and the plan s financial strategy encompass the investments in the Constrained portion of the plan; the SEPA environmental analysis encompasses the full plan, including both Constrained and Unprogrammed. In order to proceed towards implementation, projects must be included in the Constrained plan. The table below summarizes the requested revisions, with specific project details provided in Attachment A. Also described is the process by which the proposed revisions were reviewed for consistency with the adopted plan. Table 1. Summary of Requested 2015 Transportation 2040 Project Revisions Cost Change to Number of Type of Revision Projects (2015 Dollars) Unprogrammed to Constrained 5 $159,490,007 Constrained to Unprogrammed 1 ($24,195,193) Cost Updates 31 ($1,602,282,804) Project Cancellations 4 ($33,929,140) Scope Changes 6 $37,893,562 Other Modifications 83 n/a Total: ($1,463,023,568) 1 The majority of investments contained in Transportation 2040 are programmatic in nature, such as preservation, maintenance, operations and local transportation investments. However, projects adding capacity to the regional system are required to be included on the Transportation 2040 Regional Capacity Projects List. Thresholds for all modes are identified to determine whether a project is programmatic or adding regional capacity; more information can be found on PSRC s website at Doc ID 1389
3 All requested revisions were reviewed per the adopted Transportation 2040 administrative procedures. For projects requesting to be moved from Unprogrammed to Constrained, or for scope changes to existing Constrained projects, this review included the following: the project as described must be derived from a comprehensive planning process; all affected parties must be in agreement; and the project must respond to the Transportation 2040 Prioritization questions covering the nine adopted measures. These revisions, as well as revisions to project completion dates, require updating the regional model and demonstrating a positive finding of air quality conformity. The request to move projects from Unprogrammed to Constrained, as well as other project cost revisions, were also reviewed for consistency with the plan s adopted financial strategy. Given that some projects were cancelled, some were moved to Unprogrammed, and some reduced their total estimated cost, the sum total of all of the proposed project revisions results in a net decrease to the Constrained plan of $1.4 billion. The majority of this cost savings is due to the recently updated cost estimate for the State Route 520, I-5 to Montlake Boulevard project this project s cost estimate has evolved over the past several years, and the cost identified in Transportation 2040 had not been updated since As mentioned above, projects requesting to be moved from Unprogrammed to Constrained and existing Constrained projects with scope changes were required to complete the Transportation 2040 Prioritization measure questions. The total score for these projects was compared to the scoring framework and decision process conducted as part of the 2014 Transportation 2040 update. At that time, due to a funding shortfall projects that scored below a certain threshold were moved to the Unprogrammed portion of the plan or the sponsor submitted a justification form regarding why they should remain in the Constrained plan. For each of the four major types of projects, the threshold was established above the lowest quartile of scores, as follows: State route (41), arterial (37), transit (43) and bicycle/pedestrian (27). The Transportation 2040 Prioritization scores for each of the affected projects is provided in the attachment; all but one project falls above the cut-off line established in 2014, and the project justification form for that project is contained in Attachment C. The regional model was updated to reflect the proposed revisions, and an air quality analysis has been performed. As illustrated in Attachment B, the proposed minor amendment to Transportation 2040 retains the region s positive finding of air quality conformity. A webmap is provided on PSRC s website illustrating the Transportation 2040 Regional Capacity Projects as amended with this proposal, at For more information, please contact Kelly McGourty at kmcgourty@psrc.org or (206) Attachments: A Transportation 2040 Minor Amendment Proposed Project Revisions B Transportation 2040 Minor Amendment Air Quality Conformity Analysis C Transportation 2040 Minor Amendment Project Prioritization Justification Form Doc ID 1389
4 ATTACHMENT A Transportation 2040 Minor Amendment Proposed Project Revisions STATUS CHANGE REQUESTS - Unprogrammed to Constrained* (costs in 2015 $) Prioritization Score Enumclaw SR 410 Channelization: Mtn. Villa Dr.-Watson St. N $1,944, Marysville State Avenue, 116th St. NE to 136th St. NE $4,279, Priority Bus Corridor 2: Burien TC - downtown via Delridge $58,092, Priority Bus Corridor 15: Phinney Ridge - Greenwood - Broadview $49,440, Priority Bus Corridor 13/13A: Ballard - U District - Laurelhurst via Market and 45th Sts $45,732, TOTAL $159,490,007 *Some of these projects are found in table below with other modifications STATUS CHANGE REQUESTS - Constrained to Unprogrammed (costs in 2015 $) I-5/JBLM, 41st Division Dr. I/C ($24,195,193) TOTAL ($24,195,193) PROJECT CANCELATIONS (costs in 2015 $) Pierce Transit SR 16 Peninsula Park and Ride ($21,988,812) Pierce Transit 6th Avenue (Tacoma) Transit Corridor Transit Service $0 Pierce Transit 112th Avenue (Puyallup/Lakewood) Transit Corridor Transit Service $0 WSF Mukilteo Multimodal Terminal (outdated project ) TOTAL ($11,940,328) ($33,929,140) SCOPE CHANGES / UPDATED PROJECT LIMITS Adopted Plan Total Project Cost (in 2015 $) Revised Total Project Cost (in 2015 $) (in 2015 $) Bellevue Mountain-to-Sound Greenway $28,770,490 $30,676,746 $1,906, Community Transit COST CHANGES* Prioritization Score Core or Swift BRT - SR 527 Downtown Bothell to SR 526/I-5 $7,637,944 $44,231,116 $36,593, Priority Bus Corridor 10: Northgate - Ballard - Downtown via Northgate Way, Holman Rd and 15th Ave $4,972,677 $8,652,105 $3,679, High Capacity Transit Corridor 6: Central Area - First Hill - Downtown, via Madison $63,697,627 $148,321,801 $84,624, High Capacity Transit Corridor 8: Roosevelt - University District - south Lake Union - Downtown $267,577,393 $152,029,846 ($115,547,548) 87 Priority Bus Corridor 1: West - Downtown via Fauntleroy / California $4,262,295 $30,900,375 $26,638, TOTAL $37,893,562 *Some of these projects are found in table below with other modifications Adopted Plan Total Project Cost (in 2015 $) Revised Total Project Cost (in 2015 $) (in 2015 $) Auburn S 272nd/277th St Corridor Capacity & Non Motorized Trail Improvements $4,760,624 $8,293,101 $3,532,477 Bellevue Bel-Red Regional Connectivity - NE 15th/ NE 16th St (Phase 1) $62,040,067 $80,000,000 $17,959,933 Bothell Bothell Way NE / Bothell - Everett Hwy Improvements $42,396,409 $36,184,339 ($6,212,069) Kent S 228th St Grade Separation at Union Pacific $29,599,269 $29,911,563 $312,294 Kent S 228th St Grade Separation at BNSF $0 $28,428,345 $28,428,345 King County/Metro South End Transit Pathways $5,639,906 $7,600,000 $1,960,094 Renton Duvall Ave NE $0 $18,744,786 $18,744,786 Priority Bus Corridor 3: Othello - U District via Beacon Ave and Broadway $23,679,415 $38,791,493 $15,112,078 Priority Bus Corridor 5: Rainier Valley - U District via Rainier Ave and 23rd Ave $29,362,475 $86,521,050 $57,158,576 Center City Priority Bus Corridor: Jefferson / Yesler $18,943,532 $24,720,300 $5,776,768 Priority Bus Corridor 4: Mount Baker via Rainier Ave $828,779 $1,854,023 $1,025,244 Northgate Multimodal Transportation Hub $29,599,269 $44,496,540 $14,897,271
5 Center City Priority Bus Corridor: Pike / Pine $17,759,562 $30,900,375 $13,140,813 Center City Priority Bus Corridor: Jackson $13,023,679 $24,720,300 $11,696,621 Priority Bus Corridor 14: Crown Hill - Greenlake - U District $67,486,334 $12,360,150 ($55,126,184) Center City Priority Bus Corridor: Center East $23,679,415 $6,180,075 ($17,499,340) High Capacity Transit Corridor 11: Loyal Heights - Ballard - Fremont - South Lake Union - Downtown $260,473,568 $86,521,050 ($173,952,517) Priority Bus Corridor 7: Queen Anne / Magnolia - South Lake Union - Capitol Hill via Denny $45,701,272 $12,360,150 ($33,341,122) Center City Connector $108,925,310 $135,961,651 $27,036,340 Westlake Multimodal Transportation Hub $24,764,619 $6,180,075 ($18,584,544) Tacoma Schuster Parkway Trail $5,919,854 $10,079,921 $4,160,067 Tacoma Historic Water Ditch Trail Phase III $7,340,619 $3,800,000 ($3,540,619) Tacoma Historic Water Ditch Trail Phase IV $7,103,825 $2,489,828 ($4,613,997) SR SR 204 Intersection Improvement $22,553,147 $54,842,362 $32,289,216 I-5/JBLM Dupont-Steilacoom - New Interchange $113,926,081 $149,000,000 $35,073,919 I-5/JBLM, Berkeley Drive I/C $110,542,138 $71,000,000 ($39,542,138) I-5/JBLM, Thorne Lane Interchange $213,817,823 $77,000,000 ($136,817,823) I-5: Thorne Lane to Gravelly Lake Dr. - Frontage Rd $36,593,960 $30,000,000 ($6,593,960) SR 520, I-5 to Montlake Blvd. $2,506,937,780 $1,249,673,569 ($1,257,264,211) 41st Division Dr. to Thorne Lane $139,869,644 $48,000,000 ($91,869,644) WSF Mukilteo Terminal Relocation/Expansion $174,629,479 $129,000,000 ($45,629,479) TOTAL ($1,602,282,804) *Some of these projects are found in table below with other modifications OTHER MODIFICATIONS Modification Type Adopted Plan Value Revised Value Auburn S 272nd/277th St Corridor Capacity & Non Motorized Trail Improvements Completion Year Auburn Completion Year 2013 M Street Widening and Underpass; 2019 M St SE Underpass Auburn Way South (SR 164) Corridor Improvements, Fir Street SE to Hemlock Street Sega & Non-Motorized Improvements Completion Year Auburn Bellevue Mountain-to-Sound Greenway Completion Year Bellevue Bellevue Way HOV Lanes and Transit Priority Change Bellevue Sound Transit Bel-Red Regional Bellevue Bel-Red Regional Connectivity - NE 15th/ NE 16th St (Phase 1) Title Connectivity - NE Spring Blvd (Phase 1) Community Transit Core or Swift BRT - SR 527 Downtown Bothell to SR 526/I-5 Completion Year Enumclaw SR 410 Channelization: Mtn. Villa Dr.-Watson St. N Completion Year Completion Year Issaquah E Lake Sammamish Pkwy shorter limits Kent S 228th St Grade Separation at Union Pacific Completion Year Kent S 272nd St Completion Year Kent West Valley Highway Completion Year Kent 212th Street Completion Year Kent Willis Street Grade Separations Completion Year Kent South 212th Street Completion Year King County/Metro South End Transit Pathways Completion Year King County/Metro Green River Trail - Phase 2 Completion Year King County/Metro East Lake Sammamish Trail - North Completion Year King County/Metro East Lake Sammamish Trail - Sammamish Segment Completion Year King County/Metro Lake to Sound Trail 2 (Segment A) Completion Year King County/Metro South End Transit Pathways Completion Year King County/Metro Lake to Sound Trail 4 (Segment B) Completion Year King County/Metro Chief Sealth Trail Extension Completion Year Kitsap County SR 305 Trail (Sound to Olympics) Completion Year Kitsap Transit Phase I Poulsbo SR 3/ SR 305 Hub (Olhava II) P&R Completion Year Kitsap Transit Bremerton POFF Terminal Expansion Completion Year Kitsap Transit BRT on SR 303 Silverdale POF to Bethel Completion Year Kitsap Transit Annapolis Ferry Terminal Completion Year Kitsap Transit East Bremerton Bus Transit Center Completion Year Kitsap Transit SR 16 P&R (Mullenix) Completion Year Kitsap Transit Phase II and Phase III SR305 Corridor P&Rs Completion Year Kitsap Transit Passenger Only Ferry: Bremerton-Downtown Completion Year Kitsap Transit Passenger Only Ferry: Southworth-Downtown Completion Year Monroe SR 522 Trail Completion Year Monroe US Hwy 2 Trail Extension Completion Year Monroe Centennial Trail Completion Year Pacific Stewart Rd (8th St E.) Completion Year Pacific Interurban Trail Completion Year Pacific Lake Tapps Pkwy/8th St Bike Path Canceled unprogrammed project - Pierce Transit 112th St E/S Completion Year Pierce Transit Bonney Lake P & R Canceled unprogrammed project - Pierce Transit Purdy Crescent Park and Ride Expansion Canceled unprogrammed project - Pierce Transit Dupont P&R Canceled unprogrammed project -
6 Redmond Redmond Central Connector Completion Year Priority Bus Corridor 2: Burien TC - downtown via Delridge Completion Year Priority Bus Corridor 15: Phinney Ridge - Greenwood - Broadview Completion Year Priority Bus Corridor 13/13A: Ballard - U District - Laurelhurst via Market and 45th Sts Completion Year Priority Bus Corridor 3: Othello - U District via Beacon Ave and Broadway Completion Year Center City Priority Bus Corridor: Pike / Pine Completion Year Priority Bus Corridor 14: Crown Hill - Greenlake - U District Completion Year Westlake Multimodal Transportation Hub Completion Year Burke-Gilman Trail Extension Completion Year Tacoma Schuster Parkway Trail Title Completion Year 2017 Schuster Parkway Promenade; 2020 Tacoma Historic Water Ditch Trail Phase III Completion Year Tacoma Historic Water Ditch Trail Phase IV Completion Year I-5/JBLM Dupont-Steilacoom - New Interchange Completion Year I-5/JBLM, Berkeley Drive I/C Completion Year I-5/JBLM, Thorne Lane Interchange Completion Year I-5: Thorne Lane to Gravelly Lake Dr. - Frontage Rd Completion Year SR 520, I-5 to Montlake Blvd Completion Year I-5 Steilacoom/ DuPont 41st Division Drive to Thorne Lane Title Completion Year 2015 I/C to Thorne Lane; 2024 I-405 Corridor: Interchange at 132nd St NE Completion Year Bel-Red Regional Connectivity - SR 124th I/C Completion Year SR 522 (Nickel) Completion Year SR 520: Eastside Transit and HOV Completion Year I-405 Corridor: SR 520 to I-5 Widening (NE 124th to SR 522) Completion Year I-405 Corridor: SR 520 to I-5 Widening (NE 132nd structures) Completion Year th St. N Interchange Completion Year SR 520 Trail Completion Year I-405 Corridor: SR 167 Direct HOV Ramps Completion Year SR SR 304 I/C - Ramp Modification Completion Year SR 9 Completion Year SR 9 Completion Year SR Wollochet Interchange Completion Year I-5 HOV to HOT lane Conversion: Pierce/ King County Line to S. 260th Completion Year I-5 HOV to HOT lane Conversion: S. 260th to I-405 Completion Year I-5 HOV to HOT lane Conversion: I-405 to US 2 Completion Year SR 520 HOV to HOT Completion Year SR 520 Trail over 520 Bridge Completion Year I-405 Corridor: SR 520 to I-5 Widening Completion Year I-405 Corridor: SR 520 to I-5 Widening (NB NE 70th to NE 85th) Completion Year I-90 HOV to HOT Completion Year WSF Mukilteo Terminal Relocation/Expansion Completion Year
7 ATTACHMENT B: 2015 Transportation 2040 Minor Amendment Air Quality Conformity Analysis The following tables illustrate the results of the transportation conformity analysis conducted for the 2015 Transportation 2040 minor amendment. The analysis is conducted based on the transportation conformity requirements for each pollutant. The results show that the 2015 Transportation 2040 minor amendment meets all transportation conformity requirements. The conformity analysis must demonstrate that the total regional emissions produced by projects in Transportation 2040 as revised with this minor amendment, plus activity on the existing travel network, do not exceed the motor vehicle emissions budget (MVEB) defined in the State Implementation Plan for Air Quality (SIP) for each pollutant. In February 2015, the Tacoma-Pierce County nonattainment area for fine particulates (PM 2.5 ) was redesignated to maintenance status; as part of the redesignation, a new MVEB was approved for PM 2.5 and nitrogen oxides (NOx) within the maintenance area. All emissions were calculated with the U.S. Environmental Protection Agency s (EPA) Motor Vehicle Emissions Simulator model version MOVES2010b. This version does not account for Tier 3 emission standards that phase in beginning in 2017, heavy-duty engine and vehicle greenhouse gas regulations that phase in during model years , or the second phase of light-duty vehicle greenhouse gas regulations that phase in for model years cars and light trucks. Therefore, the emissions presented below may be overestimated for those years Transportation 2040 Minor Amendment: Carbon Monoxide (CO) Emissions - tons/day (Updated 6/17/2015) Year Emissions Motor Vehicle Emissions Budget* 2, , , * estimated emissions must be less than MVEB 2015 Transportation 2040 Minor Amendment: PM 2.5 and NOx Emissions - pounds/day (Updated 6/17/2015) Year PM 2.5 NOx 2017 Motor Vehicle Emissions Budget* 1,888 41, ,674 36, ,518 31, Motor Vehicle Emissions Budget** 1,321 22, ,247 20, ,204 18, ,095 14,296 * estimated emissions for years 2017 through 2025 must be less than the 2017 MVEB ** estimated emissions for years 2026 and beyond must be less than the 2026 MVEB
8 Attachment C: 2015 Transportation 2040 Minor Amendment Prioritization Project Justification Form Project Information Project : Enumclaw Project Contact: Rand Black, Transportation Engineer : SR 410 Channelization: Mtn. Villa Dr. to Watson St. N. Transportation 2040 Project ID #: 361 Project Justification Questions 1. Does the project have funding for Preliminary Engineering or later phases? Yes; the project has both PSRC federal and local funds for a total amount of $214,157 to fully fund the Preliminary Engineering phase. 2. Will the project advance to Preliminary Engineering, right of way acquisition or construction before 2018? Yes, Preliminary Engineering is almost complete, no right of way acquisition is required, and construction is scheduled to move forward by Fall Please provide a brief description of how the project implements VISION 2040 and the prioritization measures below, and explain why the VISION 2040 benefits of this project were not adequately captured through the existing prioritization questions. Air Quality Freight Jobs Multimodal Puget Sound Land & Water Safety & System Security Social Equity & Access to Opportunity Support for Centers Travel This project is located within the City of Enumclaw along an existing urbanized section of the State Route 410 corridor, which is a T2 freight route with 5 commercial urban intersections located within a half-mile stretch of corridor. Currently there are missing sidewalk segments on the north side and nonstandard ramps and pedestrian crossings. The channelization is currently a variable 2-4 lane configuration that restricts local access to the Central Business District, increases delay and reduces safety. The project will widen and rechannelize the roadway within the CBD to provide a consistent 5- lane section to manage access and improve safety. The project will also add curb, gutter and sidewalk to provide a contiguous pedestrian corridor on the north side and will upgrade ramps on the south side where the existing Foothills Trail is located to improve accessibility and safety. The project will complete the pedestrian connectivity between the two main retail shopping areas along the busiest road adjacent to the CBD. The project is located within the City of Enumclaw s downtown commercial business district, which is the critical local center for both business and employment. The project enhances multimodal access to the area, improve safety and reduce congestion. Air quality will be improved by providing pedestrian facilities and by reducing delay for diesel vehicles through improved channelization.
Transportation 2040 Update - Financial Strategy Balancing
Move PROJECTS TO BE MOVED FROM CONSTRAINED TO UNPROGRAMMED AUBURN 4513 White River Trail Bicycle/ Pedestrian P 27 2030 $6,000,000 Auburn 4514 Williams Trail Bicycle/ Pedestrian P 25 2020 $2,000,000 AUBURN
More informationThe Regional Transportation Plan Appendix G. Regional Capacity Projects List. Puget Sound Regional Council. May 2018
The Regional Transportation Plan 2018 Appendix G Regional Capacity Projects List May 2018 Puget Sound Regional Council May 2018 Funding for this document provided in part by member jurisdictions, grants
More informationDraft Transportation 2040 Update Regional Capacity Projects
Draft Transportation 2040 Update Regional Capacity Projects Note: Project costs are expressed in 2018 dollars and are sorted by sponsor. Sponsor: AUBURN Project ID: 4287 Title: Auburn Way S (SR-164) -
More informationSOUND TRANSIT AT A GLANCE
SOUND TRANSIT AT A GLANCE STATION ACCESS IMROVEMENTS ROJECT Sound Transit operates Sounder commuter trains, ST Express buses and Link light rail. The 2008 voter-approved Sound Transit 2 package included
More information2010 Regional Bicycle and Pedestrian Count Report
2010 Regional Bicycle and Pedestrian Count Report Table of Contents: I. Overview II. III. IV. Bicycle Counts a. Methodology b. Count Location Selection c. Results d. Top 10 Helmet Utilization Bicycles
More informationCURRENT AND VOTER APPROVED SOUND TRANSIT SERVICE
CURRENT AND VOTER AROVED SOUND TRANSIT SERVICE Everett MA KEY Link Light Rail Mukilteo Link (SeaTac/Airport University of Washington) Tacoma Link (Tacoma Dome Theater District) Under Construction In Design
More informationCMAQ $ 23,775,198 STP
PSRC's 2017-2020 FHWA Funding: FINAL BALANCING MAY 2017 Note: the State TIP is being amended to include the information referenced here, with approval expected in mid-june. Table 1 - FFY 2017 Projects
More informationCENTRAL AND EAST CORRIDORS
HIGH-CAPACITY TRANSIT STUDY CENTRAL AND EAST CORRIDORS SEPTEMBER 2014 CORRIDOR REPORT: I-405 BUS RAPID TRANSIT HIGH-CAPACITY TRANSIT CORRIDOR STUDY I-405 Bus Rapid Transit Corridor Sound Transit Central/East
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationC C C
C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationCITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle
SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationMulti Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY
Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationSeattle Bicycle Master Plan
Seattle Bicycle Master Plan 2016-2020 Implementation Plan Transportation Committee Barbara Gray and Darby Watson May 17, 2016 2015 Summer Parkways - Ballard Our mission, vision, and core values Mission:
More informationInterim Transit Ridership Forecast Results Technical Memorandum
Interim Transit Ridership 401 South Jackson Street Seattle, WA 98104-2826 September 2012 Table of Contents 1 INTRODUCTION... 1-1 1.1 Project Background... 1-1 2 RIDERSHIP FORECASTS... 2-1 2.1 System Ridership
More informationPedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist
2015-17 and Bicycle Safety Program Leg Lummi Nation 42 Kennewick 8 Lummi Nation 42 Jamestown S'Klallam 24 WSDOT-- NW 32 Port of Vancouver 49 Spokane 3 Seattle 46 Shoreline 32 Lummi Shore Drive Columbia
More informationSouth King County High-Capacity Transit Corridor Study
HIGH-CAPACITY TRANSIT CORRIDOR STUDY South King County Corridor South King County High-Capacity Transit Corridor Study Corridor Report August 2014 South King County High Capacity Transit Corridor Report
More informationRegional Transportation Needs Within Southeastern Wisconsin
Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationBETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY
DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR
More informationSixth Line Development - Transit Facilities Plan
Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationAppendix I Transportation 2040 Alternatives Analysis Congestion Management Process Report
Appendix I Transportation 2040 Alternatives Analysis Congestion Management Process Report Appendix I: Transportation 2040 Alternative Analysis Congestion Management Process (CMP) Report Transportation
More informationTransportation 2040 Update: Travel Trends. Transportation Policy Board June 9, 2016
Transportation 2040 Update: Travel Trends Transportation Policy Board June 9, 2016 2 Today s Discussion How has travel behavior changed? How are we growing and how has that affected our travel patterns?
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationTown of Superior. Superior Trails Plan
Part 1 Base Information 1. Project Title US 36 Bikeway Extension 2. Project Start/End points or Geographic Area Provide a map with submittal, as appropriate 3. Project Sponsor (entity that will construct/
More informationCity of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents
City of Redmond 2015-2012 Transportation Improvement Program Adopted: September 16, 2014 Table of Contents 1. What is the Six-Year Transportation Improvement Program (TIP)?... 1 2. What is included in
More informationACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION
ACTIVE TRANSPORTATION/NONMOTORIZED TRANSPORTATION BACKGROUND Active transportation, also known as nonmotorized transportation, is increasingly recognized as an important consideration when planning and
More informationPERFORMANCE ANALYSIS of The Draft 2015 CLRP
Item 9 PERFORMANCE ANALYSIS of The Draft CLRP Presentation to the Transportation Planning Board September 16, CLRP Performance Analysis 1 What is the Long-Range Transportation Plan (CLRP)? The CLRP identifies
More informationProposed Project I 35 from Denton to Cooke County Line
Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationWEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS
Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd
More informationPerformance Criteria for 2035 Long Range Transportation Plan
Minimizing Impacts on Natural, Historic, Cultural or Archeological Resources 2035 LRTP Weighting Factor: 7% Objective 1.1: Use appropriate planning and design criteria to protect and enhance the built
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationTransportation Policy Manual
March 4, 2013 EXHIBIT 2 Metropolitan Transportation Planning Organization for the Gainesville Urbanized Area A Comprehensive Guide to Adopted Metropolitan Transportation Planning Organization for the
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationUNIVERSITY OF WASHINGTON TO SOUND TRANSIT U-LINK PEDESTRIAN CONNECTION PROJECT EIS ADDENDUM
UNIVERSITY OF WASHINGTON TO SOUND TRANSIT U-LINK PEDESTRIAN CONNECTION PROJECT EIS ADDENDUM UNIVERSITY OF WASHINGTON SOUND TRANSIT January 2011 EIS Addendum for the University of Washington to Sound Transit
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationLinking Transportation and Health in Nashville & Middle Tennessee
Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationSouth King County High Capacity Transit Corridor Report. Regional Transit Connections and Active Transportation
Regional Transit Connections and Active Transportation South King County High Capacity Transit Corridor Report Alternative B2 connects to the dense bus network in West Seattle as a result of reaching the
More informationCity of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016
1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose
More informationKEARNY MESA COMMUNITY PLAN UPDATE
KEARNY MESA COMMUNITY PLAN UPDATE January 18, 2018 SUBCOMMITTEE MEETING Mobility Concepts and Urban Design Presentation Outline Mobility Concepts: Multimodal Planning Toolbox Presentation and Activities
More informationM-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016
M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has
More informationChapter 6 Transportation Plan
Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised
More informationAPPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL
D: PROJECT PRIORITIZATION Prioritization of the improvements proposed in the Multimodal Improvement Plan is required in order to determine which projects should be funded first, where the transportation
More informationBellevue Chamber of Commerce, Transportation & Public Affairs Committee meeting. July 12, 2016
Bellevue Chamber of Commerce, Transportation & Public Affairs Committee meeting July 12, 2016 Regional Link Light Rail Expansion By 2023, Puget Sound will have 50+ miles of light rail, with 30+ stations,
More informationONE CENTER CITY SEATTLE'S NEAR-TERM ACTION PLAN EXECUTIVE SUMMARY. Office of Planning and Community Development
ON CNTR CITY SATTL'S NAR-TRM ACTION PLAN XCUTIV SUMMARY Office of Planning and Community Development March 018 One Center City Seattle's Near-Term Action Plan Summary What is One Center City? The One Center
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More informationSTUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More informationAppendix T 1: Additional Supporting Data
Appendix T 1: Additional Supporting Data Project Delivery Delays with the implementation of the 2000 TIP became apparent early in the decade. In response to direction among policy officials, ARC began
More informationCity of Bartow Comprehensive Plan. Transportation Element
City of Bartow 2030 Comprehensive Plan Amended through January 7, 2013 TRANSPORTATION ELEMENT GOAL: IT SHALL BE A GOAL OF THE CITY OF BARTOW TO PROVIDE A SAFE AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM
More informationSouthwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.
Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW
More informationPEDESTRIAN ACTION PLAN
ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage
More informationWELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More informationMCA Member Meeting: Tysons Update. Fairfax County Department of Transportation November 13, 2017
MCA Member Meeting: Tysons Update Fairfax County Department of Transportation November 13, 2017 Presentation Overview Balancing Land Use and Transportation How Are We Doing? Studies and Projects Neighborhood
More informationCity of Madison: 2017 Capital Budget Capital Improvement Plan
Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationTransportation & Bicycle Plan
Transportation & Bicycle Plan Sustainable Design Group GG LO DESIGN 1301 First Ave. Suite 301 Seattle, WA 98101 206.467.5828 www.gglo.com August 2013 Table of Contents Transportation & Bicycle Plan 02
More informationPurpose and Need. Chapter Introduction. 2.2 Project Purpose and Need Project Purpose Project Need
Chapter 2 Purpose and Need 2.1 Introduction The El Camino Real Bus Rapid Transit (BRT) Project (Project) would make transit and other transportation improvements along a 17.6-mile segment of the El Camino
More informationEnvironmental Assessment Findings & Recommendations. Public Hearing November 13, 2014
Environmental Assessment Findings & Recommendations Public Hearing November 13, 2014 Welcome! Welcome and Introductions Project and Environmental Assessment Overview Public Comments Adjourn Purpose of
More informationHarbord Street and Hoskin Avenue Bicycle Lane Upgrades
STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and
More information3.0 PROJECT DESCRIPTION
The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.
More informationFROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 SUBJECT: FINANCE COMMITTEE RECOMMENDATION TO ADOPT TRANSPORTATION STRATEGIC
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationWELCOME TO OPEN HOUSE # 1 June 14, 2017
Langstaff Road Weston Road to Highway 7 Class Environmental Assessment Study WELCOME TO OPEN HOUSE # 1 June 14, 2017 Please sign in and join our mailing list Purpose of Open House #1 & Study Area York
More informationHARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN
HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More information9/25/2018. Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner
Multi-Modal Level of Service (MMLOS) Bianca Popescu, Transportation Planner 1 What is MMLOS? Is this a nice place to walk? Is this a nice place to bike? Is transit convenient? Bottom line - Are there options
More informationExhibit 1 PLANNING COMMISSION AGENDA ITEM
Exhibit 1 PLANNING COMMISSION AGENDA ITEM Project Name: Grand Junction Circulation Plan Grand Junction Complete Streets Policy Applicant: City of Grand Junction Representative: David Thornton Address:
More informationBase Information. 1. Project Title Erie Parkway and WCR 7 Traffic Signal Project
Part 1 Base Information 1. Project Title Erie Parkway and WCR 7 Traffic Signal Project 2. Project Start/End points or Geographic Area Provide a map with submittal, as appropriate 3. Project Sponsor (entity
More informationVDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment. Staff Recommendations
VDOT I-66 Inside the Beltway Eastbound Widening Environmental Assessment Staff Recommendations Department of Environmental Services Transportation January 28, 2017 Timeline of Transform66 June 2012: I-66
More informationAPPENDIX D. May 22, 2002 Open House Summary and Materials
APPENDIX D May 22, 2002 Open House Summary and Materials TH 36 Partnership Study Open House May 22, 2002 Summary of Survey Responses 1. If no new crossing of the St. Croix River is built (e.g. the existing
More informationProposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017
WELCOME Proposed Bridge Street East Bicycle Lanes Public Open House Thursday, April 27, 2017 Purpose of the Open House The purpose of this Open House is to gain public input on the bicycle lanes proposed
More informationChapter 3 BUS IMPROVEMENT CONCEPTS
Chapter 3 BUS IMPROVEMENT CONCEPTS The purpose of this chapter is to describe potential bus improvement strategies and potential impacts or implications associated with BRT implementation within the existing
More informationACTIVE TRANSPORTATION
ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE
CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 9, 2017 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationDRAFT SYSTEM PLAN MAP KEY BRT STATION EXISTING FACILITY. Burien TC
I-5 DRAFT SYSTEM PLAN I-405 BUS RAPID TRANSIT Lynnwood TC SR 527 Canyon Park I-405 BRT ELEMENTS»» Lynnwood Transit Center (existing) BRT station»» Bothell Canyon Park BRT station»» Bothell UW Bothell/NE
More informationCorridor Advisory Group and Task Force Meeting #10. July 27, 2011
Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9
More informationAMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities
I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationSan Bernardino County Non-Motorized Transportation Plan - Chapter 5
City of Upland Population 76,106 City Overview The City of Upland was incorporated on May 15, 1906, after previously being named North Ontario. The City was originally established as an irrigation colony
More information2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31
2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Part 1: General Information Funding
More informationSeattle Transit Master Plan
Seattle Transit Master Plan Seattle City Council Transportation Committee Briefing July 26, 2011 Seattle Department of Transportation In Association with: URS Corporation SVR DKS Associates The Underhill
More information